Channel morphology and sedimentation in the Rees River

Upload: others

Post on 15-Mar-2021

8 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel morphology and sedimentation in the Rees River

Page 2: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

© Copyright for this publication is held by the Otago Regional Council. This publication may be reproduced in whole or in part provided the source is fully and clearly acknowledged. Published in October 2008 ISBN 1-877265-64-0

Page 3: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River i

Channel Morphology and Sedimentation in the Rees River October 2008

Foreword Understanding the channel morphology and sedimentation characteristics of Otago’s rivers enables their effective management. Increasing growth throughout the Otago region has implications for management of river systems, primarily the extraction of gravel. To help maintain the integrity of the region’s gravel resources, the Otago Regional Council (ORC) undertakes scheduled cross-section surveys as part of the natural hazards programme. This information is utilised to understand the dynamic fluvial processes of each watercourse and general state of the gravel resource. This report explores how the morphology and sedimentation of the Rees River has changed over the surveyed periods, while providing a synthesis of the study’s results to guide management strategies into the future.

Page 4: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

ii Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

Page 5: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River iii

Channel Morphology and Sedimentation in the Rees River October 2008

Executive summary The Rees River is 41 km long and drains a remote alpine catchment of 412 km2. The majority of the catchment is dominated by foliated semischist deposits derived from undifferentiated volcaniclastic sandstone and siltstone that are highly susceptible to physical weathering. Sediment supplies within the Rees River are primarily derived from the adjacent tributary catchments such as Twelve Mile and Precipice Creeks. Aerial photography for a number of periods between 1937 and 2006 shows that the Rees River is a dynamic, mobile system. Channel form and development within the Rees River is indicative of a high sediment yield, braided river system. Significant evidence of movement in the location of the channel thalweg and associated lateral migration of secondary channels has been identified in the majority of cross-sections. However, the banks of active channel margins have remained relatively stable over the periods of survey. Analysis of cross-sections, aerial photographs and anecdotal records indicates that the river has experienced a period of general net aggradation over the respective survey periods. Upper and mid-lower cross-sections are experiencing the largest amounts of net aggradation, while the mid-upper cross-sections have exhibited signs of minor net degradation over the period from 2003 to 2006. Cross-section analysis indicates that locations adjacent to large tributary catchments experience high variability in bed levels. Additionally, there is some evidence to suggest that large flood events may be the primary transportation mechanism for the redistribution of sediments downstream.

Page 6: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

iv Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

Page 7: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River v

Channel Morphology and Sedimentation in the Rees River October 2008

Table of contents

Foreword..................................................................................................................................i

Executive summary ...............................................................................................................iii

1. Introduction ......................................................................................................................1

2. Rees River Catchment ......................................................................................................2 2.1 Geology...........................................................................................................2 2.2 Geomorphology ..............................................................................................4

3. Cross-sections...................................................................................................................7 3.1 Cross-section RR3A......................................................................................10 3.2 Cross-section RR4A......................................................................................11 3.3 Cross-section RR5 ........................................................................................12 3.4 Cross-section 8A...........................................................................................13 3.5 Cross-section RR11 ......................................................................................14 3.6 Cross-section RR12 ......................................................................................16 3.7 Cross-section RR13 ......................................................................................18 3.8 Cross-section RR14 ......................................................................................19 3.9 Cross-section 4..............................................................................................20 3.10 Cross-section RR15 ......................................................................................21 3.11 Cross-section RR17 ......................................................................................22 3.12 Cross-section 18A.........................................................................................23 3.13 Longitudinal profile ......................................................................................24

4. Conclusions ....................................................................................................................25 4.1 Upper cross-sections (4, RR15, RR17, 18A)................................................25 4.2 Mid cross-sections (RR11, RR12, RR13, RR14) .........................................25 4.3 Lower cross-sections (RR3A, RR4A, RR5, 8A) ..........................................25

5. References ......................................................................................................................27

List of figures

Figure 2.1 Rees River Catchment locality map................................................................3 Figure 2.2 Oblique view of the lower Rees and Dart valleys and surrounding

landscape ........................................................................................................................4 Figure 2.3 Aerial images of the Rees River – Lake Wakatipu confluence in 1937,

