CHALLENGES IN IMPLEMENTING PERFORMANCE-BASED CONTRACTING
IN MANAGING BUILDING FACILITIES
Case Study Bangunan Sultan Iskandar (KIK) & JB Sentral
10 September 2015
Asset & Facility Management Company
Bangunan Sultan Iskandar & JB Sentral
Abraj Al Bait Towers, Makkah
Design and Build Contractor
Gerbang Selatan Bersepadu Project
Medium Term Link
Special Purpose Vehicle (Developer)
Universiti Al-Azhar Kampus Tuanku Muhriz
Gerbang Pendidikan Seri Menanti
Customs, Immigration & Quarantine Complex (Bangunan Sultan Iskandar)
Bukit Chagar, Johor Bahru
The Abraj Al Bait Towers Makkah, Kingdom of Saudi Arabia
Gross Floor Area: 2.95 mil sq.ft (273,600 sq.m)
Gross Floor Area: 16 mil sq.ft (1.5 mil sq.m)
AMPM CURRENT PROJECTS
Customs, Immigration & Quarantine Complex (Bangunan Sultan Iskandar), Bukit Chagar, Johor Bahru
Building Owner : Bahagian Pengurusan Hartanah Jabatan Perdana Menteri Government’s : Jabatan Kerja Raya Malaysia Representative Gross Floor Area : 2.95 mil sq.ft (273,600 sqm) Building Function : Customs, Immigration and Quarantine Complex (non-stop operations) Building Classification : Building Security Category 1 Number of Agencies : 22 agencies Number of Users : 100 million users per year 135,000 vehicles daily
ABRAJ AL BAIT TOWERS (DEVELOPMENT OF KING ABDUL AZIZ ENDOWMENT - DOKAAE)
Building Owner : Government of Kingdom of Saudi Arabia
Concessionaire : Saudi Binladin Group (SBG)
Facility Manager : Alborj International for Operation & Maintenance (with AMPM as the FM Consultant & Support Services Provider)
Gross Floor Area : 16 mil sq.ft (1.5 mil sqm)
Building Mix : a) Residential b) Hotels c) Clock Tower d) Offices e) Retail Shops f) Restaurants g) Auditorium h) Car Park
District Cooling Plant : 48,000 tons refrigeration
Capacity : 80,000 pilgrims
RANGE OF SCOPE OF SERVICES “ AMPM Offers Integrated & Comprehensive Asset & Facility Management Services ”
Civil, Structural, Architectural,
Mechanical, Electrical, ICT and Custodial Services.
ENERGY MANAGEMENT SERVICES
The Energy Management Services (EnMS) Division offers:
• Qualified and Registered Energy Manager
• Compliance on Energy Act, Regulations & Certifications
• Energy Audit & Conservation Study
• Investment Grade Energy Audit
• Implementation through energy services company (ESCO)
• In-house Energy Management Implementation & Assistance
• Demand Side Management
• Renewable Energy
• Condition Based Monitoring, Energy Measurement & Verifications
• Independent Audits
CASE STUDY
Introduction
• KIK Facility Management Contract was the first outsourced
Performance-Based Contracting implemented by the Government
(June 2007 - November 2013) followed by JB Sentral Facility
Management Contract (January 2009 - May 2013).
• Being a new contracting approach, Government’s representatives (JKR)
and Contractor (AMPM) experienced differences in the interpretation of
the contracts terms.
• The state of readiness in managing PBC was not in place – standard
documents such as JKR66, PHK, PPJHK, etc. still using existing formats
for other standard contract formats i.e. JKR203A, JKR203 and not
specifically designed for FM.
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
CONTRACT BRIEF
Objectives of FM Contracts as stipulated in the Contract:-
• KIK - To outsource the Centralised Operation & Maintenance
Management of CIQ Complex
Form of Contract - Facility Management Contract (2007)
Described in Appendix 5 (Section A)
• JB Sentral - To outsource the Management, Operation and
Maintenance of Bangunan JB Sentral
Form of Contract - PWD Facilities Management Form (2008)
Described in Appendix 3 (Recital C of Contract)
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
CONTRACT BRIEF
Performance Based Contract Type (Not traditional task based)
• KIK Contract [Clause 3.3 – Contractor’s performance to the
satisfaction of the P.D]
“The Contractor shall perform the Contract to the satisfaction of
the P.D. in all aspects, as set out in the Contract, including
meeting the KPI”.
