Sl. No. Items of work Unit Qty Rate Amount
Turn Key Basis at 132 KV Sub Station Bilsi, Badaun. (Automation System)
BILL OF QUANTITY
For Costruction of Main Gantry, Aux, Foundaiton, Transformer Plith, Trenches,
Chain link Fencing, Transformer Track, Fire Protection Wall etc. in Switchyard On
9 cement concrete with 2cm gauge approved hard stone
ballast, coarse sand (F.M. 1.8 to 2.5) and cement in
proportion of 3:1:5:1 including supply of all materials, labour,side shuttering if requiring if required and T&P etc required
for proper completion of work. (CSI No.5.23)
CUM 20.00
5038.75
(Rs. Fivethousand thirty
eight and paisa
seventy five only
100775.00
10 Providing and laying 75 mm thick Stone Turfing with 20mm
to 40 mm round Pabbles or 20mm granite stone ballast over
layed CC in 1:4:8 Rates are including of proper p;acement in
level and alignment as per direction of Engineer in charge
but excluding the cost of CC 1:4:8 Complete. NSISqM 5000.00
156.25
(Rs. One
hundred fifty six
and paisa twenty
five only)
781250.00
11 RCC work with cement approved coarse sand (F.M. 1.8 to
2.5 ) and 2 cm gauge graded approved hard stone ballast in
propertion 1:1:5:3 in RCC slab. CSI NO. 5.24
CUM 5.00
6477.50
(Rs. Six thousand
four hundred
seventy sevenand paisa fifty
only)
32387.50
12 RCC work with cement approved coarse sand (F.M. 1.8 to
2.5) and 2 cm gauge graded approved hard stone ballast in
proportion 1:1:5:3 in raft foundations and colmn footing,
excluding supply of reinforcement and its bending but
including its fixing and binding the same with 24 B.W.G. G.I.
binding wire and including necessary centering and
shuttering etc. and also including cost of all materials,
binding wire, labour and T&P etc. required for proper
completion of the work. (CSI No. 5.27)
CUM 25.00
5358.75
(Rs. Five
thousand three
hundred fifty
eight and paisa
seventy five only)
133968.75
13 RCC work with cement approved coarse sand (F.M. 1.8 to
2.5 ) and 2 cm gauge graded approved hard stone ballast in
propertion 1:1:5:3 in RCC columns in proportion of cement,
chopan coarse sand (F.M. 2.0 to 2.5 ) and 20 m graded
hard approved stone ballast like granite, quartzite etc from
Dalla, Jhansi or other quarries.( CSI NO. 5.17)
CUM 5.00
7113.75
(Rs. Seventhousad one
hundred thirteen
and paisa
seventy five
only)
35568.75
14 concreting of 40 mm thick R.C.C. trench cover of mild steel
frame work with CC 1:1:5:3 in cement coarse sand, 20mm
down graded stone ballast with 3mm thick floating coat of
neat cement finish on top complete with all labour, materials,
T&P etc required for proper completion of the work but
excluding cost of cover of steel frame. (CSI No. 5.19)
SqM 150.00
253.75
(Rs. Two
hundred fifty
three and paisa
seventy five only)
38062.50
15 First class brick (class-150) work in 1:6 cement and coarsesand (F.M. 1.8 to 2.5) mortar in foundation and plinth
including supply of all materials, labour & T&P etc. required
for proper completion of work.
(CSI No. 6.01)CUM 80.00
2743.75
( Rs. Two
Thousand seven
hundred forty
three and paisa
seventy five only)
219500.00
J.E. S.D.O. COMPUTER E.E.
-
7/30/2019 Chadola Sir 68 Item
3/9
Page 3
Sl. No. Items of work Unit Qty Rate Amount
Turn Key Basis at 132 KV Sub Station Bilsi, Badaun. (Automation System)
BILL OF QUANTITY
For Costruction of Main Gantry, Aux, Foundaiton, Transformer Plith, Trenches,
Chain link Fencing, Transformer Track, Fire Protection Wall etc. in Switchyard On
16 First class brick work in 1:6 cement and coarse sand (F.M.
1.8 to 2.5) mortar in super structure including necessary
cutting and moulding of bricks as required and alsoincluding honeycomb brick work, thickness of wall not to be
less than 1.5 brick, including supply of all materials, labour &
T&P etc required for proper completion of the work. (CSI No.
