Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Work Systems and How They Work
Chapters:2. Manual Work and Worker-Machine
Systems3. Work Flow and Batch Processing4. Manual Assembly Lines5. Logistics Operations6. Service Operations and Office Work7. Projects and Project Management
Part I
![Page 2: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/2.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Manual Work & Worker-Machine Systems
Sections:1. Manual Work Systems2. Worker-Machine Systems3. Automated Work Systems4. Determining Worker and Machine
Requirements5. Machine Clusters
Chapter 2
![Page 3: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/3.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
![Page 4: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/4.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Three Categories of Work Systems
1. Manual work systemWorker performs one or more tasks without the aidof powered tools (e.g. hammers, screwdrivers,shovels)
2. Worker-machine systemHuman worker operates powered equipment (e.g.a machine tool)
Physical effort (less)Machine power(more)
3. Automated work systemProcess performed without the direct participationof a human worker
![Page 5: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/5.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
A Work System as a Physical Entity
![Page 6: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/6.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Manual Work System
![Page 7: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/7.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Worker-Machine System
![Page 8: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/8.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Automated System
![Page 9: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/9.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Manual Work SystemsMost basic form of work in which human bodyis used to accomplish some physical taskwithout an external source of power
With or without hand toolsEven if hand tools are used, the power to operatethem is derived from the strength and stamina of ahuman workerHairbrush vs hair dryer
Of course other human faculties are alsorequired, such as hand-eye coordination andmental effort
![Page 10: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/10.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Pure Manual Work
Involves only the physical and mentalcapabilities of the human worker withoutmachines or tools.
Material handler moving cartons in a warehouseWorkers loading furniture into a moving van withoutthe use of dolliesDealer at a casino table dealing cardsOffice worker filing documentsAssembly worker snap-fitting two parts together
![Page 11: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/11.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Manual Work with Hand Tools
Manual tasks are commonly augmented by useof hand tools.
Tool is a device for making changes to objects(formally work units) such as cutting,grinding,striking, sequeezing
Scissor, screwdriver, shovel
Tools can also be used for measurementand/or analysis purposes
Workholder to grasp or poisiton work units
![Page 12: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/12.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Manual Work with Hand Tools
Machinist filing a partAssembly worker using screwdriverPainter using paintbrush to paint door trimQC inspector using micrometer to measure thediameter of a shaftMaterial handling worker using a dolly to movefurnitureOffice worker writing with a pen
![Page 13: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/13.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Repetitive vs. Nonrepetitive Tasks
Repetitive TaskWork cycle is relatively short (usually a few minutesor less)High degree of similarity from one cycle to the next
Nonrepetitive TaskWork cycle takes a long timeWork cycles are not similar
In either case, the task can be divided intowork elements that consist of logical groupingsof motions
![Page 14: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/14.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Work Element Example:
Grommet : sealant like ring
![Page 15: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/15.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
REMINDER: The Pyramidal Structure of Work
Tasks consist of work elements
Work elements consist of basic motion elements
Required time
![Page 16: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/16.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Cycle Time Analysis
Cycle time Tc
whereTek= time of work element k, where k is used toidentify the work elements (min)ne = number of work elements into which acycle is divided.
1
en
c ekk
T T=
= ∑
![Page 17: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/17.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.1: A repetitive Manual Task
Current method: An assembly worker performs arepetitive task consisting of inserting 8 pegs into 8 holesin a board. A sightly interference fit is involved in eachinsertion. The worker holds the board in one hand andpicks up the pegs from a tray with other hand andinserts them into the holes, one peg at a time.
![Page 18: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/18.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Current method and current layout:
Example 2.1: A repetitive Manual Task
![Page 19: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/19.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Improved method and improved layout:Use a work-holding device to hold and position theboard while the worker uses both handssimultaneously to insert pegs.Instead of picking one peg at a time, each hand willgrab four pegs to minimize the number of times theworker’s hands must reach the trays.
Example 2.1: A repetitive Manual Task
![Page 20: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/20.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Improved method
The cycle time is reduced from 0.62 min to 0.37 min.
% cycle time reduction=(CTcurrent-CTimproved)/CTcurrent
=(0.62-0.37)/0.62=%40
Example 2.1: A repetitive Manual Task
![Page 21: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/21.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Production ratecurrent=1/0.62 min=1.61 units per min(throughput)Production rateimproved=1/0.37 min=2.70 units per min
% increase in R=(Rimproved-Rcurrent)/Rcurrent
=(1.61-2.70)/1.61=%68
It is important to design the work cycle so as to minimizethe time required to perform it.
Of course there are many alterantive ways to perform agiven task. Our focus is on the best one.
Example 2.1: A repetitive Manual Task
![Page 22: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/22.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
One Best Method Principle
Of all the possible methods that can be used to perform agiven task, there is one optimal method that minimizes thetime and effort required to accomplish it
Attributed to Frank Gilbreth
A primary objective in work design is to determine the one
best method for a task, and then to standardizeit!
