cccdu: avon river, east & north frame design (july 2013)

14
Avon River Precinct North Frame East Frame

Upload: lucas-associates-ltd

Post on 24-Mar-2016

214 views

Category:

Documents


0 download

DESCRIPTION

CCCDU: Avon River, East & North Frame Design (July 2013)

TRANSCRIPT

Page 1: CCCDU: Avon River, East & North Frame Design (July 2013)

Avon River PrecinctNorth FrameEast Frame

Page 2: CCCDU: Avon River, East & North Frame Design (July 2013)

A PLACE FOR PEOPLE

OUR VISION

"KIA ATAWHAI KI TE TANGATA"

CARE FOR PEOPLEPITA TE HORI (1861)

Page 3: CCCDU: Avon River, East & North Frame Design (July 2013)

THE KEYPRINCIPLES

• A Healthy Place – Healthy Mahinga Kai

• A Distinctive Place - Weaving cultures together

• An Accessible Place

• A Prosperous Place

A Place for People

Page 4: CCCDU: Avon River, East & North Frame Design (July 2013)

THE MAIN ELEMENTS

• Promenade the full length of the river

• Continuous cycleway the full length of the river

• Strong ecological enhancement (bringing back the bellbirds)

• Community gardens and places for hospitality

• Three main activity areas

• The Terrace (Durham to Armagh), Victoria Square and Family Playground

• High quality lighting and safe design

• Strong settings for our history and culture

• An Art and Sculpture trail

• A new residential community

Page 5: CCCDU: Avon River, East & North Frame Design (July 2013)
Page 6: CCCDU: Avon River, East & North Frame Design (July 2013)
Page 7: CCCDU: Avon River, East & North Frame Design (July 2013)
Page 8: CCCDU: Avon River, East & North Frame Design (July 2013)
Page 9: CCCDU: Avon River, East & North Frame Design (July 2013)
Page 10: CCCDU: Avon River, East & North Frame Design (July 2013)
Page 11: CCCDU: Avon River, East & North Frame Design (July 2013)
Page 12: CCCDU: Avon River, East & North Frame Design (July 2013)

• Watermark is complete as a demonstration site

• Piloting method of gathering feedback• Survey of responses to design• Specific questions that the design team need to

know• On Information boards along Watermark• Gathered via ‘txt and answer’ campaign

• Will look to expand if approach is successful

Informing the design

Page 13: CCCDU: Avon River, East & North Frame Design (July 2013)

• Business case and budget finalisation• Final approvals with Crown, CCC and Ngai Tahu

• Procurement and design leading to….• Construction commencing in November 2013• Completion early 2015

Next steps for Avon River Precinct

Page 14: CCCDU: Avon River, East & North Frame Design (July 2013)

Questions ?