cell/model name description date

30
CELL/MODEL NAME DESCRIPTION DATE BAIA-CIP-2399-0 (2 pgs.) Bridge approach integral abut; Cast in place; 2399 Rail; No skew 10/12/2021 BAIA-CIP-R34-0 (2 pgs.) Bridge approach integral abut; Cast in place; R34 Rail; No skew 10/12/2021 BAIA-CIP-R34C-0 (2 pgs.) Bridge approach integral abut; Cast in place; R34 Rail with curb; No skew 10/12/2021 BAIA-CIP-R40-0 (2 pgs.) Bridge approach integral abut; Cast in place; R40 Rail; No skew 10/12/2021 BAIA-CIP-R41-0 (2 pgs.) Bridge approach integral abut; Cast in place; R41 Rail; No skew 10/12/2021 BAIA-CIP-R41C-0 (2 pgs.) Bridge approach integral abut; Cast in place; R41 Rail with curb; No skew 10/12/2021 BAIA-CIP-R42-0 (2 pgs.) Bridge approach integral abut; Cast in place; R42 Rail; No skew 10/12/2021 BAIA-CIP-39CS-0 (2 pgs.) Bridge approach integral abut; CIP; 39 in. Constant Slope; No skew 10/12/2021 BAIA-CIP-39CS-L > 30 (2 pgs.) Bridge approach integral abut; CIP; 39 in. Constant Slope; Left skew > 30 degrees 10/12/2021 BAIA-CIP-39CS-L 30 (2 pgs.) Bridge approach integral abut; CIP; 39 in. Constant Slope; Left skew 30 degrees 10/12/2021 BAIA-CIP-39CS-R > 30 (2 pgs.) Bridge approach integral abut; CIP; 39 in. Constant Slope; Right skew > 30 degrees 10/12/2021 BAIA-CIP-39CS-R 30 (2 pgs.) Bridge approach integral abut; CIP; 39 in. Constant Slope; Right skew 30 degrees 10/12/2021 BAIA-CIP-44CS-0 (2 pgs.) Bridge approach integral abut; CIP; 44 in. Constant Slope; No skew 10/12/2021 BASA-CIP-3944CS-0 (2 pgs.) Bridge approach stub abut; CIP; 39 or 44 in. Constant Slope; No skew 10/12/2021 Approach Slabs-Bridge Cast in Place Page 1 of 2 10/12/2021

Upload: others

Post on 09-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CELL/MODEL NAME DESCRIPTION DATE

CELL/MODEL NAME DESCRIPTION DATEBAIA-CIP-2399-0 (2 pgs.) Bridge approach integral abut; Cast in place; 2399 Rail; No skew 10/12/2021BAIA-CIP-R34-0 (2 pgs.) Bridge approach integral abut; Cast in place; R34 Rail; No skew 10/12/2021

BAIA-CIP-R34C-0 (2 pgs.) Bridge approach integral abut; Cast in place; R34 Rail with curb; No skew 10/12/2021BAIA-CIP-R40-0 (2 pgs.) Bridge approach integral abut; Cast in place; R40 Rail; No skew 10/12/2021BAIA-CIP-R41-0 (2 pgs.) Bridge approach integral abut; Cast in place; R41 Rail; No skew 10/12/2021

BAIA-CIP-R41C-0 (2 pgs.) Bridge approach integral abut; Cast in place; R41 Rail with curb; No skew 10/12/2021BAIA-CIP-R42-0 (2 pgs.) Bridge approach integral abut; Cast in place; R42 Rail; No skew 10/12/2021

BAIA-CIP-39CS-0 (2 pgs.) Bridge approach integral abut; CIP; 39 in. Constant Slope; No skew 10/12/2021BAIA-CIP-39CS-L > 30 (2 pgs.) Bridge approach integral abut; CIP; 39 in. Constant Slope; Left skew > 30 degrees 10/12/2021BAIA-CIP-39CS-L ≤ 30 (2 pgs.) Bridge approach integral abut; CIP; 39 in. Constant Slope; Left skew ≤ 30 degrees 10/12/2021BAIA-CIP-39CS-R > 30 (2 pgs.) Bridge approach integral abut; CIP; 39 in. Constant Slope; Right skew > 30 degrees 10/12/2021BAIA-CIP-39CS-R ≤ 30 (2 pgs.) Bridge approach integral abut; CIP; 39 in. Constant Slope; Right skew ≤ 30 degrees 10/12/2021

BAIA-CIP-44CS-0 (2 pgs.) Bridge approach integral abut; CIP; 44 in. Constant Slope; No skew 10/12/2021BASA-CIP-3944CS-0 (2 pgs.) Bridge approach stub abut; CIP; 39 or 44 in. Constant Slope; No skew 10/12/2021

Approach Slabs-Bridge Cast in Place Page 1 of 2 10/12/2021

Page 2: CELL/MODEL NAME DESCRIPTION DATE

DATE REVISION HISTORY8/11/2017 ● Added top and bottom footing elevations.

● Changed footing thickness to constant 10 inches such that the bottom of footing follows the grade.● Added new base sheet BA-CIP-R34-0.● Corrected parapet reinforcement on base sheet BAIA-CIP-42FS-0.● Called out formed joint at beginning of approach slabs.● Corrected miscellaneous editorial and drafting errors.

6/15/2019 ● Replaced F-shaped parapets with new constant slope parapets and revised all reinforcement accordingly.● Added new base sheet BAIA-CIP-R40-0.● Called out wingwall joint material on cross section.

10/12/2021 ● Revised elevation table for sleeper slab to specify locations more clearly.● Created new version for R40 rail.● Created new version for R41 rail.● Created new version for R42 rail.● Revised the edge beam for the R34 to match the R40 and R41.● Showed hatched block on stub abutment version.

Approach Slabs-Bridge Cast in Place Page 2 of 2 10/12/2021

Page 3: CELL/MODEL NAME DESCRIPTION DATE

7'-0'' 3'-0''

Approach Footing

10'-0''

for pavement connector

See Hwy. Std. 420401

(Sheet 1 of 2)

AT APPROACH FOOTING

5'-0'' typ.

2'' cl.

15'-0'' typ.

1''

5''

'-'' out to out

Approach Sla

b and Footin

g at curb

6''

2- Rail post spaces at '-'' = '-''

of Abut.

Back

1'-

6''

1'-

6''

typ.

1'-

0"

typ.

6"

steel railing

End of

9''

'-'' out to out

Approach Sla

b at Steel

Railin

g

Type 2399

Steel Railing

7''

15'-0"

2'-6"

¡

1'-6''

Bend to fit taper.

1-#4 b13(E) bar in curb, typ.

Slope % Slope % Slope % Slope %

10-12-2021

PLAN

A A

¡

17-#5 d10(E) bars at 11'' cts. typ.

'')

41

'' cl. (±

41

2

''211'-4

''211

''8

77

'' cl. min. typ.211

bottom of Approach Footing. See Sec A-A

20-#5 w10(E) bars at 6'' cts. Top and

d10(E) a12(E) a10(E) b10(E)

b12(E) b11(E) a11(E)

e10(E)

b13(E)

t10(E)w10(E)

top and bottom of slab, typ.

2-#5 b12(E) bars at 5'' cts.

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12'' cts.

60-#8 a11(E) bars at 6'' cts. Bottom of slab

46-#5 a10(E) bars at 8'' cts. Top of slab, tilt as necessary to fit curb

Lap with each a10(E) bar

at 8'' cts. Top of slab, typ.

23-#5 a12(E) bars

-#

9 b11(E)

bars at 5'' cts.

Botto

m of sla

b

-#

5 b10(E)

bars at 8'' cts.

Top of sla

b

A

B

C

D

E

F

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

NEAR ABUTMENT

(Looking )

CROSS SECTION

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

BAIA-CIP-2399-0

to drain

'' per foot41Slope

30'-0'' end to end approach

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

Page 4: CELL/MODEL NAME DESCRIPTION DATE

92 #5

#8

#4

Concrete Superstructure Cu. Yd.

