Chagrin Highlands Building One Branden Ellenberger – Structural Option Senior Thesis 2004 Background Information Background Information Existing Structure Existing Structure Problem Statement Problem Statement Proposal Proposal Structural Redesign Structural Redesign Breadth Study Breadth Study Conclusions Conclusions Thesis Presentation Outline

TRANSCRIPT

Page 1: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building OneBeechwood, OhioBeechwood, Ohio

Branden J. Ellenberger - Structural Option

Senior Thesis 2004Senior Thesis 2004

Page 2: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Background InformationBackground Information• Existing StructureExisting Structure• Problem Statement Problem Statement • ProposalProposal• Structural RedesignStructural Redesign• Breadth StudyBreadth Study• ConclusionsConclusions

Thesis Presentation Outline

Page 3: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Background InformationBackground Information• Existing StructureExisting Structure• Problem Statement Problem Statement • ProposalProposal• Structural RedesignStructural Redesign• Breadth StudyBreadth Study• ConclusionsConclusions

Thesis Presentation Outline

Page 4: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Owner:Owner:

General Contractor:General Contractor:

Architect:Architect:

Structural Engineer:Structural Engineer:

MEP Engineer:MEP Engineer:

Landscape/Civil Engineer:Landscape/Civil Engineer:

Primary Project Team

The Richard E. Jacobs GroupThe Richard E. Jacobs Group

The Whiting-Turner CompanyThe Whiting-Turner Company

Kohn Pederson Fox Associates, PCKohn Pederson Fox Associates, PC

Gilsanz-Murray-SteficekGilsanz-Murray-Steficek

Cosentini AssociatesCosentini Associates

Opus DesignOpus Design

Page 5: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Building OneBuilding One is located in the is located in the Beechwood EastBeechwood East section of the Chagrin section of the Chagrin Highlands corporate community Highlands corporate community

www.chagrinhighlands.com

Building Location

Page 6: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• 4 story multi-use office building4 story multi-use office building• Single level under building parking garageSingle level under building parking garage• $13,600,000 overall cost$13,600,000 overall cost• Building foot print = ~31,500SF Building foot print = ~31,500SF • Total sq. ft. = ~130,000SFTotal sq. ft. = ~130,000SF• Floor to floor heights:Floor to floor heights:

– Parking to Ground floor – 12ftParking to Ground floor – 12ft– Ground & Penthouse – 15ftGround & Penthouse – 15ft– 22ndnd, 3, 3rdrd, & 4, & 4thth – 13ft – 13ft

Building Information

Page 7: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Open plan designOpen plan design

• Single level of underground parkingSingle level of underground parking

• Horizontal glass curtain wall defines the contemporary styleHorizontal glass curtain wall defines the contemporary style

• 2 story entry lobby atrium2 story entry lobby atrium

• Monolithic stone panels help draw attention to the entranceMonolithic stone panels help draw attention to the entrance

Architectural Details

Page 8: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Background InformationBackground Information• Existing StructureExisting Structure• Problem Statement Problem Statement • ProposalProposal• Structural RedesignStructural Redesign• Breadth StudyBreadth Study• ConclusionsConclusions

Thesis Presentation Outline

Page 9: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

SubstructureSubstructure• 4000 psi concrete• 5” slab-on-grade

Existing Structure

• Exterior columns sit on spread footings• 10” reinforced foundation walls

• Core columns sit on deeper tied footings

Page 10: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Substructure Substructure (con’t)(con’t)

Structural Background

• 40 perimeter spread footings• The core of the building is supported by 3 sets of tied spread footings.

