Hydro Power Workshop (WS) of the Sector Network Energy Sub-Sahara Africa and EnDev. Challenges. GTZ-ECO –Access to Modern Energy –Electricity(AMES-E/ HYDRO. Background. Stone Breaking. - PowerPoint PPT PresentationTRANSCRIPT
Challenges
GTZ-ECO –Access to Modern Energy –Electricity(AMES-E/ HYDRO
In the endeavor to provide access to
electrical energy to the rural dwellers
in Ethiopia,
GTZ-ECO,AMES-E/HYDRO intends
to contribute to the development of
the hydropower sector in the country
by developing pilot sites to generate
electricity for lighting and other
productive uses in the different
regions of the country.
Some common challenges and
remedial action taken is listed below.
Background
Land Sliding
During laying of the penstock in Ererte
MHP, we encounter a hard basaltic rock
that can not easily excavate. Then using
the community participation, some
experienced labours, and using the locally
available materials such as burning an old
car tyre an 11 m and a depth of 37 cm
basaltic rock is excavated
In Hagra-Sodicha the washed away of the
left bank of the canal was happed due to
not installing the intake gate on time. The
last 30m of the canal was not excavated at
the time when the river water is coming
through the intake gate. The water couldn’t
get a way to flow towards the downstream
direction. Then it breaches the left bank of
the canal. The remedial action taken is
backfilling (520 cubic meter) of soil and
plantation.
The Erete MHP canal around the intake
is situated near to the river. During the
rainy season, the water is coming under
the canal foundation and it creates piping.
The main reason for this case is due
shallow foundation of canal . The action
taken is to providing retaining wall that
increases seepage length.
In the Hagra –Sodicha MHP the forbay
area is situated in the hilly area. It needs
an excavation of 750 cubic meter to get
the required forbay and canal elevation.
In this site the community participation is
remarkable.
Due to rolling stone from up hill 3.92 cubic
meter of masonry retaining wall is broken
down.
Theis retaining wall protects the power
house from hitting by the rolling stone.
Hydro Power Workshop (WS) of the Sector Network Energy Sub-Sahara Africa and EnDev
Deep Excavation
Stone Breaking
Piping