1977, 1998 and 2006 ......................................................................................................5 Figure 2.4 Longitudinal profile of the subsurface Rees/Dart delta complex extending

into the head of Lake Wakatipu, surveyed November 2007 ..........................................6 Figure 3.1 Location of surveyed cross-sections for the Rees River superimposed on

2006 aerial photography .................................................................................................8 Figure 3.2 Cross-section RR3A, looking downstream...................................................10 Figure 3.3 Cross-section RR4A......................................................................................11 Figure 3.4 Cross-section RR5, looking downstream......................................................12 Figure 3.5 Cross-section 8A, looking downstream ........................................................13

Page 8: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

vi Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

Figure 3.6 Images showing the Rees River, downstream of the bridge for 1937 and 1998. Diamond Creek joins the Rees River floodplain on the right of the images .....14

Figure 3.7 Cross-section RR11, looking downstream....................................................15 Figure 3.8 Cross-section RR12, looking downstream....................................................16 Figure 3.9 Photograph showing the Rees River bridge on the true right bank looking

upstream, February 2008 ..............................................................................................17 Figure 3.10 Photograph showing the Rees River bridge on the downstream side

looking towards the true left, February 2008 ...............................................................17 Figure 3.11 Cross-section RR13, looking downstream....................................................18 Figure 3.12 Cross-section RR14, looking downstream....................................................19 Figure 3.13 Cross-section 4, looking downstream...........................................................20 Figure 3.14 Cross-section RR15, looking downstream....................................................21 Figure 3.15 Cross-section RR17, looking downstream....................................................22 Figure 3.16 Cross-section 18A, looking downstream ......................................................23 Figure 3.17 Longitudinal profile of the Rees River mean bed levels for 1984, 1999

and 2006 24 Figure 4.1 Graph showing net change in mean bed level across all survey periods

for each cross-section location .....................................................................................26 List of tables Table 3.1 Mean bed level results for surveyed cross-sections of the Rees River. A

blank space indicates the cross-section was not surveyed for that year .........................9 Table 3.2 Net change in mean bed level for each respective survey period ...................9

Page 9: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 1

Channel Morphology and Sedimentation in the Rees River October 2008

1. Introduction This document provides a background into morphological change and sedimentation in the Rees River Catchment. Aerial photography, cross-section analyses and anecdotal information is collated and interpreted to provide a comprehensive review of change over surveyed periods. This information can be used to support assessment of community vulnerability and river management.

Page 10: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

2 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

2. Rees River Catchment The Rees River is 41 km long and drains a remote alpine catchment of 412 km2 (Figure 2.1). The upper catchment is indicative of a steep alpine catchment with a confined channel cutting into schist bedrock. Surrounding tributary catchments create large depositional features on the lateral margins of the valley, while contributing substantial amounts of the sediment to the Rees River channel. As the valley floor widens in the lower catchment, the river transitions into a braided form with the development of depositional bars and islands in active channel margins. At its outlet, the river deposits into the head of Lake Wakatipu in the form of a delta. The settlement of Glenorchy is located at the margins of Rees River delta. 2.1 Geology The upper catchment of the Rees River valley is largely dominated by highly erodible schist of the Aspiring lithologic association. Sediments in this region have been identified as finely segregated, quartz-feldspar-mica schist with greenschist bands that cut across Cleft Peak (McSaveney and Glassey, 2002). These deposits are fine-grained and highly susceptible to physical weathering. The Caples-Rakaia terrane boundary has been mapped down the left and right margins of the valley. Upper slopes on the true right of the catchment are dominated by foliated semischist deposits derived from undifferentiated volcaniclastic sandstone and siltstone. While on the true left, deposits are of a similar composition but exhibit stronger foliation and segregated schists (Turnbull, 2000). Holocene alluvial deposits derived from the highly erodible upper schist catchments, such as floodplains and alluvial fans, dominate the lower slopes and floor of the valley.