Pound

Cu. Yd.Concrete Structures

#5 7'-4"

#5

#9

16 #5

4 #4

80 #5

9'-8"

Epoxy Coated

Reinforcement Bars,

2'-6"

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

120

50° F.Appr. slab

End of

¡ Joint

92

**

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

1'-2"

1'-

1"

1'-2"

1'-8"

1'-

7" #5

#5 6'-8"

12

5'-0"

5"

top of curb

3- #5 e10(E) bars

68

(PCC)

Connector

Pavement

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

DETAIL A

INSIDE ELEVATION OF RAILING AND CURB

"21

"21

29'-8"

29'-8"

14'-8"

14'-8"

14'-8"" at431

2"

7"

15'-0" 15'-0"

See Notes.

" at 50° F432

Bar No. Size Length Shape

a10(E)

a11(E)

a12(E)

b10(E)

b11(E)

b12(E)

b13(E)

d10(E)

e10(E)

t10(E)

w10(E)

BAR a12(E)

BAR a10(E)

BAR d10(E)

b13(E)

Run out to out of curb

Pavement Joint Seal". Recess ¼" minimum.

* Expansion joint. See Special Provision "Preformed

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

BAIA-CIP-2399-0

6'-6"

1'-

0"

1'-

3"

Sla

b

See Detail A

3'-0"

cl.

cl.

7'-0"

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

typ.

"871

typ.

8"

See sheet of for hatched block details.

For railing details, see sheet of .

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

Curb concrete under railing shall be paid for as Concrete Superstructure.

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

Page 5: CELL/MODEL NAME DESCRIPTION DATE

(Sheet 1 of 2)

AT APPROACH FOOTING

(Looking )

¡

2'-0"

Type SM

Steel Railing

7'-0" 3'-0"

for pavement connector

See Hwy. Std. 420401

of Approach Footing. See Sec A-A

20-#5 w10(E) bars at 6" cts. Top and bottom

15'-0"

2'-6"

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

of Abut.

Back

steel railing

End of

Edge beam for railing

14'-0" typ.

¡

Slope % Slope % Slope % Slope %

10-12-2021

CROSS SECTION

PLAN

A A

1'-

8"

2"

cl.

2- Rail post spaces at '-" = '-"

Approach Footing

10'-0"'-"

out to out

Approach Sla

b and Footin

g

")4

1"

cl. (±

41

2

a11(E)d10(E) b11(E)

16-#5 d10(E) bars at 12" cts. typ.

bottom of slab, typ.

3-#5 b12(E) bars

b12(E)

a10(E) b10(E)

Lap with each a10(E) bar

at 8" cts. Top of slab, typ.

23-#5 a12(E) bars

-#

9 b11(E)

bars at 5"

cts.

Botto

m of sla

b

-#

5 b10(E)

bars at 8"

cts.

Top of sla

b

a12(E)

w10(E) t10(E)

A

B

C

D

E

F

60-#8 a11(E) bars at 6" cts. Bottom of slab

46-#5 a10(E) bars at 8" cts. Top of slab

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

NEAR ABUTMENT

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

BAIA-CIP-R34-0

30'-0" end to end approach

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

B

B

Page 6: CELL/MODEL NAME DESCRIPTION DATE

92 #5

#8

#4

Pound

Cu. Yd.Concrete Structures

#5 7'-8"

#5

#9

12 #5

80 #5

9'-8"

Epoxy Coated

Reinforcement Bars,

2'-6"

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

120

92

#5 4'-11"64

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

INSIDE ELEVATION OF RAILING

29'-8"

29'-8"

13'-8"

15'-0" 15'-0"

Bar No. Size Length Shape

a12(E)

a11(E)

a10(E)

b12(E)

b11(E)

d10(E)

b10(E)

t10(E)

w10(E)

For railing details, see sheet of .

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

BAIA-CIP-R34-0

1'-

3"

Sla

b

See Detail A

3'-0"

cl.

cl.

7'-0"

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

50° F.Appr. slab

End of

¡ Joint

**

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

(PCC)

Connector

Pavement

DETAIL A

SECTION B-B

"21

"21

4"

")4

1"

cl. (±

41

22"

cl.

" at431

See Notes.

" at 50° F432

BAR d10(E)

BAR a12(E)

b12(E) d10(E)

b10(E)

b11(E)

Run out to out of curb

" minumum. 41 Pavement Joint Seal". Recess

* Expansion joint. See Special Provision "Preformed

a10(E) or a12(E)

6'-6"

1'-

2"

"41

1'-

3"

1'-7"

1'-3"

"2

17

10"

"856

above rail anchorage

Place first b10(E) bar

¡ of Post

Page 7: CELL/MODEL NAME DESCRIPTION DATE

(Sheet 1 of 2)

NEAR ABUTMENTAT APPROACH FOOTING

(Looking )

¡

Type SM

Steel Railing

7'-0" 3'-0"

for pavement connector

See Hwy. Std. 420401

of Approach Footing. See Sec A-A

20-#5 w10(E) bars at 6" cts. Top and bottom

15'-0"

2'-6"

60-#8 a11(E) bars at 6" cts. Bottom of slab

46-#5 a10(E) bars at 8" cts. Top of slab, tilt as necessary to fit curb

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

of Abut.

Back

steel railing

End of

Edge beam for railing

14'-0" typ.

¡

Bend to fit taper.

1-#4 b13(E) bar in curb, typ.

Slope % Slope % Slope % Slope %

10-12-2021

CROSS SECTION

PLAN

A A

2'-

0"

2"

cl.

2- Rail post spaces at '-" = '-"

5"

1"

6"

5"

6"

1"

4"

Approach Footing

10'-0"

'-"

out to out

Approach Sla

b and Footin

g

5'-0" typ.

6"

6"

4"

a11(E)b11(E)

b13(E)

16-#5 d10(E) bars at 12" cts. typ.

bottom of slab, typ.

3-#5 b12(E) bars

b13(E)

a10(E) b10(E)

Lap with each a10(E) bar

at 8" cts. Top of slab, typ.

23-#5 a12(E) bars

-#

9 b11(E)

bars at 5"

cts.

Botto

m of sla

b

-#

5 b10(E)

bars at 8"

cts.

Top of sla

b

a12(E)

w10(E) t10(E)

A

B

C

D

E

F

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

")4

1"

cl. (±

41

2

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

BAIA-CIP-R34C-0

30'-0" end to end approach

(_ approach slab shown; _ approach slab similar by 180° rotation)

2'-0"

d10(E)

b12(E)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

B

B

Page 8: CELL/MODEL NAME DESCRIPTION DATE

92 #5

#8

#4

Pound

Cu. Yd.Concrete Structures

#5 7'-8"

#5

#9

12 #5

4 #4

80 #5

9'-8"

Epoxy Coated

Reinforcement Bars,

2'-6"

5'-0"

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

120

92

#5 4'-11"64

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

INSIDE ELEVATION OF RAILING AND CURB

29'-8"

29'-8"

13'-8"

29'-8"

2"

4"

15'-0" 15'-0"

Bar No. Size Length Shape

a12(E)

a11(E)

a10(E)

BAR d10(E)

b13(E)

b12(E)

b11(E)

d10(E)

b10(E)

t10(E)

w10(E)

BAR a12(E)

b13(E)

BAR a10(E)

For railing details, see sheet of .

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

BAIA-CIP-R34C-0

1'-

3"

Sla

b

See Detail A

3'-0"

cl.

cl.

7'-0"

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

typ.

"2

15

typ.

"411

50° F.Appr. slab

End of

¡ Joint

**

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

(PCC)

Connector

Pavement

DETAIL A

SECTION B-B

"21

"21

")4

1"

cl. (±

41

22"

cl.

" at431

See Notes.

