1 Future Projects CEPA Supplier’s Conference Calgary, Alberta November, 2008

Upload: others

Post on 28-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

1

Future ProjectsCEPA Supplier’s Conference

Calgary, AlbertaNovember, 2008

Page 2: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

22

The Next 45 Minutes……..

• Who is CEPA?• CEPA Priorities• Company Project Updates• Summary

Page 3: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

33

CEPA Membership

• Transport 97% of the crude oil and natural gas produced in Canada

• Oil pipeline systems are near capacity

• New natural gas supply needs to be connected to existing pipeline systems

• Collective assets must significantly expand next 15 years

Full and Technical Members• TransCanada• Enbridge• Spectra• Alliance• Kinder Morgan Canada• TransGas• ATCO• Trans-Northern• Foothills• Trans Québec & Maritimes• Portland to Montreal• Pembina Pipelines• BP Canada Energy Company • Maritimes & Northeast Pipeline• Inter pipeline Fund• Access Pipeline• Terasen

Gas

Page 4: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

44

Associate Members

• BJ Pipeline Inspection Services• CDI Professional Services Ltd.• Deloitte• Fraser Milner Casgrain• GAZ Metro• IPSCO Inc. (Canada)• IPSCO Inc. (USA)• Miller Electric Manufacturing• OSM Tubular Camrose• Pipe Line Contractors

Association of Canada• Shaw Pipe Protection Ltd.• T.D. Williamson Canada ULC• Toronto Dominion Bank

• Rosen Inspection• Stikeman Elliott

Page 5: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

SpectrSpectr

Kinder Kinder

AccesAcces

Anchorage

Prudhoe Bay

Norman Wells

Whitehorse

Prince Rupert

Kitimat

Prince George

Taylor

Rainbow Lake Zama

Fort McMurray

LloydminsterEdmonton

HardistySundre

Kerrobert

Cutbank

Great Falls

KamloopsVancouver

AnacortesOlympia

Portland

Seattle

Spokane

Empress Regina

WinnipegCromerGretna

Mandan

Clearbrook

Thunder Bay

Superior

St. Paul

Lockport Chicago

Moosonee

Timmins

Sudbury North BayOttawa

Montreal

Quebec City St. John

Halifax

Port Hawkesbury

St. John’s

Portland

Boston

Philadelphia

Warren

Oakville

Sarnia

Nanticoke

DetroitToledo

CantonLima

Catlettsburg

Memphis

PatokaRobinson

WoodRiverMcPherson

El Dorado

Ponca CityCushing

BorgerTulsa

Coffeyville

Wynnewood

ColoradoCity Tyler

El Dorado

New Orleans

St. JamesCorpus ChristiThree Rivers Freeport

Houston

Port Arthur

Lake Charles

Longview

Big Spring

Artesia

El Paso

Billings

Casper

Salt Lake City Sinclair

Cheyenne

Denver

Guernsey/Ft. Laramie

Long BeachLos AngelesTorrance

BakersfieldSanta Maria

AvonSan Francisco

TransTrans--

Sunray

BB

EnbridgEnbridg

Canadian Oil Facts Canadian Oil Facts ––

20072007

2.8 million barrels/day – total production1.85 million barrels/day – total exports$41.5 billion (CDN) – value of total exports205.1 billion barrels – recoverable reserves

(Source: NEB)