Page 11: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 3

Channel Morphology and Sedimentation in the Rees River October 2008

Figure 2.1 Rees River Catchment locality map

Page 12: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

4 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

2.2 Geomorphology The Rees River basin was carved out by a larger Tyndall Glacier during the Pleistocene (about 12,000 years ago). This basin is typical of a previously glaciated, U-shaped valley with a flat valley floor and gentle lower slopes which lead up to the near vertical peaks of the flanking mountain ranges. On either side of the Rees River Catchment lie the Richardson Mountains to the east and the Forbes mountains to the west, which steeply rise to over 2000m above sea level (Figure 2.2). The slopes of the northern end of the Richardson Mountains are deeply dissected by a series of narrow gullies leading from minor drainage basins that head Cleft Peak and several unnamed peaks along the ridge to the north (McSaveney and Glassey, 2002). Throughout the catchment, a number of alluvial fans debouch onto the valley floor from adjacent tributaries and contribute significant proportions sediment to the Rees River floodplain.

Figure 2.2 Oblique view of the lower Rees and Dart valleys and surrounding landscape Channel morphology of the lower Rees River is indicative of a braided channel form with an extremely mobile bed load. The lateral migration of channel position, within the active channel margins, occurs frequently, particularly during periods of higher flow. Figure 2.3 shows the confluence of the Rees River with the head of Lake Wakatipu in 1937, 1977, 1998 and 2006. The dynamic nature of this fluvial system is evident from comparing these images where the secondary channel, on the left of the image, becomes inactive during the period 1937 to 2006.

Page 13: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 5

Channel Morphology and Sedimentation in the Rees River October 2008

Figure 2.3 Aerial images of the Rees River – Lake Wakatipu confluence in 1937, 1977, 1998 and 2006 The progradation1 of the Rees River delta into Lake Wakatipu is also evident in these images (Figure 2.3). Aerial photography and anecdotal records indicate that the delta has prograded 90-175m since 1890. Figure 2.4 shows a subsurface longitudinal profile of this feature extending 3km down to the bottom of Lake Wakatipu, surveyed in November 2007. 1 Progradation is the process where shorelines advance into the water body that they are depositing into. Sedimentation rates exceed the rate at which sediment is removed, therefore creating depositional features such as deltas.

1937 1977

1998 2006

A

A

A

A

B

B

B B

Page 14: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

6 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

Figure 2.4 Longitudinal profile of the subsurface Rees/Dart delta complex extending into the head of Lake Wakatipu, surveyed November 2007

North-South Profile of Dart/Rees Delta

0204060

80100120140160

0 500 1000 1500 2000 2500 3000 3500D ist ance f ro m D elt a( m)

Depth (m

)

Page 15: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 7

Channel Morphology and Sedimentation in the Rees River October 2008

3. Cross-sections ORC undertakes scheduled cross-section surveys for selected rivers every year. The cross-section programme enables changes in river morphology to be monitored, and to support assessments and potential effects on communities. Twelve cross-section locations have been intermittently surveyed on the lower-mid reaches of the Rees River (Figure 3.1). Eight surveys, from August 1978 to December 2006 exist, with comprehensive surveys being undertaken in 2003 and 2006. The shortest survey period, seven years, exists for cross-sections RR3A and RR4A, with the longest being 18 years for cross-sections RR17 and 18A. The May 1999 survey was undertaken before the Clutha Catchment flood event of November 1999. The mean bed level of the active channel in each cross-section was calculated using the X-Sect cross-section database. The database compiles a list of widths and their associated elevations for each cross-section and survey period. X-Sect calculates all output information (minimum, maximum and mean bed levels) from the respective widths and elevations. Table 3.1 shows each year surveyed and the respective mean bed level calculation for each cross-section. Some historical surveys only include part of the active channel. In this instance, mean bed levels have been calculated over these distances but are not directly comparable to the wider active channel results. Additionally, cross-sections surveyed prior to 1985 generally have few points therefore, the mean bed levels from these surveys are only viewed as indicative. Table 3.2 shows the net change in mean bed level over the different survey periods. Surveys that did not cover the entire active channel margins are included at the bottom of the table.

