OF UNDERGROUND PENETRATING RADAROR X-RAY. (PACHOMETER READING IS NOT ACCEPTABLE) TENDONS & REINFORCEMENT, UNLESS THE LOCATION IS CLEARED BY NONDISTRUCTIVE TESTING HILTI -TZ (ESR#1917) (FOR CONCRET) EXPANSION-TYPE ANCHORS EPOXY/ADHESIVE ANCHORS NO DRILLED-IN ANCHOR IS ALLOWED IN POST TENSIONED SLABS TO AVOID DAMAGING/CUTTING HILTI RE 500-V3 ADHESIVE SYSTEM, ESR#3814 ANCHOR BOLTS SHALL BE ONE OF THE FOLLOWING ACCEPTABLE PRODUCTS, OR AN EQUIVALENT. 13. CUTTING, BORING, SAW CUTTING OR DRILLING INTO (E) OR (NEW) STRUCTURAL ELEMENTS SHALL BE SPECIFICALLY DETAILED OR OTHERWISE APPROVED BY EOR. BOLTED WOOD CONNECTIONS: DRAGSTRUTS & HOLDOWNS (PERIODIC) INSTALLATION OF EXPANSION & EPOXY ANCHORS (CONTINUOUS)& HOLDOWNS (PERIODIC) INSPECTION IS REQUIRED FOR THE FOLLOWING TYPES OF WORK. SEE PROJECT ALL CONCRETE WORK INCLUDING, BUT NOT LIMITED TO, REINFORCEMENT PLACEMENT (PERIODIC) AND PLACEMENT OPERATIONS AND TAKING OF TEST SPECIMENS. (CONTINUOUS) BY A REGISTERED DEPUTY BUILDING INSPECTOR APPROVED BY THE BUILDING OFFICIALS & 1. SPECIAL INSPECTION (PERIODIC OR CONTINUOUS), SHALL BE IN ACCORDANCE WITH CBC 2013, ALL FOUNDATION WORK (PERIODIC) SPECIFICATIONS FOR OTHER SPECIFIC REQUIREMENTS. MASONRY (CONTINUOUS) WELDING, CONCRETE STRENGTH > 2500 PSI SPECIAL INSPECTION BY A REGISTERED DEPUTY INSPECTOR IS REQUIRED FOR FIELD 4. EPOXY ANCHORS/DOWELS 3. MASONRY - CONTINUOUS 2. REINFORCING STEEL FOR CONCRETE 1. CONCRETE WITH Fc > 2500 PSI REGISTERED INSPECTION ARE REQUIRED FOR THE FOLLOWING ITEMS: G. PREFABRICATED WOOD ELEMENTS; BE INSTALLED. ALL PREFABRICATED WOOD ELEMENTS INCLUDING PARALAM, TJI, TIMBERSTRAND & OPEN TRUSSES ETC.. SHALL BE PERIODICALLY INSPECTED AT THE FABRICATION SITE AND A PROOF OF INSPECTION OR CERTIFICATE SHALL BE SUBMITTED TO THE JOB INSPECTOR FOR THEIR REVIEW AND APPROVAL. JOB SITE INSPECTOR SHALL APPROVE THESE CERTIFICATE BEFORE IT CAN 5. FIELD WELDING 6. WELDED STUDS 7. HIGH STRENGTH BOLTS 8. FIREPROOFING MATERIAL ON STEEL MEMBERS THE SEISMIC DESIGN CRITERIA: COVERED BY THE CONTRACT DOCUMENTS, THE OWNER SHALL BE NOTIFIED 11. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS THE BEST PRESENT KNOWLEDGE FROM PLANS WHERE ACTUAL CONDITIONS CONFLICT WITH THE DRAWINGS, THEY SHALL BE CONSTRUCTION SHALL NOT BE MADE WITHOUT WRITTEN APPROVAL OF PROPER CLARIFICATION MAY BE MADE. MODIFICATION OF DETAILS OF REPORTED TO THE OWNER REPRESENTATIVE OR ENGINEER SO THAT SUPPLIED BY THE OWNER, BUT WITHOUT GUARANTEE OF ACCURACY. SCALED DRAWINGS AND LARGE SCALE OVER SMALL. SHALL BE AS SHOWN FOR SIMILAR WORK & PER TYP DETAILS. DAMAGED AS A RESULT OF NEW WORK. CONTRACTOR OF HIS RESPONSIBILITIES FOR THE ABOVE. LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO STRUCTURE AND SAFETY OF WORKMEN DURING CONSTRUCTION. SUCH SPECIFICALLY DETAILED. WHERE NO DETAILS ARE GIVEN, CONSTRUCTION TYPICAL DETAILS SHALL APPLY IN GENERAL CONSTRUCTION UNLESS CONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR THE PROTECTION NO HOLES, NOTCHES, BLOCKOUTS, ETC. ARE ALLOWED IN STRUCTURAL INDUSTRIAL SAFETY, PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. THE NECESSARY PERMIT FROM THE STATE OF CALIFORNIA, DIVISION OF FOR TRENCHES OR EXCAVATIONS (5) FIVE FEET OR MORE IN DEPTH INTO INSPECTION OF THE ABOVE ITEMS AND DOES NOT IN ANY WAY RELIEVE THE THE SITE BY THE CITY OR STRUCTURAL ENGINEER SHALL NOT INCLUDE MEASURES SHALL INCLUDE BUT NOT BE LIMITED TO, BRACING, SHORING FOR CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE THE CONTRACT DOCUMENTS AND SPECIFICATIONS REPRESENT THE FINISHED DO NOT SCALE DRAWINGS. PRINTED DIMENSIONS HAVE PRECEDENCE OVER AND REPAIR OF ADJACENT EXISTING SURFACES AND AREAS WHICH MAY BE ELEMENTS UNLESS DETAILED ON THE STRUCTURAL DRAWINGS OR APPROVED WHICH A PERSON IS REQUIRED TO DESCEND, THE CONTRACTOR IS TO OBTAIN BY THE STRUCTURAL ENGINEER AND OWER. 10. 9. FOR CLARIFICATION. 8. 7. 6. PRIOR TO PROCEEDING WITH THE WORK. IF DISCREPANCIES ARE ENCOUNTERED, OR CONDITIONS DEVELOP NOT DRAWINGS, START OF CONSTRUCTION, AND/OR FABRICATION OF MATERIALS. CONTRACTOR AT THE JOB SITE PRIOR TO BID SUBMITTAL, START OF SHOP ALL DIMENSIONS AND THE SITE CONDITIONS SHALL BE VERIFIED BY THE REQUIRED, THE CONTRACTOR SHALL NOTIFY THE EOR AND THE ARCHITECT CONSIDERED TO BE CONSTRUCTION STANDARDS. IF CLARIFICATION IS CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK PERFORMED IN THE REVIEW AND COORDINATION OF ALL DRAWINGS AND SPECIFICATIONS ALL DRAWINGS AND SPECIFICATIONS ARE CONSIDERED TO BE A PART OF ALL WORK SHALL COMPLY WITH CALIFORNIA BUILDING CODE, 2013 EDITION. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE SHALL BE CORRECTED BY THE CONTRACTOR AT HIS OWN EXPENSE AND AT THE OWNER REPRESENTATIVE. PRIOR TO THE START OF CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE EOR, THE ARCHITECT AND PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES THAT OCCUR THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR 4. 3. 2. 1. SPECIFICATIONS, THE PROVIDED NOTES SHALL TAKE PRESEDENCE OVER SPECS. 12. IN CASE OF DISCREPENCIES BETWEEN NOTES ON THIS SHEET & PROJECT STRUCTURAL ENGINEER AND OWNER. NO EXPENSE TO THE OWNER. FOR ALL ON SITE WELDING, U.N.O. 8. CODES & STANDARDS USE ELECTRIC SHIELDED ARC PROCESS USING 1. 2. 3. CONTINUOUS INSPECTION BY AN APPROVED DEPUTY INSPECTOR IS REQUIRED ERECTION. 4. 5. 6. 