--- In the Regu Cent Regu Open Regu Trans group And In the Powe 1. Sp 2. Re 3. G 4. G 5. PE 6. IL& 7. NS 8. Th 9. C 10. Es 11. M 12. To ------------------ Order in P e matter of Appr ulatory Ap tral Transm ulatory Co n Access ulations, 2 mission syp of devel e matter oer Grid Co pectrum Po eliance Inf VK Gauta VK Industr EL Power L &FS Tamil N SL Power P hermal Pow hitrangi Po ssar Power B Power (M oday Energ ------------------ Petition No.1 CENT C f: roval unde pproval fo mission Utimmission ( s to the 2009, for stem requ opers. f: rporation ower Gen frastructure mi Power ies Limited imited , Hy Nadu Pow Pvt. Ltd., Hy wertech C ower Privat Gujarat Li MP) Ltd., N gy (MP). Pv ------------------ 54/MP/2011 TRAL ELECT Peti Coram: Dr. Shri Shri Shri Date Date er Central or executility) Regu (Grant of e Inter-Sta grant o ired in con of India LtVs eration Ltd e Limited, Limited, Se d, Secunde yderabad wer Compa yderabad orporation te Ltd., Na imited, Ma New Delhi vt Ltd, New ------------------ RICITY REG NEW D ition No. 15 & IA No. 1 Pramod D S. Jayaram V.S. Verm M. Deena e of Hearin e of Order Electricity on of Inte lations, 20 Connectiv ate Trans of regulat nnection w d., Gurgao d., Hydera Hyderaba ecunderab erabad any Limited n India Ltd avi Mumba aharashtra w Delhi ------------------ GULATORY DELHI 54/ MP/20 & 7/2011 eo, Chairp man, Mem ma, Membe a Dayalan, ng: 13.9.20 r: 13.12.2 Regulatoer-State Tr 010 read vity, Long T mission a tory apprwith grant on bad ad bad d, Chenna ., Hyderab ai a ------------------ COMMISS 011 person mber er Member 011 2011 ry Commis ransmissiowith Cen Term and and Rela oval for of long te …… ai bad ------------------ Page 1 of 4 SION ssion (Gran n Scheme tral Electr Medium T ted Matexecution erm acce…. Petition ------- 44 nt of e to ricity Term ters) n of ss to ner

Upload: others

Post on 09-Feb-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

 

In the 

ReguCentReguOpenReguTransgroup

And In the

Powe

1. Sp2. Re3. G4. G5. PE6. IL&7. NS8. Th9. C10. Es11. M12. To

------------------ Order in P

e matter of

Apprulatory Aptral Transmulatory Con Accessulations, 2mission sysp of devel

e matter of

er Grid Co

pectrum Poeliance InfVK GautaVK Industr

EL Power L&FS Tamil NSL Power P

hermal Powhitrangi Po

ssar Power B Power (M

oday Energ

------------------Petition No.1

CENT

C

f:

roval undepproval fomission Utilmmission (s to the2009, for stem requopers.

f:

rporation o

ower Genfrastructuremi Power ies Limitedimited , HyNadu PowPvt. Ltd., Hywertech Cower Privat Gujarat LiMP) Ltd., Ngy (MP). Pv

------------------54/MP/2011

TRAL ELECT

Peti

Coram: Dr. Shri Shri Shri

Date Date

er Central or executiolity) Regu(Grant of C

e Inter-Sta grant oired in con

of India Ltd

Vs

eration Ltde Limited, Limited, Se

d, Secundeyderabad

wer Compayderabadorporationte Ltd., Naimited, Ma

New Delhi vt Ltd, New

------------------

RICITY REGNEW D

ition No. 15

&IA No. 1

Pramod D S. Jayaram V.S. Verm M. Deena

e of Hearine of Order

Electricityon of Intelations, 20Connectivate Transof regulatnnection w

d., Gurgao

d., HyderaHyderabaecunderaberabad any Limited

n India Ltdavi Mumbaaharashtra

w Delhi

------------------

GULATORY DELHI 54/ MP/20

& 7/2011

eo, Chairpman, Mem

ma, Membea Dayalan,

ng: 13.9.20r: 13.12.2

Regulatorer-State Tr010 read vity, Long Tmission atory approwith grant

on

bad ad bad

d, Chenna

., Hyderabai a

------------------

COMMISS

011

person mber er Member

011 2011

ry Commisransmissionwith CenTerm and and Relaoval for of long te

……

ai

bad

------------------Page 1 of 4

SION

ssion (Grann Schemetral ElectrMedium Tted Mattexecution

erm acces

…. Petition

------- 44

nt of e to ricity Term ters)

n of ss to

ner

Page 2: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

13. Dh14. Ka15. Bih16. W17. G18. Da19. Po20. Jh21. As22. M23. G24. Po25. E26. De27. Tri

7928. Ra29. Aj30. Ja31. Jo32. Hi33. Pu34. Ha35. Po36. Ut37. De38. C39. Ut40. BS41. BS42. No43. ND44. No45. Ka46. Ba47. G48. Hu49. M50. C

Ka51. Tra52. Ea

(A53. So

An

------------------ Order in P

hariwal Infarnataka Phar State E

West Bengarid corporamodar Vower deptharkhand Sssam State

Meghalayaovernmen

ower & Elelectricity Departmenipura Sta99001 ajasthan Rjmer Vidyuaipur Vidyuodhpur Vimachal Pr

unjab Statearyana Poower Devettar Pradeselhi TranschandigarhttarakhandSES YamunSES Rajdhaorth DelhDMC , Mezorth Centrarnataka Pangalore Eulburga Elubli Electricangalore hamundesarnataka ansmissionastern PoAPEPDCL), outhern Pondhra Prad

------------------Petition No.1

frastructurePower CorElectricity B

al State Eleation of oralley Corpt., govt. OState Electe Electricity State Elec

nt Of Arunaectricity DeDepartment of Power

ate Electr

ajya Vidyuut Vitran Niut Vitran Nidyut Vitraradesh Stae Electricit

ower Purchelopment Dsh Power C

co Ltd, Newh Administrd Power Cna Power ani Power i Power Lzzanine flo

ral RailwayPower TranElectricity Sectricity Sucity SupplyElectricity shwari E

n Corporatwer Distri Andhra Pr

ower Distribdesh

------------------54/MP/2011

e Ltd, Kolkarporation LBoard, Pactricity Borisa ltd., bhporation , C

Of sikkim, gatricity Boary Board, Actricity Boaachal Pradeptt., Govtnt, Govt. or, Govt. of ricity Corp

ut Prasaranigam Ltd, igam Ltd, n Nigam L

ate Electricty Board, Phase CentrDeptt., GoCorporatiow Delhi ration., Ch

CorporationLtd., New ltd, New DLtd, New Door, New Dy,Allahabansmission CSupply Coupply Comy Compan Supply Colectricity

tion of Andibution Cradesh bution Com

------------------

ata Ltd, Bangaatna ard, Calcu

hubaneshwCalcutta angtok- 73rd, Ranchi

Assam ard, Shillondesh, Arunt. Of Mizoraof Manipur, Nagalandporation L

n Nigam LRajasthan Jaipur

Ltd, Rajasthcity Board, Patiala re, Panchkovt. of Jamon Ltd., Luc

handigarh n Ltd., DehDelhi

Delhi Delhi Delhi ad Corporatiompany Lim

mpany Limny Limited ompany Li

Supply

dhra PradeCompany

mpany of

------------------

alore

utta war

37 101

g achal Pra

am, , Aizw, Keishamp

d. Limited, Ba

imited. Jai

han Vidyut Bh

kula mmu & Kascknow

hradun

on Ltd.,Banmited (BESC

mited (GESC(HESCOM)mited (MECorporat

esh ltd, Hydof Andh

Andhra Pr

------------------

desh al pat, Impha

anamalipu

ipur

awan, Shi

hmir, Jamm

ngalore COM). KarCM), Karna), Karnata

ESCOM), Kation Limit

derabad hra Prade

radesh ltd

------------------Page 2 of 4

al

ur. Agarta

mla

mu

rnataka ataka ka arnataka ted, (CE

esh , Lim

(APSPDC

------- 44

la –

SC),

mited

CL), ,

Page 3: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

54. Ce(A

55. No56. Ke57. Ta58. Ele59. Ele60. M61. M62. M63. G64. Ele65. Ele66. C

Follow

1. Sh2. Sh3. Sh4. Sh5. Sh6. Sm7. Sh8. Sh9. Sh10. Sh11. Sh12. Sh13. Sh

this p

Com

Trans

deve

evac------------------ Order in P

entral PoAPCPDCL),orthern Poerala Stateamilnadu Eectricity Dectricity Dadhya Praadhya Praaharashtraujarat Urjaectricity Dectricity Dhhattisgar

wing were

hri S.S. Rajuhri Jane Johri RVM Rahri Avinashhri Subir Semt. Manju hri Dilip Roihri Ravi Aryhri Abhishehri Manoj Dhri S Venkahri Kailash Chri R.B. Sha

The petit

petition se

mmission (

smission S

elopment

cuation o------------------Petition No.1

ower Dist,

ower Distribe ElectricityElectricity Bepartmenepartmen

adesh Tradadesh Auda State Ele

a Vikas Nigepartmenepartmenrh State Ele

e present:

u, PGCIL ose, PGCIL

o, PGCIL M Pavgi, n, PGCIL Gupta, PGekar, PGC

ya, MB Powek Gupta, MDubey, Adatesh, MBPChandra, rma, BSEJ

ioner, Pow

eeking reg

Grant of

cheme to

and exec

of power ------------------54/MP/2011

ribution C

bution Comy Board, ThBoard, Chet, Govt of t, Govt. of

deco, Jabadyogik Kanectricity Disam Ltd, Bat, Administt, Administ

ectricity Bo

PGCIL

GCIL CIL wer MB Power visor, MP T(MP) L Jindal Pow

wer Grid C

ulatory ap

Regulato

o Central

cution of

from vari------------------

Company

mpany of Ahiruvanantennai Pondichef Goa, Panalpur ndra Vikasstribution Caroda tration of Dtration of D

oard, Chha

Trader

wer

ORD

orporation

pproval un

ory Approv

Transmissi

certain id

ious gene------------------

y of And

Andhra Prathapuram

rry naji.

s Nigam (INCo Ltd, Mu

Daman & Dadra Nagatisgarh.

