cc montague scope of work proposed pcl-007 cluster-alternative · pcl-007 tment of env estigation...

7
T S d s c c c f T g T g w a c T o: Ronda Blaye Dale Bridgfor CC: Sathya Yalvig Craig A. Bartl Memo Subject: Pro Che Backgroun In the Februa Company (Ch determine if P Lake Michiga In response, unconsolidate (CPT). Two lo successful at constituents r creek. Howev (2015PC-CPT collected. In d from this loca Purpose The purpose groundwater Scope of W T o meet this o groundwater wells to asse attempted an PCL-007-105 construction a r, MDEQ rd, MDEQ gi, Chemours lett, Chemour o oposed Pierso emours Monta nd ary 26, 2015 l hemours), MD Pierson Creek an (see Figure Chemours co ed sand and g ocations were t one location related to the ver, a “hardpa T-02), and mu discussions w ation. of this invest beneath Pier Work objective, AE monitoring w ss groundwat nd are shown 5 (the last thre and IDs will b rs on Creek Area ague, Montag etter from Mic DEQ stated th k Landfill cons e 1) onducted vert gravel aquifer e selected on (2015PC-CP Pierson Cree an” was encou ultiple attemp with MDEQ, it igation is to d rson Creek an COM will sub wells at approp ter quality. Th in Figure 2. T ee digit numb be adjusted ba a Well Cluster gue, Michigan chigan Depar hat further inv stituents are tical aquifer sa r on a 5-foot i the western s PT-01), and an ek Landfill we untered just a pts failed to pe was agreed t determine if P nd potentially bcontract a rot priate screene he wells will b The wells are er refers to th ased on the li r PCL-007 n rtment of Env vestigation wa under-flowing ampling from interval using side of Pierso nalytical sam ere not presen above the wat enetrate the h that Chemou ierson Creek westward tow tosonic drillin ed intervals a e placed in th tentatively ide he well screen ithology enco A 4 N D U a P M P C A F G D J ironmental Q as warranted g Pierson Cre the water tab a 20-ton, tru on Creek (see ples from tha nt at that loca ter table at th hardpan to the rs could set a Landfill relate wards Lake M g company to and collect gro he vicinity of w entified as PC ns bottom dep ountered. AECOM 4051 Ogletown Roa Newark DE, 19713 USA aecom.com Project name: Montague Site Project ref: Chemours: 507756 AECOM: 60494178 From: George E. Gre Date: June 23, 2017 uality (MDEQ in the area of eek and poten ble to the bas ck-mounted c e Figure 2). S at location ind ation on the w he second loc e aquifer. No a well cluster ed constituen Michigan. o install three oundwater sa where 2015PC CL-007-060, P pth below gro ad 8 egory III, AEC 7 Q) to the Chem f Pierson Cre ntially dischar se of the cone penetro Sampling was icated that western side o ation samples cou to collect sam nts are migrat e adjacent amples from th C-CPT-02 wa PCL-007-085 ound surface) 1 COM mours eek to rging to meter rig of the ld be mples ting in hese as 5, and ). Actual

Upload: others

Post on 26-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CC Montague Scope of Work Proposed PCL-007 Cluster-alternative · PCL-007 tment of Env estigation wa under-flowing mpling from nterval using ide of Pierso alytical sam re not presen

T

S

d

scc

cf

Tg

Tgwa

c

To: Ronda BlayeDale Bridgfor

CC: Sathya YalvigCraig A. Bartl

MemoSubject: Pro

Che

BackgrounIn the FebruaCompany (Chdetermine if PLake Michiga

In response, unconsolidate(CPT). Two losuccessful atconstituents rcreek. Howev(2015PC-CPTcollected. In dfrom this loca

Purpose The purpose groundwater

Scope of WTo meet this ogroundwater wells to asseattempted anPCL-007-105construction a

r, MDEQ rd, MDEQ

gi, Chemours lett, Chemour

o oposed Piersoemours Monta

nd ary 26, 2015 lhemours), MDPierson Creekan (see Figure

Chemours coed sand and gocations weret one location related to the ver, a “hardpaT-02), and mudiscussions wation.