" at 50° F432

b12(E) d10(E)

b10(E)

b11(E)

Run out to out of curb

" minumum. 41 Pavement Joint Seal". Recess

* Expansion joint. See Special Provision "Preformed

6'-6"

1'-

2"

"41

1'-

3"

1'-7"

1'-3"

"2

17

10"

"856

8"

b13(E)

5"1"

4"

a10(E)

a12(E)

above rail anchorage

Place first b10(E) bar

¡ of Post

Page 9: CELL/MODEL NAME DESCRIPTION DATE

(Sheet 1 of 2)

AT APPROACH FOOTING

(Looking )

¡

2'-0"

7'-0" 3'-0"

for pavement connector

See Hwy. Std. 420401

of Approach Footing. See Sec A-A

20-#5 w10(E) bars at 6" cts. Top and bottom

13'-0"

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

of Abut.

Back

steel railing

End of

¡

Slope % Slope % Slope % Slope %

10-12-2021

CROSS SECTION

PLAN

A A

1'-

8"

2"

cl.

Approach Footing

10'-0"'-"

out to out

Approach Sla

b and Footin

g

")4

1"

cl. (±

41

2

a11(E)d10(E) b11(E)

9-#5 d10(E) bars at 12" cts. typ.

bottom of slab, typ.

3-#5 b12(E) bars

b12(E)

a10(E) b10(E)

Lap with each a10(E) bar

at 8" cts. Top of slab, typ.

13-#5 a12(E) bars

-#

9 b11(E)

bars at 5"

cts.

Botto

m of sla

b

-#

5 b10(E)

bars at 8"

cts.

Top of sla

b

a12(E)

w10(E) t10(E)

A

B

C

D

E

F

60-#8 a11(E) bars at 6" cts. Bottom of slab

46-#5 a10(E) bars at 8" cts. Top of slab

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

NEAR ABUTMENT

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

BAIA-CIP-R40-0

30'-0" end to end approach

Type IL-OH

Steel Railing

5'-0"

B

B

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Edge beam for railing

7'-0" typ.

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

Page 10: CELL/MODEL NAME DESCRIPTION DATE

92 #5

#8

#4

Pound

Cu. Yd.Concrete Structures

#5 7'-8"

#5

#9

12 #5

80 #5

9'-8"

Epoxy Coated

Reinforcement Bars,

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

120

50° F.Appr. slab

End of

¡ Joint

52

**

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

#536

(PCC)

Connector

Pavement

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

DETAIL A

INSIDE ELEVATION OF RAILING

SECTION B-B

"21

"21

29'-8"

29'-8"

6'-8"4"

")4

1"

cl. (±

41

22"

cl.

" at431

See Notes.

" at 50° F432

Bar No. Size Length Shape

a12(E)

a11(E)

a10(E)

BAR d10(E)

b12(E)

b11(E)

d10(E)

b10(E)

t10(E)

w10(E)

BAR a12(E)

b12(E) d10(E)

b10(E)

b11(E)

Run out to out of curb

" minumum. 41 Pavement Joint Seal". Recess

* Expansion joint. See Special Provision "Preformed

a10(E) or a12(E)

For railing details, see sheet of .

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

BAIA-CIP-R40-0

1'-

3"

Sla

b

See Detail A

3'-0"

cl.

cl.

7'-0"

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

13'-0" 17'-0"

above rail anchorage

Place first 2-b10(E) bars

6'-6"

1'-

2"

"41

1'-

3"

1'-7"

1'-3"

"2

17

10"

"856

4'-11"

Page 11: CELL/MODEL NAME DESCRIPTION DATE

(Sheet 1 of 2)

AT APPROACH FOOTING

(Looking )

¡

2'-0"

Type SMX

Steel Railing

7'-0" 3'-0"

for pavement connector

See Hwy. Std. 420401

of Approach Footing. See Sec A-A

20-#5 w10(E) bars at 6" cts. Top and bottom

15'-0"

2'-6"

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

of Abut.

Back

steel railing

End of

Edge beam for railing

14'-0" typ.

¡

Slope % Slope % Slope % Slope %

10-12-2021

CROSS SECTION

PLAN

A A

1'-

8"

2"

cl.

2- Rail post spaces at '-" = '-"

Approach Footing

10'-0"'-"

out to out

Approach Sla

b and Footin

g

")4

1"

cl. (±

41

2

a11(E)d10(E) b11(E)

16-#5 d10(E) bars at 12" cts. typ.

bottom of slab, typ.

3-#5 b12(E) bars

b12(E)

a10(E) b10(E)

Lap with each a10(E) bar

at 8" cts. Top of slab, typ.

23-#5 a12(E) bars

-#

9 b11(E)

bars at 5"

cts.

Botto

m of sla

b

-#

5 b10(E)

bars at 8"

cts.

Top of sla

b

a12(E)

w10(E) t10(E)

A

B

C

D

E

F

60-#8 a11(E) bars at 6" cts. Bottom of slab

46-#5 a10(E) bars at 8" cts. Top of slab

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

NEAR ABUTMENT

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

BAIA-CIP-R41-0

30'-0" end to end approach

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

B

B

Page 12: CELL/MODEL NAME DESCRIPTION DATE

92 #5

#8

#4

Pound

Cu. Yd.Concrete Structures

#5 7'-8"

#5

#9

12 #5

80 #5

9'-8"

Epoxy Coated

Reinforcement Bars,

2'-6"

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

120

92

#5 4'-11"64

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

INSIDE ELEVATION OF RAILING

29'-8"

29'-8"

13'-8"

15'-0" 15'-0"

Bar No. Size Length Shape

a12(E)

a11(E)

a10(E)

b12(E)

b11(E)

d10(E)

b10(E)

t10(E)

w10(E)

For railing details, see sheet of .

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

BAIA-CIP-R41-0

1'-

3"

Sla

b

See Detail A

3'-0"

cl.

cl.

7'-0"

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

50° F.Appr. slab

End of

¡ Joint

**

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

(PCC)

Connector

Pavement

DETAIL A

SECTION B-B

"21

"21

4"

")4

1"

cl. (±

41

22"

cl.

" at431

See Notes.

" at 50° F432

BAR d10(E)

BAR a12(E)

b12(E) d10(E)

b10(E)

b11(E)

Run out to out of curb

" minumum. 41 Pavement Joint Seal". Recess

* Expansion joint. See Special Provision "Preformed

a10(E) or a12(E)

6'-6"

1'-

2"

"41

1'-

3"

1'-7"

1'-3"

"2

17

10"

"856

¡ of Post

above rail anchorage

Place first 2-b10(E) bars

Page 13: CELL/MODEL NAME DESCRIPTION DATE

(Sheet 1 of 2)

NEAR ABUTMENTAT APPROACH FOOTING

(Looking )

¡

Type SMX

Steel Railing

7'-0" 3'-0"

for pavement connector

See Hwy. Std. 420401

of Approach Footing. See Sec A-A

20-#5 w10(E) bars at 6" cts. Top and bottom

15'-0"

2'-6"

60-#8 a11(E) bars at 6" cts. Bottom of slab

46-#5 a10(E) bars at 8" cts. Top of slab, tilt as necessary to fit curb

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

of Abut.

Back

steel railing

End of

Edge beam for railing

14'-0" typ.

¡

Bend to fit taper.

1-#4 b13(E) bar in curb, typ.

Slope % Slope % Slope % Slope %

10-12-2021

CROSS SECTION

PLAN

A A

2'-

0"

2"

cl.

2- Rail post spaces at '-" = '-"

5"

1"

6"

5"

6"

1"

4"

Approach Footing

10'-0"

'-"

out to out

Approach Sla

b and Footin

g

5'-0" typ.

6"

6"

4"

a11(E)b11(E)

b13(E)

16-#5 d10(E) bars at 12" cts. typ.

bottom of slab, typ.

3-#5 b12(E) bars

b13(E)

a10(E) b10(E)

Lap with each a10(E) bar

at 8" cts. Top of slab, typ.