Non-Member Pipeline

Sedimentary

CEPA Members - Liquid PipelinesAugust

Inter Inter

Portland Montreal Pipe Portland Montreal Pipe

PembinPembin

Page 6: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

SpectrSpectr

TransGTransG

TransCanaTransCana

Trans Trans & Maritimes& Maritimes

AlliancAllianc

BB

ATCATC

EnbridgEnbridg

Anchorage

Prudhoe Bay

Norman Wells

Whitehorse

Prince Rupert

KitimatPrince George

Fort St. John

Rainbow Lake

Zama

Fort McMurray

LloydminsterEdmonton

HardistySundre

KerrobertVancouver

HuntingdonOlympia

Portland

Seattle

Spokane

Empress Regina

Winnipeg

Cromer

Gretna

MandanClearbrook

Thunder Bay

Superior

St. Paul

Lockport Chicago

Moosonee

Timmins

SudburyNorth Bay

Ottawa Montreal

Quebec City

St. JohnHalifax

Port Hawkesbury

St. Johns

Portland

Boston

Philadelphia

Warren

OakvilleSarnia

Nanticoke

ToledoCantonLima

Catlettsburg

Memphis

Patoka

Sunray

ColoradoCity El Dorado

New Orleans

St. JamesCorpus ChristiThree Rivers Freeport

HoustonPort Arthur

Lake Charles

Longview

Big Spring

Artesia

El Paso

Salt Lake City

Ehrenberg

Long BeachLos AngelesTorrance

BakersfieldSanta Maria

Avon

San Francisco

MaritimesMaritimes& &

Yorktown

Detroit

Canadian Natural Gas Facts Canadian Natural Gas Facts –– 2007200716.8 billion cubic feet/day – total production9.0 billion cubic feet/day – total exports$24.3 billion (CDN) – value of net exports 58.1 trillion cubic feet – total reserves

(Source: NEB)

CEPA Members - Natural Gas Pipelines

Non-Member Pipeline

Sedimentary

Terasen Terasen

August

Page 7: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

PLATTE & EXPRESS PLATTE & EXPRESS EXPANSIONEXPANSION(Kinder Morgan)(Kinder Morgan)

SPEARHEAD SPEARHEAD (Enbridge)(Enbridge)

CHINOOK/MAPLE LEAF PIPELINECHINOOK/MAPLE LEAF PIPELINE(Kinder Morgan)(Kinder Morgan)

MACKENZIE VALLEY MACKENZIE VALLEY (TransCanada)(TransCanada)

ALASKA ALASKA PIPELINEPIPELINE(Multiple Member (Multiple Member

Anchorage

Prudhoe Bay

Norman Wells

Whitehorse

Kitimat

Prince George

TaylorRainbow Lake

Zama

Fort McMurray

LloydminsterEdmonton

HardistyCalgary

Kerrobert

KamloopsVancouver

Regina

Winnipeg

Clearbrook

Superior

St. Paul

LockportChicago

Quebec City St. John

Halifax

Port Hawkesbury

St. John’s

Portland

Boston

Philadelphia

Memphis

Patoka RobinsonWood RiverEl Dorado

Cushing Tulsa

Coffeyville

Wynnewood

Tyler

Wichita Falls

Houston

LongviewEl Paso

Los Angeles

San Francisco

WAUPISOWAUPISO(Enbridge)(Enbridge)

CANAPORT CANAPORT (Connection to Maritimes & (Connection to Maritimes &

GATEWAGATEWA(Enbridge)(Enbridge)

TMXTMX(Kinder (Kinder

KEYSTONKEYSTON(TransCanad(TransCanad

ALBERTA ALBERTA (Enbridge)(Enbridge)

GROS GROS (TransCanada)(TransCanada)

SOUTHERN SOUTHERN (Enbridge)(Enbridge)

Fort Saskatchewan

Gordondale

Springville

Nederland

Corsicana

Foreman

TEXAS TEXAS (Enbridge)(Enbridge)

SOUTHERN SOUTHERN LIGHTSLIGHTS(Enbridge)(Enbridge)

Delevan

RABASKARABASKA((GazGaz Metro & Metro &

BROADWATER BROADWATER (TransCanada)(TransCanada)

ENERGIA COSTA ENERGIA COSTA (TransCanada)(TransCanada)

CEPA Members – Proposed Crude Oil and Natural Gas Pipeline Expansions

CORRIDOR CORRIDOR (Inter Pipeline)(Inter Pipeline)

FORT HILLS FORT HILLS (Enbridge)(Enbridge)

