cemetery undelivered verification project full-process locations only
Post on 18-Dec-2015
217 views
TRANSCRIPT
![Page 1: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/1.jpg)
Cemetery Undelivered Verification Project
Full-Process Locations Only
![Page 2: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/2.jpg)
2
Session # 2 Agenda
• Review of Session # 1 • Master Listing Sign-off by Analyst• Analyst File Reviews & Escalations• Delivery: The Full-Process Approach• Subsequent Passes• Training Analysts• Quality Assurance (QA)• Resources for Help
![Page 3: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/3.jpg)
3
Introduction
• Importance of the Project – Purchase Price
• Level of Scrutiny of Results– Subject to internal/external audit and SOX
controls.– Delivery Dates– Documentation– Procedures
• Summary Memo
![Page 4: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/4.jpg)
4
CUVP Session #1 Review
• Master Listing located on Global Village – Sections
1. Location Review section is reviewed 100% by location personnel—no analysts are used– Not all locations have a Location Review section
2. At-need section can also be done as 100% location review
3. High Value section includes only Pre-Need contracts
4. Low Value section includes only Pre-Need contracts
![Page 5: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/5.jpg)
5
CUVP Session #1 Review
• Process for determining delivery status
• Documenting the Master Listing
• How to train and supervise temporary filers
![Page 6: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/6.jpg)
6
Session # 2 Agenda
• Review of session # 1 • Master Listing sign-off by analyst• Analyst File Reviews & Escalations• Delivery: The Full-Process Approach• Subsequent Passes• Training Analysts• Quality Assurance (QA)• Resources for Help
![Page 7: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/7.jpg)
7
Master Listing Sign-off By Analyst
• Each analyst must sign and date the Master Listing pages that he or she completes as each page is completed– The page is complete when every line item
has been marked with either:• The correct delivery status, • An “M” indicating a missing file, or• An “R” indicating a need for location review
![Page 8: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/8.jpg)
8
Session # 2 Agenda
• Review of session # 1 • Master Listing sign-off by analyst• Analyst File Reviews & Escalations• Delivery: The Full-Process Approach• Subsequent Passes• Training Analysts• Quality Assurance (QA)• Resources for Help
![Page 9: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/9.jpg)
9
File Reviews & Escalations Overview
• What is file review?• The 10-minute rule• Documenting a file review• What is an escalation?• When does a review become an escalation?• The Escalation Listing• Resolving review items• Options for using an Escalation Listing• Rules for documenting the Escalation Listing• What to do if you can’t resolve an escalation
![Page 10: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/10.jpg)
10
What Is File Review?
• Analyst unable to determine delivery status– Examples
• An analyst sees conflicting information in a contract file and is unsure if there is a delivery
• Deceased and a marker order, but no confirmation of delivery
• Hits the 10 minute limit.
![Page 11: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/11.jpg)
11
The 10-Minute Rule
• An analyst should never spend more than 10 minutes on a file before marking it for file review
![Page 12: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/12.jpg)
12
Documenting a File for Review
• Analyst marks the “Miss/Rvw” of the Master Listing with an “R”
• Company employee must review any file marked with an “R”
Legacy No
![Page 13: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/13.jpg)
13
What is an Escalation?
• A review file is moved to a new sheet called the “Escalation Listing”
• Files marked “M” for missing may also be escalated
• Use of the Escalation Listing is optional if review files can be resolved on the Master Listing
![Page 14: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/14.jpg)
14
Deciding to Escalate or Not
Escalate• Many contracts for
review• Several different
company employees reviewing files
• Unable to review immediately
Item marked with “R” or “M”
Item marked with “R” or “M”
Resolve on ML• Few contracts for
review• Company
employee can resolve quickly
![Page 15: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/15.jpg)
15
The Escalation Listing (EL)
• Complete location number and name
• Complete contact name and telephone number
Legacy No
![Page 16: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/16.jpg)
16
The Escalation Listing (EL)
• Analyst transfers information from the ML to the first 5 columns
• Cross-reference ML page number beside the EL line number
Legacy No
![Page 17: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/17.jpg)
17
The Escalation Listing (EL)
• Cross-reference EL row number in the “Comments” column on the ML
• Attach EL to files and forward to the appropriate company personnel for review
Legacy No
![Page 18: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/18.jpg)
18
Cross-Referenced ML & EL
Legacy No
Legacy No
![Page 19: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/19.jpg)
19
Resolving Review Items
• Company employee determines delivery status by:– Reviewing file– Reviewing secondary documents if necessary– Requesting physical inspection if necessary
![Page 20: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/20.jpg)
20
Options For Documenting Your Results
• Never escalated—all work done on Master Listing
• Escalated for review—final documentation on Master Listing
• Escalated for review—final documentation on Escalation Listing
• Contact your Market Coordinator to determine the best option for your location
Note:
Use only one method throughout the project.