DER

n of India L

nder Centr

val for ex

ion Utility)

dentified t

eration pr------------------

dhra Prad

adesh ltd

NDORE) Ltdumbai

Diu, Damagar Haveli

……

Limited (PG

ral Electric

xecution

Regulatio

transmissio

rojects pla------------------Page 3 of 4

desh Lim

(APNPDC

d.

an , Silvasa

..Respond

GCIL) has f

city Regula

of inter-S

ons, 2010,

on systems

anned to -------

44

mited

L)

ents

filed

atory

tate

, for

s for

be

Page 4: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

prom

pray

2. In

nece

the

syste

3. Th

Con

Con

gene

Krish

Chh------------------ Order in P

moted by

yers in the

(a) Gran

ident

petiti

Appli

(b) Gran

charg

Char

CERC

(c) Gran

by CE

n Interlocu

essary ord

execution

em as men

he petitio

nectivity/L

nectivity/L

eration pr

napattnam

attisgarh in------------------Petition No.1

different

petition:

t Regula

tified trans

on, for t

icants who

t approva

ges are t

rge metho

C from time

t approva

ERC.

tory Applic

er on urge

n of the A

ntioned or

ner has su

Long ter

LTA appl

rojects pri

m area in

n Western ------------------54/MP/2011

develope

tory app

smission sy

transmissio

o have be

al for inclus

o be rec

odology or

e to time;

al for inclus

cation No

ent basis,

Agreemen

prayed in

ubmitted

m Acce

ications

imarily in

n Souther

Region an------------------

ers. The pe

roval for

ystems at A

on of po

en grante

sion of the

overed th

r any othe

and

sion of sys

o. 17/2011,

permitting

nts for imp

the main

that as n

ess, it h

from pro

Vemagiri,

n Region,

nd Orissa in------------------

etitioner h

taking u

Annexure-

ower from

d LTA/ Co

e assets fo

hrough the

er sharing

stem unde

, the petiti

g the petit

plementat

petition.

odal age

has rece

ospective

, Nagapa

, Maharas

n Eastern R------------------

as made

up implem

-III to Anne

m IPPs/LTA

nnectivity

r which th

e Point o

mechanis

er the TSA

oner pray

ioner to g

tion of the

ncy for p

ived a

custome

attinam/Cu

shtra/Mad

Region. ------------------Page 4 of 4

the follow

mentation

exure-X of

A/Connect

;

e transmis

f Connec

sm notified

to be noti

ed for issu

o ahead

e transmis

processing

number

ers for t

uddalore

dhya Prad

------- 44

wing

n of

the

tivity

ssion

ction

d by

ified

e of

with

ssion

the

of

their

and

esh,

Page 5: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

4.

gran

Deve

whic

were

Mee

and

quan

their

------------------ Order in P

The petit

nted to the

elopers in

ch the Asso

e identifie

etings/Regi

Northern

ntum of Lo

r estimated

Sl. No.

Tra1. High

(Tranproje

2 High (Transprojec

3 TransmTransmMaha

4 TransmTransmChha

Tran5 Transm

Therm6 Transm

Powe7 Transm

Essar P8 Transm

Chitra

------------------Petition No.1

tioner has

e applica

Southern

ociated Tra

ed after

ional Pow

Regions.

ong Term

d cost are

Tran

nsmission SyCapacity P

nsmission Syects in VemaCapacity P

smission Systcts in Nagapmission Systemission Coarashtra/ MPmission Systemission Cottisgarh Are

nsmission Sysmission Syste

mal Powertecmission Syste

er (MP) Ltd. mission SystePower Gujarmission Systeangi Power P

------------------54/MP/2011

submitted

nts for Lon

n, Western

ansmission

discussio

wer Comm

The ident

Access/C

given in th

smission Sys

ystem for LTAPower Transystem Assoagiri Area) Power Transmtem Asspattinam/ Cuem Strengthrridor for Area em Strengthrridor for

ea stem for Conem for conch Corporatem for conn

em for conrat Ltd em for con

Pvt. Ltd.

Total

------------------

d that Lon

ng Term A

n and Eas

n Systems r

ns in co

mittee forum

tified Tran

Connectivit

he table b

stems

A to different mission Cor

ociated wit

mission Corrsociated wiuddalore Ahening in WIPP projec

hening in WIPP projec

nnectivity to nnectivity oion India Ltdectivity of M

nnectivity o

nnectivity o

------------------

ng Term Ac

Access/Co

stern Regi

required fo

oncerned

ms of Sou

nsmission S

ty granted

elow:

LoA

Co

groups of geridor-X h IPP

ridor-XI th IPP rea) WR-NR cts in

WR-NR cts in

individual gof M/s d M/s MB

of M/s

of M/s

------------------

ccess/Con

onnectivity

ons of th

or transmis

Standing

uthern, We

Systems al

d to the a

ong Term Access/ nnectivity (MW)

enerating St

6650

3297

1910

2034

generating St

1320

1200

2240

3960

21451

------------------Page 5 of 4

nnectivity

y and Pro

e country

ssion of po

g Commi

estern, Eas

long with

pplicants

Estimatedcost of the

Project (` in crore

ations

9144

7985

1610

4448

tations

96

458

558

226

24525

------- 44

was

oject

y for

ower

ttee

stern

the

and

d e

e)

Page 6: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

5.

Emp

have

Utility

add

deci

Trans

trans

bala

the p

regu

the

proc

6.

gene

the d

gene

envir

statu

proje

------------------ Order in P

The p

powered C

e desired

y (CTU) fo

ition to th

isions tak

smission h

smission sy

ance woul

petitioner

ulatory app

CTU as w

cess.

The p

eration pro

discussions

eration pro

ronment a

us was giv

ects.

------------------Petition No.1

petitioner

Committee

that Regu

or scheme

he scheme

ken in th

held on

ystem wou

d be impl

has appro

proval whi

ell as thos

petitioner h

ojects for

s held with

ojects with

and other

ven in the

------------------54/MP/2011

has furth

e on Tran

ulatory Ap

es which a

es that are

he 25th m

1st Februa

uld be imp

lemented

oached th

ich include

se to be i

has further

which LTA

h the proje

h respect

statutory

e Project

------------------

er submit

smission, t

pproval be

are consid

e to be im

meeting o

ary, 2011,

plemented

through t

e Commis

es elemen

implemen

r submitted

As have be

ect develo

to availab

clearanc

Inception

------------------

ted that

the memb

e sought

dered for

mplement

of Empow

it was

d by CTU

ariff based

ssion with t

nts propose

ted throug

d that the

een grante

opers, whe

bility of lan

es were e

Reports

------------------

in the 23r

bers of th

by Centra

tariff base

ed by CT

wered Co

decided

on cost p

d bidding

the presen

ed to be d

gh tariff b

readiness

ed was as

erein statu

nd, fuel, w

examined.

(PIR) of th

------------------Page 6 of 4

rd Meeting

he commi

al Transmis

ed biddin

U. As per

ommittee

that part

plus basis

. Accordin

nt proposa

developed

based bidd

of the var

ssessed du

s of propo

water linka

The deta

he respec

------- 44

g of

ttee

ssion

g in

the

on

t of

and

ngly,

al for

d by

ding

rious

uring

osed

ges,

ailed

ctive

Page 7: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

7.

the

case

indiv

acce

Trans

by t

corri

dem

Trans

State

with

subm

Regu

Ope

Regu

8.

gene

ones

the r

of th

soug

------------------ Order in P

Durin

petitioner

es pertain

vidual dev

ess to d

smission Sy

the CTU

dors have

mand scen

smission P

es were pr

the Inde

mitted the

ulatory Co

en Acces

ulations, 20

On t

erating sta

s in which

representa

he transmis

ght for all t

------------------Petition No.1

ng the hea

submitted

to conne

velopers a

different g

ystems (IST

and Cen

e been pla

nario in th

lanning in

resent. Bul

ependent

e requisite

ommission

s to the

010 (herein

the issue

ations whic

the gene

ative of the

ssion schem

he corrido

------------------54/MP/2011

aring of the

d that out

ectivity to

and the re

groups of

TS) are pa

ntral Elect

anned kee

e various

n which th

lk Power T

Power Pr

e Bank G

(Grant of

e Inter-Sta

nafter “the

of segreg

ch are req

erating stat

e petitione

mes would

ors. He exp

------------------

e matter o

t of eight

generatin

emaining

f genera

rt of the c

ricity Auth

eping in v

meetings

he represe

ransmissio

roducers

Guarantee

Connectiv

ate Trans

e Connect

gation of

quired to b

tions are e

er submitte

d take tim

plained th

------------------

on 28.7.201

cases un

ng station

four case

ting stati

coordinate

hority (CE

view the a

of the Sta

entatives f

n Agreem

(IPPs) and

e as per

vity, Long T

smission a

tivity Regu

the tran

be taken u

expected

ed that sin

e, regulato

at the pro

------------------

1, the rep

nder consi

ns being d

es pertain

ons. Thes

ed transmis

EA). These

all India ge

anding Co

rom all th

ments have

d most o

the Cent

Term and

and Rela

lations”).

smission a

up immedi

to be dev

nce the im

ory approv

ocedure fo

------------------Page 7 of 4

presentativ

deration,

developed

to long-t

se Inter-S

ssion plann

e transmis

eneration

ommittees

he concer

e been sig

of them h

tral Electr

Medium T

ated Matt

assets for

iately and

veloped la

mplementa

val was be

ollowed by

------- 44

ve of

four

d by

term

tate

ning

ssion

and

s on

rned

ned

have

ricity

Term

ters)

the

the

ater,

ation

eing

y the

Page 8: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

petit

Repo

App

proc

fores

9.

repre

be

cann

have

rega

------------------ Order in P

tioner take

ort (DPR),

roval from

cess includ

st clearanc

In re

esentative

commissio

not be de

e approac

ard. The P

(i) The

Envi

orde

(ii) The

by

bidd

(iii) Time

syste

(iv) Seg

whic

gen

------------------Petition No.1

es about

, floating

m the Boa

ding signin

ce, and co

eply to a

e of the pe

oned duri

eveloped i

ched the

Petitioner w

latest sta

ironment a

ers etc.

transmissi

private de

ding.

eline for

ems.

regation o

ch have t

nerating sta

------------------54/MP/2011

9 to 10 m

the Noti

rd of Direc

ng of Imp

onstruction

a query o

etitioner su

ng 2011-1

n such a s

CTU very

was directe

atus of th

and Forest

on assets

evelopers

scheduled

of the tran

to be take

ations are

------------------

months for

ce Inviting

ctors. He

plementatio

n etc. take

of the C

ubmitted t

12 and 2

short time

late and

ed to subm

he genera

ts Clearan

to be exe

on the c

d comple

nsmission a

en up imm

expected

------------------

preparat

g Tender

further sub

on Agree

es about 4

Commission

that for th

2012-13, th

frame as

they have

mit the follo

ation proje

ces, fuel s

ecuted by

cost plus

etion of

assets for

mediately

d to come

------------------

tion of De

(NIT) an

bmitted th

ment, lan

5-46 mont

n during

he generat

he transm

the Projec

e been in

owing det

ects havin

supply agr

y Power G

basis and

the each

the gener

and ones

later.

------------------Page 8 of 4

etailed Pro

d Investm

hat the wh

d acquisit

ths.

hearing,

ting statio

mission sys

ct Develo

formed in

tails:

ng Ministry

reements,

Grid and th

d tariff ba

h transmis

rating stat

s in which

------- 44

oject

ment

hole

tion,

the

n to

stem

pers

this

y of

EPC

hose

ased

ssion

tions

the

Page 9: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

1

in

sy

tr

o

1

b

o

o

w

b

tr

st

fo

re

im

12

re

tr

------------------ Order in P

0. The p

nformation

ystem thr

ransmission

order.

1.

between C

of the Conn

of the case

with the be

based on t

ransmission

tations, the

or Chitran

egulatory

mmediate

2. M/s M

egulatory

ransmission

------------------Petition No.1

petitioner

n regardin

rough tar

n system e

The petit

CTU and th

nectivity R

es, long-te

eneficiarie

the target

n system o

e petitione

ngi Power

approval

ly.

