CBRE OVERVIEW
3 CBRE | CLIENT NAME | PRESENTATION TITLE
OUR VISION
Be the preeminent, vertically integrated global
commercial real estate services and investment
firm serving our clients with market-leading
collaboration.
4 CBRE | CLIENT NAME | PRESENTATION TITLE
OUR MISSION
Putting the client first – always
Collaborating across markets and service lines
Thinking innovatively, but acting practically
Providing a rewarding work environment
5 CBRE | CLIENT NAME | PRESENTATION TITLE
OUR VALUES
RESPECT
Treat everyone with dignity, value their contributions and help one another
succeed.
INTEGRITY
Uphold the highest ethical standards in our business practices.
SERVICE
Dedicate ourselves to making a meaningful impact on our clients and in our
communities.
EXCELLENCE
Aspire to be the best in everything we do and strive for continuous
improvement.
6 CBRE | CLIENT NAME | PRESENTATION TITLE
OUR CLIENT SERVICE MODEL
Provide a complete suite of premier services to
property investors and occupiers across the globe.
CBRE PROJECT MANAGEMENT
DIVDER OPTION 1
• Use this option if you
want to have a plain
divider, without an
image
Vietnam 2013 Review
8 CBRE | CLIENT NAME | PRESENTATION TITLE
CBRE APAC PROJECT MANAGEMENT LEADERSHIP
Malaysia Ian Williams Kuala Lumpur
Taiwan James Ho Taipei
South Korea Bruce Lee Seoul
Vietnam/Cambodia Charles Esterhoy Ho Chi Minh
China Colin Clark Shanghai
Japan Craig Hudleston Tokyo
Indonesia Agus Chandra Jakarta
Philippines Allan Napoles Manila
Pacific Jo-Anne Harrison Sydney
Thailand Akom Sukakanpadoong Bangkok
Singapore Garth Chapman Singapore
India Gurjot Bhatia New Delhi
Hong Kong Paul Dingley Hong Kong
Asia Martin Woods Hong Kong
Asia Operations Zac Zdravev Singapore
9 CBRE | CLIENT NAME | PRESENTATION TITLE
PJM VIETNAM ORGANIZATION
10 CBRE | CLIENT NAME | PRESENTATION TITLE
PROJECT MANAGEMENT PROCESS
Establish Project
Strategy
Team Selection &
Design Management
Procurement
Management
Implementation
Management
Project Handover and
Close-out
Move In
Establish steering
committee
Define Team & Roles &
Responsibilities
Design Brief
Project Milestones
Cost Estimate
Shortlist and Select
Architectural teams
Prepare Overall Master Plan
Prepare Phasing Plan
Monitor Design Development
Benchmarking and Analysis of
Design
Identify Work Package / Scope
Review and Finalize Packages
General Contract Conditions
Shortlist Vendors
Select Vendors for Packages
Map Delivery Schedules
Implementation Schedule
Mobilize Resources
Monitor Timeline / Cash Flows
Monitor Variations & Correct
Contract Management / Order
Follow-up
Periodic Reporting
FM Review & Implementation
Installation &
Commissioning
Liaise with FM Team for
Handover
As-built Documentation
Close-out Report P R O J E C T
M A N A G E M E N T
11 CBRE | CLIENT NAME | PRESENTATION TITLE
PROJECT MANAGEMENT VALUE
Strongest Project Management network
+
Experience delivering variable project solutions
+
A qualified team with a single point of accountability
+
Delivering consistency in a variable model
+
Strong Corporate values
+
An invested relationship built on trust
12 CBRE | CLIENT NAME | PRESENTATION TITLE
PROJECT MANAGEMENT ADVANTAGES
STRONG NETWORK
INTEGRATED
SERVICES
LOCAL
EXPERTISE
INTERNATIONAL
STANDARDS
MARKET
KNOWLEDGE
OUR ADVANTAGES
13 CBRE | CLIENT NAME | PRESENTATION TITLE
Overall Track Record
• > 1.583M sqft of completed projects
• > 40 assignments
• > 23 Clients
VIETNAM 2013 REVIEW
9 Project Managers
26 Projects in 2013
14 CBRE | CLIENT NAME | PRESENTATION TITLE
Automotive Financial and
Investment
Government &
Utilities
High Technology Office Corporate
Wins – 3 Area added –
135k SF
Wins – 7
Area added – 1,226k
SF
Wins – 2
Area added – 14k
SF
Wins – 4 Area added –
83k SF
Wins – 10 Area added –
116k SF
CBRE PROJECT MANAGEMENT – VIETNAM WINS
Key Wins-
15 CBRE | CLIENT NAME | PRESENTATION TITLE
Automotive
Wearnes Automotove
16 CBRE | CLIENT NAME | PRESENTATION TITLE
• Luxury car showroom, service facility & offices
