Page 1: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

A D O T L o c a l P u b l i c A g e n c y S e c t i o n O c t o b e r 1 9 2 0 1 8

Certification Acceptance Assessment Packet

1

Table of Contents

Certification Acceptance Assessment Packet 3 Purpose 3 Objective 3 Goal3 Schedule 3 Instructions 3

LPA Commonly Used Acronyms 4

Procurement of Materials andor Install 5 Agency Documents Approved By ADOT Procurement Group 5 Submit to ADOT LPA Section before December 7 2018 5 Assessment Questions 5

Procurement of a Consultant 6 Agency Documents Approved By ADOT ECS Section 6 Submit to ADOT LPA Section before December 31 2018 6 Assessment Questions 6

Roadway Pavement Design 8 Agency Document Reviewed By ADOT LPA Section 8 Submit to ADOT LPA Section before January 31 2019 8 Assessment Questions 8

Roadway Design Guidelines 9 Agency Document Reviewed By ADOT LPA Section 9 Submit to ADOT LPA Section before January 31 2019 9 Assessment Questions 9

Roadway Design Exceptions 10 Agency Document Reviewed By ADOT Roadway Engineering Group 10 Submit to ADOT LPA Section before January 31 2019 10 Assessment Questions 10

Materials QA Program 11 Agency Document Reviewed By ADOT Construction-Materials Group 11 Submit to ADOT LPA Section before January 31 2019 11 Assessment Questions 11

ROW Procedures 12 Agency Document Reviewed By ADOT ROW Section 12 Submit to ADOT LPA Section before January 31 2019 12 Assessment Questions 12

DBE Procedures 14 Agency Documents Reviewed By ADOT BECO 14 Submit to ADOT LPA Section before February 28 2019 14 Assessment Questions 14

Project Delivery Manual 16 Agency Documents Reviewed By ADOT LPA Section 16 Submit to ADOT LPA Section before March 29 2019 16 Assessment Questions 16

Staffing Plan 18 Agency Documents Reviewed By ADOT LPA Section 18

2

Submit to ADOT LPA Section before March 29 2019 18 Assessment Questions 18

Bid Analysis amp Award Procedures 19 Agency Documents Reviewed By ADOT LPA Section 19 Submit to ADOT LPA Section before March 29 2019 19 Assessment Questions 19

Subcontract Approval Procedures 20 Agency Documents Reviewed By ADOT LPA Section 20 Submit to ADOT LPA Section before April 30 2019 20 Assessment Questions 20

Financial Management Procedures 21 Agency Documents Reviewed By ADOT LPA Section 21 Submit to ADOT LPA Section before April 30 2019 21 Assessment Questions 21

3

Certification Acceptance Assessment Packet

Purpose Through the CA Agreement ADOT and the CA Agency will adhere to the responsibilities and requirements set forth by Federal Highway Administration (FHWA) when implementing the Federal Aid Highway Program (FAHP) in Arizona

Objective Define requirements of delegated authority from ADOT to the CA Agency for delivery of the FAHP under ADOTrsquos CA Program

Goal Provide ADOTrsquos expectations for the CA Agency project development program in delivering the FAHP including the necessary project delivery processes and procedures

Schedule Submittals Submit to ADOT LPA Section by Procurement (Materials andor Install) December 7 2018 Procurement (Consultant) December 31 2018 Roadway (Pavement Design Design Guidelines and Design Exceptions) January 31 2019 Materials (Quality Assurance) January 31 2019 Right-of-Way January 31 2019 Disadvantaged Business Enterprises (DBE) February 28 2019 Project Delivery Manual March 29 2019 Staffing March 29 2019 Bid Analysis and Award March 29 2019 Subcontractor Approval April 30 2019 Performance Measures (Finance and Reporting) April 30 2019

Instructions The Certification Acceptance Assessment Packet provides guidance for the Agency to evaluate andor develop procedures in the administrative areas identified in the CA Agreement for compliance in delivering the FAHP The packet contains a list of essential documents and assessment questions related to each administrative area requiring ADOT review and approval It is not mandatory for the Agency to have a single procedural document or manual for delivering the FAHP however it is highly recommended For each section of the packet

bull Note the due date for the submittal of the checklist and corresponding document(s) listed Documents provided after the final ADOT submittal date for that submittal may jeopardize the Agencyrsquos CA status

bull Locate the Agency document(s) or manual(s) where procedures are housed for delivering FAHP projects bull Compare and evaluate the current Agency procedures contained within the Agencyrsquos document(s) or manual(s)

with the questions on the checklist bull Update the current Agency procedures where necessary bull Answer ldquoyesrdquo or ldquonordquo for each question Provide a brief explanation for each ldquonordquo answer bull Identify the document page and paragraph for each question bull Fill in the ldquoPrepared byrdquo box identifying who in the Agency verified the Agencyrsquos procedures and answered each

question to complete the checklist bull Submit the checklist and corresponding document(s) to the ADOT LPA Section

Email all questions regarding the packet to Jennifer VanVenRoy at JVanvenroyazdotgov

4

LPA Commonly Used Acronyms AASHTO American Association of State Highway Transportation Officials ADA Americans with Disabilities Act AE ArchitecturalEngineering ADOT Arizona Department of Transportation BECO Business Engagement Compliance Office CA Certification Acceptance CFR Code of Federal Regulations CUF Commercially Useful Function DBE Disadvantaged Business Enterprise ECS Engineering Consultants Section EEO Equal Employment Opportunity EPRISE DBE Special Provisions FAHP Federal-aid Highway Program FHWA Federal Highway Administration GFE Good Faith Effort IGA Intergovernmental Agreement LPA Local Public Agency MAG Maricopa Association of Governments NCHRP National Cooperative Highway Research Program NEPA National Environmental Policy Act of 1969 NHS National Highway System NOT Notice of Termination OJT On-the-Job Training QA Quality Assurance PAG Pima Association of Governments PSampE Plans Specifications and Estimates QBS Qualifications Based Selection RDG Roadway Design Group RFQ Request for Qualifications ROW Right-of-Way SWPPP Stormwater Pollution Prevention Plan

5

Procurement of Materials andor Install

Agency Documents Approved By ADOT Procurement Group bull Completed ADOT Procurement Code Checklist (Appendix C) bull Procurement Code bull Other Procurement Procedures or Contract Documents as needed

Submit to ADOT LPA Section before December 7 2018

Assessment Questions Question YN Document Page Paragraph Do the Procurement Procedures or Contract Documents require the following for federal-aid contracts

Written competitive bidding thresholds for informal bids and purchases between $10000 and $100000 are to be awarded to a small business if possible

Bid Lists compiled and maintained through ProcureAZ or similar eProcurement method

Verification of employment records of contractors and subcontractors using e-verify

Compliance with the Significant Procurement Role requirements

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

6

Procurement of a Consultant

Agency Documents Approved By ADOT ECS Section bull Completed Certification Acceptance Contract Administration Procedures Review Checklist (Appendix A) bull Procurement Procedures ndash written process for advertising evaluating selecting and negotiating contracts bull Contract Procedures ndash written process for contract administration and management bull Sample AE RFQ Package ndash copies of what the Agency advertises as part of its solicitation bull Sample Contract Boilerplate Documents ndash copies of contract document used for FAHP projects

Submit to ADOT LPA Section before December 31 2018

Assessment Questions Question YN Document Page Paragraph Is the Agency submitting Design Consultant Contracting (Procurement) Procedures If yes

Do the Agencyrsquos Design Consultant Contracting (Procurement) procedures meet the federal and state laws regulations and all other applicable requirements for qualification-based selection (QBS) process

Does the Agency use an ADOT approved prequalification process

If no does the Agency use ADOTrsquos prequalification list

Do the Agencyrsquos Procedures Require notification to the ADOT PM of kickoff and progress meetings

Inform the ADOT PM of error and omission actions taken

Require contacting the ADOT PM for approval and FHWA concurrence before terminating a federal-aid contract

Include a tracking and reporting process for on-call assignments if applicable

On-Call Design Procurement Procedures Is the Agency submitting Design Consultant On-Call Procurement Procedures If yes

Does the Agencyrsquos Procedures include On-Call procurement procedures

Do the CA Agencyrsquos procedures identify and define one of the two task or work orders assignment processes

Mini QBS procedures Regional selection

Do the CA Agencyrsquos procedures Include a tracking and reporting process for on-call assignments

Will the Agency be requesting an approval from ADOT before advertising for procurement of On-Call services

See Appendix B for additional resources

7

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

8

Roadway Pavement Design

Agency Document Reviewed By ADOT LPA Section Pavement Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For NHS Roadways do the Agencyrsquos standards comply with 23 CFR 626

On Local Non - NHS Roadways Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local non-NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For Agency Projects within ADOT Right-of-Way do the Agencyrsquos Pavement Design Guidelines comply with the following

bull ADOT Standard Specifications for Road and Bridge Construction and Stored Specifications

bull ADOT Materials Preliminary Design Guide bull AASHTO Design Guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

9

Roadway Design Guidelines

Agency Document Reviewed By ADOT LPA Section Roadway Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets

Do the Agencyrsquos Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria

On Local non-NHS Roadways Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local non-NHS RoadsStreets

For State Agency Projects within ADOT Right-of-Way do the Agencyrsquos Roadway Design confirm and comply with the following

bull AASHTO Controlling Design Criteria bull ADOT Roadway Design Guidelines (RDG) bull All other applicable adopted and published

ADOT design standard and guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

10

Roadway Design Exceptions

Agency Document Reviewed By ADOT Roadway Engineering Group Design Exception Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local - NHS Roadways

Does the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures

Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria

Do the Agencyrsquos procedures include submitting to and obtaining approval from the FHWA for design exceptions

On Local Non - NHS Roadways Does the Agency have an adopted and published Design Exception procedure

For Agency Projects within ADOT Right-of-Way a Does the Agency have an adopted and

published Design Exception procedure that follows FHWA and ADOT Design Exception procedures

b Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

c Do the Agencyrsquos procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 2: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

1

Table of Contents

Certification Acceptance Assessment Packet 3 Purpose 3 Objective 3 Goal3 Schedule 3 Instructions 3

LPA Commonly Used Acronyms 4

Procurement of Materials andor Install 5 Agency Documents Approved By ADOT Procurement Group 5 Submit to ADOT LPA Section before December 7 2018 5 Assessment Questions 5

Procurement of a Consultant 6 Agency Documents Approved By ADOT ECS Section 6 Submit to ADOT LPA Section before December 31 2018 6 Assessment Questions 6

Roadway Pavement Design 8 Agency Document Reviewed By ADOT LPA Section 8 Submit to ADOT LPA Section before January 31 2019 8 Assessment Questions 8

Roadway Design Guidelines 9 Agency Document Reviewed By ADOT LPA Section 9 Submit to ADOT LPA Section before January 31 2019 9 Assessment Questions 9

Roadway Design Exceptions 10 Agency Document Reviewed By ADOT Roadway Engineering Group 10 Submit to ADOT LPA Section before January 31 2019 10 Assessment Questions 10

Materials QA Program 11 Agency Document Reviewed By ADOT Construction-Materials Group 11 Submit to ADOT LPA Section before January 31 2019 11 Assessment Questions 11

ROW Procedures 12 Agency Document Reviewed By ADOT ROW Section 12 Submit to ADOT LPA Section before January 31 2019 12 Assessment Questions 12

DBE Procedures 14 Agency Documents Reviewed By ADOT BECO 14 Submit to ADOT LPA Section before February 28 2019 14 Assessment Questions 14

