DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/ CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT STATEMENT CEQR NO. 11DPR004R ULURP Not Applicable August 19, 2011 A. INTRODUCTION This draft final scope of work outlines the issues to be analyzed in the preparation of a targeted Environmental Impact Statement (EIS) for the proposed Great Kills Park/ Cedar Grove Beach Rehabilitation (“the proposed action”) in Staten Island (see Figures 1 though 4). The proposed action would rehabilitate the Cedar Grove Beach, an approximately 34 30 acre site (Block 4105 p/o Lot 50 and Block 4108 p/o Lot 45) in the New Dorp community of Staten Island (Staten Island Community District 2). The New York City Department of Parks and Recreation (NYCDPR) has assumed the role as lead agency for the proposed action. This document provides a description of the proposed action and includes task categories for all technical areas to be analyzed in a targeted EIS. This action is subject to the City Environmental Quality Review (CEQR) procedures. An Environmental Assessment Statement (EAS) was completed on February 10, 2011. NYCDPR, acting as lead agency, has determined that the proposed action would have the potential for significant adverse environmental impacts on the following areas of concern: land use, zoning and public policy; historic and cultural resources; hazardous materials; natural resources; transportation; neighborhood character and construction impacts. Therefore, a detailed assessment of likely effects in the areas of concern must be prepared and disclosed in a targeted EIS. The targeted EIS will be prepared in conformance with all applicable laws and regulations, including Executive Order No. 91 of 1977 and the New York City Environmental Quality Review (CEQR) regulations and will follow the guidelines of the CEQR Technical Manual. The targeted EIS will contain: A description of the proposed action and its environmental setting. A statement of the environmental impacts of the proposed action, including its short-and long-term effects, and typical associated environmental effects. An identification of any adverse environmental effects that cannot be avoided if the proposed action is implemented. A discussion of alternatives to the proposed action. A discussion of any irreversible and irretrievable commitments of resources that would be involved in the proposed action should it be implemented. A description of mitigation measures proposed to minimize significant adverse environmental impacts. The environmental analyses in the targeted EIS will assume all proposed phases of the rehabilitation of Cedar Grove Beach would be complete by 2014, and identify the cumulative impacts of other projects in areas affected by the proposed action. NYCDPR, as lead agency, will coordinate the review of the proposed action among the involved and interested agencies and the public.

Upload: others

Post on 24-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION

TARGETED ENVIRONMENTAL IMPACT STATEMENT

CEQR NO. 11DPR004R

ULURP Not Applicable

August 19, 2011

A. INTRODUCTION This draft final scope of work outlines the issues to be analyzed in the preparation of a targeted Environmental Impact Statement (EIS) for the proposed Great Kills Park/Cedar Grove Beach Rehabilitation (“the proposed action”) in Staten Island (see Figures 1 though 4). The proposed action would rehabilitate the Cedar Grove Beach, an approximately 34 30 acre site (Block 4105 p/o Lot 50 and Block 4108 p/o Lot 45) in the New Dorp community of Staten Island (Staten Island Community District 2). The New York City Department of Parks and Recreation (NYCDPR) has assumed the role as lead agency for the proposed action. This document provides a description of the proposed action and includes task categories for all technical areas to be analyzed in a targeted EIS. This action is subject to the City Environmental Quality Review (CEQR) procedures. An Environmental Assessment Statement (EAS) was completed on February 10, 2011. NYCDPR, acting as lead agency, has determined that the proposed action would have the potential for significant adverse environmental impacts on the following areas of concern: land use, zoning and public policy; historic and cultural resources; hazardous materials; natural resources; transportation; neighborhood character and construction impacts. Therefore, a detailed assessment of likely effects in the areas of concern must be prepared and disclosed in a targeted EIS. The targeted EIS will be prepared in conformance with all applicable laws and regulations, including Executive Order No. 91 of 1977 and the New York City Environmental Quality Review (CEQR) regulations and will follow the guidelines of the CEQR Technical Manual. The targeted EIS will contain:

• A description of the proposed action and its environmental setting. • A statement of the environmental impacts of the proposed action, including its short-and

long-term effects, and typical associated environmental effects. • An identification of any adverse environmental effects that cannot be avoided if the proposed

action is implemented. • A discussion of alternatives to the proposed action. • A discussion of any irreversible and irretrievable commitments of resources that would be

involved in the proposed action should it be implemented. • A description of mitigation measures proposed to minimize significant adverse environmental

impacts. The environmental analyses in the targeted EIS will assume all proposed phases of the rehabilitation of Cedar Grove Beach would be complete by 2014, and identify the cumulative impacts of other projects in areas affected by the proposed action. NYCDPR, as lead agency, will coordinate the review of the proposed action among the involved and interested agencies and the public.

