CERRO CORONA MINE
Investor PresentationCerro Corona, Hualgayoc
July 9, 2008
Gold Fields First Foot Print in South America
“Creating Value Through Regional Diversification”
![Page 2: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/2.jpg)
2
Introduction SAFETY
Alarm will sound and announcement made
Evacuate building through exit points
Congregate outside EPCM building where safety wardens will provide further information
In Case Of Emergency …..
![Page 3: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/3.jpg)
3
Introduction Cautionary Statement
This document and any materials distributed in connection with this document are not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publication, availability or use would be contrary to law or regulation. This presentation does not constitute or form part of an offer to sell or issue, or any solicitation of an offer to buy or subscribe for, any securities referred to herein. The capital raising and other information in connection with the capital raising in certain jurisdictions may be restricted by law and persons into whose possession any document or other information referred to herein comes should inform themselves about and observe any such restriction. Any failure to comply with these restrictions may constitute a violation of the securities laws of any such jurisdiction.The securities mentioned herein have not been, and will not be, registered under the U.S. Securities Act of 1933 (the "Securities Act"), and may not be offered or sold in the United States (as such term is defined in Regulation S under the Securities Act) unless they are registered under the Securities Act or pursuant to an exemption from registration. No public offer of the securities is being made in the United States.This document is not an offer of securities for sale in any jurisdiction. Certain statements in this presentation constitute “forward looking statements” within the meaning of Section 27A of the US Securities Act of 1933 and Section 21E of the US Securities Exchange Act of 1934.Such forward looking statements involve known and unknown risks, uncertainties and other important factors that could cause the actual results, performance or achievements of the company to be materially different from the future results, performance orachievements expressed or implied by such forward looking statements. Such risks, uncertainties and other important factors include among others: overall economic and business conditions in South Africa, Ghana, Australia, Venezuela and elsewhere; the ability to achieve anticipated efficiencies and other cost savings in connection with past and future acquisitions; the success of exploration and development activities; decreases in the market price of gold; the occurrence of hazards associated with underground and surfacegold mining; the occurrence of labor disruptions; availability, terms and deployment of capital; changes in relevant government regulations, particularly environmental regulations and potential new legislation affecting mining and mineral rights; fluctuations in exchange rates, currency devaluations and other macroeconomic monetary policies; and political instability in South Africa, Ghana, regionally in Africa or in Venezuela. These forward looking statements speak only as of the date of this document.Gold Fields undertakes no obligation to update publicly or release any revisions to these forward looking statements to reflect events or circumstances after the date of this document or to reflect the occurrence of unanticipated events.
![Page 4: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/4.jpg)
4
AGENDA
• Cerro Corona: key for GFL Strategy
• Operational Overview
• Community and Social Strategy
![Page 5: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/5.jpg)
5
Operating minesDeveloping mine
Production: ~4 moz Reserves: 92moz Resources: 252moz Mines: 9
PeruCerro Corona
GhanaTarkwaDamang
South AfricaDriefonteinKloofBeatrixSouth Deep
AustraliaSt IvesAgnew
Simple corporate structureDiversified - 40% EBITDA from outside SAUnhedged
.
Liquid - 100% free floatDaily volume 8 million sharesListed on the NYSE, JSE, DFIX
STRATEGY The Gold Fields Franchise
![Page 6: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/6.jpg)
6
Securingthe Future
Operational Excellence
Growing Gold Fields
STRATEGY Growth Strategy
AGGRESSIVE INTERNATIONAL GROWTHAGGRESSIVE INTERNATIONAL GROWTH
Notional Cash Expenditure
FreeCash Flow
Margin Growth
UNHEDGED
Maintain the Franchise of Few, Large, High Quality Assets
BUT Also Smaller Projects For Exceptional Returns
Leverage Existing Positions
Strategic Alliances With Juniors
Targeted US$100m Exploration Programme
Growth Focused In Four Regions
SAFETY!
![Page 7: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/7.jpg)
7
Operating minesDeveloping mine
Production: 4 moz Reserves: 92moz Resources: 252moz Mines: 9
PeruCerro Corona
GhanaTarkwaDamang
South AfricaDriefonteinKloofBeatrixSouth Deep
.
