  • Capital Market Day 2009 1

    Execution of a cement project from A-Z

    Per Mejnert KristensenVP, Head of Project Division EMEA/APAC, Cement

  • Capital Market Day 2009 2

    Introduction Long term trends in the global

    cement industry

    FLSmidths role in a cement project from A-Z

    Uncertainties and risks in execution of cement projects

    Outlook in Cement

    Agenda

  • Capital Market Day 2009 3

    Per Mejnert Kristensen

    VP, Head of Project Division EMEA/APAC, Cement

    Joined FLSmidth in 1992

    Positions in FLSmidth: VP, Head of Project Division EMEA/APAC

    VP, Head of Project Division 1 General Manger, FLSmidth China Chief Representative Thailand Ass. Site manager, 10,000 tpd project, Thailand Project Sales

  • Capital Market Day 2009 4

    FLSmidth Cement Project Divisions

  • Capital Market Day 2009 5

    Introduction Long term trends in the global

    cement industry

    FLSmidths role in a cement project from A-Z

    Uncertainties and risks in execution of cement projects

    Outlook in Cement

    Agenda

  • Capital Market Day 2009 6

    Growing need for cement remains despite current global crisis !

    Long term trends

  • Capital Market Day 2009 7

    Expected futureaverage:

    ~ 60-75 mty

    New global contracted cement kiln capacity(excl. of China)

    0

    20

    40

    60

    80

    100

    120

    140

    160

    1

    9

    9

    0

    1

    9

    9

    1

    1

    9

    9

    2

    1

    9

    9

    3

    1

    9

    9

    4

    1

    9

    9

    5

    1

    9

    9

    6

    1

    9

    9

    7

    1

    9

    9

    8

    1

    9

    9

    9

    2

    0

    0

    0

    2

    0

    0

    1

    2

    0

    0

    2

    2

    0

    0

    3

    2

    0

    0

    4

    2

    0

    0

    5

    2

    0

    0

    6

    2

    0

    0

    7

    2

    0

    0

    8

    2

    0

    0

    9

    E

    mty

    2009E: 25-50 mty

    Contracted kiln capacity is an indicator of total cement capital investments. However, the kiln system only accounts for around 25% of the value of a cement production line and additionally, the lifetime of a kiln is generally longer than the other equipment

  • Capital Market Day 2009 8

    Growing need for cement remains despite current global crisis !

    Emerging markets will continue to be the driver - now also Africa

    Long term trends

  • Capital Market Day 2009 9

    0

    20

    40

    60

    80

    100

    120

    140

    160

    1

    9

    9

    0

    1

    9

    9

    1

    1

    9

    9

    2

    1

    9

    9

    3

    1

    9

    9

    4

    1

    9

    9

    5

    1

    9

    9

    6

    1

    9

    9

    7

    1

    9

    9

    8

    1

    9

    9

    9

    2

    0

    0

    0

    2

    0

    0

    1

    2

    0

    0

    2

    2

    0

    0

    3

    2

    0

    0

    4

    2

    0

    0

    5

    2

    0

    0

    6

    2

    0

    0

    7

    2

    0

    0

    8

    Asia (excl. China & India)IndiaRussiaEuropeNorth AmericaSouth AmericaMiddle EastAfrica

    Geographical distribution of new global contracted cement kiln capacity

    (excl. China)mty

  • Capital Market Day 2009 10

    Growing need for cement remains despite current global crisis !

    Emerging markets will continue to be the driver - now also Africa

    Cement kiln sizes growing

    Long term trends

  • Capital Market Day 2009 11

    Wet kilns1892: 1.8x18 m

    35 tpd1967: 7.6x232 m

    3500 tpd

    Preheater kilns1970: 6.0x96 m

    4000 tpd

    Precalciner kilns1984: 5.0x80 m

    5500 tpd1990: 6.0x96 m

    10,000 tpd2006 : 6.6x93 m

    12,000 tpd

    History of kiln capacity development

  • Capital Market Day 2009 12

    Cement kiln sizes continue to grow

  • Capital Market Day 2009 13

    Cement kiln sizes continue to grow

    1000

    2000

    3000

    4000

    5000

    6000

    1970 1980 1990 2000 2010

    Year

    A

    v

    e

    r

    a

    g

    e

    p

    l

    a

    n

    t

    c

    l

    i

    n

    k

    e

    r

    c

    a

    p

    a

    c

    i

    t

    y

    (

    t

    /

    d

    )

  • Capital Market Day 2009 14

    Growing need for cement remains despite current global crisis !

