    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-1

    Table 8-22 Structural Criteria for Corrugated Steel Pipe1-3

    Diameter(mm) Min. Fill Heightto SubgradeSurface

    (m)

    Maximum Allowable Height of Cover

    4

    - (m)

    Gauge for 68 x13Corrugation

    Gauge for 75 x 125 or 125 x 25Corrugation

    18 16 14 12 10 8 16 14 12 10 8

    300

    0.3

    82 91 99 not recommended5

    size specific to 68 x 13

    375 66 73 80

    450 55 61 66 85

    525 47 52 57 73

    600 41 46 50 64 67

    750 36 40 51 55 57

    900 31 33 43 45 47

    not recommended5

    1050 34 47 74 77 81

    1200 30 41 64 67 71

    1350 36 57 60 63 34 43 65 78 87

    1500 52 54 56 31 39 58 70 78

    1650 49 51 28 35 53 63 71

    1800 45 47 26 32 49 58 65

    1950 not recommended

    5

    23 30 45 54 60

    2100 21 28 42 50 55

    2250

    size specific to 75 x 25 or 125 x 25

    19 26 39 46 51

    2400 24 36 43 48

    2550

    0.6

    23 34 41 45

    2700

    notrec.

    5

    32 38 43

    2700 31 36 41

    3000 29 34 39

    1. Gauge, diameter, and corrugation combinations not included in this table shall not be specified.2. MS-23 Live Loading.3. Final gauge specified shall also satisfy design and service life criteria.4. Maximum vertical distance between the top of the pipe and finished or surcharge grade.5. Gauge, diameter, and corrugation combinations do not meet structural criteria, or are not manufactured.

    .

  • 7/28/2019 Chapt 08a Metric

    2/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-2

    Table 8-23 Structural Criteria for Corrugated Steel Pipe-Arch 1-3

    Span(mm)

    Rise(mm)

    Min. FillHeight toSubgradeSurface

    (m)

    68x13 Corrugation 75x25 or 125x25Corrugation

    EquivalentDiameter

    (mm)Max.

    Heightof Cover

    4

    (m)

    Min.Gauge

    5

    Max.Height

    of Cover4

    (m)

    Min.Gauge

    5

    430 330

    0.3

    5 16

    size specific to 68x13

    375

    530 380 4 16 450

    610 460 4 16 525

    710 510 3 16 600

    885 610 2 16 750

    1060 740 2 16

    not recommended7

    900

    1240 840 2 14 1050

    1440 970 2 12 1200

    1620(1520)6

    1100(1170)6

    3 12 4 12 1350

    1800(1670)6

    1200(1300)6

    3 10 4 12 1500

    1850 1400 75x25 or 125x25 only 5 12 1650

    1950 1320 3 8 68x13 only 1650

    2100 1450 3 8 1800

    2050 1500

    Size specific to 75x25or 125x25

    5 12 1800

    2200 1620 5 12 1950

    2400 1720 5 12 2100

    2600 1820 4 12 2250

    2840 1920

    0.6

    4 12 2400

    2970 2020 4 12 2550

    3240 2120 4 10 2700

    3470 2220 4 10 2850

    3600 2320 4 10 3000

    1. Gauge, span and rise, and corrugation combinations not included in this table shall not be specified.2. MS-23 Live Loading.3. Final gauge specified shall also satisfy design and service life criteria.4. Maximum vertical distance between the top of the pipe and finished or surcharge grade.5. Increased material thickness (i.e.14 gauge versus 16 gauge) does not increase maximum height of cover.6. Number outside of parentheses is for 68x13 corrugation. Number inside of parentheses is for 75x25 or 125x25

    corrugation.7. Gauge, span and rise, and corrugation combinations do not meet structural criteria, or are not manufactured

  • 7/28/2019 Chapt 08a Metric

    3/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-3

    Table 8-24 Structural Criteria for Corrugated Steel Pipe Type IR1-3

    Diameter(mm)

    Min. Fill Height toSubgrade Surface

    (m)

    Maximum Allowable Height of Cover4

    (m)

    Gauge

    14 12

    525

    0.3

    24 41

    600 21 36

    750 17 29

    900 14 24

    1050 12 20

    1200 11 18

    1350

    0.45

    10 16

    1500 9 14

    1650 8 13

    1800 7 12

    1950

    0.6

    6 11

    2100not recommended

    5

    10

    2250 10

    2400 9

    2550 0.75 9

    1. Gauge, diameter, and corrugation combinations not included in this table shall not bespecified.2. MS-23 Live Loading.3. Final gauge specified shall also satisfy design and service life criteria.4. Maximum vertical distance between the top of the pipe and finished or surcharge grade.5. Gauge, diameter, and corrugation combinations do not meet structural criteria, or are not

    manufactured.