of this investbeneath Pier

Work objective, AEmonitoring wss groundwat

nd are shown 5 (the last threand IDs will b

rs

on Creek Areaague, Montag

etter from MicDEQ stated thk Landfill conse 1)

onducted vertgravel aquifere selected on

(2015PC-CPPierson Cree

an” was encouultiple attemp

with MDEQ, it

igation is to drson Creek an

COM will subwells at approp

ter quality. Thin Figure 2. T

ee digit numbbe adjusted ba

a Well Clustergue, Michigan

chigan Deparhat further invstituents are

tical aquifer sar on a 5-foot ithe western s

PT-01), and anek Landfill weuntered just a

pts failed to pewas agreed t

determine if Pnd potentially

bcontract a rotpriate screenehe wells will bThe wells are er refers to thased on the li

r PCL-007 n

rtment of Envvestigation waunder-flowing

ampling from interval usingside of Piersonalytical sam

ere not presenabove the watenetrate the hthat Chemou

ierson Creek westward tow

tosonic drillined intervals ae placed in thtentatively ide

he well screenithology enco

A4NDUa

PM

PCA

FG

DJ

ironmental Qas warranted g Pierson Cre

the water tab a 20-ton, tru

on Creek (seeples from thant at that locater table at thhardpan to thers could set a

Landfill relatewards Lake M

g company toand collect grohe vicinity of wentified as PCns bottom dep

ountered.

AECOM 4051 Ogletown RoaNewark DE, 19713 USA aecom.com

Project name: Montague Site

Project ref: Chemours: 507756 AECOM: 60494178

From: George E. Gre

Date: June 23, 2017

uality (MDEQin the area of

eek and poten

ble to the basck-mounted c

e Figure 2). Sat location indation on the whe second loce aquifer. No a well cluster

ed constituenMichigan.

o install threeoundwater sawhere 2015PCCL-007-060, Ppth below gro

ad

8

egory III, AEC

7

Q) to the Chemf Pierson Crentially dischar

se of the cone penetro

Sampling was icated that

western side oation samples couto collect sam

nts are migrat

e adjacent amples from thC-CPT-02 waPCL-007-085ound surface)

1

COM

mours eek to rging to

meter rig

of the

ld be mples

ting in

hese as 5, and ). Actual

Page 2: CC Montague Scope of Work Proposed PCL-007 Cluster-alternative · PCL-007 tment of Env estigation wa under-flowing mpling from nterval using ide of Pierso alytical sam re not presen

Memo Proposed Pierson Creek Area Well Cluster PCL-007

AECOM 2

Figure 3 displays boring logs from monitoring well PCL-05-078 and the two 2015 CPTs (CPT01 and CPT02c on the lithologic logs). These are displayed side-by-side in Figure 3 and are approximately to scale. Their layout is adjusted to approximate actual ground surface elevation. As shown near the right-hand edge of the figure, the following well screen intervals are proposed for PCL-007:

• PCL-007-060 is near the top of the water table.

• PCL-007-085 is a mid-depth well. Samples from similar depths at 2015PC-CPT-01 had detectable (but estimated) concentrations of benzene and toluene.

• PCL-007-105 is projected to be the base of the aquifer and would correspond to roughly the same interval screened by well PCL-005-078. Ground surface at PCL-005-078 is lower; hence, the difference in depth to the base of the aquifer. The base of the aquifer is underlain by a dark gray, plastic clay believed to be lacustrine in origin.

Well Construction Monitoring wells will be installed using a rotosonic rig as this drilling method has been successful at the site. An 8-inch borehole will be drilled using a full-sized truck rig. During the first well installation, the boring will be lithologically described and drilled to the gray clay. This clay is encountered typically at about 130 to 145 feet below ground surface. The rig will core at least 5 feet into this unit (there have been locations where thinner clay layers have had sand beneath them. This will confirm that the well will screen the base of the sand-gravel aquifer).

Tentatively, the deepest well will be identified as PCL-007-140. The proposed screen intervals will be adjusted where field observations indicate conditions different from those based on the CPT data. The intent is to screen across the three most likely flow intervals. The remaining two wells will be installed within 10 feet of the first well and will not require lithologic logging.

All three monitoring wells will be constructed of 2-inch diameter, schedule 40 polyvinyl chloride (PVC) with 10-foot well screens (0.01-inch slot). A filter pack of 20/40 mesh silica sand will be placed around the well screen and extend 2 feet above the top of screen. A minimum 2-foot thick annular seal of bentonite chips or pellets will be placed on the sand pack and allowed to hydrate per manufacturers recommendations before the remaining annual space is filled with cement-bentonite grout to near surface. Wells will be completed with 3-foot-square concrete surface pads and a lockable steel surface casing. The space between the PVC casing and the steel casing will be filled with gravel to near the top of casing and a weep hole will be drilled near the base of the casing to allow condensation to escape. The outside of the steel casing will be painted yellow to reduce corrosion and improve its visibility.