Page 2: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

ROMA AVE

MARI

NE W

Y

EBBI

TTS S

T

FINLEY AVE

CEDAR GROVE AVE

MAPL

E TE

CENT

ER P

L

GARI

BALD

I AVE

MILB

ANK

RD

NEUT

RAL A

VE

TOPP

ING

ST

SEAF

OAM

STBE

ACON

PLWA

VECR

EST S

T

CEDA

R GR

OVE

CT

NAVE

SINK

PL

DUSTAN ST

TWOM

BLY A

VE

MICHELLE LNHETT AVE

LOWER BAY

Great Kills Park

Cedar Grove Beach

Cedar Grove Beach RehabilitationEnvironmental Impact Statement

NYC Department of Parks and Recreation Figure 1Site Map

LegendProject Area400 Ft Buffer of Project Area

ParcelPark and Open SpaceBeach

BuildingHigh Water LinePierU.S. Bulkhead

N

0 200 400100Feet

Source:Parcel Data: City of New York Department of City Planning

Scoping Document

Page 3: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

ROMA AVE

MARI

NE W

Y

EBBIT

TS S

T

FINLEY AVE

CEDAR GROVE AVE

MAPL

E TE

CENT

ER P

L

GARI

BALD

I AVE

MILB

ANK

RD

NEUT

RAL A

VE

TOPP

ING

ST

SEAF

OAM

STBE

ACON

PL

WAVE

CRES

T ST

CEDA

R GR

OVE

CT

NAVE

SINK

PL

DUSTAN ST

TWOM

BLY A

VE

MICHELLE LNHETT AVE

LOWER BAY

50

45

70200

59

1

100

70

25

1

1

1

45

375

6

37

89

3

1

11

1

1

9

10

25

1

7

8

5

50

666

115

6

5

9

8

7

8

6

26

1

1

3

23

5

1

7

6

3 9

50

1

27

71

39

22

63

1

52

7

1

4

41

49

1

53

3

93

1

349

6

3

22

17

9

1

4

7 9

4

1

8

9

89

6

1

5

1

5

69 73

9

6

6

1

6

4

51

4

66

6

93

81

31

67

6

63

36

7

9

17

9

8

1

60

56

3

3

14

9

12

73

9

60

1

47

18

26

271

12

9

5

99

88

96

1

15

8

19

45

34

988588

18

36

103

22

24

13

59

72

31

1

37

1

82

20

67

14

4

500

5

76

28

329

64

58

68

2317

65540

78

13

79

41

71

14

3157

33

3

58

22

46

36

59

2

4

40

10

14

46

17

25

32

40

27

62

57

28

1

43

46

83

11

10

80

25

72

85

9

19

43

48

72

71

33

273

35

48

40

131

54

14

86

101

19

81

24

22

91

24

10

8

21

61

19

14

64

40

4

25

1

76

75

32

38

45

26

9

2278

2040

18

27

27

84 8829

92

25

91

39

23

25

19

15

55

70

9

10

83

76

44

4

31

34

1

94

45

62

5

53

5891

40

33

24

68

31

50

20

34

27

36

26

62

44

24

58

61

65

66 11

37

30

79

44

47 45

38

79

62

66

69

18

73

70

52

1

69

51

85

1

10

54

22 66

37

49

1555

52

73

13

60

65

13

87

12

43

40

25

82

47

19

68

29

51

74

70

26

11

44 4

4884

36

67

35

77

63

57

46

7

42

16

16

29

51

52

52

44

24

74

81

82

25

31

4

42

89

41

55

1

83

42

2

5868

38

77 89

63

85

72

23

67

33

55

23

5054

45

67

86

24

22

85

5

18

33

52

15

48

12

10

75

82

34

56

62

77

22

24

12

41

44

20

76

92

48

5

47

4814

71

30

21

321

20

20

58

51

17

47

28

60

2

79

49

27

58

29

11

20

22

1 11

1

39

31

43

76

27

72

58

22

8

1975

32

87

7

16

16

27

29

43

102

64

43

3

16

40

3

2056

44

34 38

50

53

5

14

46

50

21

13

2880

14

28

18

4633

72

18

32

82

29

21

43

69

24

1

3918

47

13

80

27

32

62

13

12

45

91

16

65

64

21

31

45

15

39

3

35

67

60

62

20

25

22

20

67

31

47

89

1

47

10

301

31

3064

15

8

84

51

78

14

58

35

7

85

64

1

17

8

89

30

36

61

54

97

20

15

18

36

541

63

6

110

26

32

536

38

43

45

60

38

23

54

95

36

549

89 91

28

34

40

69

158

21

551

50

9

92

21

41

24

547

33

600

269

369

545

37

130

93

145

25

10

35

375

40

75

27

43

367

35

539

52

30

543

37

410

48

161

341

5

142135 137

94

85

51

352

165

40

11

139

4

99

20

132

337

49

68

6 6

30 12

26

412

13

150

56

39

87

158

175 177

32

364

30

88

377

30

88

23

15

18

69

322

12

58

318

334 77

98

94

93

24

18

355

36

27339

24

34

41

70

320

148

25

69

13

86

32

15

33

1

19

123

54

29

12

314

418

39

185

426

42

23

31

306

420

30

32113

316

11

181308

264

90

13

33

11

163

64

422

209

51 69

45

154

312

19

249358

424

11

25

26

266

156

18

35

15

310

362

19

187

36

65258

428

75

360

38

255

21

5663

245247

251 18

61

207

48

253

260

15

12

32

9

17

17

2821

37

49

12

12

16

21

78

4358

202

19

204

32

96 89

54 3356

39

53

23

55

60

20

262

26

27

13

38

60

46

44

22

20

38

10

53

55

18

76

13

17

24

35304

15

70

3025

20

49

37

47

48

42

53

40

26

14

62

68

200

64

50

28

50

44

1857

70

46

36

4957

4

20

31

51

19

35

57

43

1560

68

63

13

526

14

44

18

24

66

57

26

80

31

3

56

12 12

68

44

44

75

33

64

39

60

29

59

62

37

16

37

37

68

55

61

82

56

59

77

3

5860

42

2

11

46

62

41

26

59

41

40

52

417

119

653

17

52

40

28

27

624

29 50

47

30

618

37

26

53

4

427

40

66

44

616

43

67

47

49

70

41

90

69

14

2252

35

3

64

28

96

47

5426

29 43

55

27

12

33

95

42

11

32

15

30

53

17

55

78

71

75

87 75 68

55 54

87

56

4650

97

48

45

53

7