• JB Sentral [Clause 8.1 – Level of Performance]
“The Contractor shall perform the Services according to the
provision of this Contract and comply with the standard
specified in the KPI provided in Appendix 5 …”.
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
CONTRACT BRIEF
Definition of KPI
• KIK - Clause 1.1 (v) & 13.1 (a) of COC
“means the performance and work standards in Section A of Appendix
5 that are required to be achieved by the Contractor under this
Contract. The KPI may be altered in accordance with the Contract.”
• JB Sentral - Clause 1.1 & 8.1 of the COC
“means the performance and standards for Services as specified in
Clause 8.1 and Appendix 5 that are required to be achieved by the
Contractor under this Contract;”
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
CONTRACT BRIEF
Contract Sum
• KIK - Clause 2.3 of the COC
“The Contract Sum shall be a firm and fixed price for the Contract
Period and shall not be adjusted or altered in any way otherwise than
in accordance with the express provisions of this Contract.”
• JB Sentral - Clause 2.2 of the COC
“The Contract Sum shall be a firm and fixed price for the Contract
Period and shall not be adjusted or altered in any way unless
expressly provided in this Contract.”
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
CONTRACT BRIEF
Performance-Based Contract (not traditional task-based)
• Risks fully rest on the Contractor to ensure that the agreed KPIs are
achieved.
• Contractor bears all/any additional costs incurred over and above his
planned resources and budget to meet the set KPIs.
• General provisions of discretion by the Government to instruct Contractor to
update, maintain and amend the Maintenance Schedule is for the purpose
of complying with KPI.
• If KPI is achieved, no expressed provision for the Government to interfere
with Maintenance Schedule
• If KPI is met and services/resources input requirement is less than his
planned resources and budget, Contractor benefits the cost savings (if any);
• If KPI is met - no expressed provisions that Contractor is obliged to return
any savings to the Government or deductions for reduced resources input.
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
KIK Contract’s KPI ( page 1 of 2 )
NO. SERVICE
DESCRIPTION
PERFORMANCE
MEASUREMENT TARGET VALUE
1 Overall Service
Delivery
Customer
Satisfaction Customer Satisfaction Survey = 3.0*
2
General Complaint
on Service
* All services
including cleaners
User General
Complaint
Maximum total of 32,004 per month for all services.
• ICT 10,668
• BMM 10,668
• SS 10,668
Total 32,004
3
Attending to
General Service
Complaint
Response Time
Minimum percentage of Work Order responded within 30 minutes as per below services:
• ICT 75% • BMM 75% • SS 70%
4 Resolving General
Service Complaint Turnaround Time
Max 25% incidences of un-close work order from total work order in the same month.
• ICT 25% • BMM 25% • SS
5
Availability of
Major system
in each services
Service Downtime
Max 25% downtime of major system in services hour per month [hour/month]
• ICT 25%
• BMM 25%
• SS
NO. SERVICE
DESCRIPTION
PERFORMANCE
MEASUREMENT TARGET VALUE
6 Emergency
Service Request
Emergency
Response
Min 70% Emergency Service per allowable complaint responded within 15 minutes
• ICT -
• BMM -
• SS 70%
7
Recurring Complaint
on Attended
Work Order
Recurring Complaint
on Resident User
General Complaint
Maximum percentage of incidences from total Work Order per month as per below services:
• ICT 25%
• BMM 25%
• SS 30%
8
Quality of
Service Delivery
or Workmanship
Unsatisfied
Work Rating on
Resident User
General Complaint
Max 15% incidences of total Work Order per month per services
• ICT 15%
• BMM 15%
• SS -
9
Execution of
Planned Preventive
Maintenance
according to
schedule
Execution of
Planned Preventive
Maintenance
Min 80% execution according to schedule per major services
Total PM
Schedule
• ICT 80%
• BMM 80%
• SS -
KIK Contract’s KPI ( page 2 of 2 )
NO SERVICE DESCRIPTION PERFORMANCE
MEASUREMENT
TARGET VALUE
(KPI)
1 Overall Service Delivery Customer Satisfaction Customer Satisfaction
Survey
2
Availability of All Management, Operation and
Maintenance Services and System in Form of
Written Reports Officially Submitted
Availability of Weekly, Monthly,
Half Yearly and Yearly Reports
100% Compliance
to Submission Date
3 Complaint on Services
Resident Users Complaint
Public Complaint
Zero Complaint
4 Resolving Custodial Service Complaint Execution Time Within 24 Hours
JB Sentral Contract’s KPI ( page 1 of 4 )
NO SERVICE DESCRIPTION PERFORMANCE
MEASUREMENT TARGET VALUE
(KPI)
5 Recurring Complaint on Attended Work Order Recurring Complaint Zero Recurring Complaint
6 Effectiveness of Customer Care Centre Regarding
Request and Complaint Response Time
EMERGENCY ***
Immediate response with 15
minutes follow up time.
