ch. karnchang public company...
TRANSCRIPT
CONTENTS1
01 02 03 05 04 06 At a Glance
• About CK
• CK Business Model
Strong Construction
FutureOutlook
Strong Investment
StrongPerformance
Appendix
• Strong Backlog
•Infrastructure Outlook
•Strong Recurring Incomes
• Contribution to CK Construction works
•Investment Outlook
•Financial Performance • Appendix
ABOUT CK2
Industry Property & Construction
Sector Construction Services
Market Cap. (As of 16/01/17)
1423.5 Million USD
No. of Share 1,693,899,970 shares
First Trade Date 03 Aug 1995
Par Value 1.00 Baht
Dividend Policy 40 % of Net Profit
About CK
1 Mahasiri Siam Co.,Ltd. 18.68%
2 CH. Karnchang Holding Co., Ltd. 10.36%
3 CK Office Tower Co., Ltd. 5.51%
4 Thai NDVR Co., Ltd. 4.26%
5 Bangkok Bank PCL. 2.30%
6 State Street Bank Europe Limited 1.14%
7 K Equity LTF 1.12%
8 K Equity 70:30 LTF 1.12%
9 K Equity Dividend LTF 0.94%
Major Shareholder
1972
Founded CK withinitial registered capital of 1.40 MB on November 27, 1972
First expressway concession : BECL
1987
1994
- Converted into public company- Increased registered capital to 700 MB
-CK Listed on the SET on Aug 3.- BECL Listed on the SET on Aug 31
1995
1996
Increased registered capital to 1,050 MB
First underground mass transit : BMCL
1998
2004
-Founded SEAN.-BMCL & TTW began commercial operations
BMCL listed on the SET
2006
2007
Gained total amount of 877 MB from CK Warrant
TTW listed on the SET
2008
2009
Expanded into other energy businesses
Founded CKP as a holding company
2011
2012
NN2 COD, Signed Xayaburiproject, the biggest value in CK history
CKP listed on the SET
2013
2015
Amalgamation of BEM with registered capital to 15,285 MB
BEM traded under new name
2016
(As of 13/09/16) Shareholder StructureAs of 09/11/2016
Local Funds
22.47%
Foreign Investors
6.58%
Trivisvavet Family37.54%
Others33.41%
Construction Investment
CK BUSINESS MODEL
Transportation
Water
Power
Concession Operation
Construction Revenues
Capital Gain
Dividend
Investment Revenues
To be the comprehensive contractor - infrastructure
developer - concession investor to create synergy and
complementary business.
DividendConstruction
Work
3
30.25%
30.62%
19.40%
Strong Backlog - Current Projects (As of Sep 30, 2016) Period Contract Value
(Million USD)
Remaining Value
(Million USD)Progress
1. MRT Purple Line
- Elevated Structure, Contract 1 - Supply and Installation of M&E System in the MRT, Contract 4
2009-20162013-2016
418.9565.2
0.9215.4
99.7%61.9%
2. MRT Blue Line (Extension)
- Underground Civil (Sanam Chai-Tha Phra), Contract 2- Trackwork, Contract 5
2011-20172011-2017
282.1132.0
12.731.0
95.5%76.5%
3. MRT Green Line
- Elevated Structure and Depot, Contract 1
- Trackwork, Contract 2 2012-20162013-2017
371.963.3
37.216.8
90.0%73.5%
4. Xayaburi : A Run-off-river Hydropower Project 2011-2019 2,664.9 898.1 66.3%
5. Si Rat (Sector B+) Expressway 2012-2016 635.6 12.7 98.0%