    Emerging markets will continue to be the driver - now also Africa

    Cement kiln sizes growing

    Increased environmental focus

    Long term trends

  • Capital Market Day 2009 15

    Half of the fuel used in Germancement plants is alternative fuel

    Rapid increase in alternative fuel usage during the past 5 years

    - due to focus on lowering production costs in a cement market with excess production capacity0

    10

    20

    30

    40

    50

    60

    1999 2000 2001 2002 2003 2004 2005

    Alternative fuel energy coverage in %

  • Capital Market Day 2009 16

    The trends

    Going from here /

    To there

    Increased focus on emissions

  • Capital Market Day 2009 17

    Introduction Long term trends in the global

    cement industry

    FLSmidths role in a cement project from A-Z

    Uncertainties and risks in execution of cement projects

    Outlook in Cement

    Agenda

  • Capital Market Day 2009 18

    A cement plant from A to Z

    Feasibility study Proposal stage and signing of contract Design and order handling stage Civil design and construction Erection, start-up, Commissioning, handover, guarantees Production, operation and maintenance of the

    plant

    FLSmidth strengthsand capabilities

    FLSmidth strengthsand capabilities

    Customer requirementsCustomer

    requirements

  • Capital Market Day 2009 19

    Feasibility stage

    Budget proposalsfor various sizes

    Budget proposalsfor various sizes

    Market size, cement prices,investment costs ?

    Market size, cement prices,investment costs ?

    ? ?

  • Capital Market Day 2009 20

    Proposal stage and signing of contract

    Leadtime as a conse-quence of requirementsLeadtime as a conse-

    quence of requirementsTender requirements

    on main features or technical specialities

    Tender requirementson main features

    or technical specialities

    Basic plant

    Adapted plant

    Taylor made

    24 mthContract

  • Capital Market Day 2009 21

    Proposal stage and signing of contract

    FLSmidth tests the raw materials

    FLSmidth tests the raw materials

    Raw material samples to FLSmidth

    Raw material samples to FLSmidth

    R&D and test centre in Denmark and India

  • Capital Market Day 2009 22

    Proposal stage and signing of contract

    Advanced process designAdvanced process designOptimal process and low production costOptimal process and low production cost

    FLSmidth has in house laboratory with all modern testing facilities.

    FLSmidth process designers are carrying a heritage of more than 100 years of experience and know how.

    FLSmidth is constantly increasing investments in research and development

  • Capital Market Day 2009 23

    Proposal stage and signing of contract

    FLSmidth has equipment for the entire proces

    FLSmidth has equipment for the entire proces

    Can we get the complete package from FLSmidth ?Can we get the complete package from FLSmidth ?

    Main machines & auxuilary equipment of FLSmidth design

    Electrical equipment Vendor equipment

  • Capital Market Day 2009 24

    Proposal stage and signing of contract

    FLSmidth offers split-supplyFLSmidth offers split-supplyLocal supply and manufacturingLocal supply and

    manufacturing

    1

    2

    4

    6

    5

    18

    3

    12

    740% imported

    60% local manufactured

  • Capital Market Day 2009 25

    Proposal stage and signing of contract

    Typical cost compositionTypical cost compositionWhat are the total cost?What are the total cost?

    Machinery40%

    Buildings30%

    Erection15%

    Supervision 5%

    Transport 5%

    Others5%

  • Capital Market Day 2009 26

    Proposal stage and signing of contract

    Different options are possible

    Different options are possible

    Equipment, civil design or turnkey?

