    CatalogueBridges and bridge technologiesBridges and bridge technologies

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    2/58

    5

    15

    7

    3

    13

    11

    12

    10

    6

    17

    8

    19

    18

    4

    16

    2

    14

    9

    1

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    3/58

    1 Movable scaffolding systems underslung page 6, 7

    2 Movable scaffolding systems overhead page 8, 9

    3 Mobile concreting carriages for balanced cantilevering page 10, 11

    4 Falsework for piers page 15, 16, 185 Scaffolding towers MTP100 page 15, 17, 18

    6 Scaffolding DOKA page 15, 17, 18

    7 Cornice form traveller page 15, 18

    8 Skanska posttensioning system page 20, 21

    9 Heavy lifting page 22, 23

    10 Pile load test page 25

    11 Steel retaining system for motorways page 28, 29, 30, 31

    12 Bridge expansion joints page 28, 29, 35

    13 Noise protection barriers on bridges and walls page 28, 29, 36, 37

    14 Traffic sign gantries page 28, 29, 38, 39

    Captions

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    4/58

    3

    Contents

    Contacts 4

    Movable scaffolding systems (MSS) 5

    MSS underslung 6

    MSS overhead 8

    Mobile concreting carriages for balanced cantilevering 10

    Form traveller for slab on steel composite bridges 12

    Rental facilities 14

    Rental of scaffolding, formwork, gantry and tower cranes 15

    Prestressing 19

    Skanska posttensioning system 20

    Heavy lifting 22

    Electronically controlled lifting up to 4000 tonnes 24

    Pile loading test 25

    Production of dry mixture for polymer

    mortar and concrete 26

    Steel construction workshop 27

    Steel constructions 28

    Steel retaining system for motorways 30

    Anchor component for crash barriers 31

    Skanska steel bridge handrail 32

    Universal bridge handrails 34

    Bridge expansion joints 35

    Noise protection barriers on bridges and walls 36

    Traffic sign gantries 38

    Fabrication of suspension strands 40

    Reference 41

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    5/58

    Bridges and Bridge Technologies4

    Contacts

    Branch Company DirectorIng. Frantiek [email protected]+420 737 257 229

    Production and Technical Manager

    Ing. Vladimr [email protected]+420 737 257 199

    Branch Controlling Manager

    Ing. Andrea [email protected]+420 731 535 455

    Bidding Team Leader

    Ing. Miroslav [email protected]+420 737 257 211

    Senior Technologist

    Ing. Jan [email protected]+420 737 257 193

    Chief Project EngineerIng. Peter [email protected]+420 737 257 249

    Unit Manager PrahaIng. Ji Machlek

    [email protected]+420 737 257 227

    Unit Manager OlomoucIng. Martin [email protected]+420 737 257 263

    Unit Manager R4 KoiceJi Novk

    [email protected]+420 737 257 244

    Unit Manager for Special TechnologyIng. Zdenk [email protected]+420 737 255 714

    PostTensioningIng. Jan Peka

    [email protected]+420 737 257 247

    Steel ConstructionsJosef Miek

    [email protected]+420 737 257 231

    Movable Scaffolding Systems Ing.Ji Krampla

    [email protected]+420 737 256 955

    Rental FacilitiesFrantiek [email protected]+420 737 257 225

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    6/58

    5

    Movable Scaffolding

    Systems (MSS)

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    7/58

    Bridges and Bridge Technologies6

    MSS Underslung (2 sets in service)

    MSS beam is situated under concreted bridge structure.

    Maximum bridge deck width 16.5 m

    Maximum bridge span 45.0 m

    Minimum bridge clearance above the terrain 6.0 m

    MSS is used for span by span construction of continuous beams. Economically effective use is

    for viaducts with length of up to 250 m.

    For MSS the great speed of the construction process is characteristic since it usually takes11 days for completing each span. Both MSS girders are supported directly on bridge piersor on pier foundations. It makes MSS independent of geological and terrain conditionsand allows for surmounting a variety of natural and man-made obstacles underthe bridge.

