  • Chapter # : 01 CARRIAGE

    01-01-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st 50 meter

    EQUIPMENT

    Carriage Charges #1 59.00 1.000 59.00 Rs/50mRs/50m 1

    Total Equipment % 76.00 59.00

    Cost Per 50 m: 71.39

    12.39

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 71.39

    50 Meter Rs. 0.00

    01-01-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 9.22 1.000 9.22 Rs/50mRs/50m 1

    Total Equipment % 76.00 9.22

    Cost Per 50 m: 11.15

    1.94

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 11.15

    50 Meter Rs. 0.00

    01-01-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 3rd to 5th 50

    meter

    EQUIPMENT

    Carriage Charges #3 6.41 1.000 6.41 Rs/50mRs/50m 1

    Total Equipment % 76.00 6.41

    Cost Per 50 m: 7.76

    1.35

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 7.76

    50 Meter Rs. 0.00

    01-01-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 250 MeterSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 250 to 1000

    meter

    EQUIPMENT

    Carriage Charges #4 28.56 1.000 28.56 Rs/250mRs/250m 1

    Total Equipment % 76.00 28.56

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 1 of 969

  • Chapter # : 01 CARRIAGE

    Cost Per 250 m: 34.56

    6.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 250 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    250 Meter Rs. 34.56

    250 Meter Rs. 0.00

    01-01-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st kilometer

    EQUIPMENT

    Carriage Charges #5 102.38 1.000 102.38 Rs/KmRs/Km 1

    Total Equipment % 76.00 102.38

    Cost Per km: 123.88

    21.50

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 123.88

    km Rs. 0.00

    01-01-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd - 5th

    kilometer

    EQUIPMENT

    Carriage Charges #6 23.40 1.000 23.40 Rs/KmRs/Km 1

    Total Equipment % 76.00 23.40

    Cost Per km: 28.31

    4.91

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 28.31

    km Rs. 0.00

    01-01-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 6th to 10th

    kilometer

    EQUIPMENT

    Carriage Charges #7 20.00 1.000 20.00 Rs/KmRs/Km 1

    Total Equipment % 76.00 20.00

    Cost Per km: 24.20

    4.20

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 24.20

    km Rs. 0.00

    01-01-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 11th &

    subsequent kilometer

    EQUIPMENT

    Carriage Charges #8 16.50 1.000 16.50 Rs/KmRs/Km 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 2 of 969

  • Chapter # : 01 CARRIAGE

    Total Equipment % 76.00 16.50

    Cost Per km: 19.97

    3.47

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 19.97

    km Rs. 0.00

    01-02-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st 50 meter

    EQUIPMENT

    Carriage Charges #1 37.17 0.630 59.00 Rs/50mRs/50m 1

    Total Equipment % 76.00 37.17

    Cost Per 50 m: 44.98

    7.81

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 44.98

    50 Meter Rs. 0.00

    01-02-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 5.81 0.630 9.22 Rs/50mRs/50m 1

    Total Equipment % 76.00 5.81

    Cost Per 50 m: 7.03

    1.22

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 7.03

    50 Meter Rs. 0.00

    01-02-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 3rd to 5th 50 meter

    EQUIPMENT

    Carriage Charges #3 4.04 0.630 6.41 Rs/50mRs/50m 1

    Total Equipment % 76.00 4.04

    Cost Per 50 m: 4.89

    0.85

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 4.89

    50 Meter Rs. 0.00

    01-02-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 250 - 1000 meter

    EQUIPMENT

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 3 of 969

  • Chapter # : 01 CARRIAGE

    Carriage Charges #4 17.99 0.630 28.56 Rs/250mRs/250m 1

    Total Equipment % 76.00 17.99

    Cost Per 250 m: 21.77

    3.78

    Composite Rates Per :

    Labour Rates Per : Cost Per 250 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 21.77

    50 Meter Rs. 0.00

    01-02-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st kilometer

    EQUIPMENT

    Carriage Charges #5 64.50 0.630 102.38 Rs/KmRs/Km 1

    Total Equipment % 76.00 64.50

    Cost Per km: 78.04

    13.54

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 78.04

    km Rs. 0.00

    01-02-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd - 5th kilometer

    EQUIPMENT

    Carriage Charges #6 14.74 0.630 23.40 Rs/KmRs/Km 1

    Total Equipment % 76.00 14.74

    Cost Per km: 17.84

    3.10

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 17.84

    km Rs. 0.00

    01-02-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 6th - 10th kilometer

    EQUIPMENT

    Carriage Charges #7 12.60 0.630 20.00 Rs/KmRs/Km 1

    Total Equipment % 76.00 12.60

    Cost Per km: 15.25

    2.65

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 15.25

    km Rs. 0.00

    01-02-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 11th & subsequent

    kilometer

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 4 of 969

  • Chapter # : 01 CARRIAGE

    EQUIPMENT

    Carriage Charges #8 10.39 0.630 16.50 Rs/KmRs/Km 1

    Total Equipment % 76.00 10.39

    Cost Per km: 12.58

    2.18

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 12.58

    km Rs. 0.00

    01-03-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/50 MetSpec. No :

    Carriage of cement(bag), bitumen/lubricants (drum) by truck or other means : 1st 50

    meter

    EQUIPMENT

    Carriage Charges #1 11.80 0.200 59.00 Rs/50mRs/50m 1

    Total Equipment % 76.00 11.80

    Cost Per tonne/50m: 14.28

    2.48

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/50m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/50 Meter Rs. 14.28

    Tonne/50 Meter Rs. 0.00

    01-03-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/50 MetSpec. No :

    Carriage of cement (bag) bitumen/lubricant (drum) by truck or other means : 2nd 50

    meter

    EQUIPMENT

    Carriage Charges #2 1.84 0.200 9.22 Rs/50mRs/50m 1

    Total Equipment % 76.00 1.84

    Cost Per tonne/50m: 2.23

    0.39

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/50m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/50 Meter Rs. 2.23

    Tonne/50 Meter Rs. 0.00

    01-03-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/50 MetSpec. No :

    Carriage of cement (bag), bitumen/lubricant (drum) by truck or other means : 3rd to

    5th 50 meter

    EQUIPMENT

    Carriage Charges #3 1.28 0.200 6.41 Rs/50mRs/50m 1

    Total Equipment % 76.00 1.28

    Cost Per tonne/50m: 1.55

    0.27

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/50m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/50 Meter Rs. 1.55

    Tonne/50 Meter Rs. 0.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 5 of 969

  • Chapter # : 01 CARRIAGE

    01-03-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/250 MeSpec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 250 to

    1000 meter

    EQUIPMENT

    Carriage Charges #4 5.71 0.200 28.56 Rs/250mRs/250m 1

    Total Equipment % 76.00 5.71

    Cost Per t/250m: 6.91

    1.20

    Composite Rates Per :

    Labour Rates Per : Cost Per t/250m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/250 Meter Rs. 6.91

    Tonne/250 Meter Rs. 0.00

    01-03-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/1 KmSpec. No :

    Carriage of cement(bags), bitumen/lubricant (drum) by truck or other means : 1st

    kilometer

    EQUIPMENT

    Carriage Charges #5 20.48 0.200 102.38 Rs/KmRs/Km 1

    Total Equipment % 76.00 20.48

    Cost Per tonne/km: 24.78

    4.30

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/1 Km Rs. 24.78

    Tonne/1 Km Rs. 0.00

    01-03-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/1 KmSpec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 2nd -

    5th kilometer

    EQUIPMENT

    Carriage Charges #6 4.68 0.200 23.40 Rs/KmRs/Km 1

    Total Equipment % 76.00 4.68

    Cost Per tonne/km: 5.66

    0.98

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/1 Km Rs. 5.66

    Tonne/1 Km Rs. 0.00

    01-03-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/1 KmSpec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 6th -

    10th kilometer

    EQUIPMENT

    Carriage Charges #7 4.00 0.200 20.00 Rs/KmRs/Km 1

    Total Equipment % 76.00 4.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 6 of 969

  • Chapter # : 01 CARRIAGE

    Cost Per tonne/km: 4.84

    0.84

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/1 Km Rs. 4.84

    Tonne/1 Km Rs. 0.00

    01-03-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/1 KmSpec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 11th &

    subsequent km

    EQUIPMENT

    Carriage Charges #8 3.30 0.200 16.50 Rs/KmRs/Km 1

    Total Equipment % 76.00 3.30

    Cost Per tonne/km: 3.99

    0.69

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/1 Km Rs. 3.99

    Tonne/1 Km Rs. 0.00

    01-04-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 1st 50 meter

    EQUIPMENT

    Carriage Charges #1 35.40 0.600 59.00 Rs/50mRs/50m 1

    Total Equipment % 76.00 35.40

    Cost Per 50 m: 42.83

    7.43

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 42.83

    50 Meter Rs. 0.00

    01-04-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 5.53 0.600 9.22 Rs/50mRs/50m 1

    Total Equipment % 76.00 5.53

    Cost Per 50 m: 6.69

    1.16

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 6.69

    50 Meter Rs. 0.00

    01-04-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 3rd to 5th kilometer

    EQUIPMENT

    Carriage Charges #3 3.85 0.600 6.41 Rs/50mRs/50m 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 7 of 969

  • Chapter # : 01 CARRIAGE

    Total Equipment % 76.00 3.85

    Cost Per 50 m: 4.65

    0.81

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 4.65

    50 Meter Rs. 0.00

    01-04-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 250 MeterSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 250 to 1000 meter

    EQUIPMENT

    Carriage Charges #4 17.14 0.600 28.56 Rs/250mRs/250m 1

    Total Equipment % 76.00 17.14

    Cost Per 250 m: 20.73

    3.60

    Composite Rates Per :

    Labour Rates Per : Cost Per 250 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    250 Meter Rs. 20.73

    250 Meter Rs. 0.00

    01-04-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 1st kilometer

    EQUIPMENT

    Carriage Charges #5 61.43 0.600 102.38 Rs/KmRs/Km 1

    Total Equipment % 76.00 61.43

    Cost Per km: 74.33

    12.90

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 74.33

    km Rs. 0.00

    01-04-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd - 5th kilometer

    EQUIPMENT

    Carriage Charges #6 14.04 0.600 23.40 Rs/KmRs/Km 1

    Total Equipment % 76.00 14.04

    Cost Per km: 16.99

    2.95

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 16.99

    km Rs. 0.00

    01-04-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 6th - 10th kilometer

    EQUIPMENT

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 8 of 969

  • Chapter # : 01 CARRIAGE

    Carriage Charges #7 12.00 0.600 20.00 Rs/KmRs/Km 1

    Total Equipment % 76.00 12.00

    Cost Per km: 14.52

    2.52

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 14.52

    km Rs. 0.00

    01-04-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 11th & subsequent

    kilometer

    EQUIPMENT

    Carriage Charges #8 9.90 0.600 16.50 Rs/KmRs/Km 1

    Total Equipment % 76.00 9.90

    Cost Per km: 11.98

    2.08

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 11.98

    km Rs. 0.00

    01-05-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of small consignments upto 250kg 1st 50 meter

    EQUIPMENT

    Carriage Charges #1 2.95 0.050 59.00 Rs/50mRs/50m 1

    Total Equipment % 76.00 2.95

    Cost Per 50 m: 3.57

    0.62

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 3.57

    50 Meter Rs. 0.00

    01-05-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of small consigmnments upto 250 kg 2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 0.46 0.050 9.22 Rs/50mRs/50m 1

    Total Equipment % 76.00 0.46

    Cost Per 50 m: 0.56

    0.10

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 0.56

    50 Meter Rs. 0.00

    01-05-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of small consignments upto 250 kg 3rd to 5th 50 meters

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 9 of 969

  • Chapter # : 01 CARRIAGE

    EQUIPMENT

    Carriage Charges #3 0.32 0.050 6.41 Rs/50mRs/50m 1

    Total Equipment % 76.00 0.32

    Cost Per 50 m: 0.39

    0.07

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 0.39

    50 Meter Rs. 0.00

    01-05-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 250 MeterSpec. No :

    Carriage of small consignments upto 250 kg 250 - 1000 meter

    EQUIPMENT

    Carriage Charges #4 1.43 0.050 28.56 Rs/250mRs/250m 1

    Total Equipment % 76.00 1.43

    Cost Per 250 m: 1.73

    0.30

    Composite Rates Per :

    Labour Rates Per : Cost Per 250 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    250 Meter Rs. 1.73

    250 Meter Rs. 0.00

    01-05-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of small consignments upto 250 kg 1st kilometer

    EQUIPMENT

    Carriage Charges #5 5.12 0.050 102.38 Rs/KmRs/Km 1

    Total Equipment % 76.00 5.12

    Cost Per km: 6.19

    1.07

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 6.19

    km Rs. 0.00

    01-05-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of small consignments upto 250 kg 2nd to 5th kilometer

    EQUIPMENT

    Carriage Charges #6 1.17 0.050 23.40 Rs/KmRs/Km 1

    Total Equipment % 76.00 1.17

    Cost Per km: 1.42

    0.25

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 1.42

    km Rs. 0.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 10 of 969

  • Chapter # : 01 CARRIAGE

    01-05-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of small consignments upto 250 kg 6th to 10th kilometer

    EQUIPMENT

    Carriage Charges #7 1.00 0.050 20.00 Rs/KmRs/Km 1

    Total Equipment % 76.00 1.00

    Cost Per km: 1.21

    0.21

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 1.21

    km Rs. 0.00

    01-05-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of small consignments upto 250 kg 11th & subsequent kilometer

    EQUIPMENT

    Carriage Charges #8 0.82 0.050 16.50 Rs/KmRs/Km 1

    Total Equipment % 76.00 0.82

    Cost Per km: 1.00

    0.17

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 1.00

    km Rs. 0.00

    01-06-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of consignments (odd job) Coolie load

    LABOUR

    Coolie 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 30.90

    0.90

    Cost Per km: 37.20

    6.30

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 37.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 37.20

    km Rs. 37.20

    01-06-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of consignments (odd job) Donkey load

    EQUIPMENT

    Donkey 30.00 0.075 400.00 DayDay 1

    Total Equipment % 76.00 30.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 11 of 969

  • Chapter # : 01 CARRIAGE

    Cost Per km: 36.30

    6.30

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 36.30

    km Rs. 0.00

    01-06-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of consignments (odd job) Cart Load

    EQUIPMENT

    Bullock Cart 26.25 0.038 700.00 DayDay 1

    Total Equipment % 76.00 26.25

    Cost Per km: 31.76

    5.51

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 31.76

    km Rs. 0.00

    01-06-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of consignments (odd job) Camel load

    EQUIPMENT

    Camel 45.00 0.075 600.00 DayDay 1

    Total Equipment % 76.00 45.00

    Cost Per km: 54.45

    9.45

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 54.45

    km Rs. 0.00

    01-07-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit DaySpec. No :

    Hire Charges of Truck

    EQUIPMENT

    Truck (10ton) 6,956.52 7.729 900.00 HourHour 1

    Total Equipment % 76.00 6,956.52

    Cost Per Day: 8,417.39

    1,460.87

    Composite Rates Per :

    Labour Rates Per : Cost Per Day: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Day Rs. 8,417.39

    Day Rs. 0.00

    01-07-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit DaySpec. No :

    Hire charges of Tractor with trolley

    EQUIPMENT

    Tractor With Trolly 5,797.50 7.730 750.00 HourHour 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 12 of 969

  • Chapter # : 01 CARRIAGE

    Total Equipment % 76.00 5,797.50

    Cost Per Day: 7,014.98

    1,217.48

    Composite Rates Per :

    Labour Rates Per : Cost Per Day: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Day Rs. 7,014.98

    Day Rs. 0.00

    01-07-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit DaySpec. No :

    Hire charges of Tractor without trolley

    EQUIPMENT

    Tractor Without Trolly 80 HP 4,347.60 7.246 600.00 DayDay 1

    Total Equipment % 76.00 4,347.60

    Cost Per Day: 5,260.60

    913.00

    Composite Rates Per :

    Labour Rates Per : Cost Per Day: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Day Rs. 5,260.60

    Day Rs. 0.00

    01-08-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting loaded railway wagons Upto 500 meter

    LABOUR

    Coolie 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 463.50

    13.50

    Cost Per Each: 558.00

    94.50

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 558.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 558.00

    Each Rs. 558.00

    01-08-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting loaded railway wagons Upto 1 kilometer

    LABOUR

    Coolie 675.00 2.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 695.25

    20.25

    Cost Per Each: 837.00

    141.75

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 837.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 837.00

    Each Rs. 837.00

    01-08-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting loaded railway wagons Upto 2 kilometer

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 13 of 969

  • Chapter # : 01 CARRIAGE

    Coolie 825.00 2.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 849.75

    24.75

    Cost Per Each: 1,023.00

    173.25

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 1,023.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 1,023.00

    Each Rs. 1,023.00

    01-08-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting loaded railway wagons 3rd & subsequent kilometer

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Cost Per Each: 465.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 465.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 465.00

    Each Rs. 465.00

    01-09-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting empty railway wagons Upto 500 meter

    LABOUR

    Coolie 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 231.75

    6.75

    Cost Per Each: 279.00

    47.25

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 279.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 279.00

    Each Rs. 279.00

    01-09-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting empty railway wagons Upto 1 kilometer

    LABOUR

    Coolie 337.50 1.125 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 347.63

    10.13

    Cost Per Each: 418.50

    70.88

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 418.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 418.50

    Each Rs. 418.50

    01-09-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting empty railway wagons Upto 2 kilometer

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 14 of 969

  • Chapter # : 01 CARRIAGE

    LABOUR

    Coolie 412.50 1.375 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 424.88

    12.38

    Cost Per Each: 511.50

    86.63

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 511.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 511.50

    Each Rs. 511.50

    01-09-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting empty railway wagons 3rd & subsequent kilometer

    LABOUR

    Coolie 187.50 0.625 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 193.13

    5.63

    Cost Per Each: 232.50

    39.38

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 232.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 232.50

    Each Rs. 232.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 15 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    02-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 cftSpec. No :

    Load into or unload from railway wagons within 50m shingle, sand, ballast, tiles, etc,

    laid & stacked

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Per CUM : Rs 131.37

    63.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 131.37

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 cft Rs. 372.00

    100 cft Rs. 372.00

    02-02-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 No.Spec. No :

    Load into or unload from railway wagons within 50m laid & stacked : Bricks 10" size

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Cost Per 1000 No.: 465.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 No.: 465.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 No. Rs. 465.00

    1000 No. Rs. 465.00

    02-02-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 No.Spec. No :

    Load into or unload from railway wagons within 50m laid & stacked : Bricks 9" or

    smaller size

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Cost Per 1000 No.: 372.00

    63.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 No.: 372.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 No. Rs. 372.00

    1000 No. Rs. 372.00

    02-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Load into or unload from railway wagons, cement in bags and stacking within 50m.

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 16 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Cost Per 100 No.: 465.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 465.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 465.00

    100 No. Rs. 465.00

    02-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 No.Spec. No :

    Load into or unload from railway wagons, empty cement bags and stacking

    (British)

    LABOUR

    Coolie 336.00 1.120 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 346.08

    10.08

    Cost Per 1000 No.: 416.64

    70.56

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 No.: 416.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 No. Rs. 416.64

    1000 No. Rs. 416.64

    02-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load into or unload from railway wagons and stacking white lime in bags

    (British)

    LABOUR

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 77.25

    2.25

    Per Tonne : Rs 93.00

    15.75

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 93.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 93.00

    tonne Rs. 93.00

    02-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load into or unload from railway wagons structural steel, RS joists, rails, rail

    fastenings etc

    (British)

    LABOUR

    Coolie 180.00 0.600 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 185.40

    5.40

    Per Tonne : Rs 223.20

    37.80

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 223.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 223.20

    tonne Rs. 223.20

    02-07Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Load into or unload from 45 gallon drums full, into or from railway wagons,lead upto

    50m

    (British)

    LABOUR

    Coolie 24.00 0.080 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 17 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 24.72

    0.72

    Cost Per Each: 29.76

    5.04

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 29.76

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 29.76

    Each Rs. 29.76

    02-08Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Loading or unloading packages of all sorts upto 50 kg.

    (British)

    LABOUR

    Coolie 21.00 0.070 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 21.63

    0.63

    Cost Per Each: 26.04

    4.41

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 26.04

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 26.04

    Each Rs. 26.04

    02-09-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Load or unload sleepers other than wooden, incl stacking, lead upto 50 m : Broad

    gauge

    (British)

    LABOUR

    Coolie 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 772.50

    22.50

    Cost Per 100 No.: 930.00

    157.50

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 930.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 930.00

    100 No. Rs. 930.00

    02-09-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Load or unload sleepers other than wooden, including stacking, lead upto 50 m :

    Metre gauge &

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Cost Per 100 No.: 465.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 465.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 465.00

    100 No. Rs. 465.00

    02-10Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load or unload timber logs or shuttering into or from railway wagons, including

    stacking within 50m

    (British)

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 18 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Coolie 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 101.97

    2.97

    Per Tonne : Rs 122.76

    20.79

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 122.76

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 122.76

    tonne Rs. 122.76

    02-11Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Loading or unloading bhoosa in railway wagons lead upto 50 m.

    (British)

    LABOUR

    Coolie 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 231.75

    6.75

    Per Tonne : Rs 279.00

    47.25

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 279.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 279.00

    tonne Rs. 279.00

    02-12Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load or unload timber scrap or wooden plugs into or from railway wagons &

    stacking within 50m

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Per Tonne : Rs 186.00

    31.50

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 186.00

    tonne Rs. 186.00

    02-13Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 cftSpec. No :

    Load or unload pitching stone/spawl from railway wagons of any guage including

    clearing 1.5m away

    (British)

    LABOUR

    Coolie 111.00 0.370 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 114.33

    3.33

    Per CUM : Rs 48.61

    23.31

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 48.61

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 cft Rs. 137.64

    100 cft Rs. 137.64

    02-14Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 cftSpec. No :

    Loading or unloading building stone including clearing away 1.5m from rails

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 19 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    LABOUR

    Coolie 144.00 0.480 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 148.32

    4.32

    Per CUM : Rs 63.06

    30.24

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 63.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 cft Rs. 178.56

    100 cft Rs. 178.56

    02-15-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 ltrSpec. No :

    Unloading oil,bitumen or tar etc : Crude Oil (to be pumped from tank wagon into

    tank)

    (British)

    LABOUR

    Coolie 90.00 0.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 92.70

    2.70

    Cost Per 1000 ltr: 111.60

    18.90

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 ltr: 111.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 ltr Rs. 111.60

    1000 ltr Rs. 111.60

    02-15-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 ltrSpec. No :

    Unloading oil,bitumen or tar etc Crude oil (drained by gravity)

    (British)

    LABOUR

    Coolie 90.00 0.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 92.70

    2.70

    Cost Per 1000 ltr: 111.60

    18.90

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 ltr: 111.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 ltr Rs. 111.60

    1000 ltr Rs. 111.60

    02-15-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit TonSpec. No :

    Unloading oil,bitumen or tar etc Crude oil materials from railway wagons

    (British)

    LABOUR

    Coolie 17.10 0.057 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 17.61

    0.51

    Cost Per Ton: 21.20

    3.59

    Composite Rates Per :

    Labour Rates Per : Cost Per Ton: 21.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Ton Rs. 21.20

    Ton Rs. 21.20

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 20 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    02-15-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Unloading oil, bitumen or tar etc : Fuel Oil from tank into empty drums including

    stacking within 50 m

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Per Tonne : Rs 186.00

    31.50

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 186.00

    tonne Rs. 186.00

    02-15-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unloading oil,bitumen or tar etc Petrol (2 gallon tin)

    (British)

    LABOUR

    Coolie 189.00 0.630 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 194.67

    5.67

    Cost Per 100 No.: 234.36

    39.69

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 234.36

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 234.36

    100 No. Rs. 234.36

    02-15-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unloading oil, bitumen or tar etc Kerosine oil (4 gallon tin)

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Cost Per 100 No.: 465.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 465.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 465.00

    100 No. Rs. 465.00

    02-15-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unloading oil,bitumen or tar etc Tar & Bitumen in drums with carriage upto 1 km

    (British)

    EQUIPMENT

    Bullock Cart 175.00 0.250 700.00 DayDay 1

    Total Equipment % 76.00 175.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 21 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Cost Per 100 No.: 211.75

    36.75

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 211.75

    100 No. Rs. 0.00

    02-16-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 cftSpec. No :

    Removing and stacking within 50m. lead Stone, spawl, brick bats, shingle, sand,

    lime etc

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Per CUM : Rs 65.69

    31.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 65.69

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 cft Rs. 186.00

    100 cft Rs. 186.00

    02-16-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 No.Spec. No :

    Removing and stacking within 50m. lead Bricks

    (British)

    LABOUR

    Coolie 435.00 1.450 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 448.05

    13.05

    Cost Per 1000 No.: 539.40

    91.35

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 No.: 539.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 No. Rs. 539.40

    1000 No. Rs. 539.40

    02-16-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Removing and stacking within 50m. lead Broad gauge wooden sleepers

    (British)

    LABOUR

    Coolie 240.00 0.800 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 247.20

    7.20

    Cost Per 100 No.: 297.60

    50.40

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 297.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 297.60

    100 No. Rs. 297.60

    02-16-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Removing and stacking within 50m. lead Metre gauge or narrow guage wooden

    sleepers

    (British)

    LABOUR

    Coolie 137.10 0.457 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 22 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 141.21

    4.11

    Cost Per 100 No.: 170.00

    28.79

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 170.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 170.00

    100 No. Rs. 170.00

    02-16-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Removing and stacking within 50m. lead Rails, girders, pipes, cement etc.

    (British)

    LABOUR

    Coolie 69.00 0.230 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 71.07

    2.07

    Per Tonne : Rs 85.56

    14.49

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 85.56

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 85.56

    tonne Rs. 85.56

    02-16-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Removing and stacking within 50m. lead Bridge and crossing timbers, etc.

    (British)

    LABOUR

    Coolie 801.00 2.670 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 825.03

    24.03

    Cost Per 100 No.: 993.24

    168.21

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 993.24

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 993.24

    100 No. Rs. 993.24

    02-17Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load into wagons girders, rails, MS bars, pipes etc. including 50m lead & stacking

    inside wagons

    (British)

    LABOUR

    Coolie 192.00 0.640 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 197.76

    5.76

    Per Tonne : Rs 238.08

    40.32

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 238.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 238.08

    tonne Rs. 238.08

    02-18Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Unload from wagons girders, rails, MS bars, girder etc. including 50m lead but

    excluding stacking

    (British)

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 23 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 77.25

    2.25

    Per Tonne : Rs 93.00

    15.75

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 93.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 93.00

    tonne Rs. 93.00

    02-19Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Load into wagons wooden baord guage sleepers including 50m lead & stacking

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Cost Per 100 No.: 744.00

    126.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 744.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 744.00

    100 No. Rs. 744.00

    02-20Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unload wooden broad gauge sleepers from wagons including 50m lead and

    stacking

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Cost Per 100 No.: 372.00

    63.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 372.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 372.00

    100 No. Rs. 372.00

    02-21Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Loading metre gauge or narrow guage wooden sleepers including 50m lead & stack

    inside wagons

    (British)

    LABOUR

    Coolie 330.00 1.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 339.90

    9.90

    Cost Per 100 No.: 409.20

    69.30

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 409.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 409.20

    100 No. Rs. 409.20

    02-22Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unloading metre gauge or narrow guage wooden sleepers including 50m lead but

    excluding stacking

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 24 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    LABOUR

    Coolie 159.00 0.530 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 163.77

    4.77

    Cost Per 100 No.: 197.16

    33.39

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 197.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 197.16

    100 No. Rs. 197.16

    02-23Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Loading bridge and crossing timber including 50m lead & stacking

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Cost Per 100 No.: 372.00

    63.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 372.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 372.00

    100 No. Rs. 372.00

    02-24Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unloading bridge and crossing timbers including 50m lead but excluding stacking

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Cost Per 100 No.: 186.00

    31.50

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 186.00

    100 No. Rs. 186.00

    02-25Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load or unload bitumen, asphalt, tar in drums, into or from railway wagons, lead

    upto 50m

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Per Tonne : Rs 186.00

    31.50

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 186.00

    tonne Rs. 186.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 25 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-01-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation undressed upto single throw of kassi phaorah or shovel etc : in

    ashes, sand, soft soil or silt clearance

    (British)

    LABOUR

    Coolie 1,125.00 3.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,158.75

    33.75

    Per CUM : Rs 49.26

    236.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 49.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,395.00

    1000 Cft Rs. 1,395.00

    03-01-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation undressed upto single throw of kassi phaorah or shove etc : in

    ordinary soil,

    (British)

    LABOUR

    Coolie 1,350.00 4.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,390.50

    40.50

    Per CUM : Rs 59.12

    283.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 59.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,674.00

    1000 Cft Rs. 1,674.00

    03-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in ashes, sand & soft soil or silt clearance, undressed lead upto

    25m.

    (British)

    LABOUR

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,699.50

    49.50

    Per CUM : Rs 72.25

    346.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 72.25

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,046.00

    1000 Cft Rs. 2,046.00

    03-03-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Bed clearance and dressing slopes of drains including removing of weeds and roots

    etc. Excavated material undressed within 25m

    (British)

    LABOUR

    Coolie 2,100.00 7.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,163.00

    63.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 26 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 91.96

    441.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 91.96

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,604.00

    1000 Cft Rs. 2,604.00

    03-03-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Bed clearance and dressing slopes of drains including removing of weeds and roots

    etc. Excavated material dressed within 25m lead

    (British)

    LABOUR

    Coolie 2,322.00 7.740 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,391.66

    69.66

    Per CUM : Rs 101.68

    487.62

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 101.68

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,879.28

    1000 Cft Rs. 2,879.28

    03-04-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Borrowpit excavation undressed lead upto 50m in Ordinary soil

    (British)

    LABOUR

    Coolie 2,100.00 7.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,163.00

    63.00

    Per CUM : Rs 91.96

    441.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 91.96

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,604.00

    1000 Cft Rs. 2,604.00

    03-04-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Borrowpit excavation undressed lead upto 50m in Hard soil

    (British)

    LABOUR

    Coolie 2,580.00 8.600 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,657.40

    77.40

    Per CUM : Rs 112.98

    541.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 112.98

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,199.20

    1000 Cft Rs. 3,199.20

    03-04-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Borrowpit excavation undressed lead upto 50m in shingle/gravel formation

    (British)

    LABOUR

    Coolie 5,100.00 17.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 27 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 5,253.00

    153.00

    Per CUM : Rs 223.33

    1,071.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 223.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 6,324.00

    1000 Cft Rs. 6,324.00

    03-05-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Embankment formation in ordinary soil & compaction by mechanical means at

    optimum moistures content to 95% to 100% max. modified. AASHTO dry density

    (borrow area)

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Dresser 150.00 0.500 300.00 DayDay 1

    Water Sprinkler 27.00 0.090 300.00 DayDay 1

    Water Carrier 24.00 0.080 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 9.97 593.28

    17.28

    EQUIPMENT

    Tractor With Trolly 540.00 0.720 750.00 HourHour 1

    Comp Roller 864.00 0.720 1,200.00 HourHour 1

    Grader 165 HP 4,160.00 1.600 2,600.00 HourHour 1

    Rammer Mech 88.00 0.320 275.00 HourHour 1

    Lab Test 56.00 0.080 700.00 NoNo 1

    Total Equipment % 69.03 5,708.00

    Per CUM : Rs 269.13

    1,319.64

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 25.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,620.92

    1000 Cft Rs. 714.24

    03-05-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Embankment formation in ordinary soil & compaction by mechanical means at

    optimum moistures content to 90% max. modified AASHTO dry density (borrow

    area)

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Dresser 150.00 0.500 300.00 DayDay 1

    Water Sprinkler 24.00 0.080 300.00 DayDay 1

    Water Carrier 21.00 0.070 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.01 587.10

    17.10

    EQUIPMENT

    Tractor With Trolly 540.00 0.720 750.00 HourHour 1

    Comp Roller 768.00 0.640 1,200.00 HourHour 1

    Grader 165 HP 4,160.00 1.600 2,600.00 HourHour 1

    Rammer Mech 88.00 0.320 275.00 HourHour 1

    Lab Test 56.00 0.080 700.00 NoNo 1

    Total Equipment % 68.99 5,612.00

    Per CUM : Rs 264.77

    1,298.22

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 24.96

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,497.32

    1000 Cft Rs. 706.80

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 28 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-05-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Embankment formation in ordinary soil & compaction by mechanical means at

    optimum moistures content to 85% max. modified AASHTO dry density (borrow

    area)

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Dresser 150.00 0.500 300.00 DayDay 1

    Water Sprinkler 21.00 0.070 300.00 DayDay 1

    Water Carrier 18.00 0.060 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.05 580.92

    16.92

    EQUIPMENT

    Tractor With Trolly 540.00 0.720 750.00 HourHour 1

    Comp Roller 672.00 0.560 1,200.00 HourHour 1

    Grader 165 HP 4,160.00 1.600 2,600.00 HourHour 1

    Rammer Mech 88.00 0.320 275.00 HourHour 1

    Lab Test 56.00 0.080 700.00 NoNo 1

    Total Equipment % 68.95 5,516.00

    Per CUM : Rs 260.40

    1,276.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 24.70

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,373.72

    1000 Cft Rs. 699.36

    03-06-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth fill in lawns including dressing & compaction with earth available from

    cutting/excavation

    (British)

    LABOUR

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Carrier 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,545.00

    45.00

    Per CUM : Rs 65.69

    315.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 65.69

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,860.00

    1000 Cft Rs. 1,860.00

    03-06-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth fill in lawns including dressing & compaction with suitable earth borrowed.

    (British)

    LABOUR

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Rammer 450.00 1.500 300.00 DayDay 1

    Digger 900.00 3.000 300.00 DayDay 1

    Carrier 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,935.50

    85.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 29 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 124.80

    598.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 124.80

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,534.00

    1000 Cft Rs. 3,534.00

    03-07-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Ordinary

    Soil

    (British)

    LABOUR

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Skilled Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,163.00

    63.00

    Per CUM : Rs 91.96

    441.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 91.96

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,604.00

    1000 Cft Rs. 2,604.00

    03-07-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Hard Soil

    (British)

    LABOUR

    Coolie 1,875.00 6.250 300.00 DayDay 1

    Dresser 375.00 1.250 300.00 DayDay 1

    Skilled Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,703.75

    78.75

    Per CUM : Rs 114.95

    551.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 114.95

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,255.00

    1000 Cft Rs. 3,255.00

    03-07-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Very

    hard Soil

    (British)

    LABOUR

    Coolie 1,950.00 6.500 300.00 DayDay 1

    Dresser 390.00 1.300 300.00 DayDay 1

    Skilled Coolie 390.00 1.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,811.90

    81.90

    Per CUM : Rs 119.55

    573.30

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 119.55

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,385.20

    1000 Cft Rs. 3,385.20

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 30 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-07-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Gravel &

    shingle

    (British)

    LABOUR

    Coolie 2,175.00 7.250 300.00 DayDay 1

    Dresser 435.00 1.450 300.00 DayDay 1

    Skilled Coolie 435.00 1.450 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,136.35

    91.35

    Per CUM : Rs 133.34

    639.45

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 133.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,775.80

    1000 Cft Rs. 3,775.80

    03-08-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in

    Ordinary Soil

    (British)

    LABOUR

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,090.00

    90.00

    Per CUM : Rs 131.37

    630.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 131.37

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,720.00

    1000 Cft Rs. 3,720.00

    03-08-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in

    Hard Soil

    (British)

    LABOUR

    Coolie 3,390.00 11.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,491.70

    101.70

    Per CUM : Rs 148.45

    711.90

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 148.45

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 4,203.60

    1000 Cft Rs. 4,203.60

    03-08-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in

    Very Hard Soil

    (British)

    LABOUR

    Coolie 3,900.00 13.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 4,017.00

    117.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 31 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 170.78

    819.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 170.78

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 4,836.00

    1000 Cft Rs. 4,836.00

    03-08-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut 1.5m - 3m depth for drains etc & disposal : in Gravel &

    shingle

    (British)

    LABOUR

    Coolie 6,720.00 22.400 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 6,921.60

    201.60

    Per CUM : Rs 294.27

    1,411.20

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 294.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 8,332.80

    1000 Cft Rs. 8,332.80

    03-09-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m

    lead : Dry

    (British)

    LABOUR

    Coolie 5,700.00 19.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 5,871.00

    171.00

    Per CUM : Rs 249.60

    1,197.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 249.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,068.00

    1000 Cft Rs. 7,068.00

    03-09-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m

    lead : Wet

    (British)

    LABOUR

    Coolie 6,600.00 22.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 6,798.00

    198.00

    Per CUM : Rs 289.02

    1,386.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 289.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 8,184.00

    1000 Cft Rs. 8,184.00

    03-09-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in shingle or gravel formation & rock not req. blast, undressed, 50m lead

    : in Flowing Water

    (British)

    LABOUR

    Coolie 8,400.00 28.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 32 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 8,652.00

    252.00

    Per CUM : Rs 367.84

    1,764.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 367.84

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 10,416.00

    1000 Cft Rs. 10,416.00

    03-10-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in

    Ordinary Soil

    (British)

    LABOUR

    Coolie 2,100.00 7.000 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,472.00

    72.00

    Per CUM : Rs 105.10

    504.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 105.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,976.00

    1000 Cft Rs. 2,976.00

    03-10-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in

    Hard Soil

    (British)

    LABOUR

    Coolie 2,580.00 8.600 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,966.40

    86.40

    Per CUM : Rs 126.12

    604.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 126.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,571.20

    1000 Cft Rs. 3,571.20

    03-10-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in

    Very Hard Soil

    (British)

    LABOUR

    Coolie 3,090.00 10.300 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,491.70

    101.70

    Per CUM : Rs 148.45

    711.90

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 148.45

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 4,203.60

    1000 Cft Rs. 4,203.60

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 33 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-10-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in

    Shingle/Gravel

    (British)

    LABOUR

    Coolie 5,700.00 19.000 300.00 DayDay 1

    Dresser 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 6,489.00

    189.00

    Per CUM : Rs 275.88

    1,323.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 275.88

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,812.00

    1000 Cft Rs. 7,812.00

    03-11-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Rock Excavation, dressing & disposal up to 50m Soft Rock, slate, shale, schist or

    lateriate

    (British)

    LABOUR

    Coolie 4,200.00 14.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Dresser 2,700.00 9.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 8,034.00

    234.00

    Per CUM : Rs 341.56

    1,638.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 341.56

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 9,672.00

    1000 Cft Rs. 9,672.00

    03-11-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Rock Excavation, dressing & disposal up to 50m Medium hard rock, requiring

    occasional blasting

    (British)

    MATERIAL

    Explosives for Blasting 450.00 3.000 150.00 NoNo 1

    Total Material % 3.58 450.00

    LABOUR

    Coolie 7,299.00 24.330 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Dresser 600.00 2.000 300.00 DayDay 1

    Hammer Man 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 75.42 9,371.97

    272.97

    Per CUM : Rs 417.68

    2,005.29

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 398.45

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 11,827.26

    1000 Cft Rs. 11,282.76

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 34 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-12-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade I

    (British)

    MATERIAL

    Explosives for Blasting 450.00 3.000 150.00 NoNo 1

    Total Material % 5.68 450.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Black Smith 150.00 0.250 600.00 DayDay 1

    Quarry Man 3,000.00 10.000 300.00 DayDay 1

    Smithy Coolie 75.00 0.250 300.00 DayDay 1

    Chiseller 400.00 1.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 73.32 5,742.25

    167.25

    Per CUM : Rs 263.36

    1,265.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 244.13

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,457.50

    1000 Cft Rs. 6,913.00

    03-12-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade II

    (British)

    MATERIAL

    Explosives for Blasting 750.00 5.000 150.00 NoNo 1

    Total Material % 8.32 750.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Black Smith 300.00 0.500 600.00 DayDay 1

    Quarry Man 3,300.00 11.000 300.00 DayDay 1

    Smithy Coolie 150.00 0.500 300.00 DayDay 1

    Chiseller 400.00 1.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 70.68 6,283.00

    183.00

    Per CUM : Rs 299.17

    1,438.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 267.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 8,471.50

    1000 Cft Rs. 7,564.00

    03-12-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade III

    (British)

    MATERIAL

    Explosives for Blasting 900.00 6.000 150.00 NoNo 1

    Total Material % 8.29 900.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 35 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Black Smith 450.00 0.750 600.00 DayDay 1

    Quarry Man 4,050.00 13.500 300.00 DayDay 1

    Smithy Coolie 225.00 0.750 300.00 DayDay 1

    Chiseller 600.00 1.500 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 70.71 7,570.50

    220.50

    Per CUM : Rs 360.32

    1,732.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 321.86

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 10,203.00

    1000 Cft Rs. 9,114.00

    03-12-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade IV

    (British)

    MATERIAL

    Explosives for Blasting 1,050.00 7.000 150.00 NoNo 1

    Total Material % 8.60 1,050.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Quarry Man 4,500.00 15.000 300.00 DayDay 1

    Smithy Coolie 300.00 1.000 300.00 DayDay 1

    Chiseller 800.00 2.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 70.40 8,471.75

    246.75

    Per CUM : Rs 405.04

    1,947.75

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 360.17

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 11,469.50

    1000 Cft Rs. 10,199.00

    03-12-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade V

    (British)

    MATERIAL

    Explosives for Blasting 1,200.00 8.000 150.00 NoNo 1

    Total Material % 8.85 1,200.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Quarry Man 5,100.00 17.000 300.00 DayDay 1

    Smithy Coolie 300.00 1.000 300.00 DayDay 1

    Chiseller 1,000.00 2.500 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 70.15 9,373.00

    273.00

    Per CUM : Rs 449.77

    2,163.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 398.49

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 12,736.00

    1000 Cft Rs. 11,284.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 36 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-12-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade VI

    (British)

    MATERIAL

    Explosives for Blasting 1,350.00 9.000 150.00 NoNo 1

    Total Material % 9.18 1,350.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 750.00 1.250 600.00 DayDay 1

    Quarry Man 5,400.00 18.000 300.00 DayDay 1

    Smithy Coolie 375.00 1.250 300.00 DayDay 1

    Chiseller 1,200.00 3.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 69.82 10,119.75

    294.75

    Per CUM : Rs 487.93

    2,346.75

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 430.24

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 13,816.50

    1000 Cft Rs. 12,183.00

    03-13-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting but blasting prohibited, dispose & dress

    within 25 m : Grade I

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 300.00 0.500 600.00 DayDay 1

    Quarry Man 6,000.00 20.000 300.00 DayDay 1

    Smithy Coolie 150.00 0.500 300.00 DayDay 1

    Chiseller 800.00 2.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 11,484.50

    334.50

    Per CUM : Rs 488.26

    2,341.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 488.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 13,826.00

    1000 Cft Rs. 13,826.00

    03-13-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting where blasting prohibited, dispose &

    dress within 25 m : Grade II

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Quarry Man 6,600.00 22.000 300.00 DayDay 1

    Smithy Coolie 300.00 1.000 300.00 DayDay 1

    Chiseller 800.00 2.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 12,566.00

    366.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 37 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 534.24

    2,562.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 534.24

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 15,128.00

    1000 Cft Rs. 15,128.00

    03-13-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting where blasting prohibited, dispose &

    dress within 25 m: Grade III

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Black Smith 900.00 1.500 600.00 DayDay 1

    Quarry Man 8,100.00 27.000 300.00 DayDay 1

    Smithy Coolie 450.00 1.500 300.00 DayDay 1

    Chiseller 1,200.00 3.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 15,141.00

    441.00

    Per CUM : Rs 643.72

    3,087.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 643.72

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 18,228.00

    1000 Cft Rs. 18,228.00

    03-13-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting where blasting prohibited, dispose &

    dress within 25 m: Grade IV

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Black Smith 1,200.00 2.000 600.00 DayDay 1

    Quarry Man 9,000.00 30.000 300.00 DayDay 1

    Smithy Coolie 600.00 2.000 300.00 DayDay 1

    Chiseller 1,600.00 4.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 16,943.50

    493.50

    Per CUM : Rs 720.35

    3,454.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 720.35

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 20,398.00

    1000 Cft Rs. 20,398.00

    03-13-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting where blasting prohibited, dispose &

    dress within 25 m: Grade V

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 600.00 2.000 300.00 DayDay 1

    Black Smith 1,200.00 2.000 600.00 DayDay 1

    Quarry Man 10,200.00 34.000 300.00 DayDay 1

    Smithy Coolie 600.00 2.000 300.00 DayDay 1

    Chiseller 2,000.00 5.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 18,746.00

    546.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 38 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 796.98

    3,822.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 796.98

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 22,568.00

    1000 Cft Rs. 22,568.00

    03-13-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting where blasting prohibited, dispose &

    dress within 25 m: Grade VI

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 600.00 2.000 300.00 DayDay 1

    Black Smith 1,500.00 2.500 600.00 DayDay 1

    Quarry Man 10,800.00 36.000 300.00 DayDay 1

    Smithy Coolie 750.00 2.500 300.00 DayDay 1

    Chiseller 2,400.00 6.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 20,239.50

    589.50

    Per CUM : Rs 860.48

    4,126.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 860.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 24,366.00

    1000 Cft Rs. 24,366.00

    03-14-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Rehandling of earthwork Lead upto a single throw of kassi, shovel, phaorah

    (British)

    LABOUR

    Coolie 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 772.50

    22.50

    Per CUM : Rs 32.84

    157.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 32.84

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 930.00

    1000 Cft Rs. 930.00

    03-14-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Rehandling of earthwork upto a lead of 25 m.