URGENT****
Response within 15 minutes
with 1 hour follow up time.
GENERAL *****
Response within 30 minutes
with 24 hours follow up.
7 Availability of Major Services e.g. Air-Condition,
Power Supply and Water Supply Continuous Service
Zero Downtime
of Major Service
8 Availability Of Comfortable Working Environment Air-Conditioning Temperature
24°C ± 1°C DB, RH 55 to 70% 100% Compliance
JB Sentral Contract’s KPI ( page 2 of 4 )
NO SERVICE DESCRIPTION PERFORMANCE
MEASUREMENT
TARGET VALUE
(KPI)
9 Execution of Planned Preventive
Maintenance as per Schedule
Execution of Planned
Preventive Maintenance
100% Execution
According to Schedule
10 Execution of Corrective Maintenance Execution Time
EMERGENCY ***
Immediate response,
rectification time within 3 hours.
URGENT****
Response within 30 minutes,
rectification time within 24 hours.
GENERAL *****
Response within 1 hours,
rectification time within 3 days.
11 Quality of Service Delivery or
Workmanship Satisfactory Executed Work 100% Compliance
12
Compliance to Statutory Requirement
All Systems are Operated Correctly
All Appropriate Plants,
Equipment's and Structures
Shall Comply with the Relevant
Statutory Inspections Schedule
and Operating Requirements
100% Compliance
JB Sentral Contract’s KPI ( page 3 of 4 )
NO SERVICE DESCRIPTION PERFORMANCE
MEASUREMENT
TARGET VALUE
(KPI)
13 Provide Spares Necessary
to Allow the Buildings to Function
Availability of ALL Spares
at ALL Time
There shall be no disruption
due to lack of spares
14 Develop, Manage and Maintain
a Technical Library
Technical Reference Materials,
Operation & Maintenance Manuals,
As Built Drawings and Data Sheets
are Available for Use at All Times
All Reference Materials,
Operational & Maintenance
Manuals, As Built Drawings and
Data Sheets are Current,
Relevant and Up to Date
15 Energy Management
and Conservation
Implementation of
Energy Management and
Conservation Program
Yearly Energy Audit Report,
Monthly Building Energy
Performances
Energy Management and
Conservation Committee
Submission and Verification of
Yearly Audit Reports, Target and
Presentation to PD / SO
JB Sentral Contract’s KPI ( page 4 of 4 )
ITEM DESCRIPTION PERFORMANCE
MEASUREMENT
TARGET VALUE
(KPI)
1A
Planned Preventive Maintenance for
Civil & Structure, Housekeeping,
Landscaping & Pest Control
Scheduling, Scheduled Corrective
Maintenance
Completion of monthly PPM
for Civil & Structure 100% Completion
1B Completion of monthly Housekeeping,
Landscaping & Pest Control Scheduling 100% Completion
1C Completion of Scheduled
Corrective Maintenance 100% Completion
2A
Service Requests
Response Time by
Appropriate Personnel
General: 30 minutes
Urgent: 15 minutes
Emergency: < 5 minutes
2B Execution Time
General: 3 days
Urgent: 24 hours
Emergency: 3 hours, except
Lift Entrapment: < 15 minutes
3 Customer Satisfaction Customer Satisfaction Customer Satisfaction Survey
(Quarterly) ≥ 3
4 Complaint on Services Resident Users Complaint
Public Complaint ≤ 10 No. of Complaint
5 Recurring Complaint
on Attended Work Order No. of Recurring Complaint Zero Recurring Complaint
Current Contract – BSI Contract’s KPI ( page 1 of 2 )
ITEM DESCRIPTION PERFORMANCE MEASUREMENT TARGET VALUE
(KPI)
6 Quality of Service Delivery
or Workmanship
