cesar chavez bus stop improvements project - metro · january 4, 2017 - cesar chavez bus stop...

15
PATSAOURAS BUS PLAZA METROLINK & AMTRAK PLATFORMS 1 2 3 4 1 2 3 4 METRO BUS LINES 33, 68, 70, 71, 78, 79, 378, 733 METRO BUS LINES 33, 40, 68, 70, 71, 78, 79, 378, 442, 733 METRO BUS LINES 40, 68, 70, 71, 78, 79, 378, 770 DISCHARCHE ONLY METRO BUS LINES 40, 442 IMPROVEMENT SITES TRANSIT PAVILION SITE 5 5 TRANSIT PAVILION SITE METRO BUS LINES 68, 70, 71, 78, 79, 378, 770 6 UNDERPASS LIGHTING AND WAYFINDING TREATMENT (OPTIONAL) 6 METRO GOLD LINE METRO RED/PURPLE LINE METRO SILVER LINE 1 Cesar Chavez Bus Stop Improvements Project Metro Technical Advisory Committee | January 4, 2017 20050

Upload: lamdan

Post on 30-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

PATSAOURAS BUS PLAZA

METROLINK & AMTRAK

PLATFORMS

1

2

3

4

1

2

3

4

METRO BUS LINES 33, 68, 70, 71, 78, 79, 378, 733

METRO BUS LINES 33, 40, 68, 70, 71, 78, 79, 378, 442, 733

METRO BUS LINES 40, 68, 70, 71, 78, 79, 378, 770

DISCHARCHE ONLY METRO BUS LINES 40, 442

IMPROVEMENT SITES

TRANSIT PAVILION

SITE

5 5

TRANSIT PAVILION SITE METRO BUS LINES 68, 70, 71, 78, 79, 378, 770

6 UNDERPASS LIGHTING AND WAYFINDING TREATMENT (OPTIONAL)

6

METRO GOLD LINE

METRO RED/PURPLE LINE

METRO SILVER LINE 1

Cesar Chavez Bus Stop Improvements Project Metro Technical Advisory Committee | January 4, 2017

200’ 50’

2

Cesar Chavez Bus Stop Improvements Project VICINITY SITE PLAN

METRO BUS LINES: 33, 68, 70, 71, 78, 79, 378, 733

METRO BUS LINES: 33, 40, 68, 70, 71, 78, 79, 378, 442, 733

METRO BUS LINES: 40, 68, 70, 71, 78, 79, 378, 770

DISCHARCHE ONLY METRO BUS LINES: 40, 442

TRANSIT PAVILION SITE METRO BUS LINES: 68, 70, 71, 78, 79, 378, 770

UNDERPASS LIGHTING AND WAYFINDING TREATMENT

METROLINK + AMTRAK PLATFORMS

CONTINENTAL CROSSWALKS

PATSAOURAS BUS PLAZA

IMPROVEMENT SITES

Cesar Chavez Bus Stop Improvements Project PROJECT SCOPE: SITES 1 & 2

Cesar Chavez Bus Stop Improvements Project PROJECT SCOPE: SITES 3 & 4

5

Cesar Chavez Bus Stop Improvements Project PROJECT SCOPE: SITE 5 – Transit Pavilion Site

N

AMENITIES 1. Shade structure 2. Seating for transit riders 3. System maps & real time signage 4. Bicycle lockers 5. Bicycle racks 6. Bike share kiosk 7. Enhanced landscaping

2

1

6 5

3

4

7

6

Cesar Chavez Bus Stop Improvements Project PROJECT SCOPE: Transit Pavilion – Elements to be included

• Designer chosen – Gensler

• Task 1: Site analysis – completed

• Outreach meeting #1 – completed

• Task 2: Precedent studies, Metro design criteria, and design vision – in progress

7

Cesar Chavez Bus Stop Improvements Project PROJECT STATUS

8

Cesar Chavez Bus Stop Improvements Project SITE ANALYSIS: SORROUNDING CURRENT USE

9

Cesar Chavez Bus Stop Improvements Project PROJECT GOALS

The space should be:

• SAFE

• COMFORTABLE

• INTUITIVE

• INFORMATIVE

• MAINTAINABLE

• BEAUTIFUL

10

Cesar Chavez Bus Stop Improvements Project OUTREACH MEETING #1

11

Cesar Chavez Bus Stop Improvements Project OUTREACH MEETING #1 RESULTS

Landscape Seating

0

5

10

15

20

25

30

Existing trees Hardscape Green space

0

5

10

15

20

25

30

35

40

Traditional Non-Traditional Innovative

0

5

10

15

20

25

Traditional Integrated Flexible

0

5

10

15

20

25

30

Bike racks Bike storage Bike share

Shelters Bike Facilities

12

Cesar Chavez Bus Stop Improvements Project OUTREACH MEETING #1 RESULTS

0

5

10

15

Coffee cart Food cart Fruit cart Food truck

0

5

10

15

20

Emergencycommunication

SecurityCameras

On-site secutiry0

5

10

15

20

25

30

Area Wayfinding Real-time digitalsignage

Interactive transitinformation

0

5

10

15

20

Enhancedlighting

Charging stations Web Access

Amenities/Special Features

Visual Guides Safety

Vendors

DESIGN VISION:

• Build a strong conceptual design that satisfies operational and maintenance needs.

OUTREACH

• Host onsite Community Meeting #2 – to be held in late January for one peak period.

• Increase online presence, including a survey.

35% DESIGN

• Gensler to prepare 35% Design from selected vision.

• Metro to circulate 35% Design to review team.

13

Cesar Chavez Bus Stop Improvements Project NEXT STEPS

Task 2: Precedent Studies,

Design Vision

Task 3: 35% Design

Task 4: 85% Design

Task 5: 100% Design

Task 6: Final AFC Design

Dec Jan Feb Mar Apr May June July Aug Sep

Metro Review of Draft Deliverable

Construction Procurement Process

14

Task 1: Site Analysis

Complete

Cesar Chavez Bus Stop Improvements Project DESIGN SCHEDULE & PROCESS

2016 2017

15

Cesar Chavez Bus Stop Improvements Project STAY IN TOUCH

Marie Sullivan Principal Transportation Planner, Countywide Planning and Development 213.922.5667 [email protected]