7. ULTRASONICALLY TESTED AND APPROVED. CONFORM TO A.I.S.C. SPECIFICATION. CONNECTIONS. AS NOTED HEREIN. DEFECTS. ALL BUTT WELDS SHALL BE FULL PENETRATION. A.S.T.M. SPECIFICATION A307, UNLESS NOTED OTHERWISE. STRUCTURAL STEEL NOT ENCASED IN CONCRETE OR MASONRY SHALL BE SHALL BE PERFORMED BY QUALIFIED WELDERS APPROVED BY THE BUILDING OFFICIAL. FABRICATOR UNLESS OTHERWISE NOTED ON PLANS. ALL FIELD WELDING WELDS SHALL BE DONE IN THE SHOP OF AN I.C.B.O. APPROVED APPEARANCE, AND FREE OF PINHOLES, POROSITY, UNDERCUTTING, OR OTHER E-70XX ELECTRODES. ALL WELDS SHALL BE UNIFORM IN SIZE AND WELDING SHALL BE DONE IN CONFORMANCE WITH AWS-D1.1 & OTHER APPLICABLE TO A.S.T.M. SPECIFICATION A500 GRADE "B". BOLTS SHALL CONFORM TO A.S.T.M. SPECIFICATION A572 GRADE "B". TUBE SECTIONS SHALL CONFORM STRUCTURAL STEEL AND MISCELLANEOUS IRON SHALL CONFORM TO CONTINUOUS INSPECTION IS REQUIRED FOR ALL HIGH STRENGTH BOLTING ALL FULL PENETRATION WELDS IN FIELD AND SHOP SHALL BE FOR REVIEW PRIOR TO START OF FABRICATION. FABRICATION SHALL FABRICATOR SHALL SUBMIT SHOP DRAWINGS TO STRUCTURAL ENGINEER SHOP PAINTED AS SPECIFIED. ANY ABRASIONS SHALL BE TOUCHED UP AFTER OVER THE PROJECT AND THE STRUCTURAL ENGINEER AND CONFORM TO CBC 2013 TITLE 24, AND/OR THE DEPUTY INSPECTOR APPROVED BY BUILDING OFFICIAL HAVING JURIDICTIONS INSPECTIONS SHALL BE PERFORMED BY THE APPROVED TESTING AGENCY 1. UNLESS NOTED OTHERWISE, MATERIALS SHALL CONFORM AND TESTS AND SITE CLASS "D" FOR CONCRETE - ACI 318-11 FOR MASONRY - TMS 402-11/ACI 318-11/ASCE 5-11 FOR STEEL - AISC 360-10 FOR COLD F0RMED STEEL - AISI S100-07 FOR WOOD - AF&PA NDS-15 F.O.C. FACE OF CONCRETE ELEV. ELEVATOR OR H.S.B. HIGH STRENGTH BOLT N.I.C. NOT IN CONTRACT SCHEDULE U.N.O. UNLESS NOTED DRAWINGS MIN. MINIMUM VERT. VERTICAL STD. STANDARD SQ. SQUARE V.O.S. VERIFY ON SITE V.O.J. VERIFY ON JOB TYP. TYPICAL SPEC. SPECIFICATION DWL. DOWEL W/ WITH WT. WEIGHT W.J. WALL JOINT STL. STEEL THK. THICK STIFF. STIFFENER T.O.W. TOP OF WALL T.O.S. TOP OF STEEL T.O. TOP OF SYM. SYMMETRICAL SUPPT. SUPPORT S.O.G. SLAB ON GRADE HORIZ. HORIZONTAL P.H. PENTHOUSE SIMP. SIMPSON O.C. ON CENTER NO. NUMBER N.T.S. NOT TO SCALE SIM. SIMILAR SEPN. SEPARATION SECT. SECTION S. FOOTING STEP GR. BM. GRADE BEAM FRMG. FRAMING FLR. FLOOR MTL. METAL PL. PLATE REINF. REINFORCING PLCS. PLACES FDN. FOUNDATION GA. GAUGE JT. JOINT INTR. INTERIOR MFR. MANUFACTURER MECHL. MECHANICAL MAX. MAXIMUM M.B. MACHINE BOLT LT. WT. LIGHTWEIGHT FIN. FINISH EXP. EXPANSION EXIST. EXISTING ELECTL. ELECTRICAL EL ELEVATION E.W. EACH WAY E.F. EACH FACE EXTR. EXTERIOR F.O.W. FACE OF WALL F.O.S. FACE OF STUD # NUMBER OR POUNDS B.O.F. BOTTOM OF FOOTING CONC. CONCRETE COL. COLUMN BTWN. BETWEEN BOTT. BOTTOM ANCH. ANCHOR A.B. ANCHOR BOLT DWG. DRAWING DIM. DIMENSION -3" SLAB DEPRESSION EA. EACH CL CENTER LINE BM. BEAM BEAM BEAM DET. DETAIL CLR. CLEAR CONT. CONTINUOUS PSF POUNDS PGR SQ.FT. ELEVATION S.W.S. SHEAR WALL S.A.D. SEE ARCHITECTURAL LOCAL AUTHORITIES, SPECIAL SEISMIC DESIGN CATEGORY "D" FRT. FIRE RETARDANT OTHERWISE TREATED WOOD FOR EMBEDED BOLTS & DOWELS REFER TO DETAILS. (THESE REQUIREMENTS ARE TO BE NOTED ON THE PLANS, IF ANY PIN FAILS TESTING, TEST ALL PINS OF THE SAME CATEGORY NOT PREVIOUSLY INSPECTOR'S SUPERVISION SHALL BE MADE OF APPROXIMATELY 1 N 10 PINS. SHALL BE APPLIED TO THE PIN. THEREAFTER, RANDOM TESTS UNDER THE PROJECT INSTALLATION. A TEST "PULL-OUT" LOAD OF NOT LESS THAN TWICE THE DESIGN LOAD PROJECT INSPECTOR. HE SHALL OBSERVE THE TESTING OF THE FIRST 10 FASTENER TESTING - THE OPERATOR, TOOL, AND FASTENER SHALL BE PREQUALIFIED BY THE MEET ANSI A10.0 STANDARD AS REQUIRED BY THE MANUFACTURER AND ALL OSHA WHICHEVER IS LESS. QUALIFICATION FOR USE OF ALL POWER ACTUATED TOOLS MUST THE ALLOWABLE LOADS SHALL BE 100 POUNDS OR 80% OF ICBO APPROVED VALUES, ICBO APPROVAL FOR THE TYPE OF CONCRETE USED ON THE JOB. SHOT PINS MAY NOT LIKE ACOUSTICAL CEILINGS, DUCT WORK, CONDUIT, ETC. ANY SHOT ANCHORS MUST HAVE BE USED IN TENSION TO SUPPORT LOADS LESS THAN 100 POUNDS FOR MINOR LOADS SHOT PINS MAY BE USED FOR SHEAR LOADS AND THEY MAY TESTED UNTIL TWENTY (20) CONSECUTIVE PASS, THEN RESUME THE INTIAL OR IN THE SPECIFICATIONS.) BE USED IN CONCRETE CURBS OR CONCRETE EDGES. REQUIREMENTS. TESTING REQUENCY. 1. "NOTICE TO THE APPLICANT/OWNER'S AGENT/ARCHITECT OR ENGINEER OF RECORD: BY USING THIS PERMITTED CONSTRUCTION DRAWINGS FOR CONSTRUCTION/INSTALLATION OF THE WORK SPECIFIED HEREIN, YOU AGREE TO COMPLY WITH THE THE CITY REQUIREMENTS FOR SPECIAL INSPECTIONS, STRUCTURAL OBSERVATIONS, CONSTRUCTION MATERIAL TESTING AND OFF-SITE FABRICATION OF BUILDING COMPONENTS, CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS AND, AS REQUIRED BY THE CALIFORNIA CONSTRUCTION CODES." CONSTRUCTION DRAWINGS FOR CONSTRUCTION/INSTALLATION OF THE WORK SPECIFIED HEREIN, YOU ACKNWLEGE AND ARE AWARE 2. "NOTICE TO THE CONTRACTOR/BUILDER/SUB-CONTRACTOR/OWNER-BUILDER: BY USING THIS PERMITTED OF, THE REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS. YOU AGREE TO COMPLY WITH THE REQUIREMENTS OF LOCAL BUILDING OFFICIALS AND CITY SPECIAL INSPECTIONS, STRUCTURAL OBSERVATIONS, AND OFF-SITE FABRICATION OF BUILDING COMPONENTS, CONTAINED IN THE STATEMENT OF SPEIAL INSPECTIONS AND, AS REQUIRED BY THE CALIFORNIA CONSTRUCTION CODES." 3. "THE SPECIAL INSPECTOR MUST BE ACCEPTABLE BY LOCAL BUILDING OFFICIALS & IN CONFORMANCE WITH CITY REQUIREMENTS, IN THE CATEGORY OF WORK REQUIRED TO HAVE SPECIAL INSPECTION." 4. "THE CONSTRUCTION MATERIALS TESTING LABORATORY MUST BE APPROVED BY LOCAL BUILDING OFFICIALS & PER CITY REQUIREMENTS, FOR TESTING OF MATERIALS, SYSTEMS, COMPONENTS AND, EQUIPMENTS." 5. "FABRICATOR MUST BE REGISTERED AND APPROVED BY LOCAL BUILDING OFFICIALS & IN ACCORDANCE WITH CITY REQUIREMENTS. FOR THE FABRICATION OF MEMBERS AND ASSEMBLIES ON THE PREMISES OF THE FABRICATOR'S SHOP." 6. "FABRICATOR SHALL SUBMIT AN "APPLICATION TO PERFORM OFF-SITE FABRICATION" TO THE INSPECTION SERVICES DIVISION FOR APPROVAL PRIOR TO COMMENCEMENT OF FABRICATION." 