Development After installation, the wells points will be developed by the drilling contractor to remove sediment that may have entered the screen during installation. Well sampling will be performed after the wells have had a period to equilibrate with the aquifer.

Surveying Top of casing and ground surface elevations will be surveyed for the new monitoring wells. Coordinates will be surveyed in Michigan State Plane, South system. These measurements will be used with depth to water measurements to provide hydrogeologic information to determine if Pierson Creek is intercepting groundwater flow and preventing underflow.

Page 3: CC Montague Scope of Work Proposed PCL-007 Cluster-alternative · PCL-007 tment of Env estigation wa under-flowing mpling from nterval using ide of Pierso alytical sam re not presen

A

Www

T

T

tg

Ta

W

Tt

s

8

A A

Memo Proposed Pierso

AECOM

Well SSampling willwells in the swithin a mont

• One

• Matri

• Equip

• Trip b

The equipme(pump) used

Health andThe site-spec

Based on prethe ticks and gloves and Ty

This level of pand safety sta

Waste ManInvestigation-(PSWMP). Th

Schedule The proposedthese wells wmonitoring plsampling for t

If you have a832-422-4423

Sincerely,

George E. GrSenior GeoloAECOM Corp

Attachments:

on Creek Area W

Samplil be performeampling progth of installati

field duplicate

x spike/matrix

pment blank

blank

ent blank will bafter it has be

d Safety cific Health an

evious experiepoison ivy aryvek® covera

personal protaff.

nagement -derived wasthis plan will b

d schedule is will be after thean on a semithe PCL-007

ny questions 3. For other q

regory III ogist/Project Mporation

Figures

Well Cluster PCL-

ing d using low-flram. The threon. During sa

e

x spike duplic

be collected been decontam

nd Safety Pla

ence, it is expre not significalls if condition

ective equipm

te will be manbe developed

for the instale installation annual basis wells would b

or commentsquestions rela

Manager

007

low purge meee new wells ampling, the fo

cate

by passing theminated betwe

n (HASP) will

pected that allantly present.ns are found t

ment (PPE) m

naged in accoprior to field m

lation effort to(approximatefor a period o

be reviewed b

s about the teated to the pro

ethods consiswill be samplollowing qual

e blank watereen wells.

l be develope

l work can be. This may beto differ.

may be adjuste

ordance with amobilization.

o occur in midely August), anof two years (based on the

chnical naturoject, please c

stent with the ed at least onity control sam

r over and/or

ed to ensure s

e performed ine upgraded to

ed after a rev

a Project-Spe

d-late July of 2nd the wells w(until 2H2019results.

re of this scopcontact Sathy

methods usene week aftermples will be

through samp

safe conduct

n Level D. Geo Modified Lev

view of site co

ecific Waste M

2017. The firswill then be ad). At that poin

pe, please conya Yalvigi at 3

ed for other mr developmencollected:

pling equipme

of the work.

enerally, at thivel D includin

onditions by th

Management

st sampling edded to the

nt, the frequen

ntact me at 302-773-4291

3

onitoring nt but

ent

s site, g nitrile

he health

Plan

vent of

ncy of

1.

Page 4: CC Montague Scope of Work Proposed PCL-007 Cluster-alternative · PCL-007 tment of Env estigation wa under-flowing mpling from nterval using ide of Pierso alytical sam re not presen

Memo Proposed Pierson Creek Area Well Cluster PCL-007

AECOM

Figures

Page 5: CC Montague Scope of Work Proposed PCL-007 Cluster-alternative · PCL-007 tment of Env estigation wa under-flowing mpling from nterval using ide of Pierso alytical sam re not presen

FormerManufacturing

Area

Lamo

s Rd

Old C

hann

el Trl

Indian

Bay

Rd

Wilkes Rd

Lau R

d

Willia

m Rd

.

Sunset Ln

Anderson Rd

McFa ll C i r

Lakeshore Dr

Chas

e Rd

Indian

Point

Rd

Clar

k St

Carlson Ct

Lakefront St

Sadony B

ayou Rd

Main

S t

Long Poi nt Rd

Vans

ickle

Rd

Chippewa Dr

Old Channel Trl

Willia

m Rd

.