    Underslung MSS is especially suitable for single beam bridge structures with either a linearor cranked bottom line. MSS superstructure consists of two steel box girders, placedunder the bridge superstructure and supported by triangle brackets, fixed to both sidesof the bridge pier column. On the brackets are launching wagons with hydraulic equipment

    for vertical and horizontal MSS axis adjustment. Formwork for bridge beam and for sidecantilevers is fixed to MSS beams and real adjustment of bridge beam geometry is realisedby mechanical screw jacks. No other formwork operations are necessary before, duringand after launching MSS into the next span which speeds up the work procedures.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    8/58

    7

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    9/58

    Bridges and Bridge Technologies8

    MSS beam is situated above concreted bridge structure.

    Maximum bridge deck width 14.5 m

    Maximum bridge span 45.0 m

    Minimum bridge clearance above terrain 5.5 m

    Minimum bridge local clearance * 1.5 m

    * street clearance, other local obstacles

    MSS Overhead is suited especially for double beam bridge structures with either a linearor cranked bottom line. MSS superstructure consists of one steel box girder, placed abovethe bridge deck and supported by a steel frame, standing on the pier head and penetratingthe bridge slab. Transversally to MSS girder there are steel brackets, on which the bridgeformwork is suspended by thread rods. Formwork geometry is horizontally adjusted bythe transverse position of the rods and vertically by their length. At the front end of MSSis suspended the prestressing platform, from which the strands are pulled into cable ductsand cables are tensioned by jacks after concrete has hardened.

    More than 10 km of bridge structures have been built since the first set of MSS was putin operation in 2001. The most challenging was the construction of the cable stay bridgespanning the Odra River, with the main span of 105 m. This project documented a greatadaptability of MSS for building structures the parameters of which do not fit basic MSS data.

    MSS Overhead (2 sets in service)

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    10/58

    9

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    11/58

    Bridges and Bridge Technologies10

    Equipment for balanced cantilever method Mobile concreting carriages (MCC)

    Skanska owns 1 pair of MCC used for building the first bridge across the Orava river, and 3 pairsof BB used for building by which the cable stay bridge in Povazska Bystrica. MCC is specialisedequipment for building bridges by means of in situ cast segments starting symmetricallyfrom the pier to the centre of the span where the adjacent ends of next-door cantileversare connected by concreting of the closing segment. MCC are adaptable for any box girderbridge with respect to data below:

    Type of MCC max bridge width segment length segment weight

    MCC Orava 14.00 m 4.80 m 180 tMCC Povazska Bystrica 30.40 m 4.90 m 360 t

    Cantilevering is a suitable method for building bridges crossing deep valleys or rivers by long

    spans, where other known technologies have their limits. Skanska has become an experienced

    contractor building these bridges in the Czech and Slovak Republics and in Poland.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    12/58

    11

    Povsk Bystrica Orava

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    13/58

    Bridges and Bridge Technologies12

    Form Traveller (FT) for concreting bridge deck oncomposite bridges

    Type of Traveller Concreted section Transverse distance Side cantilever

    FT length (m) length (m) of bridge beams (m) length (m)Pier FT 32.4 19.1 31.0 6.0 9.0 2.5 3.5Span FT 20.4 16.0 16.5 6.0 9.0 2.5 3.5

    FT is equipment used specially for concreting the bridge deck on composite bridges of steeland concrete type. Usually, pier sections of the deck are concreted first and, after the concrete

    has hardened, the central sections are completed. Therefore two types of FT are in use pierFT and span FT. They are designed for bridges with spans of up to 45m but can be modifiedfor shorter or longer spans if needed.Two longitudinal beams are of steel truss construction while I profiles are used as transversebeams on which formwork panels (FW) are suspended by thread bars. After the concrete slabhas hardened, formwork panels are loosened and the FT is longitudinally launched in furtherposition by use of hydraulic cylinders. Supporting blocks with sliding bearings are weldedto the upper flange of bridge girders and protrude above the deck surface. External FW (underside cantilevers) is launched together with FT while internal FW (panels between bridge steelgirders) is launched independently on rails welded to the bridge girder webs.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    14/58