• Full Project Management Services
• Project strategy / Tender & Procurement management / Contract
management / Design review / Fit-out works administration and
management, Close out project
• Design & Build by GK Construction
WEARNES
10,760 square feet
Progress March 2013 - 2014
$x,000,000 In Budget
17 CBRE | CLIENT NAME | PRESENTATION TITLE
Automotive
Nissan Techno Vietnam
18 CBRE | CLIENT NAME | PRESENTATION TITLE
• Office Fit Out and Relocation Management
• Set period (9 days) to relocate all existing IT systems, security and
office functions
• Not only upgrade the quality of the NTV workstations but also reduce power
and data requirements, reduce future workplace churn costs
• Design & Build with Modernform Inc.
NISSAN TECHNO VIETNAM
102,000 square feet
05 months
2,000 Workstations
19 CBRE | CLIENT NAME | PRESENTATION TITLE
Automotive
Regal Motor Cars (Rolls Royce)
20 CBRE | CLIENT NAME | PRESENTATION TITLE
• Full Project Management Services
• Luxury Showroom and 3S facility new construction
• Still in progress
• Design & Build with Luxxy Interiors
REGAL MOTOR CARS (ROLLS ROYCE)
21,520 square feet
Progress June 2013 - 2014
$x,000,000 In Budget
21 CBRE | CLIENT NAME | PRESENTATION TITLE
Finance & Banking
AIG
Insert picture here
22 CBRE | CLIENT NAME | PRESENTATION TITLE
• Office Expansion, Full Project Management Services
• 2 units with different commencement date.
• New IT system and supply new security for new space and renovate the
existing floor
• Construction by Union Architects
AIG
7,110 square feet
07 months
$xxx,000 In Value
23 CBRE | CLIENT NAME | PRESENTATION TITLE
Finance & Banking
JP Morgan Hanoi
Insert picture here Insert picture here Insert picture here Insert picture here
24 CBRE | CLIENT NAME | PRESENTATION TITLE
• Office Reinstatement and down-sizing, Full Project Management Services
• Client working in the office during the works : detailed phasing
• Coordination with JPMorgan global team in a tight schedule
• Design & Build with GK Construction
JP MORGAN HANOI
5,918 square feet
02 months
Live project
25 CBRE | CLIENT NAME | PRESENTATION TITLE
Finance & Banking
Wells Fargo
26 CBRE | CLIENT NAME | PRESENTATION TITLE
• New Office Fit-out and Move coordination, Full Project Management
Services
• Design coordination to match Wells Fargo expectation
• Coordination between local contractor and Wells Fargo global team
• Construction by Prime Construction
WELLS FARGO
1,614 square feet
03 months
$xxx,000 In Value
“Antoine – While I sincerely thank you and your CBRE team for doing a great job on our
Hanoi Rep Office relocation to Cornerstone”
Chuck Breitenbucher - Leader PM - CPG / US of Wells Fargo
27 CBRE | CLIENT NAME | PRESENTATION TITLE
Education
British Council Expansion
28 CBRE | CLIENT NAME | PRESENTATION TITLE
• School Fit-out, Full Project Management Services
• structural and non-structural renovation
• Working in British Consulate premises, HSE requirements, FCO MEP
requirements, while British Council still under operating and tight schedule
• Design : BHA Studio, M&E: WSP Vietnam
• Construction by Union Architects
BRITISH COUNCIL EXPANSION
4,304 square feet
04 months
$xxx,000 In Value
29 CBRE | CLIENT NAME | PRESENTATION TITLE
• Technical Due Diligence for site selection, Design Procurement and
Construction Management
• Meet high standards requested by the Embassies
• Design : DWP Vietnam
• Construction : tbd
DUTCH & DANISH EMBASSIES
10,760 square feet
2 weeks
2 Embassies
30 CBRE | CLIENT NAME | PRESENTATION TITLE
High Technology
eSilicon
31 CBRE | CLIENT NAME | PRESENTATION TITLE
• Office Fit-out and Move Management, Full Project Management Services
• The site is located in Da Nang with tight timeline
• New fit out works including MEP, IT and security infrastructure
ESILICON
4,304 square feet
04 months
$xxx,000 In Value
“The Job was completed in a professional and timely manner and the product is of high quality.