Project Delivery Manual 16 Agency Documents Reviewed By ADOT LPA Section 16 Submit to ADOT LPA Section before March 29 2019 16 Assessment Questions 16

Staffing Plan 18 Agency Documents Reviewed By ADOT LPA Section 18

2

Submit to ADOT LPA Section before March 29 2019 18 Assessment Questions 18

Bid Analysis amp Award Procedures 19 Agency Documents Reviewed By ADOT LPA Section 19 Submit to ADOT LPA Section before March 29 2019 19 Assessment Questions 19

Subcontract Approval Procedures 20 Agency Documents Reviewed By ADOT LPA Section 20 Submit to ADOT LPA Section before April 30 2019 20 Assessment Questions 20

Financial Management Procedures 21 Agency Documents Reviewed By ADOT LPA Section 21 Submit to ADOT LPA Section before April 30 2019 21 Assessment Questions 21

3

Certification Acceptance Assessment Packet

Purpose Through the CA Agreement ADOT and the CA Agency will adhere to the responsibilities and requirements set forth by Federal Highway Administration (FHWA) when implementing the Federal Aid Highway Program (FAHP) in Arizona

Objective Define requirements of delegated authority from ADOT to the CA Agency for delivery of the FAHP under ADOTrsquos CA Program

Goal Provide ADOTrsquos expectations for the CA Agency project development program in delivering the FAHP including the necessary project delivery processes and procedures

Schedule Submittals Submit to ADOT LPA Section by Procurement (Materials andor Install) December 7 2018 Procurement (Consultant) December 31 2018 Roadway (Pavement Design Design Guidelines and Design Exceptions) January 31 2019 Materials (Quality Assurance) January 31 2019 Right-of-Way January 31 2019 Disadvantaged Business Enterprises (DBE) February 28 2019 Project Delivery Manual March 29 2019 Staffing March 29 2019 Bid Analysis and Award March 29 2019 Subcontractor Approval April 30 2019 Performance Measures (Finance and Reporting) April 30 2019

Instructions The Certification Acceptance Assessment Packet provides guidance for the Agency to evaluate andor develop procedures in the administrative areas identified in the CA Agreement for compliance in delivering the FAHP The packet contains a list of essential documents and assessment questions related to each administrative area requiring ADOT review and approval It is not mandatory for the Agency to have a single procedural document or manual for delivering the FAHP however it is highly recommended For each section of the packet

bull Note the due date for the submittal of the checklist and corresponding document(s) listed Documents provided after the final ADOT submittal date for that submittal may jeopardize the Agencyrsquos CA status

bull Locate the Agency document(s) or manual(s) where procedures are housed for delivering FAHP projects bull Compare and evaluate the current Agency procedures contained within the Agencyrsquos document(s) or manual(s)

with the questions on the checklist bull Update the current Agency procedures where necessary bull Answer ldquoyesrdquo or ldquonordquo for each question Provide a brief explanation for each ldquonordquo answer bull Identify the document page and paragraph for each question bull Fill in the ldquoPrepared byrdquo box identifying who in the Agency verified the Agencyrsquos procedures and answered each

question to complete the checklist bull Submit the checklist and corresponding document(s) to the ADOT LPA Section

Email all questions regarding the packet to Jennifer VanVenRoy at JVanvenroyazdotgov

4

LPA Commonly Used Acronyms AASHTO American Association of State Highway Transportation Officials ADA Americans with Disabilities Act AE ArchitecturalEngineering ADOT Arizona Department of Transportation BECO Business Engagement Compliance Office CA Certification Acceptance CFR Code of Federal Regulations CUF Commercially Useful Function DBE Disadvantaged Business Enterprise ECS Engineering Consultants Section EEO Equal Employment Opportunity EPRISE DBE Special Provisions FAHP Federal-aid Highway Program FHWA Federal Highway Administration GFE Good Faith Effort IGA Intergovernmental Agreement LPA Local Public Agency MAG Maricopa Association of Governments NCHRP National Cooperative Highway Research Program NEPA National Environmental Policy Act of 1969 NHS National Highway System NOT Notice of Termination OJT On-the-Job Training QA Quality Assurance PAG Pima Association of Governments PSampE Plans Specifications and Estimates QBS Qualifications Based Selection RDG Roadway Design Group RFQ Request for Qualifications ROW Right-of-Way SWPPP Stormwater Pollution Prevention Plan

5

Procurement of Materials andor Install

Agency Documents Approved By ADOT Procurement Group bull Completed ADOT Procurement Code Checklist (Appendix C) bull Procurement Code bull Other Procurement Procedures or Contract Documents as needed

Submit to ADOT LPA Section before December 7 2018

Assessment Questions Question YN Document Page Paragraph Do the Procurement Procedures or Contract Documents require the following for federal-aid contracts

Written competitive bidding thresholds for informal bids and purchases between $10000 and $100000 are to be awarded to a small business if possible

Bid Lists compiled and maintained through ProcureAZ or similar eProcurement method

Verification of employment records of contractors and subcontractors using e-verify

Compliance with the Significant Procurement Role requirements

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

6

Procurement of a Consultant

Agency Documents Approved By ADOT ECS Section bull Completed Certification Acceptance Contract Administration Procedures Review Checklist (Appendix A) bull Procurement Procedures ndash written process for advertising evaluating selecting and negotiating contracts bull Contract Procedures ndash written process for contract administration and management bull Sample AE RFQ Package ndash copies of what the Agency advertises as part of its solicitation bull Sample Contract Boilerplate Documents ndash copies of contract document used for FAHP projects

Submit to ADOT LPA Section before December 31 2018

Assessment Questions Question YN Document Page Paragraph Is the Agency submitting Design Consultant Contracting (Procurement) Procedures If yes

Do the Agencyrsquos Design Consultant Contracting (Procurement) procedures meet the federal and state laws regulations and all other applicable requirements for qualification-based selection (QBS) process

Does the Agency use an ADOT approved prequalification process

If no does the Agency use ADOTrsquos prequalification list

Do the Agencyrsquos Procedures Require notification to the ADOT PM of kickoff and progress meetings

Inform the ADOT PM of error and omission actions taken

Require contacting the ADOT PM for approval and FHWA concurrence before terminating a federal-aid contract

Include a tracking and reporting process for on-call assignments if applicable

On-Call Design Procurement Procedures Is the Agency submitting Design Consultant On-Call Procurement Procedures If yes

Does the Agencyrsquos Procedures include On-Call procurement procedures

Do the CA Agencyrsquos procedures identify and define one of the two task or work orders assignment processes

Mini QBS procedures Regional selection

Do the CA Agencyrsquos procedures Include a tracking and reporting process for on-call assignments

Will the Agency be requesting an approval from ADOT before advertising for procurement of On-Call services

See Appendix B for additional resources

7

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

8

Roadway Pavement Design

Agency Document Reviewed By ADOT LPA Section Pavement Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For NHS Roadways do the Agencyrsquos standards comply with 23 CFR 626

On Local Non - NHS Roadways Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local non-NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For Agency Projects within ADOT Right-of-Way do the Agencyrsquos Pavement Design Guidelines comply with the following

bull ADOT Standard Specifications for Road and Bridge Construction and Stored Specifications

bull ADOT Materials Preliminary Design Guide bull AASHTO Design Guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

9

Roadway Design Guidelines

Agency Document Reviewed By ADOT LPA Section Roadway Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets

Do the Agencyrsquos Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria

On Local non-NHS Roadways Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local non-NHS RoadsStreets

For State Agency Projects within ADOT Right-of-Way do the Agencyrsquos Roadway Design confirm and comply with the following

bull AASHTO Controlling Design Criteria bull ADOT Roadway Design Guidelines (RDG) bull All other applicable adopted and published

ADOT design standard and guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

10

Roadway Design Exceptions

Agency Document Reviewed By ADOT Roadway Engineering Group Design Exception Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local - NHS Roadways

Does the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures

Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria

Do the Agencyrsquos procedures include submitting to and obtaining approval from the FHWA for design exceptions

On Local Non - NHS Roadways Does the Agency have an adopted and published Design Exception procedure

For Agency Projects within ADOT Right-of-Way a Does the Agency have an adopted and

published Design Exception procedure that follows FHWA and ADOT Design Exception procedures

b Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

c Do the Agencyrsquos procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 3: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

2

Submit to ADOT LPA Section before March 29 2019 18 Assessment Questions 18

Bid Analysis amp Award Procedures 19 Agency Documents Reviewed By ADOT LPA Section 19 Submit to ADOT LPA Section before March 29 2019 19 Assessment Questions 19

Subcontract Approval Procedures 20 Agency Documents Reviewed By ADOT LPA Section 20 Submit to ADOT LPA Section before April 30 2019 20 Assessment Questions 20

Financial Management Procedures 21 Agency Documents Reviewed By ADOT LPA Section 21 Submit to ADOT LPA Section before April 30 2019 21 Assessment Questions 21

3

Certification Acceptance Assessment Packet

Purpose Through the CA Agreement ADOT and the CA Agency will adhere to the responsibilities and requirements set forth by Federal Highway Administration (FHWA) when implementing the Federal Aid Highway Program (FAHP) in Arizona

Objective Define requirements of delegated authority from ADOT to the CA Agency for delivery of the FAHP under ADOTrsquos CA Program

Goal Provide ADOTrsquos expectations for the CA Agency project development program in delivering the FAHP including the necessary project delivery processes and procedures

Schedule Submittals Submit to ADOT LPA Section by Procurement (Materials andor Install) December 7 2018 Procurement (Consultant) December 31 2018 Roadway (Pavement Design Design Guidelines and Design Exceptions) January 31 2019 Materials (Quality Assurance) January 31 2019 Right-of-Way January 31 2019 Disadvantaged Business Enterprises (DBE) February 28 2019 Project Delivery Manual March 29 2019 Staffing March 29 2019 Bid Analysis and Award March 29 2019 Subcontractor Approval April 30 2019 Performance Measures (Finance and Reporting) April 30 2019

Instructions The Certification Acceptance Assessment Packet provides guidance for the Agency to evaluate andor develop procedures in the administrative areas identified in the CA Agreement for compliance in delivering the FAHP The packet contains a list of essential documents and assessment questions related to each administrative area requiring ADOT review and approval It is not mandatory for the Agency to have a single procedural document or manual for delivering the FAHP however it is highly recommended For each section of the packet

bull Note the due date for the submittal of the checklist and corresponding document(s) listed Documents provided after the final ADOT submittal date for that submittal may jeopardize the Agencyrsquos CA status

bull Locate the Agency document(s) or manual(s) where procedures are housed for delivering FAHP projects bull Compare and evaluate the current Agency procedures contained within the Agencyrsquos document(s) or manual(s)

with the questions on the checklist bull Update the current Agency procedures where necessary bull Answer ldquoyesrdquo or ldquonordquo for each question Provide a brief explanation for each ldquonordquo answer bull Identify the document page and paragraph for each question bull Fill in the ldquoPrepared byrdquo box identifying who in the Agency verified the Agencyrsquos procedures and answered each

question to complete the checklist bull Submit the checklist and corresponding document(s) to the ADOT LPA Section

Email all questions regarding the packet to Jennifer VanVenRoy at JVanvenroyazdotgov