![Page 21: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/21.jpg)
21
Escalation Listing Never Used
1. File was marked for review
2. File reviewed & status determined—Erase R
3. Document delivery status on Master Listing
Legacy No
Legacy No
Legacy No
![Page 22: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/22.jpg)
22
Escalated—Documented on ML
1. File was marked for review
2. File reviewed—record delivery status & date on EL
3. Transfer documentation to Master Listing
Legacy No
Legacy No
Legacy No
![Page 23: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/23.jpg)
23
Escalated—Documented on EL
1. File was marked for review
2. File reviewed—record status & HMIS delivery on EL
3. Process is complete
– Be sure that the cross-referencing stays in place
Legacy No
Legacy No
![Page 24: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/24.jpg)
24
When You Can’t Resolve an Escalation
• Item remains with an undelivered status
• Be sure all resources have truly been exhausted
• Comments updated: “Search Exhausted”
![Page 25: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/25.jpg)
25
Session # 2 Agenda
• Review of Session # 1 • Master Listing Sign-off by Analyst• Analyst File Reviews & Escalations• Delivery: The Full-Process Approach• Subsequent Passes• Training Analysts• Quality Assurance (QA)• Resources for Help
![Page 26: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/26.jpg)
26
Delivery: The Full-Process Approach- Overview
• 3-step CUVP Delivery Process1. Review of delivery
2. HMIS data entry
3. HMIS verification
• Rules for Delivery Review
• Documenting the Delivery Review
![Page 27: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/27.jpg)
27
Delivery: The Full-Process Approach 3-Step CUVP Delivery Process
1. Delivery review– Required for all deliveries recorded on the
ML by analysts
![Page 28: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/28.jpg)
28
Delivery: The Full-Process Approach- Rules for Delivery Review
• Must be completed by qualified company employees
• Verify:– The delivery status recorded by the analyst is
correct– The delivery date recorded by the analyst is
correct– If the date is estimated, be sure it is marked
with an “E” for estimate
![Page 29: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/29.jpg)
29
Delivery: The Full-Process Approach- Documenting the Delivery Review
• If correct– Initial the ML column “Initials Rvw of Del” if
everything is correct
• If incorrect– Update Master Listing with correct delivery
information– Initial the ML column “Initials Rvw of Del”
Legacy No
![Page 30: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/30.jpg)
30
Delivery: The Full-Process Approach- 3-Step CUVP Delivery Process
2. HMIS data entry—Accounting Delivery only
– Temp analysts may be used for data entry after they have taken the training: “How to Perform an Accounting Delivery”
3. Delivery Verification– Compare the Master Listing to the HMIS
Product Delivered Report
![Page 31: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/31.jpg)
31
Product Delivered Report
![Page 32: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/32.jpg)
32
Session # 2 Agenda
• Review of Session # 1 • Master Listing Sign-off by Analyst• Analyst File Reviews & Escalations• Delivery: The Full-Process Approach• Subsequent Passes• Training Analysts• Quality Assurance (QA)• Resources for Help
![Page 33: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/33.jpg)
33
Subsequent Passes-Overview
• What is a subsequent pass?
• Why perform a subsequent pass?
• Locating missing files
• Documenting a subsequent pass
![Page 34: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/34.jpg)
34
Subsequent Pass
• What is a subsequent pass?– A second look at your Master Listing after the analyst
has signed off.