7

9

6

98

100

5

92

4

72 81

11

1

8

2

46

10

30

9

44

27

33

43

17

29

8

30

12

31

28

61

75

98

17

80

45

11

18

38

68

107

28

2022

16

77

35

13

60

54

61

7170

23

32

21

19

51

150

12

55

58

65

57

83

58

51

26

19

76 15

1417

37

121

108

7216

60

46

11

1317

22

179

81

48

63

76

50

24

36

23

97

61

96

50

16

12

64

26

10

17

80

37

54

57

38

1082

12

60

41

78

37

95

22

96

27

94

73

71

7

22

69

60

20

52

56

65

68

183

31

17

34

3

39

73

1

36

75

28

16

32

86

41

45

22

77

44

90

8727 98

42

8332

43

22

23

50

40

49

51

14

35

91

2124

17

2

91

72

24

4971

29

174

57

31

33

35

62

63

8

43

77

81

10

59

79

18

11

10

65

81

43

49

30

58

73

55

16

7526

53

160

66

100

18

48

59

66

28

166

28

28

36

108

71

35

8

20

27

39

38

23

32

33

72

40

33

26

106

13

8330

106

31

49

1317

185

29 38

72

183

61

5072

61

397

78

55

72

64

27

60

101

51

7

168

39

18

28

78

50

29

6

61446

386

40

76

105 110

45

49

15

41

79

13

401

61

41

30

91

45

31

34

101

90

15

73

7

36

48

141

176

70

187

512

172

13

42

29

611

39

515

85

181

56

516

392

103 108

518

75

12

35

385

170164

74

47

390

162

87

31

60

527

48

8225

395

65

387389

14

394

30

70

38

45

30

15

30

51

5

69

623

414520

41

33

39

603

40111

622

55

407 511

606

110

71

104

513

868

112

396

47

105

620

123

608

408

612

517403

43

410

76102

404

116

142

412 530

605

405

14

609

409

18

12

67

528

24

31

91

101

67

88

100

628

109

88

20

106

18

602 47

95

28

52

62

32

625

650

75

42

118117

32

49

107510

413

29

646

420

44

71

110

20

23

14

179

60

634 188

422

85

177

36

418

21

421

149

633

137

118

652

104

26

21

67

42

65

90

69

114

424

626

116112

45

648

40

425

22

41

630

39

87

34

14

77

100

47

86

35

120

42

111

29

24

71

649

35

17

103

627

181

651

325

19

88

28

38

631

135

359

22

46

3636

24

85

36

88

30

23

190

358

40

21

78

39

29

72

3791

70

37

31

79

3435

48

360

119

35

82

69

328

37

55

10

25

38

647

3036

61

89

16

327

121

24

25

37

164

45 20

166

123

23

24

16

66

26

25

31

47

140

23

134

33

101

93

1514

81 73

50

24

32

16

5416

80

46

17

94

80

69

56

19

28

4342

61

2942

59

37

18

34

4634

30

14

84

68

13

33

2057

1211

33

29

17

36

19

23 25

63

10

35

194

7933

318

20

59

35

34

46

83

34

5960

56 15

99

32

57

97

20

13

104

93

8988133

23

58

35

18

161

92

35

9998

94

1051077271

162

19194

166

163

43

74

114

6984

14

49

93

42

95

7

46

86

42

19

70

64

1992

8199

8380

9999

80

31

109111100 110 112

98

Great Kills Park

Cedar Grove Beach 4105

4108

4130 4069

40684070

41604066

4067

4074

4065

4064

4077

4045

4089

4071

409240834085

4087

40804081

4084

4086

4088

4082

4073

4091

4093

4046

4076

Cedar Grove Beach RehabilitationEnvironmental Impact Statement

NYC Department of Parks and Recreation Figure 2Tax Map

LegendProject Area400 Ft Buffer of Project Area

Block BoundaryLot Boundary

High Water LinePierU.S. BulkheadLower Bay

N

0 200 400100Feet

Source:Parcel Data: City of New York Department of City Planning

410550

Block NumberLot Number

Scoping Document

Page 4: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

SMITHS LN (AKA CEDAR GROVE BLVD)

BROWN BLVD (AKA CEDAR GROVE BEACH PL)

Study Area

Cedar Grove Beach RehabilitationEnvironmental Impact Statement

NYC Department of Parks and Recreation Figure 3Sanborn Map

Scoping Document

LegendProject Area400 Ft Buffer of Project Area

N

0 200 400100Feet

Page 5: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

ROMA AVE

MARI

NE W

Y

EBBIT

TS S

T

FINLEY AVE

CEDAR GROVE AVE

MAPL

E TE

CENT

ER P

L

GARI

BALD

I AVE

MILB

ANK

RD

NEUT

RAL A

VE

TOPP

ING

ST

SEAF

OAM

STBE

ACON

PLWA

VECR

EST S

T

CEDA

R GR

OVE

CT

NAVE

SINK

PL

DUSTAN ST

TWOM

BLY A

VE

MICHELLE LNHETT AVE

LOWER BAY

PARK

R3-2 R3X

R3-1

PARK

PARK

R3-2

R3-2

R3-2

Cedar Grove Beach RehabilitationEnvironmental Impact Statement

NYC Department of Parks and Recreation Figure 4Zoning Map

LegendProject Area

400 Ft Buffer of Project Area

Zoning

C1-1 Commercial Overlay

N

0 200 400100Feet

Source:Zoning Data: City of New York Department of City Planning

R3-1/R3-2/R3X - Residential District

Scoping Document

Page 6: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

Draft Final Scope of Work For Great Kills Park/Cedar Grove Beach Rehabilitation EIS

AUGUST 19, 2011 2

B. REQUIRED APPROVALS AND REVIEW PROCEDURES In addition to the direct undertaking by NYCDPR, the proposed action requires the following approvals: New York City

NYC Department of Buildings (DOB) approval for demolition plans Coastal Zone consistency determination from the New York City Planning Commission (CPC).