MB Power

approva

n system b

------------------54/MP/2011

in its affid

g progres

riff based

etc. The sa

tioner has

he develo

Regulations

erm tie–ups

es and the

t regions.

on the ba

er has sub

r Ltd., al

in the ins

Ltd., in its

l may b

being dev

------------------

davit date

ss of gene

bidding

aid informa

s submitte

per IPPs in

s. The pet

s have be

e transmiss

Regarding

asis of pro

bmitted tha

l the tran

tant petiti

reply dat

be grante

veloped fo

------------------

ed 02.09.2

erating sta

, time lin

ation is giv

d that BP

n accorda

titioner has

een made

sion system

g the poss

ogress of

at except

nsmission

ion are re

ed 23.08.2

ed to the

or its gene

------------------

2011 has s

ations, the

ne for c

ven at Ap

PTAs have

ance with

s submitted

by the co

ms have b

sibility of p

concerne

the transm

systems

equired to

2011 has s

e petition

erating sta

------------------Page 9 of 4

submitted

e transmis

ompletion

ppendix to

been sig

Regulation

d that in n

oncerned

been plan

phasing of

ed genera

mission sys

proposed

be taken

ubmitted

ner and

ation may

------- 44

the

ssion

n of

o this

ned

n 12

none

IPPs

ned

the

ating

stem

for

n up

that

the

y be

Page 10: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

in

C

1

th

re

im

o

p

G

th

a

st

th

Es

re

su

sy

a

14

Tr

------------------ Order in P

ncluded a

Connection

3. Durin

he petition

egulatory

mmediate

of M/s Chi

present sin

Guarantee

he activiti

agreement

tation of T

hat keepin

ssar Powe

equired fo

ubmitted t

ystem for p

already be

4. Rega

ransmission

------------------Petition No.1

as part o

n charges.

ng the hea

ner submit

approval

ly needed

trangi Pow

nce the

. The repre

ies relate

t and EPC

hermal Po

ng in view

er genera

or these t

that pre-te

providing

en started

arding th

n Corridor

------------------54/MP/2011

of basic

.

aring of the

tted that o

has been

d and for th

wer Pvt. L

project d

esentative

d to land

C orders h

owertech C

w the prog

ating stati

hree conn

endering a

connectiv

d.

he Transm

r for IPP p

------------------

network

e case on

out of eig

sought, t

he eighth

Ltd, regula

developer

e of the pe

d, environ

have been

Corporatio

ress of The

ons, the

nectivity c

activities fo

vity to thes

mission Sy

projects in

------------------

for dete

n 13.09.201

ht transmi

he approv

project i.e

atory appr

has not

etitioner ha

nmental c

n comple

on Ltd. It h

ermal Pow

regulatory

cases. The

or implem

se three g

ystem Stre

n Mahara

------------------

ermination

1, the rep

ssion proje

val for sev

e. the gene

roval is no

t submitte

as further s

clearance

ted for th

has also be

wertech, M

y approva

e petitione

entation o

enerating

engthenin

ashtra/Mad

------------------Page 10 of

of Point

presentativ

ects for wh

ven projec

erating sta

ot required

ed the B

ubmitted

e, fuel sup

he genera

een submi

MB Power

al is urge

er has fur

of transmis

stations h

g in WR

dhya Prad

------- 44

t of

e of

hich

cts is

ation

d at

Bank

that

pply

ating

tted

and

ently

rther

ssion

have

R-NR

desh

Page 11: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

A

im

c

ta

b

N

a

C

o

p

w

1

1

re

(H

3

------------------ Order in P

Area, the

mmediate

ckt. of Jab

aken alon

been grant

No. 233/20

approval f

Corridor for

of up-grad

pooling sta

would requ

5. The

3.9.2011 h

(a) The dCorridors was gran (b) Detaithe transm (c) To sub

The pe

egarding t

HCPTC) fo

1.05.2011 i

------------------Petition No.1

petitione

ly, so that,

balpur-Orai

g with the

ted by the

009. The

for Transm

r IPP proje

ation of +

ation and

uire longer

Commissio

ad directe

details of p and relat

nted in Petit

ls of Long mission syst

bmit a repo

etitioner in

the progre

or which r

in petition

------------------54/MP/2011

r emphas

, in order t

i- Bulanda

e first ckt.,

e Commiss

petitioner

mission Sys

ects in Chh

+ 800 kV, 3

Kurukshetr

duration.

on in the

ed the pet

progress ofted generation No. 23

Term Accetem has be

ort after site

its affida

ess of nine

regulatory

no. 233/20

------------------

sized the

o optimize

ashahar 76

for which

sion vide o

r has fur

tem Stren

hattisgarh

3000 MW

ra to 6000

Record of

titioner to s

f the nine ating statio

33/2009.

ess of the teen propos

e visit.

avit dated

High Capa

approval

009. After

------------------

need o

e the right

65 kV tran

regulatory

order date

rther subm

ngthening

Area, is r

HVDC Bi-p

0 MW , im

f Proceed

submit the

High Capaons for wh

three genesed in the p

3.10.2011

acity Powe

l was gra

perusal of

------------------

f regulato

of way, th

smission sy

ry approva

ed 31.05.20

mitted tha

in WR-NR

required si

pole betw

mplementa

ings for th

e following

acity Powehich regula

eration projpresent pe

1 has subm

er Transmis

nted vide

f the progr

------------------Page 11 of

ory appro

he work fo

ystem can

al has alre

010 in pet

at regula

R Transmis

nce it con

ween Cham

ation of w

he hearing

informatio

er Transmisatory appr

jects for wetition.

mitted de

ssion Corri

e order da

ress report

------- 44

oval,

r 2nd

n be

eady

ition

atory

ssion

nsists

mpa

hich

g on

on:

ssion roval

which

etails

dors

ated

, we

Page 12: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

n

c

g

th

lik

fie

g

X

im

sy

u

1

re

e

a

th

th

A

1

------------------ Order in P

ote that t

corridors is

generating

hat LTA ca

kely to ma

eld area,

generating

I for IPPs

mplementa

ystems wo

nits.

6. We h

egard to

estimates a

are the pro

he HCPTCs

he succee

A. High CaAssocia

7. With

a) IPPs w

------------------Petition No.1

the progre

satisfacto

stations c

apacity of

aterialize w

the Nag

stations m

in Nagap

ation and

ould be in

have exam

the 8 tra

and the m

ospective

s from the

eding para

apacity Powated with IP

regard to

which hav

------------------54/MP/2011

ess of the

ory. With r

covered un

1560 MW

with reaso

apattinam

materialize

pattinam a

commissi

phases ke

mined in

ansmission

ilestones a

beneficiar

point of v

agraphs.

wer TransmPP projects

HCPTC – X

ve been

------------------

e generati

regard to

nder HCPT

W (IL & FS –

onable cer

m corridor

s. The pet

area may

ioning of

eeping in

detail the

n systems

achieved

ries of the

view of reg

mission Cos in Vemag

X, the Petit

granted L

------------------

ng station

the progr

TC-XI, the p

– 1200 MW

rtainty. Mo

is require

itioner has

be allow

the eleme

view the

e proposa

along w

by the ge

ese corrido

gulatory ap

orridor-X (Tgiri Area)

tioner has

LTA and h

------------------

ns and the

ress of the

petitioner

W and PPN

oreover, b

ed even

s proposed

ed to be

ents of the

progress

l of the P

with the t

neration p

ors. Our ob

pproval ar

Transmissio

submitted

have signe

------------------Page 12 of

e transmis

e work on

has submi

N – 360 MW

being a gr

if one of

d that HCP

taken up

e transmis

of genera

Petitioner

entative

projects w

bservations

re discusse

on System

as under:

ed BPTAs

------- 44

ssion

the

tted

W) is

reen

the

PTC-

p for

ssion

ating

with

cost

hich

s on

ed in

and

Page 13: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

------------------ Order in P

subm

Powe

MW

1350

b) In th

Rajah

been

Powe

conn

unde

contr

c) Besid

been

Indus

d) The s

finalis

vario

syste

bene

charg

e) Thoug

petiti

Empo

corrid

biddi

interc

------------------Petition No.1

mitted Ban

er Ltd/Relia

and Spec

MW.

his corrido

hmundry L

n synchron

er Ltd. (2X5

nectivity to

er this sche

ract is June

des these

n granted

stries Ltd. (

studies for

sed in co

us utilities.

m is to be

eficiaries a

ges.

gh BPTA fo

ioner befo

owered C

dor is to

ing and

connectio

------------------54/MP/2011

nk Guaran

ance Infra

ctrum Pow

or, LTA o

Ltd. (2X384

nised with

520 MW) h

o Vemagiri

eme. Sche

e-Septem

generatin

to GVK

800 MW)

evolution

onsultation

It was ag

e borne b

are firmed

or the sub

ore 5 Jan

Committee

be develo

the pooli

n with th

------------------

ntee in th

astructure

wer Genera

f 775 MW

4 MW). 1st

grid in Se

has also b

Pooling st

eduled CO

ber, 2013.

g stations

Gautami

n of transm

n with CE

greed that

by the ge

d up and

bject transm

nuary 201

e on Tran

oped und

ing statio

he grid

------------------

he Vemag

Ltd. (2400

ation Ltd.

W has be

unit of this

eptember,2

been grant

tation prop

OD of gene

s, LTA of 8

Power Ltd

mission syst

EA, gener

t the cha

eneration d

d agree t

mission sys

1, in line

nsmission,

der the ta

ns/sub-sta

shall be

------------------

giri area

0 MW) wit

(1400 MW

een gran

s generati

2011. Hin

ted LTA of

posed to b

erating un

800 MW e

d. (800 M

tem was d

ration dev

rges of th

developer

o bear it

stem was

e with the

the trunk

ariff based

ations alon

implemen

------------------Page 13 of

are Sama

h LTA of 2

W) with LTA

nted to G

ng station

duja Natio

f 725 MW

be develo

nits as per

each has

MW) and G

discussed

velopers

e transmis

rs till the t

s transmis

signed by

e decision

k transmis

d compet

ng with t

nted by

------- 44

alkot

2200

A of

GMR

has

onal

with

ped

EPC

also

GVK

and

and

ssion

time

ssion

the

n of

ssion

titive

their

the

Page 14: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

1

th

M

h

g

P

G

------------------ Order in P

petiti

f) The R

viz. V

been

biddi

in the

effec

assum

achie

the sy

g) The p

statio

abov

h) Cons

up fo

8. After

hat two de

MW and Sp

ave signe

generation

ower Ltd.