23-#5 a12(E) bars

-#

9 b11(E)

bars at 5"

cts.

Botto

m of sla

b

-#

5 b10(E)

bars at 8"

cts.

Top of sla

b

a12(E)

w10(E) t10(E)

A

B

C

D

E

F

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

")4

1"

cl. (±

41

2

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

BAIA-CIP-R41C-0

30'-0" end to end approach

(_ approach slab shown; _ approach slab similar by 180° rotation)

2'-0"

d10(E)

b12(E)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

B

B

Page 14: CELL/MODEL NAME DESCRIPTION DATE

92 #5

#8

#4

Pound

Cu. Yd.Concrete Structures

#5 7'-8"

#5

#9

12 #5

4 #4

80 #5

9'-8"

Epoxy Coated

Reinforcement Bars,

2'-6"

5'-0"

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

120

92

#5 4'-11"64

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

INSIDE ELEVATION OF RAILING AND CURB

29'-8"

29'-8"

13'-8"

29'-8"

2"

4"

15'-0" 15'-0"

Bar No. Size Length Shape

a12(E)

a11(E)

a10(E)

BAR d10(E)

b13(E)

b12(E)

b11(E)

d10(E)

b10(E)

t10(E)

w10(E)

BAR a12(E)

b13(E)

BAR a10(E)

For railing details, see sheet of .

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

BAIA-CIP-R41C-0

1'-

3"

Sla

b

See Detail A

3'-0"

cl.

cl.

7'-0"

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

typ.

"2

15

typ.

"411

50° F.Appr. slab

End of

¡ Joint

**

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

(PCC)

Connector

Pavement

DETAIL A

SECTION B-B

"21

"21

")4

1"

cl. (±

41

22"

cl.

" at431

See Notes.

" at 50° F432

b12(E) d10(E)

b10(E)

b11(E)

Run out to out of curb

" minumum. 41 Pavement Joint Seal". Recess

* Expansion joint. See Special Provision "Preformed

6'-6"

1'-

2"

"41

1'-

3"

1'-7"

1'-3"

"2

17

10"

"856

8"

b13(E)

5"1"

4"

a10(E)

a12(E)

¡ of Post

above rail anchorage

Place first 2-b10(E) bars

Page 15: CELL/MODEL NAME DESCRIPTION DATE

7'-0'' 3'-0''

Approach Footing

10'-0''

for pavement connector

See Hwy. Std. 420401

(Sheet 1 of 2)

AT APPROACH FOOTING

4'-0'' typ.

2'' cl.

'-'' out to out

Approach Sla

b and Footin

g at curb

6''

of Abut.

Back

1'-

6''

1'-

6''

typ.

1'-

0"

typ.

6"

steel railing

End of

9''

'-'' out to out

Approach Sla

b at Steel

Railin

g

15'-0"

2'-0"

¡

1'-6''

Bend to fit taper.

1-#4 b13(E) bar in curb, typ.

Slope % Slope % Slope % Slope %

10-12-2021

PLAN

A A

¡

'')

41

'' cl. (±

41

2

''8

77

bottom of Approach Footing. See Sec A-A

20-#5 w10(E) bars at 6'' cts. Top and

d10(E) a12(E) a10(E) b10(E)

b12(E) b11(E) a11(E)

e10(E)

b13(E)

t10(E)w10(E)

top and bottom of slab, typ.

2-#5 b12(E) bars at 5'' cts.

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12'' cts.

Lap with each a10(E) bar

at 8'' cts. Top of slab, typ.

23-#5 a12(E) bars

-#

9 b11(E)

bars at 5'' cts.

Botto

m of sla

b

-#

5 b10(E)

bars at 8'' cts.

Top of sla

b

A

B

C

D

E

F

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

NEAR ABUTMENT

(Looking )

CROSS SECTION

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

to drain

'' per foot41Slope

30'-0'' end to end approach

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

"87Type R42

Steel Railing

BAIA-CIP-R42-0

9"

"87

"815

15'-0''

60-#8 a11(E) bars at 6'' cts. Bottom of slab

46-#5 a10(E) bars at 8'' cts. Top of slab, tilt or cut as necessary to fit curb

4'-0'' typ.23-#5 d10(E) bars at 8" cts. typ.

2'' cl. min. typ.

Page 16: CELL/MODEL NAME DESCRIPTION DATE

92 #5

#8

#4

Concrete Superstructure Cu. Yd.

Pound

Cu. Yd.Concrete Structures

#5 7'-4"

#5

#9

16 #5

4 #4

80 #5

9'-8"

Epoxy Coated

Reinforcement Bars,

2'-0"

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

120

50° F.Appr. slab

End of

¡ Joint

92

**

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

1'-1"

1'-

1"

1'-2"

1'-8"

1'-

7" #5

#5 6'-7"

12

top of curb

3- #5 e10(E) bars

68

(PCC)

Connector

Pavement

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

DETAIL A

INSIDE ELEVATION OF RAILING AND CURB

"21

"21

29'-8"

29'-8"

14'-8"

14'-8"

14'-8"" at431

9"

15'-0" 15'-0"

See Notes.

" at 50° F432

Bar No. Size Length Shape

a10(E)

a11(E)

a12(E)

b10(E)

b11(E)

b12(E)

b13(E)

d10(E)

e10(E)

t10(E)

w10(E)

BAR a12(E)

BAR a10(E)

BAR d10(E)

b13(E)

Run out to out of curb

Pavement Joint Seal". Recess ¼" minimum.

* Expansion joint. See Special Provision "Preformed

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

6'-6"

1'-

0"

1'-

3"

Sla

b

See Detail A

3'-0"

cl.

cl.

7'-0"

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

4'-0"

5"

2"4'-0"

For railing details, see sheet of .

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

Curb concrete under railing shall be paid for as Concrete Superstructure.

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

"85

typ.

"43

typ.

10"

BAIA-CIP-R42-0

Page 17: CELL/MODEL NAME DESCRIPTION DATE

(Sheet 1 of 2)

NEAR ABUTMENT AT APPROACH FOOTING(Looking )

¡ Roadway

Slope % Slope % Slope % Slope %

10-12-2021

CROSS SECTION

BAIA-CIP-39CS-0

PLAN

6"

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

bottom of slab, typ.

2-#5 b12(E) bar top and

"2

19

1'-

5"

"2

17

"2

19

1'-

5"

"2

17

23-#5 d11(E) bars at 8" cts. typ.

2'-0"

typ.

11"

typ. typ.

6"

'-"

out to out

Approach Sla

b at parapet

Bend to fit taper.

1-#4 b13(E) bar in curb, typ.

-#

9 b11(E)

bars at 5"

cts.

Botto

m of sla

b

-#

5 b10(E)

bars at 8"

cts.

Top of sla

b

Lap with each a10(E) bar

at 8" cts. Top of slab, typ.

23-#5 a12(E) bars

of Abut.

Back

60-#8 a11(E) bars at 6" cts. Bottom of slab

46-#5 a10(E) bars at 8" cts. Top of slab, tilt as necessary to fit curb

¡

Footing. See Sec A-A

Top and bottom of Approach

20-#5 w10(E) bars at 6" cts.

C

B

A

D

E

F

Approach Footing

10'-0"

7'-0" 3'-0"

5'-0" typ.

for pavement connector

See Hwy. Std. 420401

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

'-"

out to out

Approach Sla

b and Footin

g at curb

AA

2" cl.

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

1'-5"

"219 "2

17

3'-

3"

d11(E)d11(E)

d10(E)

b12(E)

e10(E)

a12(E)

")4

1"

cl. (±

41

2

2"

cl.

b11(E) a11(E)

a10(E) b10(E)

"43 "4

15

4"

b13(E)

t10(E)w10(E)

min., typ.

2" cl.

15'-0" typ.

30'-0" end to end approach

"2

13'-

1

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

Page 18: CELL/MODEL NAME DESCRIPTION DATE

92 #5

#8

#4

92 #5

92 #5

40 #4

Concrete Superstructure Cu. Yd.

