casindo twg 1 3rd meeting - 28 may 2010 sanur, bali · 2010-07-02 · agenda 10.00-10.15 : opening...

7
CASINDO TWG 1 3rd meeting - 28 May 2010 Sanur, Bali

Upload: others

Post on 03-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CASINDO TWG 1 3rd meeting - 28 May 2010 Sanur, Bali · 2010-07-02 · Agenda 10.00-10.15 : Opening and introduction (ECN). 10.15-11.30 : Presentation by regional teams of progress

CASINDO TWG 13rd meeting - 28 May 2010

Sanur, Bali

Page 2: CASINDO TWG 1 3rd meeting - 28 May 2010 Sanur, Bali · 2010-07-02 · Agenda 10.00-10.15 : Opening and introduction (ECN). 10.15-11.30 : Presentation by regional teams of progress

Agenda

10.00-10.15 : Opening and introduction (ECN). 10.15-11.30 : Presentation by regional teams of progress achieved since last

meeting in February 2010 (teams)

11.30-13.30 : Lunch (all)

13.30-14.00 : Pertamina data on oil & gas (ITB, DICEMR)

14.00-14.30 : LEAP training in the regions conducted by MEMR-ETCERE and regional team : planning, participation, contents/topics (ETCERE)

14.30- 15.30 : Presentation and discussion of the outline for deliverable no. D21 (ECN,all)

15.30-16.00 : Development of work plan for the coming six months (ECN, all)

16.00-16.15 : Any other business (all)

16.15 : Conclusion and closure (ECN)

Page 3: CASINDO TWG 1 3rd meeting - 28 May 2010 Sanur, Bali · 2010-07-02 · Agenda 10.00-10.15 : Opening and introduction (ECN). 10.15-11.30 : Presentation by regional teams of progress

TWG I: Energy policy analysis Aims:

• To develop regional energy balances for 2006, 2007 and 2008=> Presentations on progress/status/ problems on 29 May 2010

• To identify and address the needs for assistance at Kabupaten/Kota levelKabupaten/Kota level

=> Discussion with ETCERE on contents in-region training

• To prepare updated regional energy outlook by October 2011

• To evaluate and monitor investment plan

• To interact regularly with energy forum and other stakeholders in the region

Page 4: CASINDO TWG 1 3rd meeting - 28 May 2010 Sanur, Bali · 2010-07-02 · Agenda 10.00-10.15 : Opening and introduction (ECN). 10.15-11.30 : Presentation by regional teams of progress

Outline D21 : D22 : D23 : Regional energy balance 2006-2007-20081.General information of province Xxx

1.1 Geographic and political 1-2 pages1.2 Socio-economic

1.2.1 Population (plus trend 2005- 200y) 2-3 pages1.2.2 Economy (overall + per (sub)sector, plus trend 2005-200y)

5-7 pages1.3 Energy resources (domestic) 1-2 pages1.3 Energy resources (domestic) 1-2 pages

2 .Energy Balance2.1 Final energy consumption2.1.1 Final energy consumption by sector (plus trend 2005- 200y)

5-7 pages2.1.2 Final energy consumption per energy (plus trend 2005- 200y)

3 pages2.2 Energy transformation2.2.1 Electricity production (PLN- non PLN; plus trend 2005- 200y)

2-3 pages2.2.2 Others (refinery, … when applicable) 1-2 pages

Page 5: CASINDO TWG 1 3rd meeting - 28 May 2010 Sanur, Bali · 2010-07-02 · Agenda 10.00-10.15 : Opening and introduction (ECN). 10.15-11.30 : Presentation by regional teams of progress

Outline D21 : D22 : D23 : Regional energy balance 2006-2007-20082.3 Energy supply (domestic plus imports/exports) (plus trend 2005-200y)

2.3.1 solid fuels 1-2 pages2.3.2 liquid fuels 3-4 pages2.3.3 gas 1-2 pages2.3.4 biomass and other renewables 3-4 pages

2.4 Energy and commodity balance2.4 Energy and commodity balance2.4.1 commodity balance 1-2 pages2.4.2 energy balance 1-2 pages

3. Data sources and assumptions3 1 data sources 1-2 pages3.2 assumptions 1-2 pages3.3 main methodology changes with energy profile 2005

1-2 pagesAnnexCommodity balanceEnergy BalanceTables and graphs from Excel file

Page 6: CASINDO TWG 1 3rd meeting - 28 May 2010 Sanur, Bali · 2010-07-02 · Agenda 10.00-10.15 : Opening and introduction (ECN). 10.15-11.30 : Presentation by regional teams of progress

Planning

• Next TWG meeting : October in Makassar• D21 original deadline = May 2010

=>D21 revised deadline = July 2010 • Proposed support :

• Papua : Oetomo• Others : Koen, Oetomo• Others : Koen, Oetomo

• By October : • updated LEAP database with 2006• D22 (2007)

Page 7: CASINDO TWG 1 3rd meeting - 28 May 2010 Sanur, Bali · 2010-07-02 · Agenda 10.00-10.15 : Opening and introduction (ECN). 10.15-11.30 : Presentation by regional teams of progress

Other business

- Last meeting, some discussion was held about what base year to use for the next outlook: 2005 or 2008 ? It was then agreed not to conclude this discussion now but to discuss it more in detail during the this meeting when Koen will also be present - Other issue discussed was the costs and environmental aspects related to the scenarios. These aspects were not included in CAREPI outlook but will be included in CASINDO. Question is whether to calculate the costs outside LEAP or include it in the cost module of LEAP. Also for this issue it was decided to discuss it more in detail next meeting which means we need at least two days. discuss it more in detail next meeting which means we need at least two days.

=> Additional session Saturday on LEAP : multiple base years, costs, scenarios, emissions

- Link TWG 1 with other TWG (EE,RE) => need to adjust demand structure HH from persons to households ?How : by using HH size

Advantage : possible introduction appliances in stead of intensitiesDisadvantage : some initial number conversion work to do