• Why perform a subsequent pass?– To locate and resolve contracts marked as “Missing”– To reduce the workload of location personnel
• Contact your Market Coordinator for help with a subsequent pass
![Page 35: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/35.jpg)
35
Subsequent Passes- Locating Missing Files
• Look for other cross-reference sources to determine where the contract is filed– Name change– Purchaser name different than property owner when
contracts are filed by property owner
• Lost files• Determine property location and perform
physical inspection to determine delivery status
![Page 36: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/36.jpg)
36
Subsequent Passes- Documenting a Subsequent Pass• File found
– The “M” is erased from the Master Listing– The analyst reviews the file and determines the
delivery status– The ML is updated with the correct code– The analyst initials and dates the ML in the
“Initials/Date Sub Pass” column
– Amended items are subject to the same delivery review, delivery verification, and QA
Legacy No
![Page 37: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/37.jpg)
37
Session # 2 Agenda
• Review of Session # 1 • Master Listing Sign-off by Analyst• Analyst File Reviews & Escalations• Delivery: The Full-Process Approach• Subsequent Passes• Training Analysts• Quality Assurance (QA)• Resources for Help
![Page 38: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/38.jpg)
38
Training Analysts
• Temps from RHI should have reviewed the analysts’ project training manual for CUVP before arriving at your location
• Walk through the process of analyzing the files– Use example documents
• Interment Order & Maintenance Work Order
– Show brochures of merchandise sold
![Page 39: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/39.jpg)
39
Training Analysts
• Review 100% of their work until you are confident that they are doing it correctly– Initial each ML page for which you do 100%
review– Reject early if they are struggling—contact your
Remote or Market Coordinator for replacements
• Once you are no longer reviewing 100%, the temp’s work is still subject to QA Review
![Page 40: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/40.jpg)
40
Training Analysts-Supervising Analysts
• Errors found during Review of Delivery– Discuss errors with the analyst immediately– Determine if you need to return to 100% review
for a period of time– Determine if staff changes need to be made
• Monitor their production
![Page 41: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/41.jpg)
41
Session # 2 Agenda
• Review of Session # 1 • Master Listing Sign-off by Analyst• Analyst File Reviews & Escalations• Delivery: The Full-Process Approach• Subsequent Passes• Training Analysts• Quality Assurance (QA)• Resources for Help
![Page 42: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/42.jpg)
42
Quality Assurance
• What is QA?
• Conducting the QA
• Documenting QA on Master Listing
• Tallying QA Results
![Page 43: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/43.jpg)
43
Quality Assurance What is QA?
• QA = Quality AssuranceTo ensure that the analysts’ work is accurate, QA is a weekly sampling of 15 contracts that have been marked with an “X” on the Master Listing indicating no change in status.
![Page 44: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/44.jpg)
44
Quality Assurance Why Do We Do QA?
• Too many undelivered items to conduct 100% review
• Demonstrate the quality of the analysts’ work
• Identify temps that need to be replaced
![Page 45: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/45.jpg)
45
Quality Assurance Basic Rules of QA
• What is subject to QA?– Items reviewed by an analyst and determined
to have no change in status – These items will be indicated by an “X” in the
“Verified Del Status” column of the Master Listing
• May be undelivered or stored items
SMBR4814 BRONZE MARKER
Legacy No
![Page 46: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/46.jpg)
46
Quality Assurance Basic Rules of QA
• What is exempt from QA?– Items determined to have a change in status– Temp analysts’ work that was subject to 100%
review by a qualified company employee– Location Review section of the Master Listing
NOTE:
Even if one analyst works only one day during the week, QA Sampling is required.
If fewer than 15 files were worked by that analyst, then 100% of their work is subject to QA.
![Page 47: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/47.jpg)
47
Quality Assurance Conducting the QA
Overview• Determining the sample population
• Selecting samples that are representative
• Choosing which samples to subject to physical inspection
• What is a QA error?
• What to do when you find an error?
![Page 48: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/48.jpg)
48
Conducting the QA Determining the Sample
Population
• 15 contracts from the Master Listing every calendar week– Week is determined by:
• The date the analyst signed-off on each Master Listing sheet
• The date the analyst has initialed the Subsequent Pass
![Page 49: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/49.jpg)
49
Conducting the QA Selecting Samples That Are
Representative• The samplings should include contracts
that represent:
– All analysts
– All types of contracts and items • Burial items • Memorialization items
![Page 50: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/50.jpg)
50
Conducting the QA Choosing Which Samples To
Subject To Physical Inspection• 5 of the 15 samples selected
must be checked by physical inspection
• Do not include any contracts where a physical inspection was previously performed to determine delivery status
![Page 51: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/51.jpg)
51
Conducting the QA What is a QA Error?