Pound

6'-5"

Cu. Yd.Concrete Structures

#5 7'-4"

#5

#9

16 #5

4 #4

80 #5

9'-8"

Epoxy Coated

Reinforcement Bars,

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

120

50° F.Appr. slab

End of

¡ Joint

92

8'-6"

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

**

(PCC)

Connector

Pavement

3'-6"

parapet

End ofThreads

Nut

and washer

Locknut

of the Standard Specifications)

galvanized according to Article 1006.09

(Anchor bolt assemblies shall be

6'-6"

10"

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

DETAIL A

VIEW B-B

INSIDE ELEVATION OF PARAPET AND CURB

BAIA-CIP-39CS-0

*

"21

"21

41

29'-8"

29'-8"

14'-8"

14'-8"

14'-8"

1" Ø ANCHOR BOLT

" at431

4"

See Notes.

" at 50° F432

Bar No. Size Length Shape

BAR a12(E)

d10(E)

b10(E)

a11(E)

a10(E)

a12(E)

b11(E)

b12(E)

b13(E)

d11(E)

e10(E)

t10(E)

w10(E)

BAR d11(E)BAR d10(E)

BAR a10(E)

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

Parapet concrete shall be paid for as Concrete Superstructure.

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

Run out to out of curb

Pavement Joint Seal". Recess ¼" minimum.

* Expansion joint. See Special Provision "Preformed

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

15'-0" 15'-0"

2'-0"

5"

4"

5'-0"

2"

Cut last 3 bars to fit taper

23-#5 d10(E) bars at 8" cts.

section near abutment

10-#4 e10(E) bars. See cross

b13(E)

Standard 631031.

connections see Highway

631026. For Type 6 terminal

View B-B and Highway Standard

terminal connections only, See

1" Ø Anchor bolts for Type 5

B

B

4"

4"

4"

¡ 1" Ø Anchor bolts

"436

"8

72'-

0

"43 "4

15

11"5"

Rad.

"852

2'-

7"

"437

"2

1

2'-

7

"8111

6"

"2

12'-

5

"811'-0

"4

3

2'-

3

1'-1" 1'-2"

1'-6" 3"

"8

32'-

3

1'-

3"

Sla

b

See Detail A

3'-0"

cl.

cl.

7'-0"

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

Bend to fit taper

Rad.

"814

typ.

"411

typ.

"2

15

Page 19: CELL/MODEL NAME DESCRIPTION DATE

(Sheet 1 of 2)10-12-2021

PLAN

BAIA-CIP-39CS-L(>30°)

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

"2

19

1'-

5"

"2

17

"2

19

1'-

5"

"2

17

23-#5 d11(E) bars at 8" cts. typ.

2'-0"

typ.

11"

typ. typ.

6"

'-"

out to out

Approach Sla

b at parapet

-#9 b11(E) bars at 5" cts. Bottom of slab

-#5 b10(E) bars at 8" cts. Top of slab

of Abut.

Back¡

C

B

A D

E

F

Approach Footing

10'-0"7'-0"

3'-0"

5'-0" typ.

for pavement connector

See Hwy. Std. 420401

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

'-"

out to out

Approach Sla

b and Footin

g at curb

AA

Lap with each a10(E) bar

at 8" cts. Top of slab, typ.

-#5 a12(E) bars

60-#8 a11(E) bars at 6" cts. Bottom of slab

-#5 a10(E) bars at 8" cts. Top of slab, tilt as necessary to fit curb

See S

ec A-A

of Approach F

ooting.

6" cts. T

op and bottom

20-#

5 w

10(E) bars at

Skew

°

bar to fit

Bend d11(E)

Bend to fit taper.

1-#4 b15(E) bar in curb.

Bend to fit taper.

1-#4 b14(E) bar in curb.

d11(E) bar to fit

Cut back leg of

NEAR ABUTMENT AT APPROACH FOOTING(Looking )

¡ Roadway

Slope % Slope % Slope % Slope %

CROSS SECTION

6"

2" cl.

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

1'-5"

"219 "2

17

3'-

3"

d11(E)d11(E)

d10(E)

e10(E)

a12(E)

")4

1"

cl. (±

41

2

2"

cl.

b11(E) a11(E)

a10(E) b10(E)

"43 "4

15

4"

t10(E)w10(E)

min., typ.

2" cl.

15'-0"

15'-0"

b13(E)

b12(E) or

b15(E)

b14(E) or

"2

13'-

1

30'-0" end to end approach

bottom of slab

2-#5 b13(E) bars top and

bottom of slab

2-#5 b12(E) bars top and

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

Page 20: CELL/MODEL NAME DESCRIPTION DATE

#5

#8

#4

92 #5

92 #5

40 #4

Concrete Superstructure Cu. Yd.

Pound

6'-5"

Cu. Yd.Concrete Structures

#5 7'-4"

#5

#9

8 #5

8 #5

80 #5

Epoxy Coated

Reinforcement Bars,

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

8'-6"

2 #4

2 #4

50° F.Appr. slab

End of

¡ Joint

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

**

(PCC)

Connector

Pavement

3'-6"

parapet

End ofThreads

Nut

and washer

Locknut

of the Standard Specifications)

galvanized according to Article 1006.09

(Anchor bolt assemblies shall be

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

DETAIL A

VIEW B-B

*

BAIA-CIP-39CS-L(>30°)

"21

"21

41

29'-8"

29'-8"

14'-8"

1" Ø ANCHOR BOLT

" at431

4"

See Notes.

" at 50° F432

Bar No. Size Length Shape

BAR a12(E)

d10(E)

b12(E)

b10(E)

a11(E)

a10(E)

a12(E)

b11(E)

b13(E)

b14(E)

b15(E)

d11(E)

e10(E)

t10(E)

w10(E)

BAR d11(E)BAR d10(E)

BAR a10(E)

Run out to out of curb

Pavement Joint Seal". Recess ¼" minimum.

* Expansion joint. See Special Provision "Preformed

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

Parapet concrete shall be paid for as Concrete Superstructure.

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

4"

4"

4"

¡ 1" Ø Anchor bolts

"436

"8

72'-

0

"43 "4

15

11"5"

Rad.

"852

2'-

7"

"437

"2

1

2'-

7

"8111

6"

"2

12'-

5

"811'-0

"4

3

2'-

3

1'-1" 1'-2"

1'-6" 3"

"8

32'-

3

6'-6"

10"

Rad.

"814

INSIDE ELEVATION OF PARAPET AND CURB

15'-0" 15'-0"

2'-0"

5"

4"

5'-0"

2"

Cut last 3 bars to fit taper

23-#5 d10(E) bars at 8" cts.

section near abutment

10-#4 e10(E) bars. See cross

b13(E)

Standard 631031.

connections see Highway

631026. For Type 6 terminal

View B-B and Highway Standard

terminal connections only, See

1" Ø Anchor bolts for Type 5

B

B

1'-

3"

Sla

b

See Detail A

cl.

cl.

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

Bend to fit taper

typ.

"2

15

typ.

"411

(at Rt. �'s)

Page 21: CELL/MODEL NAME DESCRIPTION DATE

(Sheet 1 of 2)10-12-2021BAIA-CIP-39CS-L(≤30°)

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

PLAN

"2

19

1'-

5"

"2

17

"2

19

1'-

5"

"2

17

23-#5 d11(E) bars at 8" cts. typ.

2'-0"

typ.

11"

typ. typ.

6"

'-"

out to out

Approach Sla

b at parapet

-#9 b11(E) bars at 5" cts. Bottom of slab

-#5 b10(E) bars at 8" cts. Top of slab

of Abut.

Back

C

B

A

D

E

F

Approach Footing

10'-0"

7'-0"

3'-0"

5'-0" typ.

for pavement connector

See Hwy. Std. 420401

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

'-"

out to out

Approach Sla

b and Footin

g at curb

AA

Lap with each a10(E) bar

at 8" cts. Top of slab, typ.