6. The Cogeneration Power Project No.2 (BIC-2) 2014-2017 121.8 31.0 74.5%
7. 2nd Tap Water Treatment Plant in Samut Sakhon – Nakhon Pathom 2014-2016 82.0 28.3 65.5%
8. Capacity Expansion Project in Pathum Thani – Rangsit 2014-2016 10.4 1.8 83.0%
9. The Medical Center Building and Facilities – Mae Fah Luang University 2015-2018 39.0 27.9 28.5%
10. Underground Manholes and Ductbanks Project with the MRT Green Line 2015-2018 30.2 26.8 11.5%
11. The Diagnosis and Treatment Building and Facilities @ Mae Fah Luang University 2015-2018 33.0 27.9 15.3%
12. MRT Blue Line (Extension) : M&E - E&M and MRT Blue Line : communication systems 2015-2017 29.8 11.6 61.0%
13. MRT Blue Line : Maintenance Services and E&M Systems 2015-2023 35.9 32.8 8.4%
14. MRT Purple Line Bang Pai – Tao Poon : Maintenance Services and E&M Systems 2015-2023 42.9 42.9 0.0%
15. The raw water intake relocation project for Bang Pa-in 2015-2017 3.9 3.0 23.5%
16. SRT Double Track Railroad : Chira Junction - Khon Kaen Section 2015-2018 618.5 394.0 9.0%
17. Motorway No.4, Pattaya-Map Ta Phut Section, Phase5 2016-2018 20.5 19.4 5.5%
18. The Construction of the 230/500 kV Nabong Substation 2016-2019 62.1 48.1 22.5%
19. Motorway , Bang Pa-in – Nakhon Ratchasima Section 2016-2019 51.3 51.2 0.1%
20. Repair of Si Rat Expressway : Period 3 Phase 5, Sector D (Asoke-Srinagarindra) 2012-2016 0.9 0.9 0.0%
21. Other Projects 2012-2016 237.2 41.0 82.7%
Total 6,553.8 2,013.8
*
* K-Factor projects
**
**
*
*
**
*
*
4
Signed Projects in 2016 Signed Project Value (Million USD)
1. Motorway, Bang Pa-in – Nakhon RatchasimaSection Aug 2016 51.3
2. Xayaburi : A Run-of-river Hydropower Project(Variation Order) Jul 2016 548
3. The Construction of the 230/500 kV NabongSubstation Apr 2016 62
4. The Construction of Highway No.7, Pattaya –Map Ta Phut Section, Phase 5 Mar 2016 20.5
Total 681.8
STRONG BACKLOG5
Upcoming Projects StatusProject Value (Million USD)
1. Motorway, Bang Pa-in –Nakhon Ratchasima contract 4 To be signed in 1H17 56
2. MRT Blue Line Extension M&E To be signed in 1H17 706
3. MRT Orange Line : Contract 1 To be signed in 1H17 584.7
4. MRT Orange Line : Contract 2 To be signed in 1H17 610.3
5. MRT Orange Line : Contract 5 To be signed in 1H17 138.5
Total 2,095.5
Signed Project (Million USD)
MRT21%
Power48%
Motorway &
Expressway4%
Double Track20%
Building3%
Water System
2%
Other Project
2%
46% 56% 56% 61% 53%
54% 43% 44% 39% 47%
2012 2013 2014 2015 Q3/2016
Oversea Domestic
5
Backlog (Million USD) Domestic & Oversea Backlog
3,343 3,1772,661
2,3602,014
2012 2013 2014 2015 Q3/2016
Backlog breakdown by Type of work2,809
647
215
644 682
2,113
1 2 3 4 5 62012 2013 2014 2015 2016 2017
Development Direction :
Transport Infrastructure Development Master Plan6
84.7706 791
4,067
5,141
3,503
1,4121,045
1,6102,175
790
141
2016 2017 2018 2019 2020 2021 2022
Expected disbursement on infra projects
New Ongoing (Million USD)
Source: EIC Analysis