    13

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    15/58

    Rental facilitiesBridges and bridge technologies14

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    16/58

    15

    Rental of formwork, scaffolding,portal and tower cranes

    Equipment to rent:

    - traditional scaffolding towers MTP100, rolled profiles I 1000, 500, 450, 340, U 220;

    - components ofDOKA and HNNEBECK systems;

    - gantry cranes with the lift capacity of 63t, 32t, and gantry girders

    - tower cranes Liebherr 32TT;

    - wheel universal manipulators Manitou MRT 2150 with accessories;

    - miscellaneous mechanical equipment.

    The Rental Centre provides complete service and maintenance of the foregoingequipment and consultancy for internal as well as external clients regarding the choiceof suitable formwork and scaffolding.

    Address: Vinohradsk 88, 618 00, Brno-ernovice, CZ.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    17/58

    Bridges and bridge technologies16

    Rental equipment in stock

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    18/58

    17

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    19/58

    Bridges and Bridge Technologies18

    Quantity of supports and formworks

    Component Quantity Use

    Support tower MTP 100 35 000 m3 Classic bridge scaffolding

    Support frame DOKA d2, Staxo 20 000 m3 Classic scaffolding bridge, ceiling

    Tabular formwork DOKA and HNNEBECK 5 300 m2 Wall, pier, abutment, ceiling

    Tabular formwork DOKA H20 25 000 m2 Wall, pier, abutment, ceiling

    Steel system beam 2xU100 3 300 m Bearing formwork member

    Timber beam H20 (I profile) 6 900 m Bearing formwork memberRolled steel beam I 1000 340 m Supporting formwork grid

    Rolled steel beam I 500 8 000 m Supporting formwork grid

    Rolled steel beam I 450 2600 m Supporting formwork grid

    Rolled steel beam HEA 450 1 000 m Supporting formwork grid

    Rolled steel beam I 340 3 00 m Supporting formwork grid

    Single pipe support TP 250 ton 54 m Heavy load supports

    Single pipe support TP 400 ton 108 m Heavy load supports

    Gantry girder MJD S and MJD SS 1 580 m Supporting grid, temporary bridging

    Cornice form traveller DOKA 135 m Bridge cornice

    Cantilever FW supports DOKA 328 m Formwork under bridge side cantilever

    Handy FW panels DOKA MF240 320 m2

    Formwork of walls, piers

    Rental equipment in stock

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    20/58

    19

    Prestressing

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    21/58

    Bridges and Bridge Technologies20

    Skanska Post-Tensioning System

    Hydraulic jacks PaulMaximum

    acting force Stroke mm Strand pcs Quantity

    PAUL 9750 kN 9750 kN 300 36, 37 2PAUL 4800 kN 4800 kN 300 18, 19 9PAUL 3000 kN 3000 kN 250 12, 13 9PAUL 1700 kN 1700 kN 250 7 5PAUL 850 kN 850 kN 250 4 5PAUL 650 kN 650 kN 200 3 6PAUL 250 kN 250 kN 250 1 3

    The Skanska Post-Tensioning system is CE certified and comprises all partsand components necessary for installation of cable ducts, tendons, and anchoringand coupling of tendons made of 1 to 37 strands measuring15.5 (15.7) mm in diameter,and the strength of up to 1800 MPa. In a cylindrical anchoring plate, each strandis anchored by an individual conical wedge. For internal cables, steel corrugatedducts are used and tendons are grouted by cement mortar for corrosion protectionand cohesion. For external cables, polyethylene ducts are used along with cement groutas corrosion protection.