New York State/Federal

New York State Department of Environmental Conservation (NYS DEC) Freshwater and/or Tidal Wetlands Permit

NYS DEC Coastal Erosion Hazard Areas Approval NYS DEC State Pollution Discharge Elimination System (SPDES) permit for stormwater

discharges associated with construction activities. New York State Office of Parks Recreation and Historic Preservation (NYSOPRHP) § 1409 in

consultation with NYS DEC The proposed project does not require a US ACOE § 404 Clean Water Act Permit as determined by the Army Corps of Engineers. This draft final scoping document sets forth the analyses and methodologies proposed for the EIS. The public, involved and interested agencies, Staten Island Community Board 2 and elected officials are were invited to comment on the scope, either in writing or orally, at a public scoping meeting to be held on Wednesday, March 16, 2011, between the hours of 7:00 PM and 9:00 PM at Community Board 2, Lou Caravone Community Service Building, 460 Brielle Avenue, Staten Island, NY 10301. Comments received during the public meeting, and written comments received up to 10 days after the hearing, will be were considered and incorporated as appropriate into a final scope of work. The draft final scope of work will be used as a framework for preparing the targeted Draft Environmental Impact Statement (DEIS) for the proposed action. Once the lead agency (NYCDPR) is satisfied that the DEIS is complete, the document will be made available for public review and comment. A public hearing will be held on the DEIS to afford all interested parties the opportunity to submit oral and written comments. The record will remain open for at least 10 days after the public hearing to allow additional written comments on the DEIS. At the close of the public review period, a Final Environmental Impact Statement (FEIS) will be prepared that will incorporate all substantive comments made on the DEIS, along with any revisions to the technical analysis necessary to respond to those comments. The FEIS will then be used by the decision makers to evaluate CEQR findings, which address project impacts and proposed mitigation measures, before deciding whether to proceed with the project. C. DESCRIPTION OF THE PROPOSED ACTION The project site is located in Great Kills Park, a 307 acre park, which extends from Miller Field to Great Kills Gateway National Recreation Area, along Lower New York Bay, in Staten Island. Cedar Grove Beach The project site is comprised of approximately 34 30 acres within Cedar Grove Beach located south of Ebbitts Street (Block 4105 p/o Lot 50 and Block 4108 p/o Lot 45). Although a mapped City park since 1962, the configuration of the land and beach discouraged public use. The site contains a collection

Page 7: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

Draft Final Scope of Work For Great Kills Park/Cedar Grove Beach Rehabilitation EIS

AUGUST 19, 2011 3

of approximately 421 one and one and one-half story seasonal beach bungalows that pre-date the park mapping, a clubhouse, a barn, a guardhouse and five ancillary garage structures (49 50 total structures). The New York State Office of Parks Recreation and Historic Preservation (OPRHP) recently determined that the project area is eligible for listing on the State and National Registers of Historic Places (S/NR eligible). Cedar Grove Beach is part of a total of 208.7 acres which were title vested to the City of New York on December 27, 1962 with funding provided per the New York State Park and Recreation Land Acquisition Act (NYSPRLAA) and Chapter 523 of the Laws of New York of 1960. Following City approvals for the change to the City Map for the establishment of park additions and for the acquisition of property, as per resolutions adopted by the Board of Estimate on August 23, 1962 (Calendar Numbers 477A thru 477C) an application was made by the City of New York for a grant in state aid through the Park and Recreation Land Acquisition Bond Act Program for Cedar Grove Beach, of which the project area is a part. The intention as detailed in the City’s 1962 “Application for Grant in State Aid” pursuant to Chapter 523 of the Laws of New York of 1960 was that the land acquired would be an addition to Great Kills Park and “expand the existing bathing facilities in Great Kills Park when the need arises. Aside from providing additional shorefront facilities, the inland portions of this site can be developed with playgrounds to serve the neighboring community.” Shore Front Drive was proposed to link the park sites along the southern and eastern shores.2 The NYSPRLAA and additional funds provided through Chapter 491 of the Laws of New York of 1963, created the State’s Park and Recreation Land Acquisition Bond Act Program to meet the needs of the growing population of the state through acquisition of predominantly open or natural lands for park, conservation, and outdoor recreation purposes. The addition of Cedar Grove as parkland, which was formally designated as an addition to Great Kills Park, was one of four parks on Staten Island funded through the State’s Park and Recreation Land Acquisition Bond Act Program. The City acquired Cedar Grove through condemnation and each affected owner was compensated for the full market value of their land. The other Staten Island parks funded through the program were High Rock Park, Lemon Creek Park, and the South Shore Golf Course. The proposed action involves the rehabilitation of a portion of Cedar Grove Beach, with the main goal being to provide improved access to this area for the general public. As stated, the project site currently contains a number of structures, which had been used for private seasonal summer occupancy by the Cedar Grove Beach Club. Pursuant to a written agreement between the Parks Department and the Cedar Grove Beach Club, the bungalows were vacated by September 30, 2010. Some of these structures are anticipated to be adaptively reused, while others are proposed for demolition. The project is divided into two phases3: Phase one includes demolition of a majority of the structures on site and adaptive reuse of other structures for park related purposes. This work will include the shutdown and capping of utilities and removal of in-ground and/or above ground oil tanks as necessary, as well as abatement of any hazardous materials found pursuant to all applicable local, state and federal regulations. NYCDPR will restore the demolition sites with beach grass and other native plantings. Phase one will include repair of existing parking areas on site and minor rehabilitation of the existing pick-up sport (softball/junior soccer) play area. Phase two involves construction of a new playground and new bike path. 1A July 7, 2010 OPRHP “Resource Evaluation” references “…38 primarily one-story frame cottages, or bungalows…” However, NYCDPR site reconnaissance has indicated that there are approximately 42 such bungalows in the project area. 2 “City Speeds Lemon Creek Development,” Staten Island Advance, May 25, 1962 3 Rehabilitation of building #4 and demolition of building number #5 is being contemplated as part of a separate project undergoing separate review (11DPR011R) in consultation with NYSOPRHP and NYCDPR.