Upcoming ProjectsTotal inv.(Million
USD)Progress
1 MW : Pattaya – Maptaput 565
2 MW : Bang Pa In – Nakorn Ratchasrima 2,401
3 MW : Bang Yai - Karnchanaburi 1,582
4 Sawannabhumi Airport 1,469
5 Leam Chabang Seaport (SRTO & A0 Port) 113
6 UR : Orange Line (Thailand cultural center – Min Buri) 3,107
7 UR : Pink line (Kae Rai – Min Buri) 1,610
8 UR : Yellow line Lad Prao – Sam Rong 1,554
9 UR : Blue line (Bang Sue – Tha Phra &Hua Lampong – Bang Kae)
621
10 UR : Red Line (Bang Sue – Hua Mark & Hua Lampong) 1,243
11 UR : Airport Rail Link (Bang Sue – Phayathai) 876
12 DT : Prachuap Khiri Khan - Chumpon 480
13 DT : Map Kabao – Jira Junction 847
14 DT : Lop Buri – Pak Nampo 1,412
15 DT : Nakorn Phrathom – Hua Hin 565
16 HSR : Bangkok – Hua Hin 2,684
17 HSR : Bangkok - Rayong 4,322
18 HSR : Bangkok – Nong Kai 4,802
19 HSR : Bangkok – Chiang Rai 14,972
Already bid On bidding process Need cabinet approval Under FS Study
(Million USD)
ProjectsConstruction
Value (Million USD)
Project Owner
Q3/16 Q4/16 Q1/17 Q2/17 Q3/17 Q4/17
Double Track : Prachuap KhiriKhan - Chumphon
441.47
SRT
Bidding Signing Construction
Double Track : Nakhon Pathom –Hua Hin
544.35 Bidding Signing Construction
Double Track : Mab Krabao -Chira Junction
805.08 Bidding Signing Construction
Double Track : Lop Buri – Pak Nam Po
675.14 Bidding Signing Construction
Double Track : Hua Hin –Prachuap Keeree Kan
279.66 Bidding Signing Construction
Sainoi - Ratchaburi Transmission Pipeline Project
254.24 PTT Bidding Signing Construction
Total 2,999.94
CK TARGETS IN 1H 20177
Projects Construction
Value (Million USD)
Owner
MRT Purple Line : Tao Poon - Ratboorana 1,840.4
MRTA
MRT Orange Line : Taling Chan -Thailand Cultural Centre
2,550
MRT Blue Line (Extension) : Bang Khae -Phuttamonthon 4
598.8
MRT Green Line : Samut Prakan - Bangpu 344.6
MRT Green Line : Khu Khot - Lam Luk Ka 282.5
Airport Rail Link (Extension) Don Muang- Bang Sue - Phaya Thai
881.7
SRT
Red Line : Rangsit - ThammasatUniversity (Rangsit Campus)
214.7
Red Line (Missing Link) 1,247.4
Double Track : Paknam Po – Den Chai 1,584.7
Double Track : Chira Junction –Ubon Ratchathani
1,012.4
Double Track : Khon Kaen - Nong Khai 737.3
Double Track : Chumphon - Surat Thani 661
CK TARGETS IN 2017 ONWARD8
ProjectsConstruction
Value (Million USD)
Owner
Double Track : Surat Thani - Hat Yai -Songkhla
1,466 SRT
3rd Runway, Suvarnabhumi Airport 282.5 AOT
Motorway : Pattaya - Map Ta Phut 70.6
DOHMotorway : Bang Pa-In - NakhonRatchasima
282.5
Motorway : Bang Yai - Kanchanaburi 282.5
Rama III - Dao Kanong Expressway 881.4EXAT
Third Stage Expressway (North) 406.8
Total 15,628
51%
8%4%
35%
2%
Project Breakdown By Type of work
Mass Transit
Express Way
Road
Double track train
Airport
7,890 Million USD
1,288.2 Million USD
635.6 Million USD
5,461.4 Million USD
282.5 Million USD
STRONG INVESTMENTS
As of 16/01/2017 Bangkok Expressway and Metro PLC. TTW PLC. CK Power PLC.
