SAP Certif ied Application Associate -Production Planning & Manufacturing with
SAP ERP 6.0 Exam Questions
These questions are similiar to the ones asked in the actual Test.
How should I know? I know, because although I got my PP Certification five years back, I have re-certified with the latest
version of the Associate Certification test.
Before you start here are some Key features of the PP Associate Certification Exam
- The exam is Computer based and you have three Hours to answer 80 Questions.
- The Questions are (mostly) multiple choice type and there is NO penalty for an incorrect answer.
- Some of the Questions have more than one correct answers. You must get ALL the options correct for you to be
awarded points.
- The Official Pass percentage is 65% (But this can vary). You will be told the exact passing percentage before your
begin your test.
Sample Questions
1. What is the difference between a operation-related and order-related confirmation?
a) Order confirmation is a confirmation of the entire order at order header level and an Operationconfirmation allows you to confirm an order step by step.
b) Order confirmation is a confirmation of the entire order before sending to production and operation
confirmation is a step by step confirmation of production orderc) Order confirmation is partial confirmation of the order and operation confirmation is automatic final
confirmation of the orderd) Order confirmation requires a goods receipt, operation confirmation does not require a goods receipt
Ans wer: a
There are various procedures for confirmation in SAP ECC. Each procedure implements different
requirements that a company may have. Depending on the application, one or more procedures may be
used.The procedures must be used to selected to suit the methods of organization within your company and the
allowed workload.
For the most part, the two main types are operation-related and order-related confirmations. Order
confirmation is a confirmation of the entire order at order header level. An operation confirmation allows youto
confirm an order step by step. For this type of confirmation, there are various procedures available. You can
carry out a confirmation for an order only if no confirmations have already been entered for operations.
Each confirmation is entered with a status (partial confirmation, final confirmation, automatic final
confirmation).
Once an order has been confirmed, follow-on functions are performed. The confirmed quantity, the status
RUCK and actual costs are written to the production order.
When an operation is confirmed, an automatic goods issue is posted on the basis of the quantity that has
beenassigned the material components (backflush). These material components must be prepared for backflush
posting and also be provided for use at the work center.
When you confirm the last operation that must be confirmed (or for the operation where this posting is
definedin the control key), an automatic goods receipt is posted.
Capacity reduction is carried out either in proportion to the quantity or activity. If a scrap or rework quantityis
confirmed, a quantity notification can be generated automatically.
Interested in PP Video Training? Click here for a free PP Overview Video
Page 1 of 8FREE SAP PP Certification Questions
3/7/2014http://www.sap-school.com/certificationquestionsPP.html
![Page 2: Certification Questions PP](https://reader037.vdocuments.net/reader037/viewer/2022100404/577cd0431a28ab9e7891c5b0/html5/thumbnails/2.jpg)
8/12/2019 Certification Questions PP
http://slidepdf.com/reader/full/certification-questions-pp 2/8
2. What are the options for the material staging from a warehouse management system? (more than
one
option is correct)
a) Create parts are ordered manuallyb) Release order parts are ordered manually
c) Pick parts are provided for the production order in exactly the same quantity as the requirementsquantityd) Release order parts are ordered automatically
Ans wer: a, b &c
For the material staging f rom a warehouse management system, there are three options for the productionorder. These options are described here:
Pick parts are provided for the production order in exactly the same quantity as the requirements quantity
Create parts are ordered manually when a crate is almost empty. Typical examples are small parts incontainers such as screws, nails…..
Release order parts are ordered manually: The required quantity is calculated using the targe quantities ofthe
components in the selected released orders. Typical examples are laminates, paints
3. Consider a product scenario where there is high product stability, high repetition rates, and low
product
complexity. What type of manufacturing do you suggest?
a) Mass manufacturing
b) Bulk manufacturingc) Repetitive manufacturing
d) Order based manufacturing
Ans wer: c
To allow the material to be used in repetitive manufacturing, you set the Repetitive Mfg indicator in thematerial
master (in the MRP view). This means that you can use the various production versions of this material for
repetitive manufacturing (that is, you can set the indicator Repetitive Mfg allowed for version in theproduction
version.)