6.01+60.7)
CUM 5.00
2896.25
(Rs. Twothousand eight
hundred ninety
six and paisa
twenty five only)
14481.25
17 First class brick work in 1:6 cement and coarse sand (F.M.
1.8 to 2.5) mortar in super structure for walls of one brick
thickness (CSI No. 6.01+6.07+6.08)CUM 2.00
3028.75
(Rs. Three
thousand twenty
eight and paisa
seventy five only)
6057.50
18 First class brick work in 1:4 cement and coarse sand (F.M.
1.8 to 2.5) mortar in foundation and plinth including supply
of all materials, labour & T&P etc. required for proper
completion of work. CSI No. 6.03 CUM 200.00
2922.50
(Rs. Two
thousand nine
hundred twentytwo and paisa
fifty only)
584500.00
19 Same as item No. (18) above but in superstructue including
necessary cutting, & moulding of bricks as required & also
including honey comb thick works thickness of wall not to be
less than 1 1/2 brick. . CSI No. 6.03+6.07CUM 4.00
3075.00 (Rs.
Three thousand
seventy five only)
12300.00
20 First class brick work in 1:4 cement and coarse sand (f.M.
1.8 to 2.5) mortar in super structure for walls of ne brick
thickness. (CSI No. 6.03+6.07+6.08)CUM 1.00
3207.50
(Rs. Three
thousand two
hundred seven
and paisa fifty
only)
3207.50
21 First class brick work in 1:4 cement and coarse sand (f.M.
1.8 to 2.5) mortar in super structure for walls of half brick
(115mm) thicknes in super structure .
(CSI No. 6.03+6.07+6.08+09)CUM 1.00
3274.00
(Rs. Three
thousand two
hundred seventy
four only)
3274.00
22 Rainforced brick work for f ire protection walls in 1:3 cement
and coarse sand mortar of F.M. 1.5 to 2.0 in foundation and
plinth including supply of all labour, materials T&P etc
required for proper completion of the work but excluding the
supply of reinforcement steel. (CSI NO. 6.21)
CUM 5.00
3257.50
(Rs. Three
thousand Two
hundred fifty
seven and paisa
fifty only
16287.50
23 Rainforced brick work for f ire protection walls in 1:3 cement
and coarse sand mortar of F.M. 1.5 to 2.0 in fire wall
superstructure. (CSI NO. 6.22) CUM 20.00
4105.00
(Rs. Four
thousand one
hundred five
only)
82100.00
24 Mild Steel or Iron work in heavy sizes such as trusses built
up gates, door frames, record, racks roof work gates etc.
wrought to required form including holes rivetting or welding
where necessary and also including supply of steel bolts ,
bolts nuts wastage etc. and their fixing required for proper
completion of the work (Steel shall be arranged by the
contractor ) CSI NO. 9.03
MT 2.00
76596.25
(Rs. Seventy six
thousand five
hundred ninty six
and paisa twenty
five only
153192.50
J.E. S.D.O. COMPUTER E.E.
-
7/30/2019 Chadola Sir 68 Item
4/9
Page 4
Sl. No. Items of work Unit Qty Rate Amount
Turn Key Basis at 132 KV Sub Station Bilsi, Badaun. (Automation System)
BILL OF QUANTITY
For Costruction of Main Gantry, Aux, Foundaiton, Transformer Plith, Trenches,
Chain link Fencing, Transformer Track, Fire Protection Wall etc. in Switchyard On
25 Supply of 90/105 Ibs straight Rail ( conforming to IS 266) for
grouting on Transformer Pligth. Rates are inclusiveof its
cartage upto site and all other taxes as per Govt. Rule. NIS.MT 0.00
69575.00
(Rs. Sixty ninethousand five
hundred seventy
five only)
0.00
26 Mild Steel or Iron in plain work such as reinforced concrete
or reinforced brick work (when not included in an over all
rates) wrought to required shape as necessary including
bending for proper completion of the work and including
supply of steel its wastage, bend, hooks and authorised
overlapping shall be measured. (steel shall be arranged by
the contractor). (CSI No. 9.05)
MT 3.00
73917.50
(Rs. Seventy
three thousand
nine hundred
seventeen and
paisa fifty only))
221752.50
27 supply and fixing and grounding 32/28 mm. dia M.S. Anchor
bolts with two nos. nuts and washers as per approved
drawoing and specificaiton including galvanizing in properalignment, position and level with help of a template
complete including supply of all labur & T&P etc. required for
proper completion of the work. NSI
MT 0.01
87500.00
( Rs. Eight seventhousand five
hundred only
875.00
28 supply and fixing and grounding 16/25 mm. dia M.S. Anchor
bolts with two nos. nuts and washers as per approved
drawoing and specificaiton including galvanizing in proper
alignment, position and level with help of a template
complete including supply of all labur & T&P etc. required for
proper completion of the work. NSI
MT 0.35
87500.00
( Rs. Eight seven
thousand five
hundred only
30625.00
29 Supply and fixing 50x50mm. 8 gauge G.I. chain link fencing
2.4 M high including fixing to vertical posts, horizontal
runners with 10mm dia. 40mm long bolts, nuts and washers
complete with all materials, labour and T&P etc. required for
proper completion of work chain link of 8 gauge shall begalvanised by hot dispped method as per relevant IS Code.