Page 8: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

Draft Final Scope of Work For Great Kills Park/Cedar Grove Beach Rehabilitation EIS

AUGUST 19, 2011 4

A portion of the beach was opened to the public in May 2011. Temporary mobi mats were placed along the beach for access to the water. Also on a temporary basis, two trailers were placed along the beach. One trailer is used as a summer lifeguard headquarters and the other serves as a seasonal comfort station for the 2011 beach season. As part of a separate review, NYCDPR will remove foundation remains and debris on the beach off Ebbitts Street and Cedar Grove Court. Purpose and Need Great Kills Park is a 307 acre park, the majority of which is dedicated to passive recreation with wooded areas and sandy beaches. The rehabilitation of the Cedar Grove Beach section of Great Kills Park will allow this stretch of beach to be improved, providing necessary active recreation areas and beach space along with the equally important goal of enhancing the area’s natural resources. Although a mapped City park since 1962, the land and beach have is not generally been publicly accessible. The redevelopment of Cedar Grove Beach is intended to expand public access and improve recreational resources on this site. A number of buildings on the site are proposed to be demolished so that the beach can be restored in these areas, thus allowing expanded public access to the coastal area. Bike path striping along the existing Cedar Grove Beach Place and greenway signage would be constructed, thus further improving access to and through the site. A number of remaining structures on site would be adaptively reused for public and ancillary park use. Improved public access and enhanced recreational resources will be provided as part of the project. The expanded beach area would be improved and available for public swimming patrons and for passive recreation, the existing pick up sport fields and courts are expected to remain and be cleaned up and available for public use, new fencing/gates would be installed along Ebbitts Street and the existing “tot lot” equipment would be removed and replaced with new play equipment. The Additional beach area would be improved cleaned and available for opened for public swimming patrons, the existing pick-up sport (softball/junior soccer) play area would be cleaned up and opened for public use, the existing bocce and tennis sports courts are anticipated to remain, new fencing/gates would be installed along Ebbitts Street and the existing “tot lot” playground would be removed and replaced with new playground equipment. Future No-Action Conditions (No-Build Scenario) Pursuant to a written agreement with the Cedar Grove Beach Club, the property was vacated by September 30, 2010. Without the proposed action, it is expected that all of the bungalows and other structures on site would remain subject to the natural elements and would be sealed off from public access, with the exception of Building #4 which was restored by Steiner Studios/HBO for its use in the Boardwalk Empire television series and Building #5, which has been contemplated for demolition. prior to Summer 2011. The beach area would remain in its current state with temporary trailers being brought in to allow for seasonal beach operations. The structures on site would remain and the upland areas would not be otherwise restored and available for public and ancillary park use. D. SCOPE OF WORK FOR THE TARGETED EIS An Environmental Assessment Statement (EAS) was completed on February 10, 2011. A review of the thresholds established in the CEQR Technical Manual for determining whether detailed analysis is necessary to assess potential impacts was performed in the EAS, which indicated that the proposed action would not exceed the thresholds for analysis in the following technical areas: Socioeconomic Conditions; Community Facilities and Services; Open Space; Shadows; Urban Design and Visual Resources; Water

Page 9: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

Draft Final Scope of Work For Great Kills Park/Cedar Grove Beach Rehabilitation EIS

AUGUST 19, 2011 5

and Sewer Infrastructure; Solid Waste and Sanitation Services, Energy; Air Quality; Greenhouse Gas Emissions; Noise; and Public Health. In each of these technical areas, therefore, no further analysis is warranted and no significant adverse impacts are anticipated. The potential for significant adverse impacts to Land Use, Zoning and Public Policy, Historic and Cultural Resources, Natural Resources, Hazardous Materials, Transportation, Neighborhood Character and Construction Impacts do exist and the scope of work for the review of the potential for environmental impacts in these technical areas are described below. TASK 1. PROJECT DESCRIPTION (INCLUDING REASONABLE WORST CASE

DEVELOPMENT SCENARIO) The first chapter of the targeted EIS introduces the reader to the project and sets the context in which to assess impacts. The chapter contains a project identification (brief description and location of the project); the background and/or history of the project; a statement of the public purpose and need for the project; key planning considerations that have shaped the current proposal; a detailed description of the project; and discussion of the approvals required, procedures to be followed, and the role of the EIS in the process. This chapter is the key to understanding the proposed action and gives the public and decision-makers a base from which to evaluate the project against both Action and No-Action scenarios. In addition, the description of No-Action conditions will discuss other expected actions and developments that could affect technical categories considered under CEQR. The project description will present the planning background and rationale for the proposed action. TASK 2. LAND USE, ZONING AND PUBLIC POLICY Zoning is not applicable to lands under the jurisdiction of NYCDPR. Additionally, the type of land use is not changing, as the area currently exists as parkland and will remain parkland in the future. This section of the EIS will consider the project’s compatibility with existing public policy. The consistency and compatibility of the proposed project with State and City policies and programs will be evaluated. The area of the proposed action is within the City’s coastal zone. Actions subject to CEQR, such as this proposal, that are within the designated boundaries of the coastal zone must be assessed for their consistency with the City’s Local Waterfront Revitalization Program (LWRP). The City’s LWRP program consists of 10 policies that address such issues as water dependent activities, flooding, erosion, natural resources, and water quality. The Land Use, Zoning, and Public Policy chapter of the EIS will evaluate the proposed action’s compatibility with the 10 policies. TASK 3. HISTORIC AND CULTURAL RESOURCES Historic and cultural resources include both architectural and archaeological resources. Architectural resources generally include historically important buildings, structures, objects, sites and districts. Archaeological resources are physical remains, usually subsurface, of the prehistoric, Native American, and historic periods, such as burials, foundations, artifacts, wells, and privies. According to the 2010 CEQR Technical Manual, historic and cultural resources that may be impacted by proposed projects must be identified and evaluated to determine whether they possess historic significance as defined by the New York City Landmarks Law and the National Park Service. Within New York State, the National Park Service oversees the National Register of Historic Places in conjunction with the OPRHP. If proposed projects result in adverse impacts on significant historic and cultural resources, the lead agency, working in conjunction with the New York City Landmarks

Page 10: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

Draft Final Scope of Work For Great Kills Park/Cedar Grove Beach Rehabilitation EIS