The BOM defines the planned material consumption for the components. When you backflush components
inrepetitive manufacturing, you can define the issue storage location from which components are to be
backflushed in the status/long text of the BOM item (Production storage location field).
Production lines are usually created as simple work centers in the ECC system. In the work center, you
definethe availability of the production line. The production line created at the work center is entered in the
Production
line field in the production version. This same work center is specified in the single operation of the routing.Production lines that have more than on work center can be represented in a line hierarchy.
In repetitive manufacturing, the routing define the production rate (quantity per time unit) used to produce
materials on production lines. The production quantities and their capacity requirements are scheduled andcalculated respectively according to the production rate.
The routing therefore forms the basis of lead time of scheduling. In repetitive manufacturing often have only
oneo eration. The total roduction rate of the line is s ecified in this o eration. It define how man materials
Page 2 of 8FREE SAP PP Certification Questions
3/7/2014http://www.sap-school.com/certificationquestionsPP.html
![Page 3: Certification Questions PP](https://reader037.vdocuments.net/reader037/viewer/2022100404/577cd0431a28ab9e7891c5b0/html5/thumbnails/3.jpg)
8/12/2019 Certification Questions PP
http://slidepdf.com/reader/full/certification-questions-pp 3/8
![Page 4: Certification Questions PP](https://reader037.vdocuments.net/reader037/viewer/2022100404/577cd0431a28ab9e7891c5b0/html5/thumbnails/4.jpg)
8/12/2019 Certification Questions PP
http://slidepdf.com/reader/full/certification-questions-pp 4/8
-usage area. The OPC standard was designed especially for the process control level.
OPC servers enable you to access different data sources (for example, process control systems, memory
programmable controls, temperature sensors) and thus provide process data which can be requested by
OPCclients.
SAP ECC with the component SAP ODA is an OPC server and client that can communicate with OPC
servers. This considerably simplifies the data exchange between applications. OPC servers and OPC
clients
are currently PC-based systems based on which Microsoft operating system runs.
6. As a production manager how do you enable process operations parallel to and independent of other
operations?
a) Parallel sequences
b) Successor relationshipsc) Control sequences
d) Linked sequences
Ans wer: a
The parallel sequence enables you to process operations parallel to and independent of other operations.
Youcan copy both parallel and alternative sequence types from the routing to the order. Parallel sequences are
linked to the standard sequence through predecessor/successor relationships. Parallel sequences are aspecial form of overlapping operations. This gives rise to network-like structures.
Order scheduling inserts operation floats according to the alignment key specifications.
In mechanical engineering for assemblies involving the production of individual components, inspection
processes, and preparatory and closing operations.
In the chemical industry for analysis processes that are carried out in parallel to the production process.
7. What is the difference between regenerative planning and net change planning?
a) Planning all materials from the planning file, you can only plan materials for which planning file
exists.b) Planning all materials bases on demand, you plan all materials bases on previous production
c) Planning all materials parallel, planning all materials from previous planning file
d) Planning all material online , planning is carried out as a background job
Ans wer: a
Regenerative planning means you plan all materials from the planning file. Net change planning means thatyou
can only plan materials for which planning file exists. This means that they have undergone a changerelevant to
MRP within a restricted planning horizon. You can only generate planning proposals within the horizon.
Planning is carried out online or as a background job.
Creation & Conversion of Planned Order in ECC
Page 4 of 8FREE SAP PP Certification Questions
3/7/2014http://www.sap-school.com/certificationquestionsPP.html
![Page 5: Certification Questions PP](https://reader037.vdocuments.net/reader037/viewer/2022100404/577cd0431a28ab9e7891c5b0/html5/thumbnails/5.jpg)
8/12/2019 Certification Questions PP
http://slidepdf.com/reader/full/certification-questions-pp 5/8
8. What is the report that collects all important information about a work center or a hierarchy of work
centers of a shift?
a) Shift reportb) Shift transfer report
c) Transfer reportd) Shirt work center report
Ans wer: a
The shift report is a document that is generated manually by the production scheduler once data capture forthe
preceding shift has been completed. The shift report is used for collecting all important information about awork center or a hierarchy of work centers of a shift. The shift report thereby facilitates shift transfer.