-#5 a12(E) bars

60-#8 a11(E) bars at 6" cts. Bottom of slab

-#5 a10(E) bars at 8" cts. Top of slab, tilt as necessary to fit curb

Skew

°

bar to fit

Bend d11(E)

Bend to fit taper.

1-#4 b15(E) bar in curb.

Bend to fit taper.

1-#4 b14(E) bar in curb.

d11(E) bar to fit

Cut back leg of

Footing. See Sec A-A

Top and bottom of Approach

6" cts.

20-#5 w10(E) bars at

¡

NEAR ABUTMENT AT APPROACH FOOTING(Looking )

¡ Roadway

Slope % Slope % Slope % Slope %

CROSS SECTION

6"

2" cl.

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

"2

13'-

1

1'-5"

"219 "2

17

3'-

3"

d11(E)d11(E)

d10(E)

e10(E)

a12(E)

")4

1"

cl. (±

41

2

2"

cl.

b11(E) a11(E)

a10(E) b10(E)

"43 "4

15

4"

t10(E)w10(E)

min., typ.

2" cl.

15'-0"

15'-0"

b15(E)

b14(E) or

b13(E)

b12(E) or

30'-0" end to end approach

bottom of slab

2-#5 b13(E) bars top and

bottom of slab

2-#5 b12(E) bars top and

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

Page 22: CELL/MODEL NAME DESCRIPTION DATE

#5

#8

#4

92 #5

92 #5

40 #4

Concrete Superstructure Cu. Yd.

Pound

6'-5"

Cu. Yd.Concrete Structures

#5 7'-4"

#5

#9

8 #5

8 #5

80 #5

Epoxy Coated

Reinforcement Bars,

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

8'-6"

2 #4

2 #4

50° F.Appr. slab

End of

¡ Joint

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

**

(PCC)

Connector

Pavement

3'-6"

parapet

End ofThreads

Nut

and washer

Locknut

of the Standard Specifications)

galvanized according to Article 1006.09

(Anchor bolt assemblies shall be

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

DETAIL A

VIEW B-B

*

"21

"21

41

29'-8"

29'-8"

14'-8"

1" Ø ANCHOR BOLT

" at431

4"

See Notes.

" at 50° F432

Bar No. Size Length Shape

BAR a12(E)

d10(E)

b12(E)

b10(E)

a11(E)

a10(E)

a12(E)

b11(E)

b13(E)

b14(E)

b15(E)

d11(E)

e10(E)

t10(E)

w10(E)

BAR d11(E)BAR d10(E)

BAR a10(E)

Run out to out of curb

Pavement Joint Seal". Recess ¼" minimum.

* Expansion joint. See Special Provision "Preformed

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

Parapet concrete shall be paid for as Concrete Superstructure.

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

4"

4"

4"

¡ 1" Ø Anchor bolts

"436

"8

72'-

0

"43 "4

15

11"5"

Rad.

"852

2'-

7"

"437

"2

1

2'-

7

"8111

6"

"2

12'-

5

"811'-0

"4

3

2'-

3

1'-1" 1'-2"

1'-6" 3"

"8

32'-

3

BAIA-CIP-39CS-L(≤30°)

6'-6"

10"

Rad.

"814

typ.

"411

typ.

"2

15

INSIDE ELEVATION OF PARAPET AND CURB

15'-0" 15'-0"

2'-0"

5"

4"

5'-0"

2"

Cut last 3 bars to fit taper

23-#5 d10(E) bars at 8" cts.

section near abutment

10-#4 e10(E) bars. See cross

b13(E)

Standard 631031.

connections see Highway

631026. For Type 6 terminal

View B-B and Highway Standard

terminal connections only, See

1" Ø Anchor bolts for Type 5

B

B

1'-

3"

Sla

b

See Detail A

cl.

cl.

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

Bend to fit taper

(at Rt. �'s)

Page 23: CELL/MODEL NAME DESCRIPTION DATE

(Sheet 1 of 2)10-12-2021BAIA-CIP-39CS-R(>30°)

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

PLAN

NEAR ABUTMENT AT APPROACH FOOTING(Looking )

¡ Roadway

Slope % Slope % Slope % Slope %

CROSS SECTION

6"

2" cl.

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

1'-5"

"219 "2

17

3'-

3"

d11(E)d11(E)

d10(E)

e10(E)

a12(E)

")4

1"

cl. (±

41

2

2"

cl.

b11(E) a11(E)

a10(E) b10(E)

"43 "4

15

4"

t10(E)w10(E)

min., typ.

2" cl.

b13(E)

b12(E) or

b15(E)

b14(E) or

1'-

5"

"2

19

1'-

5"

"2

17

23-#5 d11(E) bars at 8" cts. typ.

2'-0"

typ.

11"

typ.

typ.

6"

'-"

out to out

Approach Sla

b at parapet

-#9 b11(E) bars at 5" cts. Bottom of slab

-#5 b10(E) bars at 8" cts. Top of slab

of Abut.

Back ¡

A

C

E

D

Appr

oach F

ooting

10'-0"7'

-0"

3'-0"

5'-0" typ.

for pavement connector

See Hwy. Std. 420401

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

'-"

out to out

Approach Sla

b and Footin

g at curb

Lap with each a10(E) bar

at 8" cts. Top of slab, typ.

-#5 a12(E) bars

60-#8 a11(E) bars at 6" cts. Bottom of slab

-#5 a10(E) bars at 8" cts. Top of slab, tilt as necessary to fit curb

See S

ec A-A

of A

ppro

ach

Footing.

6" cts. T

op a

nd b

otto

m

20-#

5 w

10(E) bars at

Bend to fit taper.

1-#4 b15(E) bar in curb.

Bend to fit taper.

1-#4 b14(E) bar in curb.

d11(E) bar to fit

Cut back leg of

°Ske

w

A A

B

F

30'-0" end to end approach

15'-0"

15'-0"

Bend d11(E) bar to fit

"2

17

"2

19

"2

13'-

1

bottom of slab

2-#5 b13(E) bars top and

bottom of slab

2-#5 b12(E) bars top and

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

Page 24: CELL/MODEL NAME DESCRIPTION DATE

#5

#8

#4

92 #5

92 #5

40 #4

Concrete Superstructure Cu. Yd.

Pound

6'-5"

Cu. Yd.Concrete Structures

#5 7'-4"

#5

#9

8 #5

8 #5

80 #5

Epoxy Coated

Reinforcement Bars,

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

8'-6"

2 #4

2 #4

50° F.Appr. slab

End of

¡ Joint

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

**

(PCC)

Connector

Pavement

3'-6"

parapet

End ofThreads

Nut

and washer

Locknut

of the Standard Specifications)

galvanized according to Article 1006.09

(Anchor bolt assemblies shall be

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

DETAIL A

VIEW B-B

*

BAIA-CIP-39CS-R(>30°)

"21

"21

41

29'-8"

29'-8"

14'-8"

1" Ø ANCHOR BOLT

" at431

4"

See Notes.

" at 50° F432

Bar No. Size Length Shape

BAR a12(E)

d10(E)

b12(E)

b10(E)

a11(E)

a10(E)

a12(E)

b11(E)

b13(E)

b14(E)

b15(E)

d11(E)

e10(E)

t10(E)

w10(E)

BAR d11(E)BAR d10(E)

BAR a10(E)

Run out to out of curb

Pavement Joint Seal". Recess ¼" minimum.

* Expansion joint. See Special Provision "Preformed

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

Parapet concrete shall be paid for as Concrete Superstructure.

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

4"

4"

4"

¡ 1" Ø Anchor bolts

"436

"8

72'-

0 "43 "4

15

11"

5"

Rad.

"852

2'-

7"

"437

"2

1

2'-

7

"8111

6"

"2

12'-

5

"811'-0

"4

3

2'-

3

1'-1" 1'-2"

1'-6" 3"

"8

32'-

3

6'-6"

10"

Rad.