Liquid Pipeline

Gas Pipeline

Sedimentary

LNG Terminal

SUNSTONE PIPELINESUNSTONE PIPELINE(TransCanada)(TransCanada) BISON BISON

PROJECTPROJECT(TransCanada)(TransCanada)

PATHFINDEPATHFINDEPIPELINE PIPELINE

(TransCanada)(TransCanada)

NORTH NORTH EXPANSIONEXPANSION(TransCanada)(TransCanada)

PALOMAR GAS TRANSMISSION PALOMAR GAS TRANSMISSION (TransCanada)(TransCanada)

KEYSTONE KEYSTONE (TransCanada)(TransCanada)

KEYSTONE KEYSTONE (TransCanada)(TransCanada)

Sarnia PIONEER PIPELINE (2 PIONEER PIPELINE (2 (Enbridge)(Enbridge)

ALBERTAALBERTA--(TransCanada)(TransCanada)

NORTH CENTRAL NORTH CENTRAL (TransCanada)(TransCanada)

NIPISI PIPELINE NIPISI PIPELINE (Pembina)(Pembina)

August

Page 8: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

8

Transmission Pipelines

Page 9: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

99

CEPA Priorities

Enhance economic viability– Competitive business environment and fair Return on

Equity

Ensure timely decision making by governments– Effective and efficient regulation and consultation

buttressed with good policy

Opportunity through responsibility– Safety and sustainability

Responsiveness– Adaptive, relevant and solution oriented

Page 10: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

1010

Landowners Say….

83% – Favourable towards pipeline companies80% – Believe they are informed regarding pipeline activities on their land Safety: Landowners consider themselves more informed on public safety/emergency preparedness than in 2003 Environment: Nearly ¾ report that pipelines do a good job protecting the environment Compensation: Low on landowner list of concernsVery little change in past five years….

Page 11: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

11

Update TransCanada

Page 12: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

12

Pipeline AssetsPipelines

Gas Storage Facilities

GTN System

Tuscarora

North Baja

Tamazunchale

Foothills/BC

Iroquois

Portland

ANR

Alberta System

Canadian MainlineTQM

Great LakesNorthern

Border

• 59,000 km (36,500 mi) of wholly owned natural gas pipeline

• Interests in an additional 7,800 km (4,800 mi) of natural gas pipeline

• 235 Bcf of regulated natural gas storage capacity; 130 Bcf unregulated gas storage

• Unparalleled connections from traditional and emerging basins to growing markets

• Average daily volume of approximately 15 Bcf

• Keystone oil pipeline in construction

1.1 million bpd

Keystone

1

Page 13: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

13

Natural Gas Pipeline Opportunities

Pipelines

Gas Storage Facilities

GTN System

Tuscarora

North Baja

Foothills/BC

Iroquois

Portland

ANR

Alberta System

Canadian Mainline

Great LakesNorthern

Border

Keystone

2

Sunstone / Palomar

Pathfinder / Bison

Mackenzie Gas Pipeline

Alaska Pipeline

Dawn Express

Montney Pipeline

Horn River Pipeline

North Central Corridor Pipeline

• Proposed pipelines designed to help US Rockies basins natural gas get to market

• Proposed pipelines designed to bring Northern natural gas to Canadian and lower 48 US markets

• Proposed pipelines designed to connect new shale gas resources to existing pipeline assets

Pipelines

Proposed Pipelines

Gas Storage FacilitiesAlaska Pipeline

Mackenzie Gas Pipeline

Horn River Pipeline

MontneyPipeline

North Central Corridor

Palomar

PathfinderBison

SunstoneDawn

Express

Page 14: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

1414

Northern Projects:Recent Developments

Alaska Pipeline • Alaska Senate and House of

Representatives voted in favour of granting TransCanada a license to build the Alaska pipeline

• Governor Sarah Palin signed the Bill that authorizes granting the license to TransCanada on August 27

• Commence open season work

Mackenzie Gas Pipeline• Public hearing phase of the

regulatory process largely complete. Awaiting report of Joint Review Panel, likely in 2009