7. "FABRICATOR SHALL SUBMIT A "CERTIFICATE OF COMPLIANCE FOR OFF-SITE FABRICATION' TO THE INSPECTION SERVICES DIVISION OF THE CITY PRIOR TO ERECTION OF FABRICATED ITEMS AND ASSEMBLIES." 8. LABELING: "WHERE MATERIALS OR ASSEMBLIES ARE REQUIRED BY THE BUILDING CODE TO BE LABLED, SUCH MATERIALS AND ASSEMBLIES SHALL BE LABLED BY AN AGENCY APPROVED BY THE BUILDING OFFICALS IN ACCORDANCE WITH SECTION 1703. PRODUCTS AND MATERIALS TO BE LABELED SHALL BE TESTED, INSPECTED AND LABLED IN ACCORDANCE WITH THE PROCEDURES SET FORTH IN SECTIONS 1703.5.1 THROUGH 1703.5.3. IDENTIFY ON PLANS, NAME AND ADDRESS OF THE TESTING/INSPECTION AGENCY. [SECTION 1703.5]. CONSTRUCTION MATERIAL TESTING EQUIVALENT PRODUCTS WITH VALID & CURRENT ICC REPORT FOR USE UNDER SEISMIC LADING IS ACCEPTABLE. SN1........ GENERAL NOTES FOUNDATION PLAN S01........ S02........ ROOF FRAMING PLAN SD1......... DETAILS MACHINE APPLIED NAILING 1. USE OF MACHINE NAILING IS SUBJECT TO A SATISFACTORY JOBSITE DEMONSTRATION FOR EACH PROJECT AND THE APPROVAL OF THE PROJECT ARCHITECT OR STRUCTURAL ENGINEER AND THE CITY OFFICIALS MACHINE NAILING IS NOT ALLOWED FOR 5/16-INCH(7.9MM)PLYWOOD. IF THE NAIL HEADS PENETRATE THE OUTER PLY BY MORE THAN WHAT WOULD BE NORMAL FOR A HAND-HELD HAMMER, OR IF MINIMUM ALLOWABLE EDGE DISTANCES ARE NOT MAINTAINED, THE PERFORMANCE WILL BE DEEMED UNSTATISFACTORY AND MACHINE NAILING SHALL BE DISCONTINUED. REFERNCE: 2013 CALIFORNIA BUILDING CODE, SECTION 9. ROOF TRUSSES SHALL BE DESIGNED & STAMPED BY MANUFACTURE'S ENGINEER. SHOP DRAWING SHALL BE PREPARED PER NOTES ON THIS SHEET. 22. ROOF TRUSSES............................................................................... PER PLAN &APPROVED MANUFACTURER 21. IF GUN NAILING IS USED, REDUCE THE SPECIFIED NAIL SPACING BY 20% 5. PER PLAN OR EQ. TJI ................................................................................................. NO.1 NO.1 NO.2 NO.2 NO.1 NO.1 PSL OR LSL NO.2 2. 1. PLATES STUDS @ NON-BEARING WALLS 3. 4. BEAMS RAFTERS AND ROOF JOISTS POSTS AND TIMBERS FLOOR JOIST SILL PLATES PRESSURE TREATED FOR MOISTURE RESISTANCE WHERE WOOD IS IN CONTACT WITH CONCRETE OR MASONRY USE FOUNDATION REDWOOD OR DOUGLAS FIR PRESSURE TREATED FOR MOISTURE RESISTANCE. CORROSION RESISTANCE BOLTS ARE REQUIRED FOR "CHEMICALLY THREATED SILLS",SEE NOTE #23. ALL SAWN LUMBER SHALL BE DOUGLAS FIR OR WESTERN LARCH, U.N.O., GRADE MARKED BY A RECOGNIZED GRADING AGENCY (WWPA OR WCLIB). WOOD GRADES ARE TO BE AS FOLLOWS U.N.O.: 6. 7. 8. 10. 11. 12. 13. 14. 9. 15. 17. 16. 18. 19. 20. ON THIS SHEET. U.N.O. ALL DAMAGED OR DETERIORATED LUMBER SHALL BE REPLACED WITH EQUAL SECTION AND EQUAL OR BETTER GRADE AS SPECIFIED ON THESE DRAWINGS. ALL NAILS SHALL BE COMMON WIRE NAILS U.N.O. ALL BOLTS FOR WOOD CONNECTIONS SHALL BE A307, GRADE A. WHERE WOOD IS BOLTED TO STEEL, USE A LOCK WASHER UNDER THE NUT ON THE STEEL SIDE. ALL BOLT HEADS AND NUTS THAT BEAR AGAINST THE FACE OF WOOD MEMBERS SHALL BE PROVIDED WITH METAL SQUARE WASHERS AS INDICATED ON PLANS. ALL STUD WALLS SHALL HAVE FIRE BLOCKING AT 5'-0" O.C. MAXIMUM, VERTICAL BLOCKING SHALL BE INSTALLED AT THE TOP OF ALL BEARING AND SHEAR WALLS. PROVIDE DOUBLE FLOOR JOISTS UNDER PARALLEL PARTITIONS. PROVIDE 2X3 CROSS-BRIDGING OR 2X SOLID BLOCKING AT A MINIMUM OF 8'-0" O.C. FOR FLOOR JOISTS (CONTACT METAL BRIDGING OR EQUAL MAY BE USED). HOLES AND NOTCHES IN STRUCTURAL MEMBERS FOR PIPES AND CONDUIT SHALL COMPLY WITH THE BUILDING CODE & PROVIDED TYP. DETAILS. ALL BOLT HOLES SHALL BE DRILLED A MIN. OF 1/32" TO A MAX. OF 1/16" LARGER IN DIAMETER THAN THE NOMINAL SIZE OF BOLT USED. EACH SHEET OF PLYWOOD SHALL HAVE 2' MIN. SHEET DIMENSION UNLESS ALL EDGES OF THE UNDERSIZED SHEETS ARE SUPPORTED BY FRAMING MEMBERS OR BLOCKING. THREADED PORTION OF LAG SCREWS SHALL BE TURNED NOT DRIVEN INTO THE PRE-DRILLED HOLE. ALL NAILS SHALL BE GALVANIZED WHERE EXPOSED TO WEATHER. EXCEPT WHERE TOE NAIL IS REQUIRED, NAILS SHALL BE DRIVEN PERPENDICULAR. PRE-DRILL FOR ALL NAILS 20d OR LARGER. USE SIMPSON OR OTHER EQUIVALENT ICC APPROVED HARDWARE FOR ALL CONNECTION PER PLAN NOTES AND SPECIFICATIONS. THE ICC-ES REPORTS SHALL BE CURRENT. TJI, PARALLAM, AND TIMBER STRANDS SHALL BE ICBO APPROVED PER SPECIFICATIONS. ALSO SEE SPECIAL INSPECTION & SHOP DRAWING NOTES PLYWOOD SHALL BE DOUGLAS FIR CONFORMING TO U.S. PRODUCT STANDARDS PS 1-83, WITH EXTERIOR GLUE AND SHALL BE GRADE MARKED BY APA. PLYWOOD AT EXPOSED EAVES SHALL BE EXPOSURE I GRADE PLYWOOD. PLYWOOD SHALL BE STRUCTURAL- I FOR FLOOR DIAPHRAGMS & SHEAR WALLS. OSB PANELS MAY BE USED IF HAVE EQUIVALENT PROPERTIES. HEADERS/BLOCKS/SLIPPERS NO.2 U.N.O. STUDS @ BEARING/SHEAR WALLS NO.2 U.N.O. (SEE NOTE #23.) SEE SCHEDULE OPEN WEB TRUSSES PER PLAN & APPROVED MANUFACTURER 24. EDGE OF SHEATHING PLYWOOD PANELS SHALL BE BLOCKED OR T&G AS SPECIFIED ON PLANS. UNLESS ALLOWED BY CODE. UNLESS THE HEADS DO NOT PENETRATE INTO THE SHT'G.. ratio of 20 o.c. (CBC 2304.7) 6- Fasteners in contact with preservative-treated wood, or fire-retardant-treated wood used in exterior applications or wet/damp locations, shall be of hot-dipped zinc-coated galvanized steel, stainless steel, silicon bronze, or copper. (CBC 2304.9.5.1) 23. WIND: GRAVITY LOADS: GENERAL NOTES SN1 Company: Address: Phone No. Fax No. Project Contact: Email: Principal: Project Manager: ADC Project No: Cadence Capital Investments 6400 S Fiddlers Green Cir., Suite 1820 Greenwood Village, CO 80111 720-493-5100 720-493-3801 Kevin Lee [email protected] Craig Chinn Chris Lindholm CASTANEDA'S VICTORVILLE 13605A BEAR VALLEY ROAD, SUITE 106 VICTORVILLE, CA 92392 Client COPYRIGHT C 160075 Sheet Issue Date Sheet Issue & Revision Log 09-30-2016 1st Plan Check Submittal 09-30-16