Page 16: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

8 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

Figure 3.1 Location of surveyed cross-sections for the Rees River superimposed on 2006 aerial photography

Page 17: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 9

Channel Morphology and Sedimentation in the Rees River October 2008

Table 3.1 Mean bed level results for surveyed cross-sections of the Rees River. A blank space indicates the cross-section was not surveyed for that year X-Section

Width (m)

Aug 78 Jun 84 Jul 87 Aug 90 Apr 96 May 99 Jul 03 Dec 06

RR3A 311 411.08 411.16 411.17RR4A 160 412.57 412.64 412.65RR5 184 413.96 413.88 414.03 414.068A 328 420.32 420.43 420.49 420.54RR11 400 430.62 430.92 430.97 431.01 430.98RR11 110 431.47 431.51RR12 443 434.66 435.09 435.29 435.24 435.23RR13 706 441.20 441.28 441.40 441.31RR14 336 447.44 447.49 447.56 447.61 447.534 352 451.04 450.93 451.04 451.054 462 450.88 451.06 450.95RR15 328 453.77 453.95 453.70 453.90 453.74 453.70RR17 74 463.60 463.63 463.65 463.52 463.48 463.86RR17 129 463.57 463.81 463.76 463.9118A 321 467.42 467.57 467.81 467.7918A 401 467.74 467.72 Table 3.2 Net change in mean bed level for each respective survey period

X-Section

Width (m)

1978-1984

1984-1987

1987-1990

1990-1996

1996-1999

1999-2003

2003-2006

Net Change

RR3A 311 +0.08 +0.01 +0.09 RR4A 160 +0.07 +0.01 +0.08 RR5 184 -0.08 +0.15 +0.03 +0.10 8A 328 +0.11 +0.06 +0.05 +0.22 RR11 400 +0.30 +0.05 +0.04 -0.03 +0.36 RR12 443 +0.43 +0.20 -0.05 -0.01 +0.57 RR13 706 +0.08 +0.12 -0.09 +0.11 RR14 336 +0.05 +0.07 +0.05 -0.08 +0.09 4 462 +0.18 -0.11 +0.07 RR15 328 +0.18 -0.25 +0.20 -0.16 -0.04 -0.07 RR17 129 +0.24 -0.05 +0.15 +0.34 18A 321 +0.15 +0.24 -0.02 +0.37

Surveyed cross-sections for channel widths smaller than the active channel margin

RR11 110 +0.04 +0.04 4 352 -0.11 +0.11 +0.01 +0.01 RR17 74 +0.03 +0.02 -0.13 -0.04 +0.38 +0.26 18A 401 -0.02 -0.02

Page 18: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

10 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

3.1 Cross-section RR3A Cross-section RR3A is located near the end of the Rees River delta, which deposits into the head of Lake Wakatipu (Figure 3.1). The construction of the Glenorchy floodbank in 2000 can be seen with the height of the left bank increasing by 1.23m between the 1999 and 2003 surveys. Figure 3.2 shows a plot of cross-section RR3A for the 1999, 2003 and 2006 surveys. The active Rees River channel is located adjacent to the Glenorchy floodbank, on the true left of the cross-section, and covers a width of 311 m. Mean bed level analysis shows that this location has experienced net aggradation of 0.09 m between 1999 and 2006 (Table 3.1). Most of this aggradation occurred during the period 1999 to 2003, which could be indicative of sedimentation resulting from the November 1999 flood event (the May 1999 survey predated this flood event). Additionally, the thalweg experienced notable aggradation of 0.87 m during this same period, which may be attributed to deposition from the 1999 flood event or channel modification from the construction of the adjacent floodbank. Figure 2.3 shows the secondary channel on the true right of this cross-section that is no longer active. The 1937 imagery shows an active braided channel at this location, while by 2006 this channel has been succeeded by vegetation (Figure 2.3). This location has been annotated on Figure 3.2 as an ephemeral channel.

Figure 3.2 Cross-section RR3A, looking downstream

Ephemeral Channel

Active Channel

Vegetated Island

Glenorchy Floodbank

1999 Thalweg

2003 & 2006 Thalwegs

Page 19: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 11

Channel Morphology and Sedimentation in the Rees River October 2008

3.2 Cross-section RR4A Cross-section RR4A is located approximately 0.77 km upstream of cross-section RR3A. Comparative analyses between both of these sections indicate that the geomorphological state and sedimentation characteristics of these cross-sections are similar. Figure 3.3 shows a plot of cross-section RR4A for the 1999, 2003 and 2006 surveys. The active channel in this cross-section covers a width of only 160m in comparison to the entire 1.425km surveyed in 2006. Mean bed level analysis shows that this location has experienced net aggradation of 0.08m between 1999 and 2006 (Table 3.2). Like cross-section RR3A, most of this aggradation occurred between the 1999 and 2003 surveys, which could be indicative of sedimentation from the November 1999 flood event. The thalweg has experienced significant lateral movement between surveyed periods, reflecting the dynamic braided form of the active channel margins at this location.

