Page 1: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

CESI

Round Table on “Asset Management”

Asset Management Tools

A System Approach to Condition Based Maintenance of Power

Networks

2003 CIRED Conference

Page 2: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

2

CESI

Liberalised electricity markets are aimed to

competition and more performance based regulatory

schemes

Shareholders expectations are driving power industry managers to develop new strategies to increase revenues at lower costs

2003 CIRED Conference

Introduction

Page 3: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

3

CESI

Revenues depends on power networks utilisation, regulated, in many countries, by National Regulators who state:

tariffs for the network use, based on detailed cost analysis

standards for network performances, based on benchmarks with other electric systems aimed to identify internationally based best practices

In the case the stated standards are not met penalties are applied

2003 CIRED Conference

Introduction/cont.

Page 4: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

4

CESI

In the aforesaid scenario power network owners/managers have to identify new strategies to:

control the costs

improve the assets management

increase the asset profitability

2003 CIRED Conference

Introduction/cont.

Page 5: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

5

CESI

Power quality standards stated by

RegulatorsReturn on investments

The new strategies have to be identified with the aim to achieve the due balance between:

Introduction/cont.

2003 CIRED Conference

Page 6: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

6

CESI

Profitability improvement of the “power networks” assets implies to optimise the process of plant maintenance and renewal

The maintenance/renewal process has a key role in:controlling expendituresimproving performances just to respect the

service quality standards stated by the Regulators

preserving the value of assets

2003 CIRED Conference

Introduction/cont.

Page 7: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

7

CESI

Introduction/cont.

In the last years the Condition Based Maintenance (CBM) approach has been introduced in the power network sector too.

CBM is aimed to operate maintenance actions on power network plants and components (or their renewal) in the case significant decay phenomena are detected and their functionality may be soon compromised

2003 CIRED Conference

Page 8: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

8

CESI

The “Condition Based Maintenance” (CBM) approach allows:

the reduction of maintenance costs (by reducing/eliminating the need of periodic checks)

the optimisation of component life cycle the optimisation of plant renewal.

2003 CIRED Conference

Introduction/cont.

Page 9: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

9

CESI

The integration is required of several aspects

Access to background /

foreground plant data

On-line monitoring of plant status

Support decisions on maintenance

actionsHigh number of plants and

equipment

Plants scattered in

a wide territory

Introduction/cont.

2003 CIRED Conference

Page 10: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

10

CESI

ObjectivesSynthesis of plant/component performances

to support decision on maintenance/ replacement by the integration of data from :

2003 CIRED Conference

E-maintenance for power electric network

special monitoring

systems

plant tele-operation

IT corporate management

system

Page 11: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

11

CESI

Distinctive features

Evaluation of performances of components and classes of components by manufacturer, type, age, operational environment

Development of knowledge base (engineering models) based on the present status, the past operation experience, the physical features of the components

2003 CIRED Conference

E-maintenance for power electric network

Page 12: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

12

CESI

Distinctive features/cont.

Identification of the best maintenance actions aimed to achieve the Company objectives

Analysis of historical data to identify correlation and improve the technical staff know how

Integration in the Corporate management procedures and in the tele-operation and monitoring systems plants/components.

2003 CIRED Conference

E-maintenance for power electric network

Page 13: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

13

CESI

Architecture

An e-maintenance system integrates information and data owned by different legacy

Maintenance on condition requires much more informed DSS

The information should not necessarily reside on the system itself; they can be stored into specific databases and gathered (by synchronous or asynchronous connections) when needed

2003 CIRED Conference

E-maintenance for power electric network

Page 14: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

14

CESI

Architecture/cont.

Data-base with background and foreground data of plants and components

Expert system to implement the knowledge base in the identification of the maintenance/replacement actions

Statistical and correlation analysis

2003 CIRED Conference

E-maintenance for power electric network

Page 15: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

15

CESI

TriggerTrigger

TriggerModelli

Background DB

Foreground DB

(tele-op. and monitoring)

Failure and intervention

DB

•Inquiries•Reports•Business Intelligence

ModelliModels

Local user

Central user

Strategicoutput

•Operation results•Network DB update•Inquiries•Reports

Local user

Power network

E-maintenance for power electric network Architecture/cont

Corporate IT system

2003 CIRED Conference

Page 16: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

16

CESI

Knowledge base and engineering models

A set of models, one for each component type, defines the rules and criteria of maintenance on condition

The models are activated:automatically, when a new significant

data/information relevant to a component is available or at a fixed time,

by interactive action of the maintenance staff following an inspection,

2003 CIRED Conference

E-maintenance for power electric network

Page 17: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

17

CESI

-

--Historical dataRatings

Trigger

Results of the model

InspectionsTele-control &

monitoring

Historical files

Power network

Diagnostic

Measurements and anomalies ev.