Upload: others

Post on 04-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

OF UNDERGROUND PENETRATING RADAROR X-RAY. (PACHOMETER READING IS NOT ACCEPTABLE)TENDONS & REINFORCEMENT, UNLESS THE LOCATION IS CLEARED BY NONDISTRUCTIVE TESTING

HILTI -TZ (ESR#1917) (FOR CONCRET)

EXPANSION-TYPE ANCHORS

EPOXY/ADHESIVE ANCHORS

NO DRILLED-IN ANCHOR IS ALLOWED IN POST TENSIONED SLABS TO AVOID DAMAGING/CUTTING

HILTI RE 500-V3 ADHESIVE SYSTEM, ESR#3814

ANCHOR BOLTS SHALL BE ONE OF THE FOLLOWING ACCEPTABLE PRODUCTS, OR AN EQUIVALENT.

13. CUTTING, BORING, SAW CUTTING OR DRILLING INTO (E) OR (NEW) STRUCTURALELEMENTS SHALL BE SPECIFICALLY DETAILED OR OTHERWISE APPROVED BY EOR.

BOLTED WOOD CONNECTIONS: DRAGSTRUTS & HOLDOWNS (PERIODIC)

INSTALLATION OF EXPANSION & EPOXY ANCHORS (CONTINUOUS)& HOLDOWNS (PERIODIC)

INSPECTION IS REQUIRED FOR THE FOLLOWING TYPES OF WORK. SEE PROJECT

ALL CONCRETE WORK INCLUDING, BUT NOT LIMITED TO, REINFORCEMENT PLACEMENT (PERIODIC)AND PLACEMENT OPERATIONS AND TAKING OF TEST SPECIMENS. (CONTINUOUS)

BY A REGISTERED DEPUTY BUILDING INSPECTOR APPROVED BY THE BUILDING OFFICIALS &1. SPECIAL INSPECTION (PERIODIC OR CONTINUOUS), SHALL BE IN ACCORDANCE WITH CBC 2013,

ALL FOUNDATION WORK (PERIODIC)

SPECIFICATIONS FOR OTHER SPECIFIC REQUIREMENTS.

MASONRY (CONTINUOUS)

WELDING, CONCRETE STRENGTH > 2500 PSISPECIAL INSPECTION BY A REGISTERED DEPUTY INSPECTOR IS REQUIRED FOR FIELD

4. EPOXY ANCHORS/DOWELS3. MASONRY - CONTINUOUS2. REINFORCING STEEL FOR CONCRETE1. CONCRETE WITH Fc > 2500 PSI

REGISTERED INSPECTION ARE REQUIRED FOR THE FOLLOWING ITEMS:

G. PREFABRICATED WOOD ELEMENTS;

BE INSTALLED.

ALL PREFABRICATED WOOD ELEMENTS INCLUDING PARALAM, TJI, TIMBERSTRAND & OPEN TRUSSES ETC..SHALL BE PERIODICALLY INSPECTED AT THE FABRICATION SITE AND A PROOF OF INSPECTIONOR CERTIFICATE SHALL BE SUBMITTED TO THE JOB INSPECTOR FOR THEIR REVIEW ANDAPPROVAL. JOB SITE INSPECTOR SHALL APPROVE THESE CERTIFICATE BEFORE IT CAN

5. FIELD WELDING6. WELDED STUDS7. HIGH STRENGTH BOLTS8. FIREPROOFING MATERIAL ON STEEL MEMBERS

THE SEISMIC DESIGN CRITERIA:

COVERED BY THE CONTRACT DOCUMENTS, THE OWNER SHALL BE NOTIFIED

11. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS IS GIVEN AS THE BEST PRESENT KNOWLEDGE FROM PLANS

WHERE ACTUAL CONDITIONS CONFLICT WITH THE DRAWINGS, THEY SHALL BE

CONSTRUCTION SHALL NOT BE MADE WITHOUT WRITTEN APPROVAL OF PROPER CLARIFICATION MAY BE MADE. MODIFICATION OF DETAILS OF REPORTED TO THE OWNER REPRESENTATIVE OR ENGINEER SO THAT

SUPPLIED BY THE OWNER, BUT WITHOUT GUARANTEE OF ACCURACY.