  • 7/28/2019 Chapt 08a Metric

    4/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-4

    Table 8-25 Structural Criteria for Corrugated Steel Pipe Type IIR1-3

    Span(mm)

    Rise(mm)

    Min. Fill Height toSubgrade

    Surface(m)

    Maximum Allowable Height ofCover

    4(m)

    EquivalentDiameter

    (mm)

    Gauge

    14 12

    580 490

    0.3

    4 4 525

    680 540 4 4 600

    830 670 4 4 750

    1010 790 4 4 900

    1160 920

    not

    recommended

    5

    4 1050

    1340 1050 4 1200

    1520 1170 4 1350

    1670 1300 4 1500

    1. Gauge, span and rise, and corrugation combinations not included in this table shall not bespecified.

    2. MS-23 Live Loading.3. Final gauge specified shall also satisfy design and service life criteria.4. Maximum vertical distance between the top of the pipe and finished or surcharge grade.5. Gauge, span and rise, and corrugation combinations do not meet structural criteria, or are not

    manufactured.

  • 7/28/2019 Chapt 08a Metric

    5/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-5

    Table 8-26 Structural Criteria for Corrugated Struc tural Steel Plate Pipe1-3

    (6 x 2 Corrugations) Sheet 1 of 2

    Diameter(mm)

    Min. FillHeight toSubgrade

    Surface(m)

    Maximum Allowable Height of Cover4

    - (m)

    Gauge

    12 10 8 7 5 3 1 1

    4 Bolts per 300 mm of Longitudinal Seam5

    6 Bolts per 300mm

    6

    1525

    0.3

    14 21 27 31 34 34 34 34

    1675 13 19 25 29 34 34 34 34

    1830 12 17 23 26 31 34 34 34

    1980 11 16 21 24 29 34 34 34

    2135 10 15 20 22 27 32 34 34

    2285 9 14 18 21 25 30 33 34

    2440 9 13 17 20 23 28 30 34

    2590

    0.6

    8 12 16 18 22 26 28 34

    2745 8 11 15 17 21 25 27 33

    2895 7 11 14 16 20 23 25 33

    3050 7 10 13 16 19 22 24 30

    3200 6 10 13 15 18 21 23 29

    3355 6 9 12 14 17 20 22 27

    3505 6 9 12 13 16 19 21 26

    3660 6 8 11 13 16 19 20 25

    3810 5 8 11 12 15 18 19 24

    3960 5 8 10 12 14 17 19 23

    4115 5 7 10 11 14 16 18 22

    4265 5 7 9 11 13 16 17 21

    4420 5 7 9 11 13 15 16 21

    4570 5 7 9 10 12 15 16 20

    4725 4 6 9 10 12 14 16 19

    4875 notrec.

    7

    6 8 10 12 14 15 19

    1. Gauge, diameter, and corrugation combinations not included in this table shall not be specified.2. MS-23 Live Loading.3. Final gauge specified shall also satisfy design and service life criteria.4. Maximum vertical distance between the top of the pipe and finished or surcharge grade.5. Two bolts per corrugation.6. Three bolts per corrugation.7. Gauge and diameter combinations do not meet structural criteria, or are not manufactured.

  • 7/28/2019 Chapt 08a Metric

    6/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-6

    Table 8-26 Structural Criteria for Corrugated Struc tural Steel Plate Pipe1-3

    (6 x 2 Corrugations) Sheet 2 of 2

    Diameter(mm) Min. FillHeight toSubgradeSurface

    (m)

    Maximum Allowable Height of Cover

    4

    - (m)Gauge

    12 10 8 7 5 3 1 1

    4 Bolts per 300 mm of Longitudinal Seam5

    6 Bolts per 300mm

    6

    5030

    0.9

    6 8 9 11 13 15 18

    5180 6 8 9 11 13 14 18

    5335 6 8 9 11 12 14 17

    5485 6 7 9 10 12 13 17

    5640 7 8 10 12 13 16

    5790 7 8 10 12 13 16

    5945 7 8 10 11 12 16

    6095 7 8 9 11 12 15

    6250 not recommended7

    8 9 11 12 15

    6400 7 9 11 11 14

    1. Gauge, diameter, and corrugation combinations not included in this table shall not bespecified.2. Final gauge specified shall also satisfy design and service life criteria.3. MS-23 Live Loading.4. Maximum vertical distance between the top of the pipe and finished or surcharge grade.5. Two bolts per corrugation.6. Three bolts per corrugation.7. Gauge and diameter combinations do not meet structural criteria, or are not manufactured.

