Top Level Requirements• Deliver properly configured periodic train of bunches to cooling
channel at appropriate repetition rate– 54 MeV– Few mm-mrad– 0.01% x ~ 1 cm – 2 nC– Rep rate of 750 MHz/N, N=1,10,100…
• Manage stray power deposition, instabilities; preserve beam quality
• Recover itVery similar to FEL requirements (but with longitudinal phase space
rotated 90o)
Implementation Requirements
• System configuration/geometry consistent with MEIC collider– 2 x 30 m 2 kG solenoids; figure X layout– ½ m vertical separation
Perform design exercise to explore technology boundaries and beam dynamical limitations
Design ParametersParameter ValueInjection energy (momentum) pinj (MeV/c)
5
Injected longitudinal emittance ez (as used Figure 3, allows for 2x degradation; keV-psec)
80
RMS injected bunch length sl (psec) 5RMS injected energy spread sdp/p 0.003Linac on-crest energy gan (MeV) 50.4Full energy (momentum) pfull (MeV/c) 54Acceleration phase (deg) -13o (ahead of crest)Recovery phase (deg) 166o (ahead of trough)Decompression arc compactions (m) M56
T566
W5666
1.615-3.93253
Dechirper on-crest energy gain (MeV) 1.8Dechirper phase (deg) 90o (descending portion of waveform)RMS bunch length sl at CCR (cm; psec)
1; 33
RMS energy relative spread sdp/p at CCR
<10-4
CCR compaction (m) M56
0 (isochronous)Dechirper on-crest energy gain (MeV) 1.8Dechirper phase (deg) -90o (ascending portion of waveform)Decompression arc compactions (m) M56
T566
W5666
2.24250
Energy at dump (MeV) 5.3
System Configuration
• Three options– 750 MHz ERL (high risk source)– 75 MHz ERL (moderate risk source & beam transfer, high
risk beam-beam interaction)– 7.5 MHz ERL (high risk beam transfer)
• All three use common cooling channel geometry• All three use similar beam transfer system – Single DC dipole for 750 MHz ERL– Pair of RF separators/single septum for 75 MHz ERL– Pair of ultrafast kickers/single septum for 7.5 MHz ERL
System Layout
injector
dump
cooling solenoids
rechirper
dechirper
recirculation/decompression transport
recovery/recompression transport
CCR
ERLbeam
exchange system
ERL Characteristics• 4 five-cell 750 MHz SRF cavities
– Existing JLab high current design• Longitudinal aspect ratio at CCR imposes some degree of
gymnastics– Harmonic RF problematic– Chirp/compress/dechirp before injection
• Use transport system compactions for linear/nonlinear compensation– Chirp/decompress/energy compress during recovery
• Use transport system compactions for linear/nonlinear compensation
• Betatron matching between/amongst functional modules
Longitudinal Match – 1 cm
Longitudinal Match – 2 cm
Betatron Matching (1 cm)
CCR Concept• Use common figure-8 layout for all 3 ERL options• 2 x 30 m 20 kG cooling solenoids– Round beam matched to cooling channels
• FODO arcs, asymmetric chicane vertical steps– Compactions cancel isochronous transport
• Betatron matching between/amongst segments• Beam transfer: 2 x 90 FODO cells– Single dipole at center in 750 MHz ERL option– RFS/fast kickers at ends, septum in center in 75, 7.5 MHz ERL
option)• Cf. CEBAF beam distribution system
CCR layout• Figure 8, 30 m solenoids, ½ m vertical
separation
CCR Optics
Rudimentary S2E: Injector to CCR
CCR: 1000(+) particles x 100 turns• Added a few outliers to probe aperture
Rudimentary S2E: CCR to Dump
Cheats, Swindles, Things Left Undone
• Matching to/from CCR “figurative”– Simply set ERL match to 1 m into/out of exchange
dipole/septum; adjusted using Twiss matrix into/out of CCR & started simulation in middle of central quad in beam exchange section
Still have to construct details of transfer for each case…
• Path lengths not properly set– ½ lRF for full ERL– Multi-turn CCR needs to be multiple of lRF
• Haven’t started sensitivity/aberration analyses– Matching poorly optimized
Now, the bad news…
• 2 nC x 54 MeV is nontrivial…• CW MHz, rep rate, nsec-rise/fall time kickers
nontrivial