William Donovan Plant Manager Bay Park Sewage Treatment Plant 2 Marjorie Lane East Rockaway, NY 11518-2020 December 24, 2015 CERTIFIED MAIL Mr. Robert Wither, P.E. Chief, SPDES Compliance Information Section NYSDEC - Division of Water, Bureau of Water Compliance 625 Broadway 4th Floor Albany, New York 12233-3506 Re: Bay Park Sewage Treatment Plant SPDES Permit Number: NY 0026450 Discharge Monitoring Report for November 2015 Dear Mr. Wither: The County of Nassau entered into an Agreement for the Operation and Maintenance of the Nassau County Sewer System” with United Water Long Island Incorporated on September 10, 2014. Please take notice that on November 9, 2015, UWLI changed its name to SUEZ Water Long Island, Inc. The O&M Agreement remains unchanged, whereby SUEZ Water Long Island Inc., will continue to manage the County-owned assets and service areas of the Bay Park Sewage Treatment Plant, the Cedar Creek Water Pollution Control Plant and the Glen Cove Wastewater Treatment Plant, along with their respective collection systems and lift stations. Effective January 2, 2014, United Water Incorporated effectively began fulfilling our responsibilities associated with the subject Agreement. Accordingly, enclosed please find the Discharge Monitoring Report (DMR) for the Bay Park Sewage Treatment Plant (STP) for November 2015. Please note that the facility is still engaged in recovery efforts, repairing and replacing components of the plant that were damaged by superstorm Sandy in late October 2012. The facility was in compliance with all SPDES Permit effluent limitations for the reporting period. The following laboratories performed the analyses reported in the monthly DMR: Laboratory ELAP ID Number Analyses Performed Pace Analytical Services Inc. 10478 Metals, Total and Fecal Coliform, TSS, CBOD 5 , Volatile and Semi-Volatile Organics Nassau County Department of Health 10339 Total and Fecal Coliform

Upload: others

Post on 30-Apr-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

William Donovan

Plant Manager

Bay Park Sewage Treatment Plant

2 Marjorie Lane

East Rockaway, NY 11518-2020

December 24, 2015 CERTIFIED MAIL

Mr. Robert Wither, P.E.

Chief, SPDES Compliance Information Section

NYSDEC - Division of Water, Bureau of Water Compliance

625 Broadway – 4th Floor

Albany, New York 12233-3506

Re: Bay Park Sewage Treatment Plant

SPDES Permit Number: NY 0026450

Discharge Monitoring Report for November 2015

Dear Mr. Wither:

The County of Nassau entered into an Agreement for the Operation and Maintenance of the Nassau County

Sewer System” with United Water Long Island Incorporated on September 10, 2014. Please take notice that on

November 9, 2015, UWLI changed its name to SUEZ Water Long Island, Inc. The O&M Agreement remains

unchanged, whereby SUEZ Water Long Island Inc., will continue to manage the County-owned assets and

service areas of the Bay Park Sewage Treatment Plant, the Cedar Creek Water Pollution Control Plant and the

Glen Cove Wastewater Treatment Plant, along with their respective collection systems and lift stations.

Effective January 2, 2014, United Water Incorporated effectively began fulfilling our responsibilities associated

with the subject Agreement. Accordingly, enclosed please find the Discharge Monitoring Report (DMR) for the

Bay Park Sewage Treatment Plant (STP) for November 2015. Please note that the facility is still engaged in

recovery efforts, repairing and replacing components of the plant that were damaged by superstorm Sandy in late

October 2012.

The facility was in compliance with all SPDES Permit effluent limitations for the reporting period.

The following laboratories performed the analyses reported in the monthly DMR:

Laboratory ELAP ID

Number

Analyses Performed

Pace Analytical Services Inc. 10478 Metals, Total and Fecal Coliform, TSS, CBOD5,

Volatile and Semi-Volatile Organics

Nassau County Department of

Health

10339

Total and Fecal Coliform

Page 2: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

We are continuing a thorough internal review that began in February and through the month of July, for the

elevated fecal and total coliform values that occurred during the month of January and part of February. Once

completed our analysis will be forwarded to your office.

Also, as discussed with the Region 1 office, attached is a summary of the repair and replacement progress made

during November 2015, with respect to the damages that the facility sustained as a result of Superstorm Sandy

Should you have any questions or comments concerning the above, please contact me at (516) 519-5560.

Very truly yours,

William Donovan

Plant Manager

Enc.

c.

NCDPW: Commissioner Shila Shah-Gavnoudias, Chief Deputy Commissioner Richard Millet, Richard Cotugno,

Pasquale Assalone

NCHD: Donald Irwin

NYSDEC: Joe Sun, Robert Wither

SWLI: Alan Weland, Joe Davenport

Page 3: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

United Water has changed its brand to SUEZ

Head office – 461 From Road, Suite 400, Paramus, NJ 07652 – Tel: (201) 767-9300 – www.suez-na.com

William Donovan

Plant Manager

Bay Park Sewage Treatment Plant

2 Marjorie Lane

East Rockaway, NY 11518-2020

Bay Park Sewage Treatment Plant – Major Work Completed for the Month of November, 2015

The following is a summary of work for the Cleaning and Repair of Digesters and Storage Tanks:

• Awaiting close-out related paperwork.

The following is the Generator Control Project:

• Replaced damaged cabinet doors to main breakers for Engines Nos. 3 and 4.

• Worked on Blower controls in Operations Building.

• Installed filler panels for work station in Generator Control Room.

• Installed communication cable in Main Switchgear for new power meters.

The following is a summary of work for the Odor Control Biofilter Project:

Bay Park S.T.P.:

• Biofilter Cell Nos. 1-3 are in operation accepting odorous air.

• Carbon added to vessels due to settlement.

• Biofilter performance testing completed.

• Completed lightning protection at the new electrical building and biofilters.

• Installed exterior light fixtures at carbon vessels.

• Continued training and turnover spare parts.

The following is a summary of work for the Final Settling Tanks Project:

• Completed the installation of drain sluice gate for Final Settling Tank No. 6.

• Performed final inspection and 48-hour operational testing for Final Settling Tank No.6.

Page 4: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

2

• Beneficial use taken on November 8 for Final Settling Tank No. 6.

• Reprograming the scum system PLC for Final Settling Tank Nos. 2, 4, 6, 7, 8, 9 and 10.

• Final Settling Tank No. 5 turnover to the Contractor on November 6th.