SCALED DRAWINGS AND LARGE SCALE OVER SMALL.

SHALL BE AS SHOWN FOR SIMILAR WORK & PER TYP DETAILS.

DAMAGED AS A RESULT OF NEW WORK.

CONTRACTOR OF HIS RESPONSIBILITIES FOR THE ABOVE.

LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. OBSERVATION VISITS TO

STRUCTURE AND SAFETY OF WORKMEN DURING CONSTRUCTION. SUCH

SPECIFICALLY DETAILED. WHERE NO DETAILS ARE GIVEN, CONSTRUCTION TYPICAL DETAILS SHALL APPLY IN GENERAL CONSTRUCTION UNLESS

CONTRACTOR SHALL PROVIDE AND BE RESPONSIBLE FOR THE PROTECTION

NO HOLES, NOTCHES, BLOCKOUTS, ETC. ARE ALLOWED IN STRUCTURAL

INDUSTRIAL SAFETY, PRIOR TO THE ISSUANCE OF A BUILDING PERMIT.THE NECESSARY PERMIT FROM THE STATE OF CALIFORNIA, DIVISION OF

FOR TRENCHES OR EXCAVATIONS (5) FIVE FEET OR MORE IN DEPTH INTO

INSPECTION OF THE ABOVE ITEMS AND DOES NOT IN ANY WAY RELIEVE THE THE SITE BY THE CITY OR STRUCTURAL ENGINEER SHALL NOT INCLUDE

MEASURES SHALL INCLUDE BUT NOT BE LIMITED TO, BRACING, SHORING FOR

CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE THE CONTRACT DOCUMENTS AND SPECIFICATIONS REPRESENT THE FINISHED

DO NOT SCALE DRAWINGS. PRINTED DIMENSIONS HAVE PRECEDENCE OVER

AND REPAIR OF ADJACENT EXISTING SURFACES AND AREAS WHICH MAY BE

ELEMENTS UNLESS DETAILED ON THE STRUCTURAL DRAWINGS OR APPROVED

WHICH A PERSON IS REQUIRED TO DESCEND, THE CONTRACTOR IS TO OBTAIN

BY THE STRUCTURAL ENGINEER AND OWER.

10.

9.

FOR CLARIFICATION.

8.

7.

6.

PRIOR TO PROCEEDING WITH THE WORK.

IF DISCREPANCIES ARE ENCOUNTERED, OR CONDITIONS DEVELOP NOT DRAWINGS, START OF CONSTRUCTION, AND/OR FABRICATION OF MATERIALS.CONTRACTOR AT THE JOB SITE PRIOR TO BID SUBMITTAL, START OF SHOP ALL DIMENSIONS AND THE SITE CONDITIONS SHALL BE VERIFIED BY THE

REQUIRED, THE CONTRACTOR SHALL NOTIFY THE EOR AND THE ARCHITECTCONSIDERED TO BE CONSTRUCTION STANDARDS. IF CLARIFICATION IS

CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK PERFORMED IN

THE REVIEW AND COORDINATION OF ALL DRAWINGS AND SPECIFICATIONS

ALL DRAWINGS AND SPECIFICATIONS ARE CONSIDERED TO BE A PART OF

ALL WORK SHALL COMPLY WITH CALIFORNIA BUILDING CODE, 2013 EDITION.

ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE

SHALL BE CORRECTED BY THE CONTRACTOR AT HIS OWN EXPENSE AND AT

THE OWNER REPRESENTATIVE. PRIOR TO THE START OF CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE EOR, THE ARCHITECT AND PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES THAT OCCUR

THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

4.

3.

2.

1.

SPECIFICATIONS, THE PROVIDED NOTES SHALL TAKE PRESEDENCE OVER SPECS.12. IN CASE OF DISCREPENCIES BETWEEN NOTES ON THIS SHEET & PROJECT

STRUCTURAL ENGINEER AND OWNER.

NO EXPENSE TO THE OWNER.

FOR ALL ON SITE WELDING, U.N.O.

8.

CODES & STANDARDS USE ELECTRIC SHIELDED ARC PROCESS USING

1.

2.

3.

CONTINUOUS INSPECTION BY AN APPROVED DEPUTY INSPECTOR IS REQUIRED

ERECTION.

4.

5.

6.

7.ULTRASONICALLY TESTED AND APPROVED.

CONFORM TO A.I.S.C. SPECIFICATION.

CONNECTIONS.

AS NOTED HEREIN.

DEFECTS. ALL BUTT WELDS SHALL BE FULL PENETRATION.

A.S.T.M. SPECIFICATION A307, UNLESS NOTED OTHERWISE.

STRUCTURAL STEEL NOT ENCASED IN CONCRETE OR MASONRY SHALL BE

SHALL BE PERFORMED BY QUALIFIED WELDERS APPROVED BY THE BUILDING OFFICIAL.FABRICATOR UNLESS OTHERWISE NOTED ON PLANS. ALL FIELD WELDING WELDS SHALL BE DONE IN THE SHOP OF AN I.C.B.O. APPROVED

APPEARANCE, AND FREE OF PINHOLES, POROSITY, UNDERCUTTING, OR OTHER E-70XX ELECTRODES. ALL WELDS SHALL BE UNIFORM IN SIZE AND

WELDING SHALL BE DONE IN CONFORMANCE WITH AWS-D1.1 & OTHER APPLICABLE

TO A.S.T.M. SPECIFICATION A500 GRADE "B". BOLTS SHALL CONFORM TO A.S.T.M. SPECIFICATION A572 GRADE "B". TUBE SECTIONS SHALL CONFORM STRUCTURAL STEEL AND MISCELLANEOUS IRON SHALL CONFORM TO

CONTINUOUS INSPECTION IS REQUIRED FOR ALL HIGH STRENGTH BOLTING

ALL FULL PENETRATION WELDS IN FIELD AND SHOP SHALL BE

FOR REVIEW PRIOR TO START OF FABRICATION. FABRICATION SHALL FABRICATOR SHALL SUBMIT SHOP DRAWINGS TO STRUCTURAL ENGINEER

SHOP PAINTED AS SPECIFIED. ANY ABRASIONS SHALL BE TOUCHED UP AFTER

OVER THE PROJECT AND THE STRUCTURAL ENGINEER AND CONFORM TO CBC 2013 TITLE 24, AND/OR THE DEPUTY INSPECTOR APPROVED BY BUILDING OFFICIAL HAVING JURIDICTIONS INSPECTIONS SHALL BE PERFORMED BY THE APPROVED TESTING AGENCY

1. UNLESS NOTED OTHERWISE, MATERIALS SHALL CONFORM AND TESTS AND

SITE CLASS "D"

FOR CONCRETE - ACI 318-11FOR MASONRY - TMS 402-11/ACI 318-11/ASCE 5-11FOR STEEL - AISC 360-10FOR COLD F0RMED STEEL - AISI S100-07FOR WOOD - AF&PA NDS-15