    The system complies with the Czech standard SN P 74 2871. Its technical specifications

    are in compliance with Article 4.4.- Anchoring, of Czech Government Regulation

    No. 178/1997 Coll. , and with Decision No. 29/2006 of the Czech Office for Standards,

    Metrology and Testing, dated of 30 August 2006. Furthermore, the system complies

    with the requirements of Council Directive No. 89/106 EES and ETAG 013 Guideline,

    and with Czech Government Regulation No. 163/2002 Coll. and Act No. 205/2002 Coll.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    22/58

    21

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    23/58

    Bridges and Bridge Technologies22

    Equipment for heavy lifting

    Hydraulic cylinder(70 MPa pressure)

    Capacity(ton)

    Stroke(mm)

    External(diameter mm)

    Length(mm)

    Quantity(pieces)

    Hollow(diameter mm)

    Europress 100 t 100 100 220 240 2 80Europress 60 t 60 75 190 200 4 65Ulbrich 90 t 90 100 205 230 4 80Ulbrich 60 t 60 125 170 245 5 54Power Team 50 t 50 75 160 200 4 40Ulbrich 30 t 30 150 125 285 2 32

    Problems with dismantling (assembly) of bulky loads under bridge structures aresolved by the heavy lifting system, which can be used in inaccessible terrains underbridges. This equipment consists of a hydraulic cylinder and mechanical self-lockingequipment that facilitate anchoring the hydraulic cylinder. The equipment stroke dependson the length of the suspension cable and is not restricted by the available space.The maximum load is 400 t.

    This technology is mostly used for movable scaffolding or whole formwork handling.Heavy lifting is top-notch hydraulic equipment that can reduce idle time and cutbuilding costs.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    24/58

    23

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    25/58

    Bridges and Bridge Technologies24

    Equipment for lifting and handling

    Hydraulic cylinder(pressure)

    Capacity(tonnes)

    Stroke(mm)

    External(diameter mm)

    Length(mm)

    Quantity(pieces)

    Ulbrich 250 t (70MPa) 250 100 255 300 32Europress 250t (70Mpa) 250 190 270 440 7Enerpack 250t (70MPa) 250 250 280 480 8Enerpack 250 (70MPa) 250 50 280 180 4

    We own technology for repair and reconstruction, which can lift structures to replace bearingsand also lift bridge spans and a variety of other loads. Hydraulic cylinders are synchronizedaccording to requirements for accuracy and even stroke and they are computer controlled. Thissystem guarantees cylinder stroke accuracy of 5mm per 50m. The equipment is comprised ofa high-pressure pump (70MPa), hydraulic distribution of control units and a hydraulic cylinder.The equipment can work in temperatures of up to -10 C.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    26/58

    25

    Pile load test

    Technical data:

    hydraulic cylinder 4x 250t

    hydraulic pressure 71 MPa

    ground anchor 8 pieces

    A static test of a pile is to demonstrate that its loading capacity corresponds withdesigned load forces.

    The load force is generated by means of a steel cap with 8 arms to which 8 ground anchors

    are clamped. By prestressing ground anchors the axial force is introduced onto the pile head.The value of the force is controlled by electronic equipment which simultaneously measuresthe piles decline. The test results are evaluated in accordance with the Czech standards.

    Construction of ground anchors is subject to individual design in accordance with geologicalconditions and applied force.

    Test equipment is adaptable for testing the pile on horizontally acting force, i.e. the bendingeffect.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    27/58

    Bridges and Bridge Technologies26

    Production of dry mixture for polymer mortarand concrete

    Polymer mortar

    Characteristics according to affirmative tests:

    Polymer mortar

    compression strength 65 MPa

    tensile strength 20 MPa

    electrical resistance 70 k

    modulus of elasticity 10 GPa

    Mortar is used as a levelling layer for installation of bearings, anchoring plates and in high-stress parts or where electric resistance is required.

    The mixture consists of CHS Epoxy 5/2, sand 0/4, Si fly ash, thinner.