• Project proponents involved in discussions with Canadian federal government to financially restructure project

Pipelines

Proposed Pipelines

Gas Storage Facilities

Conventional Gas Basins

Mackenzie Gas Pipeline

AlaskaGas

PipelineProject

3

Page 15: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

15

Update Alliance Pipeline

Page 16: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

16

Alliance System

Page 17: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

17

Capital Projects

PROPOSED ROCKIES ALLIANCE PIPELINE:

Project Scope: – 1080 mile pipeline from the Rockies (Wamsutter) to Chicago– Capital Cost ≈

$5.0 Billion– Pipe Size: 42”– Pressure 1440 MAOP– Compression: 7 compressor stations (approx 250,000 hp)– Capacity 1.3 Bcf/d

expandable to 1.7 Bcf/d– Joint project: Alliance Pipeline and Questar

Open Season ended June 16, 2008– Initial interest = 480,000 Dth/d of subscriptions– Second Open Season pending

Targeted in-service November 1, 2012

Page 18: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

18

Capital ProjectsFACILITIES CONNECTING NEW GAS SUPPLY:

• Currently constructing new compressor station near Taylor, BC (on-line Dec 2008)

• Additional interconnects being finalized in NE BC and NW Alberta

• Interconnection to Pecan Pipeline (EOG Resources) near Bantry, North Dakota (on-line mid-2009)

• Additional interconnects being finalized in SK and North Dakota

WASTE HEAT:

– October 2008: completed construction of the fourth 5 MW waste heat unit in SK. All 4 Alliance compressor stations in SK now operate waste heat units.

– Pursuing development in Alberta:Received regulatory approval for Irma, Alberta

Page 19: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

19

Contact

Vince Amabile, Supply Chain ManagerPh:

403-517-6364 Email: [email protected]

Page 20: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

20

Update Kinder Morgan Canada

Page 21: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

21

Trans Mountain PipelineThe Only Pipeline from Alberta to the West Cost

55 year historyRecognized leader in mountain pipelining & operations in environmentally sensitive areas158km 30”/36” TMx1 (Anchor Loop) Project through Jasper & Mt. Robson Parks completed in October 2008 188,000 bpd capacity prior to 2000300,000 bpd capacity as of November 1, 2008

Page 22: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

22

Trans Mountain PipelinePlans for Continued Phased Expansion

TMx2

TMx1 (complete)

TMx3

Lowest cost to the West Cost

Greatest flexibility

TMx2: up to 330km of 30”/36” will add 80,000 bpd (total 380,000 bpd) by 2012*

TMx3: up to 750km of 30”/36” will add 320,000 bpd (total 700,000 bpd) by 2014*

Northern Leg: up to 780km of 30” will add 400,000 bpd (total 1,100,000 bpd) as early as 2014*

Additional pump stations & tanks will also be required

*Note: timing dependent on shipper support

Page 23: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

23

CO2 Infrastructure

Carbon Capture, Storage, & EOR Potential

Fort McMurray

Ft. Sask. / Edmonton

Emissions SourcesEOR / Sequestration Sites

Redwater

Swan Hills

Pembina

Innisfail / Drumheller

Brooks / Taber

Kinder Morgan is the world’s largest CO2operator (capture, transport, & injection): 1440km of pipelines; 1.3 billion cu.ft./day

Kinder Morgan is the 2nd largest oil producer in Texas: EOR increased production from 8,000 bpd to 37,000 bpd

Kinder Morgan has proposed small, commercially viable pipeline segments that will eventually form part of an Alberta network

Minimal government involvement is required

Page 24: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

24

Kinder Morgan ProjectsPrimary Contacts

– Pipeline System Major Projects (typically over $20M)Greg Hill, Director, Major Projects, KMC(403) 514-6635; [email protected]

– Non-Pipeline Terminals Projects (typically over $5M)Mark Wright, Director, Terminals Engineering, KMCT(403) 514-6498; [email protected]