• from 6 ½’x6 ½’x20”deep… • to 11’x11’x28”deep

Page 11: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Superstructure• Composite beams• 3”composite decking • 4000psi concrete deck• Steel columns

Structural Background

• Typical 40’x40’ Bay

Page 12: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Structural Background

East/West Lateral SystemEast/West Lateral System• 5 identical laterally braced frames 5 identical laterally braced frames

located at column lines 5,6,7,9,&10located at column lines 5,6,7,9,&10

North/South Lateral SystemNorth/South Lateral System• 2 identical laterally braced 2 identical laterally braced

frames located along column frames located along column lines B & Clines B & C

• Design controlled by Wind in E-W direction• Design controlled by Seismic in N-

S direction

Page 13: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Lateral Bracing LocationsLateral Bracing Locations

Structural Background

Page 14: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Background InformationBackground Information• Existing StructureExisting Structure• Problem Statement Problem Statement • ProposalProposal• Structural RedesignStructural Redesign• Breadth StudyBreadth Study• ConclusionsConclusions

Thesis Presentation Outline

Page 15: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Change existing steel structure to concreteChange existing steel structure to concrete

• Stay consistent with open plan designStay consistent with open plan design

• Monitor constructabilityMonitor constructability

Problem Statement

Page 16: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Background InformationBackground Information• Existing StructureExisting Structure• Problem Statement Problem Statement • ProposalProposal• Structural RedesignStructural Redesign• Breadth StudyBreadth Study• ConclusionsConclusions

Thesis Presentation Outline

Page 17: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Cast-in-place concrete structureCast-in-place concrete structure

Proposal

Gravity LoadingGravity Loading-Post-tensioned t-beams-Post-tensioned t-beams-Post-tensioned girders-Post-tensioned girders-Edge Beams-Edge Beams-Concrete columns-Concrete columns

Lateral LoadingLateral Loading-Concrete Shear walls-Concrete Shear walls

Page 18: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Background InformationBackground Information• Existing StructureExisting Structure• Problem Statement Problem Statement • ProposalProposal• Structural RedesignStructural Redesign• Breadth StudyBreadth Study• ConclusionsConclusions

Thesis Presentation Outline

Page 19: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Post-tensioning Design Criteria**Design based on ACI allowable stress criteriaConcrete• Normal weight – 150 pcf• Strength – 5000 psi• Modulus of Elasticity – 4030.5 ksi• Creep factor for deflections for beams/slabs – 2.0Tensioning Strands• Unbonded or greased strands• Ultimate strength – 270 ksi• ½” strands – 0.153 in^2Mild Steel• Yield strength – 60 ksi

Structural Redesign

Page 20: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Design Span ConditionsWidth of member

Deepest member

Tributary width

Slab thickness # of strands

Tendon force

40’-22’-40’ w/columns 4 ½’ 20” 20ft 5” 26 702 kips

40’-22’-40’ w/girders 4 ½’ 20” 20ft 5” 24 648 kips

41.5’-22’-40’ w/columns 4 ½’ 20” 20ft 5” 29 783 kips

41.5’-22’-40’ w/girders 4 ½’ 20” 20ft 5” 26 702 kips

40’-22’-40’ w/columns 5’ 20” 25ft 6” 43 1161 kips

Single 41 ½’ span 4 ½’ 20” 20ft 5” 20 540 kips

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Post-tensioned T-Beam Design

Structural Redesign

Page 21: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Post-tensioned T-Beam Design

Structural Redesign

Page 22: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Design Span ConditionsWidth of member

Deepest member

Tributary width

Slab thickness

# of strands

Tendon force

40’-22’-40’ w/columns 4 ½’ 20” 20ft 5” 26 702 kips

40’-22’-40’ w/girders 4 ½’ 20” 20ft 5” 24 648 kips

41.5’-22’-40’ w/columns 4 ½’ 20” 20ft 5” 29 783 kips

41.5’-22’-40’ w/girders 4 ½’ 20” 20ft 5” 26 702 kips

40’-22’-40’ w/columns 5’ 20” 25ft 6” 43 1161 kips

Single 41 ½’ span 4 ½’ 20” 20ft 5” 20 540 kips

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Post-tensioned T-Beam Design

Structural Redesign

Page 23: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Post-tensioned T-Beam Design

Structural Redesign

Page 24: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Typical Tensioning Strand Drape

Structural Redesign

Page 25: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Post-tensioned Girder Design

Structural Redesign

Page 26: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Design Span Cases Width Depth Tributary width # of strands Strand Force

15’-45’-40’ 18” 20” 20” 7 189 kips

20’-45’-40’ 18” 20” 20” 7 189 kips

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Post-tensioned Girder Design• Design for worst 3 span conditions• Same depth as beam design for constructability• Use ADAPT to take into account moment transfer