    Equipment, civil design or turnkey?

    Equipment

    Civil design

    Construction

    Erection

  • Capital Market Day 2009 27

    Proposal stage and signing of contract

    All information sources are used such as Google Earth etc.

    All information sources are used such as Google Earth etc.

    Finding the right site information?

    Finding the right site information?

  • Capital Market Day 2009 28

    Proposal stage and signing of contract

    3D layouts and models3D layouts and modelsVisualisation to customerVisualisation to

    customer

  • Capital Market Day 2009 29

    Proposal stage and signing of contract

    3D layouts incorporated in actual landscape

    3D layouts incorporated in actual landscapeVisualisation to authoritiesVisualisation to authorities

  • Capital Market Day 2009 30

    Proposal stage and signing of contract

    Quick order startQuick order startSigning the contractSigning the contract

  • Capital Market Day 2009 31

    Design and order execution

    A strong project teamA strong project teamSafe order handlingSafe order handling

    Experience + skills + tools

  • Capital Market Day 2009 32

    Design and order execution

    Company size and strengths in marketCompany size and strengths in market

    Security in a changing worldSecurity in a

    changing world

    Long track record

    Global presence

    Customer FLSmidth

    Supply chain

    Buying power

    Vendor relations

  • Capital Market Day 2009 33

    Design and order execution

    World wide designWorld wide designClose contact to the supplierClose contact to the

    supplier

    Global design centres

    design 24 hours a day

  • Capital Market Day 2009 34

    Design and order execution

    Fast civil designFast civil design Integrated technical and civil designIntegrated technical

    and civil design

  • Capital Market Day 2009 35

    Manufacturing, inspection and expediting

    High quality equipmentHigh quality equipment Close co-operation withlarge workshopsClose co-operation with

    large workshops

  • Capital Market Day 2009 36

    Shipping

    Safe transportSafe transport Odd-size equipment or in containersOdd-size equipment

    or in containers

  • Capital Market Day 2009 37

    Construction and installation

    Swift and trouble free con-struction and installation

    Swift and trouble free con-struction and installation

    Experienced and skilled supervisorsExperienced and skilled supervisors

  • Capital Market Day 2009 38

    Training of clients staff

    Training of staffTraining of staff FLSmidth Institute- good training programmeFLSmidth Institute

    - good training programme

  • Capital Market Day 2009 39

    Commissioning, handover and guarantees

    Vi har en god track rekord mht at opfylde garantierne. Har vi evt nogle kurver eller lignende?

    A swift start of the plantA swift start of the plant FLSmidth has a good record for reaching all guaranteesFLSmidth has a good record for reaching all guarantees

    FLSmidth

  • Capital Market Day 2009 40

    Operation of the plant

    A safe and economicaloperation of the plant

    A safe and economicaloperation of the plant

    FLSmidth offers full operation and maintenance

    FLSmidth offers full operation and maintenance

  • Capital Market Day 2009 41

    Introduction Long term trends in the global

    cement industry

    FLSmidths role in a cement project from A-Z

    Uncertainties and risks in execution of cement projects

    Outlook in Cement

    Agenda

  • Capital Market Day 2009 42

    Progress of ongoing projects(to be addressed in following slides)

    When will signed LoIs and non-effective contracts materialise?

    General market outlook very uncertain these days !

    Even though our customers wants to move ahead with projects, they are met by financing constraints,- i.e. not even our customers can tell when they will

    be able to go ahead !