4

LPA Commonly Used Acronyms AASHTO American Association of State Highway Transportation Officials ADA Americans with Disabilities Act AE ArchitecturalEngineering ADOT Arizona Department of Transportation BECO Business Engagement Compliance Office CA Certification Acceptance CFR Code of Federal Regulations CUF Commercially Useful Function DBE Disadvantaged Business Enterprise ECS Engineering Consultants Section EEO Equal Employment Opportunity EPRISE DBE Special Provisions FAHP Federal-aid Highway Program FHWA Federal Highway Administration GFE Good Faith Effort IGA Intergovernmental Agreement LPA Local Public Agency MAG Maricopa Association of Governments NCHRP National Cooperative Highway Research Program NEPA National Environmental Policy Act of 1969 NHS National Highway System NOT Notice of Termination OJT On-the-Job Training QA Quality Assurance PAG Pima Association of Governments PSampE Plans Specifications and Estimates QBS Qualifications Based Selection RDG Roadway Design Group RFQ Request for Qualifications ROW Right-of-Way SWPPP Stormwater Pollution Prevention Plan

5

Procurement of Materials andor Install

Agency Documents Approved By ADOT Procurement Group bull Completed ADOT Procurement Code Checklist (Appendix C) bull Procurement Code bull Other Procurement Procedures or Contract Documents as needed

Submit to ADOT LPA Section before December 7 2018

Assessment Questions Question YN Document Page Paragraph Do the Procurement Procedures or Contract Documents require the following for federal-aid contracts

Written competitive bidding thresholds for informal bids and purchases between $10000 and $100000 are to be awarded to a small business if possible

Bid Lists compiled and maintained through ProcureAZ or similar eProcurement method

Verification of employment records of contractors and subcontractors using e-verify

Compliance with the Significant Procurement Role requirements

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

6

Procurement of a Consultant

Agency Documents Approved By ADOT ECS Section bull Completed Certification Acceptance Contract Administration Procedures Review Checklist (Appendix A) bull Procurement Procedures ndash written process for advertising evaluating selecting and negotiating contracts bull Contract Procedures ndash written process for contract administration and management bull Sample AE RFQ Package ndash copies of what the Agency advertises as part of its solicitation bull Sample Contract Boilerplate Documents ndash copies of contract document used for FAHP projects

Submit to ADOT LPA Section before December 31 2018

Assessment Questions Question YN Document Page Paragraph Is the Agency submitting Design Consultant Contracting (Procurement) Procedures If yes

Do the Agencyrsquos Design Consultant Contracting (Procurement) procedures meet the federal and state laws regulations and all other applicable requirements for qualification-based selection (QBS) process

Does the Agency use an ADOT approved prequalification process

If no does the Agency use ADOTrsquos prequalification list

Do the Agencyrsquos Procedures Require notification to the ADOT PM of kickoff and progress meetings

Inform the ADOT PM of error and omission actions taken

Require contacting the ADOT PM for approval and FHWA concurrence before terminating a federal-aid contract

Include a tracking and reporting process for on-call assignments if applicable

On-Call Design Procurement Procedures Is the Agency submitting Design Consultant On-Call Procurement Procedures If yes

Does the Agencyrsquos Procedures include On-Call procurement procedures

Do the CA Agencyrsquos procedures identify and define one of the two task or work orders assignment processes

Mini QBS procedures Regional selection

Do the CA Agencyrsquos procedures Include a tracking and reporting process for on-call assignments

Will the Agency be requesting an approval from ADOT before advertising for procurement of On-Call services

See Appendix B for additional resources

7

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

8

Roadway Pavement Design

Agency Document Reviewed By ADOT LPA Section Pavement Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For NHS Roadways do the Agencyrsquos standards comply with 23 CFR 626

On Local Non - NHS Roadways Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local non-NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For Agency Projects within ADOT Right-of-Way do the Agencyrsquos Pavement Design Guidelines comply with the following

bull ADOT Standard Specifications for Road and Bridge Construction and Stored Specifications

bull ADOT Materials Preliminary Design Guide bull AASHTO Design Guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

9

Roadway Design Guidelines

Agency Document Reviewed By ADOT LPA Section Roadway Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets

Do the Agencyrsquos Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria

On Local non-NHS Roadways Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local non-NHS RoadsStreets

For State Agency Projects within ADOT Right-of-Way do the Agencyrsquos Roadway Design confirm and comply with the following

bull AASHTO Controlling Design Criteria bull ADOT Roadway Design Guidelines (RDG) bull All other applicable adopted and published

ADOT design standard and guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

10

Roadway Design Exceptions

Agency Document Reviewed By ADOT Roadway Engineering Group Design Exception Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local - NHS Roadways

Does the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures

Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria

Do the Agencyrsquos procedures include submitting to and obtaining approval from the FHWA for design exceptions

On Local Non - NHS Roadways Does the Agency have an adopted and published Design Exception procedure

For Agency Projects within ADOT Right-of-Way a Does the Agency have an adopted and

published Design Exception procedure that follows FHWA and ADOT Design Exception procedures

b Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

c Do the Agencyrsquos procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 4: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

3

Certification Acceptance Assessment Packet

Purpose Through the CA Agreement ADOT and the CA Agency will adhere to the responsibilities and requirements set forth by Federal Highway Administration (FHWA) when implementing the Federal Aid Highway Program (FAHP) in Arizona

Objective Define requirements of delegated authority from ADOT to the CA Agency for delivery of the FAHP under ADOTrsquos CA Program

Goal Provide ADOTrsquos expectations for the CA Agency project development program in delivering the FAHP including the necessary project delivery processes and procedures

Schedule Submittals Submit to ADOT LPA Section by Procurement (Materials andor Install) December 7 2018 Procurement (Consultant) December 31 2018 Roadway (Pavement Design Design Guidelines and Design Exceptions) January 31 2019 Materials (Quality Assurance) January 31 2019 Right-of-Way January 31 2019 Disadvantaged Business Enterprises (DBE) February 28 2019 Project Delivery Manual March 29 2019 Staffing March 29 2019 Bid Analysis and Award March 29 2019 Subcontractor Approval April 30 2019 Performance Measures (Finance and Reporting) April 30 2019

Instructions The Certification Acceptance Assessment Packet provides guidance for the Agency to evaluate andor develop procedures in the administrative areas identified in the CA Agreement for compliance in delivering the FAHP The packet contains a list of essential documents and assessment questions related to each administrative area requiring ADOT review and approval It is not mandatory for the Agency to have a single procedural document or manual for delivering the FAHP however it is highly recommended For each section of the packet

bull Note the due date for the submittal of the checklist and corresponding document(s) listed Documents provided after the final ADOT submittal date for that submittal may jeopardize the Agencyrsquos CA status

bull Locate the Agency document(s) or manual(s) where procedures are housed for delivering FAHP projects bull Compare and evaluate the current Agency procedures contained within the Agencyrsquos document(s) or manual(s)

with the questions on the checklist bull Update the current Agency procedures where necessary bull Answer ldquoyesrdquo or ldquonordquo for each question Provide a brief explanation for each ldquonordquo answer bull Identify the document page and paragraph for each question bull Fill in the ldquoPrepared byrdquo box identifying who in the Agency verified the Agencyrsquos procedures and answered each

question to complete the checklist bull Submit the checklist and corresponding document(s) to the ADOT LPA Section

Email all questions regarding the packet to Jennifer VanVenRoy at JVanvenroyazdotgov

4

LPA Commonly Used Acronyms AASHTO American Association of State Highway Transportation Officials ADA Americans with Disabilities Act AE ArchitecturalEngineering ADOT Arizona Department of Transportation BECO Business Engagement Compliance Office CA Certification Acceptance CFR Code of Federal Regulations CUF Commercially Useful Function DBE Disadvantaged Business Enterprise ECS Engineering Consultants Section EEO Equal Employment Opportunity EPRISE DBE Special Provisions FAHP Federal-aid Highway Program FHWA Federal Highway Administration GFE Good Faith Effort IGA Intergovernmental Agreement LPA Local Public Agency MAG Maricopa Association of Governments NCHRP National Cooperative Highway Research Program NEPA National Environmental Policy Act of 1969 NHS National Highway System NOT Notice of Termination OJT On-the-Job Training QA Quality Assurance PAG Pima Association of Governments PSampE Plans Specifications and Estimates QBS Qualifications Based Selection RDG Roadway Design Group RFQ Request for Qualifications ROW Right-of-Way SWPPP Stormwater Pollution Prevention Plan

5

Procurement of Materials andor Install

Agency Documents Approved By ADOT Procurement Group bull Completed ADOT Procurement Code Checklist (Appendix C) bull Procurement Code bull Other Procurement Procedures or Contract Documents as needed

Submit to ADOT LPA Section before December 7 2018

Assessment Questions Question YN Document Page Paragraph Do the Procurement Procedures or Contract Documents require the following for federal-aid contracts

Written competitive bidding thresholds for informal bids and purchases between $10000 and $100000 are to be awarded to a small business if possible

Bid Lists compiled and maintained through ProcureAZ or similar eProcurement method

Verification of employment records of contractors and subcontractors using e-verify

Compliance with the Significant Procurement Role requirements

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

6

Procurement of a Consultant

Agency Documents Approved By ADOT ECS Section bull Completed Certification Acceptance Contract Administration Procedures Review Checklist (Appendix A) bull Procurement Procedures ndash written process for advertising evaluating selecting and negotiating contracts bull Contract Procedures ndash written process for contract administration and management bull Sample AE RFQ Package ndash copies of what the Agency advertises as part of its solicitation bull Sample Contract Boilerplate Documents ndash copies of contract document used for FAHP projects

Submit to ADOT LPA Section before December 31 2018

Assessment Questions Question YN Document Page Paragraph Is the Agency submitting Design Consultant Contracting (Procurement) Procedures If yes

Do the Agencyrsquos Design Consultant Contracting (Procurement) procedures meet the federal and state laws regulations and all other applicable requirements for qualification-based selection (QBS) process

Does the Agency use an ADOT approved prequalification process

If no does the Agency use ADOTrsquos prequalification list

Do the Agencyrsquos Procedures Require notification to the ADOT PM of kickoff and progress meetings

Inform the ADOT PM of error and omission actions taken

Require contacting the ADOT PM for approval and FHWA concurrence before terminating a federal-aid contract

Include a tracking and reporting process for on-call assignments if applicable

On-Call Design Procurement Procedures Is the Agency submitting Design Consultant On-Call Procurement Procedures If yes

Does the Agencyrsquos Procedures include On-Call procurement procedures

Do the CA Agencyrsquos procedures identify and define one of the two task or work orders assignment processes

Mini QBS procedures Regional selection

Do the CA Agencyrsquos procedures Include a tracking and reporting process for on-call assignments

Will the Agency be requesting an approval from ADOT before advertising for procurement of On-Call services

See Appendix B for additional resources

7

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

8

Roadway Pavement Design

Agency Document Reviewed By ADOT LPA Section Pavement Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For NHS Roadways do the Agencyrsquos standards comply with 23 CFR 626

On Local Non - NHS Roadways Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local non-NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For Agency Projects within ADOT Right-of-Way do the Agencyrsquos Pavement Design Guidelines comply with the following

bull ADOT Standard Specifications for Road and Bridge Construction and Stored Specifications

bull ADOT Materials Preliminary Design Guide bull AASHTO Design Guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

9

Roadway Design Guidelines

Agency Document Reviewed By ADOT LPA Section Roadway Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets

Do the Agencyrsquos Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria

On Local non-NHS Roadways Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local non-NHS RoadsStreets

For State Agency Projects within ADOT Right-of-Way do the Agencyrsquos Roadway Design confirm and comply with the following

bull AASHTO Controlling Design Criteria bull ADOT Roadway Design Guidelines (RDG) bull All other applicable adopted and published