• Completed power washing and demolishing and disposing of sludge collectors and scum

removal systems for Final Settling Tank No. 5.

• Started concrete repairs, and leaky expansion joints in Final Settling Tank No. 5.

• Continued removing, disposing, mandreled, pulled wires, dressing, meggerred, labeling of

sludge sand scum electrical system for Final Settling Tank No. 5.

• Continued dressing up wires/cables, labeling, bonding and grounding, installing

struts/porcelain supports inside electrical manholes related to completed tanks.

• I&C vendor on site for proximity sensors replacement as warranty work

The following is a summary of work for the Sludge Thickening Facility:

• Installed Effluent Service Water Pump Nos. 1 and 2.

• Completed the installation of aluminum handrails throughout the building.

• Re-located GBT Control Panel No. 1.

• Continued installation of hot water supply and return piping to Air Handling Units.

• Continued installation of stainless steel ductwork.

• Completed site restoration.

• Installed bathroom fixtures and accessories.

The following is a summary of work for E-1, Electrical Distribution:

• Continued submitting shop drawings and RFI’s.

USS 3:

• Installed electrical conduit from EMH-105 to JB-105 and EMH-107 to JB-107.

• Installed direct buried communication conduits.

• Placed concrete ductbanks E-E, F-F (East and West), G-G, and H-H.

Page 5: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

3

• Installed low and medium switchgears and transformers.

• Installed new catch basin & associated piping.

• Continued structural steel painting.

• Completed roofing.

• Continued installation of metal ceiling panels.

• Started installation of preformed metal siding system.

• Tied in new storm water piping to existing.

• Placed reinforced concrete for SBS lines under roadway.

• Installed air cooled condensing units and associated piping.

• Pulled communication cables from new USS No. 3 to existing USS No. 3.

USS 4:

• Pulled feeder cables MCC-FA, MCC-FB, and MCC-X3.

• Pulled feeder cables emergency generator.

• Pulled and terminated “A” buss feeder cable.

• Installed glazing, stair treads, grating, sun shades and hand railing on first floor.

• Installed air cooled condensing units and associated piping.

• Performed electric field testing on switchgears.

• Performed water leakage test on preformed metal siding.

• Installed condensation drip tray.

USS 5:

• Installed electrical conduit and placed concrete ductbanks OO-OO, PP-PP, QQ-QQ.

• Connected MV switch to transformer, and transformer bus to switchboard.

• Terminated “A” bus feeders in switchboard.

• Pulled feeder existing USS5 building power “A” bus – Energization (MOPO).

Page 6: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

4

• Installed glazing, stair treads, grating, doors and sun shade.

The following is a summary of work for the Perimeter Flood Protection Berm and Flood Wall:

• Continued submitting shop drawings and RFI’s.

• Completed slurry wall installation and jet grouting.

• Progressed T-Wall and I -Wall installation (Sta. 30 -36 and Sta. 56).

• Progressed double retaining wall installation (Sta. 22 – 30).

• Progressed West duct bank installation work (Sta. 1 -3).

• Progressed drainage installation work (Sta. 24 – 30).

• Progressed installation of RPZ “Hot Boxes”.

• East Park Improvements: Completed Playground for Beneficial Use (11/3/15); progressed

Handball Court.

The following is a summary of work for the Improvements to the Influent Screenings Facility:

• Removed existing Influent Bar Screen No. 3 and started installation of new Influent Bar

Screen.

• Started removal of Influent Bar Screen No. 4.

• Cleaned channel No. 4 of grit.

• Delivered Odor Control Scrubber Nos. 1 & 2.

• Epoxy coated equipment pads located in Odor Control room.

• Removed existing sluice gate No. 3 stem and operator.

• Mounted Odor Control Panel in the Electric Room.

• Installed stanchions on the east wall of the Screenings Room for the installation of conduits.

• Mounted Nema 7, 480 volt steam cleaner receptacles in the Screenings Room.

The following is a summary of work for the Dewatering Facility Demolition Project:

Page 7: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

5

• Awaiting close-out related paperwork.

The following is a summary of work for Grit Facility Improvements:

• Continue to maintain the Temporary Grit Removal System on T&M.

• Cored Test Columns at Tank 2.

• Installed jet grout columns for Tank 2.

• Began excavation in Tank 2.

• Installed Slide Gates: SG-1, SG-1, and SG-5.

• Installed Stop Logs: 1N, 2N and 4N.

• Started the leak test for the stop logs and slide gates.

• Re-routed hot water piping on the first floor.

• Re-wired existing unit heaters.

• Installed new sanitary piping and vent piping on first floor.

• Installed additional temporary lighting inside and outside of the building.

• Re-routed storm roof drain piping.

• Removed partial ductwork for existing odor control.

The following is a summary of work for Emergency Contract – Heating the Hot Water Piping System:

• Continued submitting shop drawings and RFIs.

• Performed tie-in for 10” Hot Water Supply and Return pipes in Basement of Admin Building.

• Pressure tested 6” Hot Water Supply and Return pipes along south side of Cold Storage

building.

• Completed installation of concrete pipe supports along south side of Fire Protection Building to

Sludge Dewatering Building and completed installation of 6” Hot Water Supply and Return pipes.

• Insulated 6” Hot Water Supply and Return pipes from Middle Road to Sludge Thickening

Building.

Page 8: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

6

The following is a summary of work for Phase E2 – Unit Substation No. 2 & Electrical Distribution:

• Continued submitting shop drawing and RFI’s.

• Secured existing utilities at the Aeration Odor Control Building.

• Started demolition of existing the Aeration Odor Control Building.

The following is a summary of work for Phase E-3 – Main Unit Substation and Electrical Distribution:

• Continued submitting shop drawings, subcontractors and RFI’s.

• Performed test pits at various location throughout the site.

Page 9: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

DISCHARGE NUMBER MAJOR

Facility Bay Park STP WWTP OUTFALL

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

00010 1 0 PERMIT

Effluent Gross REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

Effluent Gross REQUIREMENT

SAMPLE

MEASUREMENT

00530 1 0 PERMIT

Effluent Gross REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 1

East Rockaway, NY 11518-2020

pH 00400 1 0E ffluent Gross

DATE

**********

519-5560516

TELEPHONE

SIGNATURE OF PRICIPAL EXECUTIVE OFFICER

OR AUTHORIZED AGENT

01.5*****

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

Plant Manager

William Donovan

*****

*****

*****

*****

TYPED OR PRINTED

Temperature, water deg.

centigrade

001-ANY0026450

***** ***** *****

*****

*****

***** 22.0

***** ***** 6.6 ***** 7.2

0

0

PARAMETERQUANTITY OR LOADING QUALITY OR CONCENTRATION NO.