STRATEGY South America: Driver of Growth
Target:1 moz
Current375koz
Target:1 moz
Target:1 moz
AustraliaSt IvesAgnew
Base load:2 moz
![Page 8: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/8.jpg)
8
STRATEGY South America Expansion Strategy
HIGH POTENTIAL FOR GROWTHHIGH POTENTIAL FOR GROWTH
Phase II:Growing CCJV with BVN
(Consolidada Hualgayoc)
Phase III:Regional Expansion
Phase I: Cerro Corona (CC)
• First shipment in 1Q FY09
• Production: 375k eq oz per year
• Increasing CC reserve base –potential for 10.1M oz equivalent reserves (resource conversion)
• Focus: Consolidada de Hualgayoc
• Expanding within South America
• North / Central America
• Greenfields exploration + JVs / M&A
Delivered September In Progress Early Stage
![Page 9: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/9.jpg)
9CERRO CORONA ON TRACK CERRO CORONA ON TRACK
Key Milestones
Mechanical Work Completed for all main Areas
Power line and Cerro Corona Substation completed and energized
TMF embankment for start-up completed; water supply guaranteed
Pre-commissioning completed
Transition to operations completed – required permits obtained
Commercial contracts signed
Cerro Corona Cerro Corona –– Project StatusProject Status
![Page 10: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/10.jpg)
10SHIPMENTS: Q1 FY 09SHIPMENTS: Q1 FY 09
START-UP SCHEDULE
Commissioning by mid July
Rock in the plant by mid July
TMF Completion Phase I – August / Starter Level Ready
Full production capacity by December
Shipping Concentrates – Late August / Early September
Cerro Corona Cerro Corona –– Start Up ScheduleStart Up Schedule
![Page 11: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/11.jpg)
11CERRO CORONA WILL DELIVER VALUECERRO CORONA WILL DELIVER VALUE
Key Performance
IndicatorsUnit Ops Plan FY09 Average Yearly
Life of Mine
Ounces produced Equivalent koz 356 ~375
Au produced k oz 142 ~140
Cu produced k tm 28 ~25
Cash Cost US$/oz 340 ~330
Sustaining Capital US$/oz 226 ~50
All-in Cost (NCE) US$/oz 586 ~400
Operating Margin % 54 ~50
Cerro Corona Cerro Corona –– Key Performance IndicatorsKey Performance Indicators
![Page 12: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/12.jpg)
12
2,800
3,219 3,2293,121
1,066
1,510 1,529 1,546
55
101 10496
0
20
40
60
80
100
120
500
1,000
1,500
2,000
2,500
3,000
3,500
Q1
F200
9
Q2
F200
9
Q3
F200
9
Q4
F200
9
eq k
oz
000
t
Mined Milled Au eq oz
Production Ramp up Summary Production Ramp up Summary –– FY 09FY 09
F2009: 356k eq oz produced (Au: 142k oz, Cu: 214k eq oz)F2009: 356k eq oz produced (Au: 142k oz, Cu: 214k eq oz)
![Page 13: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/13.jpg)
13READY FOR A SUCCESSFUL STARTREADY FOR A SUCCESSFUL START--UPUP
Cerro Corona Cerro Corona –– Main ChallengesMain Challenges
• Successful transition from project to operation and production ramp up
• Manage construction of Tailings dam within cost limitations and timelines
• Production costs optimization
• Maintain a stable relationship with communities
• Successful delivery of concentrate to smelters
![Page 14: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/14.jpg)
14