    Lacunose polymer concrete

    Characteristics according to affirmative tests:

    Lacunose polymer concrete

    compression strength 11 MPa

    tensile strength 3 MPa

    modulus of elasticity 5 GPa

    void index 30%

    Lacunose concrete is used for drainage of rain water from the layer between the roadsurface and its insulation. A bitumen layer can be executed in 24 hours after the concretelayer was put on. This interval needs to be extended in temperatures under 20C.

    The mixture consists of CHS Epoxy 512, hardening agent P11 or P23,Si fly ash and aggregate.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    28/58

    27

    Steel construction

    workshop

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    29/58

    Bridges and Bridge Technologies28

    Steel construction

    List of products certified for use in public structures

    Steel Crash Barrier for motorways

    Anchor component for crash barriers

    Skanska Steel bridge handrail

    Traffic sign gantries incl. lighting

    Bridge expansion joints

    Fabrication of suspension strands

    List of other products

    Noise barriers on bridges and retaining walls

    Miscellaneous components for water drainage and infrastructure networks fixing

    components for coupling concrete to concrete

    Modification and adaptation of steel structures

    Pedestrian bridges

    Licence for steel construction fabrication

    State authority certificate

    Quality system

    The core production programme is oriented especially on fabrication and installation

    of products certified for use in the civil engineering industry for bridge construction andreconstruction as well as for road and railway projects.

    The production process takes place in new production facilities with trained and experiencedstaff in compliance with EU quality and occupational safety standards. Welders are certifiedby a national certification body and supervised by an appointed EU-certified welding engineer.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    30/58

    29

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    31/58

    Bridges and Bridge Technologies30

    Steel retaining system for motorway bridges

    Retaining grade H2

    Crash impact level B

    Work space W5

    Traffic retaining system with handrail, Skanska ZSSK/H2

    ZSSK/H2 is a one-sided retaining system intended for installation on bridges, retaining wallsand similar constructions for providing the safety off vehicles. The system is CE certified after ithad successfully undergone a crash test in compliance with the SN EN 1317-1,2 standard.

    The barrier is composed of the steel retaining profile NH4, assembled to steel columns madeof rolled U140, distributed at a regular distance of 2000 mm. For pedestrian safety, mashpanels may be assembled to columns if requested. The columns are fixed to the anchoringcomponent with 4 bolts via a foot plate placed on a polymer mortar base. Corrosionprotection is provided by zinc metallisation and a coat of paint.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    32/58

    31

    Anchoring component for fixing retaining systemcolumns

    The component is built into the pavement. Before concreting, it is adjusted vertically with4 adjusting screws. The concrete class should be 4O MPa at least.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    33/58

    Bridges and Bridge Technologies32

    SKANSKA-type road safety fence for bridgesType SK-MZI, SK-MZII, SK-MZII-03, SK-MZII-04, SK-MZIII

    The SKANSKA-type road safety fence is intended for use on bridges with low traffic(SN 74 3305) where the horizontal impact of pedestrians on the railing could occur.Safety of vehicle traffic is ensured using a different system (retaining system).

    Product description by type:SK MZI

    The system consists of a handrail fastened to columns distributed at a distance of 3000 mm.Vertical bars placed between the columns are no more than 120 mm apart.

    SK MZIISimilar to MZI but, instead of columns, the frames are supported with short bars built intoconcrete and placed 3000 mm apart.

    SK MZII 03, SK MZII 04

    Similar to MI, but the frame is additionally supported with short columns. Vertical bars are ofa round or rectangular profile.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    34/58

    33

    SK MZIII

    Similar to MZI, but with columns and frames of L-shaped bars. This system is designedspecifically for railway bridges.Fence installation

    There are two methods used for fastening columns to the pavement:1. Sockets are formed in a concrete base into which the bottom end of the columns is placed

    and then concreted with special mixture.2. The column is fixed to the pavement with bolts via an anchor plate. The bolts are either

    sealed into bored holes or screwed into the built-in anchoring component. The plate sits onspecial mortar to allow for levelling and adjusting the column.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    35/58

    Bridges and Bridge Technologies34

    Universal bridge handrails

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    36/58

    35

    Expansion jointsSkanska EJ-type MZ 80J and 100J

    Expansion joints comprise a steel part built into the concrete structure and a rubberV profile which makes the joint water-tight. EJ are fabricated and delivered in accordancewith the specific bridge design and assembly is ensured by trained staff on site.