Generation

------------------Petition No.1

ioner unde

RFQ for on

Vemagiri–K

n issued fo

ing and b

e RFQ for

ctive date

ming that

eved by M

ystem wou

petitioner

ons and th

ve time sch

sidering ab

or impleme

r examinat

evelopers

pectrum Po

ed the B

develope

have aw

n Ltd., is in

------------------54/MP/2011

er cost plus

ne of the p

Khammam

or implem

ids have b

the schem

e as per

the RFP

March, 20

uld be Ma

shall impl

heir interc

hedule.

bove, the

entation im

tion of the

i.e. Samal

ower Gen

BPTAs and

ers i.e Sa

warded th

process. T

------------------

s basis.

packages

m–Hyderab

entation t

been ope

me has be

the TSA

process a

12, then t

rch, 2015.

ement the

connection

subject tr

mmediately

e submissio

lkot Private

eration Ltd

d submitt

malkot Pr

he EPC c

Total LTA g

------------------

of the tru

bad 765 k

through ta

ned. The t

een given

approved

and effec

the likely c

e associat

n to the g

ransmission

y.

ons made

e Ltd. (340

d. (1400 M

ted the B

rivate Ltd.

ontracts,

granted in

------------------

unk transm

V D/c line

ariff based

time sched

as 36 mo

d by MO

ctive trans

commissio

ted substa

grid matc

n system is

e by CTU,

00 MW) wi

W) with LT

Bank Gua

and Hind

while Spe

this corrido

------------------Page 14 of

mission corr

e has alre

d compet

dule speci

onths from

OP. Theref

sfer to IPT

oning date

ations/poo

hing with

s to be ta

it is obser

th LTA of 2

TA of 1350

arantee.

duja Natio

ectrum Po

or is 6650 M

------- 44

ridor

eady

titive

ified

the

fore,

C is

e for

oling

the

aken

rved

2200

MW

Two

onal

ower

MW.

Page 15: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

A

Se

u

sy

ti

d

o

th

B

1

p

------------------ Order in P

As the ge

eptember

p for impl

ystems co

me frame

developers

of the corrid

he genera

. High Ca

Associate

9.

progress of

a) IPPs w

area

IL&FS

Powe

Conn

Naga

PPN P

12th C

b) BPTA

------------------Petition No.1

nerating

r 2011 onw

ementatio

vered und

e which h

s. In our vie

dor should

ating statio

apacity Po

ed with IPP

The petit

work on c

who have

and hav

S Power Co

er Ltd (105

nectivity/LT

apatnam P

Power (10

Connectiv

s for the

------------------54/MP/2011

stations a

wards, we a

on. The pe

der this co

has been

ew, the pe

d be taken

ns.

ower Tran

P projects

tioner has

corridor XI:

been gra

e signed

ompany Lt

50 MW) w

TA to tw

Power & In

80 MW) w

ity/LTA me

subject

------------------

are sched

are of the

etitioner ha

orridor can

apprised

etitioner sh

n up in pha

nsmission

in Nagapa

submitted

anted LTA

BPTA and

td (1200 M

with LTA of

wo more

nfratech (1

with LTA of

eeting held

transmissio

------------------

uled to b

view that

as submitte

nnot be c

d to the

hould ensu

ases to ma

Corridor-X

attinam/ C

d the follow

in the Na

d submitte

MW) with L

987 MW.

generat

1320 MW)

360 MW h

d on 08.06.

on system

------------------

be comm

HCPTC-X m

ed that th

ommission

concerne

ure that im

atch with th

XI (Transm

Cuddalore

wing with

gapattina

d Bank G

LTA of 1150

Besides th

tion proje

with LTA o

has been f

.2011 at Ne

m were sig

------------------Page 15 of

missioned f

may be ta

e transmis

ned within

d genera

mplementa

he progres

mission Sys

Area)

regard to

am/Cudda

Guarantee

0 MW and

hese, gran

ects viz.

of 800 MW

inalized in

ew Delhi.

gned by

------- 44

from

aken

ssion

this

ation

ation

ss of

stem

the

alore

are

PEL

nt of

NSL

and

the

the

Page 16: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

------------------ Order in P

petiti

decis

corrid

biddi

interc

petiti

c) The

Naga

kV S/

biddi

d) The t

given

appr

effec

comm

e) The p

statio

abov

f) The s

------------------Petition No.1

ioner befo

sions of th

dor is pro

ing and

connectio

ioner unde

RFQ for

apattinam

/c line fo

ing has alr

time sched

n as 36

roved by M

ctive transf

missioning

petitioner

ons and th

ve time sch

studies for

------------------54/MP/2011

ore 5 Ja

he Empow

oposed to

the pool

n with th

er cost plus

package-

m - Salem 7

r impleme

ready bee

dule spec

months fr

MOP. Ther

fer to IPTC

date for t

shall impl

heir interc

hedule.

evolution

------------------

nuary 201

wered Co

o be dev

ing statio

he grid w

s basis.

-A of the

765 kV D/c

entation t

en issued a

cified in th

rom the

refore, ass

is achieve

he system

ement the

connection

n of transm

------------------

11. How

ommittee,

veloped u

ons/Substa

would be

e trunk tra

c line and

hrough ta

nd bids ha

e RFQ for

effective

suming tha

ed by Mar

would be

e associat

n to the g

mission syst

------------------

wever, in

the trunk

under the

tions alon

impleme

ansmission

Salem – M

ariff based

ave been

r the sche

date as

at the RFP

rch, 2012,

e March, 20

ted substa

grid matc

tem was d

------------------Page 16 of

line with

k transmis

Tariff ba

ng with t

ented by

n corridor

Maduhgiri

d compet

opened.

me has b

per the

P process

then the li

015.

ations/poo

hing with

discussed

------- 44

the

ssion

ased

their

the

viz.

765

titive

been

TSA

and

ikely

oling

the

and

Page 17: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

------------------ Order in P

finalis

vario

syste

bene

charg

g) As th

throu

desira

avail

Acco

interc

deve

taken

(SRSS

matc

Cudd

h) The

imple

------------------Petition No.1

sed in co

us utilities.

m would

eficiaries a

ges.

he synchr

ugh Raichu

able that

able by

ordingly, th

connectio

elopment i

n up sep

S-XVII). The

ching wi

dalore/Na

subject tr

ementatio

------------------54/MP/2011

onsultation

. It was ag

be borne

are firmed

onous op

ur–Sholapu

t Narendr

that t

he Narend

ns has bee

in the Cud

parately a

e 765 kV

th the

gapattina

ransmission

n immedia

------------------

n with CE

greed tha

by the ge

d up and

peration o

ur 765 kV 2

ra–Kolhapu

imeframe

dra–Kolha

en decide

ddalore/N

as regiona

operation

progress

am area.

n system

ately.

------------------

EA, gener

t the cha

eneration

d agree t

of SR and

2xS/c lines

ur 765 kV

for sm

pur sectio

ed to be de

Nagapattin

al system

of this lin

of ge

is required

------------------

ration dev

rges of th

develope

o bear it

NEW grid

s is being a

V D/c lin

mooth sy

on alongw

elinked fro

nam area

strengthe

nk shall be

neration

d to be

------------------Page 17 of

velopers

e transmis

ers till the t

s transmis

d by 201

achieved,

nk should

nchronizat

with neces

om genera

and is be

ening sche

e underta

projects

taken up

------- 44

and

ssion

time

ssion

3-14

, it is

be

tion.

ssary

ation

eing

eme

aken

in

p for

Page 18: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

2

IP

p

st

c

E

c

2

th

g

su

g

tr

ta

22

a

w

is

(S

sc

fr------------------ Order in P

0. The p

PPs, in case

physical ac

tation for

cases, there

PC orders

cases, it is u

1. It is o

here is po

granted in

ubmission

generation

runk lines h

aken up by

2. The p

alongwith n

with genera

being ta

SRSS-XVII).

cheme, w

rame of sy------------------Petition No.1

petitioner h

e of one g

ctivities lik

construct

e is no ph

were awa

under proc

observed

ssibility of

this corr

that this

project is

has alread

y the petit

petitioner

necessary

ation deve

ken up se

In that

which are

nchronisat------------------54/MP/2011

has submit

generating

ke, constru

tion powe

ysical acti

arded by I

cess.

that the w

implemen

ridor is 32

transmissio

s material

dy been st

tioner.

has submi

interconn

elopment

eparately

case, im

part of H

tion of NEW------------------

tted that a

g station o

uction of

er etc. are

ivity excep

IL&FS and

work of IL&

ntation of

297 MW. K

on system

lised and

tarted, the

itted that

nections ha

in the Cud

as region

plementa

HCPTC-XI,

W grid with------------------

as per the

out of four

site office

e under p

pt fencing

PPN Powe

&FS (1200

PPN Powe

Keeping i

would be

the RFQ

e impleme

the Naren

as been d

ddalore/N

nal system

tion of th

should be

h SR grid th------------------

report of

power pla

e, constru

progress. In

g work at P

er, and in

MW) is in

er (1080 M

n view th

e required

process fo

entation of

ndra – Kol

decided to

agapattin

strengthe

he elemen

e impleme

he balanc------------------Page 18 of

site visit of

ants, i.e. IL

uction of

n other th

PEL Power

the other

progress

MW). Total

he petition

d even if

or one of

f HCPTC-X

hapur sec

o be delin

nam area

ening sche

nts under

ented in t

ce elemen------- 44

f the

&FS,

sub-

hree

Ltd.

two

and

LTA

ner's

one

the

XI be

ction

nked

and

eme

this

time

ts of

Page 19: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

th

o

C

2

c

------------------ Order in P

his corridor

of the gene

C. Transmis

IPP proj

3. The p

corridor:

a) IP

M

Lt

M

o

b) Th

c

d

b

c) Th

O

a

th

b

------------------Petition No.1

r should be

erating uni

ssion Syste

ects in Ma

petitioner

PPs who

Maharashtr

td. (600 M

MW) with LT

f 810MW.

hese trans

onsultatio

evelopers

by the gene

his transmi

Orai - Bulan

lready ob

he Right-o

be develop

------------------54/MP/2011

e impleme

its.

m Strength

aharashtra

has made

have be

ra and Ma

W) with LT

TA of 800 M

mission sys

n with CE

. The char

eration de

ission syste

ndshahar 7

tained for

f-way con

ped as D/c

------------------

ented in p

hening in W

/ MP Area

e following

en grant

adhya Pra

TA of 300 M

MW, DB Po

stems hav

EA, variou

rges of the

evelopers.

em consist

765kV corr

r developm

nstraints, th

c line to o

------------------

hases mat

WR-NR Tran

.

g submissi

ed LTA h

adesh are

MW, Today

ower(MP)

e been di

us state u

e transmissi

ts of 2nd

ridor and r

ment of 1st

his corridor

optimize Rig

------------------

tching with

nsmission

ions with

have sign

Dhariwal

y Energy (M

Ltd. (1320

scussed a

utilities an

ion system

ckt. of Ja

regulatory

t 765kV ck

r has been

ght-of-way

------------------Page 19 of

h the prog

Corridor fo

regard to

ned BPTAs

Infrastruc

M.P) Ltd.(1

MW) with

nd finalise

d genera

m will be bo

abalpur Po

y approval

kt. Conside

n propose

y. 2nd ckt

------- 44

gress

or

this

s in

cture

1320

LTA

ed in

ation

orne

ool –

has

ering

d to

has

Page 20: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

24

p

sa

a

g

p

c

B------------------ Order in P

b

w

d) M

B

G

a

g

st

C

13

im

c

a

4. From

progress o

atisfactory

as environ

generating

petitioner b

clearance,

ulandshah------------------Petition No.1

been propo

which is env

M/s Today

PTAs with

Guarantee

bove IPPs

ranted L

trengtheni

Committee

3.05.11. S

mplemente

orridor is u

ward activ

the detai

of two ge

y, for which

ment and

station i.e

but it doe

fuel linka

har 765 kV ------------------54/MP/2011

osed to be

visaged to

Energy an

the petitio

for imple

s, M/s DB

LTA for

ng schem

e of WR an

ince the

ed as D/c

urgently re

vities can

ls of progr

enerating

h EPC con

d forest c

e. Today E

es not ful

age etc.