EX

**********

*****

FREQUENCY

OF ANALYSIS

SAMPLE

TYPEVALUE VALUE VALUE VALUE VALUE

GR

Grab

MM/DD/YYYY

11/01/2015

MM/DD/YYYY

11/30/2015

*****

***** Deg C

NUMBER

MAXIMUM

Daily MX

12

45

7 DA AVG

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

11518-2020

Form Approved

OMB No. 2040-004

No Discharge

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

12/24/2015

***** *****

Req. Mon

Daily MX

*****

06/01

UNITS UNITS

Nitrogen, nitrite total (as N)

00545 1 0

Effluent Gross

Six per Day

06/01

Six per Day

Req. Mon

Monthly Comp24

01/30

Monthly

24

Comp24

26,000

7 DA AVG

GR

Grab

01/30 24

SU

mg/L

*****

*****

11

30

MO AVG

Solids, Total Suspended4,050

18,000

30 DA AVG

4,678

mg/L

0 01/01

Daily

24

Comp24

6

MINIMUM

Solids, Total Suspended

00530 G 0

Raw, Sewage Influent

*****

**********

lb/d

186

Req. Mon

MO AVG

*****

mg/L*****

0 01/01

Daily

24

Comp24

*****

*****

*****

*****

*****

9

Solids, Settleable

00545 1 0

Effluent Gross

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

<0.10

0.3

Daily MXml/L

0 06/01

Six per Day

GR

Grab

*****

*****

*****

*****

Nitrogen, nitrite total (as N)

00545 1 0

*****

*****

*****

*****Raw, Sewage Influent

*****

*****

*****

*****

*****

*****

0.10

Req. Mon

Daily MXmg/L

0

Page 10: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2

Daily MX

Req. Mon *****

*****

*****

*****

**********

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

DISCHARGE NUMBER

PARAMETER

Nitrogen, nitrate total (as N)

Phosphorus, total (as P)

00665 1 0

Effluent Gross

Nitrogen, ammonia, total (as

NH3)

34726 1 0

Effluent Gross

Nitrogen, ammonia, total (as

NH3)

34726 1 0

Raw Sewage Influent

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

William Donovan

Plant Manager

TYPED OR PRINTED

QUANTITY OR LOADING

VALUE

*****

*****

*****

*****

*****

NY0026450

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

11/01/2015

VALUE

MM/DD/YYYY

11/30/2015

001-M

QUALITY OR CONCENTRATION

*****

UNITS

*****

*****

*****

*****

VALUE

*****

*****

*****

*****

*****

*****

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

VALUE

*****

4.6

Req. Mon

MO AVG

*****

26.3

Req. Mon

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

VALUE

2.0

Daily MX

Daily MX

48.1

*****

17.8

34.2

TELEPHONE

mg/L

mg/L

516 519-5560

NUMBER

UNITS

mg/L

mg/L

mg/L

mg/L

mg/L

Form Approved

OMB No. 2040-004

11518-2020

No Discharge

NO.

EX

0

0

0

0

0

0

0

DATE

12/24/2015

MM/DD/YYYY

FREQUENCY

OF ANALYSIS

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

SAMPLE

TYPE

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

Req. Mon

0.1

Nitrogen, Kjeldahl, total (as N)

Req. Mon

Daily MX

Nitrogen, Kjeldahl, total (as N)

00625 1 0

Effluent Gross

00620 1 0

Effluent Gross

00625 1 0

Raw, Sewage Influent

***** ***** *****

*****

*****

*****

*****

Daily MX

Req. Mon

*****

Nitrogen, nitrate total (as N)

00620 1 0

Raw, Sewage Influent

*****

*****

***** *****

Req. Mon

Daily MX*****

*****

***** *****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

Page 11: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3

30DA GEO*****

*****

*****

115

7 DA GEO

MPN/100

mL

*****

*****

*****23,000

7 DA AVG

*****

Continuous

99/99

Continuous

99/99

Daily MX

Req. Mon

DAILYMX

0.5

NO.

EX

0 01/01

Daily

50050 G

RCORDR

RC

RCORDR

RC

SAMPLE

TYPE

11518-2020

OMB No. 2040-004

Form Approved

mg/L

*****

*****

UNITS

FREQUENCY

OF ANALYSIS

0

*****

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

No Discharge

MM/DD/YYYY

12/24/2015

DATE

0

DMR Mailing ZIP Code

*****

*****

*****

VALUE

NUMBER

519-5560516

TELEPHONE

0.03

VALUE

QUALITY OR CONCENTRATION

DISCHARGE NUMBER

001-M

11/30/2015

MM/DD/YYYY

QUANTITY OR LOADING

VALUE

External Outfall

(SUBR 01)

*****

*****

*****

*****

UNITS

*****

*****

*****

*****

VALUE

11/01/2015

MM/DD/YYYY

MONITORING PERIOD

PERMIT NUMBER

NY0026450

*****

*****

45.7

VALUE

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

Effluent Gross

50060 1 0

Chlorine, total residual

Effluent Gross

Flow, in conduit or thru

treatment plant

PARAMETER

Phosphorus, In Total

orthophosphate

70507 1 0

Effluent Gross

*****

*****

*****

*****

*****

*****

***** *****

*****

2.0

***** mg/L

0 01/30

Monthly

24

Comp24

*****

***** 66Coliform, Fecal General

74055 1 0

Effluent Gross

*****

***** 200

GR

Grab

Coliform, Total General

81383 K

Effluent Gross

*****

*****

*****

*****

***** 490 *****

*****MPN/100

mLMO MEDIAN

0 01/01

Daily

GR

Grab

BOD, carbonaceous, 5 day, 20

C 0 01/01

700

80082 1 0

Effluent Gross

2,647

15,000

MO AVG

2,826

Lb/d

***** 7 7

mg/L4025

7 DA AVGMO AVGDaily

24

Comp24

BOD, carbonaceous, 5 day, 20

C

80082 G 0

Raw Sewage Influent

*****

*****

*****

*****

*****

*****

***** 157 *****

*****MO AVG

Reg. Monmg/L

0 01/01

Daily

24

Comp24

400

70

MO AVG***** *****

*****

*****

*****

*****

*****

Page 12: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4

85

85

MO AV MIN

MO AV MIN

*****

*****

96

*****

**********

*****

*****

CALCTD

CA

Monthly

01/300

%

CALCTD

CA

*****

*****

Percent Removal

81383 K

Carbonaceous oxygen demand,

% removal

*****

*****

Monthly

01/30

FREQUENCY

OF ANALYSIS

MM/DD/YYYY

12/24/2015

DATE

0

NO.