    Factors contributing to uncertainty about project income

  • Capital Market Day 2009 43

    Project Income Flow

    -10%

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    1st

    2nd

    3rd 4th 5th 6th 7th 8th 9th 10th

    11th

    12th

    13th

    14th

    15th

    16th

    17th

    18th

    19th

    20th

    21st

    22nd 23rd

    24th

    25th

    26th

    27th

    28th

    29th

    30th

    (PAC

    )

    Period of execution

    C

    o

    n

    t

    r

    a

    c

    t

    POC Net Sales CM SG&A EBIT

    Typical project progress and income recognition

    Down payment

    Letter of Credit

    Engineering

    Procurement

    Manufacture

    Shipping

    Installation

  • Capital Market Day 2009 44

    Project Income Flow

    -10%

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    1st

    2nd

    3rd 4th 5th 6th 7th 8th 9th 10th

    11th

    12th

    13th

    14th

    15th

    16th

    17th

    18th

    19th

    20th

    21st

    22nd 23rd

    24th

    25th

    26th

    27th

    28th

    29th

    30th

    (PAC

    )

    Period of execution

    C

    o

    n

    t

    r

    a

    c

    t

    POC Net Sales CM SG&A EBIT

    Typical project progress and income recognition

    Down payment

    Letter of Credit

    Engineering

    Procurement

    Manufacture

    Shipping

    Installation

  • Capital Market Day 2009 45

    Delayed supplies from vendors

    Client not ready to receive goods or formalities not in place (e.g. BTI)

    Client wants to postpone project

    Suspension of project due to temporary problems with financing

    Termination of project due to clients inability to continue

    Risks in execution of a cement project

    All of the above creates uncertainty about timing of income recognition.and just a few months delay around New Year can impact the annual result significantly !

  • Capital Market Day 2009 46

    Project Cash Flow

    -20%

    -10%

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    1st

    2nd 3rd 4th 5th 6th 7th 8th 9th 10th

    11th

    12th

    13th

    14th

    15th

    16th

    17th

    18th

    19th

    20th

    21st

    22nd 23rd

    24th

    25th

    26th

    27th

    28th

    29th

    30th

    (PAC

    )31

    st

    Period of Execution

    C

    o

    n

    t

    r

    a

    c

    t

    Client payments Total Project Cost Payments SG&A payments Net Cash

    Typical project cash flow

  • Capital Market Day 2009 47

    What happens when orders are cancelled or put on hold?

    Cancelled Initiated work and issue of purchase orders stop Legal department gets involved We stick to our contractual rights - no matter

    which client We have the right to be compensated for

    incurred and committed costs and as well as a pro-rata contribution margin

    Cancellation fee to be claimed

    Put on hold Initiated work and issue of purchase orders stop Contract and time schedule is amended We preserve the right to be compensated for

    any additional costs Some clients are constrained on cash, others are

    adjusting priorities

  • Capital Market Day 2009 48

    Overall approx. 10 % of order backlog currently on hold.

    3 - 4 major projects are partly suspended no major cement projects cancelled so far (but some minor)

    We are in very close contact with the customers and they are all determined to carry on but limited by financing

    Recent events on (partly) suspended contracts: Receipt of progress payment strong indicator of commitment Agreement on prolonged delivery schedule Agreement on finalising engineering but procurement on hold for a

    specified period

    At this stage we thus feel relatively confident about our existing cement project portfolio but timing still uncertain

    Status of our existing cement project portfolio

  • Capital Market Day 2009 49

    Introduction Long term trends in the global

    cement industry

    FLSmidths role in a cement project from A-Z

    Uncertainties and risks in execution of cement projects

    Outlook in Cement

    Agenda

  • Capital Market Day 2009 50

    We have the strongest brand in the market !

    We have a global reach present in every corner of the world !

    Strong belief in future prospects, because:

  • Capital Market Day 2009 51

    Project centres Rep. officesProduction

    Global undertaking with a local presence

  • Capital Market Day 2009 52

    We have the strongest brand in the market !

    We have a global reach present in every corner of the world !

    We have a complete product portfolio !