  • 7/28/2019 Chapt 08a Metric

    7/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-7

    Table 8-27 Structural Criteria for Corrugated Struc tural Steel Plate Pipe-Arch1-3(6 x 2 inch Corrugations) Sheet 1 of 2

    Span(mm) Rise(mm) Min. Fill Height toSubgradeSurface

    (m)

    Max. Height ofCover4

    (m)

    Minimum Gauge

    5

    EquivalentDiameter(mm)

    1850 1400

    0.45

    7 12 1675

    2060 1500 7 12 1830

    2210 1600 6 12 1980

    2410 1700 5 12 2135

    2620 1800 5 12 2285

    2840 1910 5 12 2440

    2970 2010

    0.6

    4 12 2590

    3250 2110 4 12 2745

    3480 2210 4 12 2895

    3610 2310 4 12 3050

    3810 2410 4 12 3200

    3910 2540 3 12 3355

    4040 2840 5 12 3505

    4240 2620 3 12 3505

    4270 2950 4 12 3660

    4340 2720 3 12 3660

    4390 3050 5 12 3810

    4670 2820 3 12 3810

    4670 3150 4 12 3960

    4780 2920 3 12 3960

    4830 3250 4 12 4115

    5000 3020 3 12 4115

    1. Gauge, span and rise, and corrugation combinations not included in this table shall not be specified.2. MS-23 Live Loading.3. Final gauge specified shall also satisfy design and service life criteria.4. Maximum vertical distance between the top of the pipe and finished or surcharge grade.

    5. Increased material thickness (i.e.14 gauge versus 16 gauge) does not increase maximum height ofcover.

  • 7/28/2019 Chapt 08a Metric

    8/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8-8

    Table 8-27 Structural Criteria for Corrugated Struc tural Steel Plate Pipe-Arch1-3(6 x 2 inch Corrugations) Sheet 2 of 2

    Span(mm) Rise(mm) Min. Fill Height toSubgradeSurface

    (m)

    Max. Height ofCover4

    (m)

    Minimum Gauge

    5

    EquivalentDiameter(mm)

    5030 33500.6

    4 12 4265

    5230 3450 4 12 4420

    5460 3560

    0.9

    4 12 4570

    5660 3660 4 12 4725

    5870 3760 4 12 4875

    5990 3860 4 10 5030

    6220 3960 4 10 5180

    1. Gauge, span and rise, and corrugation combinations not included in this table shall not bespecified.

    2. MS-23 Live Loading.

    3. Final gauge specified shall also satisfy design and service life criteria.4. Maximum vertical distance between the top of the pipe and finished or surcharge grade.

    5. Increased material thickness (i.e.14 gauge versus 16 gauge) does not increase maximumheight of cover.

  • 7/28/2019 Chapt 08a Metric

    9/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-9

    Table 8-28 Structural Criteria for Corrugated Aluminum Pipe1,2

    Diameter(mm) Min. Fill Height toSubgrade Surface(m)

    Maximum Allowable Height of Cover

    3

    (m)

    Gauge for 68x13 Corrugation Gauge for 75x25 Corrugation

    16 14 12 10 16 14 12 10 8

    300

    0.3

    15 15 26 not.rec.

    4

    size specific to 68 x 13

    375 12 12 20

    450 10 10 17

    525 8 8 15

    600 7 7 13

    675 6 6 11 12

    750 6 10 11 not recommended4

    900

    not recommended4

    9 11 15 23

    1050

    0.45

    7 9 13 20

    1200 6 8 11 17 22

    1350 7 10 15 20

    1500 6 9 13 18

    1650 6 8 12 16

    1800

    not rec.4

    8 11 15

    1950

    0.6 size specific to 75 x 25

    7 10 14

    2100 6 10 13

    2250 6 9 12

    2400 5 8 11

    1. Gauge, diameter, and corrugation combinations not included in this table shall not bespecified.

    2. MS-23 Live Loading.3. Maximum vertical distance between the top of the pipe and finished or surcharge grade.4. Gauge, diameter, and corrugation combinations do not meet structural criteria, or are not

    manufactured.