• Analyst marked the Master Listing with an “X” indicating the status had not changed; however, the item was in fact delivered
![Page 52: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/52.jpg)
52
Conducting the QA What To Do When You Find an Error?
• Delivery was found by reviewing the file– The file indicates that a delivery was
performed—the analyst made an error.– Make the appropriate corrections on the
Master Listing– Perform HMIS data entry
• Delivery was found on physical inspection– Nothing in the file indicates that a delivery
was performed—the analyst is not at fault
![Page 53: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/53.jpg)
53
Conducting the QA What To Do When You Find an
Error?• Evaluate the analyst
– Location may have to go back and perform 100% review of all of that analyst’s work
– Make sure that all analysts know what error occurred and are instructed on how to prevent that type of error in the future
• Call your Market Coordinator to report all errors found during QA– They will instruct you on what action to take
![Page 54: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/54.jpg)
54
• Four possible outcomes of QA– Test-ok – Test-error– Test-ok with physical inspection– Test-ok with physical inspection error
Documenting QA On the Master Listing
Overview
![Page 55: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/55.jpg)
55
Documenting QA On the Master Listing
• Test-OK = ML is correct based on contract file– Write “Test-ok” in the QA Results column– Person performing the QA initials in the “QA
Initials” column
Legacy No
![Page 56: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/56.jpg)
56
Documenting QA On the Master Listing
• Test-Error = ML is wrong based on contract file– Write “Test-error” in the QA Results column– Person performing the QA initials in the “QA
Initials” column
Legacy No
![Page 57: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/57.jpg)
57
Documenting QA On the Master Listing
• Test-Error—Correcting the delivery status– Erase the “X”– Enter the correct delivery status and delivery
date
Legacy No
![Page 58: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/58.jpg)
58
Documenting QA On the Master Listing
• Test-Error—HMIS data entry & verification– Perform the required HMIS data entry– Initial and date HMIS data entry complete– Perform Delivery Verification and initial on ML
NOTE:
Do not erase the QA documentation after correcting the error.
Legacy No
![Page 59: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/59.jpg)
59
Documenting QA On the Master Listing
• Test-ok and INSP = PI confirms ML & contract file are correct– The QA of the file tested okay & was
documented– Contract was selected for physical inspection– Physical inspection showed no delivery– Write “INSP” in the Comments column
Legacy No
![Page 60: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/60.jpg)
60
Documenting QA On the Master Listing
• Test-OK and INSP-error = PI shows delivery; ML is wrong & contract file may be wrong– The QA of the file tested okay & was documented– Contract was selected for physical inspection– Physical inspection showed two of the four items were delivered– Write “INSP” in the Comments column for the correct items– Write “INSP-error” in the Comments column for the incorrect items– Correct the delivery status, perform HMIS data entry, and complete
the documentation following the same process for “Test-error”
Legacy No
![Page 61: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/61.jpg)
61
Tallying QA Results
• There is a CUVP Web Application to register QA results.
• There will be a special session on how to use this tool.
• You will find this Web Application on The SCI Global Village.
![Page 62: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/62.jpg)
62
Tallying QA Results
![Page 63: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/63.jpg)
63
Session # 2 Agenda
• Review of Session # 1 • Master Listing Sign-off by Analyst• Analyst File Reviews & Escalations• Delivery: The Full-Process Approach• Subsequent Passes• Training Analysts• Quality Assurance (QA)• Resources for Help
![Page 64: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/64.jpg)
64
Resources for Help
• Coordinators– Market Coordinator
• Global Village– Applications—Cemetery Undelivered Verification
• Sara Beaves– [email protected]
• Juhli Farrell– [email protected]
• Pat Adams – [email protected]
![Page 65: Cemetery Undelivered Verification Project Full-Process Locations Only](https://reader030.vdocuments.net/reader030/viewer/2022032800/56649d255503460f949fc0b2/html5/thumbnails/65.jpg)
65
Resources for Help
• Email questions for Q & A session to:– [email protected]– [email protected]– [email protected]– Subject line: “CUVP Questions”