    Strong belief in future prospects, because:

  • Capital Market Day 2009 53

    Cement plant flow sheet

    3Cementsilo

    Cementsilo Cement

    silo

    Cement mill

    Separator

    Roller pressGear unit

    ClinkerSilo

    2 Packers

    Ship loading

    Ship unloading

    Limestone Clay Sand Iron

    1 2 3 4

    1234

    Storage

    CrusherAnalyzer

    Filter Filter

    Gratecooler

    Raw mealsilo

    Raw mill

    Coal mill

  • Capital Market Day 2009 54

    Cement kiln sizes continue to grow

    ATOX mills

    OK mills

    MMC Cooler

    ILC preheater

    3-support kiln

    DUOFLEX burner

    Holcim Ste. GenevieveThe worlds first 12,000 tpd single kiln line

  • Capital Market Day 2009 55

    We have the strongest brand in the market !

    We have a global reach present in every corner of the world !

    We have a complete product portfolio !

    We have an unsurpassed reference list !

    Strong belief in future prospects, because:

  • Capital Market Day 2009 56

    VKu/15.03.2007

    Ozarow 27000 tpd

    Ain Soukna5000 tpd

    Kursk3500 tpd

    Holcim5500 tpd

    Carribean Cement3250 tpd

    ACC, Rabigh7000 tpd

    Jovein3900 tpd

    Lappeenranta1800 tpd

    CIBA (Orascom)1500 tpd

    Unicem, Calabar6250 tpd

    Dwaalboom3300 tpd

    Natal Simuma1500 tpd

    EMCC (Orascom)7500 tpd

    Ash Grove foreman4200 tpd

    Rio Grande Pueblo3000 tpd

    Ha Long5500 tpd

    ABG Kutch10000 tpd

    CIBA Grey6250 tpdArabian CC, Ramliya6000 tpdSinai, Gabal Lebni 2

    4200 tpd

    Sinai White 21300 tpd

    Madras Cement7600 tpdAbyek Cement

    4500 tpdKhuzestan, Ramhormoz5500 tpd

    Karcement3200 tpd

    AUCC 25000 tpdTepeaca

    10000 tpd Dalmia3x4500 tpd

    Cimsa Eskisehir2100 tpd

    Ivano-Frankivsk2300 tpd

    Star Cement6500 tpd

    Ash Grove, Moapa4350 tpd Essroc, Martinsburg

    5000 tpd Keystone, Bath3000 tpdSte. Genevieve12000 tpd

    Hoang Thach 33300 tpd

    Sanghi, Kutch10000 tpdOrient, Adilabad

    4000 tpd

    Platin4000 tpd

    Kokshe Cement5500 tpd

    Cem. Andorra2350 tpd

    Marquesado3300 tpd

    Al Takamol4500 tpd Indocement

    700 tpd

    Fancesa750 tpd

    ACC Chanda7000 tpd

    CSN2 x OK 39

    Binani 26500 tpd

    LSR Slantsy5000 tpd

    Volyn6000 tpd

    Golden Bay350 tpd

    Lafarge Joppa7200 tpd

    Gulf Cement5000 tpd

    Molins4100 tpd

    Argos4500 tpd

    Aleppo7500 tpdAit Baha5000 tpd

    Podgorensky6000 tpd

    Akbulak6000 tpdJP Kutch

    10000 tpd

    Projects the last 4 - 5 years !

    > 100 new production lines> 150 mtpy capacity !

  • Capital Market Day 2009 57

    CIS>45

    Africa>96

    India>141

    South America>162

    Central America>94

    Middle East>55

    Australia>25

    North America>356

    Rest of Asia>269

    FLSmidth has built ~ 2000 cement kilns worldwide since 1898

    Europe>674

  • Capital Market Day 2009 58

    We have the strongest brand in the market !

    We have a global reach present in every corner of the world !

    We have a complete product portfolio !

    We have an unsurpassed reference list !

    We are investing most in R&D !

    Strong belief in future prospects, because:

  • Capital Market Day 2009 59

    The cement industrys largest R&D centre

  • Capital Market Day 2009 60

    We have the strongest brand in the market !

    We have a global reach present in every corner of the world !

    We have a complete product portfolio !

    We have an unsurpassed reference list !

    We are investing most in R&D !

    We are the strongest Group Cement & Minerals

    Strong belief in future prospects, because:

    We are very well positioned for the future !

  • Capital Market Day 2009 61

    Questions