F.O.C. FACE OF CONCRETE

ELEV. ELEVATOR OR

H.S.B. HIGH STRENGTH BOLT

N.I.C. NOT IN CONTRACT

SCHEDULE

U.N.O. UNLESS NOTED

DRAWINGS

MIN. MINIMUM

VERT. VERTICAL

STD. STANDARDSQ. SQUAREV.O.S. VERIFY ON SITEV.O.J. VERIFY ON JOBTYP. TYPICALSPEC. SPECIFICATION

DWL. DOWELW/ WITHWT. WEIGHTW.J. WALL JOINT

STL. STEELTHK. THICKSTIFF. STIFFENERT.O.W. TOP OF WALLT.O.S. TOP OF STEELT.O. TOP OF

SYM. SYMMETRICALSUPPT. SUPPORT

S.O.G. SLAB ON GRADE

HORIZ. HORIZONTAL

P.H. PENTHOUSE

SIMP. SIMPSON

O.C. ON CENTERNO. NUMBER

N.T.S. NOT TO SCALE

SIM. SIMILAR

SEPN. SEPARATIONSECT. SECTION

S. FOOTING STEP

GR. BM. GRADE BEAM

FRMG. FRAMINGFLR. FLOORMTL. METALPL. PLATEREINF. REINFORCINGPLCS. PLACES

FDN. FOUNDATION

GA. GAUGEJT. JOINTINTR. INTERIORMFR. MANUFACTURERMECHL. MECHANICALMAX. MAXIMUMM.B. MACHINE BOLTLT. WT. LIGHTWEIGHT

FIN. FINISHEXP. EXPANSIONEXIST. EXISTINGELECTL. ELECTRICALEL ELEVATIONE.W. EACH WAYE.F. EACH FACEEXTR. EXTERIORF.O.W. FACE OF WALLF.O.S. FACE OF STUD

# NUMBER OR POUNDS

B.O.F. BOTTOM OF FOOTING

CONC. CONCRETECOL. COLUMNBTWN. BETWEENBOTT. BOTTOM

ANCH. ANCHORA.B. ANCHOR BOLTDWG. DRAWINGDIM. DIMENSION-3" SLAB DEPRESSIONEA. EACH

CL CENTER LINEBM. BEAMBEAM BEAMDET. DETAILCLR. CLEARCONT. CONTINUOUS

PSF POUNDS PGR SQ.FT.

ELEVATION

S.W.S. SHEAR WALL

S.A.D. SEE ARCHITECTURAL

LOCAL AUTHORITIES, SPECIAL

SEISMIC DESIGN CATEGORY "D"

FRT. FIRE RETARDANT

OTHERWISE

TREATED WOOD

FOR EMBEDED BOLTS & DOWELS REFER TO DETAILS.

(THESE REQUIREMENTS ARE TO BE NOTED ON THE PLANS,

IF ANY PIN FAILS TESTING, TEST ALL PINS OF THE SAME CATEGORY NOT PREVIOUSLYINSPECTOR'S SUPERVISION SHALL BE MADE OF APPROXIMATELY 1 N 10 PINS.

SHALL BE APPLIED TO THE PIN. THEREAFTER, RANDOM TESTS UNDER THE PROJECT INSTALLATION. A TEST "PULL-OUT" LOAD OF NOT LESS THAN TWICE THE DESIGN LOADPROJECT INSPECTOR. HE SHALL OBSERVE THE TESTING OF THE FIRST 10 FASTENERTESTING - THE OPERATOR, TOOL, AND FASTENER SHALL BE PREQUALIFIED BY THE

MEET ANSI A10.0 STANDARD AS REQUIRED BY THE MANUFACTURER AND ALL OSHAWHICHEVER IS LESS. QUALIFICATION FOR USE OF ALL POWER ACTUATED TOOLS MUSTTHE ALLOWABLE LOADS SHALL BE 100 POUNDS OR 80% OF ICBO APPROVED VALUES,

ICBO APPROVAL FOR THE TYPE OF CONCRETE USED ON THE JOB. SHOT PINS MAY NOTLIKE ACOUSTICAL CEILINGS, DUCT WORK, CONDUIT, ETC. ANY SHOT ANCHORS MUST HAVE BE USED IN TENSION TO SUPPORT LOADS LESS THAN 100 POUNDS FOR MINOR LOADS SHOT PINS MAY BE USED FOR SHEAR LOADS AND THEY MAY

TESTED UNTIL TWENTY (20) CONSECUTIVE PASS, THEN RESUME THE INTIAL

OR IN THE SPECIFICATIONS.)

BE USED IN CONCRETE CURBS OR CONCRETE EDGES.

REQUIREMENTS.

TESTING REQUENCY.

1. "NOTICE TO THE APPLICANT/OWNER'S AGENT/ARCHITECT OR ENGINEER OF RECORD: BY USING THIS PERMITTED CONSTRUCTION DRAWINGS FOR CONSTRUCTION/INSTALLATION OF THE WORK SPECIFIEDHEREIN, YOU AGREE TO COMPLY WITH THE THE CITY REQUIREMENTS FOR SPECIAL INSPECTIONS, STRUCTURALOBSERVATIONS, CONSTRUCTION MATERIAL TESTING AND OFF-SITE FABRICATION OF BUILDING COMPONENTS, CONTAINED IN THESTATEMENT OF SPECIAL INSPECTIONS AND, AS REQUIRED BY THE CALIFORNIA CONSTRUCTION CODES."

CONSTRUCTION DRAWINGS FOR CONSTRUCTION/INSTALLATION OF THE WORK SPECIFIED HEREIN, YOU ACKNWLEGE AND ARE AWARE2. "NOTICE TO THE CONTRACTOR/BUILDER/SUB-CONTRACTOR/OWNER-BUILDER: BY USING THIS PERMITTED

OF, THE REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS. YOU AGREE TO COMPLY WITH THEREQUIREMENTS OF LOCAL BUILDING OFFICIALS AND CITY SPECIAL INSPECTIONS, STRUCTURAL OBSERVATIONS,

AND OFF-SITE FABRICATION OF BUILDING COMPONENTS, CONTAINED IN THE STATEMENT OF SPEIAL INSPECTIONS AND, ASREQUIRED BY THE CALIFORNIA CONSTRUCTION CODES."

3. "THE SPECIAL INSPECTOR MUST BE ACCEPTABLE BY LOCAL BUILDING OFFICIALS & IN CONFORMANCE WITH CITY REQUIREMENTS, IN THE CATEGORY OF WORK REQUIRED TO HAVE SPECIAL INSPECTION."

4. "THE CONSTRUCTION MATERIALS TESTING LABORATORY MUST BE APPROVED BY LOCAL BUILDING OFFICIALS & PER CITY REQUIREMENTS, FOR TESTING OF MATERIALS, SYSTEMS, COMPONENTS AND, EQUIPMENTS."

5. "FABRICATOR MUST BE REGISTERED AND APPROVED BY LOCAL BUILDING OFFICIALS & IN ACCORDANCE WITH CITY REQUIREMENTS. FOR THE FABRICATION OF MEMBERS AND ASSEMBLIES ON THE PREMISES OF THE FABRICATOR'S SHOP."

6. "FABRICATOR SHALL SUBMIT AN "APPLICATION TO PERFORM OFF-SITE FABRICATION" TO THE INSPECTIONSERVICES DIVISION FOR APPROVAL PRIOR TO COMMENCEMENT OF FABRICATION."

7. "FABRICATOR SHALL SUBMIT A "CERTIFICATE OF COMPLIANCE FOR OFF-SITE FABRICATION' TO THE INSPECTION SERVICES DIVISION OF THE CITY PRIOR TO ERECTION OF FABRICATED ITEMS AND ASSEMBLIES."