AUGUST 19, 2011 6

Preservation Commission (LPC), OPRHP and consulting parties collaborate to devise methods to avoid adverse impacts. However, if adverse impacts are unavoidable, these agencies and parties would collaborate to devise a plan to mitigate adverse impacts. A State/National Register-eligible historic district has been identified in the project area: The Cedar Grove Beach Club Historic District. The historic district is comprised of buildings and structures that contribute to the historic district and landscape elements. The proposed action anticipates the removal or adaptive reuse of several buildings, although the number has not yet been determined. Consultation has been initiated by NYCDPR with OPRHP and LPC under CEQR. As a result, OPRHP has indicated that the proposed action could result in an adverse effect on the Cedar Grove Beach Club Historic District. In addition, OPRHP requested that a Phase I archaeological survey be conducted at the site. A detailed analysis of the potential for significant impacts to historic and cultural resources will be prepared and presented in the Historic and Cultural Resources chapter of the EIS. The structural analysis of buildings, Phase 1 archaeological study and alternatives developed in consultation with OPRHP will be reviewed and the results as applicable will be incorporated into the EIS chapter. The Historic and Cultural Resources chapter of the EIS will include recommendations to mitigate adverse effects of the proposed action on the Cedar Grove Beach Club Historic District. TASK 4. NATURAL RESOURCES The CEQR Technical Manual defines natural resources as the City’s biodiversity (plants, wildlife and other organisms), any aquatic or terrestrial areas capable of providing suitable habitat to sustain the life processes of plants, wildlife, and other organisms, and any areas capable of functioning in support of the ecological systems that maintain the City’s environmental stability. The proposed action will involve the removal of structures and restoration of natural landscape and features. No dredging or construction would take place in-water. There may be additional pavement created as part of the project; however, the overall objective is to rehabilitate the beach environment. The project site contains wetlands, is located in a wetland buffer area and Coastal Erosion Hazard Area, and consists of maritime beach, dune, shrubland, and wooded wetland areas. Because the project location includes natural resources and the project will change the landscaping and modify the amount of pavement add a paved area, a natural resources assessment will be conducted as part of the targeted EIS. Site descriptions of existing natural resources conditions for flora and fauna to be used in the EIS will be based on a literature search and field investigations of the site will be based on a natural resource survey of the project site conducted in late spring/early summer of 2011, as well as the documentation discussed below. The EIS will consist of the following tasks:

Information from flora and fauna surveys will be used to identify the types of vegetation and habitats found on the site. Plant and animal species observed or likely to use the site will be identified and their abundance noted.

Using text and graphics, and based on the site surveys and a literature review, habitats of the project site will be described.

Page 11: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

Draft Final Scope of Work For Great Kills Park/Cedar Grove Beach Rehabilitation EIS

AUGUST 19, 2011 7

The results of information requests sent to the NYSDEC Natural Heritage Program, the U.S. Fish

and Wildlife Service, the New York State Department of State, and the National Oceanic and Atmospheric Administration to obtain data on the presence or absence of protected species in the area will be used to determine if there are any threatened and endangered species within the project site. If any of these species or habitats are understood to occur on the project site, the size of the group, its range, and a description of the typical habitat will be provided.

Any expected changes to the natural resources of the project site or surrounding area in the future without the proposed project will be described.

Potential project impacts on habitats as well as plants and wildlife will be analyzed

and described. This would include direct impacts such as the removal of vegetation or the displacement of wildlife.

TASK 5. HAZARDOUS MATERIALS A hazardous material is any substance that poses a threat to human health or the environment. Substances that may be of concern on the project site include, but are not limited to asbestos and lead-based paints, heavy metals, volatile organic compounds (VOCs), semi-volatile organic compounds (SVOCs), methane, polychlorinated biphenyls (PCBs), pesticides, dioxins, hazardous wastes, radiation sources, etc. For hazardous materials, the goal for CEQR is to determine whether the proposed project would increase the exposure of people or the environment to hazardous materials, and, if so, whether this increased exposure would result in potential significant public health or environmental impacts. If significant adverse impacts are identified, CEQR requires that the impacts be disclosed and mitigated or avoided to the greatest extent practicable. A preliminary screening assessment prepared pursuant to the CEQR Technical Manual will be conducted for the project site to determine which areas require further assessment. The preliminary screening assessment will consist of visual or historical documentation of any of the past or current uses that might have affected (or are still affecting) the project site. A Phase I Environmental Site Assessment (ESA) will be conducted for the project sites. Subtasks will include: Review of Information Regarding Topographical and Subsurface Conditions Appropriate United States Geological Society (USGS) topographical maps will be reviewed to ascertain the topography and drainage patterns. Available USGS and New York State Geological Survey documents will be reviewed for surface and subsurface geological conditions in addition to the groundwater conditions in the area of the subject properties. Acquisition and Review of Historical Land Use Data Sanborn Fire Insurance Maps will be reviewed to develop a profile on the historical usage of the properties. If further historical investigation is required at individual lots, the review may include City Directories, historical maps and atlases, renovation information on the buildings, and tax assessor records. Site Reconnaissance The site reconnaissance will include the following activities:

Page 12: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

Draft Final Scope of Work For Great Kills Park/Cedar Grove Beach Rehabilitation EIS

AUGUST 19, 2011 8

Visual inspection of the vegetation and surrounding property to look for stressed vegetation, disturbed topography, soil staining, surface water sheens, noticeable odors, and/or areas that have been excavated and refilled;

Notation of surrounding properties to assess potential impacts on the subject property; Notation of illegal dumping of domestic refuse, hazardous waste, and/or construction

debris, if observed; Evidence of large electrical transformers and/or large capacitors on the subject property,

if observed; and Evidence of underground storage tanks or aboveground storage tanks (USTs and/or

ASTs) on the subject property, if observed; and Evaluation and Report of Findings