Figure 3.3 Cross-section RR4A, looking downstream.

Ephemeral Channel

Active Channel

Vegetated Island

Glenorchy Wetland

2006 Thalweg 1999 Thalweg

Page 20: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

12 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

3.3 Cross-section RR5 Cross-section RR5 is located approximately 1.33km upstream of cross-section RR3A. Like cross-sections RR3A and RR4A, this survey covers the primary active channel and secondary ephemeral channel on the true right (Figure 2.3). Figure 3.4 shows a plot of cross-section RR5 for the 1990, 1999, 2003 and 2006 surveys. The active channel in this cross-section covers a width of only 184m compared to the entire 1.17km surveyed in 2006. Mean bed level analysis shows that this location has experienced net aggradation of 0.10m between 1990 and 2006 (Table 3.2). Similar to both cross-sections downstream, the most significant period of aggradation occurred during the period 1999 to 2003. Figure 3.4 indicates that the banks of the active channel margin have been relatively stable over the period 1990 to 2006. Additionally, the thalweg during this period has repositioned from the true left to the true right. The large delineation that extends from approximately 200m to 750m distance in the 1999 survey does not represent the topography at this location. Rather, this section was not surveyed in 1999 as it was not part of the active channel margins.

Figure 3.4 Cross-section RR5, looking downstream

Ephemeral Channel

Active Channel

Vegetated Island

Glenorchy Wetland

1990 Thalweg

2006 Thalweg

Page 21: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 13

Channel Morphology and Sedimentation in the Rees River October 2008

3.4 Cross-section 8A Cross-section 8A is located approximately 3.89km upstream of cross-section RR3A. Surveys were taken in 1984, 1999, 2003 and 2006 with the 1984 survey only consisting of 13 spot heights over 328m. Figure 3.5 shows a plot of cross-section 8A for each of these surveys. The active channel in this cross-section covers 328m, equal to the 1984 width of survey. Mean bed level analysis shows that this location has experienced net aggradation of 0.22m between 1984 and 2006 (Table 3.2). Visual inspection of Figure 3.5 shows considerable variability in the location of the thalweg and secondary channels between each period surveyed. This variability is symptomatic of the dynamic braided form of the Rees River channel at this location. Additionally, bank erosion of approximately 18.5m occurred on the true left between 1984 and 2003.

Figure 3.5 Cross-section 8A, looking downstream

Active Channel

1984 Thalweg 2006 Thalweg

Page 22: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

14 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

3.5 Cross-section RR11 Cross-section RR11 is located approximately 7.09km upstream of cross-section RR3A and 0.65km downstream of the Rees River bridge. A number of surveys were undertaken for this location - 1984, 1996, 1999, 2003 and 2006 - although only two years, 2003 and 2006, extended across the entire channel width. Figure 3.6 shows this location in 1937 and 1998. Downstream of the bridge, the primary Rees River channel flows to the true left of a large island located in the mid-section of the floodplain. During periods of high flow, the Rees River may migrate across the wider floodplain, although aerial photography indicates it usually resumes its initial course. The Diamond Creek channel flows onto the true right of the Rees River floodplain before confluencing with the main Rees channel downstream of the large island. Figure 3.7 shows a plot of cross-section RR11 for each of the surveyed years.

Figure 3.6 Images showing the Rees River, downstream of the bridge for 1937 and 1998. Diamond Creek joins the Rees River floodplain on the right of the images Located on the true left of the cross-section, the primary channel of the Rees River has only been surveyed in 2003 and 2006. Mean bed level analysis covered a width of 110m for this channel and showed that this location experienced net aggradation of 0.04m during this period. The rest of the cross-section covers a width of 400 m, equivalent to the width of the 1984 survey. This area extends from the true right of the island to the true right bank, including Diamond Creek (Figure 3.7). Mean bed level analysis showed that net aggradation of 0.36m occurred during the period 1984 to 2006 for this part of the cross-section. A large proportion, 0.30m, of aggradation was measured over the period 1984 to 1996. High channel mobility and lateral migration across the floodplain is evident on this wider part of the cross-section (Figure 3.7).

