CASE STUDY
Development of a One Pass Bolting System PT Nusa Halmahera Minerals – Kencana Mine, Indonesia
Page 1 | Document reference: 200375
Site Profile Kencana Mine is an underground mine situated on the
Island of Halmahera which is part of Maluku Province,
Indonesia. The Kencana Mine is owned and operated
by PT Nusa Halmahera Minerals (PTNHM). PTNHM is
a joint venture company between Newcrest Singapore
Holdings Pte Ltd (a wholly owned subsidiary of
Newcrest Mining Limited) 82.5% and PT Aneka
Tambang Tbk 17.5%. Production at the Kencana Mine
commenced in 2009 and its primary products are Gold
and Silver.
Conditions in the Kencana Mine vary significantly
throughout the underground workings. Roadways in
some areas are subject to excessive wall “squeeze”.
The roadways in these areas need enlargement to the
original profile in order to maintain vehicular access to
the mine workings. Installation of ground support can
also be difficult in these areas, particularly maintaining
an open hole between drilling and insertion of the
ground support. This causes delays in the installation
of ground support due to hole collapse which in turn
affects production. Where cement grout is used, there
is a standard wait time between grouting and
continuation of Operations of 8hrs to allow for curing.
Figure 1: Shank adaptor on a jumbo
The Situation Orica were approached by the Geotechnical
Department at the Mine to help with developing a
support system utilising Self Drilling Anchors (SDA’s)
and Carbothix™ Resin to achieve the following:
Installation of SDA’s from 3m to 9m in length
Reduce installation time
Reduce wait time for grout curing to zero
All operations to be carried out by the drilling jumbo
with minimal manual handling
Eliminate use of ancillary equipment (IT, EWP and
Solo longhole drill)
Technical Solutions Following initial trials at Kencana Mine in October
2013, Orica undertook to perform several actions in
order to improve the system.
Action 1: Modify the T38 to R32 shank adaptor to,
Prevent unwinding from the R32 SDA
Pass through jumbo stabiliser
Ensure maximum penetration of SDA into the rock
Action 2: Design an injection adaptor that:
Can be fitted to the SDA by fitting it to the T38 to
R32 shank adaptor
Does not require “screwing” onto the SDA
Can withstand pressure of pump up to 120 bar
pressure without leakage
The main aims of these trials were to:
Allow all operations to be carried out from the
ground using Jumbo only
Prove design of shank adaptor by allowing quick
detachment from SDA
Prove design of Injection adaptor by fast fitting
removal to/from the SDA
Prove design of injection adaptor by pumping
Carbothix™ resin to 120 bar without leakage
Speed up process of installation, grouting and
tensioning of SDA’s
Make ongoing modifications to improve system
CASE STUDY
Development of a One Pass Bolting System PT Nusa Halmahera Minerals – Kencana Mine, Indonesia
© 2014 Orica Group. All rights reserved. All information contained in this document is provided for informational purposes only and is subject to change without notice. Since the Orica Group cannot anticipate or control the conditions under which this information and its products may be used, each user should review the information in the specific context of the intended application. To the maximum extent permitted by law, the Orica Group specifically disclaims all warranties express or implied in law, including accuracy, non infringement, and implied warranties of merchantability or fitness for a particular purpose. The Orica Group specifically disclaims, and will not be responsible for, any liability or damages resulting from the use or reliance upon the information in this document.
The word Orica and the Ring device are trademarks of the Orica Group
Page 2 | Document reference: 200375
The Result
SDA’s ranging from 6m to 9m were installed at various
locations in the mine with the following results:
All the key aims of the trials were met
T38 to R32 adaptor worked well, even without
retaining pins, disconnection was reliable and quick
Type 1 injection adaptor worked well, was quickly
fitted and removed from shank adaptor easily and
could be easily guided onto the SDA by the Jumbo
operator unaided
Carbothix™ 1:2 worked well even in extremely hot
environmental conditions
Ground support installation times decreased
significantly throughout trials due to:
One pass system
Rapid set time of Carbothix™
All steps in the process were carried out by the
jumbo and jumbo operator.
Average time to fully install and plate a 6m SDA
was 25mins including setup time.
Testimonial Orica ground support have impressed me every step
of the way since I initially made contact with them.
Their technical team listened to our needs, considered
the options, and then set out in full partnership with us
to develop a practical solution. This bolting and resin
system has allowed us to improve production, safety
and geotechnical stability - it is a big success story for
Kencana and the PT. NHM team. Given our
remoteness on an island in Eastern Indonesia, it was
crucial to get the full support and commitment that
Orica provided us with.
Tony Sprague – Principal Geotechnical
Superintendent, PT. NHM
Acknowledgements Orica wish to thank PT Nusa Halmahera Minerals for
their support and permission to publish this case study.