(excluding cost of vertical posts and horizontal runners) (CSI
NO. 9.34)
SqM 150.00
546.25
(Rs, Five
hundred fourty
six and paisa
twenty five only)
81937.50
30 Grouting of M.S. rail of 90 Ibs including cost of all materials,
labour and T&P for fixing of rail in proper alignment, level
and position in transformer pl inth foundation etc. as per
direction of Engineer in charge (Excluding cost of rail) (CSI
No. 9.41)
RM 0.00
306.25
(Rs. Three
hundred six and
paisa twenty five
only)
0.00
31 Grouting of vertical or inclined post of pale fencing in true
level, alignment and in plumb or inclination as required,
including cost of all labour, materials and T&P required for
proper completion of work. (Posts and CC shall be
measured separately) (C.S.I.N0. 9.42)
Nos. 150.00
19.75
(Rs. Ninteen and
paisa seventy
five only)
2962.50
32 Fixing and grouting of trench edging in proper level and
alignment including cost of all labour, and T&P etc. required
for proper completion of work but excluding cost of C.C.
(CSI No. 9.45)Nos. 1000.00
9.13(Rs. Nine and
paisa thirteen
only)
9130.00
J.E. S.D.O. COMPUTER E.E.
-
7/30/2019 Chadola Sir 68 Item
5/9
Page 5
Sl. No. Items of work Unit Qty Rate Amount
Turn Key Basis at 132 KV Sub Station Bilsi, Badaun. (Automation System)
BILL OF QUANTITY
For Costruction of Main Gantry, Aux, Foundaiton, Transformer Plith, Trenches,
Chain link Fencing, Transformer Track, Fire Protection Wall etc. in Switchyard On
33 6mm thick plaster with cement mortar with 1:3 cement and
approved coarse sand mortar . (CSI No. 11.20
SqM 100.00
86.25
(Rs. Eighty six
and paisa twenty
five only)
8625.00
34 Fixing of template in proper level and alignment for grouting
of Anchor bolt in auxil iary structure cost of all mater ials,
labour and T&P required for proper completion of the work..
CSI. No. 9.47 No. 25.00
18.25
(Rs. Eightee and
paisa twenty five
only)
456.25
35 12mm thick plaster with cement mortar with 1:4 cement and
coarse sand mortar (CSI No. 11.08)
SqM 1200.00
105.00
(Rs. One
hundred five
only)
126000.00
36 12 mm thick plaster with 1:6 cement and coarse sand
morter. (CSI No. 11.10)
SqM 50.00
95.50
(Rs. Ninety five
and paisa fifty
only)
4775.00
37 Add fr extra labour and materials for plaster over rough face
of wall (CSI No. 11.15)
SqM 500.00
8.75
(Rs. Eight and
paisa seventy
five only)
4375.00
38 Champering the edge of conrete in auxiliary structure, of
size 25 mm wide in traingular section including all materials,
labour and T&P etc. complete. C.S.I. No. 11.21 RM 1500.00
5.75
(Rs. Five andpaisa seventy
five only)
8625.00
39 4.00 cm thick 1:2:4 plain cement concrete floor with cement
approved coarse sand, and 2 cm graded approved stone
ballast laid in panels finished with 3 mm floating coat of
neat cement or cement and marble dust in ratio of 5:1 as
specified and removing any overtapping mortar at the joints
of the panels if any and giving them a uniform finsih
including supply of all materials, labour and T&P etc.
required for proper completion of the work.( without base
concrete) (CSI No. 12.03)
SqM 100.00
250.00
(Rs. Two
hundred fifty
only)
25000.00
40 2.5 cm. thick 1:2:4 plain cement concrete floor with cement
approved coarse sand and 2cm. graded approved stone
ballast laid in panels finished with 3mm. floating coat ofneat cement or cement and marble dut in ratio of 5:1 as
specified (excluding base concrete) and removing any over
lapping mortar at the joints of the panels if any and giving
them a uniform finish including supply of all materials, labour
and T&P etc. required for proper completion of the work.