Diamond Creek

Rees River Secondary Channels and wider

Floodplain

Rees River Primary Channel

1937 1998

Page 23: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 15

Channel Morphology and Sedimentation in the Rees River October 2008

Figure 3.7 Cross-section RR11, looking downstream

Diamond Creek

Primary Active Channel

Vegetated Island

Braided Floodplain/ Secondary Channels

1984 Thalweg 2003 Thalweg

Page 24: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

16 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

3.6 Cross-section RR12 Cross-section RR12 is located approximately 8.01km upstream of cross-section RR3A and 0.36km upstream of the Rees River bridge. Surveys were taken in 1984, 1996, 1999, 2003 and 2006 with the 1984 survey only consisting of 16 spot heights over a distance of 653m. Figure 3.8 shows a plot of cross-section RR12 for each of these surveys. The active channel in this cross-section covers a width of 443m and excludes the true right of the surveyed cross-section (Figure 3.8). Mean bed level analysis shows that this location has experienced net aggradation of 0.57m between 1984 and 2006. As with cross-section RR11, a large proportion of this aggradation was measured during the period 1984 to 1996. There is no definitive trend in thalweg change at this location due to the high mobility of braided channels.

Figure 3.8 Cross-section RR12, looking downstream Figure 3.9 and Figure 3.10 show photographs of the Rees River bridge taken in February 2008. Anecdotal records note the reduction of freeboard under the Rees River bridge from significant sedimentation during the 20th century. Mean bed level analysis indicates that cross-section RR12 (upstream of the bridge) has experienced minor net degradation of 0.06m between 1999 and 2006 but experienced net aggradation of 0.63m between 1984 and 1999. Downstream of the bridge, cross-section RR11 experienced net aggradation of 0.39m in the period 1984 to 2003 and net degradation of 0.03m between 2003 and 2006.

Active Channel Vegetated Berm

Page 25: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 17

Channel Morphology and Sedimentation in the Rees River October 2008

Figure 3.9 Photograph showing the Rees River bridge on the true right bank looking upstream, February 2008

Figure 3.10 Photograph showing the Rees River bridge on the downstream side looking towards the true left, February 2008

Figure Approx. 1.70 m

Page 26: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

18 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

3.7 Cross-section RR13 Cross-section RR13 is located approximately 9.09km upstream of cross-section RR3A and about 1.44km upstream of the Rees River bridge. Figure 3.11 shows a plot of cross-section RR13 for the 1996, 1999, 2003 and 2006 surveys. The active channel in this cross-section covers a width of 706m, equal to the distance of the 1996 survey. Mean bed level analysis shows that this location has experienced net aggradation of 0.11m during the period 1996 to 2006. However, part of this net change includes net degradation of 0.09 from 2003 to 2006. There is no definitive trend in thalweg change at this location due to the high mobility of braided channels. While there has been substantial lateral movement of the channel, banks at this location have been relatively stable over the survey periods.

Figure 3.11 Cross-section RR13, looking downstream

Active Channel

Vegetated Island

1996 Thalweg 2006 Thalweg

Page 27: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 19

Channel Morphology and Sedimentation in the Rees River October 2008

3.8 Cross-section RR14 Cross-section RR14 is located approximately 10.17km upstream of cross-section RR3A and 2.52km upstream of the Rees River bridge. Figure 3.12 shows a plot of cross-section RR14 for the 1984, 1996, 1999, 2003 and 2006 surveys. The active channel in this cross-section covers a width of 336m, with vegetated berms on each side of the channel. Mean bed level analysis shows that this location has experienced net aggradation of 0.09m between 1984 and 2006. Surveys indicate that lateral migration of the channel is common at this location. The thalweg moved about 90m to the left between 1984 and 2006.

Figure 3.12 Cross-section RR14, looking downstream

Vegetated Berm

Active Channel

Vegetated Berm

1984 Thalweg

2006 Thalweg

Page 28: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

20 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

3.9 Cross-section 4 Cross-section 4 is located approximately 10.75km upstream of cross-section RR3A and about 3.1km upstream of the Rees River bridge. Figure 3.13 shows a plot of cross-section 4 for the 1987, 1996, 2003 and 2006 surveys. The active channel in this cross-section covers a width of 462m. Comparatively, the 1987 section was only surveyed for a width of 357m. Mean bed level analysis shows net aggradation of 0.07m over the entire channel width between 1996 and 2006 (Table 3.2). The channel on the true left deepened 2.24m between 2003 and 2006.