  • 7/28/2019 Chapt 08a Metric

    10/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-10

    Table 8-29 Structural Criteria for Corrugated Aluminum Pipe-Arch1,2

    Span(mm)

    Rise(mm)

    Min. FillHeight toSubgradeSurface

    (m)

    68 x 13 Corrugation 75 x 25 Corrugation EquivalentDiameter

    (mm)Max.Height

    of Cover3

    (m)

    Min.Gauge

    4

    Max.Height

    of Cover3

    (m)

    Min.Gauge

    4

    430 330

    0.3

    5 16

    size specific to 68 x 13

    375

    530 380 4 16 450

    610 460 3 16 525

    710 510 3 14 600

    885 610 2 14 750

    1060 740

    0.45

    2 12 900

    1240 840 2 12 1050

    1440 970 2 10 not recommended5

    1200

    1520 1170

    not recommended5

    4 14 1350

    1670 1300 4 14 1500

    1850 1400 5 14 1650

    2050 1500

    0.6

    5 12 1800

    2200 1620size specific to 75 x 25

    5 12 1950

    2400 1720 5 12 2100

    1. Gauge, span and rise, and corrugation combinations not included in this table shall not bespecified.

    2. MS-23 Live Loading.3. Maximum vertical distance between the top of the pipe and finished or surcharge grade.4. Increased material thickness (i.e. 14 gauge versus 16 gauge) does not increase maximum

    height of cover.

    5. Gauge, span and rise, and corrugation combinations do not meet structural criteria, or are notmanufactured.

  • 7/28/2019 Chapt 08a Metric

    11/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-11

    Table 8-30 Structural Criteria for Corrugated Aluminum Pipe Type IR1,2

    Diameter(mm)

    Minimum / Maximum Allowable Height of Cover3

    - (m)

    Gauge

    16 14 12 10

    450 0.3 / 15 0.3 / 22

    not recommended4525 0.3 / 13 0.3 / 18 0.3 / 30

    600 0.3 / 10 0.3 / 16 0.3 / 27

    750 0.3 / 9 0.3 / 13 0.3 / 21

    900 0.45 / 7 0.45 / 10 0.3 / 17 0.3 / 22

    1050 0.45 / 6 0.45 / 9 0.3 / 15 0.3 / 19

    1200 0.6 / 8 0.45 / 13 0.3 / 16

    1350 0.6 / 7 0.45 / 11 0.45 / 14

    1500

    not recommended4

    0.6 / 10 0.45 / 12

    1650 0.6 / 11

    1800 0.6 / 10

    1. Gauge, diameter, and corrugation combinations not included in this table shall not bespecified.

    2. MS-23 Live Loading.3. Minimum height of cover is measured to subgrade surface. Maximum vertical distance

    between the top of the pipe and finished or surcharge grade.4. Gauge, diameter, and corrugation combinations do not meet structural criteria, or are not

    manufactured.

  • 7/28/2019 Chapt 08a Metric

    12/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-12

    Table 8-31 Structural Criteria for Corrugated Aluminum Pipe Type IIR1,2

    Span(mm)

    Rise(mm)

    Minimum / Maximum Allowable Height of Cover3(m) Equivalent

    Diameter(mm)Gauge

    16 14 12 10

    500 410 0.3 / 4 0.3 / 4

    not rec.4

    450

    580 490 0.3 / 4 0.3 / 4 0.3 / 4 525

    680 540 0.45 / 4 0.3 / 4 0.3 / 4 600

    830 670 0.45 / 4 0.45 / 4 0.3 / 4 750

    1010 790 0.6 / 4 0.45 / 4 0.45 / 4 0.3 / 4 900

    1160 920

    not recommended4

    0.45 / 4 0.45 / 4 1050

    1340 1050 0.45 / 4 0.45 / 4 1200

    1520 1170 0.6 / 4 0.45 / 4 1350

    1670 1300 0.6 / 4 0.45 / 4 1500

    1. Gauge, span and rise, and corrugation combinations not included in this table shall not bespecified.

    2. MS-23 Live Loading.

    3. Minimum height of cover is measured to subgrade surface. Maximum vertical distancebetween the top of the pipe and finished or surcharge grade.

