cd-k-034-2009, painting buildings code - eac · pdf filepainting of buildings — code of...

Download CD-K-034-2009, Painting buildings code - EAC · PDF filePainting of buildings — Code of practice EAST AFRICAN COMMUNITY. Draft for comments only — Not to be cited as East African

If you can't read please download the document

Upload: hahanh

Post on 05-Feb-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • Draf

    t for

    com

    men

    ts on

    ly

    Not

    to b

    e cit

    ed a

    s Eas

    t Afri

    can

    Stan

    dard

    CD/K/034:2009ICS 87.020; 91.180

    EAC 2010 First Edition 2010

    EAST AFRICAN STANDARD Painting of buildings Code of practice

    EAST AFRICAN COMMUNITY

  • Draf

    t for

    com

    men

    ts on

    ly

    Not

    to b

    e cit

    ed a

    s Eas

    t Afri

    can

    Stan

    dard

    CD/K/034:2009

    ii EAC 2010 All rights reserved

    Foreword Development of the East African Standards has been necessitated by the need for harmonizing requirements governing quality of products and services in East Africa. It is envisaged that through harmonized standardization, trade barriers which are encountered when goods and services are exchanged within the Community will be removed. In order to meet the above objectives, the EAC Partner States have enacted an East African Standardization, Quality Assurance, Metrology and Test Act, 2006 (EAC SQMT Act, 2006) to make provisions for ensuring standardization, quality assurance, metrology and testing of products produced or originating in a third country and traded in the Community in order to facilitate industrial development and trade as well as helping to protect the health and safety of society and the environment in the Community. East African Standards are formulated in accordance with the procedures established by the East African Standards Committee. The East African Standards Committee is established under the provisions of Article 4 of the EAC SQMT Act, 2006. The Committee is composed of representatives of the National Standards Bodies in Partner States, together with the representatives from the private sectors and consumer organizations. Draft East African Standards are circulated to stakeholders through the National Standards Bodies in the Partner States. The comments received are discussed and incorporated before finalization of standards, in accordance with the procedures of the Community. Article 15(1) of the EAC SQMT Act, 2006 provides that Within six months of the declaration of an East African Standard, the Partner States shall adopt, without deviation from the approved text of the standard, the East African Standard as a national standard and withdraw any existing national standard with similar scope and purpose.

    East African Standards are subject to review, to keep pace with technological advances. Users of the East African Standards are therefore expected to ensure that they always have the latest versions of the standards they are implementing.

    East African Community 2010 All rights reserved*

    East African Community

    P O Box 1096

    Arusha

    Tanzania

    Tel: 255 27 2504253/8

    Fax: 255-27-2504481/2504255

    E-Mail: [email protected]

    Web: www.each.int

    *

    2010 EAC All rights of exploitation in any form and by any means reserved worldwide for EAC Partner States NSBs.

  • Draf

    t for

    com

    men

    ts on

    ly

    Not

    to b

    e cit

    ed a

    s Eas

    t Afri

    can

    Stan

    dard

    CD/K/034:2009

    EAC 2010 All rights reserved iii

    Contents 1 Scope .......................................................................................................................................... 1 2 Normative references ................................................................................................................... 1 3 Terms and definitions ................................................................................................................... 3 4 Design considerations .................................................................................................................. 3

    4.1 General ............................................................................................................................... 3 4.2 Accessibility ......................................................................................................................... 4 4.3 Control of moisture .............................................................................................................. 4 4.4 Profiles ................................................................................................................................ 4 4.5 Selection of materials .......................................................................................................... 4 4.6 Selection of coating systems ............................................................................................... 5

    5 Organization of work .................................................................................................................. 32 5.1 General ............................................................................................................................. 32 5.2 Health and safety .............................................................................................................. 33 5.3 Order of working ................................................................................................................ 33 5.4 Scaffolding and equipment ................................................................................................ 33 5.5 Supply of materials ............................................................................................................ 34 5.6 Storage of materials .......................................................................................................... 34 5.7 Protection of components on site ...................................................................................... 34 5.8 Off-site work ...................................................................................................................... 35 5.9 Workforce and supervision ................................................................................................ 35 5.10 Inspection procedures ....................................................................................................... 35 5.11 Materials sampling and testing .......................................................................................... 36

    6 Exchange of information ............................................................................................................ 36 6.1 General ............................................................................................................................. 36 6.2 Specification ...................................................................................................................... 36 6.3 Bills of quantities ............................................................................................................... 37 6.4 Schedules ......................................................................................................................... 37 6.5 Drawings ........................................................................................................................... 37 6.6 Records ............................................................................................................................. 37

    7 Materials .................................................................................................................................... 38 7.1 Functions of coatings ........................................................................................................ 38 7.2 General properties of coatings .......................................................................................... 38 7.3 Components of coating systems........................................................................................ 39 7.4 Ancillary materials ............................................................................................................. 41

    8 Substrates and coating systems ................................................................................................ 42 8.1 Wood ................................................................................................................................. 42 8.2 Wood-based panels products ............................................................................................ 49 8.3 Iron and steel .................................................................................................................... 51 8.4 Non-ferrous metals and metallic coatings .......................................................................... 56 8.5 Plaster, external rendering, concrete (including lightweight and autoclaved aerated blocks), brick and stone General considerations ..................................................................................... 61 8.6 Plaster ............................................................................................................................... 64 8.7 External renuenug ........................................................................................................... 66 8.8 Concrete ............................................................................................................................ 67 8.9 Brick and stone .................................................................................................................. 68 8.10 Precast concrete blocks .................................................................................................... 69 8.11 Cement-based sheets, boards and components ............................................................... 71 8.12 Paper and wallcoverings including plasterboard ................................................................ 72 8.13 Plastics ...................