EX

No Discharge

11518-2020

OMB No. 2040-004

Form Approved

SAMPLE

TYPE

%

UNITS

NUMBER

519-5560516

TELEPHONE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

VALUE

External Outfall

(SUBR 01)

DMR Mailing ZIP Code

*****

*****

VALUE

94

VALUE

QUALITY OR CONCENTRATION

DISCHARGE NUMBER

001-M

11/30/2015

MM/DD/YYYY

*****

*****

UNITS

*****

VALUE

11/01/2015

MM/DD/YYYY

MONITORING PERIOD

PERMIT NUMBER

NY0026450

*****

*****

VALUE

QUANTITY OR LOADING

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

Percent Removal

81011 K 0

Solids, suspended percent

removal

PARAMETER

Page 13: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 1

Daily MX

24COMP24

24

FREQUENCY

OF ANALYSIS

SAMPLE

TYPE

Weekly

01/07

No Discharge

MM/DD/YYYY

12/24/2015

DATE

0

NO.

EX

11518-2020

OMB No. 2040-004

Form Approved

*****

*****

UNITS

NUMBER

519-5560516

TELEPHONE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

VALUE

External Outfall

DMR Mailing ZIP Code

*****

*****

VALUE

001-F

11/30/2015

MM/DD/YYYY

*****

*****

lb/d

UNITS

<7.3

VALUE

11/01/2015

MM/DD/YYYY

MONITORING PERIOD

PERMIT NUMBER

VALUE

QUALITY OR CONCENTRATION

DISCHARGE NUMBER

(SUBR 01)

NY0026450

*****

*****

VALUE

QUANTITY OR LOADING

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

Copper. total (as Cu)

PARAMETER

Effluent Gross

01042 1 0

Page 14: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

SAMPLE

TYPE

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

0

0

01/30

Monthly

01/30

Monthly

MM/DD/YYYY

12/24/2015

DATE

0

0

0

Comp24

24

Comp24

24

0

0

NO.

EX

No Discharge

11518-2020

OMB No. 2040-004

01/30

FREQUENCY

OF ANALYSIS

01/30

Monthly

Form Approved

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

UNITS

NUMBER

519-5560516

TELEPHONE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

External Outfall

QUALITY OR CONCENTRATION

(SUBR 01)

DMR Mailing ZIP Code

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

DISCHARGE NUMBER

001-V

11/30/2015

MM/DD/YYYY

lb/d

lb/d

lb/dDaily MX

lb/d

lb/d

lb/d

Daily MX

1.7

1.08

Daily MX

87

15.45

0.9

<0.39

Daily MX

9

1.55

Daily MX

4.2

<0.39

Daily MX

5.2

<2.70

Daily MX

1.5

<0.39

VALUE

11/01/2015

MM/DD/YYYY

MONITORING PERIOD

lb/d

UNITS

PERMIT NUMBER

NY0026450

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

QUANTITY OR LOADING

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

See Comments

32106 V 0

Chloroform

See Comments

01092 V 0

Zinc, total (as Zn)

See Comments

01077 V 0

Silver total (as Ag)

Effluent Gross

01067 V 0

Nickel, total (as Ni)

See Comments

01051 V 0

Lead, total (as Pb)

PARAMETER

See Comments

01034 V 0

Chromium, total (as Cr)

See Comments

01027 V 0

Cadmium, total (as Cd)

Page 15: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 2

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

SAMPLE

TYPE

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

0

0

01/30

Monthly

01/30

Monthly

MM/DD/YYYY

12/24/2015

DATE

0

0

0

Comp24

24

Comp24

24

0

0

NO.

EX

No Discharge

11518-2020

OMB No. 2040-004

01/30

FREQUENCY

OF ANALYSIS

01/30

Monthly

Form Approved

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

UNITS

NUMBER

519-5560516

TELEPHONE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

External Outfall

QUALITY OR CONCENTRATION

(SUBR 01)

DMR Mailing ZIP Code

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

DISCHARGE NUMBER

001-V

11/30/2015

MM/DD/YYYY

lb/d

lb/d

lb/dDaily MX

lb/d

lb/d

lb/d

Daily MX

3.8

<0.39

Daily MX

5.9

<0.39

2.4

<0.39

Daily MX

0.6

<0.39

Daily MX

0.6

<0.39

Daily MX

1.1

<0.39

Daily MX

47

<1.93

VALUE

11/01/2015

MM/DD/YYYY

MONITORING PERIOD

lb/d

UNITS

PERMIT NUMBER

NY0026450

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

QUANTITY OR LOADING

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

See Comments

34475 V 0

Tetrachloroethylene

See Comments

34423 V 0

Methylene Chloride

See Comments

34336 V 0

Diethyl Phthalate

Effluent Gross

34242 V 0

Benzo (k) Fluoranthe

See Comments

34030 V 0

Benzene

PARAMETER

See Comments

34010 V 0

Toluene

See Comments

32730 V 0

Phenolics, Total

Page 16: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENTI CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 3

Comp24

24

Comp24

24

Comp24

24

Comp24

24

Comp24

24

SAMPLE

TYPE

Monthly

01/30

Monthly

01/30

Monthly

01/30

Monthly

0

0

01/30

Monthly

01/30

Monthly

MM/DD/YYYY

12/24/2015

DATE

0

0

0

Comp24

24

Comp24

24

0

0

NO.