    4. Gauge, span and rise, and corrugation combinations do not meet structural criteria, or are notmanufactured.

  • 7/28/2019 Chapt 08a Metric

    13/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-13

    Table 8-32 Structural Criteria for Round Corrugated Aluminum Struc tural Plate Pipe1,2

    Diameter(mm)

    Min. Fill Height toSubgrade Surface

    (m)

    Maximum Allowable Height of Cover3

    (m)

    Pipe Wall Thickness (mm)

    2.54 3.18 3.81 4.44 5.08 5.72 6.35

    1525

    0.45

    9 12 15 18 25 28 30

    1675 8 11 13 16 23 26 29

    1830 7 10 12 15 20 23 26

    1980

    0.6

    7 9 11 14 19 22 24

    2135 6 8 11 12 18 20 22

    2285 6 8 10 12 16 19 21

    2440 5 7 9 11 15 17 20

    2590 5 7 9 10 14 16 18

    2745

    0.75

    5 6 8 10 14 16 17

    2895 5 6 8 9 13 15 16

    3050 4 6 7 9 12 14 16

    3200 4 5 7 8 12 13 15

    3355 4 5 7 8 11 13 14

    3505 4 5 6 8 11 12 13

    3660

    0.9

    4 5 6 7 10 12 13

    3810

    not rec.4

    5 6 7 10 11 12

    3960 4 5 7 9 11 12

    4115 4 5 6 9 10 11

    4265 4 5 6 9 10 11

    4420 4 5 6 9 9 10

    4570 4 5 6 8 9 10

    1. Pipe wall thickness, and diameter combinations not included in this table shall not be specified.2. MS-23 Live Loading.

    3. Maximum vertical distance between the top of the pipe and finished or surcharge grade.4. Pipe wall thickness and diameter combinations do not meet structural criteria, or are notmanufactured.

  • 7/28/2019 Chapt 08a Metric

    14/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-14

    Table 8-33 Structural Criteria for Corrugated Aluminum Struc tural Plate Pipe-Arch1,2

    Span(mm)

    Rise(mm)

    Min. FillHeight to

    SubgradeSurface

    (m)

    Maximum Allowable Height of Cover3

    (m)

    Pipe Wall Thickness (mm)

    2.54 3.18 3.81 4.44

    2010 1730

    0.6

    6 9 11 11

    2110 1750 6 8 10 11

    2210 1800 6 8 10 10

    2360 1830 5 7 9 9

    2460 1850 5 7 9 9

    2570 1910 5 6 8 8

    2690 1930

    0.75

    5 6 7 7

    2820 1960 4 6 7 7

    2920 1980 4 6 7 7

    3020 2030 4 6 7 7

    3120 2060 4 5 7 7

    3280 2080 4 5 6 6

    3480 2160 3 5 6 6

    3730 2210

    0.9

    3 4 5 5

    3940 2290 3 4 5 53990 2540 3 4 5 5

    4270 2620

    not rec.4

    4 5 5

    4340 2920 4 5 5

    4550 3000 3 5 5

    4750 3100 4 5

    4980 3200 4 4

    1. Pipe wall thickness, and span and rise combinations not included in this table shall not be specified.2. MS-23 Live Loading.3. Maximum vertical distance between the top of the pipe and finished or surcharge grade.4. Pipe wall thickness, and span and rise combinations do not meet structural criteria, or are not

    manufactured.

  • 7/28/2019 Chapt 08a Metric

    15/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    Table 8-34 Structural Criteria for Reinfo rced Concrete Pipe 1 (Page 1 of 2)

  • 7/28/2019 Chapt 08a Metric

    16/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-16

    Table 8-34 Structural Criteria for Reinforced Concrete Pipe1 (Page 2 of 2)

  • 7/28/2019 Chapt 08a Metric

    17/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-17

    Table 8-35 Structural Criteria for Reinforced Concrete Ellip tical Pipe1

  • 7/28/2019 Chapt 08a Metric

    18/18

    APPENDIX A - HIGHWAY DRAINAGE

    10/22/09

    8A-18

    Table 8-36 Structural Criteria for Smooth Interior Corrugated Polyethylene Pipe1

    Diameter(mm)

    Min. Fill Height to SubgradeSurface

    (m)

    Maximum Allowable HeightOf Cover

    2

    (m)

    100

    0.3 4.5

    300

    375

    450

    600

    750

    900

    1050

    1200

    1500

    1. MS-23 Live Loading2. Maximum vertical distance between the top of the pipe and the finished or surcharge grade.