case study temporary foundations | london olympics · case study temporary foundations | london...

1
Weir Lane, Worcester WR2 4AY Tel: 01905 427100 Fax: 01905 427030 Email: [email protected] www.nal.ltd.uk Case Study Temporary Foundations | London Olympics Project: London Olympics 2012 Signage Product: Temporary Foundations Client: ORN (Olympic Route Network) To assist in the placement of signage to help direct athletes and officials to events, ORN utilised the NAL Temporary Foundation for securing signposts around London during the 2012 Olympic Games. The system consists of an NAL Retention Socket set into a concrete foundation providing the up-most security. Built to ORN’s specifications both 115 & 76mm sockets were used to retain the signposts. Furthermore the NAL Retention Socket Reducer was used to install 89mm posts into the 115mm sockets. The blocks provided the ideal solution for housing temporary signage during the games as well as securing pedestrian barriers. Temporary Foundations | London Olympics

Upload: others

Post on 17-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Case Study Temporary Foundations | London Olympics · Case Study Temporary Foundations | London Olympics Project: London Olympics 2012 Signage Product: Temporary Foundations Client:

Weir Lane, Worcester WR2 4AY Tel: 01905 427100 Fax: 01905 427030 Email: [email protected]

www.nal.ltd.uk

Case Study

Temporary Foundations | London Olympics

Project: London Olympics 2012 SignageProduct: Temporary FoundationsClient: ORN (Olympic Route Network)

To assist in the placement of signage to help direct athletes and officials to events, ORN utilised the NAL Temporary Foundation for securing signposts around London during the 2012 Olympic Games.

The system consists of an NAL Retention Socket set into a concrete foundation providing the up-most security. Built to ORN’s specifications both 115 & 76mm sockets were used to retain the signposts. Furthermore the NAL Retention Socket Reducer was used to install 89mm posts into the 115mm sockets.

The blocks provided the ideal solution for housing temporary signage during the games as well as securing pedestrian barriers.

Temporary Foundations | London Olympics