Figure 3.13 Cross-section 4, looking downstream

Active Channel

Vegetated Berm

2006 Thalweg

1996 Thalweg

Page 29: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 21

Channel Morphology and Sedimentation in the Rees River October 2008

3.10 Cross-section RR15 Cross-section RR15 is located approximately 11.21km upstream of cross-section RR3A and 3.56km upstream of the Rees River bridge. A large portion on the true left of this cross-section is a longitudinal profile of the Twelve Mile Creek alluvial fan that debouches onto the Rees River floodplain. Figure 3.14 shows a plot of cross-section RR15 for the 1984, 1996, 1999, 2003 and 2006 surveys. The active Rees River channel lies near the middle of the cross-section, adjacent to the Twelve Mile Creek alluvial fan toe. During periods of high flow, toe-cutting of this alluvial fan by the axial Rees channel may occur. Mean bed level analysis shows that this location has experienced net degradation of 0.07m during the period 1984 to 2006 (Table 3.2). While mean bed level analyses show relatively minor net degradation at this location, variation from aggradational to degradational environments is significant. Bed levels at this cross-section are interpreted to be significantly affected by the depositional sediment flux of Twelve Mile Creek. Where the active channel margins of the Rees River may be affected by encroachment of the alluvial fan, depositional phases of the Twelve Mile Catchment may contribute intermittent sediment fluxes across the Rees floodplain.

Figure 3.14 Cross-section RR15, looking downstream

Active Channel

Twelve Mile Creek Alluvial Fan

2003 & 2006 Thalweg 1984 Thalweg

Page 30: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

22 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

3.11 Cross-section RR17 Cross-section RR17 is located approximately 12.7km upstream of cross-section RR3A and about 5.05km upstream of the Rees River bridge. Figure 3.15 shows a plot of cross-section RR17 for the 1978, 1984, 1996, 1999, 2003 and 2006 surveys. The active channel in this cross-section covers a width of 129m. Comparatively, the 1978 section was only surveyed over 74m. Table 3.2 shows the results of mean bed level analysis for both channel widths. The 1978 survey is not comparable to the rest of the survey periods due to the limited distance. Mean bed level analysis shows that net aggradation over the entire channel width of 0.34m occurred between 1996 and 2006.

Figure 3.15 Cross-section RR17, looking downstream

Active Channel

2003 Thalweg 1984 Thalweg

Page 31: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 23

Channel Morphology and Sedimentation in the Rees River October 2008

3.12 Cross-section 18A Cross-section 18A is located approximately 13.24km upstream of cross-section RR3A and about 5.59km upstream of the Rees River bridge. Figure 3.16 shows a plot of cross-section 18A for the 1978, 1984, 2003 and 2006 surveys. The active channel in this cross-section covers a width of 401m. Comparatively, the 1978 section was only surveyed over 321m. Table 3.2 shows the results of mean bed level analysis for both channel widths. The 1978 survey is not comparable to the rest of the survey periods due to the limited distance. Mean bed level analysis shows that net aggradation of 0.37m occurred over the 321m width. The thalweg of the channel in the 2006 survey is located on the true right in an area that was not covered in the 1978 and 1984 surveys.

Figure 3.16 Cross-section 18A, looking downstream

Active Channel

1978 Thalweg

2006 Thalweg

Page 32: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

24 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

3.13 Longitudinal profile Figure 3.17 shows a longitudinal profile of mean bed level for 1984, 1999 and 2006. These three years were chosen as they covered a suitable temporal range and number of cross-sections surveyed. The longitudinal profile shows that mean bed levels have remained relatively stable over the period 1984 to 2006. Figure 3.17 indicates that mean bed levels near the upper range of the surveyed catchment have lowered marginally from 1984 to 2006. While in the lower part of the catchment, mean bed levels have risen slightly between 1999 and 2006. Observations derived from the longitudinal profile should be viewed as indicative due to the intermittent number of surveys and survey locations.