    (British)

    LABOUR

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,081.50

    31.50

    Per CUM : Rs 45.98

    220.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 45.98

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,302.00

    1000 Cft Rs. 1,302.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 39 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-15Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Rehandling of gravel work or excavated rock, lead upto 25m.

    (British)

    LABOUR

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,090.00

    90.00

    Per CUM : Rs 131.37

    630.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 131.37

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,720.00

    1000 Cft Rs. 3,720.00

    03-16-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Filling, watering and ramming earth under floor with surplus earth from foundation,

    etc

    (British)

    LABOUR

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,545.00

    45.00

    Per CUM : Rs 65.69

    315.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 65.69

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,860.00

    1000 Cft Rs. 1,860.00

    03-16-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Filling, watering and ramming earth under floor with earth excavated from outside

    lead upto 50m

    (British)

    LABOUR

    Coolie 2,700.00 9.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,244.50

    94.50

    Per CUM : Rs 137.94

    661.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 137.94

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,906.00

    1000 Cft Rs. 3,906.00

    03-17-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Extra for every 25 m extra lead or part thereof for earthwork soft, ordinary, hard &

    very hard

    (British)

    LABOUR

    Coolie 90.00 0.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 92.70

    2.70

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 40 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 3.94

    18.90

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 3.94

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 111.60

    1000 Cft Rs. 111.60

    03-17-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Extra for every 25 m extra lead or part thereof for gravel, shingle or rock.

    (British)

    LABOUR

    Coolie 120.00 0.400 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 123.60

    3.60

    Per CUM : Rs 5.25

    25.20

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 5.25

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 148.80

    1000 Cft Rs. 148.80

    03-18-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Transportation of earth all types beyond 250 m and upto 500 m.

    (British)

    LABOUR

    Coolie 2,130.00 7.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,193.90

    63.90

    Per CUM : Rs 93.27

    447.30

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 93.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,641.20

    1000 Cft Rs. 2,641.20

    03-18-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Transportation of earth all types for every 100m extra lead beyond 500m upto 1.5

    km.

    (British)

    LABOUR

    Coolie 330.00 1.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 339.90

    9.90

    Per CUM : Rs 14.45

    69.30

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 14.45

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 409.20

    1000 Cft Rs. 409.20

    03-18-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Transportation of earth all types for every 500m extra lead beyond 1.5 km. upto 8

    km.

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 41 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Per CUM : Rs 13.14

    63.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 13.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 372.00

    1000 Cft Rs. 372.00

    03-18-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Transportation of earth all types for every 1 km extra lead or part thereof beyond 8

    km.

    (British)

    LABOUR

    Coolie 210.00 0.700 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 216.30

    6.30

    Per CUM : Rs 9.20

    44.10

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 9.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 260.40

    1000 Cft Rs. 260.40

    03-19-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Dressing & levelling earth to designed sections Ashes, sand, silt or soft soil upto cut

    or fill 6 inches

    (British)

    LABOUR

    Coolie 36.00 0.120 300.00 DayDay 1

    Dresser 60.00 0.200 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 98.88

    2.88

    Per CUM : Rs 4.20

    20.16

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 4.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 119.04

    1000 Cft Rs. 119.04

    03-19-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Dressing & levelling earth to designed sections Ordinary or hard soil upto cut or fill

    6 inches

    (British)

    LABOUR

    Coolie 36.00 0.120 300.00 DayDay 1

    Dresser 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 191.58

    5.58

    Per CUM : Rs 8.14

    39.06

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 8.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 230.64

    1000 Cft Rs. 230.64

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 42 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-19-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Dressing & levelling earth to designed section Gravel work or soft rock not requiring

    blasting upto cut or fill 6 inches

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Quarry Man 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 463.50

    13.50

    Per CUM : Rs 19.71

    94.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 19.71

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 558.00

    1000 Cft Rs. 558.00

    03-20Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1 ChainSpec. No :

    Dowel dressing

    (British)

    LABOUR

    Coolie 30.00 0.100 300.00 DayDay 1

    Dresser 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 108.15

    3.15

    Per Meter : Rs 4.27

    22.05

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 4.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1 Chain Rs. 130.20

    1 Chain Rs. 130.20

    03-21Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Dressing slopes of banks or ground surface

    (British)

    LABOUR

    Dresser 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Per SQM : Rs 5.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 5.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 465.00

    1000 Sft Rs. 465.00

    03-22Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Dressing of earthwork (done by machinery or otherwise & left undressed) to

    designed section

    (British)

    LABOUR

    Dresser 405.00 1.350 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 417.15

    12.15

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 43 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per SQM : Rs 5.40

    85.05

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 5.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 502.20

    1000 Sft Rs. 502.20

    03-23-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in foundation of building, bridges etc complete : in sand, ashes or loose

    soil

    (British)

    LABOUR

    Coolie 2,400.00 8.000 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,781.00

    81.00

    Per CUM : Rs 118.23

    567.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 118.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,348.00

    1000 Cft Rs. 3,348.00

    03-23-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in foundation of building, bridges etc complete : in ordinary soil

    (British)

    LABOUR

    Coolie 2,700.00 9.000 300.00 DayDay 1

    Dresser 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,244.50

    94.50

    Per CUM : Rs 137.94

    661.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 137.94

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,906.00

    1000 Cft Rs. 3,906.00

    03-23-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in foundation of building, bridges etc complete : in hard soil or soft

    murum

    (British)

    LABOUR

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Dresser 525.00 1.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,630.75

    105.75

    Per CUM : Rs 154.36

    740.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 154.36

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 4,371.00

    1000 Cft Rs. 4,371.00

    03-23-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in foundation of building, bridges etc complete : in shingle/gravel

    (British)

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 44 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Coolie 3,300.00 11.000 300.00 DayDay 1

    Dresser 690.00 2.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 4,109.70

    119.70

    Per CUM : Rs 174.72

    837.90

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 174.72

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 4,947.60

    1000 Cft Rs. 4,947.60

    03-24Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Cutting hard rock such as granite, ballast, hard lime etc with chisels/hammers for

    small foundation

    (British)

    MATERIAL

    Steel (bars/rods/section) 1,776.64 22.680 78.33 KgKg 1

    Charcoal 10,075.50 223.900 45.00 KgKg 1

    Total Material % 29.29 11,852.14

    LABOUR

    Coolie 2,100.00 7.000 300.00 DayDay 1

    Black Smith 4,200.00 7.000 600.00 DayDay 1

    Skilled Coolie 4,200.00 14.000 300.00 DayDay 1

    Hammer Man 8,400.00 28.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 49.71 19,467.00

    567.00

    Per CUM : Rs 1,334.09

    6,457.95

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 827.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 37,777.09

    1000 Cft Rs. 23,436.00

    03-25Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Extra for excavaton requiring shoring

    (British)

    MATERIAL

    Wood Deodar 200.00 0.080 2,500.00 CftCft 1

    Total Material % 23.38 200.00

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Carpenter 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 55.62 463.50

    13.50

    Per CUM : Rs 28.25

    136.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 19.71

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 800.00

    1000 Cft Rs. 558.00

    03-26-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Mixing & moistening of earthwork to OMC in layers for compaction etc complete

    (British)

    LABOUR

    Coolie 237.00 0.790 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 45 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Bhishti 57.00 0.190 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 302.82

    8.82

    Per CUM : Rs 12.87

    61.74

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 12.87

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 364.56

    1000 Cft Rs. 364.56

    03-26-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Compaction by rolling with animal driven roller or hand rammed : Soft or sandy soil

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Bullock Man with Bullock 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 772.50

    22.50

    Per CUM : Rs 32.84

    157.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 32.84

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 930.00

    1000 Cft Rs. 930.00

    03-26-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Compaction by rolling with animal driven roller or hand rammed : Ordinary soil

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Bullock Man with Bullock 750.00 1.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 927.00

    27.00

    Per CUM : Rs 39.41

    189.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 39.41

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,116.00

    1000 Cft Rs. 1,116.00

    03-26-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Compaction by rolling with animal driven roller or hand rammed : Hard soil

    (British)

    LABOUR

    Coolie 291.00 0.970 300.00 DayDay 1

    Bullock Man with Bullock 972.00 1.620 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,300.89

    37.89

    Per CUM : Rs 55.31

    265.23

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 55.31

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,566.12

    1000 Cft Rs. 1,566.12

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 46 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-26-b-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Compaction by rolling with animal driven roller or hand rammed : Admixture of

    shingle

    (British)

    LABOUR

    Coolie 441.00 1.470 300.00 DayDay 1

    Bullock Man with Bullock 1,782.00 2.970 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,289.69

    66.69

    Per CUM : Rs 97.35

    466.83

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 97.35

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,756.52

    1000 Cft Rs. 2,756.52

    03-26-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Ramming earthwork (all types of soil)

    (British)

    LABOUR

    Coolie 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 463.50

    13.50

    Per CUM : Rs 19.71

    94.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 19.71

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 558.00

    1000 Cft Rs. 558.00

    03-26-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Ramming earthwork behind retaining wall

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Per CUM : Rs 26.27

    126.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 26.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 744.00

    1000 Cft Rs. 744.00

    03-27-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Compaction of earth with power road roller 95% to 100% max. mod. AASHTO dry

    density

    (British)

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Skilled Coolie 600.00 2.000 300.00 DayDay 1

    Water Sprinkler 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.00 1,236.00

    36.00

    EQUIPMENT

    Comp Roller 3,600.00 3.000 1,200.00 HourHour 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 47 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Equipment % 57.00 3,600.00

    Per CUM : Rs 206.38

    1,008.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 52.55

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 5,844.00

    1000 Cft Rs. 1,488.00

    03-27-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Compaction of earth with power road roller 90% max. mod. AASHTO dry density

    (British)

    LABOUR

    Bhishti 225.00 0.750 300.00 DayDay 1

    Skilled Coolie 450.00 1.500 300.00 DayDay 1

    Water Sprinkler 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.52 927.00

    27.00

    EQUIPMENT

    Comp Roller 3,003.60 2.503 1,200.00 HourHour 1

    Total Equipment % 58.48 3,003.60

    Per CUM : Rs 167.76

    819.76

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 39.41

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 4,750.36

    1000 Cft Rs. 1,116.00

    03-27-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Compaction of earth with power road roller 85% max. mod. AASHTO dry density

    (British)

    LABOUR

    Bhishti 150.00 0.500 300.00 DayDay 1

    Skilled Coolie 450.00 1.500 300.00 DayDay 1

    Water Sprinkler 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.10 772.50

    22.50

    EQUIPMENT

    Comp Roller 2,400.00 2.000 1,200.00 HourHour 1

    Total Equipment % 57.90 2,400.00

    Per CUM : Rs 135.40

    661.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 32.84

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,834.00

    1000 Cft Rs. 930.00

    03-28Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Extra for wet earthwork

    (British)

    LABOUR

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,081.50

    31.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 48 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 45.98

    220.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 45.98

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,302.00

    1000 Cft Rs. 1,302.00

    03-29Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Extra for slush or daldal including dewatering

    (British)

    LABOUR

    Coolie 2,400.00 8.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 68.14 2,472.00

    72.00

    EQUIPMENT

    Dewatering/Pumping Set 400.00 1.000 400.00 LSLS 1

    Total Equipment % 10.86 400.00

    Per CUM : Rs 122.19

    588.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 105.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,460.00

    1000 Cft Rs. 2,976.00

    03-30Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Extra for puddling.

    (British)

    LABOUR

    Coolie 1,425.00 4.750 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,931.25

    56.25

    Per CUM : Rs 82.11

    393.75

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 82.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,325.00

    1000 Cft Rs. 2,325.00

    03-31Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Earthwork on small rain water drains, along canal banks, roads, drains, etc

    complete

    (British)

    LABOUR

    Coolie 3.00 0.010 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3.09

    0.09

    Per Meter : Rs 12.20

    0.63

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 12.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 3.72

    Rft Rs. 3.72

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 49 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-32Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Filling and Compacting Soil, Earth and Boulders behind retaining walls (Available

    material)

    (British)

    LABOUR

    Coolie 2,700.00 9.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,781.00

    81.00

    Per CUM : Rs 118.23

    567.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 118.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,348.00

    1000 Cft Rs. 3,348.00

    03-33Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 2500 RftSpec. No :

    Dag belling 75 mm deep.

    (British)

    LABOUR

    Dresser 420.00 1.400 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 432.60

    12.60

    Cost Per km: 682.25

    88.20

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 682.25

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    2500 Rft Rs. 520.80

    2500 Rft Rs. 520.80

    03-34Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Turfing slopes of banks or lawns with grass sods including ploughing, laying, setting

    & watering

    (British)

    LABOUR

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,236.00

    36.00

    Per SQM : Rs 16.01

    252.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 16.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 1,488.00

    1000 Sft Rs. 1,488.00

    03-35-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Berm cutting : Lead upto single throw of phaorah or shovel, without dressing

    (British)

    LABOUR

    Coolie 1,350.00 4.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,390.50

    40.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 50 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 59.12

    283.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 59.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,674.00

    1000 Cft Rs. 1,674.00

    03-35-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Berm cutting : Upto 25 m lead (including dressing)

    (British)

    LABOUR

    Coolie 2,100.00 7.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,163.00

    63.00

    Per CUM : Rs 91.96

    441.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 91.96

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,604.00

    1000 Cft Rs. 2,604.00

    03-36-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit MileSpec. No :

    Berm trimming both sides of channels Upto 1 m depth

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Dresser 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 4,326.00

    126.00

    Cost Per km: 3,236.25

    882.00

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 3,236.25

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Mile Rs. 5,208.00

    Mile Rs. 5,208.00

    03-36-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit MileSpec. No :

    Berm trimming both sides of channels Over 1m to 1.5m depth

    (British)

    LABOUR

    Coolie 4,650.00 15.500 300.00 DayDay 1

    Dresser 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 5,716.50

    166.50

    Cost Per km: 4,276.47

    1,165.50

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 4,276.47

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Mile Rs. 6,882.00

    Mile Rs. 6,882.00

    03-36-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit MileSpec. No :

    Berm trimming both sides of channels Over 1.5m to 2.5m depth

    (British)

    LABOUR

    Coolie 7,650.00 25.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 51 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Dresser 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 9,115.50

    265.50

    Cost Per km: 6,819.24

    1,858.50

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 6,819.24

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Mile Rs. 10,974.00

    Mile Rs. 10,974.00

    03-37-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit AcreSpec. No :

    Ploughing and levelling borrow pits Upto 1m depth

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Bullock Man with Bullock 1,200.00 2.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,854.00

    54.00

    Cost Per ha: 5,515.27

    378.00

    Composite Rates Per :

    Labour Rates Per : Cost Per ha: 5,515.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Acre Rs. 2,232.00

    Acre Rs. 2,232.00

    03-37-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit AcreSpec. No :

    Ploughing and levelling borrow pits Exceeding 1m depth

    (British)

    LABOUR

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bullock Man with Bullock 1,494.00 2.490 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,774.82

    80.82

    Cost Per ha: 8,254.52

    565.74

    Composite Rates Per :

    Labour Rates Per : Cost Per ha: 8,254.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Acre Rs. 3,340.56

    Acre Rs. 3,340.56

    03-38-a-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit ChainSpec. No :

    Making boundary or service roads complete in unploughed land : From 3 m to 6 m

    wide

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Dresser 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 463.50

    13.50

    Cost Per 50 m: 915.12

    94.50

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 915.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Chain Rs. 558.00

    Chain Rs. 558.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 52 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-38-a-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit ChainSpec. No :

    Making boundary or service roads complete in unploughed land : Over 6 m to 12 m

    wide

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Cost Per 50 m: 1,220.16

    126.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 1,220.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Chain Rs. 744.00

    Chain Rs. 744.00

    03-38-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit ChainSpec. No :

    Making boundary or service roads complete in ploughed land : From 3 m to 6m

    wide

    (British)

    LABOUR

    Coolie 363.00 1.210 300.00 DayDay 1

    Dresser 162.00 0.540 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 540.75

    15.75

    Cost Per 50 m: 1,067.64

    110.25

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 1,067.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Chain Rs. 651.00

    Chain Rs. 651.00

    03-38-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit ChainSpec. No :

    Making boundary or service roads complete in ploughed land : Over 6 m to 12 m

    wide

    (British)

    LABOUR

    Coolie 456.00 1.520 300.00 DayDay 1

    Dresser 291.00 0.970 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 769.41

    22.41

    Cost Per 50 m: 1,519.10

    156.87

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 1,519.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Chain Rs. 926.28

    Chain Rs. 926.28

    03-39-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by boats, Digging and loading into boats, upto 25m lead

    (British)

    LABOUR

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,317.50

    67.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 53 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 98.53

    472.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 98.53

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,790.00

    1000 Cft Rs. 2,790.00

    03-39-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by boats, including hire of boats Carriage by boats upto 250m.

    (British)

    LABOUR

    Boatman With Boat 3,000.00 3.000 1,000.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,090.00

    90.00

    Per CUM : Rs 131.37

    630.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 131.37

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,720.00

    1000 Cft Rs. 3,720.00

    03-39-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by boats, including hiring of boats Extra for every additional 50m beyond

    250m

    (British)

    LABOUR

    Boatman With Boat 200.00 0.200 1,000.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 206.00

    6.00

    Per CUM : Rs 8.76

    42.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 8.76

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 248.00

    1000 Cft Rs. 248.00

    03-39-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by boats, Unloading earth from boats

    (British)

    LABOUR

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,081.50

    31.50

    Per CUM : Rs 45.98

    220.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 45.98

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,302.00

    1000 Cft Rs. 1,302.00

    03-40Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Unloading earth from BG trucks and clearing 1.5m from rail

    (British)

    LABOUR

    Coolie 900.00 3.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 54 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 927.00

    27.00

    Per CUM : Rs 39.41

    189.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 39.41

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,116.00

    1000 Cft Rs. 1,116.00

    03-41Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by tramway, digging and loading in trucks, upto 25m lead

    (British)

    LABOUR

    Coolie 2,100.00 7.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,163.00

    63.00

    Per CUM : Rs 91.96

    441.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 91.96

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,604.00

    1000 Cft Rs. 2,604.00

    03-42Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Unloading earth from BG trucks and spreading upto 5m from rail

    (British)

    LABOUR

    Coolie 1,350.00 4.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,390.50

    40.50

    Per CUM : Rs 59.12

    283.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 59.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,674.00

    1000 Cft Rs. 1,674.00

    03-43Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Supplying clean and screened river or pit sand within 150m including removal of

    loose earth or overburden.

    (British)

    LABOUR

    Coolie 6,000.00 20.000 300.00 DayDay 1

    Bullock Man with Bullock 6,000.00 10.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 12,360.00

    360.00

    Per CUM : Rs 525.48

    2,520.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 525.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 14,880.00

    1000 Cft Rs. 14,880.00

    03-44-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in open cut for sewers & manhole except shingle, gravel & rock : Upto

    2m

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 55 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    LABOUR

    Coolie 2,700.00 9.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,781.00

    81.00

    Per CUM : Rs 118.23

    567.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 118.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,348.00

    1000 Cft Rs. 3,348.00

    03-44-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in open cut for sewers & manholes except shingle, gravel & rock : 2m to

    5m

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,708.00

    108.00

    Per CUM : Rs 157.64

    756.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 157.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 4,464.00

    1000 Cft Rs. 4,464.00

    03-44-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in open cut for sewers & manholes except shingle, gravel & rock : Below

    5m depth

    (British)

    LABOUR

    Coolie 4,800.00 16.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 4,944.00

    144.00

    Per CUM : Rs 210.19

    1,008.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 210.19

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 5,952.00

    1000 Cft Rs. 5,952.00

    03-45-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Trench Excavation in open cutting below water level for sewers & manholes : Upto

    1.25m depth

    (British)

    MATERIAL

    Nails / Screws / Clamps 48.50 0.300 161.67 KgKg 1

    M.S Sheet 1,688.67 14.900 113.33 KgKg 1

    Wood - Kiker 225.00 0.300 750.00 CftCft 1

    Total Material % 22.55 1,962.17

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Surveyor 550.00 0.500 1,100.00 DayDay 1

    Skilled Coolie 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 47.25 3,965.50

    115.50

    EQUIPMENT

    Dewatering/Pumping Set 800.00 2.000 400.00 HourHour 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 56 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Equipment % 9.20 800.00

    Per CUM : Rs 286.62

    1,388.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 168.59

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 8,116.22

    1000 Cft Rs. 4,774.00

    03-45-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Trench Excavation in open cutting below water level for sewers & manholes : 1.25m

    to 2.5m depth

    (British)

    MATERIAL

    Nails / Screws / Clamps 80.83 0.500 161.67 KgKg 1

    M.S Sheet 2,266.67 20.000 113.33 KgKg 1

    Wood - Kiker 375.00 0.500 750.00 CftCft 1

    Total Material % 23.86 2,722.50

    LABOUR

    Coolie 2,400.00 8.000 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Surveyor 550.00 0.500 1,100.00 DayDay 1

    Skilled Coolie 1,500.00 5.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 44.63 4,892.50

    142.50

    EQUIPMENT

    Dewatering/Pumping Set 1,200.00 3.000 400.00 HourHour 1

    Total Equipment % 10.52 1,200.00

    Per CUM : Rs 375.62

    1,821.22

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 208.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 10,636.22

    1000 Cft Rs. 5,890.00

    03-45-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Trench Excavation in open cutting below water level for sewers & manholes :

    Exceeding 2.5m depth

    (British)

    MATERIAL

    Nails / Screws / Clamps 161.67 1.000 161.67 KgKg 1

    M.S Sheet 4,533.33 40.000 113.33 KgKg 1

    Wood - Kiker 750.00 1.000 750.00 CftCft 1

    Total Material % 28.95 5,445.00

    LABOUR

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Carpenter 900.00 1.500 600.00 DayDay 1

    Surveyor 550.00 0.500 1,100.00 DayDay 1

    Skilled Coolie 2,400.00 8.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 39.42 7,055.50

    205.50

    EQUIPMENT

    Dewatering/Pumping Set 2,000.00 5.000 400.00 HourHour 1

    Total Equipment % 10.63 2,000.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 57 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 618.09

    3,001.95

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 299.96

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 17,502.45

    1000 Cft Rs. 8,494.00

    03-46Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation of trench in all kinds of soils except cutting in rock for pilelines upto

    1.5m depth

    (British)

    LABOUR

    Coolie 1,530.00 5.100 300.00 DayDay 1

    Dresser 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,193.90

    63.90

    Per CUM : Rs 93.27

    447.30

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 93.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,641.20

    1000 Cft Rs. 2,641.20

    03-48-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Uprooting stump and removing within 50 m upto 2 m girth

    (British)

    LABOUR

    Coolie 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 772.50

    22.50

    Cost Per Each: 930.00

    157.50

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 930.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 930.00

    Each Rs. 930.00

    03-48-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Uprooting stump and removing within 50 m above 2 m girth

    (British)

    LABOUR

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 67.48 1,081.50

    31.50

    EQUIPMENT

    Tractor with blade/plough 187.50 0.250 750.00 HourHour 1

    Total Equipment % 11.52 187.50

    Cost Per Each: 1,528.88

    259.88

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 1,302.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 1,528.88

    Each Rs. 1,302.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 58 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-48-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Uprooting stump and removing within 50 m upto 2 m girth including sand filling and

    trinches

    (British)

    MATERIAL

    Sand 444.96 24.720 1,800.00 CFTCFT 100

    Total Material % 24.46 444.96

    LABOUR

    Coolie 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 44.23 772.50

    22.50

    EQUIPMENT

    Tractor with blade/plough 187.50 0.250 750.00 HourHour 1

    Total Equipment % 10.31 187.50

    Cost Per Each: 1,695.28

    290.32

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 930.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 1,695.28

    Each Rs. 930.00

    03-48-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Uprooting stump and removing within 50 m above 2 m girth including sand filling

    and trinches

    (British)

    MATERIAL

    Sand 953.64 52.980 1,800.00 CFTCFT 100

    Total Material % 33.08 953.64

    LABOUR

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 39.42 1,081.50

    31.50

    EQUIPMENT

    Tractor with blade/plough 187.50 0.250 750.00 HourHour 1

    Total Equipment % 6.50 187.50

    Cost Per Each: 2,682.78

    460.14

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 1,302.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 2,682.78

    Each Rs. 1,302.00

    03-49-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit DecareSpec. No :

    Jungle clearance and removing within 50m Light Jungle

    (British)

    LABOUR

    Coolie 1,614.00 5.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,662.42

    48.42

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 59 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Cost Per Decare: 2,001.36

    338.94

    Composite Rates Per :

    Labour Rates Per : Cost Per Decare: 2,001.36

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Decare Rs. 2,001.36

    Decare Rs. 2,001.36

    03-49-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit DecareSpec. No :

    Jungle clearance and removing within 50m Thick Jungle

    (British)

    LABOUR

    Coolie 3,228.00 10.760 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,324.84

    96.84

    Cost Per Decare: 4,002.72

    677.88

    Composite Rates Per :

    Labour Rates Per : Cost Per Decare: 4,002.72

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Decare Rs. 4,002.72

    Decare Rs. 4,002.72

    03-50Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Uprooting sarkanda growth & disposal within 50m

    (British)

    LABOUR

    Coolie 390.00 1.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 401.70

    11.70

    Per SQM : Rs 5.20

    81.90

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 5.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 483.60

    1000 Sft Rs. 483.60

    03-51Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit haSpec. No :

    Ploughing 3 times

    (British)

    LABOUR

    Bullock Man with Bullock 5,187.00 8.645 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 5,342.61

    155.61

    Cost Per ha: 6,431.88

    1,089.27

    Composite Rates Per :

    Labour Rates Per : Cost Per ha: 6,431.88

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    ha Rs. 6,431.88

    ha Rs. 6,431.88

    03-52Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Levelling, dressing and making lawns

    (British)

    LABOUR

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Dresser 1,500.00 5.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 60 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,090.00

    90.00

    Per SQM : Rs 40.03

    630.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 40.03

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 3,720.00

    1000 Sft Rs. 3,720.00

    03-53Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Turfing of lawn with Dacca Grass

    (British)

    MATERIAL

    Dacca Grass 8,583.33 1000.000 8.58 SftSft 1

    Total Material % 56.32 8,583.33

    LABOUR

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Mali 1,500.00 5.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.68 3,090.00

    90.00

    Per SQM : Rs 151.78

    2,432.50

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 40.03

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 14,105.83

    1000 Sft Rs. 3,720.00

    03-54Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation and Clearance of shingle, gravel including sand, soft soil and silt

    deposits in channel bed upto 25m

    (British)

    LABOUR

    Coolie 5,700.00 19.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 5,871.00

    171.00

    Per CUM : Rs 249.60

    1,197.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 249.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,068.00

    1000 Cft Rs. 7,068.00

    03-55-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 FtSpec. No :

    Clearance of choked up syphon including dewatering Upto 1.25m dia

    (British)

    LABOUR

    Coolie 15,000.00 50.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 15,450.00

    450.00

    Per Meter : Rs 610.08

    3,150.00

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 610.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Ft Rs. 18,600.00

    100 Ft Rs. 18,600.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 61 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-55-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 FtSpec. No :

    Clearance of choked up syphon including dewatering Exceeding 1.25m dia

    (British)

    LABOUR

    Coolie 27,000.00 90.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 27,810.00

    810.00

    Per Meter : Rs 1,098.14

    5,670.00

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 1,098.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Ft Rs. 33,480.00

    100 Ft Rs. 33,480.00

    03-56Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Clearing & Grubbing

    (British)

    LABOUR

    Coolie 259.20 0.864 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 14.66 266.98

    7.78

    EQUIPMENT

    Tractor With Trolly 466.50 0.622 750.00 HourHour 1

    Tractor with blade/plough 466.50 0.622 750.00 HourHour 1

    Tractor with Loader 497.60 0.622 800.00 HourHour 1

    Total Equipment % 64.34 1,430.60

    Per SQM : Rs 22.08

    354.86

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 3.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 2,052.43

    1000 Sft Rs. 321.41

    03-57-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit NoSpec. No :

    Removal of Tree : Girth 150mm - 300mm including removal of stump & backfilling

    with sand

    (British)

    MATERIAL

    Sand 222.48 12.360 1,800.00 CftCft 100

    Total Material % 49.16 222.48

    LABOUR

    Coolie 20.10 0.067 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 7.44 20.70

    0.60

    EQUIPMENT

    Tractor With Trolly 24.75 0.033 750.00 HourHour 1

    Tractor with blade/plough 50.25 0.067 750.00 HourHour 1

    Tractor with Loader 26.40 0.033 800.00 HourHour 1

    Total Equipment % 22.40 101.40

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 62 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Cost Per No: 416.82

    72.24

    Composite Rates Per :

    Labour Rates Per : Cost Per No: 24.92

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    No Rs. 416.82

    No Rs. 24.92

    03-57-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit NoSpec. No :

    Removal of Tree : Girth 300mm - 600mm including removal of stump & backfilling

    with sand

    (British)

    MATERIAL

    Sand 444.96 24.720 1,800.00 CftCft 100

    Total Material % 49.16 444.96

    LABOUR

    Coolie 40.20 0.134 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 7.44 41.41

    1.21

    EQUIPMENT

    Tractor With Trolly 49.50 0.066 750.00 HourHour 1

    Tractor with blade/plough 100.50 0.134 750.00 HourHour 1

    Tractor with Loader 52.80 0.066 800.00 HourHour 1

    Total Equipment % 22.40 202.80

    Cost Per No: 833.64

    144.47

    Composite Rates Per :

    Labour Rates Per : Cost Per No: 49.85

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    No Rs. 833.64

    No Rs. 49.85

    03-57-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit NoSpec. No :

    Removal of Tree : Girth over 600mm including removal of stump & backfilling with

    sand

    (British)

    MATERIAL

    Sand 953.64 52.980 1,800.00 CftCft 100

    Total Material % 43.07 953.64

    LABOUR

    Coolie 120.60 0.402 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 8.45 124.22

    3.62

    EQUIPMENT

    Tractor With Trolly 148.50 0.198 750.00 HourHour 1

    Tractor with blade/plough 301.50 0.402 750.00 HourHour 1

    Tractor with Loader 158.40 0.198 800.00 HourHour 1

    Total Equipment % 27.48 608.40

    Cost Per No: 2,039.61

    353.35

    Composite Rates Per :

    Labour Rates Per : Cost Per No: 149.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    No Rs. 2,039.61

    No Rs. 149.54

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 63 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-58Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Compaction of Natural Ground

    (British)

    LABOUR

    Coolie 231.30 0.771 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.39 238.24

    6.94

    EQUIPMENT

    Tractor with blade/plough 467.25 0.623 750.00 HourHour 1

    Water Tank 1000g 366.32 0.623 588.00 HourHour 1

    Vibrator Roller 12ton 248.00 0.155 1,600.00 HourHour 1

    Total Equipment % 62.61 1,081.57

    Per SQM : Rs 17.17

    275.70

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 3.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 1,595.52

    1000 Sft Rs. 286.81

    03-59-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Roadway Excavation in Surplus / Unsuitable Common Material

    (British)

    LABOUR

    Coolie 169.80 0.566 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 4.82 174.89

    5.09

    EQUIPMENT

    Tractor With Trolly 3,398.25 4.531 750.00 HourHour 1

    Tractor with blade/plough 1,698.75 2.265 750.00 HourHour 1

    Tractor with Loader 1,812.00 2.265 800.00 HourHour 1

    Total Equipment % 74.18 6,909.00

    Per CUM : Rs 302.66

    1,486.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 7.44

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 8,570.44

    1000 Cft Rs. 210.55

    03-59-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Roadway Excavation in Surplus / Unsuitable Rock (Hard) Material requiring

    blasting.

    (British)

    MATERIAL

    Explosives for Blasting 1,061.85 7.079 150.00 NoNo 1

    Total Material % 6.93 1,061.85

    LABOUR

    Quarry Man 1,529.10 5.097 300.00 DayDay 1

    Rock Driller 1,019.40 1.699 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.62 2,624.96

    76.46

    EQUIPMENT

    Pneumatic Drill w/ Compressor 2,378.25 2.265 1,050.00 HourHour 1

    Dozer D6 or equiv 120 HP 5,662.50 2.265 2,500.00 HourHour 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 64 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Equipment % 52.45 8,040.75

    Per CUM : Rs 500.56

    2,446.73

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 111.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 14,174.29

    1000 Cft Rs. 3,160.14

    03-59-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Roadway Excavation in Surplus / Unsuitable Rock (Medium) Material requiring

    blasting

    (British)

    MATERIAL

    Explosives for Blasting 611.85 4.079 150.00 NoNo 1

    Total Material % 4.61 611.85

    LABOUR

    Quarry Man 929.10 3.097 300.00 DayDay 1

    Rock Driller 509.40 0.849 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.83 1,481.65

    43.16

    EQUIPMENT

    Pneumatic Drill w/ Compressor 2,378.25 2.265 1,050.00 HourHour 1

    Dozer D6 or equiv 120 HP 5,662.50 2.265 2,500.00 HourHour 1

    Total Equipment % 60.56 8,040.75

    Per CUM : Rs 432.72

    2,119.13

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 62.99

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 12,253.39

    1000 Cft Rs. 1,783.74

    03-60-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Structural Excavation in Common Material

    (British)

    LABOUR

    Coolie 2,803.20 9.344 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 42.03 2,887.30

    84.10

    EQUIPMENT

    Tractor With Trolly 2,655.00 3.540 750.00 HourHour 1

    Total Equipment % 36.97 2,655.00

    Per CUM : Rs 236.20

    1,146.22

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 122.75

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 6,688.52

    1000 Cft Rs. 3,475.97

    03-60-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Structural Excavation in Rock Material requiring blasting

    (British)

    MATERIAL

    Explosives for Blasting 2,123.70 14.158 150.00 NoNo 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 65 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Material % 6.65 2,123.70

    LABOUR

    Coolie 6,795.90 22.653 300.00 DayDay 1

    Quarry Man 3,058.20 10.194 300.00 DayDay 1

    Rock Driller 2,038.80 3.398 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 40.26 12,249.69

    356.79

    EQUIPMENT

    Tractor With Trolly 2,655.00 3.540 750.00 HourHour 1

    Tractor with Loader 2,832.00 3.540 800.00 HourHour 1

    Pneumatic Drill w/ Compressor 4,757.55 4.531 1,050.00 HourHour 1

    Total Equipment % 32.09 10,244.55

    Per CUM : Rs 1,049.30

    5,094.84

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 520.79

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 29,712.78

    1000 Cft Rs. 14,747.20

    03-60-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Structural backfill using Common Material available at site.

    (British)

    LABOUR

    Coolie 4,247.40 14.158 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 50.35 4,374.82

    127.42

    EQUIPMENT

    Plate Compactor 2,569.60 9.344 275.00 HourHour 1

    Total Equipment % 28.65 2,569.60

    Per CUM : Rs 295.80

    1,431.57

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 185.99

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 8,375.99

    1000 Cft Rs. 5,266.78

    03-60-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Structural Backfill using Granular Material brought from outside

    (British)

    MATERIAL

    Pitrun Gravel (NHA Specified) 15,600.00 1300.000 1,200.00 CftCft 100

    Total Material % 61.65 15,600.00

    LABOUR

    Coolie 1,062.00 3.540 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 7.20 1,093.86

    31.86

    EQUIPMENT

    Plate Compactor 2,569.60 9.344 275.00 HourHour 1

    Total Equipment % 10.15 2,569.60

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 66 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 822.91

    4,038.64

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 46.51

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 23,302.10

    1000 Cft Rs. 1,316.88

    03-61-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Formation of Embankment from Roadway Excavation in Common Material including

    compaction by power roller.

    (British)

    LABOUR

    Coolie 169.80 0.566 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 4.63 174.89

    5.09

    EQUIPMENT

    Tractor With Trolly 2,548.50 3.398 750.00 HourHour 1

    Tractor with blade/plough 2,548.50 3.398 750.00 HourHour 1

    Water Tank 1000g 332.81 0.566 588.00 HourHour 1

    Vibrator Roller 12ton 452.80 0.283 1,600.00 HourHour 1

    Tractor with Loader 1,812.00 2.265 800.00 HourHour 1

    Lab Test 56.00 0.080 700.00 JobJob 1

    Total Equipment % 74.37 7,750.61

    Per CUM : Rs 338.63

    1,663.29

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 7.44

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 9,588.79

    1000 Cft Rs. 210.55

    03-61-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Formation of Embankment from Roadway Excavation in Rock Material requiring

    blasting and compaction of embankment by power roller.

    (British)

    MATERIAL

    Explosives for Blasting 1,061.85 7.079 150.00 NoNo 1

    Total Material % 5.69 1,061.85

    LABOUR

    Quarry Man 1,529.10 5.097 300.00 DayDay 1

    Rock Driller 1,019.40 1.699 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.65 2,624.96

    76.46

    EQUIPMENT

    Tractor with blade/plough 1,698.75 2.265 750.00 Hour.Hour. 1

    Water Tank 1000g 332.81 0.566 588.00 HourHour 1

    Vibrator Roller 12ton 452.80 0.283 1,600.00 HourHour 1

    Pneumatic Drill w/ Compressor 2,378.25 2.265 1,050.00 HourHour 1

    Dozer D6 or equiv 120 HP 5,662.50 2.265 2,500.00 HourHour 1

    Lab Test 56.00 0.080 700.00 JobJob 1

    Total Equipment % 56.67 10,581.11

    Per CUM : Rs 609.11

    2,980.21

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 111.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 17,248.12

    1000 Cft Rs. 3,160.14

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 67 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-61-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Formation of Embankment from Borrow Excavation in Common Material including

    compaction by power roller.

    (British)

    MATERIAL

    Mud / Clay 8,437.50 1250.000 675.00 CftCft 100

    Total Material % 62.26 8,437.50

    LABOUR

    Coolie 170.10 0.567 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 4.26 175.20

    5.10

    EQUIPMENT

    Tractor with blade/plough 850.50 1.134 750.00 HourHour 1

    Water Tank 1000g 333.40 0.567 588.00 HourHour 1

    Vibrator Roller 12ton 452.80 0.283 1,600.00 HourHour 1

    Lab Test 56.00 0.080 700.00 JobJob 1

    Total Equipment % 12.49 1,692.70

    Per CUM : Rs 440.32

    2,163.06

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 7.45

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 12,468.46

    1000 Cft Rs. 210.92

    03-61-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Formation of Embankment from Roadway Excavation in granular Material

    including compaction by power roller.

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 5.83 309.00

    9.00

    EQUIPMENT

    Tractor With Trolly 2,548.50 3.398 750.00 HourHour 1

    Tractor with blade/plough 2,548.50 3.398 750.00 HourHour 1

    Water Tank 1000g 332.81 0.566 588.00 HourHour 1

    Vibrator Roller 12ton 452.80 0.283 1,600.00 HourHour 1

    Tractor with Loader 1,812.00 2.265 800.00 HourHour 1

    Lab Test 56.00 0.080 700.00 NoNo 1

    Total Equipment % 73.17 7,750.61

    Per CUM : Rs 344.33

    1,690.63

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 13.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 9,750.24

    1000 Cft Rs. 372.00

    03-62-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Subgrade Preparation in Earth Cut

    (British)

    LABOUR

    Coolie 231.30 0.771 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.18 238.24

    6.94

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 68 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    EQUIPMENT

    Tractor with blade/plough 933.75 1.245 750.00 HourHour 1

    Water Tank 1000g 732.06 1.245 588.00 HourHour 1

    Vibrator Roller 12ton 496.00 0.310 1,600.00 HourHour 1

    Lab Test 56.00 0.080 700.00 JobJob 1

    Total Equipment % 68.82 2,217.81

    Per SQM : Rs 31.96

    514.31

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 3.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 2,970.36

    1000 Sft Rs. 286.81

    03-62-BItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Subgrade Preparation in Rock Cut

    (British)

    LABOUR

    Coolie 694.20 2.314 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.48 715.03

    20.83

    EQUIPMENT

    Tractor with blade/plough 3,750.00 5.000 750.00 HourHour 1

    Water Tank 1000g 732.06 1.245 588.00 HourHour 1

    Vibrator Roller 12ton 992.00 0.620 1,600.00 HourHour 1

    Lab Test 56.00 0.080 700.00 JobJob 1

    Total Equipment % 67.52 5,530.06

    Per SQM : Rs 81.26

    1,307.09

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 9.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 7,552.18

    1000 Sft Rs. 860.81

    03-62-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Subgrade Preparation on Existing Road

    (British)

    LABOUR

    Coolie 462.60 1.542 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.73 476.48

    13.88

    EQUIPMENT

    Tractor with blade/plough 1,867.50 2.490 750.00 HourHour 1

    Water Tank 1000g 732.06 1.245 588.00 HourHour 1

    Vibrator Roller 12ton 496.00 0.310 1,600.00 HourHour 1

    Lab Test 56.00 0.080 700.00 JobJob 1

    Total Equipment % 66.27 3,151.56

    Per SQM : Rs 47.20

    758.97

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 6.17

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 4,387.01

    1000 Sft Rs. 573.62

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 69 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-63-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by mechanical means in drains and irrigation channels in DRY soil

    dressed to designed section, grades profile/with excavated material, disposed off

    within 50 feet (15.2 m) lead and dressed as directed.