8. LABELING: "WHERE MATERIALS OR ASSEMBLIES ARE REQUIRED BY THE BUILDING CODE TO BE LABLED, SUCHMATERIALS AND ASSEMBLIES SHALL BE LABLED BY AN AGENCY APPROVED BY THE BUILDING OFFICALS IN ACCORDANCE WITHSECTION 1703. PRODUCTS AND MATERIALS TO BE LABELED SHALL BE TESTED, INSPECTED AND LABLED IN ACCORDANCE WITHTHE PROCEDURES SET FORTH IN SECTIONS 1703.5.1 THROUGH 1703.5.3. IDENTIFY ON PLANS, NAME AND ADDRESS OF THETESTING/INSPECTION AGENCY. [SECTION 1703.5].

CONSTRUCTION MATERIAL TESTING

EQUIVALENT PRODUCTS WITH VALID & CURRENT ICC REPORT FORUSE UNDER SEISMIC LADING IS ACCEPTABLE.

SN1........GENERAL NOTESFOUNDATION PLANS01........

S02........ ROOF FRAMING PLAN

SD1.........DETAILS

MACHINE APPLIED NAILING

1. USE OF MACHINE NAILING IS SUBJECT TO A SATISFACTORY JOBSITE DEMONSTRATION FOR EACH PROJECT AND THE APPROVAL OF THE PROJECT ARCHITECT OR STRUCTURAL ENGINEER AND THE CITY OFFICIALS MACHINE NAILING IS NOT ALLOWED FOR 5/16-INCH(7.9MM)PLYWOOD. IF THE NAIL HEADS PENETRATE THE OUTER PLY BY MORE THAN WHAT WOULD BE NORMAL FOR A HAND-HELD HAMMER, OR IF MINIMUM ALLOWABLE EDGE DISTANCES ARE NOT MAINTAINED, THE PERFORMANCE WILL BE DEEMED UNSTATISFACTORY AND MACHINE NAILING SHALL BE DISCONTINUED.

REFERNCE: 2013 CALIFORNIA BUILDING CODE, SECTION 9.

ROOF TRUSSES SHALL BE DESIGNED & STAMPED BY MANUFACTURE'S ENGINEER.SHOP DRAWING SHALL BE PREPARED PER NOTES ON THIS SHEET.

22.

ROOF TRUSSES............................................................................... PER PLAN &APPROVED MANUFACTURER

21.

IF GUN NAILING IS USED, REDUCE THE SPECIFIED NAIL SPACING BY 20%

5.

PER PLAN OR EQ.TJI .................................................................................................

NO.1NO.1NO.2

NO.2NO.1

NO.1 PSL OR LSL

NO.2

2.1.

PLATESSTUDS @ NON-BEARING WALLS

3.

4.

BEAMS

RAFTERS AND ROOF JOISTS

POSTS AND TIMBERS

FLOOR JOISTSILL PLATES PRESSURE TREATED FOR MOISTURE RESISTANCE

WHERE WOOD IS IN CONTACT WITH CONCRETE OR MASONRY USE FOUNDATION REDWOODOR DOUGLAS FIR PRESSURE TREATED FOR MOISTURE RESISTANCE. CORROSION RESISTANCEBOLTS ARE REQUIRED FOR "CHEMICALLY THREATED SILLS",SEE NOTE #23.

ALL SAWN LUMBER SHALL BE DOUGLAS FIR OR WESTERN LARCH, U.N.O., GRADE MARKED BY A RECOGNIZED GRADING AGENCY (WWPA OR WCLIB). WOOD GRADES ARE TO BE AS FOLLOWS U.N.O.:

6.

7.

8.

10.

11.

12.

13.

14.

9.

15.

17.

16.

18.

19.

20.

ON THIS SHEET.

U.N.O. ALL DAMAGED OR DETERIORATED LUMBER SHALL BE REPLACED WITH EQUALSECTION AND EQUAL OR BETTER GRADE AS SPECIFIED ON THESE DRAWINGS.

ALL NAILS SHALL BE COMMON WIRE NAILS U.N.O.

ALL BOLTS FOR WOOD CONNECTIONS SHALL BE A307, GRADE A. WHERE WOOD ISBOLTED TO STEEL, USE A LOCK WASHER UNDER THE NUT ON THE STEEL SIDE.ALL BOLT HEADS AND NUTS THAT BEAR AGAINST THE FACE OF WOOD MEMBERSSHALL BE PROVIDED WITH METAL SQUARE WASHERS AS INDICATED ON PLANS.ALL STUD WALLS SHALL HAVE FIRE BLOCKING AT 5'-0" O.C. MAXIMUM, VERTICAL

BLOCKING SHALL BE INSTALLED AT THE TOP OF ALL BEARING AND SHEAR WALLS.PROVIDE DOUBLE FLOOR JOISTS UNDER PARALLEL PARTITIONS.

PROVIDE 2X3 CROSS-BRIDGING OR 2X SOLID BLOCKING AT A MINIMUM OF 8'-0" O.C.FOR FLOOR JOISTS (CONTACT METAL BRIDGING OR EQUAL MAY BE USED).HOLES AND NOTCHES IN STRUCTURAL MEMBERS FOR PIPES AND CONDUIT SHALLCOMPLY WITH THE BUILDING CODE & PROVIDED TYP. DETAILS.ALL BOLT HOLES SHALL BE DRILLED A MIN. OF 1/32" TO A MAX. OF 1/16" LARGER INDIAMETER THAN THE NOMINAL SIZE OF BOLT USED.EACH SHEET OF PLYWOOD SHALL HAVE 2' MIN. SHEET DIMENSION UNLESS ALL EDGESOF THE UNDERSIZED SHEETS ARE SUPPORTED BY FRAMING MEMBERS OR BLOCKING.THREADED PORTION OF LAG SCREWS SHALL BE TURNED NOT DRIVEN INTO THEPRE-DRILLED HOLE.

ALL NAILS SHALL BE GALVANIZED WHERE EXPOSED TO WEATHER.

EXCEPT WHERE TOE NAIL IS REQUIRED, NAILS SHALL BE DRIVEN PERPENDICULAR.PRE-DRILL FOR ALL NAILS 20d OR LARGER.

USE SIMPSON OR OTHER EQUIVALENT ICC APPROVED HARDWARE FOR ALLCONNECTION PER PLAN NOTES AND SPECIFICATIONS. THE ICC-ES REPORTS SHALL BECURRENT.

TJI, PARALLAM, AND TIMBER STRANDS SHALL BE ICBO APPROVED PER SPECIFICATIONS. ALSO SEE SPECIAL INSPECTION & SHOP DRAWING NOTES

PLYWOOD SHALL BE DOUGLAS FIR CONFORMING TO U.S. PRODUCT STANDARDS PS1-83, WITH EXTERIOR GLUE AND SHALL BE GRADE MARKED BY APA. PLYWOOD ATEXPOSED EAVES SHALL BE EXPOSURE I GRADE PLYWOOD. PLYWOOD SHALL BESTRUCTURAL- I FOR FLOOR DIAPHRAGMS & SHEAR WALLS. OSB PANELS MAY BE USEDIF HAVE EQUIVALENT PROPERTIES.

HEADERS/BLOCKS/SLIPPERS NO.2 U.N.O.

STUDS @ BEARING/SHEAR WALLS NO.2 U.N.O.

(SEE NOTE #23.)

SEE SCHEDULE

OPEN WEB TRUSSES PER PLAN & APPROVED MANUFACTURER

24. EDGE OF SHEATHING PLYWOOD PANELS SHALL BE BLOCKED OR T&G AS SPECIFIED ON PLANS.

UNLESS ALLOWED BY CODE.