EX

No Discharge

11518-2020

OMB No. 2040-004

01/30

FREQUENCY

OF ANALYSIS

01/30

Monthly

Form Approved

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

UNITS

NUMBER

519-5560516

TELEPHONE

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

External Outfall

QUALITY OR CONCENTRATION

(SUBR 01)

DMR Mailing ZIP Code

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

DISCHARGE NUMBER

001-V

11/30/2015

MM/DD/YYYY

lb/d

lb/d

lb/dDaily MX

lb/d

lb/d

lb/d

Daily MX

1.7

<0.39

Daily MX

11

<0.39

11

<0.39

Daily MX

1.0

<0.66

Daily MX

0.6

<0.39

Daily MX

1.5

<0.39

Daily MX

0.8

<0.39

VALUE

11/01/2015

MM/DD/YYYY

MONITORING PERIOD

lb/d

UNITS

PERMIT NUMBER

NY0026450

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

*****

VALUE

QUANTITY OR LOADING

TYPED OR PRINTED

Plant Manager

William Donovan

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

See Comments

39180 V 0

Trichloroethylene

See Comments

39110 V 0

Di-n-Butyl Phthalate

See Comments

39100 V 0

Bis(2-ethylhexyl)Phtalate

Effluent Gross

39032 V 0

Pentachlorophenol

See Comments

34526 V 0

Benzo (a) Anthracine

PARAMETER

See Comments

34506 V 0

1,1,1 Trichloroethane

See Comments

345010 V 0

1,1Dichloroethylene

Page 17: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

PERMITTEE NAME/ADDRESS (Include NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)

Facility Name/Location if different) DISCHARGE MONITORING REPORT (DMR)

Name Nassau (County) Bay Park STP

Address 2 Marjorie Lane

East Rockaway, NY 11518-2020 MAJOR

Facility Bay Park STP OUTFALL #001 (MONTHLY MONIT)

Location 2 Marjorie Lane

East Rockaway, NY 11518-2020 FROM TO o

Attn: William Donovan

SAMPLE

MEASUREMENT

PERMIT

REQUIREMENT

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED

AND AM FAMILIAR WITH THE INFORMATION SUBMITTED HEREIN: AND BASED

ON MY INQUIRY OF THOSE INDIVIDULES IMMEDIATELY RESPONSIBLE FOR

OBTAINING THE INFORMATION, I BELIEVE THE SUBMITTED INFORMATION IS

TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE ARE

SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATIOIN, INCLUDING

THE POSSIBILITY OF FINE AND IMPRISONMENT. SEE 18 U.S.C. SS1001 AND

33 U.S.C. SS 1319. (PENALTIES UNDER THESE STATUTES MAY INCLUDE FINES UP TO AREA

$10,000 AND OR MAXIMUM IMPRISONMENT OF BETWEEN 6 MONTHS AND 5 YEARS.) CODE

COMMENT AND EXPANATION OF ANY VIOLATIONS (Reference all attachments here)

EPA Form 3320-1 (Rev. 8095) Previous editions may be used. (REPLACES EPA FORM T-40 WHICH MAY NOT BE USED.) PAGE 4

PARAMETER

Tetrachloroethane

78028 V 0

See Comments

NAME/TITLE PRINCIPAL EXECUTIVE OFFICER

William Donovan

Plant Manager

TYPED OR PRINTED

QUANTITY OR LOADING

VALUE

*****

*****

NY0026450

PERMIT NUMBER

MONITORING PERIOD

MM/DD/YYYY

11/01/2015

VALUE

<0.39

UNITS

lb/d

MM/DD/YYYY

11/30/2015

001-V

DISCHARGE NUMBER

QUALITY OR CONCENTRATION

VALUE

*****

SIGNATURE OF PRICIPAL EXECUTIVE

OFFICER OR AUTHORIZED AGENT

VALUE

*****

DMR Mailing ZIP Code

(SUBR 01)

External Outfall

VALUE

*****

TELEPHONE

516 519-5560

NUMBER

UNITS

*****

*****

Form Approved

OMB No. 2040-004

11518-2020

No Discharge

NO.

EX

0

DATE

12/24/2015

MM/DD/YYYY

FREQUENCY

OF ANALYSIS

01/30

Monthly

SAMPLE

TYPE

24

Comp24*****Daily MX

***** *****2.2

Page 18: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

BAY PARK SEWAGE TREATMENT PLANT

MONTHLY LABORATORY REPORT

PLANT PRIMARY GBT RETURN AERATION AERATION PLANT PRIMARY

INFLUENT EFFLUENT FILRATE SLUDGE EFFLUENT AVERAGE INFLUENT EFFLUENT

mg/L mg/L mg/L mg/L mg/L mg/L °C mg/L mg/L mg/L %TS %VS %TS %VS

11/01/15 182 72 7.6 133 21.0 136 108 5.0 196

11/02/15 162 40 12.0 2,138 983 1,550 21.2 162 143 7.0 168

11/03/15 158 20.00 9.2 2,225 963 1,238 130 138 21.2 151 130 7.0 171 4.4 87.6 2.2 75.8

11/04/15 114 99 6.4 2,225 1,048 1,602 130 124 21.3 130 138 7.0 179

11/05/15 172 60 57.00 7.6 2,113 998 1,520 110 111 21.3 127 101 6.0 200 3.5 88.4 2.2 75.9

11/06/15 184 60 10.4 2,250 1,320 1,443 115 97 21.4 161 141 8.0 187

11/07/15 182 76 12.4 115 21.3 169 107 9.0 202

11/08/15 182 76 11.2 21.1 156 137 8.0 174

11/09/15 172 60 64.00 8.4 2,275 1,110 1,498 128 116 20.9 156 150 7.0 180

11/10/15 188 64 46.00 8.8 2,500 1,067 1,480 133 122 20.9 140 91 5.0 171 4.5 88.9 2.0 76.4

11/11/15 174 90 9.2 2,250 665 115 173 20.9 122 142 6.0 231

11/12/15 192 62 41.00 10.4 2,388 1,178 1,443 103 88 20.8 175 131 7.0 222 2.4 88.1 2.1 76.3

11/13/15 182 61 10.0 2,275 933 1,383 118 125 20.7 165 126 7.0 270

11/14/15 188 100 9.6 100 20.4 189 123 7.0 212

11/15/15 126 64 8.4 135 20.3 133 97 6.0 210

11/16/15 200 82 13.2 2,263 893 1,393 110 124 20.4 149 147 7.0 181

11/17/15 204 60 176.00 11.2 2,100 900 1,370 90 100 20.5 148 129 8.0 189 3.3 88.3 2.0 76.2

11/18/15 184 63 8.8 2,200 1,028 1,345 88 87 20.4 145 110 6.0 193

11/19/15 188 60 54.00 12.4 2,338 913 1,348 90 99 20.4 143 120 7.0 184 3.6 88.9 2.0 75.9

11/20/15 212 59 16.0 2,125 817 1,263 83 98 20.4 175 141 10.0 178

11/21/15 180 80 16.0 100 20.2 170 117 8.0 173

11/22/15 192 80 13.2 20.1 189 160 8.0 139

11/23/15 200 63 12.4 2,125 973 1,408 110 113 19.9 158 151 7.0 131

11/24/15 162 63 128.00 10.0 2,250 993 1,338 100 101 19.7 170 146 6.0 230 4.0 88.3 2.1 76.7