    (British)

    LABOUR

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 6.07 77.25

    2.25

    EQUIPMENT

    Hire charges of Excavator

    including P.O.L, crew charges

    and carraige of the site of work.

    1,782.00 0.660 2,700.00 HourHour 1

    Total Equipment % 72.93 1,782.00

    Per CUM : Rs 79.43

    389.97

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 3.28

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,249.22

    1000 Cft Rs. 93.00

    03-63-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by mechanical means in drains and irrigation channels in DRY & WET

    soil dressed to designed section, grades profile/with excavated material, disposed

    off within 50 feet (15.2 m) lead and dressed as directed.

    (British)

    LABOUR

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 5.86 77.25

    2.25

    EQUIPMENT

    Hire charges of Excavator

    including P.O.L, crew charges

    and carraige of the site of work.

    1,915.65 0.710 2,700.00 HourHour 1

    Total Equipment % 73.14 1,915.65

    Per CUM : Rs 85.14

    418.04

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 3.28

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,410.94

    1000 Cft Rs. 93.00

    03-63-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by mechanical means in drains and irrigation channels in WET & SLUSH

    soil dressed to designed section, grades profile/with excavated material, disposed

    off within 50 feet (15.2 m) lead and dressed as directed.

    (British)

    LABOUR

    Coolie 111.00 0.370 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 6.59 114.33

    3.33

    EQUIPMENT

    Hire charges of Excavator

    including P.O.L, crew charges

    and carraige of the site of work.

    2,239.38 0.829 2,700.00 HourHour 1

    Total Equipment % 72.41 2,239.38

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 70 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 100.55

    493.58

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 4.86

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,847.29

    1000 Cft Rs. 137.64

    03-63-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by mechanical means in drains and irrigation channels in SLUSH soil

    dressed to designed section, grades profile/with excavated material, disposed off

    within 50 feet (15.2 m) lead and dressed as directed.

    (British)

    LABOUR

    Coolie 111.00 0.370 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 6.14 114.33

    3.33

    EQUIPMENT

    Hire charges of Excavator

    including P.O.L, crew charges

    and carraige of the site of work.

    2,575.26 0.954 2,700.00 HourHour 1

    Total Equipment % 72.86 2,575.26

    Per CUM : Rs 114.90

    564.11

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 4.86

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,253.70

    1000 Cft Rs. 137.64

    03-63-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by mechanical means in drains and irrigation channels in DRY & WET to

    that of SLUSH (1:2) soil dressed to designed section, grades profile/with excavated

    material, disposed off within 50 feet (15.2 m) lead and dressed as directed.

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 7.46 154.50

    4.50

    EQUIPMENT

    Hire charges of Excavator

    including P.O.L, crew charges

    and carraige of the site of work.

    2,407.32 0.892 2,700.00 HourHour 1

    Total Equipment % 71.54 2,407.32

    Per CUM : Rs 109.44

    537.04

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 6.57

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,098.86

    1000 Cft Rs. 186.00

    03-63-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by mechanical means in drains and irrigation channels in BORROW

    AREA soil dressed to designed section, grades profile/with excavated material,

    disposed off within 50 feet (15.2 m) lead and dressed as directed.

    (British)

    LABOUR

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 5.65 77.25

    2.25

    EQUIPMENT

    Hire charges of Excavator

    including P.O.L, crew charges

    and carraige of the site of work.

    2,077.38 0.769 2,700.00 HourHour 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 71 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Equipment % 73.35 2,077.38

    Per CUM : Rs 92.05

    452.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 3.28

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,606.63

    1000 Cft Rs. 93.00

    03-63-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earthwork by mechanical means in drains and irrigation channels in UNDER

    WATER soil dressed to designed section, grades profile/with excavated material,

    disposed off within 50 feet (15.2 m) lead and dressed as directed.

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 9.43 309.00

    9.00

    EQUIPMENT

    Hire charges of Excavator

    including P.O.L, crew charges

    and carraige of the site of work.

    3,248.10 1.203 2,700.00 HourHour 1

    Total Equipment % 69.57 3,248.10

    Per CUM : Rs 151.93

    745.10

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 13.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 4,302.20

    1000 Cft Rs. 372.00

    03-64Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Provide, place and compact impervious clay core in dam embakement of specified

    grading, permiability i/c leveling dressing and hauage obtaining 95% modified

    ASHTO dry density

    (British)

    EQUIPMENT

    Tractor with blade/plough 30.00 0.040 750.00 HourHour 1

    Water Tank 1000g 58.80 0.100 588.00 HourHour 1

    Vibrator Roller 12ton 160.00 0.100 1,600.00 HourHour 1

    Dozer D8 or equiv 200 HP 210.00 0.075 2,800.00 HourHour 1

    Dump Truck (10 m3 cap) 286.00 0.286 1,000.00 HourHour 1

    Excavator 128.52 0.048 2,700.00 HourHour 1

    Total Equipment % 76.00 873.32

    Per CUM : Rs 373.18

    183.40

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,056.72

    100 Cft Rs. 0.00

    03-65Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Provide , Place & compact shoulder material (sandy / silty gravel) in Dam

    Embankment, of specified grading, leveling / dressing i/c haulage for obtaining of

    95% modified ASHTHO dry density.

    (British)

    EQUIPMENT

    Tractor with blade/plough 30.00 0.040 750.00 HourHour 1

    Water Tank 1000g 58.80 0.100 588.00 HourHour 1

    Vibrator Roller 12ton 80.00 0.050 1,600.00 HourHour 1

    Dozer D8 or equiv 200 HP 210.00 0.075 2,800.00 HourHour 1

    Dump Truck (10 m3 cap) 286.00 0.286 1,000.00 HourHour 1

    Excavator 128.52 0.048 2,700.00 HourHour 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 72 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Equipment % 76.00 793.32

    Per CUM : Rs 338.99

    166.60

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 959.92

    100 Cft Rs. 0.00

    03-66Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Provide , Place & compact Fine Filter in chimney drain vertical / horizantol on

    downstream of clay core

    (British)

    MATERIAL

    Sand 1,800.00 100.000 1,800.00 CftCft 100

    Total Material % 49.59 1,800.00

    LABOUR

    Coolie 300.00 1.000 300.00 HourHour 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.26 309.00

    9.00

    EQUIPMENT

    Water Tank 1000g 58.80 0.100 588.00 HourHour 1

    Vibrator Roller 12ton 80.00 0.050 1,600.00 HourHour 1

    Front End Loader 3m3 cap 473.00 0.172 2,750.00 HourHour 1

    Dump Truck (10 m3 cap) 47.00 0.047 1,000.00 HourHour 1

    Total Equipment % 18.15 658.80

    Per CUM : Rs 1,182.04

    579.35

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 131.37

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 3,347.15

    100 Cft Rs. 372.00

    03-67Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Provide , Place & compact Coarse Filter (well graded gravel) in chimney drain

    vertical / horizantol on downstream of fine filter i/c leveling, moistening etc

    (British)

    LABOUR

    Coolie 825.00 2.750 300.00 NoNo 1

    Total Labour

    Sundries (Labour Only): %3

    % 41.17 849.75

    24.75

    EQUIPMENT

    Water Tank 1000g 58.80 0.100 588.00 HourHour 1

    Front End Loader 3m3 cap 473.00 0.172 2,750.00 HourHour 1

    Dump Truck (10 m3 cap) 286.00 0.286 1,000.00 HourHour 1

    Total Equipment % 37.83 817.80

    Per CUM : Rs 710.72

    344.99

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 361.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,012.54

    100 Cft Rs. 1,023.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 73 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-68Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure

    and Irrigation System upto a minimum depth of 35 ft in common soil including

    removing of excavated material by machinery in 1 KM radius

    (British)

    EQUIPMENT

    Dozer D8 or equiv 200 HP 116.76 0.042 2,800.00 HourHour 1

    Dump Truck (10 m3 cap) 286.00 0.286 1,000.00 HourHour 1

    Excavator 128.52 0.048 2,700.00 HourHour 1

    Total Equipment % 76.00 531.28

    Per CUM : Rs 227.02

    111.57

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 642.85

    100 Cft Rs. 0.00

    03-68-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure

    and Irrigation System upto a minimum depth of 35 ft in shingle gravel including

    removing of excavated material by machinery in 1 KM radius

    (British)

    EQUIPMENT

    Dozer D8 or equiv 200 HP 140.00 0.050 2,800.00 HourHour 1

    Dump Truck (10 m3 cap) 286.00 0.286 1,000.00 HourHour 1

    Excavator 128.52 0.048 2,700.00 HourHour 1

    Total Equipment % 76.00 554.52

    Per CUM : Rs 236.95

    116.45

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 670.97

    100 Cft Rs. 0.00

    03-68-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure

    and Irrigation System upto design depth in Soft Rock/Shale requiring 20% blasting

    i/c removing of material from outside of the structure area.

    (British)

    MATERIAL

    Blasting 735.00 1.000 735.00 NoNo 1

    Total Material % 41.13 735.00

    EQUIPMENT

    Dozer D8 or equiv 200 HP 175.00 0.063 2,800.00 HourHour 1

    Dump Truck (10 m3 cap) 286.00 0.286 1,000.00 HourHour 1

    Excavator 162.00 0.060 2,700.00 HourHour 1

    Total Equipment % 34.87 623.00

    Per CUM : Rs 580.28

    285.18

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,643.18

    100 Cft Rs. 0.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 74 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-68-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure

    and Irrigation System upto design depth in Medium Hard Rock requiring 50%

    blasting i/c removing of material from outside of the structure area.

    (British)

    MATERIAL

    Blasting 1,470.00 2.000 735.00 NoNo 1

    Total Material % 53.38 1,470.00

    EQUIPMENT

    Dozer D8 or equiv 200 HP 175.00 0.063 2,800.00 HourHour 1

    Dump Truck (10 m3 cap) 286.00 0.286 1,000.00 HourHour 1

    Excavator 162.00 0.060 2,700.00 HourHour 1

    Total Equipment % 22.62 623.00

    Per CUM : Rs 894.36

    439.53

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,532.53

    100 Cft Rs. 0.00

    03-68-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure

    and Irrigation System upto design depth in Hard Rock requiring 75% blasting i/c

    removing of material from outside of the structure area.

    (British)

    MATERIAL

    Blasting 2,205.00 3.000 735.00 NoNo 1

    Total Material % 59.26 2,205.00

    EQUIPMENT

    Dozer D8 or equiv 200 HP 175.00 0.063 2,800.00 HourHour 1

    Dump Truck (10 m3 cap) 286.00 0.286 1,000.00 HourHour 1

    Excavator 162.00 0.060 2,700.00 HourHour 1

    Total Equipment % 16.74 623.00

    Per CUM : Rs 1,208.43

    593.88

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 3,421.88

    100 Cft Rs. 0.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 75 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    04-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling dry stone masonry

    (British)

    LABOUR

    Coolie 255.00 0.850 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 262.65

    7.65

    Per CUM : Rs 111.67

    53.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 111.67

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 316.20

    100 Cft Rs. 316.20

    04-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling stone masonry in mud mortar

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Per CUM : Rs 164.21

    78.75

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 164.21

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 465.00

    100 Cft Rs. 465.00

    04-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling stone masonry in lime or cement mortar

    (British)

    LABOUR

    Coolie 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 927.00

    27.00

    Per CUM : Rs 394.11

    189.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,116.00

    100 Cft Rs. 1,116.00

    04-04-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling dry stone or spawl pitching

    (British)

    LABOUR

    Coolie 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 463.50

    13.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 76 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Per CUM : Rs 197.06

    94.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 197.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 558.00

    100 Cft Rs. 558.00

    04-04-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling stone or spawl pitching (mud grouted)

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Per CUM : Rs 262.74

    126.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 262.74

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 744.00

    100 Cft Rs. 744.00

    04-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling stone or spawl pitching and apron in silted condition

    (British)

    LABOUR

    Coolie 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 772.50

    22.50

    Per CUM : Rs 328.43

    157.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 328.43

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 930.00

    100 Cft Rs. 930.00

    04-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling stone pitching, cement or lime grouted

    (British)

    LABOUR

    Coolie 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 927.00

    27.00

    Per CUM : Rs 394.11

    189.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,116.00

    100 Cft Rs. 1,116.00

    04-07-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling stone in Wooden crates

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 77 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Per CUM : Rs 262.74

    126.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 262.74

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 744.00

    100 Cft Rs. 744.00

    04-07-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling stone in Wire crates

    (British)

    LABOUR

    Coolie 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 772.50

    22.50

    Per CUM : Rs 328.43

    157.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 328.43

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 930.00

    100 Cft Rs. 930.00

    04-08Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling stone ware drain including base concrete

    (British)

    LABOUR

    Skilled Coolie 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 463.50

    13.50

    Per CUM : Rs 197.06

    94.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 197.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 558.00

    100 Cft Rs. 558.00

    04-09Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling mud/pise walling

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Per CUM : Rs 65.69

    31.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 65.69

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 186.00

    100 Cft Rs. 186.00

    04-10Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling sun dried brick masonry

    (British)

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 78 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Per CUM : Rs 164.21

    78.75

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 164.21

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 465.00

    100 Cft Rs. 465.00

    04-11Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling dry brick masonry

    (British)

    LABOUR

    Coolie 255.00 0.850 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 262.65

    7.65

    Per CUM : Rs 111.67

    53.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 111.67

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 316.20

    100 Cft Rs. 316.20

    04-12Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling brick work in mud mortar

    (British)

    LABOUR

    Coolie 525.00 1.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 540.75

    15.75

    Per CUM : Rs 229.90

    110.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 229.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 651.00

    100 Cft Rs. 651.00

    04-13Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling brick work in lime or cement mortar

    (British)

    LABOUR

    Coolie 1,275.00 4.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,313.25

    38.25

    Per CUM : Rs 558.33

    267.75

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 558.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,581.00

    100 Cft Rs. 1,581.00

    04-14Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling cement block masonry

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 79 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    LABOUR

    Coolie 1,125.00 3.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,158.75

    33.75

    Per CUM : Rs 492.64

    236.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,395.00

    100 Cft Rs. 1,395.00

    04-15Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling Dhajji walling

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Per CUM : Rs 131.37

    63.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 131.37

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 372.00

    100 Cft Rs. 372.00

    04-16Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling mud concrete

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Per CUM : Rs 262.74

    126.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 262.74

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 744.00

    100 Cft Rs. 744.00

    04-17Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling lime concrete

    (British)

    LABOUR

    Coolie 825.00 2.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 849.75

    24.75

    Per CUM : Rs 361.27

    173.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 361.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,023.00

    100 Cft Rs. 1,023.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 80 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    04-18Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling lime or cement concrete, under water

    (British)

    LABOUR

    Coolie 3,150.00 10.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,244.50

    94.50

    Per CUM : Rs 1,379.39

    661.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,379.39

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 3,906.00

    100 Cft Rs. 3,906.00

    04-19-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling : Plain Cement Concrete 1:4:8

    (British)

    LABOUR

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,699.50

    49.50

    Per CUM : Rs 722.54

    346.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,046.00

    100 Cft Rs. 2,046.00

    04-19-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling : Plain Cement Concrete 1:3:6

    (British)

    LABOUR

    Coolie 2,700.00 9.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,781.00

    81.00

    Per CUM : Rs 1,182.34

    567.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,182.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 3,348.00

    100 Cft Rs. 3,348.00

    04-19-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling : Plain Cement Concrete 1:2:4

    (British)

    LABOUR

    Coolie 3,300.00 11.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,399.00

    99.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 81 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Per CUM : Rs 1,445.08

    693.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,445.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 4,092.00

    100 Cft Rs. 4,092.00

    04-19-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling : Cement Concrete with brick aggregate

    (British)

    LABOUR

    Coolie 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 927.00

    27.00

    Per CUM : Rs 394.11

    189.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,116.00

    100 Cft Rs. 1,116.00

    04-19-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling : DPC of cement concrete 1.5" thick and clearing the site

    (British)

    LABOUR

    Coolie 407.70 1.359 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 419.93

    12.23

    Per SQM : Rs 54.40

    85.62

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 54.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 505.55

    100 Sft Rs. 505.55

    04-20Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling RCC, separating reinforcement, cleaning & straightening the same

    (British)

    LABOUR

    Coolie 5,400.00 18.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 5,562.00

    162.00

    Per CUM : Rs 2,364.67

    1,134.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,364.67

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 6,696.00

    100 Cft Rs. 6,696.00

    04-21Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling sirki sarkanda or thached roofing supported on battens or ballies

    (British)

    LABOUR

    Coolie 180.00 0.600 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 82 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 185.40

    5.40

    Per SQM : Rs 24.02

    37.80

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 24.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 223.20

    100 Sft Rs. 223.20

    04-22-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling 1st class tile roofing

    (British)

    LABOUR

    Coolie 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 463.50

    13.50

    Per SQM : Rs 60.04

    94.50

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 60.04

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 558.00

    100 Sft Rs. 558.00

    04-22-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling 2nd class tile roofing

    (British)

    LABOUR

    Coolie 370.80 1.236 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 381.92

    11.12

    Per SQM : Rs 49.47

    77.87

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 49.47

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 459.79

    100 Sft Rs. 459.79

    04-23Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling from any height, asbestos sheets & ridge coping

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Fitter II 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Per SQM : Rs 40.03

    63.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 40.03

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 372.00

    100 Sft Rs. 372.00

    04-24Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling roof of wooden planks & battens from any height

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 83 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    LABOUR

    Coolie 120.00 0.400 300.00 DayDay 1

    Carpenter 120.00 0.200 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 247.20

    7.20

    Per SQM : Rs 32.02

    50.40

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 32.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 297.60

    100 Sft Rs. 297.60

    04-25Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling wooden ceiling above 20' height in difficult position including lifting

    along live wire

    (British)

    LABOUR

    Coolie 535.20 1.784 300.00 DayDay 1

    Carpenter 360.00 0.600 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 922.06

    26.86

    Per SQM : Rs 119.44

    187.99

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 119.44

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,110.05

    100 Sft Rs. 1,110.05

    04-26Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling jack arch roofing, including removing joists

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Per SQM : Rs 80.05

    126.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 80.05

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 744.00

    100 Sft Rs. 744.00

    04-27Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling RB roof complete with mud and mud plaster including reinforcement

    complete

    (British)

    LABOUR

    Coolie 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 772.50

    22.50

    Per SQM : Rs 100.07

    157.50

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 100.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 930.00

    100 Sft Rs. 930.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 84 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    04-28-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Stripping and stacking: Slate or tiles from the truss roofing

    (British)

    LABOUR

    Skilled Coolie 250.80 0.836 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 258.32

    7.52

    Per SQM : Rs 33.46

    52.67

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 33.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 310.99

    100 Sft Rs. 310.99

    04-28-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Stripping and stacking: GI sheet roofing

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Fitter II 72.00 0.120 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 383.16

    11.16

    Per SQM : Rs 49.63

    78.12

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 49.63

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 461.28

    100 Sft Rs. 461.28

    04-29Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Extra for dismantling CI sheet roof above 20 ft. in dificult position including lifting

    along live wire

    (British)

    LABOUR

    Coolie 75.00 0.250 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 695.25

    20.25

    Per SQM : Rs 90.06

    141.75

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 90.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 837.00

    100 Sft Rs. 837.00

    04-30Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling slates or tiles including battens, purlins and planking

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 85 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Per SQM : Rs 80.05

    126.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 80.05

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 744.00

    100 Sft Rs. 744.00

    04-31Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling brick or flagged flooring without concrete foundation

    (British)

    LABOUR

    Coolie 255.00 0.850 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 262.65

    7.65

    Per SQM : Rs 34.02

    53.55

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 34.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 316.20

    100 Sft Rs. 316.20

    04-32Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling plank or wooden block flooring etc

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Per SQM : Rs 50.03

    78.75

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 50.03

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 465.00

    100 Sft Rs. 465.00

    04-33-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Disjointing RCC pipes inside trench & removing pipes & stacking outside : 6" to 12"

    diameter

    (British)

    LABOUR

    Coolie 3,750.00 12.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,862.50

    112.50

    Per Meter : Rs 152.52

    787.50

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 152.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 4,650.00

    100 Rft Rs. 4,650.00

    04-33-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Disjointing RCC pipes inside trench & removing pipes & stacking outside : 13" to

    24" diameter

    (British)

    LABOUR

    Coolie 5,250.00 17.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 86 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 5,407.50

    157.50

    Per Meter : Rs 213.53

    1,102.50

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 213.53

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 6,510.00

    100 Rft Rs. 6,510.00

    04-33-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Disjointing RCC pipes inside trench & removing pipes & stacking outside : 25" to

    36" diameter

    (British)

    LABOUR

    Coolie 6,750.00 22.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 6,952.50

    202.50

    Per Meter : Rs 274.54

    1,417.50

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 274.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 8,370.00

    100 Rft Rs. 8,370.00

    04-33-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Disjointing RCC pipes inside trench & removing pipes & stacking outside : Over 36"

    diameter

    (British)

    LABOUR

    Coolie 9,000.00 30.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 9,270.00

    270.00

    Per Meter : Rs 366.05

    1,890.00

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 366.05

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 11,160.00

    100 Rft Rs. 11,160.00

    04-34Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Removing door with chowkat

    (British)

    LABOUR

    Mason 90.00 0.150 600.00 DayDay 1

    Coolie 45.00 0.150 300.00 DayDay 1

    Carpenter 30.00 0.050 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 169.95

    4.95

    Cost Per Each: 204.60

    34.65

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 204.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 204.60

    Each Rs. 204.60

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 87 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    04-35Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Removing windows and sky lights with chowkat

    (British)

    LABOUR

    Mason 60.00 0.100 600.00 DayDay 1

    Coolie 30.00 0.100 300.00 DayDay 1

    Carpenter 30.00 0.050 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 123.60

    3.60

    Cost Per Each: 148.80

    25.20

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 148.80

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 148.80

    Each Rs. 148.80

    04-36Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Removing ventilators and wooden sunshades

    (British)

    LABOUR

    Mason 30.00 0.050 600.00 DayDay 1

    Coolie 15.00 0.050 300.00 DayDay 1

    Carpenter 15.00 0.025 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 61.80

    1.80

    Cost Per Each: 74.40

    12.60

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 74.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 74.40

    Each Rs. 74.40

    04-37-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Dismantling: Woden beams up to 12' in length

    (British)

    LABOUR

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 77.25

    2.25

    Cost Per Each: 93.00

    15.75

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 93.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 93.00

    Each Rs. 93.00

    04-37-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Dismantling: Wooden beams from 12.1' to 23' length

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 88 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Cost Per Each: 186.00

    31.50

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 186.00

    Each Rs. 186.00

    04-37-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 600 SftSpec. No :

    Dismantling: Wooden partiton Jaffry Work etc

    (British)

    LABOUR

    Coolie 585.30 1.951 300.00 DayDay 1

    Carpenter 568.20 0.947 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,188.11

    34.61

    Per SQM : Rs 25.65

    242.24

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 25.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    600 Sft Rs. 1,430.34

    600 Sft Rs. 1,430.34

    04-37-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 5 CwtSpec. No :

    Dismantling: Wooden trusses

    (British)

    LABOUR

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Black Smith 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,390.50

    40.50

    Cost Per 100 Kg: 652.86

    283.50

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 Kg: 652.86

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    5 Cwt Rs. 1,674.00

    5 Cwt Rs. 1,674.00

    04-37-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 RftSpec. No :

    Dismantling: Wooden palisade fencing

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Carpenter 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 927.00

    27.00

    Per Meter : Rs 73.21

    189.00

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 73.21

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Rft Rs. 1,116.00

    50 Rft Rs. 1,116.00

    04-38Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 5 CwtSpec. No :

    Dismantling iron work of trusses, sheds, water tanks, etc excluding cutting of rivets

    (British)

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 89 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Coolie 900.00 3.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,545.00

    45.00

    Cost Per 100 Kg: 725.40

    315.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 Kg: 725.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    5 Cwt Rs. 1,860.00

    5 Cwt Rs. 1,860.00

    04-39Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 12 CwtSpec. No :

    Dismantling rolled steel beams or iron rails etc.

    (British)

    LABOUR

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,545.00

    45.00

    Cost Per 100 Kg: 305.04

    315.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 Kg: 305.04

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    12 Cwt Rs. 1,860.00

    12 Cwt Rs. 1,860.00

    04-40Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Dismantling iron latrine

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Fitter II 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Cost Per Each: 744.00

    126.00

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 744.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 744.00

    Each Rs. 744.00

    04-41Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Each/25mm DSpec. No :

    Dismantling tees, bends or sluice valves upto 12" i/d

    (British)

    LABOUR

    Coolie 3.00 0.010 300.00 DayDay 1

    Fitter II 6.00 0.010 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 9.27

    0.27

    Cost Per Ea/25mm D: 11.16

    1.89

    Composite Rates Per :

    Labour Rates Per : Cost Per Ea/25mm D: 11.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each/25mm D Rs. 11.16

    Each/25mm D Rs. 11.16

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 90 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    04-42-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Dismantling water column : BG

    (British)

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 4,326.00

    126.00

    Cost Per Each: 5,208.00

    882.00

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 5,208.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 5,208.00

    Each Rs. 5,208.00

    04-42-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Dismantling water column : MG or NG

    (British)

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 1,950.00 6.500 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,935.50

    85.50

    Cost Per Each: 3,534.00

    598.50

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 3,534.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 3,534.00

    Each Rs. 3,534.00

    04-43Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 230 RftSpec. No :

    Dismantling all type of wire fencing, including rolling wire into bundles and collecting

    material

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Per Meter : Rs 10.61

    126.00

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 10.61

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    230 Rft Rs. 744.00

    230 Rft Rs. 744.00

    04-44Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling wire netting of tennis courts and frame work

    (British)

    LABOUR

    Coolie 120.00 0.400 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 123.60

    3.60

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 91 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Per SQM : Rs 16.01

    25.20

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 16.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 148.80

    100 Sft Rs. 148.80

    04-45Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling cloth ceiling and supporting timber

    (British)

    LABOUR

    Coolie 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 231.75

    6.75

    Per SQM : Rs 30.02

    47.25

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 30.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 279.00

    100 Sft Rs. 279.00

    04-46Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dismantling and removing road metalling

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Per CUM : Rs 262.74

    126.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 262.74

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 744.00

    100 Cft Rs. 744.00

    04-47Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling & removing road pavement etc including screening & stacking of

    by-products upto 50m.

    (British)

    LABOUR

    Coolie 3,936.00 13.120 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 4,054.08

    118.08

    Per SQM : Rs 525.16

    826.56

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 525.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,880.64

    100 Sft Rs. 4,880.64

    04-48-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 500 SftSpec. No :

    Removing from walls: Mud plaster

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 92 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Per SQM : Rs 8.01

    63.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 8.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    500 Sft Rs. 372.00

    500 Sft Rs. 372.00

    04-48-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 250 SftSpec. No :

    Removing from walls: Cement or lime plaster

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Per SQM : Rs 16.01

    63.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 16.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    250 Sft Rs. 372.00

    250 Sft Rs. 372.00

    04-49-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Scraping : White wash or colour wash

    (British)

    LABOUR

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 77.25

    2.25

    Per SQM : Rs 10.01

    15.75

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 10.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 93.00

    100 Sft Rs. 93.00

    04-49-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Scraping : Ordinary distemper, oil bound distemper or paint off wall

    (British)

    LABOUR

    Coolie 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 231.75

    6.75

    Per SQM : Rs 30.02

    47.25

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 30.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 279.00

    100 Sft Rs. 279.00

    04-50Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dismantling glazed or accoustics tiles etc

    (British)

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 93 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 927.00

    27.00

    Per SQM : Rs 120.08

    189.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 120.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,116.00

    100 Sft Rs. 1,116.00

    04-51Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Scraping boulders.

    (British)

    LABOUR

    Coolie 1,019.70 3.399 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,050.29

    30.59

    Per CUM : Rs 446.53

    214.14

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 446.53

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,264.43

    100 Cft Rs. 1,264.43

    04-52Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cleaning mortar of old stones to be used in masonry

    (British)

    LABOUR

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,081.50

    31.50

    Per CUM : Rs 459.80

    220.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 459.80

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,302.00

    100 Cft Rs. 1,302.00

    04-53Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit PointSpec. No :

    Dismantling light, fan and call bell point including casing, capping/strip open type

    complete

    (British)

    LABOUR

    Mason 6.00 0.010 600.00 DayDay 1

    Electrician II 30.00 0.050 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 37.08

    1.08

    Cost Per Point: 44.64

    7.56

    Composite Rates Per :

    Labour Rates Per : Cost Per Point: 44.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Point Rs. 44.64

    Point Rs. 44.64

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 94 of 969

  • Chapter # : 04 DISMANTLING (DEMOLITION)

    04-54Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit PointSpec. No :

    Dismantling plug point & making good damaged surface (building portion)

    (British)

    LABOUR

    Mason 6.00 0.010 600.00 DayDay 1

    Electrician II 24.00 0.040 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 30.90

    0.90

    Cost Per Point: 37.20

    6.30

    Composite Rates Per :

    Labour Rates Per : Cost Per Point: 37.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Point Rs. 37.20

    Point Rs. 37.20

    04-55-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Dismantle GI/MS conduit/GI flexible/PVC pipes or conduit wiring of all sizes : On

    surface

    (British)

    LABOUR

    Mason 1.46 0.002 600.00 DayDay 1

    Electrician II 5.49 0.009 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 7.16

    0.21

    Per Meter : Rs 28.27

    1.46

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 28.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 8.62

    Rft Rs. 8.62

    04-55-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Dismantle GI/MS conduit/GI flexible/PVC pipes or conduit wiring of all sizes :

    Recessed in wall

    (British)

    LABOUR

    Mason 3.66 0.006 600.00 DayDay 1

    Electrician II 7.32 0.012 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 11.30

    0.33

    Per Meter : Rs 44.64

    2.30

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 44.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 13.61

    Rft Rs. 13.61

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 95 of 969

  • Chapter # : 05 MORTAR

    05-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime Sand Mortar 1 : 2 (one Lime: 2 Sand)

    (British)

    MATERIAL

    Sand 1,710.00 95.000 1,800.00 CftCft 100

    Slaked Lime 4,750.00 19.000 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    63.57 32.300 196.80 CftCft 100

    Total Material % 64.82 6,523.57

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 14.18 1,158.75

    33.75

    Per CUM : Rs 3,280.21

    1,606.20

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 9,288.52

    100 Cft Rs. 1,395.00

    05-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime Sand Mortar 1 : 3 (one Lime: 3 Sand)

    (British)

    MATERIAL

    Sand 1,926.00 107.000 1,800.00 CftCft 100

    Slaked Lime 3,575.00 14.300 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    47.82 24.300 196.80 CftCft 100

    Total Material % 63.19 5,548.82

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 15.81 1,158.75

    33.75

    Per CUM : Rs 2,863.70

    1,401.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 8,109.08

    100 Cft Rs. 1,395.00

    05-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime Surkhi Mortar 1 : 1-1/2 (one Lime: 1-1/2 Surkhi)

    (British)

    MATERIAL

    Surkhi 51.10 73.000 70.00 CftCft 100

    Slaked Lime 4,900.00 19.600 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    65.53 33.300 196.80 CftCft 100

    Total Material % 62.08 5,016.63

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 96 of 969

  • Chapter # : 05 MORTAR

    Total Labour

    Sundries (Labour Only): %3

    % 16.92 1,158.75

    33.75

    Per CUM : Rs 2,636.29

    1,289.74

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 7,465.13

    100 Cft Rs. 1,395.00

    05-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime Surkhi Mortar 1 : 2 (one Lime: 2 Surkhi)

    (British)

    MATERIAL

    Surkhi 57.40 82.000 70.00 CftCft 100

    Slaked Lime 4,100.00 16.400 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    54.91 27.900 196.80 CftCft 100

    Total Material % 59.98 4,212.31

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.02 1,158.75

    33.75

    Per CUM : Rs 2,292.59

    1,120.83

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 6,491.89

    100 Cft Rs. 1,395.00

    05-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime Surkhi Mortar 1 : 3 (one Lime: 3 Surkhi)

    (British)

    MATERIAL

    Surkhi 64.40 92.000 70.00 CftCft 100

    Slaked Lime 3,100.00 12.400 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    41.52 21.100 196.80 CftCft 100

    Total Material % 56.26 3,205.92

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.74 1,158.75

    33.75

    Per CUM : Rs 1,862.56

    909.49

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 5,274.17

    100 Cft Rs. 1,395.00

    05-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime Sand And Surkhi Mortar 1 : 1 : 1 (one Lime: 1 Sand And : 1 Surkhi)

    (British)

    MATERIAL

    Sand 725.94 40.330 1,800.00 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 97 of 969

  • Chapter # : 05 MORTAR

    Surkhi 28.23 40.330 70.00 CftCft 100

    Slaked Lime 4,032.50 16.130 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    53.96 27.420 196.80 CftCft 100

    Total Material % 61.67 4,840.63

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.33 1,158.75

    33.75

    Per CUM : Rs 2,561.08

    1,252.78

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 7,252.17

    100 Cft Rs. 1,395.00

    05-07Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime Sand And Surkhi Mortar 1 : 2 : 1 (one Lime: 2 Sand And : 1 Surkhi)

    (British)

    MATERIAL

    Sand 1,089.00 60.500 1,800.00 CftCft 100

    Surkhi 21.17 30.250 70.00 CftCft 100

    Slaked Lime 3,002.50 12.010 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    40.48 20.570 196.80 CftCft 100

    Total Material % 59.80 4,153.16

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.20 1,158.75

    33.75

    Per CUM : Rs 2,267.32

    1,108.41

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 6,420.32

    100 Cft Rs. 1,395.00

    05-08Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime, Cement And Sand Mortar 1 : 1 : 3 (one Lime: One Cement And : 3 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 9,963.10 23.170 430.00 BagBag 1

    Sand 1,501.20 83.400 1,800.00 CftCft 100

    Slaked Lime 2,780.00 11.120 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    37.20 18.900 196.80 CftCft 100

    Cartage of cement for average 5

    miles lead

    47.27 23.170 2.04 CwtCwt 1

    Total Material % 70.47 14,328.76

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 8.53 1,158.75

    33.75

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 98 of 969

  • Chapter # : 05 MORTAR

    Per CUM : Rs 6,615.43

    3,245.29

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 18,732.80

    100 Cft Rs. 1,395.00

    05-09Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime, Cement And Sand Mortar 1 : 1 : 4 (one Lime: One Cement And : 4 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 8,299.00 19.300 430.00 BagBag 1

    Sand 1,667.52 92.640 1,800.00 CftCft 100

    Slaked Lime 2,315.00 9.260 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    30.98 15.740 196.80 CftCft 100

    Cartage of cement for average 5

    miles lead

    39.37 19.300 2.04 CwtCwt 1

    Total Material % 69.66 12,351.87

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 9.34 1,158.75

    33.75

    Per CUM : Rs 5,770.69

    2,830.14

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,340.76

    100 Cft Rs. 1,395.00

    05-10Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime, Cement And Sand Mortar 1 : 1 : 5 (one Lime: One Cement And : 5 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 7,116.50 16.550 430.00 BagBag 1

    Sand 1,787.40 99.300 1,800.00 CftCft 100

    Slaked Lime 1,985.00 7.940 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    26.57 13.500 196.80 CftCft 100

    Cartage of cement for average 5

    miles lead

    33.76 16.550 2.04 CwtCwt 1

    Total Material % 68.92 10,949.23

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.08 1,158.75

    33.75

    Per CUM : Rs 5,171.33

    2,535.59

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,643.57

    100 Cft Rs. 1,395.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 99 of 969

  • Chapter # : 05 MORTAR

    05-11Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime, Cement And Sand Mortar 1 : 1 : 6 (one Lime: One Cement And : 6 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 6,235.00 14.500 430.00 BagBag 1

    Sand 1,872.00 104.000 1,800.00 CftCft 100

    Slaked Lime 1,740.00 6.960 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    23.28 11.830 196.80 CftCft 100

    Cartage of cement for average 5

    miles lead

    29.58 14.500 2.04 CwtCwt 1

    Total Material % 68.24 9,899.86

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.76 1,158.75

    33.75

    Per CUM : Rs 4,722.93

    2,315.22

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 13,373.83

    100 Cft Rs. 1,395.00

    05-12Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime, Cement And Sand Mortar 1 : 1 : 7 (one Lime: One Cement And : 7sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 5,572.80 12.960 430.00 BagBag 1

    Sand 1,962.00 109.000 1,800.00 CftCft 100

    Slaked Lime 1,555.00 6.220 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    20.80 10.570 196.80 CftCft 100

    Cartage of cement for average 5

    miles lead

    26.44 12.960 2.04 CwtCwt 1

    Total Material % 67.67 9,137.04

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.33 1,158.75

    33.75

    Per CUM : Rs 4,396.97

    2,155.03

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,450.82

    100 Cft Rs. 1,395.00

    05-13Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime, Cement And Sand Mortar 1 : 1 : 8 (one Lime: One Cement And : 8 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 4,910.60 11.420 430.00 BagBag 1

    Sand 1,980.00 110.000 1,800.00 CftCft 100

    Slaked Lime 1,370.00 5.480 250.00 MdsMds 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 100 of 969

  • Chapter # : 05 MORTAR

    Cartage of un-slaked lime for

    average 5 mile lead

    18.34 9.320 196.80 CftCft 100

    Cartage of cement for average 5

    miles lead

    23.30 11.420 2.04 CwtCwt 1

    Total Material % 66.93 8,302.24

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.07 1,158.75

    33.75

    Per CUM : Rs 4,040.25

    1,979.72

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 11,440.71

    100 Cft Rs. 1,395.00

    05-14Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime, Cement And Sand Mortar 1 : 1 : 9 (one Lime: One Cement And : 9 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 4,549.40 10.580 430.00 BagBag 1

    Sand 2,052.00 114.000 1,800.00 CftCft 100

    Slaked Lime 1,270.00 5.080 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    17.00 8.640 196.80 CftCft 100

    Cartage of cement for average 5

    miles lead

    21.58 10.580 2.04 CwtCwt 1

    Total Material % 66.54 7,909.99

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.46 1,158.75

    33.75

    Per CUM : Rs 3,872.64

    1,897.35

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 10,966.08

    100 Cft Rs. 1,395.00

    05-15Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lime, Cement And Sand Mortar 1 : 1 : 10 (one Lime: One Cement And : 10 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 4,192.50 9.750 430.00 BagBag 1

    Sand 2,106.00 117.000 1,800.00 CftCft 100

    Slaked Lime 1,170.00 4.680 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    15.67 7.960 196.80 CftCft 100

    Cartage of cement for average 5

    miles lead

    19.89 9.750 2.04 CwtCwt 1

    Total Material % 66.09 7,504.06

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 101 of 969

  • Chapter # : 05 MORTAR

    Total Labour

    Sundries (Labour Only): %3

    % 12.91 1,158.75

    33.75

    Per CUM : Rs 3,699.18

    1,812.10

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 10,474.91

    100 Cft Rs. 1,395.00

    05-16Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement, Lime And Sand Mortar 1 : 2 : 6 (one Cement: 2 Lime And : 6 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 4,975.10 11.570 430.00 BagBag 1

    Sand 1,499.40 83.300 1,800.00 CftCft 100

    Slaked Lime 2,740.00 10.960 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    36.70 18.650 196.80 CftCft 100

    Cartage of cement for average 5

    miles lead

    23.60 11.570 2.04 CwtCwt 1

    Total Material % 67.78 9,274.81

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.22 1,158.75

    33.75

    Per CUM : Rs 4,455.84

    2,183.96

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,617.52

    100 Cft Rs. 1,395.00

    05-17Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement, Lime And Sand Mortar 1 : 2 : 9 (one Cement: 2 Lime And : 9 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 4,282.80 9.960 430.00 BagBag 1

    Sand 1,741.86 96.770 1,800.00 CftCft 100

    Slaked Lime 2,150.00 8.600 250.00 MdsMds 1

    Cartage of un-slaked lime for

    average 5 mile lead

    28.77 14.620 196.80 CftCft 100

    Cartage of cement for average 5

    miles lead

    20.32 9.960 2.04 CwtCwt 1

    Total Material % 66.85 8,223.75

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.15 1,158.75

    33.75

    Per CUM : Rs 4,006.71

    1,963.24

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 492.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 11,345.74

    100 Cft Rs. 1,395.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 102 of 969

  • Chapter # : 05 MORTAR

    05-18Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Sand Mortar 1 : 1 (one Cement: One Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 24,940.00 58.000 430.00 BagBag 1

    Sand 1,260.00 70.000 1,800.00 CftCft 100

    Cartage of cement for average 5

    miles lead

    118.32 58.000 2.04 CwtCwt 1

    Total Material % 73.49 26,318.32

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 5.51 927.00

    27.00

    Per CUM : Rs 11,640.14

    5,715.85

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 32,961.17

    100 Cft Rs. 1,116.00

    05-19Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Sand Mortar 1 : 1-1/2 (one Cement: 1-1/2 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 20,210.00 47.000 430.00 BagBag 1

    Sand 1,527.12 84.840 1,800.00 CftCft 100

    Cartage of cement for average 5

    miles lead

    95.88 47.000 2.04 CwtCwt 1

    Total Material % 72.99 21,833.00

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 6.01 927.00

    27.00

    Per CUM : Rs 9,723.52

    4,773.93

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 27,533.93

    100 Cft Rs. 1,116.00

    05-20Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Sand Mortar 1 : 2 (one Cement: 2 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 17,157.00 39.900 430.00 BagBag 1

    Sand 1,723.68 95.760 1,800.00 CftCft 100

    Cartage of cement for average 5

    miles lead

    81.40 39.900 2.04 CwtCwt 1

    Total Material % 72.56 18,962.08

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 103 of 969

  • Chapter # : 05 MORTAR

    Total Labour

    Sundries (Labour Only): %3

    % 6.44 927.00

    27.00

    Per CUM : Rs 8,496.76

    4,171.04

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 24,060.11

    100 Cft Rs. 1,116.00

    05-21Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Sand Mortar 1 : 2-1/2 (one Cement: 2-1/2 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 14,594.20 33.940 430.00 BagBag 1

    Sand 1,832.40 101.800 1,800.00 CftCft 100

    Cartage of cement for average 5

    miles lead

    69.24 33.940 2.04 CwtCwt 1

    Total Material % 72.07 16,495.84

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 6.93 927.00

    27.00

    Per CUM : Rs 7,442.91

    3,653.13

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 21,075.96

    100 Cft Rs. 1,116.00

    05-22Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Sand Mortar 1 : 3 (one Cement: 3 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 12,508.70 29.090 430.00 BagBag 1

    Sand 1,919.88 106.660 1,800.00 CftCft 100

    Cartage of cement for average 5

    miles lead

    59.34 29.090 2.04 CwtCwt 1

    Total Material % 71.55 14,487.92

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 7.45 927.00

    27.00

    Per CUM : Rs 6,584.92

    3,231.46

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 18,646.39

    100 Cft Rs. 1,116.00

    05-23Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Sand Mortar 1 : 4 (one Cement: 4 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 9,902.90 23.030 430.00 BagBag 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 104 of 969

  • Chapter # : 05 MORTAR

    Sand 2,007.00 111.500 1,800.00 CftCft 100

    Cartage of cement for average 5

    miles lead

    46.98 23.030 2.04 CwtCwt 1

    Total Material % 70.68 11,956.88

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 8.32 927.00

    27.00

    Per CUM : Rs 5,503.38

    2,699.95

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,583.83

    100 Cft Rs. 1,116.00

    05-24Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Sand Mortar 1 : 5 (one Cement: 5 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 8,385.00 19.500 430.00 BagBag 1

    Sand 2,106.00 117.000 1,800.00 CftCft 100

    Cartage of cement for average 5

    miles lead

    39.78 19.500 2.04 CwtCwt 1

    Total Material % 70.02 10,530.78

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 8.98 927.00

    27.00

    Per CUM : Rs 4,894.00

    2,400.46

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 13,858.24

    100 Cft Rs. 1,116.00

    05-25Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Sand Mortar 1 : 6 (one Cement: 6 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 7,095.00 16.500 430.00 BagBag 1

    Sand 2,138.40 118.800 1,800.00 CftCft 100

    Cartage of cement for average 5

    miles lead

    33.66 16.500 2.04 CwtCwt 1

    Total Material % 69.27 9,267.06

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 9.73 927.00

    27.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 105 of 969

  • Chapter # : 05 MORTAR

    Per CUM : Rs 4,354.00

    2,135.08

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,329.14

    100 Cft Rs. 1,116.00

    05-26Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Sand Mortar 1 : 7 (one Cement: 7 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 6,235.00 14.500 430.00 BagBag 1

    Sand 2,192.40 121.800 1,800.00 CftCft 100

    Cartage of cement for average 5

    miles lead

    29.58 14.500 2.04 CwtCwt 1

    Total Material % 68.69 8,456.98

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.31 927.00

    27.00

    Per CUM : Rs 4,007.85

    1,964.97

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 11,348.95

    100 Cft Rs. 1,116.00

    05-27Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Sand Mortar 1 : 8 (one Cement: 8 Sand)

    (British)

    MATERIAL

    Ordinary Portland Cement 5,516.90 12.830 430.00 BagBag 1

    Sand 2,216.52 123.140 1,800.00 CftCft 100

    Cartage of cement for average 5

    miles lead

    26.17 12.830 2.04 CwtCwt 1

    Total Material % 68.10 7,759.59

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.90 927.00

    27.00

    Per CUM : Rs 3,709.85

    1,818.51

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 10,505.11

    100 Cft Rs. 1,116.00

    05-28Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Clay Mortar.