ADOT design standard and guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

10

Roadway Design Exceptions

Agency Document Reviewed By ADOT Roadway Engineering Group Design Exception Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local - NHS Roadways

Does the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures

Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria

Do the Agencyrsquos procedures include submitting to and obtaining approval from the FHWA for design exceptions

On Local Non - NHS Roadways Does the Agency have an adopted and published Design Exception procedure

For Agency Projects within ADOT Right-of-Way a Does the Agency have an adopted and

published Design Exception procedure that follows FHWA and ADOT Design Exception procedures

b Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

c Do the Agencyrsquos procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 5: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

4

LPA Commonly Used Acronyms AASHTO American Association of State Highway Transportation Officials ADA Americans with Disabilities Act AE ArchitecturalEngineering ADOT Arizona Department of Transportation BECO Business Engagement Compliance Office CA Certification Acceptance CFR Code of Federal Regulations CUF Commercially Useful Function DBE Disadvantaged Business Enterprise ECS Engineering Consultants Section EEO Equal Employment Opportunity EPRISE DBE Special Provisions FAHP Federal-aid Highway Program FHWA Federal Highway Administration GFE Good Faith Effort IGA Intergovernmental Agreement LPA Local Public Agency MAG Maricopa Association of Governments NCHRP National Cooperative Highway Research Program NEPA National Environmental Policy Act of 1969 NHS National Highway System NOT Notice of Termination OJT On-the-Job Training QA Quality Assurance PAG Pima Association of Governments PSampE Plans Specifications and Estimates QBS Qualifications Based Selection RDG Roadway Design Group RFQ Request for Qualifications ROW Right-of-Way SWPPP Stormwater Pollution Prevention Plan

5

Procurement of Materials andor Install

Agency Documents Approved By ADOT Procurement Group bull Completed ADOT Procurement Code Checklist (Appendix C) bull Procurement Code bull Other Procurement Procedures or Contract Documents as needed

Submit to ADOT LPA Section before December 7 2018

Assessment Questions Question YN Document Page Paragraph Do the Procurement Procedures or Contract Documents require the following for federal-aid contracts

Written competitive bidding thresholds for informal bids and purchases between $10000 and $100000 are to be awarded to a small business if possible

Bid Lists compiled and maintained through ProcureAZ or similar eProcurement method

Verification of employment records of contractors and subcontractors using e-verify

Compliance with the Significant Procurement Role requirements

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

6

Procurement of a Consultant

Agency Documents Approved By ADOT ECS Section bull Completed Certification Acceptance Contract Administration Procedures Review Checklist (Appendix A) bull Procurement Procedures ndash written process for advertising evaluating selecting and negotiating contracts bull Contract Procedures ndash written process for contract administration and management bull Sample AE RFQ Package ndash copies of what the Agency advertises as part of its solicitation bull Sample Contract Boilerplate Documents ndash copies of contract document used for FAHP projects

Submit to ADOT LPA Section before December 31 2018

Assessment Questions Question YN Document Page Paragraph Is the Agency submitting Design Consultant Contracting (Procurement) Procedures If yes

Do the Agencyrsquos Design Consultant Contracting (Procurement) procedures meet the federal and state laws regulations and all other applicable requirements for qualification-based selection (QBS) process

Does the Agency use an ADOT approved prequalification process

If no does the Agency use ADOTrsquos prequalification list

Do the Agencyrsquos Procedures Require notification to the ADOT PM of kickoff and progress meetings

Inform the ADOT PM of error and omission actions taken

Require contacting the ADOT PM for approval and FHWA concurrence before terminating a federal-aid contract

Include a tracking and reporting process for on-call assignments if applicable

On-Call Design Procurement Procedures Is the Agency submitting Design Consultant On-Call Procurement Procedures If yes

Does the Agencyrsquos Procedures include On-Call procurement procedures

Do the CA Agencyrsquos procedures identify and define one of the two task or work orders assignment processes

Mini QBS procedures Regional selection

Do the CA Agencyrsquos procedures Include a tracking and reporting process for on-call assignments

Will the Agency be requesting an approval from ADOT before advertising for procurement of On-Call services

See Appendix B for additional resources

7

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

8

Roadway Pavement Design

Agency Document Reviewed By ADOT LPA Section Pavement Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For NHS Roadways do the Agencyrsquos standards comply with 23 CFR 626

On Local Non - NHS Roadways Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local non-NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For Agency Projects within ADOT Right-of-Way do the Agencyrsquos Pavement Design Guidelines comply with the following

bull ADOT Standard Specifications for Road and Bridge Construction and Stored Specifications

bull ADOT Materials Preliminary Design Guide bull AASHTO Design Guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

9

Roadway Design Guidelines

Agency Document Reviewed By ADOT LPA Section Roadway Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets

Do the Agencyrsquos Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria

On Local non-NHS Roadways Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local non-NHS RoadsStreets

For State Agency Projects within ADOT Right-of-Way do the Agencyrsquos Roadway Design confirm and comply with the following

bull AASHTO Controlling Design Criteria bull ADOT Roadway Design Guidelines (RDG) bull All other applicable adopted and published

ADOT design standard and guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

10

Roadway Design Exceptions

Agency Document Reviewed By ADOT Roadway Engineering Group Design Exception Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local - NHS Roadways

Does the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures

Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria

Do the Agencyrsquos procedures include submitting to and obtaining approval from the FHWA for design exceptions

On Local Non - NHS Roadways Does the Agency have an adopted and published Design Exception procedure

For Agency Projects within ADOT Right-of-Way a Does the Agency have an adopted and

published Design Exception procedure that follows FHWA and ADOT Design Exception procedures

b Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

c Do the Agencyrsquos procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 6: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

5

Procurement of Materials andor Install

Agency Documents Approved By ADOT Procurement Group bull Completed ADOT Procurement Code Checklist (Appendix C) bull Procurement Code bull Other Procurement Procedures or Contract Documents as needed

Submit to ADOT LPA Section before December 7 2018

Assessment Questions Question YN Document Page Paragraph Do the Procurement Procedures or Contract Documents require the following for federal-aid contracts

Written competitive bidding thresholds for informal bids and purchases between $10000 and $100000 are to be awarded to a small business if possible

Bid Lists compiled and maintained through ProcureAZ or similar eProcurement method

Verification of employment records of contractors and subcontractors using e-verify

Compliance with the Significant Procurement Role requirements

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

6

Procurement of a Consultant

Agency Documents Approved By ADOT ECS Section bull Completed Certification Acceptance Contract Administration Procedures Review Checklist (Appendix A) bull Procurement Procedures ndash written process for advertising evaluating selecting and negotiating contracts bull Contract Procedures ndash written process for contract administration and management bull Sample AE RFQ Package ndash copies of what the Agency advertises as part of its solicitation bull Sample Contract Boilerplate Documents ndash copies of contract document used for FAHP projects

Submit to ADOT LPA Section before December 31 2018

Assessment Questions Question YN Document Page Paragraph Is the Agency submitting Design Consultant Contracting (Procurement) Procedures If yes

Do the Agencyrsquos Design Consultant Contracting (Procurement) procedures meet the federal and state laws regulations and all other applicable requirements for qualification-based selection (QBS) process

Does the Agency use an ADOT approved prequalification process

If no does the Agency use ADOTrsquos prequalification list

Do the Agencyrsquos Procedures Require notification to the ADOT PM of kickoff and progress meetings

Inform the ADOT PM of error and omission actions taken

Require contacting the ADOT PM for approval and FHWA concurrence before terminating a federal-aid contract

Include a tracking and reporting process for on-call assignments if applicable

On-Call Design Procurement Procedures Is the Agency submitting Design Consultant On-Call Procurement Procedures If yes

Does the Agencyrsquos Procedures include On-Call procurement procedures

Do the CA Agencyrsquos procedures identify and define one of the two task or work orders assignment processes

Mini QBS procedures Regional selection

Do the CA Agencyrsquos procedures Include a tracking and reporting process for on-call assignments

Will the Agency be requesting an approval from ADOT before advertising for procurement of On-Call services

See Appendix B for additional resources

7

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

8

Roadway Pavement Design

Agency Document Reviewed By ADOT LPA Section Pavement Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For NHS Roadways do the Agencyrsquos standards comply with 23 CFR 626

On Local Non - NHS Roadways Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local non-NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For Agency Projects within ADOT Right-of-Way do the Agencyrsquos Pavement Design Guidelines comply with the following

bull ADOT Standard Specifications for Road and Bridge Construction and Stored Specifications

bull ADOT Materials Preliminary Design Guide bull AASHTO Design Guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

9

Roadway Design Guidelines

Agency Document Reviewed By ADOT LPA Section Roadway Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets

Do the Agencyrsquos Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria

On Local non-NHS Roadways Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local non-NHS RoadsStreets

For State Agency Projects within ADOT Right-of-Way do the Agencyrsquos Roadway Design confirm and comply with the following

bull AASHTO Controlling Design Criteria bull ADOT Roadway Design Guidelines (RDG) bull All other applicable adopted and published

ADOT design standard and guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

10

Roadway Design Exceptions

Agency Document Reviewed By ADOT Roadway Engineering Group Design Exception Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local - NHS Roadways

Does the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures

Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria

Do the Agencyrsquos procedures include submitting to and obtaining approval from the FHWA for design exceptions

On Local Non - NHS Roadways Does the Agency have an adopted and published Design Exception procedure

For Agency Projects within ADOT Right-of-Way a Does the Agency have an adopted and

published Design Exception procedure that follows FHWA and ADOT Design Exception procedures

b Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

c Do the Agencyrsquos procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 7: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

6

Procurement of a Consultant

Agency Documents Approved By ADOT ECS Section bull Completed Certification Acceptance Contract Administration Procedures Review Checklist (Appendix A) bull Procurement Procedures ndash written process for advertising evaluating selecting and negotiating contracts bull Contract Procedures ndash written process for contract administration and management bull Sample AE RFQ Package ndash copies of what the Agency advertises as part of its solicitation bull Sample Contract Boilerplate Documents ndash copies of contract document used for FAHP projects

Submit to ADOT LPA Section before December 31 2018

Assessment Questions Question YN Document Page Paragraph Is the Agency submitting Design Consultant Contracting (Procurement) Procedures If yes

Do the Agencyrsquos Design Consultant Contracting (Procurement) procedures meet the federal and state laws regulations and all other applicable requirements for qualification-based selection (QBS) process

Does the Agency use an ADOT approved prequalification process

If no does the Agency use ADOTrsquos prequalification list

Do the Agencyrsquos Procedures Require notification to the ADOT PM of kickoff and progress meetings

Inform the ADOT PM of error and omission actions taken

Require contacting the ADOT PM for approval and FHWA concurrence before terminating a federal-aid contract

Include a tracking and reporting process for on-call assignments if applicable

On-Call Design Procurement Procedures Is the Agency submitting Design Consultant On-Call Procurement Procedures If yes

Does the Agencyrsquos Procedures include On-Call procurement procedures

Do the CA Agencyrsquos procedures identify and define one of the two task or work orders assignment processes

Mini QBS procedures Regional selection

Do the CA Agencyrsquos procedures Include a tracking and reporting process for on-call assignments

Will the Agency be requesting an approval from ADOT before advertising for procurement of On-Call services

See Appendix B for additional resources

7

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

8

Roadway Pavement Design

Agency Document Reviewed By ADOT LPA Section Pavement Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For NHS Roadways do the Agencyrsquos standards comply with 23 CFR 626