CSI No. 12.02
SqM 160.00
167.50( Rs. One
hundred sixty
seven and paisa
fifty only)
26800.00
J.E. S.D.O. COMPUTER E.E.
-
7/30/2019 Chadola Sir 68 Item
6/9
Page 6
Sl. No. Items of work Unit Qty Rate Amount
Turn Key Basis at 132 KV Sub Station Bilsi, Badaun. (Automation System)
BILL OF QUANTITY
For Costruction of Main Gantry, Aux, Foundaiton, Transformer Plith, Trenches,
Chain link Fencing, Transformer Track, Fire Protection Wall etc. in Switchyard On
41 First class brick on edge floor laid in cemet mortar
consisting of one part of cement and six parts of coarse
sand and pointed with cement mortar 1:2 including supply ofall materials labour & T&P required for proper completion of
the work. (CSI No. 12.06)SqM 40.00
412.50
(Rs. Four
hundred twelve
and paisa fifty
only)
16500.00
42 First class brick on edge floor laid dry, joints sand filled,
including preparation of base to proper slope and its
ramming including supply of all material labour & T&P etc.
required for proper completion of the work. (CSI No. 12.08) SqM 1600.00
257.50
( Rs. Two
hundred fifty
seven and paisa
fifty only)
412000.00
43 Supply and laying of 80 mm thick Cement Concrete
interlocking tiles grey coloured 'I' shaped including supply of
all material, labour and T&P etc. required for proper
completion of work. C.S.I. No. 12.27 SqM 200.00
585.38
(Rs. Five
hundred eightyfive and paisa
thirty eight only)
117076.00
44 Painting or varnishing new iron work in small areas or new
wood work with one coat of ready mixed priming paint and
two coat coat of approved superior quality ready mix paint
"Luxol" or equivalent brand or varnish including supply of all
materials, labour and T&P etc. required for proper
completion of the work.Paint to be used should conform to
the I.S. 103-1950. C.S.I. No. 13.01+13.02
SqM 200.00
67.25
(Rs. Sixty seven
and paisa twenty
five only)
13450.00
45 Painting one priming coat and two coats of water proof
exterior emulsion paint of APEX ULTIMA (ASIAN)/Weather
Shield Max (ICI) or equivalent brand APEX PaintofBerger/Asiann/ICI or equivalent including supply of all
materials, labour and T&P etc. required for proper
completion of work. (CSI No. 13.23+13.24)
SqM 100.00
77.50(Rs. Seventy
seven and paisa
fifty only)
7750.00
46 Painting letters & number over cable trench cover or other
places with the help of stencils including painting of base of
150 mm. dia of one coat of primer and two coats of superior
quality synthetic enamel paint size of letter to be 60 mm x 10
mm. including cost of all mater ials, labour and T&P etc.
required for proper completion of the work. Including placing
of trench covers in required position. CSI NO. 13.20
No 650.00
7.81
(Rs. Seven and
paisa eighty one
only)
5076.50
47 White washing with three coats including supply of all
materials, labour and T&P etc. required for proper
completion of the work. CSI No. 14.03 SqM 100.00
7.50
(Rs. Seven and
paisa fifty only)
750.00
J.E. S.D.O. COMPUTER E.E.
-
7/30/2019 Chadola Sir 68 Item
7/9
Page 7
Sl. No. Items of work Unit Qty Rate Amount
Turn Key Basis at 132 KV Sub Station Bilsi, Badaun. (Automation System)
BILL OF QUANTITY
For Costruction of Main Gantry, Aux, Foundaiton, Transformer Plith, Trenches,
Chain link Fencing, Transformer Track, Fire Protection Wall etc. in Switchyard On
48 Fil ling of 20mm. Wide 100mm. Deep joint with coarse sand
and saw dust mixed with hot bitumen inclduding all materal
and T&P etc. required for proper completion of the work.(CSI No. 18.20)
RM 600.00
36.38
(Rs. Thirty sixand paisa thirty
eight only)
21828.00
49
Placing of trench cover of all size in proper position
including transportation from different places the S/S area
including all labour, T&P etc. required for proper completion
of the work as per direction of Engineer-in-charge. CSI No.