11/25/15 182 66 10.8 2,412 873 1,397 103 120 19.7 127 114 5.0 212

11/26/15 190 70 22.00 9.6 148 19.7 154 188 6.0 191 2.8 88.5 2.0 77.0

11/27/15 288 49 12.4 2,513 1,250 1,570 168 133 20.5 202 75 7.0 201

11/28/15 216 68 14.0 183 19.7 176 145 10.0 201

11/29/15 238 84 10.0 193 19.6 155 169 6.0 204

11/30/15 200 65 6.4 2,263 1,163 1,580 193 166 19.4 179 163 5.0 183

157

MAXIMUM 288.00 100.00 176.00 16.00 2513.00 1320.20 2647.00 192.50 173.41 21.37 202.00 188.00 10.00 270.00 4.50 88.90 2.20 76.98

MINIMUM 114.00 40.00 20.00 < 6.40 2100.00 665.20 1237.60 82.50 86.90 19.37 122.00 75.00 5.00 131.00 2.40 87.60 2.00 75.75

AVERAGE 186.47 68.83 67.56 < 11 2261.40 1003.20 1429.83 122.87 117.65 20.51 157.07 131.33 7 192.10 3.56 88.38 2.08 76.25

96

3.632 4 5.5 <7.3 <7.3

DEPARTMENT OF PUBLIC WORKS

COUNTY OF NASSAU

SLUDGE SOLIDS

INFLUENT

CHLORIDES

CBOD5AERATION

EFFLUENT

TEMPERATURESLUDGE

INDEX

AERATION 30

MINUTE

SETTLING

TOTAL SUSPENDED SOLIDS

November, 2015

DATE DIGESTERS PRIMARY SETTLING

TANKS

PLANTPLANT

mg/L

EFFLUENTEFFLUENT

mg/L

Page 19: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

INFLUENTEFFLUEN

TINFLUENT

EFFLUEN

T%TS %TVS %TS %Solids mg/L mg/L mg/L mg/L mL/L mL/L Minimum Maximum Minimum Maximum °C °C MGD

11/01/15 5,240 82 0.02 0.02 8.6 <0.10 7.1 7.2 6.8 7.2 20.1 21.3 47.4

11/02/15 1.77 17.32 123 0.02 9.4 <0.10 7.0 7.4 6.9 7.1 20.5 21.2 45.9

11/03/15 6 87 1.88 17.69 353 7.30 5,128 73 0.01 0.02 8.3 <0.10 7.0 7.5 6.8 7.1 21.1 22.0 46.3

11/04/15 1.73 17.74 375 0.01 9.1 <0.10 7.1 7.4 6.8 7.0 20.3 21.2 44.4

11/05/15 6 87 1.80 17.47 443 5,353 103 0.02 0.02 8.4 <0.10 7.0 7.3 6.8 7.0 20.9 21.8 45.2

11/06/15 1.80 17.65 430 0.02 9.8 <0.10 7.0 7.2 6.7 7.0 20.9 21.7 48.1

11/07/15 7.20 0.03 8.0 <0.10 7.0 7.3 6.6 7.0 21.0 22.0 46.8

11/08/15 5,473 78 0.01 0.02 8.3 <0.10 7.0 7.4 6.8 7.0 20.8 21.3 44.9

11/09/15 1.83 17.57 440 0.01 10.0 <0.10 7.0 7.4 6.9 7.2 19.9 20.4 44.6

11/10/15 6 87 1.85 17.50 475 5,275 82 0.02 0.01 10.3 <0.10 7.1 7.3 6.9 7.1 20.0 20.8 45.1

11/11/15 1.83 18.01 460 7.15 0.01 9.3 <0.10 7.0 7.4 6.9 7.1 19.7 20.6 46.1

11/12/15 6 87 1.81 18.48 338 7.18 5,038 82 0.02 0.01 10.3 <0.10 7.0 7.5 6.9 7.1 19.7 20.8 45.5

11/13/15 1.90 18.47 310 0.01 8.3 <0.10 7.0 7.3 6.9 7.1 20.4 21.5 46.9

11/14/15 0.01 7.8 <0.10 7.0 7.3 6.7 7.1 19.3 20.2 44.7

11/15/15 5,025 78 0.02 0.01 8.3 <0.10 6.9 7.4 6.7 7.1 19.4 19.8 46.4

11/16/15 1.89 18.59 428 0.01 8.7 <0.10 7.0 7.5 7.0 7.2 20.2 20.7 44.8

11/17/15 6 87 1.87 18.36 368 4,995 86 0.02 0.03 9.1 <0.10 7.0 7.5 7.0 7.2 19.8 20.9 43.9

11/18/15 1.85 18.38 440 0.02 9.3 <0.10 7.1 7.5 7.0 7.1 19.9 20.5 43.3

11/19/15 7 87 1.88 18.45 430 4,933 78 0.02 0.02 9.8 <0.10 7.1 7.4 7.0 7.1 19.5 20.5 44.8

11/20/15 1.80 17.93 353 7.17 0.02 9.8 <0.10 7.0 7.5 7.0 7.1 19.5 20.3 48.6

11/21/15 0.02 8.7 <0.10 7.0 7.4 7.1 7.2 19.0 20.0 46.2

11/22/15 4,978 95 0.02 0.02 9.0 <0.10 7.1 7.3 7.0 7.1 19.0 20.0 46.5

11/23/15 1.84 18.51 463 0.02 9.7 <0.10 7.1 7.4 7.0 7.2 18.3 18.9 45.5

11/24/15 6 87 1.81 17.98 358 7.24 0.02 8.2 <0.10 7.0 7.6 7.0 7.2 18.0 18.7 43.7

11/25/15 1.76 17.96 523 0.02 12.6 <0.10 7.0 7.5 7.0 7.2 18.1 18.9 46.0

11/26/15 6 86 1.91 17.33 5,090 148 0.03 0.01 8.3 <0.10 6.9 7.2 6.9 7.1 18.2 18.9 48.9