Structural Redesign

Page 27: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Edge Beam Design

• 30ft beam span • 20’ tributary width• 6” slab• 303ft-kip moment

Reinforcement

Structural Redesign

Design CaseDesign Case Beam Sizes Beam Sizes (wide x deep)(wide x deep)

Shear Shear ReinforcingReinforcing

Top Top ReinforcingReinforcing

Bottom Bottom ReinforcingReinforcing

24” x 20”24” x 20” #5 bars @ 10.5”#5 bars @ 10.5” 5-#7 bars5-#7 bars 5-#5 bars5-#5 bars

30” x 20”30” x 20” #6 bars @ 9”#6 bars @ 9” 6-#6 bars6-#6 bars 5-#5 bars5-#5 bars

• 40ft beam span• 10’ tributary width• 5” slab• 276 ft-kip moment

30 ft edge beam

40 ft edge beam

Page 28: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Column Design

Structural Redesign

Exterior Column Interior Column

Page 29: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Shear Wall Design & Lateral Analysis

Structural Redesign

Page 30: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Shear Wall Thickness Designed Length Actual Length

Resist E-W direction 10” 15’-0” 22’-0”

Resist N-S direction 8” 46’-6” 60’-0”

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Lateral Analysis

Structural Redesign

• Seismic forces control the deflection in the N-S direction• Wind controls in the deflection in the E-W direction.

Page 31: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Redesigned Structure

Structural Redesign

Plan View

Page 32: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Background InformationBackground Information• Existing StructureExisting Structure• Problem Statement Problem Statement • ProposalProposal• Structural RedesignStructural Redesign• Breadth StudyBreadth Study• ConclusionsConclusions

Thesis Presentation Outline

Page 33: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Office plan lighting and ceiling was specified to the tenants

Lighting Design

Design Assumptions:• 40’ x 40’ Bay• If partitions, they had to be between columns• Lighting designed for no daylight

Page 34: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Lighting Design

• Desired illuminance of 50 foot candles (fc)

• 2’x4’ Parabolic, 3-lamp fixtures with 3” louvers (www.columbia-ltg.com)

• 10’x10’ lighting grid

Total Fixtures:Per 40’x40’ Bay – 16Per typical Floor – 232

• Modeled in Lighting Designer to yield 69.1 fc

Page 35: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Existing Structure CostBased on:• W-shape steel beams, girders, and columns• Lateral bracing TS members• Base plates• Shear studs• Steel decking• Concrete deck• WWF

Construction Management

Final Cost - $1,900,000

Page 36: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Redesigned Structure CostBased on:• Structural concrete• Pre-stressing steel strand weight• Mild steel reinforcing weight• Concrete forms• Shoring• Placing concrete

Construction Management

Redesign Cost - $ 1,480,000

Page 37: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Construction ManagementStructural Cost Comparison

Existing: $1,900,000Redesign: $1,480,000

$ 390,000 saved in redesign

Page 38: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Background InformationBackground Information• Existing StructureExisting Structure• Problem Statement Problem Statement • ProposalProposal• Structural RedesignStructural Redesign• Breadth StudyBreadth Study• ConclusionsConclusions

Thesis Presentation Outline

Page 39: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

SummaryStructure

Gravity and Lateral system20” max floor depth

LightingDirect louvered lighting

Construction ManagementCost savings of $390,000

Conclusions

Page 40: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

• Post-tensioning design & composite steel framing are used hand in hand with in this span condition to limit the structural depth

• Given further construction information I would be able to investigate scheduling more closely to find which system would be better.

Recommendation

Page 41: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

AcknowledgementsAE FacultyAE Faculty

Professor ParfittDr. HanaganDr. Boothby

Jonathan Dougherty

Special ThanksSpecial ThanksGilsanz Murray Steficek

Adapt CorporationDr. Andrea Schokker

Brian SiverlingMy AE Friends

My Thesis SponsorsMy Thesis Sponsors

Page 42: Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004

Chagrin Highlands Building OneChagrin Highlands Building One

Branden Ellenberger – Structural OptionBranden Ellenberger – Structural Option Senior Thesis 2004Senior Thesis 2004

Any Questions?...Any Questions?...

The End!