400

410

420

430

440

450

460

470

0 2 4 6 8 10 12 14

Kilometres from Cross-section RR3A

Mea

n B

ed L

evel

(m)

Jun-84May-99Dec-06

Figure 3.17 Longitudinal profile of the Rees River mean bed levels for 1984, 1999 and 2006

Page 33: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 25

Channel Morphology and Sedimentation in the Rees River October 2008

4. Conclusions A desktop analysis of channel morphology and sedimentation in surveyed reaches of the Rees River has been undertaken using aerial photography, cross-section surveys and relevant documentation. This section provides a synthesis of the study’s results to provide an indication of how the river system is changing over time. This will be expressed for the lower, mid and upper cross-sections with a general overview discussing notable variation and trends. 4.1 Upper cross-sections (4, RR15, RR17, 18A)

Cross-sections 18A and RR17 experienced net aggradation of 0.37m (1978-2006) and 0.34m (1996-2006) respectively.

Cross-section RR15 exhibits high volatility of switches in aggradation and degradation between survey periods. This is interpreted to a function of the sediment input from the Twelve Mile Creek Catchment. This section experienced net degradation of 0.07m (1984-2006).

Cross-section 4 experienced net aggradation of 0.07m (1996-2006), while exhibiting fluctuation similar to cross-section RR15.

4.2 Mid cross-sections (RR11, RR12, RR13, RR14)

Between 1984 and 1999, cross-sections RR12 and RR11 experienced net aggradation of 0.63m and 0.35m aggradation respectively.

All cross-sections in this part of river experienced minor net degradation during the survey period 2003 to 2006.

Cross-sections RR13 and RR14 experienced 0.11m (1996-2006) and 0.09m (1984-2006) net aggradation respectively.

4.3 Lower cross-sections (RR3A, RR4A, RR5, 8A)

Cross-sections RR3A and RR4A have a relatively short period of survey from 1999 to 2006 and show minor net aggradation over this period.

Cross-sections RR5 and 8A have longer survey periods and show net aggradation of 0.10m (1990-2006) and 0.22m (1984-2006) respectively.

Aerial photography obtained for a number of periods between 1937 and 2006, shows that the Rees River is a dynamic, mobile system. Channel form and development within the Rees River is indicative of a high sediment yield, braided river system. Significant evidence of movement in the location of the channel thalweg and associated lateral migration of secondary channels has been identified in the majority of cross-sections. While dynamism in channel morphology has been identified from cross-sectional analysis, the Rees River banks have remained relatively stable at surveyed locations. Figure 4.1 shows a graphical representation of the net change in mean bed levels quantified for each cross-section over each respective period of survey. An holistic interpretation of mean bed level results indicates that the upper (RR17, 18A) and mid (8A, RR11, RR12) cross-sections are experiencing net aggradation while other surveyed locations are experiencing minor fluctuations in net mean bed levels.

Page 34: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

26 Channel Morphology and Sedimentation in the Rees River

Channel Morphology and Sedimentation in the Rees River October 2008

-0.1

0

0.1

0.2

0.3

0.4

0.5

0.6

RR3A RR4A RR5 8A RR11 RR12 RR13 RR14 4 RR15 RR17 18A

Cross-section

Net

Cha

nge

in M

ean

Bed

Lev

el (m

)

Figure 4.1 Graph showing net change in mean bed level across all survey periods for each cross-section location Local variability in the bed levels of some cross-sections, such as RR15, over surveyed periods indicates that bed levels are significantly affected by sediment inputs from adjacent catchments. Additionally, the redistribution of these sediments from upper to lower catchments may be primarily activated by large flood flow events, such as in November 1999.

Page 35: Channel morphology and sedimentation in the Rees River · 4 Channel Morphology and Sedimentation in the Rees River Channel Morphology and Sedimentation in the Rees River October 2008

Channel Morphology and Sedimentation in the Rees River 27

Channel Morphology and Sedimentation in the Rees River October 2008

5. References McSaveney MJ, Glassey PJ. 2002. The fatal Cleft Peak debris flow of 3 January 2002, Upper Rees Valley, West Otago. Institute of Geological and Nuclear Sciences, Science Report 2002/03, Lower Hutt, New Zealand. Turnbull IM. 2000. Geology of the Wakatipu Area. Institute of Geological and Nuclear Sciences Limited, Lower Hutt, New Zealand.