Stock Quote BEM TTW CKP
Shareholding (%) 30.62% 19.40% 30.25%
Concession
Expressway : EXAT
1990-2020 (2nd Stage Sector A B C)
1997-2027 (2nd Stage Sector D)
1996-2026 (Bang Pa-In – Pak Kret)
2012-2042 (Sirat – Outer Ring Road)
Metro: MRTA
2004-2029
(Blue Line)
2013-2043
(Purple Line)
TTW: PWA
2004-2034
PTW
1998-2023
2006-2023
TTW:
MNRE
2005-2030
PTW:
MOI
2000-2025
EGAT
2011-2036 (NN2 )2013-2038 (BIC)2019-2050 (XPCL)
PEA2012-2037 (BKC)2012-2037 (NRS)2013-2038 (CRS)
Registered Capital (Million USD)
431.78 112.71 261.02
Market Cap. (Million USD) 3,238.35 1,194.75 757.82
Par Value (Baht / share)
1.00 1.00 1.00
Dividend Policy 40% of net profit 50% of net profit 40% of net profit
Revenue (Million USD)
(As of 30 Sep 2016)267.5 117.24 139.25
D/E (As of 30 Sep 2016)
1.76 1.21 0.97
(29.73 % - Separate Balance Sheet)
9
1 CK 29.73%
2 MRTA 8.22%
3 KTB 6.85%
4 Others 54.31%
1 Mitsui 25.98%
2 BEM 19.45%
3 CK 19.40%
4 Others 35.17%
1 CK 30.25%
2 TTW 25.31%
3 BEM 19.40%
4 Others 25.04%
2012 2013 2014 2015 2016
DPS (baht) 1.32 1.58 1.70 2.50 -
Dividend Yield (%)
4.32 % 4.72 % 4.30 % 5.52 % -
DPS (baht) - - - - 0.12
Dividend Yield (%)
- - - - 1.74 %*
DPS (baht) 0.47 0.55 0.65 0.65 0.60
Dividend Yield (%)
4.35 % 5.20 % 5.17 % 6.13 % 5.56 %*
DPS (baht) - - - 0.10 0.0223
Dividend Yield (%)
- - - 0.75 % 0.70 % *
Total Dividend (Million Baht)
717.43 602.27 692.26 888.45 1,042
Total Dividend (Million USD)
20.3 17 19.5 25 29.5
STRONG RECURRING INCOMES10
* as of 30/09/2016
Construction Projects within CK Group by %
7
Signed Projects From CK Group by Contract Values (Million USD)
CONTRIBUTION TO CK CONSTRUCTION WORKS11
664.3
97.1
90.9
9.7219.5 312.5
2,807.6
565.3
214.1 108.6
610.2
61.5
117.7
71.4
515.6 424.0
919.3
1.7 81.7
535.3
71.972.3
2.8 2.9
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Q3/2016
CK Group Government Private
64% 64%53%
8% 17% 16%
84% 80% 85%69% 62%
36% 36%47%
92% 83% 84%
16% 20% 15%31% 38%
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Q3/2016
CK Group Government & Private
12POTENTIAL PROJECTS FROM CK GROUP
The key projects of BEM to achieve during 2016 - 2020
TTW is taking the first stepin Myanmar
Y. 2016
Operating : 755 MW
Hydro : NN2 615 MW
Thermal : BIC 1 117.5 MW
Solar : BKC 8 MW,
CRS 8 MW, NRS 6 MW
Y. 2017 – 2018
Operating : 875 MW
New Capacity :
• 120 MW from BIC 2 (June 2017)
Y. 2019 – 2020
Operating : 2,280 MW
New Capacity :
• 1,285 MW from Xayaburi (Oct 2019)
Y. 2020 Onward
Target : 5,000 MW
Potentials :
• Hydropower Projects from Cross-Border
• Domestic Power Projects
CKP Solid Project Pipeline and Strong Growth Plan during 2016 - 2020
Mawlamyine Project
JointVenture
TTW 70% Z Corperation CO., LTD 30%
Concession BOT 30 years (Option +10 years 2 times)