The data collected will be evaluated to assess the potential for environmental concerns at the project subject sites and potential environmental impacts from surrounding properties. Upon completion of the preliminary screening assessments for the project site, a summary of findings and conclusions will be prepared for inclusion in the EIS. TASK 6. TRANSPORTATION Task 6A: Traffic The proposed action is expected to generate more than 50 additional (net) vehicular trips in the project study area during the peak hour. Therefore, the EIS will provide a detailed traffic analysis. The data collection effort would include two key study intersections on the approach route to the Cedar Grove Beach area: Mill Road and Ebbitts Street (signalized) and Cedar Grove Avenue and Ebbitts Street (stop-controlled). As part of this effort, manual turning movement counts will be collected on two typical Saturdays during the midday (11:30 PM to 2:00 PM) and PM (4:00 to 6:30 6:00 PM) peak periods, at both study intersections. A detailed roadway inventory will also be performed for all study intersections. This inventory includes all items needed to analyze traffic operations and capacity at the study intersections, including:

Traffic flow directions and channelization features; Lane configurations and lane widths; Parking regulations; Special route designations, such as truck routes or snow emergency routes; Crosswalk lengths and widths; Turning prohibitions; and Traffic signal timing and phasing characteristics.

Official traffic signal timings plans will be obtained from the New York City Department of Transportation (NYCDOT) for use in the analysis. In addition, Automatic Traffic Recorder (ATR) counts will be conducted at two locations for a period of nine days One ATR location will be used to document daily traffic peaking patterns in the vicinity of the project site. The other ATR location will be at a site where recent summer counts have previously been obtained. The ATR counts gathered for this location would be compared to the earlier counts to derive a seasonal adjustment factor. The following steps will be taken to analyze the traffic impacts of the proposed action:

Page 13: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

Draft Final Scope of Work For Great Kills Park/Cedar Grove Beach Rehabilitation EIS

AUGUST 19, 2011 9

Existing Baseline Traffic Volumes: The turning movement count data for the two peak periods will be summarized, and the weekend midday, and PM peak hours will be seasonally adjusted increased by a 10 percent seasonal adjustment factor, suggested by NYC DOT, to account for the increase in beach traffic during the peak summer season. based on the ATR counts obtained. Baseline traffic flow maps will be prepared showing the turning movement volumes during all three peak hours. Existing Conditions Analysis: A traffic operations analysis will be conducted at each study intersection, for each peak hour, using the latest version of the Highway Capacity Manual (HCM). Results of these analyses will provide a quantitative assessment of existing traffic operations, including levels-of-service (LOS), average delays, and volume-to-capacity (V/C) ratios that will be used to assess the performance of the roadway network in the vicinity of the proposed project site. Future No-Action Conditions Analysis: Prior to the analysis of the “Action condition” (i.e., the future with the proposed project), a background analysis of future conditions without the proposed project must first be established for the project’s build year. This “No-Action” condition includes traffic growth from two components:

General background growth attributable to regional traffic increases over time. General background growth is estimated by increasing existing volumes by a fixed percentage. Because the build year is within five (5) years, we propose to use a background growth rate of 0.5 one percent per year, as specified in the CEQR Technical Manual for Staten Island.

Traffic generated by other future development projects (i.e., “soft sites”) expected to be completed and operating within the same build year as the proposed project. These projects will be identified in consultation with the Staten Island Office of the Department of City Planning and the NYCDOT. The trip generation for these soft sites will be estimated and assigned to the local street network.

In addition, any future planned or programmed transportation improvements expected to be completed by the build year (i.e., roadway improvements, new signalization, etc.), plus approved traffic mitigation measures from recently completed EISs, will be discussed with NYCDOT and incorporated into the future No-Action condition analyses, as appropriate. Based on the projected future No-Action conditions traffic volumes, the traffic operations analyses will be repeated for all study intersections during each analysis peak hour to project traffic operations in the future build year without the proposed project. Trip Generation, Distribution, and Assignment: To estimate the travel characteristics of employees, visitors, and service vehicles to the project site, we will review trip generation rates, arrival and departure patterns, mode splits, and vehicle occupancy rates for comparable land uses from recent EISs and input from NYC DOT. In addition, a geographic distribution pattern for future site-generated trips will be developed based on census data and/or existing traffic patterns. Based on the trip generation estimate and the estimated trip distribution pattern, the projected numbers of peak hour vehicle trips to be generated by the proposed redevelopment will be assigned onto the street network in the study area. These peak hour volumes will then be added to the projected future No-Action condition traffic volumes to arrive at the future “Action” condition traffic volumes. It is assumed that all traffic analyses will be based on the build year.

Page 14: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

Draft Final Scope of Work For Great Kills Park/Cedar Grove Beach Rehabilitation EIS

AUGUST 19, 2011 10

Future Action Conditions Analysis: Based on the projected future Action conditions traffic volumes, the traffic operations analyses will be repeated for all study intersections during each analysis peak hour to project traffic operations in the future build year with the proposed project. Assessment of Projected Traffic Impacts: Based on the results of the No-Action and Action conditions traffic operations analyses, the traffic impacts of the proposed action will be assessed. The future No-Action condition will serve as the future baseline for evaluating the potential impacts of the proposed redevelopment project. Potential significant adverse traffic impacts will be identified based on the criteria contained in the CEQR Technical Manual. Identify Mitigation Measures: Based on the identification of significant adverse traffic impacts, appropriate measures to mitigate these impacts will be investigated and tested for the build year. Typical measures for projects of this size may include:

Adjustment of traffic signal timing and/or phasing sequences; On-street parking restrictions or prohibitions; Changes in intersection geometry and/or street directions; Installation of traffic signals; and/or Modification of site-access.