corridor h------------------

e commiss

o be comm

nd M/s Dh

oner and M

ementatio

Power M

810MW

me in the r

nd 14th me

transmissi

line by 20

equired so

be started

ess of gen

stations i

tracts are

clearance

Energy, th

fill essenti

Since first

has alread------------------

sioned ma

missioned b

hariwal Infr

M/s Dhariw

n of this

MP Ltd. (13

along w

recent 32n

eeting of W

ion corrid

015-16, reg

o that DPR

d immedia

nerating sta

i.e Dhariw

awarded

e are also

ough hav

al require

t ckt. of J

y been ap------------------

atching wi

by 2015-16

rastructure

wal has su

corridor. I

320MW) h

with abov

nd Meeting

WR Constit

or is pro

gulatory ap

R prepara

tely.

ations it is o

wal and

and fuel li

o availab

ve signed

ements like

Jabalpur

pproved, C------------------Page 20 of

ith the 1st

6.

e have sig

ubmitted B

n addition

as also b

ve identi

g of Stand

tuents held

posed to

pproval of

tion and

observed

D.B Powe

inkage as

le. The o

BPTA with

e land, fo

Pool – Or

CTU shall a------- 44

ckt.

ned

Bank

n to

been

ified

ding

d on

be

f this

pre-

that

er is

well

other

the

orest

rai -

asses

Page 21: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

th

re

b

D

2

c

------------------ Order in P

he require

elated to f

be taken u

D. Transm

project

5. The p

corridor:

a) IPPs h

area

Energ

b) M/s K

Bank

c) The t

abov

NR. A

streng

shall

abov

d) This t

------------------Petition No.1

ment of 2

first as we

p in phase

mission Sys

ts in Chhat

petitioner

have been

are Karn

gy and Min

KPCL has

k Guarante

ransmissio

ve IPPs in C

As per the

gthening s

impleme

ve time sch

ransmissio

------------------54/MP/2011

nd ckt. ba

ll as secon

es matchin

stem Stre

ttisgarh A

has subm

n granted

nataka Po

nerals (350

signed BP

ee for impl

n system s

Chhattisga

e present

scheme in

nt above

hedule.

n system c

------------------

ased on th

nd ckt. an

ng with the

ngthening

rea :

mitted follo

LTA and h

ower Corp

0 MW) and

PTA with t

ementatio

hall be co

arh as well

position, it

n the time

e transmiss

consists of

------------------

he progres

nd then th

e progress

g in WR-N

owing info

have signe

poration L

d Jaiswal N

the pettio

on of this st

ommissione

as power

t is envisa

e frame of

sion syste

upgradat

------------------

ss of gene

e implem

of the gen

NR Tr. Co

ormation r

ed BPTA in

Ltd. (1600

Neco Urja L

ner and h

trengtheni

ed based o

r transfer re

ged to co

f 2016-17.

em match

tion of ±80

------------------Page 21 of

rating stat

mentation s

nerating un

orridor for

regarding

n Chhattisg

0 MW), Sa

Ltd. (600 M

has submi

ing schem

on progres

equiremen

ommission

The petitio

hing with

00kV, 3000

------- 44

tions

shall

nits.

IPP

this

garh

arda

MW).

tted

me.

ss of

nt to

this

oner

the

0MW

Page 22: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

2

o

re

a

st

th

sa

------------------ Order in P

HVDC

(NR)

MW b

in Ch

comm

e) Since

mont

Chha

there

f) This

cons

deve

trans

6. From t

of concern

equiremen

are not av

tations, tw

hese two

atisfactory

------------------Petition No.1

C bi-pole

to 6000 M

bipole as a

hhattisgar

missioned

e ±800kV

ths) for im

attisgarh m

efore, regu

transmissio

ultation w

elopers. It

mission sys

the inform

ned gene

nts e.g. ac

vailable wi

wo have c

is good. H

y and the

------------------54/MP/2011

between

MW. Regula

a part of H

h and is

in Decem

HVDC te

plementat

may also

ulatory app

on system

with CEA

was agre

stem is to b

mation subm

erating st

quiring of

ith the ge

captive co

However,

further re

------------------

Champa

atory appr

High Capa

in tender

ber 2015.

erminal ta

tion and p

become

proval of th

m has be

, various

eed that

be borne b

mitted by

ations it

land and

enerating s

oal mines

the progr

eview of

------------------

Pooling St

roval has b

acity Trans

ing stage

kes a lon

progress o

e satisfact

his project

een discu

state ut

the transm

by the gen

the petitio

is noted

forest & en

stations. O

and poss

ress of ge

the progr

------------------

tation and

been obta

smission Co

. It is exp

ng duratio

f generati

ory in ne

t may be g

ussed and

tilities and

mission ch

neration de

oner regar

that eve

nvironmen

Out of thre

sibility of c

enerating s

ess needs

------------------Page 22 of

d Kurukshe

ained for 3

orridor for

pected to

on (about

ion projec

ext 1-2 ye

granted.

d finalized

d genera

harges of

eveloper.

rding prog

en the b

ntal cleara

ee genera

coming up

stations is

s to be d

------- 44

ehtra

3000

IPPs

o be

t 48

cts in

ears,

d in

ation

the

gress

basic

ance

ating

p of

not

one

Page 23: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

b

p

sa

tr

8

a

o

sy

a

st

is

c

2

tr

------------------ Order in P

before ap

progress of

ame time,

ransmission

00 kV tran

are of the

optimize th

ystem shou

achieve re

tations sha

required

concerned

E. Transm

Corporat

7. The p

ransmission

a) The B

petiti

by th

b) Deta

prelim

comm

------------------Petition No.1

proval for

f generati

, we are a

n system, p

smission sy

view that

he investm

uld be imp

quisite pro

all be done

, impleme

d state ben

mission Sy

tion India L

petitioner

n system:

BPTA for t

ioner on 24

he petitione

iled Proje

minary ac

menced. T

------------------54/MP/2011

r this sch

ng station

also consc

problem o

ystem bein

a cautiou

ment. Acco

plemented

ogress. A t

e after site

entation s

neficiaries

ystem for

Ltd.( 1320 M

has subm

the subjec

4th Decem

er on cost

ect Repo

ctivities lik

The transm

------------------

eme. The

ns may be

cious abo

of right of

ng relative

us approa

ordingly, t

d only if th

thorough

e visit and

shall be t

as well as

connecti

MW)

mitted follo

ct transmi

mber 2010.

plus basis

ort is und

ke packa

mission syst

------------------

e petitione

e satisfacto

out the fut

way and

ely new tec

ach is requ

he second

he concern

review of

if it is felt t

taken up

this Comm

ivity of M

owing info

ission syste

The system

.

der prepa

aging, sur

tem as pe

------------------

er itself su

ory in 1-2

ture requir

the time

chnology.

uired to be

d module

ned gene

progress

hat the se

after intim

mission.

M/s Therm

ormation r

em was s

m shall be

aration a

rvey etc.

er the BPTA

------------------Page 23 of

ubmitted

years. At

rement of

required f

Therefore,

e adopted

of this HV

rating stat

of genera

econd mod

mating to

al Powert

elated to

igned by

implemen

nd all o

have b

A is schedu

------- 44

that

the

the

for +

, we

d to

VDC

tions

ating

dule

o all

tech

this

the

nted

other

been

uled

Page 24: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

2

o

c

Th

u

F.

M

2

p

------------------ Order in P

for co

subje

imme

c) Total

has b

state

trans

8.

observed t

clearance,

herefore, w

p for imple

. Transmiss

MW) :

9. The

progress of

i) BPTA f

on 14t

target

the pe

------------------Petition No.1

ommission

ect transm

ediately.

LTA grant

been discu

utilities a

mission sys

From th

hat the m

Fuel Supp

we are of

ementatio

sion Syste

petitioner

this corrid

or the sub

th June 20

beneficia

etitioner on

------------------54/MP/2011

ning by Ma

mission syst

ted to this

ussed and

and gene

stem is to b

e details

milestones l

ply agreem

the view

on.

m for con

r has sub

or:

bject transm

010. The LT

aries. The s

n cost plus

------------------

ay, 2014. K

em is to b

project is

d finalised

eration d

be borne b

of progres

ike land p

ment and E

that this tr

nnectivity o

bmitted th

mission sys

TA granted

system is p

basis.

------------------

Keeping in

be taken

1240 MW.

in consult

evelopers

by the gen

ss of the

possession,

EPC award

ransmission

of M/s MB

he followin

stem was s

d is 392 M

proposed

------------------

view the

up for im

This transm

tation with

. The ch

neration de

generatin

environm

d have be

n system m

B Power (M

ng with re

signed by

MW with W

to be imp

------------------Page 24 of

schedule,

mplementa

mission sys

h CEA, var

arges of

eveloper.

g station,

mental & fo

een achiev

may be ta

MP) Ltd.( 1

egard to

the petitio

WR and NR

plemented

------- 44

the

ation

stem

rious

the

it is

orest

ved.

aken

1200

the

oner

R as

d by

Page 25: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

3

o

e

Th

------------------ Order in P

ii) As pe

Ltd., th

period

triple c

sched

iii) Consid

system

implem

and p

The su

implem

iv) The st

discuss

develo

by the

0. From th

observed th

environmen

his transmi

------------------Petition No.1

r “Transm

he above

d of 9 mo

conductor

ule of this

dering the

m is require

mentation

placement

ubject tra

mentation

tudies for

sed and

opers. The

e generatio

he informa

hat it has a

ntal & fore

ssion syste

------------------54/MP/2011

ission Agre

transmissio

nths plus

r line) from

system is S

progress

ed on urge

of this co

t of award

ansmission

on immed

r evolutio

finalised i

charges

on develop

ation rega

already ac

est clearan

em may be

------------------

eement”

on system

the Comm

m zero da

Septembe

of the ge

ent basis.

orridor has

d of transm

system is

diate basis

n of this

in consult

of this tran

pers till the

arding pro

chieved th

nce, Fuel S

e taken up

------------------

signed wi

would be

mission’s ti

ate (Jun’10

r 2013.

neration p

Hence, ad

been tak

mission line

s required

s.

transmiss

ation with

nsmission s

e time ben

ogress of

he milesto

upply Assu

p for implem

------------------

ith M/s M

implemen

ime line (3

0). Thus, c

project, th

dvance a

ken up by

e is in adv

d to be

sion syste

h CEA an

system are

neficiaries a

generatin

nes like lan

urance an

mentation

------------------Page 25 of

MB Power(M

nted in a t

30 months

commission

is transmis

ction towa

the petitio

vanced sta

taken up

m has b

nd genera

e to be bo

are firmed

ng station

nd possess

nd EPC aw

n.

------- 44

M.P)

time

s for

ning

ssion

ards

oner

age.

for

been

ation

orne

d up.

it is

sion,

ward.

