CASTORONE

OFFSHORE

Page 2: CASTORONE -  · PDF fileCASTORONE PIPELAYING FULLY DP VESSEL CLASSIFICATION Class ABS +A1, Crane Service, HELIDK, Pipe Laying ... DECK EQUIPMENT Main crane: 600 t

CASTORONEPIPELAYING FULLY DP VESSEL

CLASSIFICATIONClass ABS+A1, Crane Service, HELIDK, Pipe Laying Service, Ice Class A0, Ice Class IA, (E), +AMS, +ACCU, +DPS-3, TCM.Additional notations: UWILD, RRDA, CRC

DIMENSIONSLength (o.a.): 330 m excludingramp/stingerMoulded breadth: 39 m Operational draft: min. 9.5 m,max. 10.6 mTransit draft: 10 m approx.Displacement: 100,000 t at max. operational draft

PERFORMANCEMax. speed: 14 knotsPipelaying capacity: triple joint 12 m or double joint 18 m; pipe size up to 48” (60” including coating)

CARGO/TANK CAPACITYDeck area: 4,300 sq.mFuel oil: 6,500 cu.mFresh water: 1,400 cu.mBallast water: 36,000 cu.m20,000 t pipe storage in cargo holds

DECK EQUIPMENTMain crane: 600 t @ 30 m, 350 t @ 46 mPipe handling cranes: 2 x gantry cranes 110 t @ 42 mPedestal crane: 30 t @ 30 mS-lay stern ramp: 120 m long hinged stinger composed of 3 articulated and adjustable sectionsTensioners: 3 x 250 tA/R winch: 750 t (6” diam. x 3,850 m length)Working stations:3 welding + 4 completionTriple joint fabrication shop below deckROVs: 2 Work Class ROVs ratedfor 3,000 m of water depth

Page 3: CASTORONE -  · PDF fileCASTORONE PIPELAYING FULLY DP VESSEL CLASSIFICATION Class ABS +A1, Crane Service, HELIDK, Pipe Laying ... DECK EQUIPMENT Main crane: 600 t

PROPULSION SYSTEM Main gensets: 8 x 8,400 kWat 600 rpm eachEmergency generator: 1 x 1,200 kWPower distribution: 2 separate switchboards 11 kVMain shafts: 2 x 8,000 kWAzimuthal thrusters: 6 x 92 tBow tunnel thrusters: 2 x 35 tStern tunnel thruster: 1 x 35 t

ACCOMMODATION702 personsMess room; offices; crew lifts; meeting rooms; gymnasium/recreation; television rooms

DYNAMIC POSITIONING SYSTEMDP system: fully redundant, class 3Reference system: 2 x HIPAP 501for 3,000 m of water depth; 3 x DGPS2 x Taut Wire

HELIDECK 12.8 t, 22.2 D-value - suitable for Super Puma and Eurocopter, Sikorsky S61N& Sikorsky 92

J-LAY TOWERFeatures for future installationof a fixed tower for pipelaying in J mode through the centre moon pool.

Page 4: CASTORONE -  · PDF fileCASTORONE PIPELAYING FULLY DP VESSEL CLASSIFICATION Class ABS +A1, Crane Service, HELIDK, Pipe Laying ... DECK EQUIPMENT Main crane: 600 t

03.201

4

People, Skills, Equipment.

Saipem S.p.A.Via Martiri di Cefalonia, 67 - 20097 San Donato Milanese, Milan - ItalyTel. +39.02.520.1 - Fax +39.02.520.44415

saipem.com - A subsidiary of Eni S.p.A.