Satisfactory
Executed Work 100% Compliance
7A
Reports
Timely Submission
of Reports
100% Compliance
to Submission Date
7B Accuracy of Reports ≤ 40 No. of Statistical Error
8 Injury due to
Improper Maintenance
No. of Incident due to
Improper Maintenance Zero Incident
9 Toilet Supply Availability
During Office Hours
100% Available
During Office Hours
10 Toilet Asset
Asset Functioning /
Good Working Condition / Meet
Specification
at All Times
100% Available
at All Times
Current Contract – BSI Contract’s KPI ( page 2 of 2 )
No Adjustment Provisions Clause
KIK
a) Interpretation – Reduction in cost of performing the Contractor’s
obligations due to ambiguity, discrepancy and/or inconsistency
“…deducted accordingly from the Contract Sum.”
1.4
b) Variation (Adjustment of Contract Sum) – upon determination
of the valuation of variation by way of addition or deduction
17.5
JB Sentral
a) Resolution of ambiguities, discrepancies and/or inconsistencies
“…deducted accordingly from the Contract Sum.”
1.4
b) Variation (Adjustment of Contract Sum) – upon determination
of the valuation of variation by way of addition or deduction
25.5
Expressed Provisions to Adjust Contract Sum
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
No. Deduction provisions Clause
KIK
i) LAD deduction, if Contractor fails to meet KPI –
[as per Appendix 5]
13.2
ii) Default in insuring – Government takes over 21.2
iii) Incompliance with SOCSO Registration – Government
takes over
21.3
iv) Contractor is in default - Government’s right to step in to
carry out services – Government takes over
24.1 (g)
v) Right to deduct monies under the Contract or any other
Contract which the Government and the Contractor are
parties (set off provision)
31.1
vi) Termination - 34.1(d), 35.1 & 36.3
Expressed Provisions for Deductions Under the Contract
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
No. Deduction provisions Clause
JB Sentral
i) APD deduction, if Contractor fails to meet KPI –
(as per Appendix 5]
8.2
ii) Default to obtain license – Government takes over 24.1
iii) Right to deduct monies under the Contract / any other
Contract which the Government and the Contractor are
parties (set off provision)
27.1
v) Auditing by the Government – Government takes over 30.2
vi) Termination - 31.1 (d), 31.2(c), 32.2 & 33.3
vii) Continuous default or defaults that affect national
interests, risk to safety & health etc - Government rights
to step in to carry out services – Government takes over
34.1(g)
Expressed Provision for Deductions Under the Contract
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
No Deduction provisions Clause
KIK
a) Monthly Scheduled Interim Payment Certificates * (MSIP)
Contractor’s defaults
Advance Payment
Variations
“Any other deductions” under the Contract not covered in b, c, d
Errors (corrections/adjustments from previous MSIP)
28.3 (a)
28.3(b),
28.3(c),
28.3(d),
28.3(e),
28.3(f)
* “ The Parties agree that P.D shall be entitled to revise or amend
the amount of the MSIP set out in Appendix 10 provided such
revision or amendment does not alter the total amount of the
Contract Sum (including additions / deductions in accordance
with this Contract) that is payable to the Contractor pursuant to
this Contract”.