eSilicon never had a moment of worry or complaints. eSilicon particularly appreciated the way
in which we were included in every state, insofar as we wished and that our views were both
heard and debated”
Nguyen Phuong Mai, General Director
eSilicon Vietnam JSC
32 CBRE | CLIENT NAME | PRESENTATION TITLE
High Technology
Microchip Vietnam
33 CBRE | CLIENT NAME | PRESENTATION TITLE
• New Office Fit-out, Full Project Management Services
• Co-ordinate time to import IT equipment and Fit Out time
• Design and Build of the pipe system of exact machine in Lab room is
complicated
• Design & Build by Accord Construction
MICROCHIP VIETNAM
3,120 square feet
04 months
$xxx,000 In Value
34 CBRE | CLIENT NAME | PRESENTATION TITLE
High Technology
Marvell Semiconductor
35 CBRE | CLIENT NAME | PRESENTATION TITLE
• New Office Fit-out, Full Project Management Services
• Short period from Tender time to kick off Meeting
• Co-ordinate many partners: IT, Security, Fit-out, Suppliers of chairs,
equipment, sub-contractors
• Design & Build by Huynchi Construction
MARVELL SEMICONDUCTOR
8,608 square feet
03 months
$xxx,000 In Value
36 CBRE | CLIENT NAME | PRESENTATION TITLE
• Multi-use Building Technical Due Diligence for Eden A facility
• Limited timeframe of report
• Assessment of Building: Architect, Structure, M&E services and of
Environment: Utilities, environment setting, environment site.
• The most prominent building and property transaction in HCMC in 2013
• Collaboration with S&K Engineers
EDEN A – TECHNICAL DUE DILIGENCE
1 million square feet
10 days
9 Floors
37 CBRE | CLIENT NAME | PRESENTATION TITLE
Manufacturing
GE Vietnam
38 CBRE | CLIENT NAME | PRESENTATION TITLE
• New Office Fit-out, Full Project Management Services
• High requirement for M&E, lead time for imported GE equipment
• Complicated stakeholder Management, especially coordinating 2 business
in one project: GE II and GE VN
• Design & Build by MAI Construction
GE VIETNAM
13,988 square feet
04 months
$x,000,000 In Value
39 CBRE | CLIENT NAME | PRESENTATION TITLE
Pharmaceutical & Life Sciences
Mundipharma
40 CBRE | CLIENT NAME | PRESENTATION TITLE
• New Office Fit out, Full Project Management Services
• Very tight time constraint – 8 weeks total for all design, procurement
and fit out works
• Challenging budget while maintaining high quality standards.
• Construction by Huynchi Construction
MUNDIPHARMA
3,066 square feet
03 months
$xxx,000 In Value
41 CBRE | CLIENT NAME | PRESENTATION TITLE
Retail & Consumer Goods
Puma Vietnam
42 CBRE | CLIENT NAME | PRESENTATION TITLE
• New Office Fit-out, Full Project Management Services
• High Standard brand, tight construction lead time (3 month) in large
area, complicated structure
• Various abroad imported items
• In progress
PUMA VIETNAM
21,520 square feet
06 months
$x,000,000 In Budget
43 CBRE | CLIENT NAME | PRESENTATION TITLE
• Technical Due Diligence Service
• Study in tight time but full items of Architect, M&E, Structure
• Have many invisible items and lack many documents (as-built drawings,
design document, construction method of statement), so evaluation
based on third party’s services (ultrasonic and rebound hammer)
UNILEVER VIETNAM
96,840 square feet
02 weeks
4 Stories