Engineering Model

E-maintenance for power electric network•Knowledge base and engineering models/cont.

2003 CIRED Conference

Page 18: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

18

CESI

Knowledge base and engineering models/cont

Sources of the information used by the models: Inspection on components

Information are usually provided by visual checks and by reading the instrumentation during the normal operation of components.

More detailed information are provided by technical checks and measurements when the component is out of service

2003 CIRED Conference

E-maintenance for power electric network

Page 19: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

19

CESI

Knowledge base and engineering models/cont

Sources of the information used by the models: Historical files

Ratings of componentsPast operation dataPast maintenance actions

2003 CIRED Conference

E-maintenance for power electric network

Page 20: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

20

CESI

Knowledge base and engineering models/cont

Sources of the information used by the models: Tele-control and monitoring systems

Readings of appropriate sensors integrated in the tele-control and monitoring systems of components

The readings,locally stored, are acquired and elaborated by models at fixed times

This data source may substitute physical inspections

2003 CIRED Conference

E-maintenance for power electric network

Page 21: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

21

CESI

Knowledge base and engineering models/contThe application of the engineering models

provide:detection of anomalies,directly identified

by the local staff (after inspection) or on the basis of the available measurements

identification of the maintenance actions to be undertaken and the relevant priorities,

description of the main steps used by the diagnostic algorithm, just to allow the improvement of the understanding of the decision making process

2003 CIRED Conference

E-maintenance for power electric network

Page 22: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

22

CESI

IT structure and solutions

Objectives and constraints Integration (i.e., no redundancy,

synchronisation) with corporate management systems and with the technical operation systems

Communication between plants, local files, central databases, local and central user stations

Adoption of state-of-the art IT solutions

2003 CIRED Conference

E-maintenance for power electric network

Page 23: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

23

CESI

E-maintenance for power electric network

E-maintenance

Internet/Intranet

IT structure and solutionsThe web solution

2003 CIRED Conference

Page 24: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

24

CESI

Modello

Server

Data Bases

Corporate management systems

Intranet

Intr

anet

Local station

Local station

Central station

Power network

E-maintenance for power electric networkIT structure ……..

The web solution/cont.

2003 CIRED Conference

Page 25: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

25

CESI

IT structure and solutions

Technological solution adoptedDistributed architecture based on INTERNET

technology. The solution allows the connection of hundreds or thousands of personnel of the local technical staff

Data base structured to facilitate communication with the other IT Corporate systems

2003 CIRED Conference

E-maintenance for power electric network

Page 26: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

26

CESI

IT structure and solutions

Technological solution adopted/cont.Data warehouse to integrate historical data

provided by different sources/operators. The solution is recommended by the need tomanage data relevant to a wide number of componentsmanage several types of dataretain historical data for many years

2003 CIRED Conference

E-maintenance for power electric network

Page 27: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

27

CESI

IT structure and solutions

Technological solution adopted/cont.Expert Systems (ES) to build-up the

logical/deductive models used to build up the engineering models. ES allows to assess and consolidate the knowledge base of the maintenance process

Data mining techniques to analyse historical data and identify the existing relations

Friendly MMI Distributed architecture based on INTERNET technology

2003 CIRED Conference

E-maintenance for power electric network

Page 28: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

28

CESI

Application to transmission networkTERNA, the Company owner of the 95 % of the Italian transmission network developed, in collaboration with CESI, an e-maintenance systemThe application regards a HV transmission network consisting of:

268 substations 3549 bays 550 transformers more than 30.000 km of lines

The total number of the substation components are more than 40.000

2003 CIRED Conference

E-maintenance for power electric networks

Page 29: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

29

CESI

E-maintenance for power electric network

Application to transmission network. The benefits

Standardisation and complete automation of the maintenance /substitution process

Creation of a well assessed knowledge base and data bases that will improve the Corporate maintenance policies

Reduction of the number of the maintenance actions. Elimination of periodic maintenance actions

Reduction/elimination of the failures numberOptimisation of the actions to revise and renew the

network plants

2003 CIRED Conference

Page 30: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

30

CESI

Subjects for further discussion

The key factor of the proposed approach is the evaluation of components condition. Significant improvements may be provided by additional monitoring systems. May the possible benefits be higher than the additional costs required?

2003 CIRED Conference

E-maintenance for power electric network

Page 31: CESI Round Table on “Asset Management” Asset Management Tools A System Approach to Condition Based Maintenance of Power Networks 2003 CIRED Conference

31

CESI

Subjects for further discussion/cont.

In the aforesaid example the proposed approach is applied to an HV transmission network. May the same approach be applied to MV and LV distribution networks?

2003 CIRED Conference