SOUTH AMERICA SOUTH AMERICA –– HIGH PROSPECTIVE BELTSHIGH PROSPECTIVE BELTS
40°0'0"W50°0'0"W60°0'0"W70°0'0"W80°0'0"W
10°0'0"N
0°0'0"
10°0'0"S
20°0'0"S
30°0'0"S
40°0'0"S
50°0'0"S
Chile Central Subprovince
Peru North Subprovince
• Two highly prospective belts in South America:
- Northern Peru
- Central Chile
• Porphyry and epithermal style Au/Cu mineralization
• Actively exploring the area through regional exploration and opportunistic approach
![Page 15: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/15.jpg)
15
Consolidada Hualgayoc JV Consolidada Hualgayoc JV -- Location & StatusLocation & Status
• Highly endowned area: 185 M oz Au
• 50:50 JV - GF La Cima & Buenaventura
• JV commenced F2005
• 13,900 hectares
• GF spend: US $2.25M
• 9,300 meters drilled
• 3 targets tested
76° W78° W80° W
4° S
6° S
10° S
EQUADOR
PERUPERUPERUPERU
GBAR – Northern Peru Polygon
A Lima
Huarmey
Huaraz
Lagunas Norte
La Arena
Poderosa
Buldibuyo
Pierina Antamina
Hualgayoc JVCerro Corona
Minas Conga
Sipan
Minas Santa Rosa
Rio Blanco
La Zanja
MichiquillayYanacocha
Cañariaco
La Granja
La Virgen
8° S
Chiclayo
Trujillo
Pacasmayo Cajamarca
![Page 16: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/16.jpg)
16
Pan de AzucarPan de Azucar
FirenzeFirenze
Tres CrucesTres Cruces
Titan Titan -- ArabeArabeCº JesusCº Jesus
Las VenadasLas Venadas
PujupePujupe
QuijoteQuijote
Cerro CoronaCerro Corona
LolaLola
0
4 Km
2 4
Targets drilled
Targets AFE 3
Other Targets
Consolidada Hualgayoc JVConsolidada Hualgayoc JVAirborne Magnetics & Target LocationsAirborne Magnetics & Target Locations
RTP Mag
Mining Concession
GFLCColquirrumi
Corona Project
(JV)
![Page 17: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/17.jpg)
17
Americas Region Americas Region –– Gold Fields ProjectsGold Fields Projects
Denver
Santiago
Hualgayoc JV
DR JV
Redstar JV
Active SBX JV
Garrafao JV
Tapajos
Disposals
Lima
Vancouver
Offices
Mexico Generative
N & S Peru Generative
Canada Generative
![Page 18: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/18.jpg)
18
3
2
0
1
5
4
6
24
7
18
19
10
11
15
8
20
9
16
12
23
13
22
1721
14
20°
30°
40°
50°
10°
0°
10°
80° 70° 60° 50° 40°
Chile Centralsubprovince
South America South America –– Chile Central SubprovinceChile Central Subprovince
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
"
"
!
"
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
"
!!
"
!
!
!!
!
"
!
"
!
!
!
!
!"
"
"!
!
"
"
"!
"
"
"
"""
""
"!
"""""
"
!
""
""""
!
!
!
!!
!
!"
"
"
!
!
"
!
"
"
!
"
"
"
!"!
! !"!
!
!
!
26°0
'0"S
28°0
'0"S
30°0
'0"S
32°0
'0"S
LF
VA
AC
BA
F
PL
V
30°
28°
26°
Maricunga belt
El Indio belt
70° 68°P€-Paleozoic rocksJr intrusivesKr intrusivesJr volcanic-sedimentary rocksKr volcanic-sedimentary rocksTt volcanic-sedimentary rocksQt volcanic-sedimentary rocks
Chile CentralSubprovince+90 M oz
SBX JOINT VENTURE
![Page 19: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/19.jpg)
19
440 520
7000
7080
7160
Refugio
Volcan
Isla
La Falda
40 km La Pepa
Puren
Esperanza
Marte-Lobo
La Coipa
SBX JV
Valle Ancho
Project Endowment (Moz)
La Coipa-Puren 3.7 Au, 178 Ag
Marte – Lobo 7.9 Au
Volcan 7.1 Au
Refugio 8.1 Au
4 projects to be advancedand drill tested in 2008/09.