Page 26: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

G

3

w

32

c

a

c

1

g

------------------ Order in P

G. Transmis

3240MW

1. The Pe

works on th

a. BPTA f

on 3rd

the p

sched

b. Consid

system

system

prepa

transm

immed

2. From th

concerned

and EPC

clearance

920 MW

generating

------------------Petition No.1

ssion Syste

W)

etitioner ha

his corridor

or the sub

January 2

etitioner

ule as May

dering the

m is require

m have be

red and t

mission sys

diate basis

he details

d generati

orders ha

is not rece

only, out

station is

------------------54/MP/2011

em for co

as made th

:

bject transm

2011. The

on cost

y 2014.

progress

d on urge

een initiat

tenders ha

stem is to

s.

submitted

ng station

ave been

eived yet

t of tota

likely to c

------------------

nnectivity

he followin

mission sys

system is p

plus basis

of the ge

nt basis. H

ted. DPR o

ave been

o be tak

d by petitio

ns, it is ob

signed.

and Fuel

l capacit

come but

------------------

of M/s Es

ng submiss

stem was s

proposed

s with ex

neration p

Hence, pre

of transmi

issued in

ken up f

oner regar

served tha

However,

Supply Ag

ty of 324

t there ma

------------------

ssar Power

sions on th

signed by

to be imp

xpected c

project, th

e-award ac

ission syste

July 2011

or implem

rding the p

at land is

Environm

greement

40 MW. T

ay be som

------------------Page 26 of

r Gujarat

he progres

the petitio

plemented

commission

is transmis

ctivities for

em has b

1. The sub

mentation

progress of

in posses

ment & fo

is in place

herefore,

me delay.

------- 44

Ltd.(

ss of

oner

d by

ning

ssion

r the

been

bject

on

f the

ssion

orest

e for

the

The

Page 27: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

im

p

3

th

im

st

b

34

w

a

im

w

n

le

in

Fl

in

sh

tr

a------------------ Order in P

mplementa

petitioner m

H. Transm

3. The

he genera

mplementa

tation is no

been consi

4. In or

well as tran

and trans

mplementa

with the co

ew IPP co

ead to gre

n Loop out

lexible AC

ncreasing

hould be

ransmission

approval. ------------------Petition No.1

ation of t

matching w

ission Syste

petitioner

ation deve

ation of tr

ot being t

dered for

rder to ens

nsmission,

smission t

ation of th

ommercial

omes up, th

eater reliab

t (LILO) sh

C Transm

the capac

explored

n systems

------------------54/MP/2011

he transm

with comm

em for con

r vide affi

eloper ha

ansmission

taken up.

approval.

sure optim

there is an

to come

e transmis

l operation

he additio

bility of the

ould be a

ission Syst

city of an

by the C

proposed

------------------

mission syst

missioning o

nnectivity

davit date

as not furn

n system fo

Therefore

mum utilizat

n imperati

e up sim

ssion system

n of the g

onal margi

e grid. Als

adopted b

tem (FAC

existing tr

CTU to en

d to be

------------------

tem may

of generat

of M/s Chi

ed 2.9.201

nished the

or connec

e, this trans

tion of ca

ive necess

multaneou

ms as far a

generation

ins in trans

o, interim

by the CTU

CTS) devic

ransmission

nsure opti

develope

------------------

be under

ting units.

itrangi Pow

11 submitt

e Bank Gu

ctivity to th

smission sy

apacity in

sity for bo

usly by

as possi

projects.

smission ca

arrangem

U to the ex

ces can

n line. The

imum utili

ed with th

------------------Page 27 of

rtaken by

wer Pvt. Ltd

ed that si

uarantee,

his genera

ystem has

generatio

th genera

phasing

ible to ma

Till the tim

apacity wo

ments like L

xtent poss

be used

ese possibi

zation of

he regula

------- 44

the

d.

ince

the

ating

not

n as

ation

the

atch

me a

ould

oop

ible.

for

lities

the

atory

Page 28: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

3

b

im

a

c

p

W

im

th

n

th

3

re

tr

p

fi

C

c

P

------------------ Order in P

5. We

become a

mpetus to

a whole. T

coastal ar

projects ha

Western Re

mportant m

he likelihoo

ot to burd

he benefit

6. All

egulations

ransmission

proposed

nalized by

CEA after

consultatio

ower Syste

------------------Petition No.1

are of th

available d

the devel

he power

eas (whic

as to be

egions whi

matter wh

od of thes

den the c

of extra p

the aspec

in gener

n network

transmissio

y the CTU

holding

ns at the

em Plannin

------------------54/MP/2011

he consid

due to se

opment o

r projects

ch would

brought t

ich require

ich has en

se genera

consumers

power.

cts have

ral and c

in particul

on corrid

in line wit

extensive

LTOA Me

ng and me

------------------

dered view

tting up o

of industry i

are locat

use imp

to the loa

e develop

ngaged th

tion projec

with tran

been exa

orridor-wis

ar. We hav

ors have

h the pers

deliberat

eetings, St

eetings of

------------------

w that th

of these c

in particula

ted either

orted coa

ad center

pment of t

he attentio

cts comin

smission c

amined in

se require

ve taken n

been e

spective p

tions with

anding C

the Regio

------------------

e power

corridors w

ar and the

in the co

al). Powe

rs in the

transmissio

on of the

g up as p

charges w

accorda

ment of t

note of the

evolved, p

plans deve

the stake

ommittee

onal Power

------------------Page 28 of

which wo

would prov

e econom

oal belt, o

er from th

Northern

n systems

Commissio

planned, so

without get

ance with

the propo

e fact that

planned

eloped by

eholders

Meetings

r Committ

------- 44

ould

vide

y as

or in

hese

and

. An

on is

o as

tting

the

osed

t the

and

the

and

s for

tees.

Page 29: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

W

im

3

a

o

a

M

g

3

d

th

su

C

tr

o

tr

ta

sa

c

------------------ Order in P

We are o

mplemente

7. Based

and on the

of impleme

at the time

Moreover, t

guarantee

8. From

developing

he genera

ubmitted

Chitrangi P

ransmission

order be

ransmission

aken up o

atisfactory

commission

------------------Petition No.1

of the vie

ed matchi

d on the a

spot asse

entation is

of their pr

the projec

in many c

the foreg

g the abov

ation proje

by petitio

Power Ltd

n systems

taken up

n system f

only after p

y. The

ning of tra

------------------54/MP/2011

ew that

ing with th

affidavits s

ssment by

satisfacto

rogressive

ct develop

cases.

oing discu

ve mention

ects and

oner, the

. is not re

as per the

p for by

or the gen

progress o

petitioner

nsmission

------------------

these tra

he commis

ubmitted

y CTU, the p

ory and uti

commissio

pers of IPPs

ussion, we

ned transm

bring the

transmiss

equired to

e details g

the peti

neration p

of concern

r should

elements

------------------

nsmission

sioning sc

by the pro

progress o

ilization lev

oning is ex

have sign

are satisfie

mission syst

power to

sion syste

o be take

given at A

itioner for

projects in

ned gener

ensure

shall be d

------------------

systems

hedules of

oject deve

of IPPs at d

vel of pro

xpected to

ned and su

ed that the

tems in ord

o the loa

m for co

n up. The

Annexure-

r impleme

Chhatisga

rating stati

that the

done to m

------------------Page 29 of

need to

f the IPPs.

elopers of

ifferent sta

posed HC

o be suffici

ubmitted B

ere is need

der to har

d centres

onnectivity

erefore, se

I to VII of

entation.

arh should

ions beco

phasing

match with

------- 44

be

IPPs

ages

CPTC

ient.

Bank

d for

ness

. As

y to

even

this

The

d be

mes

of

the

Page 30: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

g

st

3

12

v

in

in

c

p

G

a

e

th

im

a

1

h

c

p

d

b

im

------------------ Order in P

generation

tranded tra

9. Relia

2.9.2011 h

iolation o

nvestment

nvited thro

case basis

petition ha

Governmen

as CTU has

effect on c

he comme

mplementa

after 5.1.20

3.9.2011 s

ave been

competitive

petitioner in

different fr

beneficiarie

mplementa

------------------Petition No.1

projects

ansmission

ance Pow

has submit

of the Tar

by trans

ough com

s. The As

s not bee

nt. RPTL ha

s tried to m

competitio

ents from

ation of th

11. The re

tated tha

n signed

e bidding

n respect o

rom the

es. He su

ation of t

------------------54/MP/2011

for optim

n assets.

wer Transm

tted that

riff Policy

smission d

petitive bi

sociated

n exempte

as further s

misuse its d

on in trans

Reliance

he transmi

presentati

at though

before 5

as per th

of the tran

regional

ubmitted t

the transm

------------------

um utilizat

mission Lim

granting r

amended

developer

ids, apart

Transmissi

ed on a c

submitted

dominant

mission se

Power Tra

ssion proje

ve of RPTL

the trans

.1.2011 a

he revised

nsmission sy

BPTAs /

hat the C

mission sys

------------------

tion of the

mited (RP

regulatory

d w.e.f. 6

including

from few

on System

case to ca

that the p

position w

ector. We

ansmission

ects throug

L submitted

smission sy

re exemp

policy, th

ystems cov

TSAs sign

Commission

tem ident

------------------

e system

TL) in its

approva

6.1.2011, r

CTU/STU

exemptio

m covere

ase basis b

petitioner i

which will

e have als

Limited w

gh compe

d during th

ystems for

pted from

he BPTAs s

vered in th

ned by C

n may gra

tified for g

------------------Page 30 of

and to av

letter da

l would b

requiring

(s) would

ns on cas

ed under

by the Cen

in its capa

have adv

so conside

with regard

etitive bidd

he hearing

r which BP

m tariff ba

signed by

he petition

CTU with

ant regula

granting l

------- 44

void

ated

e in

that

be

e to

the

ntral

acity

erse

ered

d to

ding

g on

PTAs

ased

the

n are

the

atory

ong

Page 31: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

te

Tr

ta

th

b

a

su

ta

o

4

N

Se

12

tr

g

e

------------------ Order in P

erm assess

ransmission

ariff based

he petition

before 6.1.

approache

ubstantial

ariff based

others inclu

0. We

National E

ection 3 o

2.2.2005 r

ransmission

generation

emphasizes

“Netwthe anin thenot benetwostakeh

------------------Petition No.1

s / conne

n System c

d compete

ner submit

2011 and

ed the C

part of th

d compet

uding the R

e have co

lectricity

of the Act v

recognizes

n capacity

and for

s the need

work expansnticipated open acce a precon

ork expansiholders and

------------------54/MP/2011

ctivity sub

covered u

ed biddin

tted that it

since ben

Commission

e transmis

itive biddi

Reliance P

onsidered

Policy not

vide Resol

s the imp

y keeping

developm

d for netwo

sion shouldtransmissio

cess regimendition for ion after idd taking up

------------------

bject to th

nder the p

g only. In

t has signe

neficiaries

n for reg

ssion system

ing, which

ower Tran

the subm

tified by

ution No.

portance

g in view t

ment of po

ork expans

be plannen needs th

e. Prior agrenetwork ex

dentifying th the execu

------------------

he conditio

petition are

n response

ed BPTAs w

have not

gulatory a

ms shall be

h would p

smission Li

missions of

the Cent

No. 23/40/

of adequ

the massiv

ower mar

sion as und

ed and implhat would beement witxpansion. Che requiremtion after d

------------------

on that th

e impleme

e, the rep

with Projec

been firm

approval.

e impleme

provide op

mited.

f RPTL. Pa

ral Gover

/2004-R&R

uately aug

ve increas

rket. The

der:

lemented kbe incidentth the beneCTU/STU shoments in codue regulato

------------------Page 31 of

he Associa

ented thro

resentative

ct Develo

med up, it

Moreover

ented thro

pportunitie

ara 5.3 of

rnment un

R (Vol.II) da

gmenting

se planne

Policy fur

keeping in vt on the syseficiaries would underonsultation ory approv

------- 44

ated

ough

e of

pers

has

r, a

ough

es to

the

nder

ated

the

d in

rther

view stem ould take with

vals.”