    (British)

    MATERIAL

    Cartage mannually including

    loading and un-loading upto 5

    chain

    331.67 100.000 331.67 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 106 of 969

  • Chapter # : 05 MORTAR

    Total Material % 13.22 331.67

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 65.78 1,622.25

    47.25

    Per CUM : Rs 831.42

    400.40

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 689.70

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,354.32

    100 Cft Rs. 1,953.00

    05-29Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Clay Mortar Mixed With Chipped Bhoosa Or Straw.

    (British)

    MATERIAL

    Cartage mannually including

    loading and un-loading upto 5

    chain

    331.67 100.000 331.67 CftCft 100

    Chopped Bhoosa @ 1 Seer per

    Cft

    26.88 2.500 10.75 MdsMds 1

    Total Material % 14.09 358.54

    LABOUR

    Bhishti 375.00 1.250 300.00 DayDay 1

    Beldar 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 64.91 1,622.25

    47.25

    Per CUM : Rs 842.90

    406.04

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 689.70

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,386.84

    100 Cft Rs. 1,953.00

    05-30Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 200 CftSpec. No :

    Clay Mortar Mixed With Cow-dung 1 : 1 (1 Clay: 1 Cow Dung).

    (British)

    MATERIAL

    Cow Dung 3,333.33 100.000 33.33 CftCft 1

    Cartage mannually including

    loading and un-loading upto 5

    chain

    331.67 100.000 331.67 CftCft 100

    Chopped Bhoosa @ 1 Seer per

    Cft

    26.88 2.500 10.75 MdsMds 1

    Total Material % 52.53 3,691.87

    LABOUR

    Bhishti 450.00 1.500 300.00 DayDay 1

    Beldar 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.47 1,699.50

    49.50

    Per CUM : Rs 1,150.05

    1,121.79

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 361.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    200 Cft Rs. 6,513.17

    200 Cft Rs. 2,046.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 107 of 969

  • Chapter # : 05 MORTAR

    05-31Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    White Cement And Sand Mortar1 : 3 (1 White Cement 3 Sand)

    (British)

    MATERIAL

    Sand 1,919.88 106.660 1,800.00 CftCft 100

    White Cement 19,781.20 29.090 680.00 BagBag 1

    Cartage of cement for average 5

    miles lead

    59.34 29.090 2.04 CwtCwt 1

    Total Material % 72.98 21,760.42

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 6.02 927.00

    27.00

    Per CUM : Rs 9,692.51

    4,758.69

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 27,446.11

    100 Cft Rs. 1,116.00

    05-32Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coloured Cement Mortar Made By Mixing White Cement And Pigment Of Approved

    Shade (1 White Cement Mixed With Pigment Of Approved Shade: 2 Sand)

    (British)

    MATERIAL

    Sand 1,723.68 95.760 1,800.00 CftCft 100

    White Cement 27,132.00 39.900 680.00 BagBag 1

    Pigment for flooring 50,785.00 203.140 250.00 KgKg 1

    Cartage of cement 89.54 43.890 2.04 CwtCwt 1

    Total Material % 75.15 79,730.22

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 3.85 927.00

    27.00

    Per CUM : Rs 34,463.46

    16,932.35

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 97,589.56

    100 Cft Rs. 1,116.00

    05-33Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    White Cement And Sand Mortar1 : 2 (1 White Cement 2 Sand)

    (British)

    MATERIAL

    Sand 1,723.68 95.760 1,800.00 CftCft 100

    White Cement 27,132.00 39.900 680.00 BagBag 1

    Cartage of cement 81.40 39.900 2.04 CwtCwt 1

    Total Material % 73.71 28,937.08

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 108 of 969

  • Chapter # : 05 MORTAR

    Total Labour

    Sundries (Labour Only): %3

    % 5.29 927.00

    27.00

    Per CUM : Rs 12,759.15

    6,265.79

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 36,129.86

    100 Cft Rs. 1,116.00

    05-34Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coloured Cement Mortar Made By Mixing Grey Cement And Pigment Of Approved

    Shade (1 Grey Cement Mixed With Pigment Of Approved Shade: 2 Sand)

    (British)

    MATERIAL

    Sand 1,723.68 95.760 1,800.00 CftCft 100

    White Cement 27,132.00 39.900 680.00 BagBag 1

    Pigment for flooring 50,785.00 203.140 250.00 KgKg 1

    Cartage of cement 89.54 43.890 2.04 CwtCwt 1

    Total Material % 75.15 79,730.22

    LABOUR

    Bhishti 300.00 1.000 300.00 DayDay 1

    Beldar 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 3.85 927.00

    27.00

    Per CUM : Rs 34,463.46

    16,932.35

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 97,589.56

    100 Cft Rs. 1,116.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 109 of 969

  • Chapter # : 06 CONCRETE

    06-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Mud concrete in foundation using brick ballast or stone ballast 1.5" gauge to 2"

    guage

    (British)

    MATERIAL

    Brick Ballast /Stone Ballast 1,260.00 100.000 1,260.00 CftCft 100

    Mud / Clay 337.50 50.000 675.00 CftCft 100

    Total Material % 41.15 1,597.50

    LABOUR

    Mason 78.00 0.130 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.85 1,393.59

    40.59

    Per CUM : Rs 1,275.11

    619.61

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 592.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 3,610.70

    100 Cft Rs. 1,677.72

    06-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dry rammed shingle brick ballast or stone ballast 1.5" to 2" guage

    (British)

    MATERIAL

    Brick Ballast /Stone Ballast 1,386.00 110.000 1,260.00 CftCft 100

    Total Material % 46.08 1,386.00

    LABOUR

    Coolie 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.92 927.00

    27.00

    Per CUM : Rs 986.36

    480.06

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,793.06

    100 Cft Rs. 1,116.00

    06-03-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and

    cleaned) in foundation & plinth (Ratio 1:3:6)

    (British)

    MATERIAL

    Ordinary Portland Cement 5,590.00 13.000 430.00 BagBag 1

    Sand 828.00 46.000 1,800.00 CftCft 100

    Brick Aggregate 1,214.40 92.000 1,320.00 CftCft 100

    Total Material % 61.50 7,632.40

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.50 1,854.00

    54.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 110 of 969

  • Chapter # : 06 CONCRETE

    Per CUM : Rs 4,049.61

    1,980.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 788.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 11,467.20

    100 Cft Rs. 2,232.00

    06-03-BItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and

    cleaned) in foundation & plinth (Ratio 1:4:8)

    (British)

    MATERIAL

    Brick Ballast /Stone Ballast 1,209.60 96.000 1,260.00 CftCft 100

    Ordinary Portland Cement 3,870.00 9.000 430.00 BagBag 1

    Sand 864.00 48.000 1,800.00 CftCft 100

    Total Material % 58.33 5,943.60

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.67 1,854.00

    54.00

    Per CUM : Rs 3,327.97

    1,626.16

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 788.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 9,423.76

    100 Cft Rs. 2,232.00

    06-03-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and

    cleaned) in foundation & plinth (Ratio 1:5:10)

    (British)

    MATERIAL

    Brick Ballast /Stone Ballast 1,234.80 98.000 1,260.00 CftCft 100

    Ordinary Portland Cement 3,354.00 7.800 430.00 BagBag 1

    Sand 864.00 48.000 1,800.00 CftCft 100

    Total Material % 57.14 5,452.80

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.86 1,854.00

    54.00

    Per CUM : Rs 3,118.25

    1,523.09

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 788.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 8,829.89

    100 Cft Rs. 2,232.00

    06-03-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and

    cleaned) in foundation & plinth (Ratio 1:6:12)

    (British)

    MATERIAL

    Brick Ballast /Stone Ballast 1,234.80 98.000 1,260.00 CftCft 100

    Ordinary Portland Cement 2,838.00 6.600 430.00 BagBag 1

    Sand 882.00 49.000 1,800.00 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 111 of 969

  • Chapter # : 06 CONCRETE

    Total Material % 55.75 4,954.80

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 23.25 1,854.00

    54.00

    Per CUM : Rs 2,905.45

    1,418.51

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 788.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 8,227.31

    100 Cft Rs. 2,232.00

    06-03-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and

    cleaned) in foundation & plinth (Ratio 1:6:18)

    (British)

    MATERIAL

    Brick Ballast /Stone Ballast 1,411.20 112.000 1,260.00 CftCft 100

    Ordinary Portland Cement 2,150.00 5.000 430.00 BagBag 1

    Sand 666.00 37.000 1,800.00 CftCft 100

    Total Material % 53.30 4,227.20

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 25.70 1,854.00

    54.00

    Per CUM : Rs 2,594.54

    1,265.71

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 788.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 7,346.91

    100 Cft Rs. 2,232.00

    06-03-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and

    cleaned) in foundation & plinth (Ratio 1:7:20)

    (British)

    MATERIAL

    Brick Ballast /Stone Ballast 1,398.60 111.000 1,260.00 CftCft 100

    Ordinary Portland Cement 1,935.00 4.500 430.00 BagBag 1

    Sand 702.00 39.000 1,800.00 CftCft 100

    Total Material % 52.56 4,035.60

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.44 1,854.00

    54.00

    Per CUM : Rs 2,512.67

    1,225.48

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 788.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 7,115.08

    100 Cft Rs. 2,232.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 112 of 969

  • Chapter # : 06 CONCRETE

    06-04-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra on Item 3 above, for sedimentation tank or filter beds in PHE works (in bed)

    (British)

    LABOUR

    Coolie 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 927.00

    27.00

    Per CUM : Rs 394.11

    189.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,116.00

    100 Cft Rs. 1,116.00

    06-04-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra on Item 3 above, for sedimentation tank or filter beds in PHE works (On slope)

    (British)

    LABOUR

    Coolie 1,350.00 4.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,390.50

    40.50

    Per CUM : Rs 591.17

    283.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 591.17

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,674.00

    100 Cft Rs. 1,674.00

    06-05-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Plain Cement Conrete including placing, compacting, finishing & curing (Ratio

    1:1:2)

    (British)

    MATERIAL

    Ordinary Portland Cement 13,545.00 31.500 430.00 BagBag 1

    Sand 702.00 39.000 1,800.00 CftCft 100

    Crushed Aggregate 2,106.00 78.000 2,700.00 CftCft 100

    Total Material % 64.11 16,353.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,062.00 3.540 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 9.50 1,708.77

    49.77

    EQUIPMENT

    Concrete Mixer 1 Bag 778.80 1.416 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 5.38 1,373.10

    Per CUM : Rs 8,300.98

    4,070.87

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 726.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 23,505.74

    100 Cft Rs. 2,057.16

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 113 of 969

  • Chapter # : 06 CONCRETE

    06-05-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Plain Cement Concrete including placing, compacting, finishing & curing (Ratio

    1:1.5:1.5)

    (British)

    MATERIAL

    Ordinary Portland Cement 13,545.00 31.500 430.00 BagBag 1

    Sand 1,044.00 58.000 1,800.00 CftCft 100

    Crushed Aggregate 1,566.00 58.000 2,700.00 CftCft 100

    Total Material % 63.99 16,155.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,062.00 3.540 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 9.57 1,708.77

    49.77

    EQUIPMENT

    Concrete Mixer 1 Bag 778.80 1.416 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 5.44 1,373.10

    Per CUM : Rs 8,216.37

    4,029.29

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 726.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 23,266.16

    100 Cft Rs. 2,057.16

    06-05-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Plain Cement Concrete including placing, compacting, finishing & curing (Ratio

    1:1.5:3)

    (British)

    MATERIAL

    Ordinary Portland Cement 9,675.00 22.500 430.00 BagBag 1

    Sand 756.00 42.000 1,800.00 CftCft 100

    Crushed Aggregate 2,268.00 84.000 2,700.00 CftCft 100

    Total Material % 61.35 12,699.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,062.00 3.540 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.01 1,708.77

    49.77

    EQUIPMENT

    Concrete Mixer 1 Bag 778.80 1.416 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 6.63 1,373.10

    Per CUM : Rs 6,739.60

    3,303.53

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 726.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 19,084.40

    100 Cft Rs. 2,057.16

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 114 of 969

  • Chapter # : 06 CONCRETE

    06-05-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Plain Cement Concrete including placing, compacting, finishing & curing (Ratio

    1:2:3)

    (British)

    MATERIAL

    Ordinary Portland Cement 9,030.00 21.000 430.00 BagBag 1

    Sand 936.00 52.000 1,800.00 CftCft 100

    Crushed Aggregate 2,106.00 78.000 2,700.00 CftCft 100

    Total Material % 60.74 12,072.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,062.00 3.540 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.35 1,708.77

    49.77

    EQUIPMENT

    Concrete Mixer 1 Bag 778.80 1.416 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 6.91 1,373.10

    Per CUM : Rs 6,471.68

    3,171.86

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 726.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 18,325.73

    100 Cft Rs. 2,057.16

    06-05-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Plain Cement Concrete including placing, compacting, finishing & curing (Ratio

    1:3:3)

    (British)

    MATERIAL

    Ordinary Portland Cement 7,568.00 17.600 430.00 BagBag 1

    Sand 1,188.00 66.000 1,800.00 CftCft 100

    Crushed Aggregate 1,782.00 66.000 2,700.00 CftCft 100

    Total Material % 59.02 10,538.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,062.00 3.540 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.29 1,708.77

    49.77

    EQUIPMENT

    Concrete Mixer 1 Bag 778.80 1.416 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 7.69 1,373.10

    Per CUM : Rs 5,816.19

    2,849.72

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 726.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,469.59

    100 Cft Rs. 2,057.16

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 115 of 969

  • Chapter # : 06 CONCRETE

    06-05-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Plain Cement Concrete including placing, compacting, finishing & curing (Ratio

    1:2:4)

    (British)

    MATERIAL

    Ordinary Portland Cement 7,568.00 17.600 430.00 Bag.Bag. 1

    Sand 792.00 44.000 1,800.00 CftCft 100

    Crushed Aggregate 2,376.00 88.000 2,700.00 CftCft 100

    Total Material % 59.26 10,736.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,062.00 3.540 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.16 1,708.77

    49.77

    EQUIPMENT

    Concrete Mixer 1 Bag 778.80 1.416 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 7.58 1,373.10

    Per CUM : Rs 5,900.79

    2,891.30

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 726.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,709.17

    100 Cft Rs. 2,057.16

    06-05-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Plain Cement Concrete including placing, compacting, finishing & curing (Ratio

    1:2:6)

    (British)

    MATERIAL

    Ordinary Portland Cement 5,891.00 13.700 430.00 BagBag 1

    Sand 612.00 34.000 1,800.00 CftCft 100

    Crushed Aggregate 2,754.00 102.000 2,700.00 CftCft 100

    Total Material % 57.25 9,257.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,062.00 3.540 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.26 1,708.77

    49.77

    EQUIPMENT

    Concrete Mixer 1 Bag 778.80 1.416 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 8.49 1,373.10

    Per CUM : Rs 5,268.81

    2,580.71

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 726.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,919.58

    100 Cft Rs. 2,057.16

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 116 of 969

  • Chapter # : 06 CONCRETE

    06-05-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Plain Cement Concrete including placing, compacting, finishing & curing (Ratio

    1:3:6)

    (British)

    MATERIAL

    Ordinary Portland Cement 5,590.00 13.000 430.00 BagBag 1

    Sand 828.00 46.000 1,800.00 CftCft 100

    Crushed Aggregate 2,484.00 92.000 2,700.00 CftCft 100

    Total Material % 56.69 8,902.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,062.00 3.540 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.57 1,708.77

    49.77

    EQUIPMENT

    Concrete Mixer 1 Bag 778.80 1.416 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 8.74 1,373.10

    Per CUM : Rs 5,117.11

    2,506.16

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 726.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,490.03

    100 Cft Rs. 2,057.16

    06-05-iItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Plain Cement Concrete including placing, compacting, finishing & curing (Ratio

    1:4:8)

    (British)

    MATERIAL

    Ordinary Portland Cement 3,870.00 9.000 430.00 BagBag 1

    Sand 864.00 48.000 1,800.00 CftCft 100

    Crushed Aggregate 2,592.00 96.000 2,700.00 CftCft 100

    Total Material % 53.75 7,326.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,062.00 3.540 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 15.17 1,708.77

    49.77

    EQUIPMENT

    Concrete Mixer 1 Bag 778.80 1.416 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 10.07 1,373.10

    Per CUM : Rs 4,443.67

    2,175.20

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 726.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,583.07

    100 Cft Rs. 2,057.16

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 117 of 969

  • Chapter # : 06 CONCRETE

    06-06-a-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    RCC in roof slab, beam, column & other structural members, insitu or precast. Type

    A (1:1:2)

    (British)

    MATERIAL

    Ordinary Portland Cement 13,545.00 31.500 430.00 BagBag 1

    Sand 702.00 39.000 1,800.00 CftCft 100

    Crushed Aggregate 2,106.00 78.000 2,700.00 CftCft 100

    Nails / Screws / Clamps 404.17 2.500 161.67 KgKg 1

    Wood - Partal 550.00 0.550 1,000.00 CftCft 1

    Mobile Oil 280.00 1.000 280.00 LtrLtr 1

    Total Material % 59.88 17,587.17

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Carpenter 60.00 0.100 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 14.44 3,460.80

    100.80

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 4.68 1,375.30

    Per CUM : Rs 9,574.16

    4,687.72

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,471.35

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 27,110.98

    100 Cft Rs. 4,166.40

    06-06-a-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    RCC in roof slab, beam, column & other structural members, insitu or precast. Type

    B (1:1.5:3)

    (British)

    MATERIAL

    Ordinary Portland Cement 10,320.00 24.000 430.00 BagBag 1

    Sand 828.00 46.000 1,800.00 CftCft 100

    Crushed Aggregate 2,268.00 84.000 2,700.00 CftCft 100

    Nails / Screws / Clamps 404.17 2.500 161.67 KgKg 1

    Wood - Partal 550.00 0.550 1,000.00 CftCft 1

    Mobile Oil 280.00 1.000 280.00 LtrLtr 1

    Total Material % 57.44 14,650.17

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Carpenter 60.00 0.100 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.17 3,460.80

    100.80

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 5.39 1,375.30

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 118 of 969

  • Chapter # : 06 CONCRETE

    Per CUM : Rs 8,319.16

    4,070.95

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,471.35

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 23,557.21

    100 Cft Rs. 4,166.40

    06-06-a-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    RCC in roof slab, beam, column & other structural members, insitu or precast. Type

    C (1:2:4)

    (British)

    MATERIAL

    Ordinary Portland Cement 8,213.00 19.100 430.00 BagBag 1

    Sand 864.00 48.000 1,800.00 CftCft 100

    Crushed Aggregate 2,376.00 88.000 2,700.00 CftCft 100

    Nails / Screws / Clamps 404.17 2.500 161.67 KgKg 1

    Wood - Partal 550.00 0.550 1,000.00 CftCft 1

    Mobile Oil 280.00 1.000 280.00 LtrLtr 1

    Total Material % 55.34 12,687.17

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Carpenter 60.00 0.100 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.66 3,460.80

    100.80

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 6.00 1,375.30

    Per CUM : Rs 7,480.35

    3,658.72

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,471.35

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 21,181.98

    100 Cft Rs. 4,166.40

    06-06-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    RCC in raft foundation slab, base slab of column & ret. wall etc, not including in

    06-06. Type A (1:1:2)

    (British)

    MATERIAL

    Ordinary Portland Cement 13,459.00 31.300 430.00 BagBag 1

    Sand 702.00 39.000 1,800.00 CftCft 100

    Crushed Aggregate 2,106.00 78.000 2,700.00 CftCft 100

    Total Material % 59.03 16,267.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 14.98 3,399.00

    99.00

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 4.99 1,375.30

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 119 of 969

  • Chapter # : 06 CONCRETE

    Per CUM : Rs 8,983.77

    4,397.88

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,445.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 25,439.18

    100 Cft Rs. 4,092.00

    06-06-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    RCC in raft foundation slab, base slab of column & ret. wall etc, not including in

    06-06 Type B (1:1.5:3)

    (British)

    MATERIAL

    Ordinary Portland Cement 10,320.00 24.000 430.00 BagBag 1

    Sand 828.00 46.000 1,800.00 CftCft 100

    Crushed Aggregate 2,268.00 84.000 2,700.00 CftCft 100

    Total Material % 56.37 13,416.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.86 3,399.00

    99.00

    EQUIPMENT

    Concrete Mixer 1 Bag 778.80 1.416 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 5.77 1,373.10

    Per CUM : Rs 7,764.58

    3,798.71

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,445.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 21,986.81

    100 Cft Rs. 4,092.00

    06-06-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    RCC in raft foundation slab, base slab of column & ret. wall etc, not including in

    06-06. Type C(1:2:4)

    (British)

    MATERIAL

    Ordinary Portland Cement 7,568.00 17.600 430.00 BagBag 1

    Sand 792.00 44.000 1,800.00 CftCft 100

    Crushed Aggregate 2,376.00 88.000 2,700.00 CftCft 100

    Total Material % 52.94 10,736.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.27 3,399.00

    99.00

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 6.78 1,375.30

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 120 of 969

  • Chapter # : 06 CONCRETE

    Per CUM : Rs 6,620.33

    3,236.37

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,445.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 18,746.67

    100 Cft Rs. 4,092.00

    06-06-c-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    RCC including Precast/Prestressed in slab, beam, column, lintel, girder, etc. Type A

    (1:1:2)

    (British)

    MATERIAL

    Ordinary Portland Cement 13,545.00 31.500 430.00 BagBag 1

    Sand 702.00 39.000 1,800.00 CftCft 100

    Crushed Aggregate 2,106.00 78.000 2,700.00 CftCft 100

    Nails / Screws / Clamps 404.17 2.500 161.67 KgKg 1

    Wood - Partal 3,000.00 3.000 1,000.00 CftCft 1

    Mobile Oil 280.00 1.000 280.00 KgKg 1

    Total Material % 60.16 20,037.17

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Carpenter 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 14.71 4,017.00

    117.00

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 4.13 1,375.30

    Per CUM : Rs 10,857.53

    5,315.62

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,707.82

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 30,745.08

    100 Cft Rs. 4,836.00

    06-06-c-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    RCC including Precast/Prestressed in slab, beam. column, lintels, girder, etc. Type

    B (1:1.5:3)

    (British)

    MATERIAL

    Ordinary Portland Cement 10,320.00 24.000 430.00 BagBag 1

    Sand 828.00 46.000 1,800.00 CftCft 100

    Crushed Aggregate 2,268.00 84.000 2,700.00 CftCft 100

    Nails / Screws / Clamps 404.17 2.500 161.67 KgKg 1

    Wood - Partal 3,000.00 3.000 1,000.00 CftCft 1

    Mobile Oil 280.00 1.000 280.00 LtrLtr 1

    Total Material % 58.08 17,100.17

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Carpenter 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.25 4,017.00

    117.00

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 121 of 969

  • Chapter # : 06 CONCRETE

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 4.67 1,375.30

    Per CUM : Rs 9,602.53

    4,698.85

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,707.82

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 27,191.31

    100 Cft Rs. 4,836.00

    06-06-c-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    RCC including Precast/Prestressed slab, column, beam, lintel, girder etc. Type C

    (1:2:4).

    (British)

    MATERIAL

    Ordinary Portland Cement 7,568.00 17.600 430.00 BagBag 1

    Sand 792.00 44.000 1,800.00 CftCft 100

    Crushed Aggregate 2,376.00 88.000 2,700.00 CftCft 100

    Nails / Screws / Clamps 404.17 2.500 161.67 KgKg 1

    Wood - Partal 3,000.00 3.000 1,000.00 CftCft 1

    Mobile Oil 280.00 1.000 280.00 LtrLtr 1

    Total Material % 55.64 14,420.17

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Carpenter 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.05 4,017.00

    117.00

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 5.31 1,375.30

    Per CUM : Rs 8,457.35

    4,136.05

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,707.82

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 23,948.51

    100 Cft Rs. 4,836.00

    06-06-d-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Reinforced cement concrete work as in dams, spillways, weirs, barrages, cross

    drainage works and other hydrolic structures using crushed stone

    aggregate(screening & washing) and coarse sand i/c costof all labour and material

    (British)

    MATERIAL

    Ordinary Portland Cement 13,459.00 31.300 430.00 BagBag 1

    Sand 702.00 39.000 1,800.00 CftCft 100

    Crushed Aggregate 2,376.00 88.000 2,700.00 CftCft 100

    Bolts / Nuts / Screws 306.25 2.500 122.50 KgKg 1

    Wood - Partal 550.00 0.550 1,000.00 CftCft 1

    Oil & Grease 120.00 1.000 120.00 KgKg 1

    Total Material % 54.13 17,513.25

    LABOUR

    Mason 1,800.00 3.000 600.00 NoNo 1

    Coolie 2,250.00 7.500 300.00 NoNo 1

    Bhishti 450.00 1.500 300.00 NoNo 1

    Carpenter 1,200.00 2.000 600.00 NoNo 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 122 of 969

  • Chapter # : 06 CONCRETE

    Total Labour

    Sundries (Labour Only): %3

    % 20.62 5,871.00

    171.00

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 4.25 1,375.30

    Per CUM : Rs 10,567.27

    5,163.60

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,496.04

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 29,923.15

    100 Cft Rs. 7,068.00

    06-06-d-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Reinforced cement concrete work as in dams, spillways, weirs, barrages, cross

    drainage works and other hydrolic structures using crushed stone

    aggregate(screening & washing) and coarse sand i/c costof all labour and material

    (British)

    MATERIAL

    Ordinary Portland Cement 10,320.00 24.000 430.00 BagBag 1

    Sand 828.00 46.000 1,800.00 CftCft 100

    Crushed Aggregate 2,268.00 84.000 2,700.00 CftCft 100

    Bolts / Nuts / Screws 306.25 2.500 122.50 KgKg 1

    Wood - Partal 550.00 0.550 1,000.00 CftCft 1

    Oil & Grease 120.00 1.000 120.00 KgKg 1

    Total Material % 50.95 14,392.25

    LABOUR

    Mason 1,800.00 3.000 600.00 NoNo 1

    Coolie 2,250.00 7.500 300.00 NoNo 1

    Bhishti 450.00 1.500 300.00 NoNo 1

    Carpenter 1,200.00 2.000 600.00 NoNo 1

    Total Labour

    Sundries (Labour Only): %3

    % 23.18 5,871.00

    171.00

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 4.87 1,375.30

    Per CUM : Rs 9,233.64

    4,508.19

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,496.04

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 26,146.74

    100 Cft Rs. 7,068.00

    06-06-d-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Reinforced cement concrete work as in dams, spillways, weirs, barrages, cross

    drainage works and other hydrolic structures using crushed stone

    aggregate(screening & washing) and coarse sand i/c costof all labour and material

    (British)

    MATERIAL

    Ordinary Portland Cement 8,213.00 19.100 430.00 BagBag 1

    Sand 864.00 48.000 1,800.00 CftCft 100

    Crushed Aggregate 2,376.00 88.000 2,700.00 CftCft 100

    Bolts / Nuts / Screws 306.25 2.500 122.50 KgKg 1

    Wood - Partal 550.00 0.550 1,000.00 CftCft 1

    Oil & Grease 120.00 1.000 120.00 KgKg 1

    Total Material % 48.43 12,429.25

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 123 of 969

  • Chapter # : 06 CONCRETE

    Mason 1,800.00 3.000 600.00 NoNo 1

    Coolie 2,250.00 7.500 300.00 NoNo 1

    Bhishti 450.00 1.500 300.00 NoNo 1

    Carpenter 1,200.00 2.000 600.00 NoNo 1

    Total Labour

    Sundries (Labour Only): %3

    % 25.21 5,871.00

    171.00

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 5.36 1,375.30

    Per CUM : Rs 8,394.84

    4,095.96

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,496.04

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 23,771.51

    100 Cft Rs. 7,068.00

    06-06-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Add extra labour for RCC in 2nd & subsequent storeys

    (British)

    LABOUR

    Coolie 1,275.00 4.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,313.25

    38.25

    Per CUM : Rs 558.33

    267.75

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 558.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,581.00

    100 Cft Rs. 1,581.00

    06-07-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit CwtSpec. No :

    Supply & fabricate M.S. reinforcement for cement concrete (Plain bars)

    (British)

    MATERIAL

    Binding Wire 12.10 0.110 110.00 KgKg 1

    Steel Plain Bars 3,763.20 56.000 67.20 KgKg 1

    Total Material % 71.73 3,775.30

    LABOUR

    Coolie 75.00 0.250 300.00 DayDay 1

    Black Smith 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 7.27 231.75

    6.75

    Per Tonne : Rs 95,411.54

    840.06

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 5,491.89

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Cwt Rs. 4,847.11

    Cwt Rs. 279.00

    06-07-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit CwtSpec. No :

    Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed

    bars Grade 60)

    (British)

    MATERIAL

    Binding Wire 12.10 0.110 110.00 KgKg 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 124 of 969

  • Chapter # : 06 CONCRETE

    Rfcnt Steel: Grd-60 KSM 4,728.27 56.000 84.43 KgKg 1

    Total Material % 72.56 4,740.37

    LABOUR

    Coolie 75.00 0.250 300.00 DayDay 1

    Black Smith 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 6.44 231.75

    6.75

    Per Tonne : Rs 118,397.37

    1,042.73

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 5,491.89

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Cwt Rs. 6,014.84

    Cwt Rs. 279.00

    06-07-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit CwtSpec. No :

    Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed

    bars Grade 40)

    (British)

    MATERIAL

    Binding Wire 12.10 0.110 110.00 KgKg 1

    Rfcnt Steel: Grd-40 KSM 4,349.33 56.000 77.67 KgKg 1

    Total Material % 72.27 4,361.43

    LABOUR

    Coolie 75.00 0.250 300.00 DayDay 1

    Black Smith 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 6.73 231.75

    6.75

    Per Tonne : Rs 109,371.99

    963.15

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 5,491.89

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Cwt Rs. 5,556.33

    Cwt Rs. 279.00

    06-08Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit CwtSpec. No :

    Supplying & fixing high tensile steel wire in prestressing cables in precast girders

    (British)

    MATERIAL

    Binding Wire 12.10 0.110 110.00 KgKg 1

    High Tensile Steel 8,064.00 56.000 144.00 KgKg 1

    Total Material % 71.99 8,076.10

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Black Smith 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 7.01 463.50

    13.50

    Per Tonne : Rs 203,339.38

    1,790.48

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 10,983.78

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Cwt Rs. 10,330.08

    Cwt Rs. 558.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 125 of 969

  • Chapter # : 06 CONCRETE

    06-09Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Precast cement concrete solid or face blocks 1:2:4, including cost of templates.

    (British)

    MATERIAL

    Ordinary Portland Cement 7,568.00 17.600 430.00 BagBag 1

    Sand 792.00 44.000 1,800.00 CftCft 100

    Crushed Aggregate 2,376.00 88.000 2,700.00 CftCft 100

    Wood - Partal 430.00 0.430 1,000.00 CftCft 1

    Total Material % 61.20 11,166.00

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.80 2,781.00

    81.00

    Per CUM : Rs 5,953.66

    2,911.86

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,182.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,858.86

    100 Cft Rs. 3,348.00

    06-10Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Precast cem. concrete hollow blocks 1:2:4, including cost of templates &

    constructing wall thereof

    (British)

    MATERIAL

    Ordinary Portland Cement 4,214.00 9.800 430.00 BagBag 1

    Sand 504.00 28.000 1,800.00 CftCft 100

    Crushed Aggregate 1,512.00 56.000 2,700.00 CftCft 100

    Wood - Partal 200.00 0.200 1,000.00 CftCft 1

    Total Material % 39.79 6,430.00

    LABOUR

    Mason 2,700.00 4.500 600.00 DayDay 1

    Coolie 2,400.00 8.000 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 39.21 6,025.50

    175.50

    Per CUM : Rs 5,309.32

    2,578.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,561.73

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,034.30

    100 Cft Rs. 7,254.00

    06-11Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & fix ornamental cement jali 1:2:4 2" thick without steel.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,290.00 3.000 430.00 BagBag 1

    Sand 135.00 7.500 1,800.00 CftCft 100

    Crushed Aggregate 270.00 10.000 2,700.00 CftCft 100

    Wood - Partal 200.00 0.200 1,000.00 CftCft 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 126 of 969

  • Chapter # : 06 CONCRETE

    Total Material % 33.53 1,895.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 750.00 2.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 45.47 2,472.00

    72.00

    Per SQM : Rs 566.94

    901.95

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 320.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,268.95

    100 Sft Rs. 2,976.00

    06-12-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour for laying concrete (plain or reinforced) From 20' upto 40' height

    (British)

    LABOUR

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,236.00

    36.00

    Per CUM : Rs 525.48

    252.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 525.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,488.00

    100 Cft Rs. 1,488.00

    06-12-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour for laying concrete (plain or reinforced) For every extra10' height

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Per CUM : Rs 262.74

    126.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 262.74

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 744.00

    100 Cft Rs. 744.00

    06-13Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour for work of weirs, rails or bridges, syphons & concreting in

    superstructure

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Per CUM : Rs 131.37

    63.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 131.37

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 372.00

    100 Cft Rs. 372.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 127 of 969

  • Chapter # : 06 CONCRETE

    06-14Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    RCC spout, 2.5'x6"x5", including fixing in position

    (British)

    MATERIAL

    Ordinary Portland Cement 60.20 0.140 430.00 BagBag 1

    Sand 6.23 0.346 1,800.00 CftCft 100

    Crushed Aggregate 18.68 0.692 2,700.00 CftCft 100

    Steel (bars/rods/section) 235.01 3.000 78.33 KgKg 1

    Wood - Partal 25.00 0.025 1,000.00 CftCft 1

    Total Material % 46.01 345.12

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.99 231.75

    6.75

    Cost Per Each: 696.59

    119.72

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 279.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 696.59

    Each Rs. 279.00

    06-15Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Making holes upto 3" dia, 18" depth in cement concrete or stone masonry walls and

    repairing

    (British)

    LABOUR

    Mason 420.00 0.700 600.00 DayDay 1

    Coolie 210.00 0.700 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 648.90

    18.90

    Cost Per Each: 781.20

    132.30

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 781.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 781.20

    Each Rs. 781.20

    06-16Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour for skipping concrete in wells

    (British)

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 4,480.50

    130.50

    Per CUM : Rs 1,904.87

    913.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,904.87

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 5,394.00

    100 Cft Rs. 5,394.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 128 of 969

  • Chapter # : 06 CONCRETE

    06-17-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Nicking cement concrete surface.

    (British)

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Per SQM : Rs 40.03

    63.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 40.03

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 372.00

    100 Sft Rs. 372.00

    06-17-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Nicking lime concrete surface.

    (British)

    LABOUR

    Mason 99.00 0.165 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 101.97

    2.97

    Per SQM : Rs 13.21

    20.79

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 13.21

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 122.76

    100 Sft Rs. 122.76

    06-18-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Prepare, water and ramming surface for laying concrete (for Headworks only)

    Horizontal floor

    (British)

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 231.75

    6.75

    Per SQM : Rs 30.02

    47.25

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 30.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 279.00

    100 Sft Rs. 279.00

    06-18-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Prepare, water and ramming surface for laying concrete (for Headworks only)

    Glacis and crest

    (British)

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 129 of 969

  • Chapter # : 06 CONCRETE

    Per SQM : Rs 50.03

    78.75

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 50.03

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 465.00

    100 Sft Rs. 465.00

    06-18-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Prepare, water and ramming surface for laying concrete (for Headworks only)

    inverted filters

    (British)

    LABOUR

    Mason 75.00 0.125 600.00 DayDay 1

    Coolie 37.50 0.125 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 115.88

    3.38

    Per SQM : Rs 15.01

    23.63

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 15.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 139.50

    100 Sft Rs. 139.50

    06-19Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Providing and fixing 6" wide GI sheet 18 SWG. stopper to expansion joint.