11/27/15 7.22 0.02 10.6 <0.10 7.0 7.4 6.9 7.1 18.7 19.8 46.4

11/28/15 0.02 8.9 <0.10 7.1 7.3 7.0 7.1 19.0 20.0 45.0

11/29/15 0.02 9.8 <0.10 7.1 7.5 7.0 7.2 19.0 19.5 45.2

11/30/15 288 0.01 9.9 <0.10 7.0 7.3 7.0 7.2 18.4 18.8 44.9

157

MAXIMUM 6.50 87.00 1.91 18.59 523 7.30 5473 2647 0.03 0.03 12.58 <0.10 7.10 7.60 7.1 7.2 21.1 22.0 48.9

MINIMUM 5.50 86.00 1.73 17.32 123 7.15 4933 73 0.01 0.01 7.83 <0.10 6.90 7.20 6.6 7.0 18.0 18.7 43.3

AVERAGE 5.71 86.88 1.83 17.97 389 7.21 5139 89 0.02 0.02 9.22 <0.10 7.02 7.39 6.9 7.1 19.6 20.4 45.7

PLANT PRIMARY PLANT

INFLUENT EFFLUENT EFFLUENT 96

TSS - mg/L 186 68.8 63.1 10.6 94

CBOD5 - mg/L 157 131.3 16.4 6.9 96

3.632 4.1 5.5 <7.3 <7.3

pHAVERAGE DAILY

SETTLEABLE SOLIDS

AVERAGE

DAILY

CHLORINE

RESIDUAL

GRAVITY BELT

THICKENERS VOLATILE

ACIDS/

ALKALINIT

Y

VOLATIL

E ACIDS

DIGESTERS

ALKALINITYAVERAGE

pH

FILTRATECAKEDATE

% REMOVED % REMOVED

TREATMENT PLANT EFFICIENCY - MONTHLY AVERAGE

DAILYDAILYTHICKENED SLUDGE

FEED

SLUDGE

PLANT

EFFLUENT

FLOW

AVERAGE DAILY

TEMPERATURES

pH

EFFLUENTINFLUENT

DE-WATERED SLUDGE

Page 20: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

November, 2015

WEEK WEEK WEEK WEEK WEEK MONTHLY

PERMIT OF OF OF OF OF TOTALS

LIMIT 01-Nov-15 08-Nov-15 15-Nov-15 22-Nov-15

07-Nov-15 14-Nov-15 21-Nov-15 28-Nov-15 Date Sampled:

11/03/15 mg/L

TEMPERATURE; INFLUENT [°C] HIGHEST DAILY VALUE 21.1

TEMPERATURE; EFFLUENT [°C] HIGHEST DAILY VALUE 22.0 INFLUENT 1 34.20

EFFLUENT 1 17.80

pH; INFLUENT LOWEST DAILY VALUE 6.9

HIGHEST DAILY VALUE 7.6 INFLUENT 1 0.1

EFFLUENT 1 1.5

pH; EFFLUENT LOWEST DAILY VALUE 6.00 6.6

HIGHEST DAILY VALUE 9.00 7.2 INFLUENT 1 0.1

EFFLUENT 1 2.0

MONTHLY AVERAGE [lbs/day] 71,151

MONTHLY AVERAGE [mg/L] 186 INFLUENT 1 48.1

EFFLUENT 1 26.3

MONTHLY AVERAGE [lbs/day] 18000 lbs/d 4,050

WEEKLY AVERAGE [lbs/day] 26000 lbs/d 3,630 3,658 4,678 4,509 4,678 INFLUENT 1 12.5

MONTHLY AVERAGE [mg/L] 30 mg/L 11 EFFLUENT 1 4.6

WEEKLY AVERAGE [mg/L] 45 mg/L 9 10 12 12 12

INFLUENT 1 2.7

SETTLEABLE SOLIDS; INFLUENT DAILY MAXIMUM 12.6 EFFLUENT 1 2.0

SETTLEABLE SOLIDS; EFFLUENT DAILY MAXIMUM 0.3 mL/L <0.10

NUMBER OF READINGS >0.3 0.0

EFFLUENT FLOW MONTHLY AVERAGE [MGD] 70 MGD 45.7

Date Sampled: LBS/DAY LBS/DAY

COLIFORM, FECAL MONTHLY GEOMETRIC MEAN 200/100mL 66 METHYLENE CHLORIDE 5.90 <0.39

WEEKLY GEOMETRIC MEAN 400/100mL 14 98 101 115 115 1,1-DICHLOROETHYLENE 0.80 <0.39

# OF DAYS>2400 (Interstate Parameter) 0 1,1,1-TRICHLOROETHANE 1.40 <0.39

TRICHLOROETHYLENE 1.70 <0.39

COLIFORM, TOTAL MONTHLY MEDIAN <700 700/100mL 490 TETRACHLOROETHANE 2.20 <0.39

COLIFORM, TOTAL NO MORE THAN 10% EXCEEDING 2300 10% 4 TETRACHLOROETHYLENE 3.80 <0.39

BENZO (a) ANTHRACENE 0.60 <0.39

MONTHLY AVERAGE LBS/DAY 58,624 BENZO (k) FLUORANTHENE 0.60 <0.39

MONTHLY AVERAGE mg/L 157 DIETHYL PHTHALATE 2.40 <0.39

DI-N-BUTHYL PHTHALATE 11.00 <0.39

MONTHLY AVERAGE [lbs/day] 15000 lbs/d 2,647 BIS (2-ETHYLHEXYL) PHTHALATE 11.00 <0.39

WEEKLY AVERAGE [lbs/day] 23000 lbs/d 2,706 2,542 2,826 2,465 2,826 PENTACHLOROPHENOL 1.00 <0.66

MONTHLY AVERAGE [mg/L] 25 mg/L 7 CHLOROFORM 1.70 1.08

WEEKLY AVERAGE [mg/L] 40 mg/L 7 7 7 7 7 BENZENE 0.60 <0.39

TOLUENE 1.10 <0.39

TSS; % REMOVAL MONTHLY PERCENT REMOVAL 85% 94 PHENOLICS, TOTAL 47.00 <1.93

CBOD5; % REMOVAL MONTHLY PERCENT REMOVAL 85% 96

CHLORINE, TOTAL RESIDUAL LOWEST DAILY VALUE 0.00

DAILY MAX 0.5 mg/L 0.03

METALS PERMIT LIMIT

11/07/15 11/14/15 11/21/15 11/28/15 12/05/15

COPPER, TOTAL 24 LBS/DAY 3.632 4.1 5.5 < 7.3 < 7.3

11/07/15 11/14/15 11/21/15 11/28/15 12/05/15

MERCURY, TOTAL 200 ng/L

METALS ACTION LEVEL MAXIMUM

11/07/15 11/14/15 11/21/15 11/28/15 12/05/15

CADMIUM, TOTAL 1.5 LBS/DAY <0.39 <0.39

CHROMIUM, TOTAL 5.2 LBS/DAY <2.70 <2.70

LEAD, TOTAL 4.2 LBS/DAY <0.39 <0.39

NICKEL, TOTAL 9.3 LBS/DAY 1.55 1.55

SILVER, TOTAL 0.9 LBS/DAY <0.39 <0.39

ZINC, TOTAL 87 LBS/DAY 15.45 15.45

TOTAL SUSPENDED SOLIDS;