    Working stroke for MZ 80 is 40 mm, and 50 mm for MZ 100.

    Built-in steel part is mostly fabricated of L-shaped profile, but can be also welded fromsteel plates. Underside the profile, anchors of transversal plates with reinforcing barsare welded on.

    Steel upper blocks are of special F shape with a channel for rubber belt slat. The beltshould be dismantled and replaced if damaged.

    Sidewalk part - the EJ is covered by an overlapping plate for pedestrian safety.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    37/58

    Bridges and Bridge Technologies36

    Noise protection barriers on bridges and walls

    Protection barriers are installed for protection of populated areas against the unfavourableinfluence of noise produced by traffic and as bird protection against collisions with vehicles.

    Skanska supplies and installs barriers made of steel columns to which noise protectionpanels are fastened. The columns are fixed to the pavement with bolts via steel plates.Glass or polycarbonate panels are used as noise protection material. The panels are coupledto columns by means of L profiles with rubber sealing belts. The bottom edge of the panelis reinforced with a stainless U profile. The upper edge is loose.

    The barrier height and column distribution varies by design.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    38/58

    37

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    39/58

    Bridges and Bridge Technologies38

    Traffic sign gantries

    Gantries serve for accommodation of traffic signs, information panels, cameras and trafficcontrol gauges, etc.

    The gantries are subject to certification in accordance with Czech legislation. If requested,the gantries are fitted with sign lighting. Their supporting columns must be protectedby a retaining wall against any vehicle impact.

    Skanska gantry types:

    Single beam gantrytype max clearance gantry span sign areaJNP 1 6.2 m < 16 m < 40 m2

    JNP 2 6.8 m

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    40/58

    39

    F b i ti f i t d

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    41/58

    Bridges and Bridge Technologies40

    Fabrication of suspension strands

    The qualification for fabrication of this product is approved by certificate. The strand loopis fixed by a sleeve pressed onto rope ends by a PNB 300T hydraulic cylinder equipped withappropriate accessories fitting the rope and sleeve diameter. All dispatched products are dulyrecorded and marked in accordance with respective applicable standards (certification).

    The production programme also includes other types of strands made of chains, with hooks,couplers, suspension bolts, etc.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    42/58

    41

    Reference projects

    D1 t i d t th it

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    43/58

    Bridges and Bridge Technologies42

    D1 motorway viaduct over the cityof Povask Bystrica

    Award Project 2010 by the Slovak government Balanced cantilever method used for construction. Prestressing system Skanska.

    Belt high a aro nd Prag e section 513

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    44/58

    43

    Belt highway around Prague, section 513,Bridge across the Vltava River

    Award: Czech civil project 2010 Balanced cantilever method used for construction. Prestressing system Skanska.

    Lay by railway station Brno 1st stage

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    45/58

    Bridges and Bridge Technologies44

    In situ cast by use of ordinary scaffolding with MTP 100 supports

    Lay-by railway station Brno, 1st stage

    Award: Civil project 2010 of the South Moravian Region

    Optimisation of the railway track

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    46/58

    45

    Optimisation of the railway trackfrom Stbro to Plan near Marinsk Lzn

    Railway bridge reconstruction Structure lifted up and down by hydraulic cylinders.

    Optimisation of the railway track

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    47/58

    Bridges and Bridge Technologies46

    Optimisation of the railway trackfrom Stbro to Plan near Marinsk Lzn

    Railway bridge reconstruction at km 386.918 Structure lifted up and down by hydraulic cylinders.