    (British)

    MATERIAL

    G.I Sheet 63.87 0.583 109.50 KgKg 1

    Total Material % 70.80 63.87

    LABOUR

    Black Smith 3.13 0.005 600.00 DayDay 1

    Helper 1.56 0.005 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 8.20 4.83

    0.14

    Per Meter : Rs 272.57

    14.40

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 19.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 83.10

    Rft Rs. 5.81

    06-20Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Fill expansion joints with bitumen, sand & saw dust in Ratio 1:2:2

    (British)

    MATERIAL

    Sand 8.10 0.450 1,800.00 CftCft 100

    Coal Tar (in canisters) 3.96 0.055 72.00 KgKg 1

    Saw Dust 1.46 0.101 14.50 KgKg 1

    Total Material % 62.20 13.52

    LABOUR

    Coolie 3.00 0.010 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.80 3.09

    0.09

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 130 of 969

  • Chapter # : 06 CONCRETE

    Per Meter : Rs 65.88

    3.47

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 12.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 20.08

    Rft Rs. 3.72

    06-21-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Filling expansion joints with bitumen

    (British)

    MATERIAL

    Coal Tar (in canisters) 18.00 0.250 72.00 KgKg 1

    Total Material % 28.50 18.00

    LABOUR

    Coolie 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 50.50 30.90

    0.90

    Per Meter : Rs 193.45

    10.08

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 122.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 58.98

    Rft Rs. 37.20

    06-21-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Laying Asphaltic Mixture in Expansion Joints

    (British)

    LABOUR

    Coolie 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 30.90

    0.90

    Per Meter : Rs 122.02

    6.30

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 122.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 37.20

    Rft Rs. 37.20

    06-22-a-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene &

    1 coat bitumen (1.5" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 967.50 2.250 430.00 Bag.Bag. 1

    Sand 99.00 5.500 1,800.00 CftCft 100

    Crushed Aggregate 297.00 11.000 2,700.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 49.14 1,948.58

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Carpenter 90.00 0.150 600.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 131 of 969

  • Chapter # : 06 CONCRETE

    Total Labour

    Sundries (Labour Only): %3

    % 29.86 1,096.95

    31.95

    Per SQM : Rs 395.79

    632.85

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 142.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,678.39

    100 Sft Rs. 1,320.60

    06-22-a-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene &

    1 coat bitumen (2" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 1,259.90 2.930 430.00 BagBag 1

    Sand 135.00 7.500 1,800.00 CftCft 100

    Crushed Aggregate 405.00 15.000 2,700.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 52.54 2,384.98

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Carpenter 90.00 0.150 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.46 1,096.95

    31.95

    Per SQM : Rs 452.61

    724.50

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 142.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,206.43

    100 Sft Rs. 1,320.60

    06-22-a-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene &

    1 coat bitumen (3" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 1,935.00 4.500 430.00 BagBag 1

    Sand 198.00 11.000 1,800.00 CftCft 100

    Crushed Aggregate 594.00 22.000 2,700.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 56.73 3,312.08

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Carpenter 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.27 1,158.75

    33.75

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 132 of 969

  • Chapter # : 06 CONCRETE

    Per SQM : Rs 581.32

    931.79

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 150.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,402.62

    100 Sft Rs. 1,395.00

    06-22-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene &

    2 coats bitumen (1.5" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 967.50 2.250 430.00 BagBag 1

    Sand 99.00 5.500 1,800.00 CftCft 100

    Crushed Aggregate 297.00 11.000 2,700.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 55.46 2,308.58

    LABOUR

    Mason 90.00 0.150 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Carpenter 90.00 0.150 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 23.54 880.65

    25.65

    Per SQM : Rs 414.65

    664.35

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 114.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,853.59

    100 Sft Rs. 1,060.20

    06-22-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene &

    2 coats bitumen (2" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 1,259.90 2.930 430.00 BagBag 1

    Sand 135.00 7.500 1,800.00 CftCft 100

    Crushed Aggregate 405.00 15.000 2,700.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 54.76 2,744.98

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Carpenter 90.00 0.150 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 24.24 1,096.95

    31.95

    Per SQM : Rs 499.48

    800.10

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 142.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,642.03

    100 Sft Rs. 1,320.60

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 133 of 969

  • Chapter # : 06 CONCRETE

    06-22-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene &

    2 coats bitumen (3" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 1,935.00 4.500 430.00 BagBag 1

    Sand 198.00 11.000 1,800.00 CftCft 100

    Crushed Aggregate 594.00 22.000 2,700.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 58.99 3,672.08

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Carpenter 84.00 0.140 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.01 1,090.77

    31.77

    Per SQM : Rs 619.39

    993.53

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 141.30

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,756.38

    100 Sft Rs. 1,313.16

    06-23-a-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:4 (0.5"

    thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 313.90 0.730 430.00 BagBag 1

    Sand 70.20 3.900 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 37.89 969.18

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 41.11 1,004.25

    29.25

    Per SQM : Rs 256.27

    408.28

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,381.71

    100 Sft Rs. 1,209.00

    06-23-a-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:4 (0.75"

    thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 473.00 1.100 430.00 BagBag 1

    Sand 99.00 5.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 134 of 969

  • Chapter # : 06 CONCRETE

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 41.25 1,157.08

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.75 1,004.25

    29.25

    Per SQM : Rs 280.74

    447.74

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,609.07

    100 Sft Rs. 1,209.00

    06-23-a-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:3 (0.5"

    thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 395.60 0.920 430.00 BagBag 1

    Sand 63.00 3.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 39.29 1,043.68

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 39.71 1,004.25

    29.25

    Per SQM : Rs 265.97

    423.92

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,471.86

    100 Sft Rs. 1,209.00

    06-23-a-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:3 (0.75"

    thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 593.40 1.380 430.00 BagBag 1

    Sand 90.00 5.000 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 42.97 1,268.48

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 36.03 1,004.25

    29.25

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 135 of 969

  • Chapter # : 06 CONCRETE

    Per SQM : Rs 295.24

    471.13

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,743.86

    100 Sft Rs. 1,209.00

    06-23-a-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:2 (0.5"

    thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 516.00 1.200 430.00 BagBag 1

    Sand 54.00 3.000 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 41.21 1,155.08

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.79 1,004.25

    29.25

    Per SQM : Rs 280.48

    447.32

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,606.65

    100 Sft Rs. 1,209.00

    06-23-a-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 1 coat bitumen Ratio 1:2 (0.75"

    thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 791.20 1.840 430.00 BagBag 1

    Sand 81.00 4.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 45.53 1,457.28

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 33.47 1,004.25

    29.25

    Per SQM : Rs 319.82

    510.78

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,972.31

    100 Sft Rs. 1,209.00

    06-23-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:4 (0.5"

    thick)

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 136 of 969

  • Chapter # : 06 CONCRETE

    MATERIAL

    Ordinary Portland Cement 313.90 0.730 430.00 BagBag 1

    Sand 72.00 4.000 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 43.87 1,330.98

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 35.13 1,004.25

    29.25

    Per SQM : Rs 303.38

    484.26

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,819.49

    100 Sft Rs. 1,209.00

    06-23-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:4

    (0.75" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 473.00 1.100 430.00 BagBag 1

    Sand 99.00 5.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 46.27 1,517.08

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.73 1,004.25

    29.25

    Per SQM : Rs 327.61

    523.34

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,044.67

    100 Sft Rs. 1,209.00

    06-23-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:3 (0.5"

    thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 395.60 0.920 430.00 BagBag 1

    Sand 63.00 3.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 44.85 1,403.68

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 137 of 969

  • Chapter # : 06 CONCRETE

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 34.15 1,004.25

    29.25

    Per SQM : Rs 312.84

    499.52

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,907.46

    100 Sft Rs. 1,209.00

    06-23-b-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:3

    (0.75" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 593.40 1.380 430.00 BagBag 1

    Sand 90.00 5.000 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 47.54 1,628.48

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.46 1,004.25

    29.25

    Per SQM : Rs 342.11

    546.73

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,179.46

    100 Sft Rs. 1,209.00

    06-23-b-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:2 (0.5"

    thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 516.00 1.200 430.00 BagBag 1

    Sand 54.00 3.000 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 46.24 1,515.08

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.76 1,004.25

    29.25

    Per SQM : Rs 327.35

    522.92

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,042.25

    100 Sft Rs. 1,209.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 138 of 969

  • Chapter # : 06 CONCRETE

    06-23-b-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Damp proof course in c/s plaster, 1 layer polythene, 2 coats bitumen Ratio 1:2

    (0.75" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 791.20 1.840 430.00 BagBag 1

    Sand 81.00 4.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 49.46 1,817.28

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 29.54 1,004.25

    29.25

    Per SQM : Rs 366.69

    586.38

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,407.91

    100 Sft Rs. 1,209.00

    06-24-a-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:4 (0.5" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 322.50 0.750 430.00 BagBag 1

    Sand 72.00 4.000 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 38.09 979.58

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 40.91 1,004.25

    29.25

    Per SQM : Rs 257.63

    410.46

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,394.30

    100 Sft Rs. 1,209.00

    06-24-a-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:4 (0.75" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 473.00 1.100 430.00 BagBag 1

    Sand 99.00 5.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 139 of 969

  • Chapter # : 06 CONCRETE

    Total Material % 41.25 1,157.08

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.75 1,004.25

    29.25

    Per SQM : Rs 280.74

    447.74

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,609.07

    100 Sft Rs. 1,209.00

    06-24-a-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:3 (0.5" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 408.50 0.950 430.00 BagBag 1

    Sand 63.00 3.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 39.53 1,056.58

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 39.47 1,004.25

    29.25

    Per SQM : Rs 267.65

    426.63

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,487.47

    100 Sft Rs. 1,209.00

    06-24-a-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:3 (0.75" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 593.40 1.380 430.00 BagBag 1

    Sand 90.00 5.000 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 42.97 1,268.48

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 36.03 1,004.25

    29.25

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 140 of 969

  • Chapter # : 06 CONCRETE

    Per SQM : Rs 295.24

    471.13

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,743.86

    100 Sft Rs. 1,209.00

    06-24-a-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:2 (0.5" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 516.00 1.200 430.00 BagBag 1

    Sand 54.00 3.000 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 41.21 1,155.08

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.79 1,004.25

    29.25

    Per SQM : Rs 280.48

    447.32

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,606.65

    100 Sft Rs. 1,209.00

    06-24-a-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 1 coat bitumen Ratio 1:2 (0.75" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 791.20 1.840 430.00 BagBag 1

    Sand 81.00 4.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Total Material % 45.53 1,457.28

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 33.47 1,004.25

    29.25

    Per SQM : Rs 319.82

    510.78

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,972.31

    100 Sft Rs. 1,209.00

    06-24-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:4 (0.5" thick)

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 141 of 969

  • Chapter # : 06 CONCRETE

    MATERIAL

    Ordinary Portland Cement 322.50 0.750 430.00 BagBag 1

    Sand 72.00 4.000 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 43.99 1,339.58

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 35.01 1,004.25

    29.25

    Per SQM : Rs 304.50

    486.06

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,829.90

    100 Sft Rs. 1,209.00

    06-24-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:4 (0.75" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 473.00 1.100 430.00 BagBag 1

    Sand 99.00 5.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 46.27 1,517.08

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.73 1,004.25

    29.25

    Per SQM : Rs 327.61

    523.34

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,044.67

    100 Sft Rs. 1,209.00

    06-24-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:3 (0.5" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 412.80 0.960 430.00 BagBag 1

    Sand 63.00 3.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 45.07 1,420.88

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 142 of 969

  • Chapter # : 06 CONCRETE

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 33.93 1,004.25

    29.25

    Per SQM : Rs 315.08

    503.14

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,928.27

    100 Sft Rs. 1,209.00

    06-24-b-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:3 (0.75" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 593.40 1.380 430.00 BagBag 1

    Sand 90.00 5.000 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 47.54 1,628.48

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.46 1,004.25

    29.25

    Per SQM : Rs 342.11

    546.73

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,179.46

    100 Sft Rs. 1,209.00

    06-24-b-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:2 (0.5" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 516.00 1.200 430.00 BagBag 1

    Sand 54.00 3.000 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 46.24 1,515.08

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.76 1,004.25

    29.25

    Per SQM : Rs 327.35

    522.92

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,042.25

    100 Sft Rs. 1,209.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 143 of 969

  • Chapter # : 06 CONCRETE

    06-24-b-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    V. Damp proof c/s plaster, 1 layer polythene 2 coats bitumen Ratio 1:2 (0.75" thick)

    (British)

    MATERIAL

    Ordinary Portland Cement 791.20 1.840 430.00 BagBag 1

    Sand 81.00 4.500 1,800.00 CftCft 100

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Fuel Wood 36.75 0.100 367.50 MdsMds 1

    Coal Tar (in canisters) 720.00 10.000 72.00 KgKg 1

    Total Material % 49.46 1,817.28

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 29.54 1,004.25

    29.25

    Per SQM : Rs 366.69

    586.38

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,407.91

    100 Sft Rs. 1,209.00

    06-25Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Grouting concrete between the grooves of gates including shuttering

    (British)

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 4,017.00

    117.00

    Per CUM : Rs 1,707.82

    819.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,707.82

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 4,836.00

    100 Cft Rs. 4,836.00

    06-26Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 SftSpec. No :

    Chisel dressing concrete surface on sides of grooves

    (British)

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,545.00

    45.00

    Per SQM : Rs 20.01

    315.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 20.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Sft Rs. 1,860.00

    1000 Sft Rs. 1,860.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 144 of 969

  • Chapter # : 06 CONCRETE

    06-27Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Laying and ramming dry ballast or kankar

    (British)

    LABOUR

    Coolie 3,627.00 12.090 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,735.81

    108.81

    Per SQM : Rs 483.93

    761.67

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 483.93

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,497.48

    100 Sft Rs. 4,497.48

    06-28Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 NoSpec. No :

    Hoisting & placing in position RCC shelves

    (British)

    LABOUR

    Mason 1,878.00 3.130 600.00 DayDay 1

    Coolie 2,820.00 9.400 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 4,838.94

    140.94

    Cost Per No: 58.26

    986.58

    Composite Rates Per :

    Labour Rates Per : Cost Per No: 58.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No Rs. 5,825.52

    100 No Rs. 5,825.52

    06-29-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Breaking brick ballast, screening & stacking 2" ring

    (British)

    LABOUR

    Coolie 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 927.00

    27.00

    Per CUM : Rs 394.11

    189.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,116.00

    100 Cft Rs. 1,116.00

    06-29-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Breaking brick ballast, screening & stacking 1.5" ring

    (British)

    LABOUR

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,081.50

    31.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 145 of 969

  • Chapter # : 06 CONCRETE

    Per CUM : Rs 459.80

    220.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 459.80

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,302.00

    100 Cft Rs. 1,302.00

    06-29-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Breaking brick ballast, screening & stacking 1" ring

    (British)

    LABOUR

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,236.00

    36.00

    Per CUM : Rs 525.48

    252.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 525.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,488.00

    100 Cft Rs. 1,488.00

    06-29-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Breaking brick ballast, screening & stacking. Jhama ballast 3/4" ring

    (British)

    LABOUR

    Coolie 1,350.00 4.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,390.50

    40.50

    Per CUM : Rs 591.17

    283.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 591.17

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,674.00

    100 Cft Rs. 1,674.00

    06-30Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Supply & fix broken glasses on court yard walls, including 1:3:6 cement concrete

    coping

    (British)

    MATERIAL

    Broken Glass Pieces 6,000.00 100.000 60.00 KgKg 1

    Total Material % 65.57 6,000.00

    LABOUR

    Mason 58.20 0.097 600.00 DayDay 1

    Coolie 896.10 2.987 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.43 982.93

    28.63

    Per Meter : Rs 276.94

    1,460.40

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 38.81

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 8,443.33

    100 Rft Rs. 1,183.33

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 146 of 969

  • Chapter # : 06 CONCRETE

    06-31Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Crushing stone ballast by machine

    (British)

    LABOUR

    Coolie 849.00 2.830 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 874.47

    25.47

    Per CUM : Rs 371.78

    178.29

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 371.78

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,052.76

    100 Cft Rs. 1,052.76

    06-32-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Breaking stone ballast screened & stacked 2" ring

    (British)

    LABOUR

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,081.50

    31.50

    Per CUM : Rs 459.80

    220.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 459.80

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,302.00

    100 Cft Rs. 1,302.00

    06-32-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Breaking stone ballast screened & stacked 1.5" ring

    (British)

    LABOUR

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,236.00

    36.00

    Per CUM : Rs 525.48

    252.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 525.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,488.00

    100 Cft Rs. 1,488.00

    06-32-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Breaking stone ballast screened & stacked 1" ring

    (British)

    LABOUR

    Coolie 1,350.00 4.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,390.50

    40.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 147 of 969

  • Chapter # : 06 CONCRETE

    Per CUM : Rs 591.17

    283.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 591.17

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,674.00

    100 Cft Rs. 1,674.00

    06-32-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Breaking stone ballast screened & stacked 0.5" ring

    (British)

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,854.00

    54.00

    Per CUM : Rs 788.22

    378.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 788.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,232.00

    100 Cft Rs. 2,232.00

    06-32-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Breaking stone ballast screened & stacked 1/8" to 1/4" ring

    (British)

    LABOUR

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,090.00

    90.00

    Per CUM : Rs 1,313.71

    630.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,313.71

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 3,720.00

    100 Cft Rs. 3,720.00

    06-33Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Screening and stacking stone ballast, shingle or bajri etc

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Per CUM : Rs 131.37

    63.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 131.37

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 372.00

    100 Cft Rs. 372.00

    06-34Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Washing ballast, bajri or shingle

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 148 of 969

  • Chapter # : 06 CONCRETE

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Per CUM : Rs 131.37

    63.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 131.37

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 372.00

    100 Cft Rs. 372.00

    06-35Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Erecting and carting sun shades of precast RCC (upto 5"x 2.5")

    (British)

    LABOUR

    Mason 60.00 0.100 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 216.30

    6.30

    Cost Per Each: 260.40

    44.10

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 260.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 260.40

    Each Rs. 260.40

    06-36-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    PCC 1:3:6 in mass concrete less formwork using 50% boulders

    (British)

    MATERIAL

    Ordinary Portland Cement 2,833.70 6.590 430.00 BagBag 1

    Sand 456.12 25.340 1,800.00 CftCft 100

    Crushed Aggregate 1,368.36 50.680 2,700.00 CftCft 100

    Boulder (Screened/Washed) 825.00 50.000 1,650.00 CftCft 100

    Total Material % 56.61 5,483.18

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,290.00 4.300 300.00 DayDay 1

    Bhishti 216.00 0.720 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.39 1,934.34

    56.34

    Per CUM : Rs 3,165.39

    1,545.85

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 822.38

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 8,963.37

    100 Cft Rs. 2,328.72

    06-36-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    PCC 1:3:6 in mass concrete less formwork using 40% boulders

    (British)

    MATERIAL

    Ordinary Portland Cement 3,397.00 7.900 430.00 BagBag 1

    Sand 547.38 30.410 1,800.00 CftCft 100

    Crushed Aggregate 1,642.14 60.820 2,700.00 CftCft 100

    Boulder (Screened/Washed) 660.00 40.000 1,650.00 CftCft 100

    Total Material % 58.45 6,246.52

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 149 of 969

  • Chapter # : 06 CONCRETE

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,290.00 4.300 300.00 DayDay 1

    Bhishti 213.00 0.710 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.55 1,931.25

    56.25

    Per CUM : Rs 3,490.25

    1,705.52

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 821.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 9,883.29

    100 Cft Rs. 2,325.00

    06-36-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    PCC 1:3:6 in mass concrete less formwork using 30% boulders

    (British)

    MATERIAL

    Ordinary Portland Cement 3,968.90 9.230 430.00 BagBag 1

    Sand 638.64 35.480 1,800.00 CftCft 100

    Crushed Aggregate 1,917.00 71.000 2,700.00 CftCft 100

    Boulder (Screened/Washed) 495.00 30.000 1,650.00 CftCft 100

    Total Material % 59.98 7,019.54

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,290.00 4.300 300.00 DayDay 1

    Bhishti 213.00 0.710 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.02 1,931.25

    56.25

    Per CUM : Rs 3,820.57

    1,867.85

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 821.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 10,818.64

    100 Cft Rs. 2,325.00

    06-37-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    PCC 1:4:8 in mass concrete less formwork using 50% boulders

    (British)

    MATERIAL

    Ordinary Portland Cement 1,935.00 4.500 430.00 BagBag 1

    Sand 450.00 25.000 1,800.00 CftCft 100

    Crushed Aggregate 1,350.00 50.000 2,700.00 CftCft 100

    Boulder (Screened/Washed) 825.00 50.000 1,650.00 CftCft 100

    Total Material % 53.86 4,560.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,290.00 4.300 300.00 DayDay 1

    Bhishti 213.00 0.710 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 25.14 1,931.25

    56.25

    Per CUM : Rs 2,769.59

    1,351.35

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 821.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 7,842.60

    100 Cft Rs. 2,325.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 150 of 969

  • Chapter # : 06 CONCRETE

    06-37-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    PCC 1:4:8 in mass concrete less formwork using 40% boulders

    (British)

    MATERIAL

    Ordinary Portland Cement 2,322.00 5.400 430.00 BagBag 1

    Sand 540.00 30.000 1,800.00 CftCft 100

    Crushed Aggregate 1,620.00 60.000 2,700.00 CftCft 100

    Boulder (Screened/Washed) 660.00 40.000 1,650.00 CftCft 100

    Total Material % 55.69 5,142.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,290.00 4.300 300.00 DayDay 1

    Bhishti 213.00 0.710 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 23.31 1,931.25

    56.25

    Per CUM : Rs 3,018.28

    1,473.57

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 821.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 8,546.82

    100 Cft Rs. 2,325.00

    06-37-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    PCC 1:4:8 in mass concrete less formwork using 30% boulders

    (British)

    MATERIAL

    Ordinary Portland Cement 2,709.00 6.300 430.00 BagBag 1

    Sand 630.00 35.000 1,800.00 CftCft 100

    Crushed Aggregate 1,890.00 70.000 2,700.00 CftCft 100

    Boulder (Screened/Washed) 495.00 30.000 1,650.00 CftCft 100

    Total Material % 57.25 5,724.00

    LABOUR

    Mason 372.00 0.620 600.00 DayDay 1

    Coolie 1,290.00 4.300 300.00 DayDay 1

    Bhishti 213.00 0.710 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.75 1,931.25

    56.25

    Per CUM : Rs 3,266.98

    1,595.79

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 821.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 9,251.04

    100 Cft Rs. 2,325.00

    06-38-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Erecting & removing formwork to concrete in any shape / position (Horizontal)

    (British)

    MATERIAL

    Wood - Partal 183.00 0.183 1,000.00 CftCft 1

    Mobile Oil 140.00 0.500 280.00 LtrLtr 1

    Total Material % 9.02 323.00

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 151 of 969

  • Chapter # : 06 CONCRETE

    Carpenter 1,800.00 3.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 69.98 2,472.00

    72.00

    Per SQM : Rs 362.27

    571.83

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 320.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,366.83

    100 Sft Rs. 2,976.00

    06-38-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Erecting & removing formwork to concrete in any shape / position (Vertical)

    (British)

    MATERIAL

    Wood - Partal 217.00 0.217 1,000.00 CftCft 1

    Mobile Oil 140.00 0.500 280.00 LtrLtr 1

    Total Material % 8.88 357.00

    LABOUR

    Coolie 900.00 3.000 300.00 DayDay 1

    Carpenter 1,800.00 3.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 70.12 2,781.00

    81.00

    Per SQM : Rs 406.72

    641.97

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 360.24

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,779.97

    100 Sft Rs. 3,348.00

    06-39-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Erection and removal of steel Form work for RCC or Plain Concrete horizontal

    (British)

    MATERIAL

    Steel (bars/rods/section) 2,193.38 28.000 78.33 KgKg 1

    M.S Sheet 3,400.00 30.000 113.33 KgKg 1

    Bolts / Nuts / Screws 30.63 0.250 122.50 DozDoz 1

    Welding Rod 23.09 0.080 288.67 PktPkt 1

    Mobile Oil 28.00 0.100 280.00 LtrLtr 1

    Steel Pipes 12 Ft with Clamps 57.00 0.190 300.00 NoNo 1

    Total Material % 72.22 5,732.10

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Black Smith 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 6.78 309.00

    9.00

    Per SQM : Rs 786.32

    1,266.74

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 40.03

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 7,307.84

    100 Sft Rs. 372.00

    06-39-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Erection and removal of steel Form work for RCC or Plain Concrete vertical

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 152 of 969

  • Chapter # : 06 CONCRETE

    MATERIAL

    Steel (bars/rods/section) 2,193.38 28.000 78.33 KgKg 1

    M.S Sheet 3,400.00 30.000 113.33 KgKg 1

    Bolts / Nuts / Screws 30.63 0.250 122.50 DozDoz 1

    Welding Rod 23.09 0.080 288.67 PktPkt 1

    Mobile Oil 28.00 0.100 280.00 LtrLtr 1

    Steel Pipes 12 Ft with Clamps 27.00 0.090 300.00 NoNo 1

    Total Material % 72.93 5,702.10

    LABOUR

    Coolie 60.00 0.200 300.00 DayDay 1

    Black Smith 180.00 0.300 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 6.07 247.20

    7.20

    Per SQM : Rs 774.41

    1,247.84

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 32.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 7,197.14

    100 Sft Rs. 297.60

    06-40-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Class A1 concrete in reinforcement/non reinforcement concrete structure with

    minimum cylinder compressive strength 3000 psi on 28 days other than concrete in

    water and piles with consistency range in slump 25-75 mm with water cement ratio

    (British)

    MATERIAL

    Ordinary Portland Cement 7,310.00 17.000 430.00 BagBag 1

    Sand 792.00 44.000 1,800.00 CftCft 100

    Crushed Aggregate 2,376.00 88.000 2,700.00 CftCft 100

    Total Material % 55.29 10,478.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.46 2,626.50

    76.50

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 7.26 1,375.30

    Per CUM : Rs 6,181.66

    3,024.69

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,116.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 17,504.49

    100 Cft Rs. 3,162.00

    06-40-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Class A2 cement concrete for concrete place under water with minimum cylinder

    compressive strength 3500 psi on 28 days with consistency range in slump

    100-150 mm with water cement ratio 0.58

    (British)

    MATERIAL

    Ordinary Portland Cement 8,600.00 20.000 430.00 BagBag 1

    Sand 774.00 43.000 1,800.00 CftCft 100

    Crushed Aggregate 2,322.00 86.000 2,700.00 CftCft 100

    Total Material % 59.15 11,696.00

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 153 of 969

  • Chapter # : 06 CONCRETE

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 15.90 2,626.50

    76.50

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Total Equipment % 3.95 781.00

    Per CUM : Rs 6,448.17

    3,155.67

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,116.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 18,259.17

    100 Cft Rs. 3,162.00

    06-40-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Class A3 cement concrete for concrete in pile with minimum cylinder compressive

    strenght 4000 psi on 28 days other than concrete in water and piles with

    consistency range in slump 100-150 mm with water cement ratio 0.58

    (British)

    MATERIAL

    Ordinary Portland Cement 9,890.00 23.000 430.00 BagBag 1

    Sand 756.00 42.000 1,800.00 CftCft 100

    Crushed Aggregate 2,268.00 84.000 2,700.00 CftCft 100

    Total Material % 58.28 12,914.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 14.51 2,626.50

    76.50

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 6.21 1,375.30

    Per CUM : Rs 7,222.58

    3,536.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,116.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 20,452.05

    100 Cft Rs. 3,162.00

    06-40-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Class B concrete for concrete in pile specified works only with minimum cylinder

    compressive strenght 2418 psi on 28 days and consistency range in slump 25-75

    mm with water cement ratio 0.65

    (British)

    MATERIAL

    Ordinary Portland Cement 6,020.00 14.000 430.00 BagBag 1

    Sand 828.00 46.000 1,800.00 CftCft 100

    Crushed Aggregate 2,484.00 92.000 2,700.00 CftCft 100

    Total Material % 53.50 9,332.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 154 of 969

  • Chapter # : 06 CONCRETE

    Total Labour

    Sundries (Labour Only): %3

    % 17.62 2,626.50

    76.50

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 7.88 1,375.30

    Per CUM : Rs 5,691.96

    2,784.03

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,116.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,117.83

    100 Cft Rs. 3,162.00

    06-40-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Class C concrete for concrete for cribbing or otherwise specified in special provision

    with minimum cylinder compressive strength 3000 psi on 28 days and consistency

    range in slump 25-75 mm with water cement ratio 0.58

    (British)

    MATERIAL

    Ordinary Portland Cement 6,880.00 16.000 430.00 BagBag 1

    Sand 810.00 45.000 1,800.00 CftCft 100

    Crushed Aggregate 2,430.00 90.000 2,700.00 CftCft 100

    Total Material % 54.76 10,120.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.80 2,626.50

    76.50

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 7.44 1,375.30

    Per CUM : Rs 6,028.68

    2,949.51

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,116.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 17,071.31

    100 Cft Rs. 3,162.00

    06-40-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Class D1 concrete for concrete in pre-stressed & post tensioned with minimum

    cylinder compressive strength 4978.12 psi on 28 days and consistency range in

    slump 50-100 mm with water cement ratio 0.40

    (British)

    MATERIAL

    Ordinary Portland Cement 10,750.00 25.000 430.00 BagBag 1

    Sand 738.00 41.000 1,800.00 CftCft 100

    Crushed Aggregate 2,214.00 82.000 2,700.00 CftCft 100

    Total Material % 59.08 13,702.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.99 2,626.50

    76.50

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 155 of 969

  • Chapter # : 06 CONCRETE

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 5.93 1,375.30

    Per CUM : Rs 7,559.30

    3,701.73

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,116.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 21,405.53

    100 Cft Rs. 3,162.00

    06-40-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Class D2 concrete for concrete in pre-stressed & post tensioned with minimum

    cylinder compressive strength 6045 psi on 28 days and consistency range in slump

    50-100 mm with water cement ratio 0.40

    (British)

    MATERIAL

    Ordinary Portland Cement 12,040.00 28.000 430.00 BagBag 1

    Sand 720.00 40.000 1,800.00 CftCft 100

    Crushed Aggregate 2,160.00 80.000 2,700.00 CftCft 100

    Total Material % 60.17 14,920.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.28 2,626.50

    76.50

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 5.55 1,375.30

    Per CUM : Rs 8,079.76

    3,957.51

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,116.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 22,879.31

    100 Cft Rs. 3,162.00

    06-40-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Class D3 concrete for concrete in pre-stressed & post tensioned with minimum

    cylinder compressive strength 7112 psi on 28 days and consistency range in slump

    50-100 mm with water cement ratio 0.40

    (British)

    MATERIAL

    Ordinary Portland Cement 13,330.00 31.000 430.00 BagBag 1

    Sand 691.56 38.420 1,800.00 CftCft 100

    Crushed Aggregate 2,074.68 76.840 2,700.00 CftCft 100

    Total Material % 61.10 16,096.24

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.68 2,626.50

    76.50

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Concrete Vibrator 594.30 2.830 210.00 HourHour 1

    Total Equipment % 5.22 1,375.30

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 156 of 969

  • Chapter # : 06 CONCRETE

    Per CUM : Rs 8,582.38

    4,204.52

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,116.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 24,302.56

    100 Cft Rs. 3,162.00

    06-40-iItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Class Y concrete for concrete use as filler in steel grid, Bridge floor, in then

    reinforced section etc with minimum cylinder compressive strength 2575 psi on 28

    days and consistency range in slump 50-100 mm with water cement ratio 0.58

    (British)

    MATERIAL

    Ordinary Portland Cement 9,890.00 23.000 430.00 BagBag 1

    Sand 756.00 42.000 1,800.00 CftCft 100

    Crushed Aggregate 2,268.00 84.000 2,700.00 CftCft 100

    Total Material % 60.42 12,914.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 14.93 2,626.50

    76.50

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Total Equipment % 3.65 781.00

    Per CUM : Rs 6,968.63

    3,411.45

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,116.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 19,732.95

    100 Cft Rs. 3,162.00

    06-40-jItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Lean concrete for use as thin layer under neath footings with cylinder compressive

    strength of 1423 psi on 28 days.

    (British)

    MATERIAL

    Ordinary Portland Cement 4,300.00 10.000 430.00 BagBag 1

    Sand 792.00 44.000 1,800.00 CftCft 100

    Crushed Aggregate 2,376.00 88.000 2,700.00 CftCft 100

    Total Material % 52.56 7,468.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.95 2,626.50

    76.50

    EQUIPMENT

    Concrete Mixer 1 Bag 781.00 1.420 550.00 HourHour 1

    Total Equipment % 5.50 781.00

    Per CUM : Rs 4,641.51

    2,267.79

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,116.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 13,143.29

    100 Cft Rs. 3,162.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 157 of 969

  • Chapter # : 07 BRICK MASONRY

    07-01-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brickwork in mud mortar in buildings in foundation and plinth

    (British)

    MATERIAL

    Mud / Clay 236.25 35.000 675.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Total Material % 62.30 8,336.25

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 795.00 2.650 300.00 DayDay 1

    Bhishti 138.00 0.460 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.70 1,887.99

    54.99

    Per CUM : Rs 4,364.82

    2,135.54

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 802.67

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,359.78

    100 Cft Rs. 2,272.92

    07-01-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brickwork in mud mortar in buildings in ground floor

    (British)

    MATERIAL

    Mud / Clay 236.25 35.000 675.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 58.98 8,441.25

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,098.00 3.660 300.00 DayDay 1

    Bhishti 138.00 0.460 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.02 2,509.08

    73.08

    Per CUM : Rs 4,673.74

    2,284.22

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,066.73

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 13,234.55

    100 Cft Rs. 3,020.64

    07-02-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Add extra on Item 07-01 for brickwork in First floor

    (British)

    MATERIAL

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 14.38 105.00

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 64.62 463.50

    13.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 158 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 241.92

    116.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 197.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 685.05

    100 Cft Rs. 558.00

    07-02-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Add extra on Item 07-01 for brickwork in Second floor

    (British)

    MATERIAL

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 6.91 105.00

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 72.09 1,081.50

    31.50

    Per CUM : Rs 504.66

    242.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 459.80

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,429.05

    100 Cft Rs. 1,302.00

    07-02-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Add extra on Item 07-01 for brickwork in Third floor

    (British)

    MATERIAL

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 4.55 105.00

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 74.45 1,699.50

    49.50

    Per CUM : Rs 767.41

    368.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,173.05

    100 Cft Rs. 2,046.00

    07-02-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Add extra on Item 07-01 for brickwork in Fourth & subsequent floors.

    (British)

    MATERIAL

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 3.39 105.00

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 159 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 75.61 2,317.50

    67.50

    Per CUM : Rs 1,030.15

    494.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 985.28

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,917.05

    100 Cft Rs. 2,790.00

    07-03-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in mud mortar other than building Upto 20 ft. height

    (British)

    MATERIAL

    Mud / Clay 236.25 35.000 675.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Total Material % 58.20 8,336.25

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.80 2,626.50

    76.50

    Per CUM : Rs 4,678.80

    2,286.11

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,116.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 13,248.86

    100 Cft Rs. 3,162.00

    07-03-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in mud mortar other than building Extra labour for each 5 ft. addl.

    height or part

    (British)

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 463.50

    13.50

    Per CUM : Rs 197.06

    94.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 197.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 558.00

    100 Cft Rs. 558.00

    07-04-a-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Cement, sand mortar 1:2

    (British)

    MATERIAL

    Ordinary Portland Cement 3,440.00 8.000 430.00 BagBag 1

    Sand 360.00 20.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Total Material % 63.14 11,900.00

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 160 of 969

  • Chapter # : 07 BRICK MASONRY

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 15.86 2,496.72

    72.72

    Per CUM : Rs 6,146.44

    3,008.04

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 17,404.76

    100 Cft Rs. 3,005.76

    07-04-a-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Cement, sand mortar 1:3

    (British)

    MATERIAL

    Ordinary Portland Cement 2,580.00 6.000 430.00 BagBag 1

    Sand 405.00 22.500 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Total Material % 62.36 11,085.00

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.64 2,496.72

    72.72

    Per CUM : Rs 5,798.18

    2,836.89

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,418.61

    100 Cft Rs. 3,005.76

    07-04-a-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Cement, sand mortar 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 2,064.00 4.800 430.00 BagBag 1

    Sand 432.00 24.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Total Material % 61.85 10,596.00

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.15 2,496.72

    72.72

    Per CUM : Rs 5,589.23

    2,734.20

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,826.92

    100 Cft Rs. 3,005.76

    07-04-a-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Cement, sand mortar 1:5

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 161 of 969

  • Chapter # : 07 BRICK MASONRY

    MATERIAL

    Ordinary Portland Cement 1,720.00 4.000 430.00 BagBag 1

    Sand 414.00 23.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Total Material % 61.45 10,234.00

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.55 2,496.72

    72.72

    Per CUM : Rs 5,434.54

    2,658.18

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,388.90

    100 Cft Rs. 3,005.76

    07-04-a-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Cement, sand mortar 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 1,479.20 3.440 430.00 BagBag 1

    Sand 462.60 25.700 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Total Material % 61.22 10,041.80

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.78 2,496.72

    72.72

    Per CUM : Rs 5,352.42

    2,617.82

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,156.34

    100 Cft Rs. 3,005.76

    07-04-a-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Cement, sand mortar 1:7

    (British)

    MATERIAL

    Ordinary Portland Cement 1,290.00 3.000 430.00 BagBag 1

    Sand 477.00 26.500 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Total Material % 61.01 9,867.00

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.99 2,496.72

    72.72

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 162 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 5,277.72

    2,581.11

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,944.83

    100 Cft Rs. 3,005.76

    07-04-a-07Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Cement, sand mortar 1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 1,143.80 2.660 430.00 BagBag 1

    Sand 480.06 26.670 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Total Material % 60.83 9,723.86

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.17 2,496.72

    72.72

    Per CUM : Rs 5,216.56

    2,551.05

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,771.63

    100 Cft Rs. 3,005.76

    07-04-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 1,376.00 3.200 430.00 Bag.Bag. 1

    Sand 432.00 24.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    White Lime 400.00 1.600 250.00 MdsMds 1

    Total Material % 61.53 10,308.00

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.47 2,496.72

    72.72

    Per CUM : Rs 5,466.16

    2,673.72

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,478.44

    100 Cft Rs. 3,005.76

    07-04-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:7

    (British)

    MATERIAL

    Ordinary Portland Cement 1,225.50 2.850 430.00 BagBag 1

    Sand 445.32 24.740 1,800.00 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 163 of 969

  • Chapter # : 07 BRICK MASONRY

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    White Lime 355.00 1.420 250.00 MdsMds 1

    Total Material % 61.32 10,125.82

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.68 2,496.72

    72.72

    Per CUM : Rs 5,388.32

    2,635.46

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,258.00

    100 Cft Rs. 3,005.76

    07-04-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 1,100.80 2.560 430.00 BagBag 1

    Sand 460.80 25.600 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    White Lime 320.00 1.280 250.00 MdsMds 1

    Total Material % 57.66 9,981.60

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.34 3,269.22

    95.22

    Per CUM : Rs 5,655.12

    2,762.68

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,013.50

    100 Cft Rs. 3,935.76

    07-04-b-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:9

    (British)

    MATERIAL

    Ordinary Portland Cement 997.60 2.320 430.00 BagBag 1

    Sand 471.60 26.200 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    White Lime 290.00 1.160 250.00 MdsMds 1

    Total Material % 61.00 9,859.20

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.00 2,496.72

    72.72

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 164 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 5,274.39

    2,579.47

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,935.39

    100 Cft Rs. 3,005.76

    07-04-b-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Lime, cement, sand mortar 1:1:10

    (British)

    MATERIAL

    Ordinary Portland Cement 920.20 2.140 430.00 BagBag 1

    Sand 479.88 26.660 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    White Lime 267.50 1.070 250.00 MdsMds 1

    Total Material % 60.89 9,767.58

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.11 2,496.72

    72.72

    Per CUM : Rs 5,235.24

    2,560.23

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,824.53

    100 Cft Rs. 3,005.76

    07-04-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in Lime, sand mortar 1:2

    (British)

    MATERIAL

    Sand 419.94 23.330 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    White Lime 1,167.50 4.670 250.00 MdsMds 1

    Total Material % 60.79 9,687.44

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.21 2,496.72

    72.72

    Per CUM : Rs 5,200.99

    2,543.40

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,727.56

    100 Cft Rs. 3,005.76

    07-04-c-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in lime, sand, surkhi 1:1:1

    (British)

    MATERIAL

    Sand 210.06 11.670 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 165 of 969

  • Chapter # : 07 BRICK MASONRY

    Surkhi 8.16 11.660 70.00 CftCft 100

    White Lime 1,085.00 4.340 250.00 MdsMds 1

    Total Material % 60.42 9,403.22

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.58 2,496.72

    72.72

    Per CUM : Rs 5,079.55

    2,483.72

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,383.66

    100 Cft Rs. 3,005.76

    07-04-c-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in lime, coarse cinder.

    (British)

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    White Lime 1,600.00 6.400 250.00 MdsMds 1

    Cinder including Cartage 192.00 16.000 1,200.00 CftCft 100

    Total Material % 61.04 9,892.00

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.96 2,496.72

    72.72

    Per CUM : Rs 5,288.40

    2,586.36

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,975.08

    100 Cft Rs. 3,005.76

    07-04-c-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in lime, surkhi mortar 2:3

    (British)

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Surkhi 14.70 21.000 70.00 CftCft 100

    White Lime 1,400.00 5.600 250.00 MdsMds 1

    Total Material % 60.57 9,514.70

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.43 2,496.72

    72.72

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 166 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 5,127.18

    2,507.13

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,518.55

    100 Cft Rs. 3,005.76

    07-04-c-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in lime, surkhi mortar 1:2

    (British)

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Surkhi 16.33 23.330 70.00 CftCft 100

    White Lime 1,167.50 4.670 250.00 MdsMds 1

    Total Material % 60.26 9,283.83

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.74 2,496.72

    72.72

    Per CUM : Rs 5,028.53

    2,458.64

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,239.20

    100 Cft Rs. 3,005.76

    07-04-c-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in lime, surkhi mortar 1:3

    (British)

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Surkhi 18.38 26.250 70.00 CftCft 100

    White Lime 875.00 3.500 250.00 MdsMds 1

    Total Material % 59.86 8,993.38

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 999.00 3.330 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.14 2,496.72

    72.72

    Per CUM : Rs 4,904.42

    2,397.65

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,061.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 13,887.74

    100 Cft Rs. 3,005.76

    07-05-a-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Cement, sand mortar 1:2

    (British)

    MATERIAL

    Ordinary Portland Cement 3,440.00 8.000 430.00 BagBag 1

    Sand 360.00 20.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 167 of 969

  • Chapter # : 07 BRICK MASONRY

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 60.35 12,005.00

    LABOUR

    Mason 1,440.00 2.400 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.65 3,207.42

    93.42

    Per CUM : Rs 6,493.46

    3,174.99

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,363.63

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 18,387.41

    100 Cft Rs. 3,861.36

    07-05-a-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Cement, sand mortar 1:3

    (British)

    MATERIAL

    Ordinary Portland Cement 2,580.00 6.000 430.00 BagBag 1

    Sand 405.00 22.500 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 59.45 11,190.00

    LABOUR

    Mason 1,440.00 2.400 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.55 3,207.42

    93.42

    Per CUM : Rs 6,145.20

    3,003.84

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,363.63

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 17,401.26

    100 Cft Rs. 3,861.36

    07-05-a-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Cement, sand mortar 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 2,064.00 4.800 430.00 BagBag 1

    Sand 432.00 24.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 58.87 10,701.00

    LABOUR

    Mason 1,440.00 2.400 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 Day.Day. 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.13 3,207.42

    93.42

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 168 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 5,936.25

    2,901.15

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,363.63

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,809.57

    100 Cft Rs. 3,861.36

    07-05-a-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Cement, sand mortar 1:5

    (British)

    MATERIAL

    Ordinary Portland Cement 1,720.00 4.000 430.00 BagBag 1

    Sand 450.00 25.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 58.46 10,375.00

    LABOUR

    Mason 1,440.00 2.400 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.54 3,207.42

    93.42

    Per CUM : Rs 5,796.95

    2,832.69

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,363.63

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,415.11

    100 Cft Rs. 3,861.36

    07-05-a-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Cement, sand mortar 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 1,479.20 3.440 430.00 BagBag 1

    Sand 462.60 25.700 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 58.15 10,146.80

    LABOUR

    Mason 1,440.00 2.400 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.85 3,207.42

    93.42

    Per CUM : Rs 5,699.44

    2,784.77

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,363.63

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,138.99

    100 Cft Rs. 3,861.36

    07-05-a-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Cement, sand mortar 1:7

    (British)

    MATERIAL

    Ordinary Portland Cement 1,290.00 3.000 430.00 BagBag 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 169 of 969

  • Chapter # : 07 BRICK MASONRY

    Sand 477.00 26.500 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 57.91 9,972.00

    LABOUR

    Mason 1,440.00 2.400 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.09 3,207.42

    93.42

    Per CUM : Rs 5,624.74

    2,748.06

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,363.63

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,927.48

    100 Cft Rs. 3,861.36

    07-05-a-07Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Cement, sand mortar 1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 1,143.80 2.660 430.00 BagBag 1

    Sand 480.06 26.670 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 57.71 9,828.86

    LABOUR

    Mason 1,440.00 2.400 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.29 3,207.42

    93.42

    Per CUM : Rs 5,563.58

    2,718.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,363.63

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,754.28

    100 Cft Rs. 3,861.36

    07-05-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Lime, cement, sand mortar 1:1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 1,384.60 3.220 430.00 BagBag 1

    Sand 432.00 24.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 400.00 1.600 250.00 MdsMds 1

    Total Material % 58.26 10,421.60

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.74 3,269.22

    95.22

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 170 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 5,843.13

    2,855.08

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,545.90

    100 Cft Rs. 3,935.76

    07-05-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Lime, cement, sand mortar 1:1:7

    (British)

    MATERIAL

    Ordinary Portland Cement 1,225.50 2.850 430.00 BagBag 1

    Sand 445.32 24.740 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 355.00 1.420 250.00 MdsMds 1

    Total Material % 58.00 10,230.82

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.00 3,269.22

    95.22

    Per CUM : Rs 5,761.61

    2,815.01

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,315.05

    100 Cft Rs. 3,935.76

    07-05-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Lime, cement, sand mortar 1:1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 1,100.80 2.560 430.00 BagBag 1

    Sand 460.80 25.600 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 320.00 1.280 250.00 MdsMds 1

    Total Material % 57.81 10,086.60

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.19 3,269.22

    95.22

    Per CUM : Rs 5,699.99

    2,784.73

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,140.55

    100 Cft Rs. 3,935.76

    07-05-b-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Lime, cement, sand mortar 1:1:9

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 171 of 969

  • Chapter # : 07 BRICK MASONRY

    MATERIAL

    Ordinary Portland Cement 997.60 2.320 430.00 BagBag 1

    Sand 471.60 26.200 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 290.00 1.160 250.00 MdsMds 1

    Total Material % 57.64 9,964.20

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.36 3,269.22

    95.22

    Per CUM : Rs 5,647.68

    2,759.02

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,992.44

    100 Cft Rs. 3,935.76

    07-05-b-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Lime, cement, sand mortar 1:1:10

    (British)

    MATERIAL

    Ordinary Portland Cement 920.20 2.140 430.00 BagBag 1

    Sand 479.88 26.660 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 267.50 1.070 250.00 MdsMds 1

    Total Material % 57.51 9,872.58

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.49 3,269.22

    95.22

    Per CUM : Rs 5,608.53

    2,739.78

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,881.58

    100 Cft Rs. 3,935.76

    07-05-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in ground floor Lime, sand mortar 1:2

    (British)

    MATERIAL

    Sand 419.94 23.330 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 1,167.50 4.670 250.00 MdsMds 1

    Total Material % 57.40 9,792.44

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 172 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 21.60 3,269.22

    95.22

    Per CUM : Rs 5,574.29

    2,722.95

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,784.61

    100 Cft Rs. 3,935.76

    07-05-c-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in foundation and plinth in lime, sand, surkhi 1:1:1.