28.6
(Para 1)
b) Final Certificate subject to Clause 25 (Unfulfilled Obligations) &
other deductions authorized under the Contract
29.2
Provisions to Effect Deductions Under the Contract
(based on Permissible deductions of specified provisions)
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
No Deduction provisions Clause
JB Sentral
a) Monthly Scheduled Payment Certificates ** (MSP)
Contractor’s defaults including any APD
Variations
“Any other deductions Government entitled under this
Contract not covered by b, c and/or d
26.3 (a)
28.3(b),
28.3(c)
28.3(d)
** “The Parties agree that the P.D/S.O shall be entitled to
revise or amend the amount of the MSP set out in
Appendix 6 where in the opinion of the P.D/S.O the
Contractor fails to comply with the KPI”.
26.6
(Para 1)
b) Final Certificate subject to Clause 29.2 (Unfulfilled
Obligations) & other deductions authorized under the
Contract
28.2(a)
Provisions to Effect Deductions Under the Contract
(based on Permissible deductions of specified provisions)
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
CLAUSES REFERRED BY JKR IN EFFECTING DEDUCTIONS
Contract Sum
• KIK & JB Sentral - Clause 2.1
“For the consideration mentioned in Clause 2.2, the Contractor shall carry
out the Services in full compliance with the terms and conditions of this
Contract.”
• KIK & JB Sentral - Clause 2.2
“The Government hereby covenants to pay the Contractor the sum of ….
or such other sum as shall become payable hereunder at the times and in
the manner specified in this Contract in consideration of the Contractor
performing the services in full compliance with the Contract…”
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
CLAUSES REFERRED BY JKR IN EFFECTING DEDUCTIONS
Issue of Monthly Scheduled Interim Payment Certificates
Clause 28.3 (KIK) / 26.3 (JB Sentral)
“The PD shall within 28 days upon receipt of an application for a Monthly
Scheduled Interim Payment ... make a valuation … and issue a Monthly
Scheduled Interim Payment Certificate to the Government … stating the
amount (if any) due … after taking into account the following matters:
• KIK - Clause 28.3 (e)
“the amount of any other deductions from the Contract Sum that the
Government is entitled to make under the Contract that are not
covered by the provisions in Clause 28.3(b), (c); and/or (d);”
• JB Sentral - Clause 26.3 (d)
“the amount of any other deductions from the Contract Sum that the
Government is entitled to make under the Contract that are not
covered by the provisions in Clause 28.3(b), (c); and/or (d);”
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
CLAUSES REFERRED BY JKR IN EFFECTING DEDUCTIONS
General Requirements
• KIK – Item 3.6 of the Government General Requirements
“The contractor shall carry out the total comprehensive maintenance of
the Services as detailed in the Scope of Works … and in the General
Requirement incorporating the Specifications for the respective Services.
The term comprehensive maintenance shall include all aspects of
preventive, predictive and corrective maintenance, condition monitoring,
inspection, servicing, repair and replacement, supply of consumables or
upgrading all services, equipment, facilities, fittings and fixtures including
external works and landscaping. The FMC shall propose and follow the
preventive schedule maintenance as mentioned in the specification.”
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
CLAUSES REFERRED BY JKR IN EFFECTING DEDUCTIONS
General Requirements
• JB Sentral - Item 3.0 (b) of the Technical Specifications
“The scope of work shall include management, operation and
maintenance services to be delivered in relation to the Asset and are
described … includes the following:
(i) the required performance from the management of the FM Services
(ii) the required service levels during the management of the FM Services; and
(iii) the performance indicators that shall be used to assess the Contractor’s
performance.”
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
KONTRAK PENGURUSAN FASILITI KOMPLEKS KASTAM, IMIGRESEN DAN KUARANTIN (KIK) & JB SENTRAL
Documentations for Monthly Monitoring and Contracts Administration
Corporate Office MALAYSIA : 3, Jalan 222, Petaling Jaya 46100, Selangor, Malaysia T. +6 03 7957 8890 F. +6 03 7957 0931 Operations Office MALAYSIA : Level 4, North Wing, Bangunan Sultan Iskandar Jalan Lingkaran Dalam, 80300 Johor Bahru, Johor, Malaysia T. +6 07 218 8181 F. +6 07 226 8010 Operations Office KINGDOM OF SAUDI ARABIA : Level P4, Abraj Al Bait Towers Development of King Abdul Aziz Endowment Makkah, Kingdom of Saudi Arabia T. + 966 12 571 9191 F. + 966 12 571 8428