"814

typ.

"2

15

typ.

"411

INSIDE ELEVATION OF PARAPET AND CURB

15'-0" 15'-0"

2'-0"

5"

4"

5'-0"

2"

Cut last 3 bars to fit taper

23-#5 d10(E) bars at 8" cts.

section near abutment

10-#4 e10(E) bars. See cross

b13(E)

Standard 631031.

connections see Highway

631026. For Type 6 terminal

View B-B and Highway Standard

terminal connections only, See

1" Ø Anchor bolts for Type 5

B

B

1'-

3"

Sla

b

See Detail A

cl.

cl.

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

Bend to fit taper

(at Rt. �'s)

Page 25: CELL/MODEL NAME DESCRIPTION DATE

(Sheet 1 of 2)10-12-2021BAIA-CIP-39CS-R(≤30°)

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

"2

19

1'-

5"

"2

17

"2

19

1'-

5"

"2

17

23-#5 d11(E) bars at 8" cts. typ.

2'-0"

typ.

11"

typ.

typ.

6"

'-"

out to out

Approach Sla

b at parapet

-#9 b11(E) bars at 5" cts. Bottom of slab

-#5 b10(E) bars at 8" cts. Top of slab

of Abut.

Back

¡

A

B

C F

E

D

7'-0"

3'-0"

5'-0" typ.

for pavement connector

See Hwy. Std. 420401

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

'-"

out to out

Approach Sla

b and Footin

g at curb

Lap with each a10(E) bar

at 8" cts. Top of slab, typ.

-#5 a12(E) bars

60-#8 a11(E) bars at 6" cts. Bottom of slab

-#5 a10(E) bars at 8" cts. Top of slab, tilt as necessary to fit curb

bar to fit

Bend d11(E)

Bend to fit taper.

1-#4 b15(E) bar in curb.

Bend to fit taper.

1-#4 b14(E) bar in curb.

d11(E) bar to fit

Cut back leg of

Footing. S

ee S

ec A-A

Top an

d botto

m of A

ppro

ach6"

cts.

20-#

5 w10

(E) b

ars at

A A

10'-0

" Appro

ach

Footing

°Ske

w

PLAN

NEAR ABUTMENT AT APPROACH FOOTING(Looking )

¡ Roadway

Slope % Slope % Slope % Slope %

CROSS SECTION

6"

2" cl.

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

"2

13'-

1

1'-5"

"219 "2

17

3'-

3"

d11(E)d11(E)

d10(E)

e10(E)

a12(E)

")4

1"

cl. (±

41

2

2"

cl.

b11(E) a11(E)

a10(E) b10(E)

"43 "4

15

4"

t10(E)w10(E)

min., typ.

2" cl.

15'-0"

15'-0"

b15(E)

b14(E) or

b13(E)

b12(E) or

30'-0" end to end approach

bottom of slab

2-#5 b13(E) bars top and

bottom of slab

2-#5 b12(E) bars top and

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

Page 26: CELL/MODEL NAME DESCRIPTION DATE

#5

#8

#4

92 #5

92 #5

40 #4

Concrete Superstructure Cu. Yd.

Pound

6'-5"

Cu. Yd.Concrete Structures

#5 7'-4"

#5

#9

8 #5

8 #5

80 #5

Epoxy Coated

Reinforcement Bars,

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

8'-6"

2 #4

2 #4

50° F.Appr. slab

End of

¡ Joint

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

**

(PCC)

Connector

Pavement

3'-6"

parapet

End ofThreads

Nut

and washer

Locknut

of the Standard Specifications)

galvanized according to Article 1006.09

(Anchor bolt assemblies shall be

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

DETAIL A

VIEW B-B

*

"21

"21

41

29'-8"

29'-8"

14'-8"

1" Ø ANCHOR BOLT

" at431

4"

See Notes.

" at 50° F432

Bar No. Size Length Shape

BAR a12(E)

d10(E)

b12(E)

b10(E)

a11(E)

a10(E)

a12(E)

b11(E)

b13(E)

b14(E)

b15(E)

d11(E)

e10(E)

t10(E)

w10(E)

BAR d11(E)BAR d10(E)

BAR a10(E)

Run out to out of curb

Pavement Joint Seal". Recess ¼" minimum.

* Expansion joint. See Special Provision "Preformed

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

Parapet concrete shall be paid for as Concrete Superstructure.

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

4"

4"

4"

¡ 1" Ø Anchor bolts

"436

"8

72'-

0 "43 "4

15

11"

5"

Rad.

"852

2'-

7"

"437

"2

1

2'-

7

"8111

6"

"2

12'-

5

"811'-0

"4

3

2'-

3

1'-1" 1'-2"

1'-6" 3"

"8

32'-

3

BAIA-CIP-39CS-R(≤30°)

6'-6"

10"

Rad.

"814

typ.

"2

15

typ.

"411

INSIDE ELEVATION OF PARAPET AND CURB

15'-0" 15'-0"

2'-0"

5"

4"

5'-0"

2"

Cut last 3 bars to fit taper

23-#5 d10(E) bars at 8" cts.

section near abutment

10-#4 e10(E) bars. See cross

b13(E)

Standard 631031.

connections see Highway

631026. For Type 6 terminal

View B-B and Highway Standard

terminal connections only, See

1" Ø Anchor bolts for Type 5

B

B

1'-

3"

Sla

b

See Detail A

cl.

cl.

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

Bend to fit taper

(at Rt. �'s)

Page 27: CELL/MODEL NAME DESCRIPTION DATE

(Sheet 1 of 2)

Slope % Slope % Slope % Slope %

10-12-2021BAIA-CIP-44CS-0

2" cl.

")4

1"

cl. (±

41

2

2"

cl.

6"

4"

a11(E)

a12(E)

d10(E)

e10(E)

d11(E)

b12(E)

b13(E)

a10(E) b10(E)

b11(E)

t10(E)w10(E)

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

(Looking )

CROSS SECTION

adhesive as recommended by supplier.

bonded to wingwall with suitable

of the Standard Specifications)

2" PJF (per Article 1051.09

7'-0" 3'-0"

for pavement connector

See Hwy. Std. 420401

'-"

out to out

Approach Sla

b at parapet

of Abut.

Back

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

¡

60-#8 a11(E) bars at 6" cts. Bottom of slab

46-#5 a10(E) bars at 8" cts. Top of slab, tilt as necessary to fit curb

bottom of slab, typ.

2-#5 b12(E) bar top and

typ.

2'-0"

Bend to fit taper.

1-#4 b13(E) bar in curb, typ.

A A

'-"

out to out

Approach Sla

b and Footin

g at curb

typ.

6"

Approach Footing

10'-0"

5'-0" typ.

Lap with each a10(E) bar

at 8" cts. Top of slab, typ.

23-#5 a12(E) bars

-#

9 b11(E)

bars at 5"

cts.

Botto

m of sla

b

-#

5 b10(E)

bars at 8"

cts.

Top of sla

b

A

B

C

D

E

F

"2

18

"2

18

1'-

5"

"2

18

"2

18

1'-

5"

Footing. See Sec A-A

Top and bottom of Approach

20-#5 w10(E) bars at 6" cts."

21

3'-

6

"218 "2

18

1'-5"

3'-

8"

"43

"415

PLAN

typ.

11"

30'-0" end to end approach

15'-0"

min., typ.

2" cl.

¡ Roadway

AT APPROACH FOOTINGNEAR ABUTMENT

23-#5 d11(E) bars at 8" cts., typ.

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

Page 28: CELL/MODEL NAME DESCRIPTION DATE

92 #5

#8

#4

#5

#5

48 #4

Concrete Superstructure Cu. Yd.

Pound

Cu. Yd.Concrete Structures

#5 7'-4"

#5

#9

16 #5

4 #4

80 #5

9'-8"

Epoxy Coated

Reinforcement Bars,

(Approach Slab)

Concrete SuperstructureCu. Yd.