Page 32: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

4

R

n

42

Ta

re

a

c

a

b

ta

b

c

4

C

Tr

R

------------------ Order in P

1. Para

esolution

eed for ne

“In viebenefCTU/Srequirconsuregula

2. From

ariff Policy

esponsibilit

and inter-S

capacity in

and transm

beneficiarie

aking regu

been ident

consultatio

3. The

Commission

ransmission

egulation

"(1) ------------------Petition No.1

7.1.4 of th

No. No.23

etwork exp

ew of the aficiaries woSTU should rements in ultation withatory appro

m the ab

y, it eme

ty to plan

State leve

n order to

mission fa

es, the CT

ulatory ap

tified in co

n with the

Commissio

n (Grant o

n Scheme

3 of the sa

These regu------------------54/MP/2011

he Tariff P

3/2/2005-R

pansion aft

approach laould not undertak consonanh stakehold

ovals.”

bove provi

erges that

the assoc

ls comme

o avoid a

cilities. In

TU can un

proval if t

onsonanc

stakehold

on has sp

of Regula

e to Cent

aid regulat

ulations sh------------------

olicy notif

R&R (Vol.I

ter obtaini

aid down bbe a pre

ke networkce with thders, and

ision of th

t the CTU

ciated tran

ensurate w

mismatch

the abs

ndertake p

he require

e with the

ders.

pecified th

tory Appr

tral Transm

tions provi

hall apply t------------------

fied by Ce

II) dated

ing regula

by the NEP,-condition k expansiohe Nationataking up

he Nationa

U has be

nsmission c

with the p

h betwee

sence of

planned n

ement for

e Nationa

he Centra

roval for e

mission Ut

des as und

to: ------------------

entral Gov

6.1.2006

tory appro

prior agreefor netwo

on after ial Electricitthe execu

al Electrici

een enjoin

capacity a

planning o

en genera

prior agr

etwork ex

network e

l Electricity

al Electrici

execution

ility) Regu

der:

------------------Page 32 of

vernment v

reiterates

oval as und

ement withork expanidentifying ty Plan anution after

ity Policy

ned with

at the regio

of genera

tion capa

reement

xpansion a

expansion

y Plan an

ty Regula

of Inter-S

ulations, 2

------- 44

vide

the

der:

h the sion. the

d in due

and

the

onal

ation

acity

with

after

has

d in

atory

tate

2010.

Page 33: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

44

th

q

A

tr

th

th

a

4

in

P

c

d

------------------ Order in P

(i) geneRegMedMatElecfor Agreof ap (ii) by Candconsiden

4. The

he Commi

quoted ab

Accordingl

ransmission

he actual

he extant g

are duly co

5. Othe

nclusion of

ower has

connectivit

determinat

------------------Petition No.1

an ISTS Scerators havulatory Co

dium-Term Oters) Regutricity Authsetting up

eements wipplication.

an ISTS ScCentral Tran economicsultation w

ntified has b

Transmissio

ission for R

bove since

y, we acc

n systems a

implemen

guidelines

omplied wi

er prayer

f the transm

also reque

ty of M/s M

tion and

------------------54/MP/2011

cheme prove sought lmmission (Open Accelations, 200ority and b

p the ISTSith all the b

cheme for snsmission U

cal flow of ewith Centrbeen held.

on System

Regulatory

e PPAs ha

cord in pri

as per the

ntation of t

of the Ce

ith.

made by

mission ass

ested to in

MB Power

recovery

------------------

posed by Clong-term aGrant of Cess to the 09, and fo

beneficiarieS Scheme,beneficiarie

system strenUtility to enaelectricity wral Electric"

s for whic

y approval

ave not b

nciple ap

e details g

the projec

entral Gove

y the pet

sets in Poin

nclude the

r (MP) Ltd

of the a

------------------

Central Traaccess as p

ConnectivityInter-State or which ces if already

but for s have not

ngthening able reliabl

within and acity Author

h the peti

l are cove

been signe

proval for

given in th

ts, the pe

ernment in

titioner pe

nt of Conn

e asset i.e.

. as a pa

applicable

------------------

ansmission Uper the Cey, Long-TerTransmissio

consultationy identified

which Po been signe

/ up-gradale, efficient

across the rerity and b

tioner has

ered under

ed by all

r impleme

he annexu

etitioner sha

ncluding th

ertains to

ection ch

Transmiss

art of Basic

e transmis

------------------Page 33 of

Utility, for wentral Electrrm Access

on and Relan with Ce has been

ower Purched on the d

ation , identt, co-ordinaegion for wbeneficiarie

s approac

r the provi

beneficia

ntation of

res. As reg

all ensure

he tariff po

approval

arges. M/s

ion System

c Network

ssion cha

------- 44

which ricity and

ated ntral held hase date

tified ated

which es if

hed

ision

aries.

the

gard

that

olicy

l for

s MB

m for

k for

rges

Page 34: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

th

P

su

C

D

R

th

o

fo

tr

4

P

o

C

2

------------------ Order in P

hrough Po

oC Regula

ubmitted

Connectivit

Designated

egulations

he Project

out in the

orm a par

ransmission

6. We h

ower on t

of Connect

"8(8) and hgenethe pcoordCentr

Further, R

Commission

010 provid

"7(1)(coperaNetw

------------------Petition No.1

oint of Co

ations and

that in v

ty Regula

d ISTS Custo

s, 2010 an

is required

subject Pe

rt of the '

n charges

ave consi

he issue o

tivity Regu

Provided thhydro generating plan

point of condinated traral Electricit

Regulation

n (Calcula

des as und

c). The dated by ISTSork…….

------------------54/MP/2011

nnection

d Connect

view of v

ations, its

omer as d

d the ded

d to be co

etition an

'Basic Net

and losses

idered the

of inclusion

ulations pro

hat a thermeration stationt, shall notnnection asansmission ty Authority

n 7(1)(c)

ation of Tra

er:

dedicated TS Licensees

------------------

charge m

ivity Regul

arious pro

project

efined und

dicated tra

onstructed

d such de

twork' for

s under the

e submissio

n of the pr

ovides as u

mal generaon of 250 Mt be requires such statplanning

y."

of the

ansmission

transmissios shall be c

------------------

methodolog

ations. M/

ovisions of

falls withi

der Regula

ansmission

by the Pe

edicated

determina

e PoC Reg

ons of the

roject und

under:

ation statioMW and abed to constions shall bby Centra

Central

Charges a

on lines, cconsidered

------------------

gy in acc

/s M.B. Pow

f PoC Reg

n the de

ation 2(1)

line for C

etitioner at

transmissio

ation of th

gulations.

e petitione

er PoC. Re

n of 500 Mbove, other struct a debe taken inal Transmiss

Electricity

and Losses

constructed to be a pa

------------------Page 34 of

cordance

wer has fur

gulations

efinition o

(1) of the

Connectivit

its cost, as

on line sho

he applica

er and the

egulation

MW and ab than a capdicated lin

nto accounsion Utility

y Regula

s) Regulati

d owned art of the B

------- 44

with

rther

and

of a

PoC

ty of

s set

ould

able

e MB

8(8)

bove ptive ne to nt for

and

atory

ions,

and Basic

Page 35: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

In

g

c

4

in

C

c

tr

u

4

tr

o

c

tr

4

th

(M

------------------ Order in P

n view of th

granted reg

charges.

7. Rega

nclusion of

Commission

coordinate

ransmission

nder PoC

8. We

ransmission

of the IPPs.

created in

ransmission

9. Peti

he above.

SdM Deena D Membe

------------------Petition No.1

he above

gulatory a

arding the

f the trans

n, it is c

ed plannin

n systems

charges R

direct the

n corridors

. In order

first pha

n elements

tion No.15

d/- Dayalan) er

------------------54/MP/2011

provisions

approval u

e prayer o

smission sy

clarified t

ng of tran

shall be p

Regulation

e CTU to

s, along w

to ensure

ase, CTU s

s in consul

54/2011 an

sd/ (VS Verm

Membe

------------------

s, the trans

under this

of the pet

ystems und

that since

nsmission s

part of TS

s.

submit qu

with the pro

optimum

shall sche

tation with

nd IA No.17

/- ma) (S Jer M

------------------

smission sys

petition sh

titioner for

der the TSA

e these

system by

A approv

uarterly pr

ogress of t

utilization

edule imp

h CEA.

7/2011 are

sd/- JayaramanMember

------------------

stems whic

hall be inc

r granting

A to be n

schemes

y CTU and

ved by thi

rogress re

the gener

of transm

lementatio

e disposed

n) (Dr C

------------------Page 35 of

ch have b

cluded in

approva

otified by

are part

d CEA, th

is Commis

port of th

ration proj

mission syst

on of var

d of in term

sd/- Pramod DChairperso

------- 44

been

PoC

l for

the

t of

hese

ssion

hese

ects

ems

rious

ms of

eo)

on

Page 36: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

A. HS

------------------ Order in P

High Capystem as

1) Vema

2) Kham3) Ward4) Estab

MVA 5) LILO o6) Estab

Hyde7) Hyde8) Kham9) Hyde

Additiona

Khamma

------------------Petition No.1

pacity Pssociated

agiri Pooling

mmam – Hydha – Jabal

blishment oftransforme

of Gazuwakblishment o

rabad withrabad 765/

mmam 765/rabad – Wa

al Strengthe

am- Nagarju

------------------54/MP/2011

Power Trad with IPP

g Station – K

derabad 76pur Poolingf 765/400kVr ka-Vijayawof 765/400

h 2x1500 MV/400 kV S/s-400 kV S/s- ardha 765 k

ening

unasagar 4

------------------

ansmissioP projects

Khammam

65kV 2xD/cg Station 76V GIS Pool

wada 400kV0kV GIS PVA transform- Hyderaba KhammamkV D/c line

400 kV D/c l

------------------

on Corris in Vema

m 765kV 2xD

c line 5 kV D/c lining station

S/c line at Pooling stmers each d (existing)

m (existing) 4

ine

------------------

idor-X (Tagiri area

D/c line

ne at Vemag

Vemagiri Pation at

400 kV D/c400 kV D/c

------------------Page 36 of

Annexu

Transmissa)

giri with 4x

Pooling StatKhammam

c (quad) lin (quad) line

------- 44

ure-I

sion

1500

tion m &

ne e

Page 37: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

HSA

------------------ Order in P

High Caystem as

Area, Tam

Package

a. Naga

Package

a. Madhb. Kolha

CommonArea of T

a) New sectiocharg

b) LILO for in

c) 2 nosfor te(initia

d) 1 Salem - M CommonArea of T

a) 2 noMad

b) 2 nosKolhacharg

------------------Petition No.1

pacity Pssociated

mil Nadu)

e A

apattinam P

e C

hugiri – Nareapur – Padg

n System ATamil Nadu

765/400 onalisationged at 400of Neyveliitial arrangs. 400 kV berminatingally charge

no. 400 kMadhugiri

n System ATamil Nadu

s. 400 kV hugiri - Na

s. 400 kV bapur – Paged at 400

------------------54/MP/2011

Power Td with IPP)