    Bridge across the Odra River

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    48/58

    47

    Bridge across the Odra River,road II/464 Studnka Monov

    Heavy lifting by hydraulic hollow cylinders and threaded bars.

    Country road overpass across D47 motorway

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    49/58

    Bridges and Bridge Technologies48

    Country road overpass across D47 motorway

    Award: Czech Bridge Project 2009 In situ cast by use of DOKA falsework. Prestressing system Skanska with cables of strands15.5/1800 for deck was used.

    Road bridge across the Morava River in Olomouc

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    50/58

    49

    Road bridge across the Morava River in Olomouc

    Awards: 1. 2008 Czech Bridge Project,

    2. 2008 Construction Project of the Olomouc Region

    In situ cast by use of heavy falsework PEINER and Doka formwork. Prestressing system Skan-ska with cables of 19 strands 15.5/1800 was used.

    Railway viaduct Sluncov

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    51/58

    Bridges and Bridge Technologies50

    In situ cast by use of falsework with MTP towers and formwork DOKA, launched from span tospan. Prestressing system Skanska with cables of 19 strands 15.5/1800 was used.

    Railway viaduct Sluncov,project Praha New connection

    Awards: Czech Bridge Project, Czech Civil Project of 2009

    Cable stay bridge across the Odra River

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    52/58

    51

    Cable stay bridge across the Odra Riverand Antoovicke Lake, D47 motorway

    Awards: Czech Bridge Project 2007, Czech Civil Project of 2007, Project 2007

    of the Moravian-Silesian Region, 2007 Topinvest Best Investment, 2007

    Skanska Bridge Project.

    Movable Scaffolding System overhead was used for span by span construction.Prestressing system Skanska with cables of 4/13/19/36 strands 15.5/1800 for deck was used,VSL for stays.

    Kninice Bridge D8 motorway

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    53/58

    Bridges and Bridge Technologies52

    Kninice Bridge, D8 motorway

    Award: Czech Civil Project 2008 Movable Scaffolding System underslung was used for span by spanconstruction. Prestressing system Skanska with cables of 19 strands15.5/1800 was used.

    Pedestrian Bridge across the Svratka River, Brno

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    54/58

    53

    Technology precast arch components, precast slab segments. Skanska post- tensioningsystem for prestressing was used.

    Pedestrian Bridge across the Svratka River, Brno

    Awards

    1. Czech Bridge Project 2007

    2. FIB Awards For Outstanding Concrete Structures, Washington:

    Footbridge Awards 2008, Aesthetics Medium Span

    Footbridge Awards 2008, Technical Medium Span

    Viaduct Blotn, R48 highway

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    55/58

    Bridges and Bridge Technologies54

    Composite bridge of steel and concrete structure. Slab was concreted by use of Skanska form travellers.

    Viaduct Blotn, R48 highway

    Green Bridge, D11 motorway

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    56/58

    55

    g , y

    Falsework DOKA was used for concreting the arch in three sections into which the falseworksection was launched.

    Railway viaduct Jezernice brick half

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    57/58

    Bridges and Bridge Technologies56

    y

    Award Czech Bridge Project 2001. Reconstruction of the Czech historical monument. The entire superstructure was demolishedand newly reproduced. Piers were regenerated.

  • 7/29/2019 Catalogue Bridges and Bridge Technologies

    58/58

    Skanska a.s., Roads and Bridges division

    www.skanska.cz

    Branch Company Bridges

    Bohunick 133/50619 00 BrnoCzech RepublicTel: +420 547 138 217Fax: + 420 547 212 059

    Company registered office - billing address:Skanska a.s.Lbalova 1/2348149 00 Prague 4 - ChodovBusiness Registration No. (I): 26271303Tax Identification No. (DI): CZ26271303

    Bank Account: 2038057503/2600 CITI BANK EUROPE