20.11
No 650.007.00 (Rs.
Seven only)4550.00
50 3 mm thick floating coat of neat cement finish including
supply of all mater ials, labour and T&P etc. required for
proper completion of the work (including cost of cement),
cement consumption 0.044 bag/sq.m. CSI No. 20.23 SqM 200.00
21.25 (
Rs. Twenty one
and paisa twenty
five only)
4250.00
51 Providing and fixing of 110 mm dia. PVC pipe 6Kg/Sq.cm for
water supply mains andsewerage system, Tirupti or
equivalent make with special such as Tee, bend , socket,
elbow, shoe etc including cutting of pipe where necessary
and including excavation of trenches for laying the pipe line
of approved size (600 x900mm ) and including its back filling
after festing the pipe line, watering, ramming etc complete
including disposal of surplus earth from the sides upto 100
Meter as per direction of Engineer I/C as required for proper
completion of work. (CSI No. 26.64a
RM 50.00
243.75
(Rs. Two
hundred forty
three and paisa
seventy five only)
12187.50
52 Same as above in item no 62 but 75 mm dia PVC pipe (CSI
No. 26.64cRM 50.00
120.00
( Rs. One
hundred twenty
only)
6000.00
53 Prov iding and laying 150mm dia. R.C.C. Hume pipe with
coller (P-2) in proper level and alignment including cost of all
materials labour and T&P required for proper completion of
work. Job Complete. NSI
RM 12.00
437.50
(Rs. Four
hundred thirty
seve and paisa
fifty only))
5250.00
54 Prov iding and laying 350mm dia. R.C.C. Hume pipe with
coller (P-2) in proper level and alignment including cost of all
materials labour and T&P required for proper completion of
work. Job Complete. NSI
RM 6.00
600.00
(Rs. Six hundred
only)
3600.00
55 Concrete work with 40 mm gauge brick ballast obtained
from breaking brick bats (brick bats supplied by the
department free of cost) in proportion of 12:6:1 as in item5.01 above including cost of all labour, materials, T&P etc.
required for proper completion of the work.CSI NO. 5.22
CUM 20.00
1893.75
(Rs. Onethousand eight
hundred ninty
three and paisa
seventy five only)
37875.00
J.E. S.D.O. COMPUTER E.E.
-
7/30/2019 Chadola Sir 68 Item
8/9
Page 8
Sl. No. Items of work Unit Qty Rate Amount
Turn Key Basis at 132 KV Sub Station Bilsi, Badaun. (Automation System)
BILL OF QUANTITY
For Costruction of Main Gantry, Aux, Foundaiton, Transformer Plith, Trenches,
Chain link Fencing, Transformer Track, Fire Protection Wall etc. in Switchyard On
56 Providing barbed iron wire fencing including stretching,
fixing into the post including all labour, materials and T&P
required for proper completion of work the weight of hotdipped GI barbed wire having 12 SWG-2 ply wires and 4
point ordinary barbs @ 150mm (approx) C/C should be 10
gm per Meter. (CSI No. 9.13)
Kg 150.00
96.75(Rs. Ninty six and
paisa seventy
five only)
14512.50
57 Laying CC road slab consisting of 1 cement 2 approved
coarse sand 4 approved stone ballast 2 cm gauge over
prepared subgrde after its rectificaitons and briging it to
proper camber and including supply of all materials, labour
and T&P etc requied for proper completion of the work
finished to required template as per direction of the engineer
in charge but excluding cost of metal required for the
rectification of the sub-grade . CSI No. 18.13
CUM 120 5638.75
(Rs. Five
thousand six
hundred thirty
eight and paisa
seventy five only)
676650.00
1
Extra Item :
Providing M.S. Frames work for R.C.C. Trench covers and
edging with M.S. Angles inlcuding cutting, bending and
weldng of M.S. Angle and cutting and welding of M.S. bars
for reinforcement and lifting hooks as per approved design.
The rate is including cost of all labour, materials, etc. as
required for proper completion of the work. CSI No. 9.27
MT 10 73133.75(Rs Seventy
three thousand
one hundred
thirty three and
paisa seventy
five only)
731337.50
7751076.00
J.E. S.D.O. COMPUTER E.E.
-