Pooling Stat

endra 765 kghe 765 kV

Associated – Part A1

kV Poon arrange0 kV) i- Trichy 40gement whbays eachg Nagapaed at 400 kkV bay ea765 kV S/c

Associated – Part A2

bays eacrendra 765

bays eachadghe 7650 kV)

------------------

TransmissP projects

tion - Salem

kV D/c line D/c line (on

with ISGS

oling statioement to

00kV S/c linhich later s

h at Nagapttinam Po

kV) ach at Sac line-2 (ini

with ISGS

ch at Ma5 kV D/c li

h at Kolha5 kV D/c

------------------

sion Cors in Naga

m 765 kV D/

ne circuit v

Projects i

on at Ncontrol s

ne at Nagshall be bypattinam Poling Stati

alem and tially charg

Projects in

dhugiri & ne (initially

pur, Padgline (one

------------------

rridor-XI apattinam

/c line

ia Pune)

in Nagapa

agapattinhort circu

gapattinamy passed Pooling Staion-Salem

Madhugirged at 400

Nagapatti

Narendray charged

he & Pune circuit via

------------------Page 37 of

Annex

(Transmm / Cudd

attinam/Cud

nam (GISuit MVA (

m Pooling S

ation and 765 kV D

ri for term0 kV)

nam / Cud

a for term at 400 kV

e for terma Pune) (

------- 44

ure-II

mission dalore

ddalore

) with (initially

Station

Salem D/c line

inating

ddalore

inating )

inating (initially

Page 38: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

------------------ Order in P

System S

a) New (Whic

b) Nare400 k

c) LILO Kolha

d) Nare

Additiona

Nagapat

------------------Petition No.1

trengthenin

400 kV such shall bendra (GIS)

kV) of both ci

apur (newndra (GIS)

al Strengthe

ttinam Poo

------------------54/MP/2011

ng in Southe

ub-station e later upg) – Kolhap

ircuits of e) ) – Narend

ening

ling Station

------------------

ern Region-

each at graded to pur (new)

existing Ko

dra (existing

n – Thiruvale

------------------

-XVII

Narendra 765 kV) 765 kV D/

lhapur – M

g) 400 kV D

em 765kV D

------------------

(GIS) and

/c line (init

Mapusa 40

D/c Quad

D/c line

------------------Page 38 of

d Kolhapu

tially charg

00 kV D/c

line.

------- 44

ur (GIS)

ged at

line at

Page 39: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

TrcM

123

Trp

------------------ Order in P

ransmissicorridor aMaharash

. Jabalpur

. Orai – Bu

. Sonipat-K

ransmissipart of Lon

1. UpPo

2. Ku3. Ku4. Au

at

------------------Petition No.1

ion Systas part htra

r Pooling staulandshahaKaithal 400

ion Systeng-term

pgradationooling Statiourukshetra(Nurukshetra(Nugmentatiot Champa

------------------54/MP/2011

tem Streof Long

ation – Orar 765 kV D/ kV D/c (Qu

em StrengAccess f

of ±800 kVon – KurukshNR)–Jind 40NR)–suitableon of 765/4 pooling sta

------------------

engthenin-term Ac

i 765 kV D/c/c (2nd cktuad)

gtheningor IPPs in

V, 3000 MWhehtra(NR) 00kV D/c(Qe location

400 kV transation

------------------

ng in Wccess fo

c (2nd ckt) )

in WR-Nn Chhattis

W HVDC b to 6000 MW

Quad) near Ambasformation

------------------

WR-NR Tor IPPs in

NR HVDCsgarh

bi-pole betwW

ala 400 kV D capacity b

------------------Page 39 of

Annexur

Transmissn M.P. a

Annexure

C corridor

ween Cham

D/c(Quad) by 2x1500 M

------- 44

re-lll

sion and

e-IV

r as

mpa

MVA

Page 40: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

ThC

------------------ Order in P

he transmCorporati

1. TPC2. 2 no

lines

Note: Thegene

------------------Petition No.1

mission son India

CIL Switchyaos. 400 kV ls.

e bay extenration deve

------------------54/MP/2011

system fo Limited (

ard – Nelloreline bays a

nsion in theeloper.

------------------

or Conne(TPCIL)

e Pooling Stt Nellore Po

e generatio

------------------

ectivity of

tation 400 kooling Stat

n switchyar

------------------

f Therma

kV D/c (quaion for term

rd shall be

------------------Page 40 of

Annexur

l Powerte

ad) line minating ab

in the scop

------- 44

re-V

ech

bove

pe of

Page 41: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

---

1.g

------------------ Order in P

. The transeneration P

1. MB TPJabalp

2. 2 nos. 3. 2 nos. 4. 2 nos.

above

Note - Bageneratio

1. Es2. 2 n3. 1x

TP

Note- Bimpleme

------------------Petition No.1

smission syProject)

PS (Anuppupur (existing400 kV line 400 kV line 50 MVAR Le line

ays and reon develop

sar Power Tnos. 400kV

x63 MVAR liPS – Bachau

ays and ented by M/

------------------54/MP/2011

stem for C

ur) – Jabag) substatio bays at Ja bays at JaLine reacto

eactors at Gper.

TPS – Bachaline bays aine reactoru 400 kV D/c

reactors /s Essar Pow

------------------

Connectivity

alpur Poolion

blapur poobalpur (exi

or at 400kV

Generation

au 400 kV Dt Bachau S

r at Bachauc line

at Salayawer Gujarat

------------------

y of MB Po

ng station

oling stationsting) statioJabalpur P

n Switchyar

D/c (Triple) ub-station

u end on b

a Generat Ltd.

------------------

ower (M.P)

400 kV D

n on (for interimPooling stat

rd to be im

oth circuits

tion Switc

------------------Page 41 of

Annexure

Ltd. (Anup

D/c (triple)

m arrangemention end for

mplemented

Annexure

s of Essar Po

chyard to

------- 44

e-VI

ppur

via

nt) r the

d by

e-VII

ower

be

Page 42: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

- ----------------------- Order in Pet

Sl. No.

Transmission Syfor LTA

1 High CapPower TransmCorridor-X (Transmission System Assocwith IPP projeVemagiri AreHinduja - VemPool & KhammN sagar

2

High CapPower TransmCorridor-XI (Transmission System Associated wiprojects NagapattinamCuddalore ANagapattinamThiruvalam 76D/c (icharged at 40

-----------------------tition No.154/MP

Details o

ystem Cost (Rs.

Crore)

G

pacity mission

ciated ects in a + magiri

mam -

9,144 R

SPrS

G

P

Ray

pacity mission

ith IPP in

m/ Area + m - 65 kV initally

00 kV)

7,985

-----------------------P/2011

of Transmission

Generating Stations

InstalleCapaci

( MW)

Reliance Infra

Samalkot rivate Ltd.

2400

Spectrum Power

Generation Ltd.

1400

Hinduja National

Power Ltd.

520 X2

GMR ajahmundry Energy

Ltd.

384x2

IL&FS 600 X2

PEL 1050

NSL 1320

PPN 1080

-----------------------

n Systems and

ed ity )

LTA/ Connectivity

(MW)

2,200

1,350

2 725

2 775

2 1,150

987

1,240

360

----------------------- Page

Progress of Re

Commissioning Schedule

L

Dec,11 Ac

Mar,13 Ac

Jun,13 Ac

September, 2011

Ac

June,13 PAc

Apr,14 Ac

Oct,14 PAc

Sep,13 Ac

------------------ e 42 of 44

elated Genera

Land Environment & Forest Clearance

quired Obtained

quired Obtained

quired Obtained

quired obtained

Partly quired

Obtained

quired Obtained

Partly quired

Obtained

quired Obtained

ting Stations

Fuel Linkage

EPC Orde

No Place

No NIT Issued

Assurance from MoC

Place

No Place

Acquired Captive Mines in

Indonesia

Place

Assurance from MoC

No

70 %- Granted by MoC ;

30%-Import

NA

Tied up No

APPE

er

BPTA

ed Signed Sub

d Signed Sub

ed No

ed No

ed Signed Sub

Signed Sub

No 

No 

NDIX

BG

bmitted

bmitted

No

No

bmitted

bmitted

No 

No 

Page 43: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

-

T

----------------------- Order in Pet

3

Transmission SyStrengthenin

WR-NR Tr. Corfor IPP projecMaharashtra

Area

4

Transmission SyStrengthenin

WR-NR Tr. Corfor IPP projec

Chhattisgarh

5

Transmission Syfor connectiv

M/s ThermPowertec

Corporation ILtd

6

Transmission Sfor connectivM/s MB PoweLtd.

7

Transmission Sfor connectivM/s Essar PGujarat Ltd

Total

-----------------------tition No.154/MP

ystem ng in rridor

cts in / MP

1,610 DIn

En

D

ystem ng in rridor

cts in Area

4,448 K

Co

EnMi

JN

ystem vity of al h India

96 PC

ystem vity of r (MP)

458 M

ystem vity of Power

558 EsG

24,299

-----------------------P/2011

Dhariwal frastructur

e Ltd

300 X2

Today nergy (MP)

Ltd.

2X660

DB Power (MP) Ltd.

2X 660

Karnataka Power

orporation Ltd.

2 X 800

Sarda nergy and inerals Ltd.

350

Jayaswal Neco Urja

Ltd.

600

Thermal owertech

Cor. India Ltd.

2 X660

M. B. Power (MP) Ltd.

2 X600

ssar Power ujarat Ltd.

4 X150 +X 660+2600=324

-----------------------

2 300

0 800

0 810

0 1,278

156

600

0 1,320

0 1,200

+2 2 X 40

2,240

17,491

----------------------- Page

Oct,12 Ac

Jun,15 PAc

July,14 MAc

Sep,15 UPr

Jan,14 PAc

Dec,13 PAc

Jan,14 Ac

Aug,13 Ac

Mar,14 Ac

------------------ e 43 of 44

quired Obtained

Partly quired

No

Mostly quired

Obtained

nder ocess

No

Partly quired

No

Partly quired

No

quired Obtained

quired Obtained

quired No

Available Place

No No

Received for one

unit

Shortl

No No

Captive Coal Mine

No

Captive Coal Mine

No

70 %- Granted by MCL ;

30%-Import

Place

Assurance for 1000

MW ; sanction for 200

MW

Place

FSA for 1920 MW

Place

ed Signed G

Signed Not

y NA

Signed G

NA

NA

ed Signed

ed Signed

ed Signed G

Given

t Given

Given

Given

Page 44: CENTRAL ELECT RICITY REG ULATORY COMMISSION NEW … · grant o ired in con f India Ltd Vs eration Ltd Limited, Limited, Se, Secunde derabad er Compa derabad orporation e Ltd., Na

-

----------------------- Order in Pet

8

Transmission Sfor connectivM/s Chitrangi PPvt. Ltd.

-----------------------tition No.154/MP

ystem vity of Power

226

-----------------------P/2011

-----------------------

3,960

----------------------- Page

------------------ e 44 of 44

BG not submitted

. No Action is