Chile Maricunga Belt Chile Maricunga Belt –– Exploration ProjectsExploration Projects
![Page 20: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/20.jpg)
20
Introduction
AGENDA
• Cerro Corona: key for GFL Strategy
• Operational Overview
• Community and Social Strategy
![Page 21: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/21.jpg)
21
Management Reviews
Verification and Corrective / Preventive
Actions
Implementation and Operation
Planning
Safety and Occupational Health
Policy
Continuous Improvement
SAFETY AND HEALTH MANAGEMENTSAFETY AND HEALTH MANAGEMENT
Safety and Occupational Health SystemElements for a Successful Management
![Page 22: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/22.jpg)
22
HEALTH AND SAFETY FIRST
LDI/MTI Frequency Rate
20.818.8
16.714.6
0
5
10
15
20
25
Q1 2009 Q2 2009 Q3 2009 Q4 2009
Frequency Rate
![Page 23: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/23.jpg)
23
ROM PAD – June 08
![Page 24: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/24.jpg)
24
CERRO CORONA PIT – June 08
![Page 25: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/25.jpg)
25
Total F2009:
12,368 kt
0
400
800
1,200
1,600
2,000
2,400
2,800
3,200
3,600
Qtr1
Qtr2
Qtr3
Qtr4
Oxide Sulphide Waste
2,800 kt
3,219 kt 3,228 kt3,121 kt
25%
10% 13%3%
37%
42% 40%46%
38%
48%47%
50%
MINE PRODUCTION – FY 09
![Page 26: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/26.jpg)
26
ORE STOCKPILE – JUNE 08
![Page 27: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/27.jpg)
27
MINING FLEET
Loading Tools
1 Loader CAT 994
1 Shovel Terex RH-120
MA: 85% / Usage: 75%
Trucks
6 Trucks CAT 785
4 Trucks Komatsu 330M
MA: 85% / Usage: 75%
Drill Rigs
2 IR DM-45
1 Pantera Sandvick (for pre-splitting)
MA: 90% / Usage: 60%
AncillaryFleet
MA Usage
01 Dozer D8 84% 45%
01 Dozer D9 84% 45%
02 Graders 140 87% 52%
03 Loader CAT 988* 89% 66%
01 Excavator 330 90%
* (02 coming in July 08)
CONTRACT MININGFive year contract
with Minera San Martin
![Page 28: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/28.jpg)
28
PROCESS FACILITIES – Jun 08
![Page 29: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/29.jpg)
29
Total F2009:
5,650 kt
0
250
500
750
1,000
1,250
1,500
1,750
Qtr1
Qtr2
Qtr3
Qtr4
Mixed Supergene Hypogene
1,065 kt
1,510 kt 1,529 kt 1,546 kt
74%
22%32%
28%
23%66%
58%
54%
3%
12% 10% 17%
PLANT TREATMENT – FY 09
![Page 30: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/30.jpg)
30
PLANT RAMP UP
RAMP UP
8500
1275013600
15300
17000
50% 75% 80% 90% 100%
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
Jul Aug Sep Oct Nov
MONTH
TON
S / D
AY
![Page 31: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/31.jpg)
31
PRODUCTION PROFILE - CONCENTRATE PRODUCED
Total F2009:
118.6 kt
0
5
10
15
20
25
30
35
40
45
Qtr1
Qtr2
Qtr3
Qtr4
AU g/t
43.7
AU g/t
37.1
AU g/t
33.9 AU g/t
44.6
18.4 kt
35.1 kt37.0 kt
28.1 kt
![Page 32: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/32.jpg)
32
PRODUCTION PROFILE - METALS PRODUCED
Total F2009:
356 Equivalent koz
24
40 37 42
31
61 67 54
0
20
40
60
80
100
120Q
tr1
Qtr2
Qtr3
Qtr4
Gold koz Copper Equiv Koz
![Page 33: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/33.jpg)
33
PANAMERICANA
LA ZANJA
SIPAN
CERRO NEGRO SAN JOSE
C. CARACHUGO
MAQUI MAQUI
YANACOCHA
TANTAHUATAY
CERRO CORONA
LOS PIRCOSSANTA CRUZ
CHOTA
BAMBAMARCA
HUALGAYOC
EL EMPALME
CAJAMARCA
CHILETESalaverryPort
403 KmTotal
129 KmPacasmayo - Salaverry
190 KmCajamarca - Pacasmayo
84 KmCerro Corona- Cajamarca
403 KmTotal
129 KmPacasmayo - Salaverry
190 KmCajamarca - Pacasmayo
84 KmCerro Corona- Cajamarca
PACASMAYO
CONCENTRATE SHIPMENTS THROUGH SALAVERRY
![Page 34: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/34.jpg)
34
Ship loader under commissioning
Target deadline July 30th
SALAVERRY PORT INFRASTRUCTURE
![Page 35: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/35.jpg)
35
CAPITAL EXPENDITURE - $M
576 2
15 80
0
20
40
60
80
100S
usta
inin
gC
apita
l
Ram
p-up
Cap
italis
edin
tere
st
Pro
ject
com
plet
ion
Tota
l