    (British)

    MATERIAL

    Sand 210.06 11.670 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Surkhi 8.16 11.660 70.00 CftCft 100

    White Lime 1,085.00 4.340 250.00 MdsMds 1

    Total Material % 56.82 9,403.22

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.18 3,269.22

    95.22

    Per CUM : Rs 5,407.97

    2,641.22

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,313.66

    100 Cft Rs. 3,935.76

    07-05-c-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in Ground floor lime, coarse cinder.

    (British)

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    White Lime 1,600.00 6.400 250.00 MdsMds 1

    Cinder including Cartage 192.00 16.000 1,200.00 CftCft 100

    Total Material % 57.54 9,892.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.46 3,269.22

    95.22

    Per CUM : Rs 5,616.83

    2,743.86

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,905.08

    100 Cft Rs. 3,935.76

    07-05-c-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in Ground floor lime, surkhi mortar 2:3

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 173 of 969

  • Chapter # : 07 BRICK MASONRY

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Surkhi 14.70 21.000 70.00 CftCft 100

    White Lime 1,400.00 5.600 250.00 MdsMds 1

    Total Material % 56.99 9,514.70

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.01 3,269.22

    95.22

    Per CUM : Rs 5,455.61

    2,664.63

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,448.55

    100 Cft Rs. 3,935.76

    07-05-c-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in Ground floor lime, surkhi mortar 1:2

    (British)

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Surkhi 16.33 23.330 70.00 CftCft 100

    White Lime 1,167.50 4.670 250.00 MdsMds 1

    Total Material % 56.64 9,283.83

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.36 3,269.22

    95.22

    Per CUM : Rs 5,356.96

    2,616.14

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,169.20

    100 Cft Rs. 3,935.76

    07-05-c-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in Ground floor lime, surkhi mortar 1:3

    (British)

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Surkhi 18.38 26.250 70.00 CftCft 100

    White Lime 875.00 3.500 250.00 MdsMds 1

    Total Material % 56.17 8,993.38

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.83 3,269.22

    95.22

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 174 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 5,232.84

    2,555.15

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,817.74

    100 Cft Rs. 3,935.76

    07-06-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Add extra on item No.07-05 for brick work in First floor

    (British)

    MATERIAL

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 14.38 105.00

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 64.62 463.50

    13.50

    Per CUM : Rs 241.92

    116.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 197.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 685.05

    100 Cft Rs. 558.00

    07-06-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Add extra on item No.07-05 for brick work in in Second floor

    (British)

    MATERIAL

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 6.91 105.00

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 72.09 1,081.50

    31.50

    Per CUM : Rs 504.66

    242.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 459.80

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,429.05

    100 Cft Rs. 1,302.00

    07-06-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Add extra on item No.07-05 for brick work in Third floor

    (British)

    MATERIAL

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 4.55 105.00

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 175 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 74.45 1,699.50

    49.50

    Per CUM : Rs 767.41

    368.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,173.05

    100 Cft Rs. 2,046.00

    07-06-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Add extra on item No.07-05 for brick work in in Fourth & subsequent floors.

    (British)

    MATERIAL

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 2.84 105.00

    LABOUR

    Mason 1,350.00 2.250 600.00 DayDay 1

    Coolie 1,350.00 4.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 76.16 2,781.00

    81.00

    Per CUM : Rs 1,227.20

    589.05

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,182.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 3,475.05

    100 Cft Rs. 3,348.00

    07-07-a-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:2

    (British)

    MATERIAL

    Ordinary Portland Cement 3,440.00 8.000 430.00 BagBag 1

    Sand 360.00 20.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 61.42 12,005.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.58 2,935.50

    85.50

    Per CUM : Rs 6,377.85

    3,119.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 18,060.05

    100 Cft Rs. 3,534.00

    07-07-a-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:3

    (British)

    MATERIAL

    Ordinary Portland Cement 2,580.00 6.000 430.00 BagBag 1

    Sand 405.00 22.500 1,800.00 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 176 of 969

  • Chapter # : 07 BRICK MASONRY

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 59.93 11,190.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,350.00 4.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.07 3,090.00

    90.00

    Per CUM : Rs 6,095.28

    2,979.90

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,313.71

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 17,259.90

    100 Cft Rs. 3,720.00

    07-07-a-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 2,064.00 4.800 430.00 BagBag 1

    Sand 432.00 24.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 60.02 10,701.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.98 2,935.50

    85.50

    Per CUM : Rs 5,820.64

    2,845.71

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,482.21

    100 Cft Rs. 3,534.00

    07-07-a-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:5

    (British)

    MATERIAL

    Ordinary Portland Cement 1,720.00 4.000 430.00 BagBag 1

    Sand 450.00 25.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 59.62 10,375.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.38 2,935.50

    85.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 177 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 5,681.34

    2,777.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,087.75

    100 Cft Rs. 3,534.00

    07-07-a-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 1,479.20 3.440 430.00 BagBag 1

    Sand 462.60 25.700 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 59.33 10,146.80

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.67 2,935.50

    85.50

    Per CUM : Rs 5,583.83

    2,729.33

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,811.63

    100 Cft Rs. 3,534.00

    07-07-a-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:7

    (British)

    MATERIAL

    Ordinary Portland Cement 1,290.00 3.000 430.00 BagBag 1

    Sand 477.00 26.500 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 59.11 9,972.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.89 2,935.50

    85.50

    Per CUM : Rs 5,509.14

    2,692.62

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,600.12

    100 Cft Rs. 3,534.00

    07-07-a-07Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Cement, sand mortar 1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 1,143.80 2.660 430.00 BagBag 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 178 of 969

  • Chapter # : 07 BRICK MASONRY

    Sand 480.06 26.670 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 58.92 9,828.86

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.08 2,935.50

    85.50

    Per CUM : Rs 5,447.97

    2,662.56

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,426.92

    100 Cft Rs. 3,534.00

    07-07-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar

    1:1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 1,376.00 3.200 430.00 BagBag 1

    Sand 432.00 24.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 400.00 1.600 250.00 MdsMds 1

    Total Material % 59.67 10,413.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 Day.Day. 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.33 2,935.50

    85.50

    Per CUM : Rs 5,697.58

    2,785.23

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,133.73

    100 Cft Rs. 3,534.00

    07-07-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar

    1:1:7

    (British)

    MATERIAL

    Ordinary Portland Cement 1,225.50 2.850 430.00 BagBag 1

    Sand 446.04 24.780 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 355.00 1.420 250.00 MdsMds 1

    Total Material % 59.44 10,231.54

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 179 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 19.56 2,935.50

    85.50

    Per CUM : Rs 5,620.04

    2,747.12

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,914.16

    100 Cft Rs. 3,534.00

    07-07-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar

    1:1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 1,100.80 2.560 430.00 BagBag 1

    Sand 460.80 25.600 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 320.00 1.280 250.00 MdsMds 1

    Total Material % 59.26 10,086.60

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.74 2,935.50

    85.50

    Per CUM : Rs 5,558.11

    2,716.69

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,738.79

    100 Cft Rs. 3,534.00

    07-07-b-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar

    1:1:9

    (British)

    MATERIAL

    Ordinary Portland Cement 997.60 2.320 430.00 BagBag 1

    Sand 471.60 26.200 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 290.00 1.160 250.00 MdsMds 1

    Total Material % 59.10 9,964.20

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.90 2,935.50

    85.50

    Per CUM : Rs 5,505.80

    2,690.98

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,590.68

    100 Cft Rs. 3,534.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 180 of 969

  • Chapter # : 07 BRICK MASONRY

    07-07-b-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Lime, cement, sand mortar

    1:1:10

    (British)

    MATERIAL

    Ordinary Portland Cement 920.20 2.140 430.00 BagBag 1

    Sand 479.88 26.660 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 267.50 1.070 250.00 MdsMds 1

    Total Material % 58.98 9,872.58

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.02 2,935.50

    85.50

    Per CUM : Rs 5,466.65

    2,671.74

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,479.82

    100 Cft Rs. 3,534.00

    07-07-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work other than building upto 10 ft. height : Lime, sand mortar 1:2

    (British)

    MATERIAL

    Sand 419.94 23.330 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 1,167.50 4.670 250.00 MdsMds 1

    Total Material % 58.87 9,792.44

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.13 2,935.50

    85.50

    Per CUM : Rs 5,432.41

    2,654.91

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,382.85

    100 Cft Rs. 3,534.00

    07-07-c-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in other than building upto 10 ft height in lime, sand, surkhi 1:1:1

    (British)

    MATERIAL

    Sand 210.06 11.670 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Surkhi 8.17 11.670 70.00 CftCft 100

    White Lime 1,085.00 4.340 250.00 MdsMds 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 181 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Material % 52.71 9,508.23

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 1,500.00 5.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.29 4,326.00

    126.00

    Per CUM : Rs 5,902.13

    2,878.73

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,839.19

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,712.96

    100 Cft Rs. 5,208.00

    07-07-c-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in other than building upto 10 ft height in lime, coarse cinder 1:1

    (British)

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 1,600.00 6.400 250.00 MdsMds 1

    Cinder including Cartage 192.00 16.000 1,200.00 CftCft 100

    Total Material % 59.14 9,997.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.86 2,935.50

    85.50

    Per CUM : Rs 5,519.82

    2,697.87

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,630.37

    100 Cft Rs. 3,534.00

    07-07-c-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in other than building upto 10 ft height in lime, surkhi mortar 2:3

    (British)

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Surkhi 14.70 21.000 70.00 CftCft 100

    White Lime 1,400.00 5.600 250.00 MdsMds 1

    Total Material % 58.63 9,619.70

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.37 2,935.50

    85.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 182 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 5,358.60

    2,618.64

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,248.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,173.84

    100 Cft Rs. 3,534.00

    07-07-c-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in other than building upto 10 ft height in lime, surkhi mortar 1:2

    (British)

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Surkhi 16.33 23.330 70.00 CftCft 100

    White Lime 1,167.50 4.670 250.00 MdsMds 1

    Total Material % 60.53 9,388.83

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 750.00 2.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.47 2,472.00

    72.00

    Per CUM : Rs 5,062.89

    2,475.65

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,050.97

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,336.49

    100 Cft Rs. 2,976.00

    07-07-c-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pacca brick work in other than building upto 10 ft height in lime, surkhi mortar 1:3

    (British)

    MATERIAL

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Surkhi 18.38 26.250 70.00 CftCft 100

    White Lime 875.00 3.500 250.00 MdsMds 1

    Total Material % 56.34 9,098.38

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.66 3,269.22

    95.22

    Per CUM : Rs 5,277.71

    2,577.20

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,944.79

    100 Cft Rs. 3,935.76

    07-08Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Add extra on item No. 07-07 for every 10 ft. additional height, or part thereof

    (British)

    MATERIAL

    Scaffolding 21.00 4.000 5.25 SftSft 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 183 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Material % 3.39 21.00

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 75.61 463.50

    13.50

    Per CUM : Rs 206.03

    98.91

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 197.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 583.41

    100 Cft Rs. 558.00

    07-09Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour for arch work in brick masonry, including labour for centring and

    decentring

    (British)

    MATERIAL

    Scaffolding 52.50 10.000 5.25 SftSft 1

    Total Material % 3.19 52.50

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 75.81 1,236.00

    36.00

    Per CUM : Rs 547.92

    263.03

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 525.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,551.53

    100 Cft Rs. 1,488.00

    07-10Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra for pacca brick work in steining of wells or any other circular masonry.

    (British)

    MATERIAL

    Burnt Brick 420.00 70.000 6,000.00 NoNo 1,000

    Total Material % 27.28 420.00

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 51.72 772.50

    22.50

    Per CUM : Rs 507.90

    245.70

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 328.43

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,438.20

    100 Cft Rs. 930.00

    07-11Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour for profile & flared walls

    (British)

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 184 of 969

  • Chapter # : 07 BRICK MASONRY

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 927.00

    27.00

    Per CUM : Rs 394.11

    189.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,116.00

    100 Cft Rs. 1,116.00

    07-12-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour for pacca brick work in pier/abutment From 10 ft.to 20 ft. height.

    (British)

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Per CUM : Rs 262.74

    126.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 262.74

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 744.00

    100 Cft Rs. 744.00

    07-12-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour for pacca brick work in pier/abutment Exceeding 20 ft height.

    (British)

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,081.50

    31.50

    Per CUM : Rs 459.80

    220.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 459.80

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,302.00

    100 Cft Rs. 1,302.00

    07-13Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Extra for face work (half brick thick) using special bricks instead of first class bricks.

    (British)

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Per SQM : Rs 80.05

    126.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 80.05

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 744.00

    100 Sft Rs. 744.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 185 of 969

  • Chapter # : 07 BRICK MASONRY

    07-14Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Reinforced brick work in lintel of openings, laid in 1:3 cement mortar complete

    (British)

    MATERIAL

    Ordinary Portland Cement 4,708.50 10.950 430.00 BagBag 1

    Sand 741.60 41.200 1,800.00 CftCft 100

    Burnt Brick 6,030.00 1005.000 6,000.00 NoNo 1,000

    Centering Wood 504.00 0.700 720.00 CftCft 1

    Total Material % 46.03 11,984.10

    LABOUR

    Mason 3,798.00 6.330 600.00 DayDay 1

    Coolie 3,330.00 11.100 300.00 DayDay 1

    Bhishti 675.00 2.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.97 8,037.09

    234.09

    Per CUM : Rs 8,537.85

    4,155.29

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 3,416.95

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 24,176.48

    100 Cft Rs. 9,675.72

    07-15-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 NoSpec. No :

    Extra for dressing or chamfering bricks for Special architectural bricks

    (British)

    LABOUR

    Mason 1,800.00 3.000 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,008.50

    58.50

    Cost Per 100 No.: 2,418.00

    409.50

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 2,418.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No Rs. 2,418.00

    100 No Rs. 2,418.00

    07-15-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 NoSpec. No :

    Extra for dressing or chamfering bricks for all other purposes.

    (British)

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,390.50

    40.50

    Cost Per 100 No.: 1,674.00

    283.50

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 1,674.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No Rs. 1,674.00

    100 No Rs. 1,674.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 186 of 969

  • Chapter # : 07 BRICK MASONRY

    07-16-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Mud mortar

    (British)

    MATERIAL

    Mud / Clay 59.06 8.750 675.00 CftCft 100

    Burnt Brick (Perforated) 1,541.28 338.000 4,560.00 NoNo 1,000

    Total Material % 43.16 1,600.34

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 549.00 1.830 300.00 DayDay 1

    Bhishti 69.00 0.230 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 35.84 1,254.54

    36.54

    Per SQM : Rs 370.87

    591.85

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 162.51

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,446.73

    100 Sft Rs. 1,510.32

    07-16-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:2

    (British)

    MATERIAL

    Ordinary Portland Cement 860.00 2.000 430.00 BagBag 1

    Sand 90.00 5.000 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Burnt Brick (Perforated) 1,541.28 338.000 4,560.00 NoNo 1,000

    Total Material % 47.13 2,596.28

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.87 1,637.70

    47.70

    Per SQM : Rs 550.17

    879.12

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,113.10

    100 Sft Rs. 1,971.60

    07-16-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:3

    (British)

    MATERIAL

    Ordinary Portland Cement 645.00 1.500 430.00 Bag.Bag. 1

    Sand 100.80 5.600 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Burnt Brick (Perforated) 1,541.28 338.000 4,560.00 NoNo 1,000

    Total Material % 45.65 2,392.08

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 187 of 969

  • Chapter # : 07 BRICK MASONRY

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 33.35 1,637.70

    47.70

    Per SQM : Rs 523.58

    836.24

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,866.02

    100 Sft Rs. 1,971.60

    07-16-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 516.00 1.200 430.00 BagBag 1

    Sand 108.00 6.000 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Burnt Brick (Perforated) 1,541.28 338.000 4,560.00 NoNo 1,000

    Total Material % 44.70 2,270.28

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 34.30 1,637.70

    47.70

    Per SQM : Rs 507.73

    810.66

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,718.64

    100 Sft Rs. 1,971.60

    07-16-b-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:5

    (British)

    MATERIAL

    Ordinary Portland Cement 430.00 1.000 430.00 BagBag 1

    Sand 112.50 6.250 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Burnt Brick (Perforated) 1,541.28 338.000 4,560.00 NoNo 1,000

    Total Material % 44.02 2,188.78

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 34.98 1,637.70

    47.70

    Per SQM : Rs 497.11

    793.54

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,620.02

    100 Sft Rs. 1,971.60

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 188 of 969

  • Chapter # : 07 BRICK MASONRY

    07-16-b-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 369.80 0.860 430.00 BagBag 1

    Sand 115.20 6.400 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Burnt Brick (Perforated) 1,541.28 338.000 4,560.00 NoNo 1,000

    Total Material % 43.53 2,131.28

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 35.47 1,637.70

    47.70

    Per SQM : Rs 489.63

    781.47

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,550.45

    100 Sft Rs. 1,971.60

    07-16-b-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:7

    (British)

    MATERIAL

    Ordinary Portland Cement 322.50 0.750 430.00 BagBag 1

    Sand 119.70 6.650 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Burnt Brick (Perforated) 1,541.28 338.000 4,560.00 NoNo 1,000

    Total Material % 43.15 2,088.48

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 35.85 1,637.70

    47.70

    Per SQM : Rs 484.06

    772.48

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,498.66

    100 Sft Rs. 1,971.60

    07-16-b-07Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Cement, sand mortar 1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 288.10 0.670 430.00 BagBag 1

    Sand 120.06 6.670 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Burnt Brick (Perforated) 1,541.28 338.000 4,560.00 NoNo 1,000

    Total Material % 42.84 2,054.44

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 189 of 969

  • Chapter # : 07 BRICK MASONRY

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.30 2.421 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 36.16 1,638.01

    47.71

    Per SQM : Rs 479.66

    765.40

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.18

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,457.84

    100 Sft Rs. 1,971.97

    07-16-c-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar

    1:1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 344.00 0.800 430.00 BagBag 1

    Sand 108.00 6.000 1,800.00 CftCft 100

    Burnt Brick 2,028.00 338.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 100.00 0.400 250.00 MdsMds 1

    Total Material % 47.73 2,685.00

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.27 1,637.70

    47.70

    Per SQM : Rs 561.72

    897.75

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,220.45

    100 Sft Rs. 1,971.60

    07-16-c-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar

    1:1:7

    (British)

    MATERIAL

    Ordinary Portland Cement 305.30 0.710 430.00 BagBag 1

    Sand 110.34 6.130 1,800.00 CftCft 100

    Burnt Brick 2,028.00 338.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 95.00 0.380 250.00 MdsMds 1

    Total Material % 47.46 2,643.64

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.54 1,637.70

    47.70

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 190 of 969

  • Chapter # : 07 BRICK MASONRY

    Per SQM : Rs 556.34

    889.06

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,170.40

    100 Sft Rs. 1,971.60

    07-16-c-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar

    1:1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 275.20 0.640 430.00 BagBag 1

    Sand 115.20 6.400 1,800.00 CftCft 100

    Burnt Brick 2,028.00 338.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 82.50 0.330 250.00 MdsMds 1

    Total Material % 47.20 2,605.90

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.80 1,637.70

    47.70

    Per SQM : Rs 551.42

    881.14

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,124.74

    100 Sft Rs. 1,971.60

    07-16-c-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar

    1:1:9

    (British)

    MATERIAL

    Ordinary Portland Cement 249.40 0.580 430.00 BagBag 1

    Sand 117.00 6.500 1,800.00 CftCft 100

    Burnt Brick 2,028.00 338.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 72.50 0.290 250.00 MdsMds 1

    Total Material % 46.97 2,571.90

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.03 1,637.70

    47.70

    Per SQM : Rs 547.00

    874.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,083.60

    100 Sft Rs. 1,971.60

    07-16-c-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, cement, sand mortar

    1:1:10

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 191 of 969

  • Chapter # : 07 BRICK MASONRY

    MATERIAL

    Ordinary Portland Cement 232.20 0.540 430.00 BagBag 1

    Sand 120.06 6.670 1,800.00 CftCft 100

    Burnt Brick 2,028.00 338.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 67.50 0.270 250.00 MdsMds 1

    Total Material % 46.83 2,552.76

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.17 1,637.70

    47.70

    Per SQM : Rs 544.50

    869.98

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,060.44

    100 Sft Rs. 1,971.60

    07-16-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1/2 brick thick in ground floor : Lime, sand mortar 1:2

    (British)

    MATERIAL

    Sand 100.44 5.580 1,800.00 CftCft 100

    Burnt Brick 2,028.00 338.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 292.50 1.170 250.00 MdsMds 1

    Total Material % 46.64 2,525.94

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 726.00 2.420 300.00 DayDay 1

    Bhishti 114.00 0.380 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.36 1,637.70

    47.70

    Per SQM : Rs 541.01

    864.35

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 212.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,027.99

    100 Sft Rs. 1,971.60

    07-17-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Add extra on item No. 07-16 for pacca brick work in First floor

    (British)

    MATERIAL

    Scaffolding 21.00 4.000 5.25 SftSft 1

    Total Material % 6.49 21.00

    LABOUR

    Mason 75.00 0.125 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 72.51 231.75

    6.75

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 192 of 969

  • Chapter # : 07 BRICK MASONRY

    Per SQM : Rs 32.75

    51.66

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 30.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 304.41

    100 Sft Rs. 279.00

    07-17-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Add extra on item No. 07-16 for pacca brick work in Second floor

    (British)

    MATERIAL

    Scaffolding 21.00 4.000 5.25 SftSft 1

    Total Material % 2.92 21.00

    LABOUR

    Mason 225.00 0.375 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 76.08 540.75

    15.75

    Per SQM : Rs 72.78

    114.66

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 70.05

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 676.41

    100 Sft Rs. 651.00

    07-17-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Add extra on item No. 07-16 for pacca brick work in Third floor

    (British)

    MATERIAL

    Scaffolding 26.25 5.000 5.25 SftSft 1

    Total Material % 2.34 26.25

    LABOUR

    Mason 375.00 0.625 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 76.66 849.75

    24.75

    Per SQM : Rs 113.49

    178.76

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,054.76

    100 Sft Rs. 1,023.00

    07-17-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Add extra on item No. 07-16 for pacca brick work in Fourth & subsequent floors.

    (British)

    MATERIAL

    Scaffolding 36.75 7.000 5.25 SftSft 1

    Total Material % 2.01 36.75

    LABOUR

    Mason 675.00 1.125 600.00 DayDay 1

    Coolie 675.00 2.250 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 193 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 76.99 1,390.50

    40.50

    Per SQM : Rs 184.91

    291.22

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 180.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,718.47

    100 Sft Rs. 1,674.00

    07-18-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Mud mortar

    (British)

    MATERIAL

    Mud / Clay 118.13 17.500 675.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 53.24 4,273.13

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 825.00 2.750 300.00 DayDay 1

    Bhishti 102.00 0.340 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 25.76 1,881.81

    54.81

    Per SQM : Rs 800.11

    1,281.03

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 243.77

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 7,435.96

    100 Sft Rs. 2,265.48

    07-18-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:2

    (British)

    MATERIAL

    Ordinary Portland Cement 1,720.00 4.000 430.00 BagBag 1

    Sand 180.00 10.000 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 54.78 6,055.00

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 24.22 2,416.38

    70.38

    Per SQM : Rs 1,101.35

    1,764.21

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 10,235.59

    100 Sft Rs. 2,909.04

    07-18-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:3

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 194 of 969

  • Chapter # : 07 BRICK MASONRY

    MATERIAL

    Ordinary Portland Cement 1,290.00 3.000 430.00 BagBag 1

    Sand 202.50 11.250 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 53.69 5,647.50

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 25.31 2,416.38

    70.38

    Per SQM : Rs 1,048.29

    1,678.64

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,742.52

    100 Sft Rs. 2,909.04

    07-18-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 1,032.00 2.400 430.00 BagBag 1

    Sand 216.00 12.000 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 52.99 5,403.00

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.01 2,416.38

    70.38

    Per SQM : Rs 1,016.46

    1,627.29

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,446.67

    100 Sft Rs. 2,909.04

    07-18-b-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:5

    (British)

    MATERIAL

    Ordinary Portland Cement 860.00 2.000 430.00 BagBag 1

    Sand 225.00 12.500 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 52.50 5,240.00

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 195 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 26.50 2,416.38

    70.38

    Per SQM : Rs 995.24

    1,593.06

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,249.44

    100 Sft Rs. 2,909.04

    07-18-b-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 739.60 1.720 430.00 BagBag 1

    Sand 230.40 12.800 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 52.13 5,125.00

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.87 2,416.38

    70.38

    Per SQM : Rs 980.27

    1,568.91

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,110.29

    100 Sft Rs. 2,909.04

    07-18-b-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:7

    (British)

    MATERIAL

    Ordinary Portland Cement 645.00 1.500 430.00 BagBag 1

    Sand 236.34 13.130 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 51.85 5,036.34

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 27.15 2,416.38

    70.38

    Per SQM : Rs 968.72

    1,550.29

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,003.01

    100 Sft Rs. 2,909.04

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 196 of 969

  • Chapter # : 07 BRICK MASONRY

    07-18-b-07Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Cement, sand mortar 1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 571.90 1.330 430.00 BagBag 1

    Sand 240.12 13.340 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Total Material % 51.62 4,967.02

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 27.38 2,416.38

    70.38

    Per SQM : Rs 959.70

    1,535.73

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,919.13

    100 Sft Rs. 2,909.04

    07-18-c-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 688.00 1.600 430.00 BagBag 1

    Sand 216.00 12.000 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 200.00 0.800 250.00 MdsMds 1

    Total Material % 52.56 5,259.00

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.44 2,416.38

    70.38

    Per SQM : Rs 997.71

    1,597.05

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,272.43

    100 Sft Rs. 2,909.04

    07-18-c-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:7

    (British)

    MATERIAL

    Ordinary Portland Cement 610.60 1.420 430.00 BagBag 1

    Sand 223.02 12.390 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 177.50 0.710 250.00 MdsMds 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 197 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Material % 52.27 5,166.12

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.73 2,416.38

    70.38

    Per SQM : Rs 985.62

    1,577.55

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,160.05

    100 Sft Rs. 2,909.04

    07-18-c-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 554.70 1.290 430.00 BagBag 1

    Sand 229.50 12.750 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 162.50 0.650 250.00 MdsMds 1

    Total Material % 52.06 5,101.70

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.94 2,416.38

    70.38

    Per SQM : Rs 977.23

    1,564.02

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,082.10

    100 Sft Rs. 2,909.04

    07-18-c-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar 1:1:9

    (British)

    MATERIAL

    Ordinary Portland Cement 498.80 1.160 430.00 BagBag 1

    Sand 235.80 13.100 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 145.00 0.580 250.00 MdsMds 1

    Total Material % 51.84 5,034.60

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 27.16 2,416.38

    70.38

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 198 of 969

  • Chapter # : 07 BRICK MASONRY

    Per SQM : Rs 968.50

    1,549.93

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,000.91

    100 Sft Rs. 2,909.04

    07-18-c-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Lime, cement, sand mortar

    1:1:10

    (British)

    MATERIAL

    Ordinary Portland Cement 460.10 1.070 430.00 BagBag 1

    Sand 239.94 13.330 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 135.00 0.540 250.00 MdsMds 1

    Total Material % 51.70 4,990.04

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 27.30 2,416.38

    70.38

    Per SQM : Rs 962.70

    1,540.57

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,946.99

    100 Sft Rs. 2,909.04

    07-18-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Perf. pacca brick wall 1 brick thick in ground floor : Lime, sand mortar 1:2

    (British)

    MATERIAL

    Sand 210.06 11.670 1,800.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Scaffolding 105.00 20.000 5.25 SftSft 1

    White Lime 557.50 2.230 250.00 MdsMds 1

    Total Material % 51.47 4,922.56

    LABOUR

    Mason 1,128.00 1.880 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 168.00 0.560 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 27.53 2,416.38

    70.38

    Per SQM : Rs 953.91

    1,526.40

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 313.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,865.34

    100 Sft Rs. 2,909.04

    07-19-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Add extra on item No. 07-18 for perf. pacca brick work in First floor

    (British)

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 199 of 969

  • Chapter # : 07 BRICK MASONRY

    Mason 114.00 0.190 600.00 DayDay 1

    Coolie 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 349.17

    10.17

    Per SQM : Rs 45.23

    71.19

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 45.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 420.36

    100 Sft Rs. 420.36

    07-19-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Add extra on item No. 07-18 for perf. pacca brick work in Second floor

    (British)

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,081.50

    31.50

    Per SQM : Rs 140.10

    220.50

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 140.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,302.00

    100 Sft Rs. 1,302.00

    07-19-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Add extra on item No. 07-18 for perf. pacca brick work in Third floor

    (British)

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 975.00 3.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,931.25

    56.25

    Per SQM : Rs 250.17

    393.75

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 250.17

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,325.00

    100 Sft Rs. 2,325.00

    07-19-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Add extra on item No. 07-18 for perf. pacca brck work in Fourth & subsequent floors

    (British)

    LABOUR

    Mason 1,350.00 2.250 600.00 DayDay 1

    Coolie 1,350.00 4.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,781.00

    81.00

    Per SQM : Rs 360.24

    567.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 360.24

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,348.00

    100 Sft Rs. 3,348.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 200 of 969

  • Chapter # : 07 BRICK MASONRY

    07-20-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Fire brick masonry in fire-clay mortar Upto 20 ft. height including all charges

    (British)

    MATERIAL

    Scaffolding 52.50 10.000 5.25 SftSft 1

    Alumina Cement 4,752.00 8.800 540.00 BagBag 1

    Fire Brick Crush 286.00 22.000 1,300.00 CftCft 100

    Fire Bricks 8,775.00 1350.000 6,500.00 CftCft 1,000

    Total Material % 61.93 13,865.50

    LABOUR

    Mason 1,800.00 3.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.07 3,244.50

    94.50

    Per CUM : Rs 7,304.23

    3,573.26

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,379.39

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 20,683.26

    100 Cft Rs. 3,906.00

    07-20-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Fire brick masonry in fire-clay mortar. Extra for every 5 ft. additional height, or part

    thereof

    (British)

    MATERIAL

    Scaffolding 52.50 10.000 5.25 SftSft 1

    Total Material % 7.94 52.50

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 71.06 463.50

    13.50

    Per CUM : Rs 219.49

    105.53

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 197.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 621.53

    100 Cft Rs. 558.00

    07-21-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    1st class brick wall laid in 1:3 c/s mortar reinfd 4.5" thick wall with hoop iron bonding

    6" apart

    (British)

    MATERIAL

    Ordinary Portland Cement 1,049.20 2.440 430.00 BagBag 1

    Sand 162.00 9.000 1,800.00 CftCft 100

    Steel (bars/rods/section) 12.85 0.164 78.33 KgKg 1

    Burnt Brick 3,150.00 525.000 6,000.00 NoNo 1,000

    Total Material % 60.84 4,374.05

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 375.00 1.250 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 201 of 969

  • Chapter # : 07 BRICK MASONRY

    Black Smith 40.20 0.067 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.16 1,122.91

    32.71

    Per SQM : Rs 714.94

    1,147.49

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 145.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 6,644.44

    100 Sft Rs. 1,351.85

    07-21-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    1st class brick wall laid in 1:3 c/s mortar reinfd 4.5" thick wall with hoop iron bonding

    12" apart

    (British)

    MATERIAL

    Ordinary Portland Cement 1,049.20 2.440 430.00 BagBag 1

    Sand 162.00 9.000 1,800.00 CftCft 100

    Steel (bars/rods/section) 6.42 0.082 78.33 KgKg 1

    Burnt Brick 3,150.00 525.000 6,000.00 NoNo 1,000

    Total Material % 60.82 4,367.62

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 375.00 1.250 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Black Smith 40.20 0.067 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.18 1,122.91

    32.71

    Per SQM : Rs 714.11

    1,146.14

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 145.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 6,636.67

    100 Sft Rs. 1,351.85

    07-21-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    1st class brick wall laid in 1:3 c/s mortar reinfd 3" thick wall with hoop iron bonding

    6" apart

    (British)

    MATERIAL

    Ordinary Portland Cement 774.00 1.800 430.00 BagBag 1

    Sand 117.00 6.500 1,800.00 CftCft 100

    Steel (bars/rods/section) 12.85 0.164 78.33 KgKg 1

    Burnt Brick 2,100.00 350.000 6,000.00 NoNo 1,000

    Total Material % 59.23 3,003.85

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 60.00 0.200 300.00 DayDay 1

    Black Smith 40.20 0.067 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.77 875.71

    25.51

    Per SQM : Rs 504.53

    809.35

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 113.44

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,688.90

    100 Sft Rs. 1,054.25

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 202 of 969

  • Chapter # : 07 BRICK MASONRY

    07-21-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    1st class brick wall laid in 1:3 c/s mortar reinfd 3" thick wall with hoop iron banding

    12" apart

    (British)

    MATERIAL

    Ordinary Portland Cement 774.00 1.800 430.00 BagBag 1

    Sand 117.00 6.500 1,800.00 CftCft 100

    Steel (bars/rods/section) 6.42 0.082 78.33 KgKg 1

    Burnt Brick 2,100.00 350.000 6,000.00 NoNo 1,000

    Total Material % 58.90 2,997.42

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 60.00 0.200 300.00 DayDay 1

    Black Smith 60.00 0.100 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.10 896.10

    26.10

    Per SQM : Rs 506.33

    812.16

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 116.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,705.68

    100 Sft Rs. 1,078.80

    07-22Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ghilafi work (1.5 brick thick wall)

    (British)

    MATERIAL

    Mud / Clay 246.38 36.500 675.00 CftCft 100

    Burnt Brick 4,050.00 675.000 6,000.00 NoNo 1,000

    Sundried Bricks 2,013.75 675.000 2,983.33 NoNo 1,000

    Total Material % 49.14 6,310.12

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 29.86 3,553.50

    103.50

    Per CUM : Rs 4,207.13

    2,049.63

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,510.76

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 11,913.25

    100 Cft Rs. 4,278.00

    07-23Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Dry brick pitching

    (British)

    MATERIAL

    Sand 360.00 20.000 1,800.00 CftCft 100

    Burnt Brick 8,100.00 1350.000 6,000.00 NoNo 1,000

    Total Material % 66.56 8,460.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 203 of 969

  • Chapter # : 07 BRICK MASONRY

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.44 1,236.00

    36.00

    Per CUM : Rs 4,140.51

    2,028.60

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 525.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 11,724.60

    100 Cft Rs. 1,488.00

    07-24Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Sun dried bricks in mud mortar

    (British)

    MATERIAL

    Mud / Clay 236.25 35.000 675.00 CftCft 100

    Sundried Bricks 4,027.50 1350.000 2,983.33 NoNo 1,000

    Total Material % 51.53 4,263.75

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 27.47 2,085.75

    60.75

    Per CUM : Rs 2,708.69

    1,320.64

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 886.75

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 7,670.14

    100 Cft Rs. 2,511.00

    07-25Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Pise wall (mud walling)

    (British)

    MATERIAL

    Mud / Clay 877.50 130.000 675.00 CftCft 100

    Total Material % 37.52 877.50

    LABOUR

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Skilled Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 41.48 927.00

    27.00

    Per CUM : Rs 769.07

    373.28

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 394.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,177.78

    100 Cft Rs. 1,116.00

    07-26-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Eave brick moulded in 1:3 c/s mortar 3" thick drip course cornice

    (British)

    MATERIAL

    Ordinary Portland Cement 645.00 1.500 430.00 BagBag 1

    Sand 90.00 5.000 1,800.00 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 204 of 969

  • Chapter # : 07 BRICK MASONRY

    Burnt Brick 1,680.00 280.000 6,000.00 NoNo 1,000

    Total Material % 45.15 2,415.00

    LABOUR

    Mason 1,050.00 1.750 600.00 Day.Day. 1

    Coolie 525.00 1.750 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 33.85 1,699.50

    49.50

    Per Meter : Rs 162.96

    853.65

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 67.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 4,968.15

    100 Rft Rs. 2,046.00

    07-26-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Eave brick moulded in 1:3 c/s mortar 4.5" thick drip course cornice

    (British)

    MATERIAL

    Ordinary Portland Cement 752.50 1.750 430.00 BagBag 1

    Sand 108.00 6.000 1,800.00 CftCft 100

    Burnt Brick 2,520.00 420.000 6,000.00 NoNo 1,000

    Total Material % 48.89 3,380.50

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 30.11 1,931.25

    56.25

    Per Meter : Rs 210.43

    1,103.66

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 76.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 6,415.41

    100 Rft Rs. 2,325.00

    07-26-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Eave brick moulded in 1:3 c/s mortar 4.5" thick eave brick with back brick

    (British)

    MATERIAL

    Ordinary Portland Cement 516.00 1.200 430.00 BagBag 1

    Sand 90.00 5.000 1,800.00 CftCft 100

    Burnt Brick 2,640.00 440.000 6,000.00 NoNo 1,000

    Burnt Brick (Perforated) 200.64 44.000 4,560.00 NoNo 1,000

    Total Material % 52.16 3,446.64

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 Day.Day. 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.84 1,622.25

    47.25

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 205 of 969

  • Chapter # : 07 BRICK MASONRY

    Per Meter : Rs 200.85

    1,054.54

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 64.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 6,123.43

    100 Rft Rs. 1,953.00

    07-27-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Laying dressed or moulded brick cornices in c/s mortar, plaster or paint (1 brick)

    (British)

    MATERIAL

    Ordinary Portland Cement 688.00 1.600 430.00 BagBag 1

    Sand 108.00 6.000 1,800.00 CftCft 100

    Burnt Brick 450.00 75.000 6,000.00 NoNo 1,000

    Total Material % 30.34 1,246.00

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 48.66 1,931.25

    56.25

    Per Meter : Rs 125.71

    655.41

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 76.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 3,832.66

    100 Rft Rs. 2,325.00

    07-27-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Laying dressed or moulded brick cornices c/s mortar, plaster or paint (2 brick)

    (British)

    MATERIAL

    Ordinary Portland Cement 2,150.00 5.000 430.00 BagBag 1

    Sand 324.00 18.000 1,800.00 CftCft 100

    Burnt Brick 1,350.00 225.000 6,000.00 NoNo 1,000

    Total Material % 44.04 3,824.00

    LABOUR

    Mason 1,800.00 3.000 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 34.96 2,858.25

    83.25

    Per Meter : Rs 264.63

    1,385.79

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 112.86

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 8,068.04

    100 Rft Rs. 3,441.00

    07-27-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Laying dressed or moulded brick cornices c/s mortar, plaster or paint (3 brick)

    (British)

    MATERIAL

    Ordinary Portland Cement 3,440.00 8.000 430.00 BagBag 1

    Sand 504.00 28.000 1,800.00 CftCft 100

    Burnt Brick 2,700.00 450.000 6,000.00 NoNo 1,000

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 206 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Material % 48.82 6,644.00

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 30.18 3,809.97

    110.97

    Per Meter : Rs 414.13

    2,172.03

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 150.45

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 12,626.00

    100 Rft Rs. 4,586.76

    07-27-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Laying dressed or moulded brick cornices c/s mortar, plaster or paint (4 brick)

    (British)

    MATERIAL

    Ordinary Portland Cement 4,300.00 10.000 430.00 BagBag 1

    Sand 666.00 37.000 1,800.00 CftCft 100

    Burnt Brick 4,512.00 752.000 6,000.00 NoNo 1,000

    Total Material % 50.99 9,478.00

    LABOUR

    Mason 3,000.00 5.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 28.01 4,789.50

    139.50

    Per Meter : Rs 565.29

    2,966.88

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 189.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 17,234.38

    100 Rft Rs. 5,766.00

    07-28Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 No.Spec. No :

    Cleaning bricks dismantled from kacha pacca masonry

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Cost Per 1000 No.: 372.00

    63.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 No.: 372.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 No. Rs. 372.00

    1000 No. Rs. 372.00

    07-29Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 No.Spec. No :

    Scraping bricks dismantled from pacca masonry

    (British)

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 207 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Cost Per 1000 No.: 744.00

    126.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 No.: 744.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 No. Rs. 744.00

    1000 No. Rs. 744.00

    07-30Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Supplying and filling sand under floor or plugging in wells

    (British)

    MATERIAL

    Sand 1,980.00 110.000 1,800.00 CftCft 100

    Total Material % 72.62 1,980.00

    LABOUR

    Coolie 56.10 0.187 300.00 DayDay 1

    Bhishti 12.00 0.040 300.00 DayDay 1

    Dresser 24.00 0.080 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 6.38 94.86

    2.76

    Per CUM : Rs 886.40

    435.14

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 40.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,510.00