120

92

8'-6"

3'-6"

parapet

End ofThreads

Nut

and washer

Locknut

of the Standard Specifications)

galvanized according to Article 1006.09

(Anchor bolt assemblies shall be

50° F.Appr. slab

End of

¡ Joint

** Per manufacturer recommendations

* Cost included with Concrete Superstructure (Approach Slab).

**

(PCC)

Connector

Pavement

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

BAIA-CIP-44CS-0

INSIDE ELEVATION OF PARAPET AND CURB

*

DETAIL A

VIEW B-B

41

"21

"21

29'-8"

29'-8"

14'-8"

14'-8"

7'-0"

14'-8"

1" Ø ANCHOR BOLT

4"

" at431

See Notes.

" at 50° F432

Bar No. Size Length Shape

BAR a12(E)d10(E)

b10(E)

a11(E)

a10(E)

a12(E)

b11(E)

b12(E)

b13(E)

d11(E)

e10(E)

t10(E)

w10(E)

BAR d11(E)BAR d10(E)

BAR a10(E)

Run out to out of curb

Pavement Joint Seal". Recess ¼" minimum.

* Expansion joint. See Special Provision "Preformed

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

Parapet concrete shall be paid for as Concrete Superstructure.

bridge length plus the length of the bridge approach slab.

length of bridge used to calculate the adjustment shall be equal to half the total

Standard Specifications. However, since this detail is for jointless structures, the

The joint opening shall be adjusted for temperature per Article 520.04 of the

Notes:

92

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

(Sheet 2 of 2)

2'-0"

5'-0"

Bend to fit taper

B

B

4"

2"

b13(E)

1'-6"

1'-1"

3"

¡ 1" Ø Anchor bolts

4"

92

Standard 631031.

connections see Highway

631026. For Type 6 terminal

View B-B and Highway Standard

terminal connections only, See

1" Ø Anchor bolts for Type 510"

Cut last 3 bars to fit taper

23-#5 d10(E) bars at 8" cts.

15'-0" 15'-0"

near abutment

See cross section

12-#4 e10(E) bars

Rad.

"212 "2

17

"4

32'-

10

"439

"8

7

2'-

10

6"

Rad.

"814

"811'-0

"2

12'-

5

"43

2'-3 "

83

2'-

3

1'-2"

4"

4"

"436

"415"4

3

"8

72'-

0

11"

6'-6"

10"

"2

15

Typ.

"411

1'-

3"

Sla

b

See Detail A

3'-0"

cl.

cl.

7'-0"

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

10"

Page 29: CELL/MODEL NAME DESCRIPTION DATE

7'-0" 3'-0"

(Sheet 1 of 2)

NEAR ABUTMENTAT APPROACH FOOTING

(Looking )

'-"

out to out

Approach Sla

b at parapet

of Abut.

Back

Top and botto

m of

Approach Footin

g,

See Sec.

A-

A

-#

4 t10(E)

bars at 12"

cts.

*

*

Wingwall

for pavement connector

See Roadway Plans

¡ Roadway

¡

Slope % Slope % Slope % Slope %

10-12-2021

PLAN

A A

CROSS SECTION

'-"

out to out

Approach Sla

b and Footin

g at curb

6"

typ.

6"

Approach Footing

10'-0"

'-" typ.

5'-0" typ.

2"

cl.

6" bottom

8" top

4"

")4

1"

cl. (±

41

2

a12(E)

b13(E)

a10(E) b10(E)

-#

9 b11(E)

bars at 5"

cts.

Botto

m of sla

b

-#

5 b10(E)

bars at 8"

cts.

Top of sla

b

b11(E)

a11(E) a13(E)

t10(E)w10(E)

A

B

C

D

E

F

1'-0"1'-0"

of back wall

Front face

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

slab, full length of parapet. Typ. each parapet.

1051.09 of the Standard Specifications; full depth of

"Preformed Expansion Joint Filler according to Article21*

Footing. See Sec A-A

Top and bottom of Approach

20-#5 w10(E) bars at 6" cts.

-#8 a13(E) bars at 6" cts. Bottom of slab

tilt as necessary to fit curb

-#5 a11(E) bars at 8" cts. Top of slab,

bottom of slab, typ.

1-#5 b12(E) bar top and

'-" typ.

Bend to fit taper.

1-#4 b13(E) bar in curb, typ.

"43

"415

b12(E)

Bottom of slab

-#8 a12(E) bars at 6" cts.,

-#5 a10(E) bars at 8" cts. Top of slab

30'-0" end to end approach

BASA-CIP-3944CS-0

(_ approach slab shown; _ approach slab similar by 180° rotation)

BottomTopTop Bottom

FOR APPROACH FOOTING

TOP AND BOTTOM ELEVATIONS

Location

Point/

Location

Point/

Approach Approach

D -

C -

B -

A -

E -

F -

D -

C -

B -

A -

E -

F -

Page 30: CELL/MODEL NAME DESCRIPTION DATE

#5

#5

#4

Pound

Cu. Yd.Concrete Structures

#8

#5

#9

8 #5

80 #5

9'-8"

Epoxy Coated

Reinforcement Bars,

5'-0"

(Sheet 2 of 2)

(Approach Slab)

Concrete SuperstructureCu. Yd.

#8

#44

Appr. slab

End of

¡ Joint

(PCC)

Connector

Pavement

Highway Standard 420406.)

Detail A for pavement connector (HMA) may be found on

(Detail A shown, applies to Highway Standard 420401 only.

10-12-2021

BILL OF MATERIAL

TWO APPROACHES

B

B

INSIDE ELEVATION OF PARAPET AND CURB

SECTION B-B

DETAIL A

"21

"21

"432

"431

29'-8"

29'-8"

4"

4"

2"

Bar No. Size Length Shape

a13(E)

b10(E)

w10(E)

t10(E)

b13(E)

b12(E)

b11(E)

a12(E)

a11(E)

a10(E)

b13(E)

b13(E)b10(E) a11(E)

a13(E) b11(E)

b12(E)

BAR a11(E)

*** Per manufacturer recommendations

** Cost included with Concrete Superstructure (Approach Slab).

***

Run out to out of curb

Pavement Joint Seal". Recess ¼" minimum.

** Expansion joint. See Special Provision "Preformed

STRUCTURE NO.

BRIDGE APPROACH SLAB DETAILS SECTION COUNTY

ILLINOIS FED. AID PROJECT

TOTAL

SHEETS

SHEET

NO.RTE.

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

USER NAME =

PLOT SCALE =

PLOT DATE =

DESIGNED REVISED

REVISED

REVISED

REVISED

F.A.

SHEET OF SHEETS

-

-

-

-

-

-

-

-

CHECKED

DRAWN

CHECKED

$TIME$$DATE$

MO

DE

L:

FIL

E N

AM

E:

$M

OD

EL

NA

ME$

$FIL

EL$

"43 "4

15

1'-

3"

Sla

b

See Detail A

3'-0"

cl.

cl.

7'-0"

cl.

cl.

Mat'l. Type B, 4"

Subbase Granular*

breaker on steel trowel finish

* 10 mil. Polyethylene bond

Footing

Approach

for Structures

Granular Backfill

")4

1" (±

41

2

typ.

2" cl.

2"

2"

2"

v100(E)

a11(E)a10(E)b11(E)

w10(E)

t10(E)

10"

relief joint sealer. Full width.

¼" x ¾" Formed joint with bridge

SECTION A-A

b10(E)

30'-0" end to end approach

typ.

"2

15

typ.

"411

See sheet of for hatched block details.

For Granular Backfill for Structures and drainage treatment details, see sheet of .

Cost of excavation for approach footing included with Concrete Structures.

The approach footing maximum applied service bearing pressure (Qmax) = 2.0 ksf.

Approach footing concrete shall be paid for as Concrete Structures.

Approach slab shall be paid for as Concrete Superstructure (Approach Slab).

Notes:

BASA-CIP-3944CS-0