UNLESS THE HEADS DO NOT PENETRATE INTO THE SHT'G..

ratio of 20 o.c. (CBC 2304.7)6- Fasteners in contact with preservative-treated wood, or fire-retardant-treated wood used in exterior applicationsor wet/damp locations, shall be of hot-dipped zinc-coated galvanized steel, stainless steel, silicon bronze, or copper.(CBC 2304.9.5.1)

23.

WIND:

GRAVITY LOADS:

GENERALNOTES

SN1

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:

Cadence Capital Investments

6400 S Fiddlers Green Cir., Suite 1820Greenwood Village, CO 80111

720-493-5100720-493-3801

Kevin [email protected]

Craig ChinnChris Lindholm

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

Shee

t Iss

ue &

Rev

isio

n Lo

g09

-30-

2016

1st P

lan

Che

ck S

ubm

ittal

0

9-30

-16

Page 2: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

7

D C B A A.0

6

5

4

3

2

1

S01

FOUNDATION PLAN

KEY PLAN

1

A

7

FOUNDATION PLAN

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:

Cadence Capital Investments

6400 S Fiddlers Green Cir., Suite 1820Greenwood Village, CO 80111

720-493-5100720-493-3801

Kevin [email protected]

Craig ChinnChris Lindholm

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

Shee

t Iss

ue &

Rev

isio

n Lo

g09

-30-

2016

1st P

lan

Che

ck S

ubm

ittal

0

9-30

-16

BCD

6

SHEAR WALL SCHEDULE (FROM AS-BUILT)

7

6

LEDGEND

Page 3: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

7

D C B A A.0

6

5

4

3

2

1

S02

ROOF FRAMING PLAN

KEY PLAN

1

A

7

ROOF FRAMING PLAN

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:

Cadence Capital Investments

6400 S Fiddlers Green Cir., Suite 1820Greenwood Village, CO 80111

720-493-5100720-493-3801

Kevin [email protected]

Craig ChinnChris Lindholm

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

Shee

t Iss

ue &

Rev

isio

n Lo

g09

-30-

2016

1st P

lan

Che

ck S

ubm

ittal

0

9-30

-16

BCD A.0

6

Page 4: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

11317

18

3111519

20 16 4

26

7

12 8

MECH. EQ. PLATFORM SUPPORT

NEW ROOF OPENING14 WALL ELEVATION @ NEW OPEN'G.

6

MENU BOARD FOOTINGMENU BOARD ATTACHMENT

BEAM END CONNECTIONHOLD-DOWN CONNECTION

DETAILS

SD1

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:

Cadence Capital Investments

6400 S Fiddlers Green Cir., Suite 1820Greenwood Village, CO 80111

720-493-5100720-493-3801

Kevin [email protected]

Craig ChinnChris Lindholm

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

Shee

t Iss

ue &

Rev

isio

n Lo

g09

-30-

2016

1st P

lan

Che

ck S

ubm

ittal

0

9-30

-16

Page 5: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

FOOD SERVICENOTES

K1.0

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:Kevin Lee

[email protected] Chinn

Chris Lindholm

irvine, ca 92604www.adcollaborative.com

14252 culver drive suite A-347

949.267.1660

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

11-0

8-20

16

1BU

ILD

ING

DEP

T. C

OR

REC

TIO

NS

SCALE: N.T.S. 1FOOD SERVICE NOTES

Page 6: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

FOOD SERVICEEQUIPMENT PLAN

K2.0

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:Kevin Lee

[email protected] Chinn

Chris Lindholm

irvine, ca 92604www.adcollaborative.com

14252 culver drive suite A-347

949.267.1660

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

11-0

8-20

16

1BU

ILD

ING

DEP

T. C

OR

REC

TIO

NS

SCALE: 1/4"=1'-0" 1FOOD SERVICE EQUIPMENT PLAN

1

1

Page 7: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

FOOD SERVICEEQUIPMENTSCHEDULE

K3.0

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:Kevin Lee

[email protected] Chinn

Chris Lindholm

irvine, ca 92604www.adcollaborative.com

14252 culver drive suite A-347

949.267.1660

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

11-0

8-20

16

1BU

ILD

ING

DEP

T. C

OR

REC

TIO

NS

SCALE: N.T.S. 1FOOD SERVICE EQUIPMENT SCHEDULE

Page 8: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

ROOM FINISH PLAN& SCHEDULE

K4.0

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:Kevin Lee

[email protected] Chinn

Chris Lindholm

irvine, ca 92604www.adcollaborative.com

14252 culver drive suite A-347

949.267.1660

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

11-0

8-20

16

1BU

ILD

ING

DEP

T. C

OR

REC

TIO

NS

SCALE: 1/4"=1'-0" 1ROOM FINISH PLAN & SCHEDULE

Page 9: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

FOOD SERVICEROUGH INELECTRICAL PLAN

K5.0

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:Kevin Lee

[email protected] Chinn

Chris Lindholm

irvine, ca 92604www.adcollaborative.com

14252 culver drive suite A-347

949.267.1660

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

11-0

8-20

16

1BU

ILD

ING

DEP

T. C

OR

REC

TIO

NS

SCALE: 1/4"=1'-0" 1FOOD SERVICE ROUGH IN ELECTRICAL PLAN

Page 10: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

FOOD SERVICEROUGH INPLUMBING PLAN

K6.0

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:Kevin Lee

[email protected] Chinn

Chris Lindholm

irvine, ca 92604www.adcollaborative.com

14252 culver drive suite A-347

949.267.1660

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

11-0

8-20

16

1BU

ILD

ING

DEP

T. C

OR

REC

TIO

NS

SCALE: 1/4"=1'-0" 1FOOD SERVICE ROUGH IN PLUMBING PLAN

Page 11: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

MECHANICALEXHAUSTVENTILATIONSYSTEM

K7.0

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:Kevin Lee

[email protected] Chinn

Chris Lindholm

irvine, ca 92604www.adcollaborative.com

14252 culver drive suite A-347

949.267.1660

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

11-0

8-20

16

1BU

ILD

ING

DEP

T. C

OR

REC

TIO

NS

SCALE: N.T.S. 1MECHANICAL EXHAUST VENTILATION SYSTEM

Page 12: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

WALK IN COOLERDETAIL

K8.0

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:Kevin Lee

[email protected] Chinn

Chris Lindholm

irvine, ca 92604www.adcollaborative.com

14252 culver drive suite A-347

949.267.1660

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

11-0

8-20

16

1BU

ILD

ING

DEP

T. C

OR

REC

TIO

NS

SCALE: N.T.S. 1WALK IN COOLER DETAIL

Page 13: CASTANEDA'S VICTORVILLE Equitment Plan.pdfof underground penetrating radaror x-ray. (pachometer reading is not acceptable) tendons & reinforcement, unless the location is cleared by

WALK IN COOLERSPECIFICATIONS

K8.1

Company:Address:

Phone No.Fax No.

Project Contact:Email:Principal:Project Manager:

ADC Project No:Kevin Lee

[email protected] Chinn

Chris Lindholm

irvine, ca 92604www.adcollaborative.com

14252 culver drive suite A-347

949.267.1660

CAS

TAN

EDA'

S VI

CTO

RVI

LLE

1360

5A B

EAR

VAL

LEY

RO

AD, S

UIT

E 10

6VI

CTO

RVI

LLE,

CA

9239

2

Client

COPYRIGHT C

160075

Shee

t Iss

ue D

ate

11-0

8-20

16

1BU

ILD

ING

DEP

T. C

OR

REC

TIO

NS

SCALE: N.T.S. 1WALK IN COOLER SPECIFICATIONS