On Local Non - NHS Roadways Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local non-NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For Agency Projects within ADOT Right-of-Way do the Agencyrsquos Pavement Design Guidelines comply with the following

bull ADOT Standard Specifications for Road and Bridge Construction and Stored Specifications

bull ADOT Materials Preliminary Design Guide bull AASHTO Design Guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

9

Roadway Design Guidelines

Agency Document Reviewed By ADOT LPA Section Roadway Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets

Do the Agencyrsquos Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria

On Local non-NHS Roadways Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local non-NHS RoadsStreets

For State Agency Projects within ADOT Right-of-Way do the Agencyrsquos Roadway Design confirm and comply with the following

bull AASHTO Controlling Design Criteria bull ADOT Roadway Design Guidelines (RDG) bull All other applicable adopted and published

ADOT design standard and guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

10

Roadway Design Exceptions

Agency Document Reviewed By ADOT Roadway Engineering Group Design Exception Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local - NHS Roadways

Does the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures

Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria

Do the Agencyrsquos procedures include submitting to and obtaining approval from the FHWA for design exceptions

On Local Non - NHS Roadways Does the Agency have an adopted and published Design Exception procedure

For Agency Projects within ADOT Right-of-Way a Does the Agency have an adopted and

published Design Exception procedure that follows FHWA and ADOT Design Exception procedures

b Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

c Do the Agencyrsquos procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 8: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

7

Agency ndash Prepared by ADOT ndash Approved by Signature Signature Printed Name Printed Name Title Title Date Date

8

Roadway Pavement Design

Agency Document Reviewed By ADOT LPA Section Pavement Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For NHS Roadways do the Agencyrsquos standards comply with 23 CFR 626

On Local Non - NHS Roadways Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local non-NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For Agency Projects within ADOT Right-of-Way do the Agencyrsquos Pavement Design Guidelines comply with the following

bull ADOT Standard Specifications for Road and Bridge Construction and Stored Specifications

bull ADOT Materials Preliminary Design Guide bull AASHTO Design Guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

9

Roadway Design Guidelines

Agency Document Reviewed By ADOT LPA Section Roadway Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets

Do the Agencyrsquos Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria

On Local non-NHS Roadways Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local non-NHS RoadsStreets

For State Agency Projects within ADOT Right-of-Way do the Agencyrsquos Roadway Design confirm and comply with the following

bull AASHTO Controlling Design Criteria bull ADOT Roadway Design Guidelines (RDG) bull All other applicable adopted and published

ADOT design standard and guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

10

Roadway Design Exceptions

Agency Document Reviewed By ADOT Roadway Engineering Group Design Exception Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local - NHS Roadways

Does the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures

Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria

Do the Agencyrsquos procedures include submitting to and obtaining approval from the FHWA for design exceptions

On Local Non - NHS Roadways Does the Agency have an adopted and published Design Exception procedure

For Agency Projects within ADOT Right-of-Way a Does the Agency have an adopted and

published Design Exception procedure that follows FHWA and ADOT Design Exception procedures

b Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

c Do the Agencyrsquos procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 9: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

8

Roadway Pavement Design

Agency Document Reviewed By ADOT LPA Section Pavement Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For NHS Roadways do the Agencyrsquos standards comply with 23 CFR 626

On Local Non - NHS Roadways Does the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local non-NHS RoadsStreets

Is MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated

For Agency Projects within ADOT Right-of-Way do the Agencyrsquos Pavement Design Guidelines comply with the following

bull ADOT Standard Specifications for Road and Bridge Construction and Stored Specifications

bull ADOT Materials Preliminary Design Guide bull AASHTO Design Guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

9

Roadway Design Guidelines

Agency Document Reviewed By ADOT LPA Section Roadway Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets

Do the Agencyrsquos Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria

On Local non-NHS Roadways Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local non-NHS RoadsStreets

For State Agency Projects within ADOT Right-of-Way do the Agencyrsquos Roadway Design confirm and comply with the following

bull AASHTO Controlling Design Criteria bull ADOT Roadway Design Guidelines (RDG) bull All other applicable adopted and published

ADOT design standard and guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

10

Roadway Design Exceptions

Agency Document Reviewed By ADOT Roadway Engineering Group Design Exception Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local - NHS Roadways

Does the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures

Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria

Do the Agencyrsquos procedures include submitting to and obtaining approval from the FHWA for design exceptions

On Local Non - NHS Roadways Does the Agency have an adopted and published Design Exception procedure

For Agency Projects within ADOT Right-of-Way a Does the Agency have an adopted and

published Design Exception procedure that follows FHWA and ADOT Design Exception procedures

b Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

c Do the Agencyrsquos procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 10: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

9

Roadway Design Guidelines

Agency Document Reviewed By ADOT LPA Section Roadway Design Guidelines

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local NHS Roadways

Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets

Do the Agencyrsquos Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria

On Local non-NHS Roadways Does the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local non-NHS RoadsStreets

For State Agency Projects within ADOT Right-of-Way do the Agencyrsquos Roadway Design confirm and comply with the following

bull AASHTO Controlling Design Criteria bull ADOT Roadway Design Guidelines (RDG) bull All other applicable adopted and published

ADOT design standard and guidelines

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

10

Roadway Design Exceptions

Agency Document Reviewed By ADOT Roadway Engineering Group Design Exception Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local - NHS Roadways

Does the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures

Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria

Do the Agencyrsquos procedures include submitting to and obtaining approval from the FHWA for design exceptions

On Local Non - NHS Roadways Does the Agency have an adopted and published Design Exception procedure

For Agency Projects within ADOT Right-of-Way a Does the Agency have an adopted and

published Design Exception procedure that follows FHWA and ADOT Design Exception procedures

b Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

c Do the Agencyrsquos procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 11: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

10

Roadway Design Exceptions

Agency Document Reviewed By ADOT Roadway Engineering Group Design Exception Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph On Local - NHS Roadways

Does the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures

Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria

Do the Agencyrsquos procedures include submitting to and obtaining approval from the FHWA for design exceptions

On Local Non - NHS Roadways Does the Agency have an adopted and published Design Exception procedure

For Agency Projects within ADOT Right-of-Way a Does the Agency have an adopted and

published Design Exception procedure that follows FHWA and ADOT Design Exception procedures

b Do the Agencyrsquos procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

c Do the Agencyrsquos procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 12: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

11

Materials QA Program

Agency Document Reviewed By ADOT Construction-Materials Group Materials QA Program or a letter signed by the Designated Approval Authority stating that the Agency adopts the ADOT Materials QA Program

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own ADOT-approved Materials QA Program

If no has the Agency adopted the ADOT Materials QA Program

Does the Materials QA Program Require the inclusion of the materials memo in the construction authorization packet and project file

Require the inclusion of the ADOT-approved Materials QA Project Plan in the construction authorization packet

Apply the Buy America provision to the entire FAHP project

Require verification that the Buy America certifications accompany each material shipment including steel or iron products

Require visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site

See Appendix B for additional resources

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 13: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

12

ROW Procedures

Agency Document Approved By ADOT ROW Section ROW Procedures

Submit to ADOT LPA Section before January 31 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have its own written ROW manual If ldquoNordquo please explain If ldquoYesrdquo has the Agency ROW manual been submitted and approved for use on Federal Aid Projects

If the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810

Is the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 (b)

Does the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual

Does the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 (c)

Does the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects

Does the Agency request property donations from non-governmental owners whose Real Property Interest is required for Title 23 projects If ldquoYesrdquo does that donation meet the requirement per 23 CFR 710505(a)

Does the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities

Does the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503

Does the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710

Is the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 14: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

13

of the Agency Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations

Does the Agency include the preparation of right of way plans in their Federal Aid projects (CFR or Statute reference) If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners

Does the Agency maintain a written logdiary (contact report) of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 15: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

14

DBE Procedures Agency Documents Reviewed By ADOT BECO

DBE Procedures

Submit to ADOT LPA Section before February 28 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency follow the current ADOT FHWA DBE Plan Does the Agency follow the current DBE EPRISE (DBE contract language)

Does the Agency have a DBE Liaison Do the DBE Procedures require the agency to

Follow the most current DBE Plan DBE EPRISE (DBE contract language)

Submit the required documents to ADOT BECO for Federal-aid Highway Program (FAHP) projects to be assessed for DBE Goal and ensuring the DBE Goal is ldquovalidrdquo for advertisement

Obtain from BECO and provide to bidders and proposers all current BECO LPA Forms

Include a ldquovalidrdquo DBE goal percentage in advertisement solicitations and contract documents

Provide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program

Conduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO

Ensure receipt of Bid Verification Notice from ADOT BECO before contract award

Ensure Good Faith Effort (GFE) documentation is provided to meet requirements of EPRISE Specifications (as applicable)

Notify ADOT PM and ADOT BECO of contract award or rejection of bids

Report contract awards to BECO by the 10th of the month following contract award

Ensure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting

Monitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment amp Payment Reporting Provisions

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 16: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

15

Question YN Document Page Paragraph Monitor and enforce the Prompt Payment amp Payment Reporting Provisions for prime contractor payments to subcontractors

Monitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met

Monitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award

Conduct a Commercially Useful Function (CUF) review for each DBE on a FAHP project

Obtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met

Monitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications

Monitor LPA DBE System in preparation for the semi-annual reporting by ensuring contract payments are up date

Ensure timely closeout of contracts in the LPA DBE System

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 17: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

16

Project Delivery Manual

Agency Documents Reviewed By ADOT LPA Section bull FAHP Project Delivery Manual ndash title page table of contents publication or modification date bull Other manuals as needed ndash title page table of contents publication or modification date bull Schedule for updating the Project Delivery Manual and any other manuals listed below

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agency have a single Project Delivery Manual Does the Project Delivery Manual contain or incorporate through reference the following

Staffing Plan Communication Plan Training Plan Roadway Pavement Design Guidelines Roadway Design Guidelines Roadway Design Exception Procedures Materials QA Program ROW Procedures Procurement of a Consultant Procurement of Materials andor Install Bid Analysis and Award Procedures Subcontract Approval Procedures ADA Transition Plan Title VI Program Plan DBE Procedures Financial Management Procedures Audit and Oversight Procedures Reporting Procedures

Does the Project Delivery Manual or another manual address the following

Request for proposal qualifications andor bids will be issued within 90 days from FHWA authorization

Pre-planning Project initiation Scoping document PSampE development Environmental document Utilities clearance Railroad clearance Materials memo Pre-construction meetings SWPPP Labor compliance Inspector daily diaries Supplemental agreements Progress payments Prompt pay

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 18: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

17

Question YN Document Page Paragraph Claims Final acceptance Project closeout Record keeping EEO OJT Authorization Reimbursement

Do the FAHP Contract Approval Procedures require the contract include the following as applicable

Buy America Requirements FHWA Non-Collusion Statement FHWA Form 1273 USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Sanctions and Penalties for Breach of Contract Termination for Cause and Convenience Clean Air ActFederal Water Pollution Control Act Debarment and Suspension Byrd Anti Lobbying Amendment Language regarding compliance with and federal and state immigration laws and regulations

Title VI Assurances and Appendices A and E Does the Project Delivery Manual include a schedule for updating the manual(s)

Is the Project Delivery Manual posted on the Agencyrsquos internal website or made readily available for all staff involved in FAHP projects

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 19: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

18

Staffing Plan

Agency Documents Reviewed By ADOT LPA Section Organizational Chart

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Does the Agencyrsquos Organizational Chart accurately identify current Key Personnel

Does the Agencyrsquos Organizational Chart identify position title and contact information for each Key Personnel

Does the Agency have a well-documented process for addingdeletingmodifying Key Personnel Does the Agencyrsquos process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur

See the list of Key Personnel and Roles and Responsibility below for more information

Key Personnel Role and Responsibility Designated Approval Authority Official with the authority to formally assume responsibility for the

implementation of the project development program and delivery of FAHP projects

CA Liaison An executive decision maker with working knowledge of the CA Program and main point of contact for ADOT

Responsible Charge Note If the responsible charge is not a full-time Agency employee the Agency must designate a full-time employee in responsible charge for the project

Title VI Coordinator Designated individual directly responsible for the management and administration of the Agencyrsquos ADOT-approved Title VI Program Plan

ADA Coordinator Designated individual directly responsible for the Agencyrsquos compliance with its ADA Transition Plan

DBE Liaison Designated individual directly responsible for implementing and monitoring DBE Program activities and advising the Agency fully and properly of DBE Program Plan issues

ROW Agent Designated individual directly responsible for the Agencyrsquos compliance with federal requirements for ROW activities administration of appraisal acquisition and relocation activities and preparation of the ROW Plan and ROW Clearance Letter

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 20: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

19

Bid Analysis amp Award Procedures Agency Documents Reviewed By ADOT LPA Section

bull Bid Analysis amp Award Procedures bull Bid Analysis Documentation Template (form or checklist is acceptable)

Submit to ADOT LPA Section before March 29 2019

Assessment Questions Question YN Document Page Paragraph Do the Bid Analysis amp Award Procedures comply with 23 CFR 635114

Do your bidding procedures and related documents comply with 23 CFR 635110(c) which allows the contractor to bid on the contract prior to obtaining a license before award of a contract

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 21: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

20

Subcontract Approval Procedures

Agency Documents Reviewed By ADOT LPA Section bull Subcontractor Approval Procedures bull Subcontractor Request Form or equivalent

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Subcontractor Approval Procedures require the subcontract include the following as applicable

ADOT project number Executed date Correct name of prime or higher tier company Correct name of subcontractor Signature of prime or higher tier and subcontractor with dates and titles

Record retention language Language regarding compliance with federal and state immigration laws and regulations

EEO Clause Form FHWA-1273 Title VI Assurances and Appendices A and E USDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action (Exec Order 11246) and EEO Contract Specifications (Exec Order 11246)

Project Wage Determination DBE Contractor Compliance Agreement Assurances

Do the Subcontractor Approval Procedures require For committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount

Verification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred

Use of a Subcontractor Request Form or equivalent Verification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract (ie bid item dollar amount)

See Appendix B for additional resources

Prepared by Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 22: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

21

Financial Management Procedures

Agency Documents Reviewed By ADOT LPA Section bull Financial Management Procedures

Submit to ADOT LPA Section before April 30 2019

Assessment Questions Question YN Document Page Paragraph Do the Financial Management Procedures

Identify the financial management system used Require federal authorization before eligible costs can be incurred

Address progress payments to contractors Require adequate source documentation to support progress payments (ie contractorvendor invoices time sheets expense vouchers materials records certifications)

Identify the approval process before making payments to the contractor

Identify a process for avoiding duplicate payments Comply with the Arizona Prompt Payment Act Identify standards for determining whether costs are allowable for federal reimbursement

Describe the process for seeking federal reimbursement through ADOT

Include a quarterly reimbursement billing process Include a process for communicating project extensions (ie rebid construction delays delays in advertising for design etc) to ADOT

Agency ndash Prepared by ADOT ndash Reviewed by Signature Signature Printed Name Printed Name Title Title Date Date

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 23: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

Appendix A

ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-

consultantsLocalPublicAgencyConsultantProcurementdocuments

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 24: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

Appendix B Resources

Procurement of a Consultant ADOT ECS Certification Acceptance Agency Contract Administration Guidelines for Federal-aid Project httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Certification Acceptance Contract Administration Procedures Review Checklist httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Terms and Conditions httpswwwazdotgovbusinessengineering-consultantsLocalPublicAgencyConsultantProcurementdocuments ADOT ECS Forms and Templates httpswwwazdotgovbusinessengineering-consultantsFormsandTemplates Procurement of Materials andor Install ADOA-SPO Form 120 ndash Procurement Disclosure Statement httpsspoazgovspo-forms Pavement Design Policy ADOT Materials Section Preliminary Engineering and Design Manual httpazdotgovbusinessengineering-and-constructionMaterialsGroupmaterials-manuals

Design Exceptions Procedures ADOT Roadway Engineering Group Design Exception and Design Variance Process Guide httpsazdotgovbusinessengineering-and-constructionroadway-engineeringroadway-designstandards-and-guidelines FHWA Guidance on NHS Design Standards and Design Exceptions httpwwwfhwadotgovdesignstandardsqacfm Materials QA Program ADOT Materials Quality Assurance Program httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADOT Local Public Agency Certification Acceptance Quality Assurance Requirements httpswwwazdotgovbusinessengineering-and-constructionconstruction-and-materialsquality-assurance ADA Transition Plan Civil Rights Americans with Disabilities Act Transition Plans httpswwwfhwadotgovfederal-aidessentialscompanionresources32transitionplanspdf Questions and Answers about ADASection 504 httpswwwfhwadotgovcivilrightsprogramsada_sect504qacfm NCHRP ADA Transition Plans A Guide to Best Management Practices httpwwwfhwadotgovindivdocsada_transition_plans_reportpdf

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4
Page 25: Certification Acceptance Assessment Packet...• Sample A/E RFQ Package – copies of what the Agency advertises as part of its solicitation • Sample Contract Boilerplate Documents

State Transportation Agency (STA) Responsibilities httpswwwfhwadotgovresourcecenterteamscivilrights Subcontractor Approval Procedures System for Award Management httpswwwsamgovportalSAM11