The least-costly and most easily-implemented solutions will be tested first, and depending on the need for further improvements, more complex and costly measures will then be considered. Task 6B: Parking To ascertain the existing on-street parking supply and demand in the vicinity of the proposed beach area, this study will include a survey of on-street parking utilization during the morning (7:00 to 9:00 AM), midday (12:00 to 2:00 PM), and afternoon (4:00 to 6:00 PM) period on one weekday (the late evening period is critical because of the need for adequate overnight parking for residents in the vicinity of Great Kills Park/Cedar Grove Beach) weekend day. The Parking assessment time periods have been revised since the Draft Scope of Work was released. Data collection for the parking assessment will occur during the weekend peak periods, in order to coincide with the weekend peak periods studied as part of the traffic assessment. This survey will be conducted on the streets located within approximately ¼ mile of the proposed rehabilitated beach. These streets provide the most accessible parking for the proposed site. Data to be collected for the on-street survey will include parking regulations, legal parking supply, and observed number of parked vehicles. Based on the field data collected, the utilization of on-street parking will be calculated, relative to the available on-street parking supply, for each time period. One utilization observation will be made during each of the four two time periods. Future No-Action parking conditions will be projected taking into account future “soft sites” and anticipated background growth (as described above for Traffic). The projected future on-street parking utilization under the No-Action condition will then be calculated relative to the existing on-street parking supply. Task 6C: Transit A detailed transit analysis is usually not performed unless a proposed action generates 200 or more transit trips in a peak hour. It is expected that the trip generation for the proposed recreational area will

Page 15: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

Draft Final Scope of Work For Great Kills Park/Cedar Grove Beach Rehabilitation EIS

AUGUST 19, 2011 11

demonstrate that this threshold is unlikely to be exceeded. This section will discuss the trip generation as well as why no detailed analysis is required by the action. Task 6D: Pedestrians A detailed transit analysis is usually not performed unless a proposed action generates 200 or more pedestrian trips in a peak hour. It is expected that the trip generation for the proposed recreational area will demonstrate that this threshold is unlikely to be exceeded. This section will discuss the trip generation as well as why no detailed analysis is required by the action. A safety assessment will be conducted at both proposed study intersections, as per the 2010 CEQR Technical Manual, using the most recent available three-year crash data. The safety assessment will identify any crashes involving pedestrians and bicycles, as well as those involving vehicles. TASK 7. NEIGHBORHOOD CHARACTER Neighborhood character is an amalgam of various elements that give neighborhoods their distinct "personality.” These elements may include a neighborhood’s land use, zoning, public policy; socioeconomic conditions, open space, historic and cultural resources, urban design and visual resources, shadows, transportation, or noise. In a neighborhood character assessment under CEQR, the assessment considers how elements of the environment combine to create the context and feeling of a neighborhood, and how a project may affect that context and feeling. An assessment of neighborhood character is generally needed when a proposed project has the potential to result in significant adverse impacts in any of the technical areas presented above, or when the project may have moderate effects on several of the elements that define a neighborhood’s character. The Cedar Grove Beach area has a distinct character that has been often cited in support of its preservation. These elements are closely tied to the community's eligibility for historic designation and will be extensively covered in this chapter of the EIS. This chapter will reflect that work and will include observations of such features as the major existing uses, scale and types of buildings, and the relationship between traffic, noise, and the waterfront. Photographs will be used as supplemental information. Data gathered for other technical areas of the environmental assessment (in addition to cultural resources); such as land use, visual resources, socioeconomics; will be used in identifying the neighborhood's characteristics. TASK 8. CONSTRUCTION IMPACTS The EIS will assess the potential for significant adverse impacts from construction related to the proposed project. The rehabilitation of the beach is expected to be completed in 2014. Typical construction equipment expected to be used includes, but is not limited to the following machinery: dump trucks, backhoes, pavers, and concrete mixers and pumps. Potential construction impacts related to the project are due to the presence of natural and historic resources in the project area, as well as potential for air quality, traffic and noise impacts from construction equipment. The targeted EIS will assess the potential for the proposed action to affect historic resources and the natural resources surrounding and on the project site. In addition, the EIS will review diesel emissions of trucks and construction equipment on site, as well as potential increases in emissions from adjacent roadways. Locations where dust from demolition might be a problem will be identified, along with methods for controlling fugitive dust problems. The EIS will also address the potential for noise and traffic impacts related to the proposed project.

Page 16: CG Final Scope - New York City Department of Parks and ...€¦ · DRAFT FINAL SCOPE OF WORK FOR THE GREAT KILLS PARK/CEDAR GROVE BEACH REHABILITATION TARGETED ENVIRONMENTAL IMPACT

Draft Final Scope of Work For Great Kills Park/Cedar Grove Beach Rehabilitation EIS

AUGUST 19, 2011 12

TASK 9. MITIGATION Where significant adverse project impacts have been identified in the targeted EIS, measures to mitigate those impacts will be described. These measures will be developed and coordinated with the responsible City/State agency. Where impacts cannot be mitigated, they will be described as unavoidable adverse impacts. TASK 10. ALTERNATIVES Under CEQR, a certifiable DEIS must demonstrate that all reasonable efforts have been made to avoid adverse environmental impacts. This requires that reasonable and plausible alternatives to the proposed action have been explored to determine if the goals of the proposed action could have been achieved with fewer negative effects on the environment. Specific alternatives have not been identified at this time. At this juncture, the most likely alternatives appear to be the "No-Action Alternative" and any alternatives developed in consultation between NYCDPR and OPRHP. TASK 11. SUMMARY EIS CHAPTERS In accordance with CEQR guidelines, the EIS will include the following three summary chapters, where appropriate to the proposed action:

Unavoidable Adverse Impacts - which summarizes any significant adverse impacts that are unavoidable if the action is implemented regardless of the mitigation employed (or if mitigation is impossible).

Growth-Inducing Aspects of the proposed action - which generally refer to “secondary” impacts of a proposed action that trigger further development.

Irreversible and Irretrievable Commitments of Resources - which summarizes the proposed action and its impacts in terms of the loss of environmental resources (loss of vegetation, use of fossil fuels and materials for construction, etc.), both in the immediate future and in the long term.

TASK 12. EXECUTIVE SUMMARY The executive summary will utilize relevant material from the body of the EIS to describe the proposed project, its environmental impacts, measures to mitigate those impacts, and alternatives to the proposed action. The executive summary will be written in enough detail to facilitate the issuance of a notice of completion.