DUBLIN PORT: OCEAN PIER BERTH 32-34 Ground Investigation Project 17-0755 Client: L & M Keating Client’s Representative: Gavin & Doherty Geosolutions Site Operations: July and August 2017 Causeway Geotech were appointed by Gavin & Doherty Geosolutions on the behalf of L & M Keating to carry out a ground investigation in Dublin Port to provide geotechnical and environmental information for input to the design and Geobor S Coring: high percentage of core recovery in port clay The scope of works included: 3 boreholes by light cable percussion boring with rotary follow-on drilling 2 boreholes by rotary drilling, including Symmetrix- cased full hole rotary percussion and Geobor S wireline coring techniques 1 standpipe installation Factual ground investigation report Site operations were conducted from Causeway Geotech’s hub in Dublin, with a full time Site Engineer based in an office on location.

Upload: others

Post on 16-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Causeway Geotech€¦ · Web viewSite operations were conducted from Causeway Geotech’s hub in Dublin, with a full time Site Engineer based in an office on location. Works were

DUBLIN PORT: OCEAN PIER BERTH 32-34Ground Investigation

Project 17-0755Client: L & M KeatingClient’s Representative: Gavin & Doherty GeosolutionsSite Operations: July and August 2017

Causeway Geotech were appointed by Gavin & Doherty Geosolutions on the behalf of L & M Keating to carry out a ground investigation in Dublin Port to provide geotechnical and environmental information for input to the design and construction of a new quay wall and associated tie back anchors/sheet piles. The new quay wall forms part of Dublin Port Company’s Alexandra Basin Redevelopment Project.

Geobor S Coring: high percentage of core recovery in port clay

The scope of works included:

3 boreholes by light cable percussion boring with rotary follow-on drilling 2 boreholes by rotary drilling, including Symmetrix-cased full hole rotary

percussion and Geobor S wireline coring techniques 1 standpipe installation Factual ground investigation report

Site operations were conducted from Causeway Geotech’s hub in Dublin, with a full time Site Engineer based in an office on location.

Works were completed on schedule and the final report was received and accepted within three weeks of the completion of site works.