– Sustaining Projects (typically under $20M)Michael Davies, Director, Engineering, KMC(403) 514-6597; [email protected]

– Contracts; Supplier QualificationGabrielle Butler, Director, Procurement, KMC(403) 514-6650; [email protected]

Page 25: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

25

Update ATCO Pipelines

Page 26: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

26

Existing Facilities

8,400 km Pipeline system

43 Compressor Stations

1350 Delivery stations

250 Receipt Stations

150 Interconnect Stations

Page 27: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

27

Capital ProjectsSouthern Extension Replacement (Three year project)

Viking to Red Deer

Replace 160 km of 219mm pipe

East Edmonton Compression (2009)

6500 HP total

4 or 5 reciprocating compressors

Small Pipeline Projects throughout Alberta annually

50km (60.3 through 406mm diameter)

generally 1 or 2 km in length or shorter

Fort Saskatchewan Upgraders

(2009 plus)

10 km 406 -

508 km pipe

Page 28: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

28

Contact

Scott ArndtVice President, Operations

(780) 420 -

5625 [email protected]

Page 29: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

29

Update Inter Pipeline Fund

Page 30: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

30

Oil Sands Transportation

Conventional Oil Pipelines

NGL Extraction

Bulk Liquid Storage

Business Segments

Page 31: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

31

Fort McMurray

Edmonton

Muskeg River Mine

Scotford Upgrader

Albe

rta

Sask

atch

ewan

24”, 12” pipelinesNew 42” pipeline

Corridor PipelinesCorridor Expansion Pipelines

16”, 20” pipelinesNew 20” pipeline

Corridor Pipeline System

• Corridor is a major oil sands pipeline system that services the AOSP

• AOSP is owned by Shell Canada (60%), Chevron Canada (20%), and Marathon Oil (20%)

Page 32: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

32

Corridor Pipeline Expansion Overview

$1.8 billion expansion

453 km of 42”, 43 km 20”pipe and upgraded pump stations

Blend capacity increased to 465,000 b/d

Expected to be in service in 2010

Page 33: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

33

Sole transporter of Cold Lake blended bitumen

Third-party Shell Orion connection

$225 million expansion program in progress

Cold Lake Pipeline

Edmonton

Fort McMurray

CNRL Wolf Lake

EnCana Foster Creek

Hardisty

Imperial Cold Lake

Albe

rta

Sask

atch

ewan

Shell Orion Project

Page 34: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

34

Oil Sands Pipeline Capacities(000 b/d)

Cold Lake capacities on a 100% basis

460300

560

465

705

1,400

0

500

1,000

1,500

2,000

2,500

2007 2011 Ultimate Capacity

Cold Lake Corridor

7601,025

2,105

Page 35: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

35

Conventional Oil Pipelines

Transport ~ 18% of total western Canadian conventional volumes

3,900 km of pipe connected to 160 producer owned batteries

875,000 barrels of storage

Bow River PipelineCentral Alberta PipelineMid-Saskatchewan PipelineValley PipelineNon-IPF Pipeline

Kerrobert

Hardisty

Calgary

Edmonton

Albe

rta

Sask

atch

ewan

Page 36: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

36

Conclusions

CEPA members are dedicated to ensuring a strong and viable pipeline industry in Canada

The industry continues to be quite active on a number of fronts

CEPA members continue to make significant investment in pipeline infrastructure projects

Other CEPA companies have significant active projects but could not be included in this presentation

Presentation will be posted on the CEPA web site

Page 37: CEPA OTTAWA LOBBY DAY - flywithwind.com › ...company_projects_2008.pdf• Company Project Updates • Summary. 3. 3. CEPA Membership • Transport 97% of the crude oil and natural

37

For more information, please contact:

Ziad Saad,Director, Operations

Canadian Energy Pipeline AssociationSuite 1860, 205 - 5th Avenue S.W.

Bow Valley Square IICalgary, Alberta T2P 2V7

Tel: (403) 221-8777 Fax: (403) [email protected]

www.cepa.com