    100 Cft Rs. 114.20

    07-31Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Provide & lay 2" thick & 15" projected tile band, laid in 1:2 c/s mortar

    (British)

    MATERIAL

    Ordinary Portland Cement 172.00 0.400 430.00 BagBag 1

    Sand 180.00 10.000 1,800.00 CftCft 100

    Iron Sheet 106.67 1.000 106.67 KgKg 1

    Brick Tile (12"x6"x2") 730.00 60.000 12,166.67 NoNo 1,000

    Total Material % 15.47 1,188.67

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Bhishti 750.00 2.500 300.00 DayDay 1

    Black Smith 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 63.53 4,789.50

    139.50

    Per Meter : Rs 236.30

    1,226.12

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 189.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 7,204.29

    100 Rft Rs. 5,766.00

    07-32-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    First class brick tiles clad by laying tiles in stretcher course, in cement sand mortar

    1:3

    (British)

    MATERIAL

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 208 of 969

  • Chapter # : 07 BRICK MASONRY

    Ordinary Portland Cement 1,182.50 2.750 430.00 BagBag 1

    Sand 180.00 10.000 1,800.00 CftCft 100

    Iron Sheet 64.00 0.600 106.67 KgKg 1

    Brick Tile (12"x6"x2") 2,433.33 200.000 12,166.67 NoNo 1,000

    Total Material % 57.63 3,859.83

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Black Smith 30.00 0.050 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.37 1,266.90

    36.90

    Per SQM : Rs 666.65

    1,068.87

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 164.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 6,195.60

    100 Sft Rs. 1,525.20

    07-32-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    First class brick tiles clad by laying tiles in stretcher course, in cement sand mortar

    1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 967.50 2.250 430.00 BagBag 1

    Sand 267.66 14.870 1,800.00 CftCft 100

    Iron Sheet 64.00 0.600 106.67 KgKg 1

    Brick Tile (12"x6"x2") 2,433.33 200.000 12,166.67 NoNo 1,000

    Total Material % 57.16 3,732.49

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Black Smith 30.00 0.050 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.84 1,266.90

    36.90

    Per SQM : Rs 650.07

    1,042.12

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 164.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 6,041.52

    100 Sft Rs. 1,525.20

    07-33Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Chamfering sides of head regulators and masonry walls to increase width

    (British)

    LABOUR

    Mason 2,397.60 3.996 600.00 DayDay 1

    Coolie 1,198.80 3.996 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,704.29

    107.89

    Per SQM : Rs 479.85

    755.24

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 479.85

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,459.54

    100 Sft Rs. 4,459.54

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 209 of 969

  • Chapter # : 07 BRICK MASONRY

    07-34Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Replacing kallar eaten bricks

    (British)

    MATERIAL

    Burnt Brick 6.00 1.000 6,000.00 NoNo 1,000

    Total Material % 19.00 6.00

    LABOUR

    Mason 12.00 0.020 600.00 DayDay 1

    Coolie 6.00 0.020 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 60.00 18.54

    0.54

    Cost Per Each: 29.58

    5.04

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 22.32

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 29.58

    Each Rs. 22.32

    07-35Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Repairing corners of bridges & other hydraulic masonry works

    (British)

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 231.75

    6.75

    Cost Per Each: 279.00

    47.25

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 279.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 279.00

    Each Rs. 279.00

    07-36Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Extra labour for drains of bath rooms etc

    (British)

    LABOUR

    Mason 1,792.20 2.987 600.00 DayDay 1

    Coolie 896.10 2.987 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,768.95

    80.65

    Per Meter : Rs 109.34

    564.54

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 109.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 3,333.49

    100 Rft Rs. 3,333.49

    07-37Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Maroo corners

    (British)

    LABOUR

    Mason 78.00 0.130 600.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 210 of 969

  • Chapter # : 07 BRICK MASONRY

    Coolie 39.00 0.130 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 120.51

    3.51

    Cost Per Each: 145.08

    24.57

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 145.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 145.08

    Each Rs. 145.08

    07-38-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Masonry with Facing/Machine/Special Bricks in cement sand mortar 1:2 upto 10 ft.

    height

    (British)

    MATERIAL

    Ordinary Portland Cement 3,440.00 8.000 430.00 BagBag 1

    Sand 360.00 20.000 1,800.00 CftCft 100

    Scaffolding 105.11 20.020 5.25 SftSft 1

    Facing / Machine Bricks 12,465.00 1350.000 9.23 EachEach 1

    Total Material % 63.41 16,370.11

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 15.59 3,346.47

    97.47

    Per CUM : Rs 8,417.82

    4,120.01

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,422.74

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 23,836.59

    100Cft Rs. 4,028.76

    07-38-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Masonry using Facing/Machine/Special bricks in cement sand mortar 1:3 upto 10 ft.

    height

    (British)

    MATERIAL

    Ordinary Portland Cement 2,580.00 6.000 430.00 BagBag 1

    Sand 405.18 22.510 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Facing / Machine Bricks 12,465.00 1350.000 9.23 EachEach 1

    Total Material % 63.12 15,555.18

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 15.88 3,269.22

    95.22

    Per CUM : Rs 8,036.75

    3,933.13

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 22,757.53

    100Cft Rs. 3,935.76

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 211 of 969

  • Chapter # : 07 BRICK MASONRY

    07-38-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Masonry using Facing/Machine/Special bricks in cement sand mortar 1:4 upto 10 ft.

    height

    (British)

    MATERIAL

    Ordinary Portland Cement 2,064.00 4.800 430.00 BagBag 1

    Sand 432.00 24.000 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Facing / Machine Bricks 12,465.00 1350.000 9.23 EachEach 1

    Total Material % 62.78 15,066.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,449.00 4.830 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.23 3,269.22

    95.22

    Per CUM : Rs 7,827.72

    3,830.40

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,389.90

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 22,165.62

    100Cft Rs. 3,935.76

    07-39Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Add extra on Item 07-38 for every 10 ft additional height or part thereof

    (British)

    MATERIAL

    Scaffolding 6.82 1.300 5.25 SftSft 1

    Total Material % 3.10 6.82

    LABOUR

    Mason 54.00 0.090 600.00 DayDay 1

    Coolie 106.50 0.355 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 75.90 165.32

    4.82

    Per CUM : Rs 73.20

    35.14

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 70.28

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 207.28

    100Cft Rs. 199.02

    07-40Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Masonry with Machine/Special Bricks in 1:3 c/s mortar in circular core wall of

    Overhead Reservoir

    (British)

    MATERIAL

    Ordinary Portland Cement 2,838.00 6.600 430.00 BagBag 1

    Sand 446.40 24.800 1,800.00 CftCft 100

    Scaffolding 192.68 36.700 5.25 SftSft 1

    Facing / Machine Bricks 13,711.50 1485.000 9.23 EachEach 1

    Total Material % 57.30 17,188.57

    LABOUR

    Mason 2,250.00 3.750 600.00 DayDay 1

    Coolie 2,820.00 9.400 300.00 DayDay 1

    Bhishti 540.00 1.800 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 212 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 21.70 5,778.30

    168.30

    Per CUM : Rs 9,801.45

    4,787.70

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,456.63

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 27,754.58

    100Cft Rs. 6,956.40

    07-41-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using

    Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,720.00 4.000 430.00 BagBag 1

    Sand 180.00 10.000 1,800.00 CftCft 100

    Hollow Block 16"X8"X8" 10,710.00 170.000 63.00 NoNo 1

    Total Material % 67.21 12,610.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.79 1,699.50

    49.50

    Per CUM : Rs 6,110.89

    2,994.60

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 17,304.10

    100Cft Rs. 2,046.00

    07-41-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using

    Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,290.00 3.000 430.00 BagBag 1

    Sand 207.00 11.500 1,800.00 CftCft 100

    Hollow Block 16"X8"X8" 10,710.00 170.000 63.00 NoNo 1

    Total Material % 66.95 12,207.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.05 1,699.50

    49.50

    Per CUM : Rs 5,938.69

    2,909.97

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 16,816.47

    100Cft Rs. 2,046.00

    07-41-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using

    Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 213 of 969

  • Chapter # : 07 BRICK MASONRY

    Ordinary Portland Cement 1,032.00 2.400 430.00 BagBag 1

    Sand 216.00 12.000 1,800.00 CftCft 100

    Hollow Block 16"X8"X8" 10,710.00 170.000 63.00 NoNo 1

    Total Material % 66.78 11,958.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.22 1,699.50

    49.50

    Per CUM : Rs 5,832.29

    2,857.68

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 16,515.18

    100Cft Rs. 2,046.00

    07-41-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using

    Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 860.00 2.000 430.00 BagBag 1

    Sand 225.00 12.500 1,800.00 CftCft 100

    Hollow Block 16"X8"X8" 10,710.00 170.000 63.00 NoNo 1

    Total Material % 66.67 11,795.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.33 1,699.50

    49.50

    Per CUM : Rs 5,762.64

    2,823.45

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 16,317.95

    100Cft Rs. 2,046.00

    07-41-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using

    Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 752.50 1.750 430.00 BagBag 1

    Sand 232.20 12.900 1,800.00 CftCft 100

    Hollow Block 16"X8"X8" 10,710.00 170.000 63.00 NoNo 1

    Total Material % 66.60 11,694.70

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.40 1,699.50

    49.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 214 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 5,719.78

    2,802.39

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 16,196.59

    100Cft Rs. 2,046.00

    07-41-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using

    Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 645.00 1.500 430.00 BagBag 1

    Sand 239.40 13.300 1,800.00 CftCft 100

    Hollow Block 16"X8"X8" 10,710.00 170.000 63.00 NoNo 1

    Total Material % 66.53 11,594.40

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.47 1,699.50

    49.50

    Per CUM : Rs 5,676.92

    2,781.32

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 16,075.22

    100Cft Rs. 2,046.00

    07-41-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using

    Hollow Block 16"x8"x8" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 571.90 1.330 430.00 BagBag 1

    Sand 239.40 13.300 1,800.00 CftCft 100

    Hollow Block 16"X8"X8" 10,710.00 170.000 63.00 NoNo 1

    Total Material % 66.48 11,521.30

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.52 1,699.50

    49.50

    Per CUM : Rs 5,645.68

    2,765.97

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 15,986.77

    100Cft Rs. 2,046.00

    07-42-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using

    Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 2,064.00 4.800 430.00 BagBag 1

    Sand 216.00 12.000 1,800.00 CftCft 100

    Hollow Block 16"X8"X6" 11,925.00 225.000 53.00 NoNo 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 215 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Material % 66.96 14,205.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.04 1,974.51

    57.51

    Per CUM : Rs 6,909.37

    3,385.62

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 19,565.13

    100Cft Rs. 2,377.08

    07-42-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using

    Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,548.00 3.600 430.00 BagBag 1

    Sand 243.00 13.500 1,800.00 CftCft 100

    Hollow Block 16"X8"X6" 11,925.00 225.000 53.00 NoNo 1

    Total Material % 66.68 13,716.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.32 1,974.51

    57.51

    Per CUM : Rs 6,700.41

    3,282.93

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 18,973.44

    100Cft Rs. 2,377.08

    07-42-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using

    Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,238.40 2.880 430.00 BagBag 1

    Sand 259.20 14.400 1,800.00 CftCft 100

    Hollow Block 16"X8"X6" 11,925.00 225.000 53.00 NoNo 1

    Total Material % 66.50 13,422.60

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.50 1,974.51

    57.51

    Per CUM : Rs 6,575.04

    3,221.32

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 18,618.43

    100Cft Rs. 2,377.08

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 216 of 969

  • Chapter # : 07 BRICK MASONRY

    07-42-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using

    Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,032.00 2.400 430.00 BagBag 1

    Sand 270.00 15.000 1,800.00 CftCft 100

    Hollow Block 16"X8"X6" 11,925.00 225.000 53.00 NoNo 1

    Total Material % 66.38 13,227.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.62 1,974.51

    57.51

    Per CUM : Rs 6,491.46

    3,180.24

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 18,381.75

    100Cft Rs. 2,377.08

    07-42-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using

    Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 885.80 2.060 430.00 BagBag 1

    Sand 277.20 15.400 1,800.00 CftCft 100

    Hollow Block 16"X8"X6" 11,925.00 225.000 53.00 NoNo 1

    Total Material % 66.29 13,088.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.71 1,974.51

    57.51

    Per CUM : Rs 6,432.06

    3,151.05

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 18,213.56

    100Cft Rs. 2,377.08

    07-42-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using

    Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 774.00 1.800 430.00 BagBag 1

    Sand 286.20 15.900 1,800.00 CftCft 100

    Hollow Block 16"X8"X6" 11,925.00 225.000 53.00 NoNo 1

    Total Material % 66.22 12,985.20

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 217 of 969

  • Chapter # : 07 BRICK MASONRY

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.78 1,974.51

    57.51

    Per CUM : Rs 6,388.14

    3,129.46

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 18,089.17

    100Cft Rs. 2,377.08

    07-42-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using

    Hollow Block 16"x8"x6" factory manufactured with 1.5" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 688.00 1.600 430.00 BagBag 1

    Sand 288.00 16.000 1,800.00 CftCft 100

    Hollow Block 16"X8"X6" 11,925.00 225.000 53.00 NoNo 1

    Total Material % 66.17 12,901.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.83 1,974.51

    57.51

    Per CUM : Rs 6,352.16

    3,111.78

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 17,987.29

    100Cft Rs. 2,377.08

    07-43-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using

    Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 2,408.00 5.600 430.00 BagBag 1

    Sand 252.00 14.000 1,800.00 CftCft 100

    Hollow Block 16"X8"X4" 15,889.50 321.000 49.50 NoNo 1

    Total Material % 67.90 18,549.50

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.10 2,280.42

    66.42

    Per CUM : Rs 8,895.86

    4,360.34

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 25,190.26

    100Cft Rs. 2,745.36

    07-43-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using

    Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght

    of 1900 psi.

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 218 of 969

  • Chapter # : 07 BRICK MASONRY

    MATERIAL

    Ordinary Portland Cement 1,806.00 4.200 430.00 BagBag 1

    Sand 284.40 15.800 1,800.00 CftCft 100

    Hollow Block 16"X8"X4" 15,889.50 321.000 49.50 NoNo 1

    Total Material % 67.67 17,979.90

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.33 2,280.42

    66.42

    Per CUM : Rs 8,652.47

    4,240.72

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 24,501.04

    100Cft Rs. 2,745.36

    07-43-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using

    Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,444.80 3.360 430.00 BagBag 1

    Sand 302.40 16.800 1,800.00 CftCft 100

    Hollow Block 16"X8"X4" 15,889.50 321.000 49.50 NoNo 1

    Total Material % 67.52 17,636.70

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.48 2,280.42

    66.42

    Per CUM : Rs 8,505.82

    4,168.65

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 24,085.77

    100Cft Rs. 2,745.36

    07-43-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using

    Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,204.00 2.800 430.00 BagBag 1

    Sand 315.00 17.500 1,800.00 CftCft 100

    Hollow Block 16"X8"X4" 15,889.50 321.000 49.50 NoNo 1

    Total Material % 67.42 17,408.50

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.58 2,280.42

    66.42

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 219 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 8,408.30

    4,120.73

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 23,809.65

    100Cft Rs. 2,745.36

    07-43-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using

    Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,036.30 2.410 430.00 BagBag 1

    Sand 324.00 18.000 1,800.00 CftCft 100

    Hollow Block 16"X8"X4" 15,889.50 321.000 49.50 NoNo 1

    Total Material % 67.36 17,249.80

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.64 2,280.42

    66.42

    Per CUM : Rs 8,340.49

    4,087.40

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 23,617.62

    100Cft Rs. 2,745.36

    07-43-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using

    Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 903.00 2.100 430.00 BagBag 1

    Sand 334.80 18.600 1,800.00 CftCft 100

    Hollow Block 16"X8"X4" 15,889.50 321.000 49.50 NoNo 1

    Total Material % 67.30 17,127.30

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.70 2,280.42

    66.42

    Per CUM : Rs 8,288.15

    4,061.67

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 23,469.39

    100Cft Rs. 2,745.36

    07-43-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Hollow Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using

    Hollow Block 16"x8"x4" factory manufactured with 1.25" wall thickness and strenght

    of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 799.80 1.860 430.00 BagBag 1

    Sand 336.60 18.700 1,800.00 CftCft 100

    Hollow Block 16"X8"X4" 15,889.50 321.000 49.50 NoNo 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 220 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Material % 67.25 17,025.90

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.75 2,280.42

    66.42

    Per CUM : Rs 8,244.82

    4,040.38

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 23,346.70

    100Cft Rs. 2,745.36

    07-44-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using

    16"x8"x8" factory manufactured solid blocks with strength of 2100 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,720.00 4.000 430.00 BagBag 1

    Sand 180.00 10.000 1,800.00 CftCft 100

    Solid Block 16"X8"X8" 9,860.00 170.000 58.00 NoNo 1

    Total Material % 66.65 11,760.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.35 1,699.50

    49.50

    Per CUM : Rs 5,747.68

    2,816.10

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 16,275.60

    100Cft Rs. 2,046.00

    07-44-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using

    16"x8"x8" factory manufactured solid blocks with strength of 2100 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,290.00 3.000 430.00 BagBag 1

    Sand 207.00 11.500 1,800.00 CftCft 100

    Solid Block 16"X8"X8" 9,860.00 170.000 58.00 NoNo 1

    Total Material % 66.36 11,357.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.64 1,699.50

    49.50

    Per CUM : Rs 5,575.47

    2,731.47

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 15,787.97

    100Cft Rs. 2,046.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 221 of 969

  • Chapter # : 07 BRICK MASONRY

    07-44-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using

    16"x8"x8" factory manufactured solid blocks with strength of 2100 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,032.00 2.400 430.00 BagBag 1

    Sand 216.00 12.000 1,800.00 CftCft 100

    Solid Block 16"X8"X8" 9,860.00 170.000 58.00 NoNo 1

    Total Material % 66.17 11,108.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.83 1,699.50

    49.50

    Per CUM : Rs 5,469.07

    2,679.18

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 15,486.68

    100Cft Rs. 2,046.00

    07-44-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using

    16"x8"x8" factory manufactured solid blocks with strength of 2100 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 860.00 2.000 430.00 BagBag 1

    Sand 225.00 12.500 1,800.00 CftCft 100

    Solid Block 16"X8"X8" 9,860.00 170.000 58.00 NoNo 1

    Total Material % 66.04 10,945.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.96 1,699.50

    49.50

    Per CUM : Rs 5,399.42

    2,644.95

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 15,289.45

    100Cft Rs. 2,046.00

    07-44-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using

    16"x8"x8" factory manufactured solid blocks with strength of 2100 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 752.50 1.750 430.00 BagBag 1

    Sand 232.20 12.900 1,800.00 CftCft 100

    Solid Block 16"X8"X8" 9,860.00 170.000 58.00 NoNo 1

    Total Material % 65.96 10,844.70

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 222 of 969

  • Chapter # : 07 BRICK MASONRY

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.04 1,699.50

    49.50

    Per CUM : Rs 5,356.56

    2,623.89

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 15,168.09

    100Cft Rs. 2,046.00

    07-44-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using

    16"x8"x8" factory manufactured solid blocks with strength of 2100 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 645.00 1.500 430.00 BagBag 1

    Sand 239.40 13.300 1,800.00 CftCft 100

    Solid Block 16"X8"X8" 9,860.00 170.000 58.00 NoNo 1

    Total Material % 65.88 10,744.40

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.12 1,699.50

    49.50

    Per CUM : Rs 5,313.71

    2,602.82

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 15,046.72

    100Cft Rs. 2,046.00

    07-44-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using

    16"x8"x8" factory manufactured solid blocks with strength of 2100 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 571.90 1.330 430.00 BagBag 1

    Sand 239.40 13.300 1,800.00 CftCft 100

    Solid Block 16"X8"X8" 9,860.00 170.000 58.00 NoNo 1

    Total Material % 65.82 10,671.30

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.18 1,699.50

    49.50

    Per CUM : Rs 5,282.47

    2,587.47

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 722.54

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 14,958.27

    100Cft Rs. 2,046.00

    07-45-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using

    16"x8"x6" factory manufactured solid blocks with strength of 1900 psi.

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 223 of 969

  • Chapter # : 07 BRICK MASONRY

    MATERIAL

    Ordinary Portland Cement 2,064.00 4.800 430.00 BagBag 1

    Sand 216.00 12.000 1,800.00 CftCft 100

    Solid Block 16"X8"X6" 10,800.00 225.000 48.00 NoNo 1

    Total Material % 66.29 13,080.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.71 1,974.51

    57.51

    Per CUM : Rs 6,428.65

    3,149.37

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 18,203.88

    100Cft Rs. 2,377.08

    07-45-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using

    16"x8"x6" factory manufactured solid blocks with strength of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,548.00 3.600 430.00 BagBag 1

    Sand 243.00 13.500 1,800.00 CftCft 100

    Solid Block 16"X8"X6" 10,800.00 225.000 48.00 NoNo 1

    Total Material % 65.96 12,591.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.04 1,974.51

    57.51

    Per CUM : Rs 6,219.69

    3,046.68

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 17,612.19

    100Cft Rs. 2,377.08

    07-45-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using

    16"x8"x6" factory manufactured solid blocks with strength of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,238.40 2.880 430.00 BagBag 1

    Sand 259.20 14.400 1,800.00 CftCft 100

    Solid Block 16"X8"X6" 10,800.00 225.000 48.00 NoNo 1

    Total Material % 65.75 12,297.60

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.25 1,974.51

    57.51

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 224 of 969

  • Chapter # : 07 BRICK MASONRY

    Per CUM : Rs 6,094.32

    2,985.07

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 17,257.18

    100Cft Rs. 2,377.08

    07-45-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using

    16"x8"x6" factory manufactured solid blocks with strength of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,032.00 2.400 430.00 BagBag 1

    Sand 270.00 15.000 1,800.00 CftCft 100

    Solid Block 16"X8"X6" 10,800.00 225.000 48.00 NoNo 1

    Total Material % 65.61 12,102.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.39 1,974.51

    57.51

    Per CUM : Rs 6,010.74

    2,943.99

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 17,020.50

    100Cft Rs. 2,377.08

    07-45-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using

    16"x8"x6" factory manufactured solid blocks with strength of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 885.80 2.060 430.00 BagBag 1

    Sand 277.20 15.400 1,800.00 CftCft 100

    Solid Block 16"X8"X6" 10,800.00 225.000 48.00 NoNo 1

    Total Material % 65.50 11,963.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.50 1,974.51

    57.51

    Per CUM : Rs 5,951.34

    2,914.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 16,852.31

    100Cft Rs. 2,377.08

    07-45-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using

    16"x8"x6" factory manufactured solid blocks with strength of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 774.00 1.800 430.00 BagBag 1

    Sand 286.20 15.900 1,800.00 CftCft 100

    Solid Block 16"X8"X6" 10,800.00 225.000 48.00 NoNo 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 225 of 969

  • Chapter # : 07 BRICK MASONRY

    Total Material % 65.43 11,860.20

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.57 1,974.51

    57.51

    Per CUM : Rs 5,907.42

    2,893.21

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 16,727.92

    100Cft Rs. 2,377.08

    07-45-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using

    16"x8"x6" factory manufactured solid blocks with strength of 1900 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 688.00 1.600 430.00 BagBag 1

    Sand 288.00 16.000 1,800.00 CftCft 100

    Solid Block 16"X8"X6" 10,800.00 225.000 48.00 NoNo 1

    Total Material % 65.36 11,776.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 867.00 2.890 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.64 1,974.51

    57.51

    Per CUM : Rs 5,871.44

    2,875.53

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 839.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 16,626.04

    100Cft Rs. 2,377.08

    07-46-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:2 cement sand mortar using

    16"x8"x4" factory manufactured solid blocks with strength of 1800 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 2,408.00 5.600 430.00 BagBag 1

    Sand 252.00 14.000 1,800.00 CftCft 100

    Solid Block 16"X8"X4" 13,482.00 321.000 42.00 NoNo 1

    Total Material % 66.83 16,142.00

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.17 2,280.42

    66.42

    Per CUM : Rs 7,867.12

    3,854.76

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 22,277.18

    100Cft Rs. 2,745.36

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 226 of 969

  • Chapter # : 07 BRICK MASONRY

    07-46-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:3 cement sand mortar using

    16"x8"x4" factory manufactured solid blocks with strength of 1800 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,806.00 4.200 430.00 BagBag 1

    Sand 284.40 15.800 1,800.00 CftCft 100

    Solid Block 16"X8"X4" 13,482.00 321.000 42.00 NoNo 1

    Total Material % 66.54 15,572.40

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.46 2,280.42

    66.42

    Per CUM : Rs 7,623.72

    3,735.14

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 21,587.96

    100Cft Rs. 2,745.36

    07-46-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:4 cement sand mortar using

    16"x8"x4" factory manufactured solid blocks with strength of 1800 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,444.80 3.360 430.00 BagBag 1

    Sand 302.40 16.800 1,800.00 CftCft 100

    Solid Block 16"X8"X4" 13,482.00 321.000 42.00 NoNo 1

    Total Material % 66.35 15,229.20

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.65 2,280.42

    66.42

    Per CUM : Rs 7,477.07

    3,663.07

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 21,172.69

    100Cft Rs. 2,745.36

    07-46-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:5 cement sand mortar using

    16"x8"x4" factory manufactured solid blocks with strength of 1800 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,204.00 2.800 430.00 BagBag 1

    Sand 315.00 17.500 1,800.00 CftCft 100

    Solid Block 16"X8"X4" 13,482.00 321.000 42.00 NoNo 1

    Total Material % 66.23 15,001.00

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 227 of 969

  • Chapter # : 07 BRICK MASONRY

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.77 2,280.42

    66.42

    Per CUM : Rs 7,379.56

    3,615.15

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 20,896.57

    100Cft Rs. 2,745.36

    07-46-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:6 cement sand mortar using

    16"x8"x4" factory manufactured solid blocks with strength of 1800 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 1,036.30 2.410 430.00 BagBag 1

    Sand 324.00 18.000 1,800.00 CftCft 100

    Solid Block 16"X8"X4" 13,482.00 321.000 42.00 NoNo 1

    Total Material % 66.13 14,842.30

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.87 2,280.42

    66.42

    Per CUM : Rs 7,311.75

    3,581.82

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 20,704.54

    100Cft Rs. 2,745.36

    07-46-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:7 cement sand mortar using

    16"x8"x4" factory manufactured solid blocks with strength of 1800 psi.

    (British)

    MATERIAL

    Ordinary Portland Cement 903.00 2.100 430.00 BagBag 1

    Sand 334.80 18.600 1,800.00 CftCft 100

    Solid Block 16"X8"X4" 13,482.00 321.000 42.00 NoNo 1

    Total Material % 66.06 14,719.80

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.94 2,280.42

    66.42

    Per CUM : Rs 7,259.40

    3,556.10

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 20,556.32

    100Cft Rs. 2,745.36

    07-46-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100CftSpec. No :

    Solid Block Masonry in walls upto 20 feet height in 1:8 cement sand mortar using

    16"x8"x4" factory manufactured solid blocks with strength of 1800 psi.

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 228 of 969

  • Chapter # : 07 BRICK MASONRY

    MATERIAL

    Ordinary Portland Cement 799.80 1.860 430.00 BagBag 1

    Sand 336.60 18.700 1,800.00 CftCft 100

    Solid Block 16"X8"X4" 13,482.00 321.000 42.00 NoNo 1

    Total Material % 66.00 14,618.40

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 1,014.00 3.380 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.00 2,280.42

    66.42

    Per CUM : Rs 7,216.07

    3,534.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 969.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100Cft Rs. 20,433.62

    100Cft Rs. 2,745.36

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 229 of 969

  • Chapter # : 08 STONE MASONRY

    08-01-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in foundn. & plinth Dry masonry.

    (British)

    MATERIAL

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 48.10 3,620.00

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 30.90 2,163.00

    63.00

    Per CUM : Rs 2,466.45

    1,201.20

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 919.59

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 6,984.20

    100 Cft Rs. 2,604.00

    08-01-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in foundn. & plinth in mud mortar

    (British)

    MATERIAL

    Loose Earth 405.00 45.000 900.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 46.00 4,025.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 33.00 2,703.75

    78.75

    Per CUM : Rs 2,869.41

    1,396.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,149.49

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 8,125.25

    100 Cft Rs. 3,255.00

    08-01-c-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry (Un coursed) in foundn. & plinth in lime, sand mortar 1:2

    (British)

    MATERIAL

    Sand 540.00 30.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    White Lime 1,500.00 6.000 250.00 MdsMds 1

    Total Material % 44.30 5,660.00

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 230 of 969

  • Chapter # : 08 STONE MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 34.70 4,171.50

    121.50

    Per CUM : Rs 4,192.07

    2,039.10

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,773.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 11,870.60

    100 Cft Rs. 5,022.00

    08-01-c-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry (Un coursed) in foundn. & plinth in lime, sand mortar,

    Surkhi Ratio 1:1:1

    (British)

    MATERIAL

    Sand 270.00 15.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Surkhi 10.50 15.000 70.00 CftCft 100

    White Lime 1,500.00 6.000 250.00 MdsMds 1

    Total Material % 43.43 5,400.50

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 35.57 4,171.50

    121.50

    Per CUM : Rs 4,081.18

    1,984.61

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,773.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 11,556.61

    100 Cft Rs. 5,022.00

    08-01-c-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry (Un coursed) in foundn. & plinth in lime, Surkhi Ratio 1:2

    (British)

    MATERIAL

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Surkhi 21.00 30.000 70.00 CftCft 100

    White Lime 1,500.00 6.000 250.00 MdsMds 1

    Total Material % 42.51 5,141.00

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 36.49 4,171.50

    121.50

    Per CUM : Rs 3,970.29

    1,930.11

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,773.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 11,242.61

    100 Cft Rs. 5,022.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 231 of 969

  • Chapter # : 08 STONE MASONRY

    08-01-d-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:3

    (British)

    MATERIAL

    Ordinary Portland Cement 3,870.00 9.000 430.00 BagBag 1

    Sand 607.50 33.750 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 50.66 8,097.50

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 28.34 4,171.50

    121.50

    Per CUM : Rs 5,233.63

    2,550.98

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,773.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,819.98

    100 Cft Rs. 5,022.00

    08-01-d-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 3,096.00 7.200 430.00 BagBag 1

    Sand 648.00 36.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 49.03 7,364.00

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 29.97 4,171.50

    121.50

    Per CUM : Rs 4,920.20

    2,396.94

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,773.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 13,932.44

    100 Cft Rs. 5,022.00

    08-01-d-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 2,210.20 5.140 430.00 BagBag 1

    Sand 694.26 38.570 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 46.89 6,524.46

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 232 of 969

  • Chapter # : 08 STONE MASONRY

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.11 4,171.50

    121.50

    Per CUM : Rs 4,561.46

    2,220.64

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,773.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,916.60

    100 Cft Rs. 5,022.00

    08-01-d-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 1,720.00 4.000 430.00 BagBag 1

    Sand 720.00 40.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 45.55 6,060.00

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 33.45 4,171.50

    121.50

    Per CUM : Rs 4,362.99

    2,123.10

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,773.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,354.60

    100 Cft Rs. 5,022.00

    08-02-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry in foundn. & plinth dry masonry.

    (British)

    MATERIAL

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 43.53 3,620.00

    LABOUR

    Mason 1,800.00 3.000 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 35.47 2,781.00

    81.00

    Per CUM : Rs 2,729.19

    1,327.20

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,182.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 7,728.20

    100 Cft Rs. 3,348.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 233 of 969

  • Chapter # : 08 STONE MASONRY

    08-02-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry in foundn. & plinth in mud mortar

    (British)

    MATERIAL

    Loose Earth 405.00 45.000 900.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 39.34 4,025.00

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 39.66 3,862.50

    112.50

    Per CUM : Rs 3,362.05

    1,632.75

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,642.13

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 9,520.25

    100 Cft Rs. 4,650.00

    08-02-c-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in lime, sand mortar

    1:2

    (British)

    MATERIAL

    Sand 480.06 26.670 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    White Lime 1,332.50 5.330 250.00 MdsMds 1

    Total Material % 41.26 5,432.56

    LABOUR

    Mason 2,850.00 4.750 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.74 4,712.25

    137.25

    Per CUM : Rs 4,324.78

    2,101.59

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,003.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,246.40

    100 Cft Rs. 5,673.00

    08-02-c-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in lime, sand

    mortar, Surkhi Ratio 1:1:1

    (British)

    MATERIAL

    Sand 239.94 13.330 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Surkhi 9.33 13.330 70.00 CftCft 100

    White Lime 1,332.50 5.330 250.00 MdsMds 1

    Total Material % 42.05 5,666.77

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 234 of 969

  • Chapter # : 08 STONE MASONRY

    LABOUR

    Mason 2,850.00 4.750 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 36.95 4,712.25

    137.25

    Per CUM : Rs 4,424.86

    2,150.77

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,003.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,529.79

    100 Cft Rs. 5,673.00

    08-02-c-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in lime, Surkhi

    Ratio 1:2

    (British)

    MATERIAL

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Surkhi 18.67 26.670 70.00 CftCft 100

    White Lime 1,332.50 5.330 250.00 MdsMds 1

    Total Material % 41.27 5,436.17

    LABOUR

    Mason 2,850.00 4.750 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.73 4,712.25

    137.25

    Per CUM : Rs 4,326.32

    2,102.35

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,003.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,250.76

    100 Cft Rs. 5,673.00

    08-02-d-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand

    mortar : Ratio 1:3

    (British)

    MATERIAL

    Ordinary Portland Cement 3,440.00 8.000 430.00 BagBag 1

    Sand 540.00 30.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Total Material % 48.49 8,065.00

    LABOUR

    Mason 2,850.00 4.750 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 30.51 4,712.25

    137.25

    Per CUM : Rs 5,449.64

    2,654.40

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,003.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,431.65

    100 Cft Rs. 5,673.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 235 of 969

  • Chapter # : 08 STONE MASONRY

    08-02-d-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand

    mortar : Ratio 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 2,752.00 6.400 430.00 BagBag 1

    Sand 576.00 32.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Total Material % 47.00 7,413.00

    LABOUR

    Mason 2,850.00 4.750 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.00 4,712.25

    137.25

    Per CUM : Rs 5,171.04

    2,517.48

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,003.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,642.73

    100 Cft Rs. 5,673.00

    08-02-d-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand

    mortar : Ratio 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 1,965.10 4.570 430.00 BagBag 1

    Sand 612.00 34.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Total Material % 45.06 6,662.10

    LABOUR

    Mason 2,850.00 4.750 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 33.94 4,712.25

    137.25

    Per CUM : Rs 4,850.17

    2,359.79

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,003.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 13,734.14

    100 Cft Rs. 5,673.00

    08-02-d-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement,sand

    mortar : Ratio 1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 1,530.80 3.560 430.00 BagBag 1

    Sand 640.80 35.600 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Total Material % 43.90 6,256.60

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 236 of 969

  • Chapter # : 08 STONE MASONRY

    LABOUR

    Mason 2,850.00 4.750 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 35.10 4,712.25

    137.25

    Per CUM : Rs 4,676.90

    2,274.64

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,003.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 13,243.49

    100 Cft Rs. 5,673.00

    08-03-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in ground floor Dry masonry.

    (British)

    MATERIAL

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 45.70 3,620.00

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 33.30 2,472.00

    72.00

    Per CUM : Rs 2,597.82

    1,264.20

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,050.97

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 7,356.20

    100 Cft Rs. 2,976.00

    08-03-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in ground floor in mud mortar

    (British)

    MATERIAL

    Mud / Clay 303.75 45.000 675.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 42.16 3,923.75

    LABOUR

    Mason 1,800.00 3.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 36.84 3,244.50

    94.50

    Per CUM : Rs 3,056.04

    1,485.49

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,379.39

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 8,653.74

    100 Cft Rs. 3,906.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 237 of 969

  • Chapter # : 08 STONE MASONRY

    08-03-c-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in ground floor in lime, sand mortar 1:2

    (British)

    MATERIAL

    Sand 540.00 30.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    White Lime 1,500.00 6.000 250.00 MdsMds 1

    Total Material % 42.65 5,660.00

    LABOUR

    Mason 2,700.00 4.500 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 36.35 4,557.75

    132.75

    Per CUM : Rs 4,356.28

    2,117.85

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,937.72

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,335.60

    100 Cft Rs. 5,487.00

    08-03-c-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1

    (British)

    MATERIAL

    Sand 270.00 15.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Surkhi 10.50 15.000 70.00 CftCft 100

    White Lime 1,500.00 6.000 250.00 MdsMds 1

    Total Material % 41.77 5,400.50

    LABOUR

    Mason 2,700.00 4.500 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.23 4,557.75

    132.75

    Per CUM : Rs 4,245.39

    2,063.36

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,937.72

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,021.61

    100 Cft Rs. 5,487.00

    08-03-c-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in ground floor in lime, Surkhi Ratio 1:2

    (British)

    MATERIAL

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Surkhi 21.00 30.000 70.00 CftCft 100

    White Lime 1,500.00 6.000 250.00 MdsMds 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 238 of 969

  • Chapter # : 08 STONE MASONRY

    Total Material % 40.84 5,141.00

    LABOUR

    Mason 2,700.00 4.500 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 38.16 4,557.75

    132.75

    Per CUM : Rs 4,134.51

    2,008.86

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,937.72

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 11,707.61

    100 Cft Rs. 5,487.00

    08-03-d-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:3

    (British)

    MATERIAL

    Ordinary Portland Cement 3,870.00 9.000 430.00 BagBag 1

    Sand 607.50 33.750 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 49.14 8,097.50

    LABOUR

    Mason 2,700.00 4.500 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 29.86 4,557.75

    132.75

    Per CUM : Rs 5,397.84

    2,629.73

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,937.72

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,284.98

    100 Cft Rs. 5,487.00

    08-03-d-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 3,096.00 7.200 430.00 BagBag 1

    Sand 648.00 36.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 47.47 7,364.00

    LABOUR

    Mason 2,700.00 4.500 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.53 4,557.75

    132.75

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 239 of 969

  • Chapter # : 08 STONE MASONRY

    Per CUM : Rs 5,084.41

    2,475.69

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,937.72

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,397.44

    100 Cft Rs. 5,487.00

    08-03-d-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 2,210.20 5.140 430.00 BagBag 1

    Sand 694.26 38.570 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 45.29 6,524.46

    LABOUR

    Mason 2,700.00 4.500 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 33.71 4,557.75

    132.75

    Per CUM : Rs 4,725.67

    2,299.39

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,937.72

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 13,381.60

    100 Cft Rs. 5,487.00

    08-03-d-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Random rubble masonry in ground floor in cement,sand mortar : Ratio 1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 1,720.00 4.000 430.00 BagBag 1

    Sand 720.00 40.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 43.93 6,060.00

    LABOUR

    Mason 2,700.00 4.500 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 35.07 4,557.75

    132.75

    Per CUM : Rs 4,527.20

    2,201.85

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,937.72

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,819.60

    100 Cft Rs. 5,487.00

    08-04-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry in ground floor Dry masonry.