![Page 36: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/36.jpg)
36
• EIA approved by the MEM
• Preventive measures to mitigation and compensate potential environmental impacts for every stage of the Project: Construction, Operation and Closing
• Compliance with the Cerro Corona EIA commitments
• The EMP was implemented since the beginning of the Operation stage
EIA – ENVIRONMENTAL MANAGEMENT PLAN (EMP)
![Page 37: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/37.jpg)
37
• Environmental Management System Implementation – ISO 14001 (2004)
• Environmental Emergency Response System
• Implementation of the Awareness and Preparedness of Response to EmergenciesProgram to Local Level (APELL)
• Environmental audits
• Geotechnical Testing
ENVIRONMENTAL MANAGEMENTENVIRONMENTAL MANAGEMENT
KEY ACTIVITIES
![Page 38: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/38.jpg)
38
AGENDA
• Cerro Corona: key for GFL Strategy
• Operational Overview
• Community and Social Strategy
![Page 39: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/39.jpg)
39
Cerro Corona Mine site 2004
![Page 40: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/40.jpg)
40
Cerro Corona Mine site 2007
![Page 41: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/41.jpg)
41
Cerro Corona Mine site 2008
![Page 42: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/42.jpg)
42
GENERAL PERCEPTION ABOUT MINING
SOUNDS FAMILIAR?
• It contaminates; damages the environment• Government supports only mining companies• Doesn´t make any positive impact in the local
economy. Only take away• Doesn´t promote any development• No transparency• Not compatible with any other productive
activity, as for example agriculture
![Page 43: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/43.jpg)
43
Community of El Tingo2004 – WHERE THE STORY BEGINS
![Page 44: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/44.jpg)
44
So….. WHAT COULD THE PROBLEM BE?SOME IDEAS:
Political Perspective
• Presence of Government
• Existence of big impacts and socialconflicts, Government's national strategy?Ministry of Environment... Excludes mining!
• Private actions
• Free space for anti mining actions
• Does it worth to talk about “CANON” FromNational to District level…. Andcommunities where the project takesplace?
• Voluntary Contribution
![Page 45: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/45.jpg)
45
Social Perspective:
• Who is visiting who? Concession vsLand
• We look for immediate results:SOCIAL LICENSE
• Social Base Line, what is it for?• Everything has to do with Perception• Common Denominators: do not be
exposed• Expectations over 3,000 mts• Is it enough to comply with the law?• Little information about benefits mining
provides, changing strategies• NGO´s point of view• Use the bridge!
So….. WHAT COULD THE PROBLEM BE?SOME IDEAS:
![Page 46: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/46.jpg)
46
WE FOLLOWED THE GF WAY !“SECURING THE FUTURE”- Social programs: an investment not a cost
- Open dialogue
- Coexists with other economic activities like agriculture, cattle, tourism, among others
- Large investment to develop
- Creates labor opportunities, carefully
- Complies with regulations, keep an eye on 042-2003-EM
- Is formal and pays taxes
- Is subject to permanent supervisions and inspections
![Page 47: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/47.jpg)
47
But…TRUST IS EASILY DESTROYED
• Keep people informed
• Make Commitments In Good Faith
• Fulfill All Commitments in a timely manner
![Page 48: CERRO CORONA MINE - · PDF file120 500 1,000 1,500 2,000 2,500 3,000 3,500 Q1 F2009 Q2 F2009 Q3 F2009 Q4 F2009 000 t eq koz ... 1 Shovel Terex RH-120 MA: 85% / Usage: 75% Trucks 6](https://reader034.vdocuments.net/reader034/viewer/2022052608/5ab8ac9e7f8b9a684c8d0f31/html5/thumbnails/48.jpg)
48
CERRO CORONA MINE
Gold Fields First Foot Print in South America
“Creating Value Through Regional Diversification”
Investor PresentationCerro Corona, Hualgayoc
July 9, 2008