The shift report consists of the following parts:• Header data and company logo
• Shift notes• Confirmations (including activity confirmations and goods movements)
• Maintenance notifications
• Graphical evaluationsIn Customizing for the shift report, you define which information you want to be part of the shift report and
which
layout you want to used for the document.
You cannot change the shift report manually.
9. What is the indicator that controls whether a valuated or non-valuated goods receipt should be made
and on what are the criteria that this indicator is dependent upon? (more than one option is correct)
a) The stock type indicatorb) The GR valuation indicatorc) Material type of the product and account assignment
d) Demand and Supply
Ans wer: b & c
The Goods receipt indicator defines whether a goods receipt can be posted once production has been
completed.
The proposal for storage of goods receipt comes from material master (screen AV). The stock type indicator
defines the stock to which receipts from production are to be posted. This can be the unrestricted use,
blockedstock or stock in quality inspection. The indicator can be activated at different points: in the material master
screen (screen AV), in a production order or at the time of goods receipt.
The GR valuation indicator controls whether a valuated or non-valuated goods receipt should be made. This
indicator depends on the material type of the product and the account assignment of the production order.
The Delivery Completed indicator specifies whether an order is regarded as closed from the point of view ofgoods receipt. This means that no further goods receipt will be expected for this order.
Page 5 of 8FREE SAP PP Certification Questions
3/7/2014http://www.sap-school.com/certificationquestionsPP.html
![Page 6: Certification Questions PP](https://reader037.vdocuments.net/reader037/viewer/2022100404/577cd0431a28ab9e7891c5b0/html5/thumbnails/6.jpg)
8/12/2019 Certification Questions PP
http://slidepdf.com/reader/full/certification-questions-pp 6/8
10. Settlement in product cost controller is based on? (more than one option is correct)
a) Period-oriented
b) Costs of the product cost controllerc) Order settlement
d) No settlement rule
Ans wer: a & b
In product-related costs object controlling, all costs are debited and credited to a product cost controller.
Individual production orders do not have cost segments or settlement rules. All functions in Production andMaterials Management that are relevant to costs( material withdrawal, confirmation, goods receipt for the
production order and goods receipt from production) are executed on the basis of the production order.
All controlling functions (process cost allocation, overhead allocation, WIP and variance calculation,
settlement)are carried out at the end of the period on the basis of product costs collector. Thus, the relevant values are
determined.
The current costs for a period comprise values for:• The material quantities delivered for the period according to the valuation control of the goods receipt.• The unfinished product s (WIP) according to the status of the operations confirmed.
• Variances (such a scrap)
• Settlement is a period-oriented based on the costs of the product cost collector. In this case, there isno
order settlement for the individual production order. In this case the production order does not have a
settlement rule.• It makes senses to use product-related COC for the following:
• Make-to-stock production• Repetitive manufacturing and mass manufacturing
• Sales order controlling only in Profitability Analysis
More Questions? Have a look at:
SAP Certified App lication Associate - Production Planning & Manufacturing
with
SAP ERP 6.0 Questions, Answers & Explanations
Page 6 of 8FREE SAP PP Certification Questions
3/7/2014http://www.sap-school.com/certificationquestionsPP.html
![Page 7: Certification Questions PP](https://reader037.vdocuments.net/reader037/viewer/2022100404/577cd0431a28ab9e7891c5b0/html5/thumbnails/7.jpg)
8/12/2019 Certification Questions PP
http://slidepdf.com/reader/full/certification-questions-pp 7/8
Page 7 of 8FREE SAP PP Certification Questions
3/7/2014http://www.sap-school.com/certificationquestionsPP.html
![Page 8: Certification Questions PP](https://reader037.vdocuments.net/reader037/viewer/2022100404/577cd0431a28ab9e7891c5b0/html5/thumbnails/8.jpg)
8/12/2019 Certification Questions PP
http://slidepdf.com/reader/full/certification-questions-pp 8/8
Page 8 of 8FREE SAP PP Certification Questions