Ferry St

Lifeg

uard

Rd

AECOMSabre Building, Suite 300

4051 Ogletown RoadNewark, DE 19713

SITE MAPProposed Groundwater Monitoring

Well Cluster PCL-007 West of Pierson CreekChemours Montague Facility

Montague, MichiganTASK NUMBER:

DESIGNED BY:

DRAWN BY:

DATA QUALITY CHECK BY:GEG

CAD

PJC18984840.201010

PROJECT NUMBER:

DATE:

FIGURE NUMBER:

60426164

1

®0 1,200 2,400600

Feet

MAP FORMATTED FOR "B" (11" X 17") SIZE SHEET. TEXT SCALE NOT VALID FOR DIFFERENT PAGE SIZE.

1 inch = 1,200 feet

Illinois Ohio

Wisconsin

Indiana

MichiganSite

Location

2005 NAIP Aerial Source: Credit to Remote Sensing& GIS Research and Outreach Services (RS&GIS),USDA-FSA Aerial Photography Field Office

Area Map

C:\D

uPon

t\Mon

tague

\_GIS

\Pro

ject\6

0426

164_

Prop

GW_M

WPC

L007

_Jun

2017

\Fig1

_Site

Map.m

xdLegend

Pierson Creek - Main ChannelPierson Creek - TributaryChemours Property Line (from ChemoursReal Estate)Road CenterlineFormer Manufacturing AreaWaste Management Unit (WMU) orArea of Concern (AOC)

6/14/2017

PiersonCreek

SadonyBayou

MirrorLake

PiersonCreek

Landfill

LakeMichigan

White Lake

Page 6: CC Montague Scope of Work Proposed PCL-007 Cluster-alternative · PCL-007 tment of Env estigation wa under-flowing mpling from nterval using ide of Pierso alytical sam re not presen

PROPOSED LOCATIO N O FPCL-007

Proposed Groundwater MonitoringWell Cluster PCL-007 West of Pierson Creek

Chemours Montague FacilityMontague, Michigan

TAS K NUMB ER:

DESIG NED BY:

DRAW N B Y:

DATA QU ALIT Y CHECK B Y:GEG

CAD

PJC18984840.201010

PRO JECT NUM BER:

DATE :

FIG URE NUM BER:

60426164

2

2005 Aerial C redit: Remote Sensing & GIS Researchand O utreach Services (RS&GIS), USDA-FSA AerialPhotography Field Office

MAP F O RMATT ED FO R "B" (11 " X 17 ") SIZ E SHEE T. TEX T SCALE NO T VA LID F O R D IF FE RENT PA G E SIZE .

C:\D

uPon

t\Mon

tague

\_GIS

\Proje

ct\60

4261

64_P

ropGW

_MWP

CL00

7_Ju

n201

7\Fig2

_Prop

PCL0

07Lo

c.mxd

LegendPCL-007 ClusterCPT Boring

!A Monitoring Well LocationPierson Creek - Main ChannelPierson Creek - TributaryChemours Property Line (from ChemoursReal Estate)Road CenterlinePierson Creek Landfill Boundary

®0 150 30075

Feet1 inch = 150 feet

ChemoursProperty

Boundary

Map E xten t

AECO MSabre Building, Su ite 300

4051 Ogletow n RoadNewark, DE 19713

6/14/2017

!A!A

!A !A

!A

!A

!A

!A

!A !A

!A

!APCL-5S PCL-5D

PIERSONCREEK

LANDFILL

PCL-6-77

PCL-3-17

PCL-1-67

PCL-2-70

MW-209-67

MW-250-54

PCL-4-17MW-207-55

MW-208-83MW-208-20

2015PC-CPT-02(Incomplete CPT - Installing PCL-007)

2015PC-CPT-01(Completed CPT)

Old Channel Trl

Wilkes Rd

Pierson Creek - Main

Tributary 1

Tributary 4

Tributary 3

Tributary 6

Tributary 5

Tributary 3 - Fork

Tributary 2

Page 7: CC Montague Scope of Work Proposed PCL-007 Cluster-alternative · PCL-007 tment of Env estigation wa under-flowing mpling from nterval using ide of Pierso alytical sam re not presen

---

0' 500' 1000'

NOTES:Each log presented at same vertical scale (ground surface to -120').Approximate vertical difference between PCL-005-078 and 2015 CPTs = ~30 feet.

PCL-005-0452015PC-CPT-01 sample results:J-value of benzene and toluenedetected in 76' and 81.8' samples.All other depths ND for VOCs.