![Page 23: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/23.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
One Best Method Principle
This ‘One Best’ refers to:1. an average worker with a moderate level
of skill,2. operating under normal working conditions3. with nominal material quality and4. tool/equipment availability
![Page 24: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/24.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Cycle Time Variations
Once the method has been standardized, theactual time to perform the task is a variablebecause of:
Differences in worker performanceMistakes, failures and errorsVariations in starting work unitsVariations in hand and body motionsExtra elements not performed every cycleDifferences among workersThe learning curve phenomenon
![Page 25: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/25.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Worker Performance
Defined as the pace (tempo) or relative speedwith which the worker does the task.
As worker performance increases, cycle timedecreases
From the employer’s viewpoint, it is desirablefor worker performance to be high
What is a reasonable performance/pace toexpect from a worker in accomplishing a giventask?
![Page 26: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/26.jpg)
What is a reasonable performance for a worker?
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
![Page 27: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/27.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Normal Performance (normal pace)
A pace of working that can be MAINTAINED by a properlytrained average worker throughout an entire work shiftwithout harmful short-term or long-term effects on theworker’s health or physical well-being
![Page 28: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/28.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Normal Performance (normal pace)
The work shift is usually 8 hours, duringwhich periodic rest breaks are allowed
Normal performance = 100%performance
Faster pace > 100%, slower pace < 100%
Common benchmark of normalperformance:
Walking at 3 mi/hr (~4.83 km/hr)
![Page 29: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/29.jpg)
The normal pace refers to the pace of worker while actually working (does not include or relate to rest periods)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Normal Performance (normal pace)
![Page 30: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/30.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Normal Time
The time to complete a task when working atnormal performance
Actual time to perform the cycle depends onworker performance
Tc = Tn / Pw
whereTc = cycle time,Tn = normal time,Pw = worker performance (or pace)
![Page 31: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/31.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.2: Normal Performance
Given: A man walks in the early morning forhealth and fitness. His usual route is 1.85 miles.The benchmark of normal performance = 3mi/hr.
Determine:(a) how long the route would take at normalperformance(b) the man’s performance when he completesthe route in 30 min.
![Page 32: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/32.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.2: Solution
(a) At 3 mi/hr, time = 1.85 mi / 3 mi/hr= 0.6167 hr = 37 min
(b) Rearranging equation, Pw = Tn / TcPw = 37 min / 30 min = 1.233 = 123.3 %
or an alternative approach in (b):Using v = 1.85 mi / 0.5 hr = 3.7 mi/hrPw = 3.7 mi/hr / 3.0 mi/hr = 1.233
If worker performance > 100%, then the time required tocomplete the cycle will be less than normal time.
If worker performance < 100%, then the time required tocomplete the cycle will be greater than normal time.
233.10.37.3===
VnVcPw
233.1min30min37
===TnTcPw
![Page 33: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/33.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Standard Performance
Same as normal performance, butacknowledges that periodic rest breaks mustbe taken by the worker
Periodic rest breaks are allowed during thework shift
Lunch breaks (1/2 or 1 hour)usually not counted as part of work shifts
Shorter rest beraks (15 mins)usually counted as part of work shifts
![Page 34: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/34.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Rest Breaks in a Work ShiftA typical work shift is 8 hours (8:00 A.M. to 5:00 P.M.with one hour lunch break)
E.g. In one country work time is defined as 45 hoursa week(so 8:00 A.M. to 6:00 P.M. with one hour lunch break,provided that workers work for 5 days)
The shift usually includes one rest break in the morningand another in the afternoon.
The employers allows these breaks, because they knowthat the overall productivity of a worker is higher if restbreaks are allowed.
The rest periods are not included in daily work hours inwhich employers are paid for.
![Page 35: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/35.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Standard Performance
Of course other interruptions and delays alsooccur during the shift
Machine breakdowns
Receiving instructions from the foreman
Telephone calls
Bathroom/toilette breaks etc.
![Page 36: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/36.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Personal time, Fatigue, Delay (PFD)Allowance
To account for the delays and rest breaks, anallowance is added to the normal time in orderto determine allowed time for the worker toperform the task throughout a shift
Personal time (P)Bathroom breaks, personal phone calls
Fatigue (F)Rest breaks are intended to deal with fatigue
Delays (D)Interruptions, equipment breakdowns
![Page 37: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/37.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Standard TimeDefined as the normal time but with an allowance addedinto account for losses due to personal time, fatigue, anddelays
Tstd = Tn (1 + Apfd)whereTstd = standard time,Tn = normal time,Apfd = PFD allowance factor
Also called the allowed time
Now we are confident to say that a worker working at100% performance during 8 hours CAN ACCOMPLİSHa task of 8 hour standard time.
![Page 38: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/38.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Irregular Work Elements
Elements that are performed with a frequencyof less than once per cycle
Examples:Changing a toolExchanging parts when containers become full
Irregular elements are prorated into the regularcycle according to their frequency
![Page 39: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/39.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.3: Determining Standard Timeand Standard Output
Given: The normal time to perform the regularwork cycle is 3.23 min. In addition, an irregularwork element with a normal time = 1.25 min isperformed every 5 cycles. The PFD allowancefactor is 15%.