  • Certification Acceptance Assessment Packet
    • Purpose
    • Objective
    • Goal
    • Schedule
    • Instructions
      • LPA Commonly Used Acronyms
      • Procurement of Materials andor Install
        • Agency Documents Approved By ADOT Procurement Group
        • Submit to ADOT LPA Section before December 7 2018
        • Assessment Questions
          • Procurement of a Consultant
            • Agency Documents Approved By ADOT ECS Section
            • Submit to ADOT LPA Section before December 31 2018
            • Assessment Questions
              • Roadway Pavement Design
                • Agency Document Reviewed By ADOT LPA Section
                • Submit to ADOT LPA Section before January 31 2019
                • Assessment Questions
                  • Roadway Design Guidelines
                    • Agency Document Reviewed By ADOT LPA Section
                    • Submit to ADOT LPA Section before January 31 2019
                    • Assessment Questions
                      • Roadway Design Exceptions
                        • Agency Document Reviewed By ADOT Roadway Engineering Group
                        • Submit to ADOT LPA Section before January 31 2019
                        • Assessment Questions
                          • Materials QA Program
                            • Agency Document Reviewed By ADOT Construction-Materials Group
                            • Submit to ADOT LPA Section before January 31 2019
                            • Assessment Questions
                              • ROW Procedures
                                • Agency Document Approved By ADOT ROW Section
                                • Submit to ADOT LPA Section before January 31 2019
                                • Assessment Questions
                                  • DBE Procedures
                                    • Agency Documents Reviewed By ADOT BECO
                                    • Submit to ADOT LPA Section before February 28 2019
                                    • Assessment Questions
                                      • Project Delivery Manual
                                        • Agency Documents Reviewed By ADOT LPA Section
                                        • Submit to ADOT LPA Section before March 29 2019
                                        • Assessment Questions
                                          • Staffing Plan
                                            • Agency Documents Reviewed By ADOT LPA Section
                                            • Submit to ADOT LPA Section before March 29 2019
                                            • Assessment Questions
                                              • Bid Analysis amp Award Procedures
                                                • Agency Documents Reviewed By ADOT LPA Section
                                                • Submit to ADOT LPA Section before March 29 2019
                                                • Assessment Questions
                                                  • Subcontract Approval Procedures
                                                    • Agency Documents Reviewed By ADOT LPA Section
                                                    • Submit to ADOT LPA Section before April 30 2019
                                                    • Assessment Questions
                                                      • Financial Management Procedures
                                                        • Agency Documents Reviewed By ADOT LPA Section
                                                        • Submit to ADOT LPA Section before April 30 2019
                                                        • Assessment Questions
                                                              1. YNWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              2. Document Page ParagraphWritten competitive bidding thresholds for informal bids and purchases between 10000 and 100000 are to be awarded to a small business if possible
                                                              3. YNBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              4. Document Page ParagraphBid Lists compiled and maintained through ProcureAZ or similar eProcurement method
                                                              5. YNVerification of employment records of contractors and subcontractors using everify
                                                              6. Document Page ParagraphVerification of employment records of contractors and subcontractors using everify
                                                              7. YNCompliance with the Significant Procurement Role requirements
                                                              8. Document Page ParagraphCompliance with the Significant Procurement Role requirements
                                                              9. Signature
                                                              10. Signature_2
                                                              11. Printed Name
                                                              12. Printed Name_2
                                                              13. Title
                                                              14. Title_2
                                                              15. Date
                                                              16. Date_2
                                                              17. YNIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              18. Document Page ParagraphIs the Agency submitting Design Consultant Contracting Procurement Procedures If yes
                                                              19. YNDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              20. Document Page ParagraphDo the Agencys Design Consultant Contracting Procurement procedures meet the federal and state laws regulations and all other applicable requirements for qualificationbased selection QBS process
                                                              21. YNDoes the Agency use an ADOT approved prequalification process
                                                              22. Document Page ParagraphDoes the Agency use an ADOT approved prequalification process
                                                              23. YNIf no does the Agency use ADOTs prequalification list
                                                              24. Document Page ParagraphIf no does the Agency use ADOTs prequalification list
                                                              25. YNRequire notification to the ADOT PM of kickoff and progress meetings
                                                              26. Document Page ParagraphRequire notification to the ADOT PM of kickoff and progress meetings
                                                              27. YNInform the ADOT PM of error and omission actions taken
                                                              28. Document Page ParagraphInform the ADOT PM of error and omission actions taken
                                                              29. YNRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              30. Document Page ParagraphRequire contacting the ADOT PM for approval and FHWA concurrence before terminating a federalaid contract
                                                              31. YNInclude a tracking and reporting process for oncall assignments if applicable
                                                              32. Document Page ParagraphInclude a tracking and reporting process for oncall assignments if applicable
                                                              33. YNIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              34. Document Page ParagraphIs the Agency submitting Design Consultant OnCall Procurement Procedures If yes
                                                              35. YNDoes the Agencys Procedures include OnCall procurement procedures
                                                              36. Document Page ParagraphDoes the Agencys Procedures include OnCall procurement procedures
                                                              37. YNDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              38. Document Page ParagraphDo the CA Agencys procedures identify and define one of the two task or work orders assignment processes
                                                              39. YNMini QBS procedures
                                                              40. Document Page ParagraphMini QBS procedures
                                                              41. YNRegional selection
                                                              42. Document Page ParagraphRegional selection
                                                              43. YNDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              44. Document Page ParagraphDo the CA Agencys procedures Include a tracking and reporting process for oncall assignments
                                                              45. YNWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              46. Document Page ParagraphWill the Agency be requesting an approval from ADOT before advertising for procurement of OnCall services
                                                              47. Signature_3
                                                              48. Signature_4
                                                              49. Printed Name_3
                                                              50. Printed Name_4
                                                              51. Title_3
                                                              52. Title_4
                                                              53. Date_3
                                                              54. Date_4
                                                              55. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              56. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local NHS RoadsStreets
                                                              57. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              58. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated
                                                              59. YNFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              60. Document Page ParagraphFor NHS Roadways do the Agencys standards comply with 23 CFR 626
                                                              61. YNDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              62. Document Page ParagraphDoes the Agency have its own adopted and published Pavement Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              63. YNIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              64. Document Page ParagraphIs MAG Uniform Standard Specifications and Details or PAG Standard Specifications for Public Improvements incorporated_2
                                                              65. YNADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              66. Document Page ParagraphADOT Standard Specifications for Road and Bridge Construction and Stored Specifications
                                                              67. YNADOT Materials Preliminary Design Guide
                                                              68. Document Page ParagraphADOT Materials Preliminary Design Guide
                                                              69. YNAASHTO Design Guidelines
                                                              70. Document Page ParagraphAASHTO Design Guidelines
                                                              71. Signature_5
                                                              72. Signature_6
                                                              73. Printed Name_5
                                                              74. Printed Name_6
                                                              75. Title_5
                                                              76. Title_6
                                                              77. Date_5
                                                              78. Date_6
                                                              79. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              80. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local NHS RoadsStreets
                                                              81. YNDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              82. Document Page ParagraphDo the Agencys Roadway Design Standards incorporate and conform to the AASHTO Controlling Design Criteria
                                                              83. YNDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              84. Document Page ParagraphDoes the Agency have its own adopted and published Roadway Design Standards for the design and construction of Local nonNHS RoadsStreets
                                                              85. YNAASHTO Controlling Design Criteria
                                                              86. Document Page ParagraphAASHTO Controlling Design Criteria
                                                              87. YNADOT Roadway Design Guidelines RDG
                                                              88. Document Page ParagraphADOT Roadway Design Guidelines RDG
                                                              89. YNAll other applicable adopted and published ADOT design standard and guidelines
                                                              90. Document Page ParagraphAll other applicable adopted and published ADOT design standard and guidelines
                                                              91. Signature_7
                                                              92. Signature_8
                                                              93. Printed Name_7
                                                              94. Printed Name_8
                                                              95. Title_7
                                                              96. Title_8
                                                              97. Date_7
                                                              98. Date_8
                                                              99. YNDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              100. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure that follows FHWA Design Exception procedures
                                                              101. YNDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              102. Document Page ParagraphDo the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria
                                                              103. YNDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              104. Document Page ParagraphDo the Agencys procedures include submitting to and obtaining approval from the FHWA for design exceptions
                                                              105. YNDoes the Agency have an adopted and published Design Exception procedure
                                                              106. Document Page ParagraphDoes the Agency have an adopted and published Design Exception procedure
                                                              107. YNa Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              108. Document Page Paragrapha Does the Agency have an adopted and published Design Exception procedure that follows FHWA and ADOT Design Exception procedures
                                                              109. YNb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              110. Document Page Paragraphb Do the Agencys procedures address documentation and requirements for addressing exceptions to the AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines
                                                              111. YNc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              112. Document Page Paragraphc Do the Agencys procedures include submitting to and obtaining approval from ADOT and the FHWA for design exceptions
                                                              113. Signature_9
                                                              114. Signature_10
                                                              115. Printed Name_9
                                                              116. Printed Name_10
                                                              117. Title_9
                                                              118. Title_10
                                                              119. Date_9
                                                              120. Date_10
                                                              121. YNDoes the Agency have its own ADOTapproved Materials QA Program
                                                              122. Document Page ParagraphDoes the Agency have its own ADOTapproved Materials QA Program
                                                              123. YNIf no has the Agency adopted the ADOT Materials QA Program
                                                              124. Document Page ParagraphIf no has the Agency adopted the ADOT Materials QA Program
                                                              125. YNRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              126. Document Page ParagraphRequire the inclusion of the materials memo in the construction authorization packet and project file
                                                              127. YNRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              128. Document Page ParagraphRequire the inclusion of the ADOTapproved Materials QA Project Plan in the construction authorization packet
                                                              129. YNApply the Buy America provision to the entire FAHP project
                                                              130. Document Page ParagraphApply the Buy America provision to the entire FAHP project
                                                              131. YNRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              132. Document Page ParagraphRequire verification that the Buy America certifications accompany each material shipment including steel or iron products
                                                              133. YNRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              134. Document Page ParagraphRequire visual inspection and documentation in the daily diaries of the Buy America certifications when materials are delivered to the project site
                                                              135. Signature_11
                                                              136. Signature_12
                                                              137. Printed Name_11
                                                              138. Printed Name_12
                                                              139. Title_11
                                                              140. Title_12
                                                              141. Date_11
                                                              142. Date_12
                                                              143. YNDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              144. Document Page ParagraphDoes the Agency have its own written ROW manual If No please explain If Yes has the Agency ROW manual been submitted and approved for use on Federal Aid Projects
                                                              145. YNIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              146. Document Page ParagraphIf the Agency uses its own ROW manual has it been updated to reflect changes created by updates to Title 23 Parts 635 710 and 810
                                                              147. YNIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              148. Document Page ParagraphIs the Agency adequately staffed equipped and organized to discharge all its real property related responsibilities as per 23 CFR Part 710201 b
                                                              149. YNDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              150. Document Page ParagraphDoes the Agency have a property management section that maintains records of Real Property Interest acquired and disposed of in accordance with Title 23 funds and is the management process spelled out in ROW manual
                                                              151. YNDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              152. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group a request for concurrence of Right of Way clearance prior to advertising a project for construction noting that one of four conditions have been met per 23 CFR Part 635309 c
                                                              153. YNDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              154. Document Page ParagraphDoes the Agency submit to the ADOT ROW Group all conditional Right of Way clearances for approval and concurrence by FHWA prior to advertisement of all federal aid projects
                                                              155. YNDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              156. Document Page ParagraphDoes the Agency request property donations from non governmental owners whose Real Property Interest is required for Title 23 projects If Yes does that donation meet the requirement per 23 CFR 710505a
                                                              157. YNDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              158. Document Page ParagraphDoes the Agency submit all administrative settlements to the ADOT ROW Group for concurrence before finalizing them with a property owner as part of the program oversight responsibilities
                                                              159. YNDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              160. Document Page ParagraphDoes the Agency avoid contact with an affected property owner for purposes of negotiation and relocation assistance until after NEPA approval except as provided for in 23 CFR 710501 and 710503
                                                              161. YNDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              162. Document Page ParagraphDoes the Agency perform acquisition and related relocation assistance activities in accordance with 49 CFR Part 24 and 23 CFR 710
                                                              163. YNIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              164. Document Page ParagraphIs the amount the Agency believes to be just compensation for a Real Property Interest approved by a responsible official
                                                              165. of the Agency
                                                              166. Does the Agency provide a person affected by a project with a written description of the Real Property Interest acquisition process under state and federal law which clearly informs the owners of their rights and obligations
                                                              167. Does the Agency include the preparation of right of way plans in their Federal Aid projects CFR or Statute reference If no how does the Agency depict real property acquisitions for their project personnel appraisers and project impact communication with the property owners
                                                              168. Does the Agency maintain a written logdiary contact report of each and every contact with the property owner including the agency acquisition person who contacted them date of contact person contacted matters discussed and any and all outcomes in sufficient detail that if another agentnegotiator had to take over a new agent could continue as if they had worked on the parcel assignment all along and that it would reveal the acquisitionrelocation was accomplished in accordance with the federal guidelines
                                                              169. Signature_13
                                                              170. Signature_14
                                                              171. Printed Name_13
                                                              172. Printed Name_14
                                                              173. Title_13
                                                              174. Title_14
                                                              175. Date_13
                                                              176. Date_14
                                                              177. YNDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              178. Document Page ParagraphDoes the Agency follow the current ADOT FHWA DBE Plan
                                                              179. YNDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              180. Document Page ParagraphDoes the Agency follow the current DBE EPRISE DBE contract language
                                                              181. YNDoes the Agency have a DBE Liaison
                                                              182. Document Page ParagraphDoes the Agency have a DBE Liaison
                                                              183. YNFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              184. Document Page ParagraphFollow the most current DBE Plan DBE EPRISE DBE contract language
                                                              185. YNSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              186. Document Page ParagraphSubmit the required documents to ADOT BECO for Federalaid Highway Program FAHP projects to be assessed for DBE Goal and ensuring the DBE Goal is valid for advertisement
                                                              187. YNObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              188. Document Page ParagraphObtain from BECO and provide to bidders and proposers all current BECO LPA Forms
                                                              189. YNInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              190. Document Page ParagraphInclude a valid DBE goal percentage in advertisement solicitations and contract documents
                                                              191. YNProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              192. Document Page ParagraphProvide written notice to BECO and the ADOT PM immediately before termination of a FAHP contract related to the DBE Program
                                                              193. YNConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              194. Document Page ParagraphConduct a bid analysis process to justify the approval or rejection of submitted DBE Assurance Form and DBE Affidavits forms and request concurrence from ADOT BECO
                                                              195. YNEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              196. Document Page ParagraphEnsure receipt of Bid Verification Notice from ADOT BECO before contract award