EFFLUENT

TOTAL SUSPENDED SOLIDS;

INFLUENT

CBOD5 EFFLUENT

CBOD5 INFLUENT

ACTION

LEVEL

NUMBER OF

SAMPLES

ORTHOPHOSPHATE AS P

DATE MAXIMUM

TOTAL KJELDAHL NITROGEN

AMMONIA AS NH3-N

NITRITE AS N

DATE

MONITORING REQUIREMENTS

BAY PARK SEWAGE TREATMENT PLANT

ORGANIC COMPOUNDS

SUMMARY

OPERATIONS AND LABORATORY ANALYSES

PHOSPHORUS, TOTAL AS P

NITRATE AS N

MAXIMUM

VALUE

ANALYTICAL

RESULTS

Page 21: CERTIFIED MAIL DMRs/Bay Park/BP… · • Progressed West duct bank installation work (Sta. 1 -3). • Progressed drainage installation work (Sta. 24 – 30). • Progressed installation

Effluent

Dissolved

Oxygen

Effluent

Temperature

Chlorine

ResidualFlow Total Coliform Fecal Coilform

[mg/L] [°C] [mg/L] [MGD] [MPN/100mL] [MPN/100mL]

Sunday 11/01/2015 10:55 am 5.90 21.5 0.0 50.0 130 13

Monday 11/02/2015 5:30 am 6.02 22.0 0.0 24.0 22 2

Monday 11/02/2015 10:15 am 6.06 20.9 0.0 56.0 49 9

Tuesday 11/03/2015 10:55 7.04 22.0 0.0 60.0 110 23

Wednesday 11/04/2015 5:20 am 5.50 19.4 0.0 22.6 79 7

Wednesday 11/04/2015 10:30 am 6.64 21.9 0.0 58.0 230 4

Thursday 11/05/2015 10:44 am 4.96 22.0 0.0 59.6 170 11

Friday 11/06/2015 10:05 am 5.13 21.6 0.0 52.0 1,700 330

Saturday 11/07/2015 11:37 am 5.32 21.8 0.0 51.0 1,300 46

Sunday 11/08/2015 11:36 am 5.26 21.3 0.0 54.0 330 230

Monday 11/09/2015 5:30 am 7.06 18.9 0.0 21.0 33 2

Monday 11/09/2015 10:16 am 6.38 21.5 0.0 60.0 490 79

Tues 11/10/2015 10:31am 6.19 20.4 0.0 54.0 490 33

Wed 11/11/2015 10:50am 6.72 20.1 0.0 54.0 790 330

Thur 11/12/2015 10:05 AM 5.32 20.1 0.0 57.0 1,100 170

Friday 11/13/2015 5:30 am 5.63 20.6 0.0 24.0 460 33

Friday 11/13/2015 10:30 am 5.70 20.2 0.0 61.0 2,300 790

Saturday 11/14/2015 11:38 am 6.36 20.5 0.0 56.2 3,300 490

Sunday 10/15/2015 12:02 pm 5.70 21.0 0.0 58.0 4,900 330

Monday 11/16/2015 5:30 am 7.59 18.6 0.0 23.0 170 13

Monday 11/16/2015 10:38 am 6.22 20.8 0.0 58.0 3,300 330

Tuesday 11/17/2015 11:45 am 6.82 19.8 0.0 58.0 1,100 230

Wednesday 11/18/2015 5:23 am 6.30 19.5 0.0 22.0 530 11

Wednesday 11/18/2015 11:30 am 5.93 20.4 0.0 58.6 490 230

Thursday 11/19/2015 11:31 am 5.90 22.3 0.0 60.0 940 79

Thursday 11/19/2015 11:31 am 5.90 22.3 0.0 60.0 790 79

Friday 11/20/2015 11:30 am 6.10 20.6 0.0 60.4 790 280

Friday 11/20/2015 11:30 am 6.10 20.6 0.0 60.4 330 170

Saturday 11/21/2015 12:15 pm 7.76 21.1 0.0 59.0 330 46

Sunday 11/22/2015 12:00 pm 4.93 19.4 0.0 56.6 790 140

Monday 11/23/2015 5:30 am 7.35 16.7 0.0 23.0 130 5

Monday 11/23/2015 11:30 am 4.87 19.7 0.0 55.0 1,300 230

Tuesday 11/24/2015 11:30 am 5.86 18.6 0.0 58.2 1,700 330

Tuesday 11/24/2015 11:30 am 5.86 18.6 0.0 58.2 790 170

Wednesday 11/25/2015 5:34 am 5.40 20.0 0.0 22.0 70 7

Wednesday 11/25/2015 5:34 am 6.86 20.5 0.0 60.0 490 170

Wednesday 11/25/2015 5:34 am 6.86 20.5 0.0 60.0 1,300 130

Thursday 11/26/2015 11:29 am 6.81 20.0 0.0 54.6 1,300 230

Friday 11/27/2015 11:45AM 6.71 19.9 0.0 54.0 4,900 330

Saturday 11/28/2015 11:27 am 6.58 19.7 0.0 51.7 1,300 490

Sunday 11/29/2015 11:45 am 6.01 19.4 0.0 54.0 490 130

Monday 11/30/2015 5:30 am 7.24 19.0 0.0 21.0 33 8

Monday 11/30/2015 11:30 am 6.11 19.8 0.0 57.0 490 130

LIMITS

490 700 14

66 200 98

115 400 101

115

4.87 Week Five

Bay Park Sewage Treatment Plant

Total and Fecal Coliform Sampling Results and Miscellaneous Effluent Data

Day

MONTHLY COLIFORM RESULTS

Total Coliform Monthly Median

Fecal Coliform Monthly Geometric Mean

November, 2015

Fecal Coliform Weekly Max

Monthly Minimum DO

Date Time

WEEKLY COLIFORM GEOMETRIC MEAN

Week One

Week Two

Week Three

Week Four