Determine(a) the standard time(b) the number of work units produced duringan 8-hr shift if the worker's pace is consistentwith standard performance.
![Page 40: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/40.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.3: Solution
(a) Normal time Tn = 3.23 + 1.25/5= 3.48 min
Standard time Tstd = 3.48 (1 + 0.15)= 4.00 min
(b) Number of work units produced during an 8-hrshift
Qstd = 8.0(60)/4.00 = 120 work units
Normal time of a task involves normal timesfor regular and irregular work elements
![Page 41: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/41.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.4: Determining Lost Time due to the Allowance Factor
Given: An allowance factor of 15% is used.
Determine the anticipated amount of time lostper 8-hour shift.
Solution:8.0 hour =(actual time worked) (1+0.15)
Actual time worked = 8/ 1.15 = 6.956 hr
Time lost = 8.0 – 6.956 = 1.044 hr
![Page 42: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/42.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.5: Production rate when worker performance exceeds 100%
Given: Tsd=4.00 min. The worker’s averageperformance during an 8-hour shift is 125%and the hours actually worked is 6.956 hr(which corresponds to the 15% allowancefactor).
Determine daily production rate.
![Page 43: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/43.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.5: Solution
Based on normal time Tn=3.48 min, the actualcycle time with a worker performance of 125%,Tc=3.48 / 1.25 = 2.78 min.
Assuming one work unit is produced eachcycle, the corresponding daily production rate,Rp=6.956(60)/2.78=150 work unitsOR125% of 120 units (we know that from Exercise2.3.b) at 100% performance = 150 units
![Page 44: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/44.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Standard Hours and Worker Efficiency
Two (three) common measures of workerproductivity used in industry
Standard hours – represents the amount of workactually accomplished during a given period (shift,week)
Quantity of work units (in terms of time) producedHstd = Q Tstd
whereHstd =standard hours accomplished, hrQ = quantity of work units completed during the
period, pcTstd =standard time per work unit, hr/pc
![Page 45: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/45.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Standard Hours and Worker Efficiency
Two (three) common measures of worker productivity used in industry
Worker efficiency – work accomplished during the shift expressed as a proportion of shift hours
Ew = Hstd / Hsh
where Hstd =standard hours accomplished, hrEw =worker efficiency, normally expressed as a
percentage, hrHsh =number of shift hours, hr
![Page 46: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/46.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.6: Standard hours and worker efficiency
Given: The worker performance of 125% in the previousexample.
Determine:(a) number of standard hours produced(b) worker efficiency
Solution:(a) Hstd=150(4 min)=600 min= 10.0 hr
(Hstd = Q Tstd)(b) Ew = 10hr / 8 hr =125 %
(Ew = Hstd / Hsh)
![Page 47: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/47.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.6: Standard hours and worker efficiency
Note that worker efficiency is found to beequal to the worker performance (rate).
What are the reasons for that?
The number of hours actually worked is consistentwith 15% allowance factor.
The entire work cycle consists of manual labor.So, worker efficiency=worker performance (rate)
![Page 48: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/48.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.7: Standard hours and worker efficiency as affected by hours actually worked
Given: The worker performance of 125%, actual hoursworked is 7.42 hr.
Determine:(a) number of pieces produced,(b) number of standard hours accomplished,(c) the worker’s efficiency
Solution:(a) Tc= 2.78 (prev. example), Q=7.42(60)/2.78=160units(b) Hstd=160(4 min)=640 min= 10.67 hr(c) Ew = 10.67hr / 8 hr =133.3 %
![Page 49: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/49.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
Example 2.7: Standard hours and worker efficiency as affected by hours actually worked
Note that in this example worker efficiency, Ew, andworker pace, Pw, are not equivalent.
The reason for thatActual work hours of that labor (7.42–given in theexample) is greater than the allowed time (or anticipatedwork time, which is found to be 6.956 hr in Example 2.4)
That is, on that specific day, the worker delays (8-7.42=0.58hr) and the rest breaks are less than theanticipated time loss due to PDF allowances (1.044hr).
It is better to calculate worker efficiency by using actualoutputs (in terms of hour).
![Page 50: Ch02 Manual Work 1](https://reader034.vdocuments.net/reader034/viewer/2022050709/547abfb7b479599a098b4aa7/html5/thumbnails/50.jpg)
Work Systems and the Methods, Measurement, and Management of Workby Mikell P. Groover, ISBN 0-13-140650-7.
©2007 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved.
More on Worker Efficiency
Worker efficiency is commonly used to evaluateworkers in industry.
In many incentive wage payment plans, the worker’searnings are based on
worker’s efficiency, Ew,orthe number of standard hours accomplished, Hstd.
Either one of these two measures can be derived fromthe other one. Thus, they are equivalent.