                                                              197. YNEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              198. Document Page ParagraphEnsure Good Faith Effort GFE documentation is provided to meet requirements of EPRISE Specifications as applicable
                                                              199. YNNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              200. Document Page ParagraphNotify ADOT PM and ADOT BECO of contract award or rejection of bids
                                                              201. YNReport contract awards to BECO by the 10th of the month following contract award
                                                              202. Document Page ParagraphReport contract awards to BECO by the 10th of the month following contract award
                                                              203. YNEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              204. Document Page ParagraphEnsure committed DBEs subcontracts are provided to agency by prime at preconstruction meeting
                                                              205. YNMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              206. Document Page ParagraphMonitor contract contractor and subcontractor information and report prime payments in the LPA DBE System in accordance with Prompt Payment Payment Reporting Provisions
                                                              207. YNMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              208. Document Page ParagraphMonitor and enforce the Prompt Payment Payment Reporting Provisions for prime contractor payments to subcontractors
                                                              209. YNMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              210. Document Page ParagraphMonitor DBE participation to ensure the Termination Substitution Reduction EPRISE specifications are met
                                                              211. YNMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              212. Document Page ParagraphMonitor DBE utilization on projects notifying ADOT BECO when aware of a potential issue that may affect DBE commitments made at award
                                                              213. YNConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              214. Document Page ParagraphConduct a Commercially Useful Function CUF review for each DBE on a FAHP project
                                                              215. YNObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              216. Document Page ParagraphObtain Certification of Final DBE Payment forms from prime contractor and determine if established DBE goal has been met
                                                              217. YNMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              218. Document Page ParagraphMonitor FAHP contracts for compliance and consider imposing sanctions when a contractor fails to be in compliance with EPRISE specifications
                                                              219. YNMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              220. Document Page ParagraphMonitor LPA DBE System in preparation for the semi annual reporting by ensuring contract payments are up date
                                                              221. YNEnsure timely closeout of contracts in the LPA DBE System
                                                              222. Document Page ParagraphEnsure timely closeout of contracts in the LPA DBE System
                                                              223. Signature_15
                                                              224. Signature_16
                                                              225. Printed Name_15
                                                              226. Printed Name_16
                                                              227. Title_15
                                                              228. Title_16
                                                              229. Date_15
                                                              230. Date_16
                                                              231. YNDoes the Agency have a single Project Delivery Manual
                                                              232. Document Page ParagraphDoes the Agency have a single Project Delivery Manual
                                                              233. YNStaffing Plan
                                                              234. Document Page ParagraphStaffing Plan
                                                              235. YNCommunication Plan
                                                              236. Document Page ParagraphCommunication Plan
                                                              237. YNTraining Plan
                                                              238. Document Page ParagraphTraining Plan
                                                              239. YNRoadway Pavement Design Guidelines
                                                              240. Document Page ParagraphRoadway Pavement Design Guidelines
                                                              241. YNRoadway Design Guidelines
                                                              242. Document Page ParagraphRoadway Design Guidelines
                                                              243. YNRoadway Design Exception Procedures
                                                              244. Document Page ParagraphRoadway Design Exception Procedures
                                                              245. YNMaterials QA Program
                                                              246. Document Page ParagraphMaterials QA Program
                                                              247. YNROW Procedures
                                                              248. Document Page ParagraphROW Procedures
                                                              249. YNProcurement of a Consultant
                                                              250. Document Page ParagraphProcurement of a Consultant
                                                              251. YNProcurement of Materials andor Install
                                                              252. Document Page ParagraphProcurement of Materials andor Install
                                                              253. YNBid Analysis and Award Procedures
                                                              254. Document Page ParagraphBid Analysis and Award Procedures
                                                              255. YNSubcontract Approval Procedures
                                                              256. Document Page ParagraphSubcontract Approval Procedures
                                                              257. YNADA Transition Plan
                                                              258. Document Page ParagraphADA Transition Plan
                                                              259. YNTitle VI Program Plan
                                                              260. Document Page ParagraphTitle VI Program Plan
                                                              261. YNDBE Procedures
                                                              262. Document Page ParagraphDBE Procedures
                                                              263. YNFinancial Management Procedures
                                                              264. Document Page ParagraphFinancial Management Procedures
                                                              265. YNAudit and Oversight Procedures
                                                              266. Document Page ParagraphAudit and Oversight Procedures
                                                              267. YNReporting Procedures
                                                              268. Document Page ParagraphReporting Procedures
                                                              269. YNRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              270. Document Page ParagraphRequest for proposal qualifications andor bids will be issued within 90 days from FHWA authorization
                                                              271. YNPreplanning
                                                              272. Document Page ParagraphPreplanning
                                                              273. YNProject initiation
                                                              274. Document Page ParagraphProject initiation
                                                              275. YNScoping document
                                                              276. Document Page ParagraphScoping document
                                                              277. YNPSE development
                                                              278. Document Page ParagraphPSE development
                                                              279. YNEnvironmental document
                                                              280. Document Page ParagraphEnvironmental document
                                                              281. YNUtilities clearance
                                                              282. Document Page ParagraphUtilities clearance
                                                              283. YNRailroad clearance
                                                              284. Document Page ParagraphRailroad clearance
                                                              285. YNMaterials memo
                                                              286. Document Page ParagraphMaterials memo
                                                              287. YNPreconstruction meetings
                                                              288. Document Page ParagraphPreconstruction meetings
                                                              289. YNSWPPP
                                                              290. Document Page ParagraphSWPPP
                                                              291. YNLabor compliance
                                                              292. Document Page ParagraphLabor compliance
                                                              293. YNInspector daily diaries
                                                              294. Document Page ParagraphInspector daily diaries
                                                              295. YNSupplemental agreements
                                                              296. Document Page ParagraphSupplemental agreements
                                                              297. YNProgress payments
                                                              298. Document Page ParagraphProgress payments
                                                              299. YNPrompt pay
                                                              300. Document Page ParagraphPrompt pay
                                                              301. YNClaims
                                                              302. Document Page ParagraphClaims
                                                              303. YNFinal acceptance
                                                              304. Document Page ParagraphFinal acceptance
                                                              305. YNProject closeout
                                                              306. Document Page ParagraphProject closeout
                                                              307. YNRecord keeping
                                                              308. Document Page ParagraphRecord keeping
                                                              309. YNEEO
                                                              310. Document Page ParagraphEEO
                                                              311. YNOJT
                                                              312. Document Page ParagraphOJT
                                                              313. YNAuthorization
                                                              314. Document Page ParagraphAuthorization
                                                              315. YNReimbursement
                                                              316. Document Page ParagraphReimbursement
                                                              317. YNBuy America Requirements
                                                              318. Document Page ParagraphBuy America Requirements
                                                              319. YNFHWA NonCollusion Statement
                                                              320. Document Page ParagraphFHWA NonCollusion Statement
                                                              321. YNFHWA Form 1273
                                                              322. Document Page ParagraphFHWA Form 1273
                                                              323. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              324. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246
                                                              325. YNSanctions and Penalties for Breach of Contract
                                                              326. Document Page ParagraphSanctions and Penalties for Breach of Contract
                                                              327. YNTermination for Cause and Convenience
                                                              328. Document Page ParagraphTermination for Cause and Convenience
                                                              329. YNClean Air ActFederal Water Pollution Control Act
                                                              330. Document Page ParagraphClean Air ActFederal Water Pollution Control Act
                                                              331. YNDebarment and Suspension
                                                              332. Document Page ParagraphDebarment and Suspension
                                                              333. YNByrd Anti Lobbying Amendment
                                                              334. Document Page ParagraphByrd Anti Lobbying Amendment
                                                              335. YNLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              336. Document Page ParagraphLanguage regarding compliance with and federal and state immigration laws and regulations
                                                              337. YNTitle VI Assurances and Appendices A and E
                                                              338. Document Page ParagraphTitle VI Assurances and Appendices A and E
                                                              339. YNDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              340. Document Page ParagraphDoes the Project Delivery Manual include a schedule for updating the manuals
                                                              341. YNIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              342. Document Page ParagraphIs the Project Delivery Manual posted on the Agencys internal website or made readily available for all staff involved in FAHP projects
                                                              343. Signature_17
                                                              344. Signature_18
                                                              345. Printed Name_17
                                                              346. Printed Name_18
                                                              347. Title_17
                                                              348. Title_18
                                                              349. Date_17
                                                              350. Date_18
                                                              351. YNDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              352. Document Page ParagraphDoes the Agencys Organizational Chart accurately identify current Key Personnel
                                                              353. YNDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              354. Document Page ParagraphDoes the Agencys Organizational Chart identify position title and contact information for each Key Personnel
                                                              355. YNDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              356. Document Page ParagraphDoes the Agency have a welldocumented process for addingdeletingmodifying Key Personnel Does the Agencys process include providing an advance written notice to the ADOT LPA Section when Key Personnel changes occur
                                                              357. Signature_19
                                                              358. Signature_20
                                                              359. Printed Name_19
                                                              360. Printed Name_20
                                                              361. Title_19
                                                              362. Title_20
                                                              363. Date_19
                                                              364. Date_20
                                                              365. YNDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              366. Document Page ParagraphDo the Bid Analysis Award Procedures comply with 23 CFR 635114
                                                              367. YNDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              368. Document Page ParagraphDo your bidding procedures and related documents comply with 23 CFR 635110c which allows the contractor to bid on the contract prior to obtaining a license before award of a contract
                                                              369. Signature_21
                                                              370. Signature_22
                                                              371. Printed Name_21
                                                              372. Printed Name_22
                                                              373. Title_21
                                                              374. Title_22
                                                              375. Date_21
                                                              376. Date_22
                                                              377. YNADOT project number
                                                              378. Document Page ParagraphADOT project number
                                                              379. YNExecuted date
                                                              380. Document Page ParagraphExecuted date
                                                              381. YNCorrect name of prime or higher tier company
                                                              382. Document Page ParagraphCorrect name of prime or higher tier company
                                                              383. YNCorrect name of subcontractor
                                                              384. Document Page ParagraphCorrect name of subcontractor
                                                              385. YNSignature of prime or higher tier and subcontractor with dates and titles
                                                              386. Document Page ParagraphSignature of prime or higher tier and subcontractor with dates and titles
                                                              387. YNRecord retention language
                                                              388. Document Page ParagraphRecord retention language
                                                              389. YNLanguage regarding compliance with federal and state immigration laws and regulations
                                                              390. Document Page ParagraphLanguage regarding compliance with federal and state immigration laws and regulations
                                                              391. YNEEO Clause
                                                              392. Document Page ParagraphEEO Clause
                                                              393. YNForm FHWA1273
                                                              394. Document Page ParagraphForm FHWA1273
                                                              395. YNTitle VI Assurances and Appendices A and E_2
                                                              396. Document Page ParagraphTitle VI Assurances and Appendices A and E_2
                                                              397. YNUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              398. Document Page ParagraphUSDOL OFCCP EEO Clause Notice of Requirement for Affirmative Action Exec Order 11246 and EEO Contract Specifications Exec Order 11246_2
                                                              399. YNProject Wage Determination
                                                              400. Document Page ParagraphProject Wage Determination
                                                              401. YNDBE Contractor Compliance Agreement Assurances
                                                              402. Document Page ParagraphDBE Contractor Compliance Agreement Assurances
                                                              403. YNFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              404. Document Page ParagraphFor committed DBE subcontractors verification that the subcontract amount is equal to or greater than the DBE committed amount
                                                              405. YNVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              406. Document Page ParagraphVerification that the subcontractor has an ROC license for the work to be performed if applicable and is not suspended or debarred
                                                              407. YNUse of a Subcontractor Request Form or equivalent
                                                              408. Document Page ParagraphUse of a Subcontractor Request Form or equivalent
                                                              409. YNVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              410. Document Page ParagraphVerification that information on the Subcontractor Request Form or equivalent matches the information in the subcontract ie bid item dollar amount
                                                              411. Signature_23
                                                              412. Signature_24
                                                              413. Printed Name_23
                                                              414. Printed Name_24
                                                              415. Title_23
                                                              416. Title_24
                                                              417. Date_23
                                                              418. Date_24
                                                              419. YNIdentify the financial management system used
                                                              420. Document Page ParagraphIdentify the financial management system used
                                                              421. YNRequire federal authorization before eligible costs can be incurred
                                                              422. Document Page ParagraphRequire federal authorization before eligible costs can be incurred
                                                              423. YNAddress progress payments to contractors
                                                              424. Document Page ParagraphAddress progress payments to contractors
                                                              425. YNRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              426. Document Page ParagraphRequire adequate source documentation to support progress payments ie contractorvendor invoices time sheets expense vouchers materials records certifications
                                                              427. YNIdentify the approval process before making payments to the contractor
                                                              428. Document Page ParagraphIdentify the approval process before making payments to the contractor
                                                              429. YNIdentify a process for avoiding duplicate payments
                                                              430. Document Page ParagraphIdentify a process for avoiding duplicate payments
                                                              431. YNComply with the Arizona Prompt Payment Act
                                                              432. Document Page ParagraphComply with the Arizona Prompt Payment Act
                                                              433. YNIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              434. Document Page ParagraphIdentify standards for determining whether costs are allowable for federal reimbursement
                                                              435. YNDescribe the process for seeking federal reimbursement through ADOT
                                                              436. Document Page ParagraphDescribe the process for seeking federal reimbursement through ADOT
                                                              437. YNInclude a quarterly reimbursement billing process
                                                              438. Document Page ParagraphInclude a quarterly reimbursement billing process
                                                              439. YNInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              440. Document Page ParagraphInclude a process for communicating project extensions ie rebid construction delays delays in advertising for design etc to ADOT
                                                              441. Signature_25
                                                              442. Signature_26
                                                              443. Printed Name_25
                                                              444. Printed Name_26
                                                              445. Title_25
                                                              446. Title_26
                                                              447. Date_25
                                                              448. Date_26
                                                              449. Text1
                                                              450. Text2
                                                              451. Text3
                                                              452. Text4