Raw river Attran river
Investment 12 Million USD
Capacity 33,000 M3 Expandable up to 40,000 M3
(Source : Bangkok Post)
(Million USD) 2012 2013 2014 2015 1Q16 2Q16 3Q16 9M16
Construction Revenue
584.32 920.06 928.20 984.49 253.87 584.21 241.05 1,079.01
Total Revenue 624.12 1,186.72 1,001.21 1,074.24 9,086 256.67 252.82 1,101.27
Gross Profit 66.86 97.29 85.96 80.93 783 35.14 19.60 76.84
Net Profit 16.05 85.96 64.86 61.95 305 29.01 9.27 46.89
Gross Profit Margin
11.37% 10.54% 9.26% 8.22% 8.71% 6.02% 8.12% 7.12%
Net Profit Margin 2.57% 18.28% 6.48% 5.77% 3.35% 4.9% 3.67% 4.26%
Net D/E Ratio 2.64 1.73 1.48 1.66 1.67 1.56 1.47 1.47
STRONG PERFORMANCE13
Sirat Expressway Project Value : 636 Million USD
Completed in 2016
MRT Purple Line ProjectProject Value : 984 Million USD
Completed in 2016
Construction Project Progress Update15
Construction Project Progress Update16
MRT Blue Line Extension ProjectProject Value : 282 Million USD
Construction Progress : 9.0 %
MRT Green Line (Extension) ProjectProject Value : 984 Million USD
Construction Progress : 90.0 %
Double Track : Chira Junction - Khon KaenProject Value : 619 Million USD
Construction Progress : 9.0 %
Motorway , Bang Pa-in – Nakhon RatchasimaProject Value : 21 Million USD
Construction Progress : 5.5 %
Construction Project Progress Update17
Construction Project Progress Update
Xayaburi : Hydropower ProjectProject Value : 2,665 Million USD
Construction Progress : 66.3 %
18
Construction Project Progress Update19
Xayaburi : Hydropower ProjectProject Value : 2,665 Million USD
Construction Progress : 66.3 %
Metro Map
ProjectsDistance
kms.Stations Trains Cars Status
Operated(Year)
Operator
Blue Line (Bang Sue-Hua Lamphong) 20 18 19 57 Operating 2004 BEM
Purple Line (Bang Yai-Tao Poon) 23 16 21 63 Operating Aug 6, 2016 BEM
Airport Rail Link (Phaya Thai-SuvarnabhumiAirport)
28.5 8 9 - Operating 2010 SRT
Green Line - Mochit - Baring
21.8 2252 208 Operating 1999 BTS
Light Green Line - National Stadium-Saphan Taksin-Bang Wa
14.5 13
Total (kms.) 107.8
Existing Metro Lines 6 more Lines under construction
ProjectDistance
kms.Stations Trains Cars Status
Operated(Year)
Operator
Blue Line (Extension)Bang Sue-Tha PraHua Lamphong-Bang Khae
27 20 30 90 Constructing 2020BEM
(to be negotiated)
Red Line (Bang Sue-Rang Sit) 26.3 8 - - Constructing 2021 SRT
Green Line (Khu Khot – Samut Prakan)
44.7 33 - Constructing 2021 BTS
Pink Line (Kae Rai – Min Buri) 36 24 - - Constructing 2020 BTS
Yellow Line (Lat Phrao –Samrong)
30.4 21 - - Constructing 2020 BTS
Orange Line (TCC - Minburi)
23 17 - - Constructing 2022 -
Total (kms.) 187.4
22
Please visit CK Website @
http://www.ch-karnchang.co.th
More Information : [email protected]