    (British)

    MATERIAL

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 240 of 969

  • Chapter # : 08 STONE MASONRY

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 40.64 3,620.00

    LABOUR

    Mason 2,100.00 3.500 600.00 DayDay 1

    Coolie 1,050.00 3.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 38.36 3,244.50

    94.50

    Per CUM : Rs 2,926.25

    1,421.70

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,379.39

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 8,286.20

    100 Cft Rs. 3,906.00

    08-04-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry in ground floor in mud mortar

    (British)

    MATERIAL

    Mud / Clay 303.75 45.000 675.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    Total Material % 33.61 3,923.75

    LABOUR

    Mason 3,300.00 5.500 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 45.39 5,098.50

    148.50

    Per CUM : Rs 3,844.27

    1,863.49

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,167.62

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 10,885.74

    100 Cft Rs. 6,138.00

    08-04-c-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry in ground floor in lime, sand mortar 1:2

    (British)

    MATERIAL

    Sand 478.26 26.570 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 620.00 20.000 3,100.00 CftCft 100

    White Lime 1,332.50 5.330 250.00 MdsMds 1

    Total Material % 38.92 5,430.76

    LABOUR

    Mason 3,300.00 5.500 600.00 DayDay 1

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 40.08 5,330.25

    155.25

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 241 of 969

  • Chapter # : 08 STONE MASONRY

    Per CUM : Rs 4,586.75

    2,227.21

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,266.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,988.22

    100 Cft Rs. 6,417.00

    08-04-c-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1

    (British)

    MATERIAL

    Sand 239.94 13.330 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Surkhi 9.33 13.330 70.00 CftCft 100

    White Lime 1,332.50 5.330 250.00 MdsMds 1

    Total Material % 39.72 5,666.77

    LABOUR

    Mason 3,300.00 5.500 600.00 DayDay 1

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 39.28 5,330.25

    155.25

    Per CUM : Rs 4,687.60

    2,276.77

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,266.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 13,273.79

    100 Cft Rs. 6,417.00

    08-04-c-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry in ground floor in lime, Surkhi Ratio 1:2

    (British)

    MATERIAL

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Surkhi 18.60 26.570 70.00 CftCft 100

    White Lime 1,332.50 5.330 250.00 MdsMds 1

    Total Material % 38.94 5,436.10

    LABOUR

    Mason 3,300.00 5.500 600.00 DayDay 1

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 40.06 5,330.25

    155.25

    Per CUM : Rs 4,589.03

    2,228.33

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,266.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 12,994.68

    100 Cft Rs. 6,417.00

    08-04-d-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:3

    (British)

    MATERIAL

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 242 of 969

  • Chapter # : 08 STONE MASONRY

    Ordinary Portland Cement 3,440.00 8.000 430.00 BagBag 1

    Sand 540.00 30.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Total Material % 46.29 8,065.00

    LABOUR

    Mason 3,300.00 5.500 600.00 DayDay 1

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.71 5,330.25

    155.25

    Per CUM : Rs 5,712.38

    2,780.40

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,266.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,175.65

    100 Cft Rs. 6,417.00

    08-04-d-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 2,752.00 6.400 430.00 BagBag 1

    Sand 576.00 32.000 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Total Material % 44.76 7,413.00

    LABOUR

    Mason 3,300.00 5.500 600.00 DayDay 1

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 34.24 5,330.25

    155.25

    Per CUM : Rs 5,433.78

    2,643.48

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,266.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 15,386.73

    100 Cft Rs. 6,417.00

    08-04-d-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 1,965.10 4.570 430.00 BagBag 1

    Sand 615.60 34.200 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Total Material % 42.78 6,665.70

    LABOUR

    Mason 3,300.00 5.500 600.00 DayDay 1

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 36.22 5,330.25

    155.25

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 243 of 969

  • Chapter # : 08 STONE MASONRY

    Per CUM : Rs 5,114.45

    2,486.55

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,266.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,482.50

    100 Cft Rs. 6,417.00

    08-04-d-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Coursed rubble masonry in ground floor in cement,sand mortar : Ratio 1:8

    (British)

    MATERIAL

    Ordinary Portland Cement 1,530.80 3.560 430.00 BagBag 1

    Sand 658.80 36.600 1,800.00 CftCft 100

    Quarried Stone 3,000.00 100.000 3,000.00 CftCft 100

    Through Stone 1,085.00 35.000 3,100.00 CftCft 100

    Total Material % 41.65 6,274.60

    LABOUR

    Mason 3,300.00 5.500 600.00 DayDay 1

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.35 5,330.25

    155.25

    Per CUM : Rs 4,947.33

    2,404.42

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 2,266.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,009.27

    100 Cft Rs. 6,417.00

    08-05-a-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar block masonry in ground floor in lime, sand mortar 1:2

    (British)

    MATERIAL

    Sand 360.00 20.000 1,800.00 CftCft 100

    Steel (bars/rods/section) 142.57 1.820 78.33 KgKg 1

    Charcoal 613.35 13.630 45.00 KgKg 1

    Quarried Stone 6,000.00 200.000 3,000.00 CftCft 100

    White Lime 1,000.00 4.000 250.00 MdsMds 1

    Total Material % 27.39 8,115.92

    LABOUR

    Mason 10,200.00 17.000 600.00 DayDay 1

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Bellowman 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 51.61 14,832.00

    432.00

    Per CUM : Rs 9,773.79

    4,728.34

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 6,305.79

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 27,676.26

    100 Cft Rs. 17,856.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 244 of 969

  • Chapter # : 08 STONE MASONRY

    08-05-a-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar block masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1

    (British)

    MATERIAL

    Sand 180.00 10.000 1,800.00 CftCft 100

    Steel (bars/rods/section) 142.57 1.820 78.33 KgKg 1

    Charcoal 613.35 13.630 45.00 KgKg 1

    Quarried Stone 6,000.00 200.000 3,000.00 CftCft 100

    Surkhi 7.00 10.000 70.00 CftCft 100

    White Lime 1,000.00 4.000 250.00 MdsMds 1

    Total Material % 27.02 7,942.92

    LABOUR

    Mason 10,200.00 17.000 600.00 DayDay 1

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Bellowman 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 51.98 14,832.00

    432.00

    Per CUM : Rs 9,699.86

    4,692.01

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 6,305.79

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 27,466.93

    100 Cft Rs. 17,856.00

    08-05-a-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar block masonry in ground floor in lime, Surkhi Ratio 1:2

    (British)

    MATERIAL

    Steel (bars/rods/section) 142.57 1.820 78.33 KgKg 1

    Charcoal 613.35 13.630 45.00 KgKg 1

    Quarried Stone 6,000.00 200.000 3,000.00 CftCft 100

    Surkhi 14.00 20.000 70.00 CftCft 100

    White Lime 1,000.00 4.000 250.00 MdsMds 1

    Total Material % 26.64 7,769.92

    LABOUR

    Mason 10,200.00 17.000 600.00 DayDay 1

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Bellowman 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 52.36 14,832.00

    432.00

    Per CUM : Rs 9,625.94

    4,655.68

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 6,305.79

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 27,257.60

    100 Cft Rs. 17,856.00

    08-05-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar block masonry in ground floor in cement,sand mortar : Ratio 1:3

    (British)

    MATERIAL

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 245 of 969

  • Chapter # : 08 STONE MASONRY

    Ordinary Portland Cement 2,580.00 6.000 430.00 BagBag 1

    Sand 405.00 22.500 1,800.00 CftCft 100

    Steel (bars/rods/section) 142.57 1.820 78.33 KgKg 1

    Charcoal 613.35 13.630 45.00 KgKg 1

    Quarried Stone 6,000.00 200.000 3,000.00 CftCft 100

    Total Material % 30.67 9,740.92

    LABOUR

    Mason 10,200.00 17.000 600.00 DayDay 1

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Bellowman 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 48.33 14,832.00

    432.00

    Per CUM : Rs 10,468.16

    5,069.59

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 6,305.79

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 29,642.51

    100 Cft Rs. 17,856.00

    08-05-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar block masonry in ground floor in cement,sand mortar : Ratio 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 2,064.00 4.800 430.00 BagBag 1

    Sand 432.00 24.000 1,800.00 CftCft 100

    Steel (bars/rods/section) 142.57 1.820 78.33 KgKg 1

    Charcoal 613.35 13.630 45.00 KgKg 1

    Quarried Stone 6,000.00 200.000 3,000.00 CftCft 100

    Total Material % 29.73 9,251.92

    LABOUR

    Mason 10,200.00 17.000 600.00 DayDay 1

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Bellowman 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 49.27 14,832.00

    432.00

    Per CUM : Rs 10,259.21

    4,966.90

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 6,305.79

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 29,050.82

    100 Cft Rs. 17,856.00

    08-05-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar block masonry in ground floor in cement,sand mortar : Ratio 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 1,479.20 3.440 430.00 BagBag 1

    Sand 462.60 25.700 1,800.00 CftCft 100

    Steel (bars/rods/section) 142.57 1.820 78.33 KgKg 1

    Charcoal 613.35 13.630 45.00 KgKg 1

    Quarried Stone 6,000.00 200.000 3,000.00 CftCft 100

    Total Material % 28.62 8,697.72

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 246 of 969

  • Chapter # : 08 STONE MASONRY

    LABOUR

    Mason 10,200.00 17.000 600.00 DayDay 1

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Bellowman 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 50.38 14,832.00

    432.00

    Per CUM : Rs 10,022.40

    4,850.52

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 6,305.79

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 28,380.24

    100 Cft Rs. 17,856.00

    08-06-a-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar fine masonry in ground floor in lime, sand mortar 1:2

    (British)

    MATERIAL

    Sand 180.00 10.000 1,800.00 CftCft 100

    Steel (bars/rods/section) 177.82 2.270 78.33 KgKg 1

    Charcoal 1,227.15 27.270 45.00 KgKg 1

    Quarried Stone 7,500.00 250.000 3,000.00 CftCft 100

    White Lime 500.00 2.000 250.00 MdsMds 1

    Total Material % 19.36 9,584.97

    LABOUR

    Mason 24,000.00 40.000 600.00 DayDay 1

    Coolie 2,400.00 8.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 900.00 1.500 600.00 DayDay 1

    Bellowman 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 59.64 28,891.50

    841.50

    Per CUM : Rs 16,378.89

    7,903.34

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 12,283.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 46,379.81

    100 Cft Rs. 34,782.00

    08-06-a-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar fine masonry in ground floor in lime, sand mortar, Surkhi Ratio 1:1:1

    (British)

    MATERIAL

    Sand 90.00 5.000 1,800.00 CftCft 100

    Steel (bars/rods/section) 177.82 2.270 78.33 KgKg 1

    Charcoal 1,227.15 27.270 45.00 KgKg 1

    Quarried Stone 7,500.00 250.000 3,000.00 CftCft 100

    Surkhi 3.50 5.000 70.00 CftCft 100

    White Lime 500.00 2.000 250.00 MdsMds 1

    Total Material % 19.23 9,498.47

    LABOUR

    Mason 24,000.00 40.000 600.00 DayDay 1

    Coolie 2,400.00 8.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 900.00 1.500 600.00 DayDay 1

    Bellowman 450.00 1.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 247 of 969

  • Chapter # : 08 STONE MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 59.77 28,891.50

    841.50

    Per CUM : Rs 16,341.93

    7,885.18

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 12,283.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 46,275.15

    100 Cft Rs. 34,782.00

    08-06-a-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar fine masonry in ground floor in lime, Surkhi Ratio 1:2

    (British)

    MATERIAL

    Steel (bars/rods/section) 177.82 2.270 78.33 KgKg 1

    Charcoal 1,227.15 27.270 45.00 KgKg 1

    Quarried Stone 7,500.00 250.000 3,000.00 CftCft 100

    Surkhi 7.00 10.000 70.00 CftCft 100

    White Lime 500.00 2.000 250.00 MdsMds 1

    Total Material % 19.09 9,411.97

    LABOUR

    Mason 24,000.00 40.000 600.00 DayDay 1

    Coolie 2,400.00 8.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 900.00 1.500 600.00 DayDay 1

    Bellowman 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 59.91 28,891.50

    841.50

    Per CUM : Rs 16,304.97

    7,867.01

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 12,283.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 46,170.48

    100 Cft Rs. 34,782.00

    08-06-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar fine masonry in ground floor in cement,sand mortar : Ratio 1:3

    (British)

    MATERIAL

    Ordinary Portland Cement 1,290.00 3.000 430.00 BagBag 1

    Sand 202.50 11.250 1,800.00 CftCft 100

    Steel (bars/rods/section) 177.82 2.270 78.33 KgKg 1

    Charcoal 1,227.15 27.270 45.00 KgKg 1

    Quarried Stone 7,500.00 250.000 3,000.00 CftCft 100

    Total Material % 20.55 10,397.47

    LABOUR

    Mason 24,000.00 40.000 600.00 DayDay 1

    Coolie 2,400.00 8.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 900.00 1.500 600.00 DayDay 1

    Bellowman 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 58.45 28,891.50

    841.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 248 of 969

  • Chapter # : 08 STONE MASONRY

    Per CUM : Rs 16,726.08

    8,073.97

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 12,283.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 47,362.94

    100 Cft Rs. 34,782.00

    08-06-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar fine masonry in ground floor in cement,sand mortar : Ratio 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 1,032.00 2.400 430.00 BagBag 1

    Sand 216.00 12.000 1,800.00 CftCft 100

    Steel (bars/rods/section) 177.82 2.270 78.33 KgKg 1

    Charcoal 1,227.15 27.270 45.00 KgKg 1

    Quarried Stone 7,500.00 250.000 3,000.00 CftCft 100

    Total Material % 20.20 10,152.97

    LABOUR

    Mason 24,000.00 40.000 600.00 DayDay 1

    Coolie 2,400.00 8.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 900.00 1.500 600.00 DayDay 1

    Bellowman 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 58.80 28,891.50

    841.50

    Per CUM : Rs 16,621.60

    8,022.62

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 12,283.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 47,067.09

    100 Cft Rs. 34,782.00

    08-06-b-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Ashlar fine masonry in ground floor in cement,sand mortar : Ratio 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 743.90 1.730 430.00 BagBag 1

    Sand 231.12 12.840 1,800.00 CftCft 100

    Steel (bars/rods/section) 177.82 2.270 78.33 KgKg 1

    Charcoal 1,227.15 27.270 45.00 KgKg 1

    Quarried Stone 7,500.00 250.000 3,000.00 CftCft 100

    Total Material % 19.80 9,879.99

    LABOUR

    Mason 24,000.00 40.000 600.00 DayDay 1

    Coolie 2,400.00 8.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 900.00 1.500 600.00 DayDay 1

    Bellowman 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 59.20 28,891.50

    841.50

    Per CUM : Rs 16,504.96

    7,965.30

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 12,283.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 46,736.79

    100 Cft Rs. 34,782.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 249 of 969

  • Chapter # : 08 STONE MASONRY

    08-07-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour on items 08-03-a-01 to 08-06-b-03 for work in First floor

    (British)

    LABOUR

    Mason 240.00 0.400 600.00 DayDay 1

    Coolie 405.00 1.350 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 664.35

    19.35

    Per CUM : Rs 282.45

    135.45

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 282.45

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 799.80

    100 Cft Rs. 799.80

    08-07-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Second floor

    (British)

    LABOUR

    Mason 720.00 1.200 600.00 DayDay 1

    Coolie 780.00 2.600 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,545.00

    45.00

    Per CUM : Rs 656.85

    315.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 656.85

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 1,860.00

    100 Cft Rs. 1,860.00

    08-07-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Third floor

    (British)

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,170.00 3.900 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,441.10

    71.10

    Per CUM : Rs 1,037.83

    497.70

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,037.83

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,938.80

    100 Cft Rs. 2,938.80

    08-07-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour on items 08-03-a-01 to 08-06-b-03 for work in Fourth & subsequent

    floors

    (British)

    LABOUR

    Mason 2,100.00 3.500 600.00 DayDay 1

    Coolie 1,680.00 5.600 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,893.40

    113.40

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 250 of 969

  • Chapter # : 08 STONE MASONRY

    Per CUM : Rs 1,655.27

    793.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,655.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 4,687.20

    100 Cft Rs. 4,687.20

    08-08Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour on items 08-03-a-01 to 08-06-b-03 for every 5' additional height, other

    than building

    (British)

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Per CUM : Rs 262.74

    126.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 262.74

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 744.00

    100 Cft Rs. 744.00

    08-09Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour for arch work in stone masonry including centring & decentring etc.

    (British)

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,472.00

    72.00

    Per CUM : Rs 1,050.97

    504.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,050.97

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,976.00

    100 Cft Rs. 2,976.00

    08-10-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour for coping & caps etc

    (British)

    LABOUR

    Mason 12,000.00 20.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 12,360.00

    360.00

    Per CUM : Rs 5,254.83

    2,520.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 5,254.83

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,880.00

    100 Cft Rs. 14,880.00

    08-10-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Extra labour for cornice & string course

    (British)

    LABOUR

    Mason 12,000.00 20.000 600.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 251 of 969

  • Chapter # : 08 STONE MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 12,360.00

    360.00

    Per CUM : Rs 5,254.83

    2,520.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 5,254.83

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 14,880.00

    100 Cft Rs. 14,880.00

    08-11-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dressing stones : Hammer dressed

    (British)

    LABOUR

    Mason 3,000.00 5.000 600.00 DayDay 1

    Coolie 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,862.50

    112.50

    Per SQM : Rs 500.34

    787.50

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 500.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,650.00

    100 Sft Rs. 4,650.00

    08-11-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dressing stones : Rough tooled dressed

    (British)

    LABOUR

    Mason 6,000.00 10.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 7,416.00

    216.00

    Per SQM : Rs 960.65

    1,512.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 960.65

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,928.00

    100 Sft Rs. 8,928.00

    08-11-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dressing stones : Chisel dressed

    (British)

    LABOUR

    Mason 7,200.00 12.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 8,961.00

    261.00

    Per SQM : Rs 1,160.79

    1,827.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 1,160.79

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 10,788.00

    100 Sft Rs. 10,788.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 252 of 969

  • Chapter # : 08 STONE MASONRY

    08-11-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dressing stones : Fine dressed

    (British)

    LABOUR

    Mason 16,800.00 28.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 19,467.00

    567.00

    Per SQM : Rs 2,521.71

    3,969.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 2,521.71

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 23,436.00

    100 Sft Rs. 23,436.00

    08-12Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dhajji walling 5"x5" thick deodar framing with stone laid in 1:6 c/s mortar & 1:4 c/s

    plaster

    (British)

    MATERIAL

    Ordinary Portland Cement 731.00 1.700 430.00 BagBag 1

    Sand 306.00 17.000 1,800.00 CftCft 100

    Steel (bars/rods/section) 46.22 0.590 78.33 KgKg 1

    Charcoal 173.70 3.860 45.00 KgKg 1

    Nails / Screws / Clamps 72.75 0.450 161.67 KgKg 1

    Quarried Stone 1,440.00 48.000 3,000.00 CftCft 100

    Wood Deodar 4,075.00 1.630 2,500.00 CftCft 1

    Total Material % 41.67 6,844.67

    LABOUR

    Mason 3,300.00 5.500 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 60.00 0.200 300.00 DayDay 1

    Carpenter 1,020.00 1.700 600.00 DayDay 1

    Bellowman 60.00 0.200 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.33 5,809.20

    169.20

    Per SQM : Rs 1,643.66

    2,621.78

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 752.51

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 15,275.65

    100 Sft Rs. 6,993.60

    08-13Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Provide & fix stone blocks from 2 cft. to 6 cft. each, including lift upto 20 ft.

    (British)

    MATERIAL

    Quarried Stone 3,600.00 120.000 3,000.00 CftCft 100

    Total Material % 11.08 3,600.00

    LABOUR

    Mason 10,800.00 18.000 600.00 DayDay 1

    Coolie 5,400.00 18.000 300.00 DayDay 1

    Bhishti 900.00 3.000 300.00 DayDay 1

    Chiseller 4,000.00 10.000 400.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 253 of 969

  • Chapter # : 08 STONE MASONRY

    Total Labour

    Sundries (Labour Only): %3

    % 67.92 21,733.00

    633.00

    Per CUM : Rs 10,778.05

    5,187.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 9,239.74

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 30,520.00

    100 Cft Rs. 26,164.00

    08-14Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Providing and fixing stone blocks, under 2 cft. each, including lift upto 20 ft.

    (British)

    MATERIAL

    Quarried Stone 3,600.00 120.000 3,000.00 CftCft 100

    Total Material % 20.27 3,600.00

    LABOUR

    Mason 6,000.00 10.000 600.00 DayDay 1

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Bhishti 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 58.73 10,197.00

    297.00

    Per CUM : Rs 5,873.54

    2,835.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 4,335.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 16,632.00

    100 Cft Rs. 12,276.00

    08-15Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Provide & lay stone/boulder dry hand packed as filling behind retaining walls or in

    pitching

    (British)

    MATERIAL

    Quarried Stone 4,050.00 135.000 3,000.00 CftCft 100

    Total Material % 66.19 4,050.00

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Skilled Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.81 618.00

    18.00

    Per CUM : Rs 1,993.34

    976.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 262.74

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 5,644.50

    100 Cft Rs. 744.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 254 of 969

  • Chapter # : 09 ROOFING

    09-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    First class tile roofing including earth, mud plaster, gobri leeping, cement plaster etc

    complete

    (British)

    MATERIAL

    Mud / Clay 371.25 55.000 675.00 CftCft 100

    Ordinary Portland Cement 769.70 1.790 430.00 BagBag 1

    Sand 234.00 13.000 1,800.00 CftCft 100

    Fuel Wood 73.50 0.200 367.50 MdsMds 1

    Bhoosa 126.28 17.000 7.43 SrSr 1

    Clay (fine) 6.13 0.750 816.67 CftCft 100

    Cow Dung 25.00 0.750 33.33 CftCft 1

    Coal Tar (in canisters) 1,112.40 15.450 72.00 KgKg 1

    Brick Tile (12"x6"x2") 4,866.67 400.000 12,166.67 CftCft 1,000

    Total Material % 48.24 7,584.92

    LABOUR

    Mason 2,190.00 3.650 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 30.76 4,495.95

    130.95

    Per SQM : Rs 1,569.92

    2,509.48

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 582.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 14,590.35

    100 Sft Rs. 5,412.60

    09-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Second class tile roofing consisting of 4" earth and 1" mud plaster with gobri

    leeping etc

    (British)

    MATERIAL

    Mud / Clay 371.25 55.000 675.00 CftCft 100

    Ordinary Portland Cement 516.00 1.200 430.00 BagBag 1

    Sand 162.00 9.000 1,800.00 CftCft 100

    Fuel Wood 73.50 0.200 367.50 MdsMds 1

    Bhoosa 126.28 17.000 7.43 SrSr 1

    Clay (fine) 6.13 0.750 816.67 CftCft 100

    Cow Dung 25.00 0.750 33.33 CftCft 1

    Coal Tar (in canisters) 1,112.40 15.450 72.00 KgKg 1

    Ceramic Tile 6"x6" White 1,680.00 200.000 8.40 NoNo 1

    Total Material % 41.98 4,072.55

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.02 3,399.00

    99.00

    Per SQM : Rs 970.53

    1,548.24

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 440.30

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,019.79

    100 Sft Rs. 4,092.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 255 of 969

  • Chapter # : 09 ROOFING

    09-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Covering mud roof with coal tar and fine sand

    (British)

    MATERIAL

    Sand 15.30 0.850 1,800.00 CftCft 100

    Fuel Wood 22.05 0.060 367.50 MdsMds 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    Kerosene Oil 241.00 2.500 96.40 LtrLtr 1

    Total Material % 61.77 638.35

    LABOUR

    Mason 72.00 0.120 600.00 DayDay 1

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.23 151.41

    4.41

    Per SQM : Rs 102.72

    164.92

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 19.61

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 954.68

    100 Sft Rs. 182.28

    09-04-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Filling spaces in between wooden battens over beams, filled with deodar wood

    pieces

    (British)

    MATERIAL

    Wood Deodar 1,625.00 0.650 2,500.00 CftCft 1

    Wire Nails 12.00 0.100 120.00 KgKg 1

    Total Material % 59.61 1,637.00

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.39 463.50

    13.50

    Per SQM : Rs 273.17

    438.27

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 60.04

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,538.77

    100 Sft Rs. 558.00

    09-04-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Filling spaces in between RCC battens, filled with PCC block 1:3:6

    (British)

    MATERIAL

    Ordinary Portland Cement 193.50 0.450 430.00 BagBag 1

    Sand 36.00 2.000 1,800.00 CftCft 100

    Crushed Aggregate 108.00 4.000 2,700.00 CftCft 100

    Total Material % 26.27 337.50

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 39.00 0.130 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 256 of 969

  • Chapter # : 09 ROOFING

    Total Labour

    Sundries (Labour Only): %3

    % 52.73 658.17

    19.17

    Per SQM : Rs 129.20

    205.07

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 85.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,200.74

    100 Sft Rs. 792.36

    09-04-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Filling spaces in between spacers filled with bricks

    (British)

    MATERIAL

    Ordinary Portland Cement 86.00 0.200 430.00 BagBag 1

    Sand 18.00 1.000 1,800.00 CftCft 100

    Burnt Brick 270.00 45.000 6,000.00 NoNo 1,000

    Total Material % 51.03 374.00

    LABOUR

    Mason 102.00 0.170 600.00 DayDay 1

    Coolie 51.00 0.170 300.00 DayDay 1

    Bhishti 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 27.97 188.49

    5.49

    Per SQM : Rs 73.11

    116.97

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 24.42

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 679.46

    100 Sft Rs. 226.92

    09-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Single layer of tiles 10"x5"x1.25" laid over 4" earth and 1" mud plaster on top of RC

    roof slab

    (British)

    MATERIAL

    Mud / Clay 371.25 55.000 675.00 CftCft 100

    Ordinary Portland Cement 219.30 0.510 430.00 BagBag 1

    Sand 54.00 3.000 1,800.00 CftCft 100

    Fuel Wood 73.50 0.200 367.50 MdsMds 1

    Coal Tar (in canisters) 1,112.40 15.450 72.00 KgKg 1

    Brick Tile (12"x6"x2") 4,258.33 350.000 12,166.67 CftCft 1,000

    Total Material % 62.21 6,088.78

    LABOUR

    Mason 750.00 1.250 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.79 1,390.50

    40.50

    Per SQM : Rs 972.86

    1,562.14

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 180.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,041.43

    100 Sft Rs. 1,674.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 257 of 969

  • Chapter # : 09 ROOFING

    09-06-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Jack arch roof 4.5" thick laid in 1:5 c/s mortar a) cement concrete in haunches

    1:6:12

    (British)

    MATERIAL

    Mud / Clay 303.75 45.000 675.00 CftCft 100

    Ordinary Portland Cement 2,085.50 4.850 430.00 BagBag 1

    Sand 576.00 32.000 1,800.00 CftCft 100

    Crushed Aggregate 918.00 34.000 2,700.00 CftCft 100

    Fuel Wood 73.50 0.200 367.50 MdsMds 1

    Burnt Brick 3,300.00 550.000 6,000.00 NoNo 1,000

    Bhoosa 126.28 17.000 7.43 SrSr 1

    Clay (fine) 6.13 0.750 816.67 CftCft 100

    Cow Dung 25.00 0.750 33.33 CftCft 1

    Coal Tar (in canisters) 1,112.40 15.450 72.00 KgKg 1

    Total Material % 48.63 8,526.55

    LABOUR

    Mason 2,100.00 3.500 600.00 DayDay 1

    Coolie 2,100.00 7.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 30.37 4,944.00

    144.00

    Per SQM : Rs 1,750.56

    2,798.58

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 640.44

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 16,269.13

    100 Sft Rs. 5,952.00

    09-06-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Jack arch roof 4.5" thick laid in 1:5 c/s mortar b) cement concrete in haunches 1:3:6

    (British)

    MATERIAL

    Mud / Clay 371.25 55.000 675.00 CftCft 100

    Ordinary Portland Cement 3,001.40 6.980 430.00 BagBag 1

    Sand 558.00 31.000 1,800.00 CftCft 100

    Crushed Aggregate 918.00 34.000 2,700.00 CftCft 100

    Fuel Wood 73.50 0.200 367.50 MdsMds 1

    Burnt Brick 3,300.00 550.000 6,000.00 NoNo 1,000

    Bhoosa 126.28 17.000 7.43 SrSr 1

    Clay (fine) 6.13 0.750 816.67 CftCft 100

    Cow Dung 25.00 0.750 33.33 CftCft 1

    Coal Tar (in canisters) 1,112.40 15.450 72.00 KgKg 1

    Total Material % 50.48 9,491.95

    LABOUR

    Mason 2,100.00 3.500 600.00 DayDay 1

    Coolie 2,100.00 7.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 28.52 4,944.00

    144.00

    Per SQM : Rs 1,876.25

    3,001.31

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 640.44

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 17,437.26

    100 Sft Rs. 5,952.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 258 of 969

  • Chapter # : 09 ROOFING

    09-07-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Jack arch roofing 4.5"thick laid in 1:5 c/s mortar complete. Cement concrete in

    haunches 1:6:12

    (British)

    MATERIAL

    Ordinary Portland Cement 2,304.80 5.360 430.00 BagBag 1

    Sand 648.00 36.000 1,800.00 CftCft 100

    Crushed Aggregate 945.00 35.000 2,700.00 CftCft 100

    Fuel Wood 73.50 0.200 367.50 MdsMds 1

    Burnt Brick 3,300.00 550.000 6,000.00 NoNo 1,000

    Coal Tar (in canisters) 1,112.40 15.450 72.00 KgKg 1

    Total Material % 51.87 8,383.70

    LABOUR

    Mason 1,650.00 2.750 600.00 DayDay 1

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 27.13 4,017.00

    117.00

    Per SQM : Rs 1,611.88

    2,579.58

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 520.35

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 14,980.28

    100 Sft Rs. 4,836.00

    09-07-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Jack arch roofing 4.5"thick laid in 1:5 cement mortar, including complete. Cement

    concrete in haunches 1:3:6

    (British)

    MATERIAL

    Ordinary Portland Cement 3,225.00 7.500 430.00 BagBag 1

    Sand 630.00 35.000 1,800.00 CftCft 100

    Crushed Aggregate 918.00 34.000 2,700.00 CftCft 100

    Fuel Wood 73.50 0.200 367.50 MdsMds 1

    Burnt Brick 3,300.00 550.000 6,000.00 NoNo 1,000

    Coal Tar (in canisters) 1,112.40 15.450 72.00 KgKg 1

    Total Material % 53.48 9,258.90

    LABOUR

    Mason 1,650.00 2.750 600.00 DayDay 1

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 25.52 4,017.00

    117.00

    Per SQM : Rs 1,725.83

    2,763.37

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 520.35

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 16,039.27

    100 Sft Rs. 4,836.00

    09-08Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Extra for vaulted jack arch roofing

    (British)

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 259 of 969

  • Chapter # : 09 ROOFING

    Carpenter 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,236.00

    36.00

    Per SQM : Rs 160.11

    252.00

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 160.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,488.00

    100 Sft Rs. 1,488.00

    09-09Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Jack arch roofing of shingle & cement concrete 1:3:6, 4.5" at crown & 1/2" cem.

    plaster complete

    (British)

    MATERIAL

    Ordinary Portland Cement 3,259.40 7.580 430.00 BagBag 1

    Sand 504.00 28.000 1,800.00 CftCft 100

    Total Material % 37.32 3,763.40

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 2,700.00 9.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Carpenter 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 41.68 4,017.00

    117.00

    Per SQM : Rs 1,010.33

    1,609.31

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 520.35

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,389.71

    100 Sft Rs. 4,836.00

    09-10-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Earth filling over roof including watering, ramming etc 3" thick earth filling and 1"

    mud plaster

    (British)

    MATERIAL

    Mud / Clay 303.75 45.000 675.00 CftCft 100

    Bhoosa 126.28 17.000 7.43 SrSr 1

    Clay (fine) 6.13 0.750 816.67 CftCft 100

    Cow Dung 25.00 0.750 33.33 CftCft 1

    Total Material % 40.32 461.15

    LABOUR

    Mason 72.00 0.120 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 36.00 0.120 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 38.68 420.24

    12.24

    Per SQM : Rs 114.48

    182.52

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 54.44

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,063.91

    100 Sft Rs. 505.92

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 260 of 969

  • Chapter # : 09 ROOFING

    09-10-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Earth filling over roof including watering, ramming etc 4" thick earth filling and 1"

    mud plaster

    (British)

    MATERIAL

    Mud / Clay 371.25 55.000 675.00 CftCft 100

    Bhoosa 126.28 17.000 7.43 SrSr 1

    Clay (fine) 6.13 0.750 816.67 CftCft 100

    Cow Dung 25.00 0.750 33.33 CftCft 1

    Total Material % 42.09 528.65

    LABOUR

    Mason 72.00 0.120 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 54.00 0.180 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 36.91 438.78

    12.78

    Per SQM : Rs 125.67

    200.48

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 56.84

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,167.91

    100 Sft Rs. 528.24

    09-11Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    1/8" thick gobri leeping on roofs or floors

    (British)

    MATERIAL

    Clay (fine) 6.13 0.750 816.67 CftCft 100

    Cow Dung 25.00 0.750 33.33 CftCft 1

    Total Material % 19.53 31.12

    LABOUR

    Mason 72.00 0.120 600.00 DayDay 1

    Bhishti 18.00 0.060 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 59.47 92.70

    2.70

    Per SQM : Rs 16.06

    25.44

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 12.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 149.26

    100 Sft Rs. 111.60

    09-12Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    2 coats of bitumen laid hot using 34 lbs. for %sft over roof & blinded with sand at 1

    cft per % sft

    (British)

    MATERIAL

    Sand 18.00 1.000 1,800.00 CftCft 100

    Fuel Wood 44.10 0.120 367.50 MdsMds 1

    Coal Tar (in canisters) 1,112.40 15.450 72.00 KgKg 1

    Total Material % 60.54 1,174.50

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 261 of 969

  • Chapter # : 09 ROOFING

    Total Labour

    Sundries (Labour Only): %3

    % 18.46 309.00

    9.00

    Per SQM : Rs 192.94

    309.65

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 40.03

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,793.15

    100 Sft Rs. 372.00

    09-13-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc. complete : 20 BWG

    (British)

    MATERIAL

    G.I Sheet 11,169.00 102.000 109.50 KgKg 1

    G.I Bolt & Nuts 180.00 1.500 120.00 DozDoz 1

    Limpet Washer 76.00 2.000 38.00 DozDoz 1

    Bolts / Nuts / Screws 245.00 2.000 122.50 DozDoz 1

    Bitumen Washer 25.20 42.000 0.60 NoNo 1

    Tie Rod Brass 600.00 10.000 60.00 KgKg 1

    Total Material % 70.82 12,295.20

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 8.18 927.00

    27.00

    Per SQM : Rs 1,720.87

    2,770.99

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 120.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 15,993.19

    100 Sft Rs. 1,116.00

    09-13-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc. complete : 22 BWG

    (British)

    MATERIAL

    G.I Sheet 9,417.00 86.000 109.50 KgKg 1

    G.I Bolt & Nuts 180.00 1.500 120.00 DozDoz 1

    Limpet Washer 76.00 2.000 38.00 DozDoz 1

    Bolts / Nuts / Screws 245.00 2.000 122.50 DozDoz 1

    Bitumen Washer 25.20 42.000 0.60 NoNo 1

    Tie Rod Brass 600.00 10.000 60.00 KgKg 1

    Total Material % 70.02 10,543.20

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 8.98 927.00

    27.00

    Per SQM : Rs 1,492.76

    2,403.07

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 120.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 13,873.27

    100 Sft Rs. 1,116.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 262 of 969

  • Chapter # : 09 ROOFING

    09-13-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Supply & fix corrugated GI sheet with GI bolts, nuts, limpet etc. complete : 24 BWG

    (British)

    MATERIAL

    G.I Sheet 7,446.00 68.000 109.50 KgKg 1

    G.I Bolt & Nuts 180.00 1.500 120.00 DozDoz 1

    Limpet Washer 76.00 2.000 38.00 DozDoz 1

    Bolts / Nuts / Screws 245.00 2.000 122.50 DozDoz 1

    Bitumen Washer 25.20 42.000 0.60 NoNo 1

    Tie Rod Brass 600.00 10.000 60.00 KgKg 1

    Total Material % 68.78 8,572.20

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.22 927.00

    27.00

    Per SQM : Rs 1,236.15

    1,989.16

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 120.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 11,488.36

    100 Sft Rs. 1,116.00

    09-14Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Khassi parnalas in c/s mortar 1:2, 12" outside width finished smooth with a floating

    coat

    (British)

    MATERIAL

    Ordinary Portland Cement 18.27 0.043 430.00 BagBag 1

    Sand 1.50 0.083 1,800.00 CftCft 100

    Total Material % 20.79 19.77

    LABOUR

    Mason 33.50 0.056 600.00 DayDay 1

    Coolie 16.75 0.056 300.00 DayDay 1

    Bhishti 2.25 0.008 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 58.21 54.08

    1.58

    Per Meter : Rs 292.01

    15.18

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 213.53

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 89.03

    Rft Rs. 65.10

    09-15Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Khuras on roof 2'x2'x6"

    (British)

    MATERIAL

    Ordinary Portland Cement 129.00 0.300 430.00 BagBag 1

    Sand 18.00 1.000 1,800.00 CftCft 100

    Crushed Aggregate 54.00 2.000 2,700.00 CftCft 100

    Total Material % 38.58 201.00

    LABOUR

    Mason 120.00 0.200 600.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 263 of 969

  • Chapter # : 09 ROOFING

    Coolie 60.00 0.200 300.00 DayDay 1

    Bhishti 15.00 0.050 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 40.42 200.85

    5.85

    Cost Per Each: 485.01

    83.16

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 241.80

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 485.01

    Each Rs. 241.80

    09-16Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Bottom khuras of brick masonry in c/s mortar 1:6,4'x2'x4.5" over 3" cem. concrete

    1:4:8

    (British)

    MATERIAL

    Brick Ballast /Stone Ballast 25.20 2.000 1,260.00 CftCft 100

    Ordinary Portland Cement 159.10 0.370 430.00 BagBag 1

    Sand 36.00 2.000 1,800.00 CftCft 100

    Burnt Brick 252.00 42.000 6,000.00 NoNo 1,000

    Total Material % 53.79 472.30

    LABOUR

    Mason 120.00 0.200 600.00 DayDay 1

    Coolie 60.00 0.200 300.00 DayDay 1

    Bhishti 15.00 0.050 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 25.21 200.85

    5.85

    Cost Per Each: 813.28

    140.13

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 241.80

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 813.28

    Each Rs. 241.80

    09-17-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Plain GI sheets 22 SWG rain water down pipe a) 4" diameter down pipe

    (British)

    MATERIAL

    G.I Sheet 74.45 0.680 109.50 KgKg 1

    Bolts / Nuts / Screws 18.67 0.152 122.50 DozDoz 1

    Total Material % 50.97 93.12

    LABOUR

    Mason 18.29 0.030 600.00 DayDay 1

    Coolie 9.15 0.030 300.00 DayDay 1

    Pipe Fitter II 18.29 0.030 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 28.03 47.10

    1.37

    Per Meter : Rs 555.58

    29.16

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 169.38

    Rft Rs. 56.71

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 264 of 969

  • Chapter # : 09 ROOFING

    09-17-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Plain GI sheets 22 SWG rain water down pipe b) 5" diameter down pipe

    (British)

    MATERIAL

    G.I Sheet 94.14 0.860 109.50 KgKg 1

    Bolts / Nuts / Screws 18.67 0.152 122.50 DozDoz 1

    Total Material % 54.08 112.82

    LABOUR

    Mason 18.29 0.030 600.00 DayDay 1

    Coolie 9.15 0.030 300.00 DayDay 1

    Pipe Fitter II 18.29 0.030 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 24.92 47.10

    1.37

    Per Meter : Rs 633.75

    33.30

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 193.22

    Rft Rs. 56.71

    09-18Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Plain galvanized iron sheet flashing, 22 guage

    (British)

    MATERIAL

    G.I Sheet 4,966.17 45.353 109.50 KgKg 1

    Bolts / Nuts / Screws 284.62 2.323 122.50 DozDoz 1

    Total Material % 36.48 5,250.79

    LABOUR

    Mason 3,011.15 5.019 600.00 DayDay 1

    Coolie 892.19 2.974 300.00 DayDay 1

    Black Smith 1,784.39 2.974 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 42.52 5,858.36

    170.63

    Per SQM : Rs 1,442.51

    2,297.09

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 758.88

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 13,406.24

    100 Sft Rs. 7,052.79

    09-19-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Cast iron rain water down pipe fixed in position excluding heads & shoes : 4" dia

    (British)

    MATERIAL

    Ordinary Portland Cement 10.49 0.024 430.00 BagBag 1

    Hold Fast With Bolt 16.95 0.169 100.00 KgKg 1

    Lead 7.50 0.038 195.00 KgKg 1

    Paint : Enamel 5.08 0.017 300.00 LtrLtr 1

    Cast Iron Pipe 4" 424.97 1.017 417.89 RFTRFT 1

    Total Material % 71.32 465.00

    LABOUR

    Mason 20.34 0.034 600.00 DayDay 1

    Coolie 10.17 0.034 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 265 of 969

  • Chapter # : 09 ROOFING

    Total Labour

    Sundries (Labour Only): %3

    % 7.68 31.42

    0.92

    Per Meter : Rs 1,969.59

    104.06

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 124.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 600.49

    Rft Rs. 37.83

    09-19-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Cast iron rain water down pipe fixed in position excluding heads & shoes : 3" dia

    (British)

    MATERIAL

    Ordinary Portland Cement 10.49 0.024 430.00 BagBag 1

    Hold Fast With Bolt 16.95 0.169 100.00 KgKg 1

    Lead 7.50 0.038 195.00 KgKg 1

    Paint : Enamel 5.08 0.017 300.00 LtrLtr 1

    Cast Iron Pipe 3" 333.97 1.017 328.27 RFTRFT 1

    Total Material % 70.27 374.00

    LABOUR

    Mason 20.34 0.034 600.00 DayDay 1

    Coolie 10.17 0.034 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 8.73 31.42

    0.92

    Per Meter : Rs 1,608.41

    84.95

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 124.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 490.37

    Rft Rs. 37.83

    09-20Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Heads for cast iron rain water down pipe fixed in place including cost of clamp

    holdfast and painting

    (British)

    MATERIAL

    Ordinary Portland Cement 61.92 0.144 430.00 BagBag 1

    Hold Fast With Bolt 100.00 1.000 100.00 KgKg 1

    Lead 44.26 0.227 195.00 KgKg 1

    Shoe Head Offs 950.00 1.000 950.00 NoNo 1

    Paint : Enamel 15.00 0.050 300.00 LtrLtr 1

    Total Material % 68.15 1,171.18

    LABOUR

    Mason 54.00 0.090 600.00 DayDay 1

    Coolie 27.00 0.090 300.00 DayDay 1

    Fitter II 54.00 0.090 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.85 139.05

    4.05

    Cost Per Each: 1,584.53

    274.30

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 167.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 1,584.53

    Each Rs. 167.40

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 266 of 969

  • Chapter # : 09 ROOFING

    09-21Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Shoes, bends or offsets for cast iron ran water down pipe, including fixing & painting

    (British)

    MATERIAL

    Ordinary Portland Cement 61.92 0.144 430.00 BagBag 1

    Hold Fast With Bolt 100.00 1.000 100.00 KgKg 1

    Lead 44.26 0.227 195.00 KgKg 1

    Shoe Head Offs 950.00 1.000 950.00 NoNo 1

    Paint : Enamel 15.00 0.050 300.00 LtrLtr 1

    Total Material % 71.43 1,171.18

    LABOUR

    Mason 30.00 0.050 600.00 DayDay 1

    Coolie 15.00 0.050 300.00 DayDay 1

    Pipe Fitter II 30.00 0.050 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 7.57 77.25

    2.25

    Cost Per Each: 1,510.13

    261.70

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 93.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 1,510.13

    Each Rs. 93.00

    09-22Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Plain GI sheet spouts fixed in position, including paint

    (British)

    MATERIAL

    Ordinary Portland Cement 61.92 0.144 430.00 BagBag 1

    G.I Sheet 74.46 0.680 109.50 KgKg 1

    Paint : Enamel 30.00 0.100 300.00 LtrLtr 1

    Total Material % 39.97 166.38

    LABOUR

    Mason 60.00 0.100 600.00 DayDay 1

    Coolie 30.00 0.100 300.00 DayDay 1

    Black Smith 60.00 0.100 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 39.03 154.50

    4.50

    Cost Per Each: 387.32

    66.44

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 387.32

    Each Rs. 186.00

    09-23Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Laying 1/2" thick deodar ceiling complete, including sawing, planing & fixing

    (British)

    MATERIAL

    Nails / Screws / Clamps 323.33 2.000 161.67 KgKg 1

    Wood Deodar 12,500.00 5.000 2,500.00 CftCft 1

    Total Material % 60.44 12,823.33

    LABOUR

    Coolie 900.00 3.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 267 of 969

  • Chapter # : 09 ROOFING

    Carpenter 2,400.00 4.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.56 3,399.00

    99.00

    Per SQM : Rs 2,109.85

    3,385.90

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 440.30

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 19,608.23

    100 Sft Rs. 4,092.00

    09-24-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Flat sheet roof with GI plain sheets, including batten rolls, screws, clips etc : 22

    BWG

    (British)

    MATERIAL

    Nails / Screws / Clamps 97.00 0.600 161.67 KgKg 1

    Wood Deodar 1,818.75 0.728 2,500.00 CftCft 1

    G.I Sheet 8,842.13 80.750 109.50 KgKg 1

    Total Material % 62.49 10,757.88

    LABOUR

    Coolie 900.00 3.000 300.00 DayDay 1

    Carpenter 225.00 0.375 600.00 DayDay 1

    Black Smith 1,200.00 2.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.51 2,394.75

    69.75

    Per SQM : Rs 1,710.84

    2,747.40

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 310.21

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 15,900.03

    100 Sft Rs. 2,883.00

    09-24-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Flat sheet roof with GI plain sheets, including batten rolls, screws, clips etc : 24

    BWG

    (British)

    MATERIAL

    Nails / Screws / Clamps 119.39 0.738 161.67 KgKg 1

    Wood Deodar 1,818.75 0.728 2,500.00 CftCft 1

    G.I Sheet 7,582.88 69.250 109.50 KgKg 1

    Total Material % 61.08 9,521.02

    LABOUR

    Coolie 900.00 3.000 300.00 DayDay 1

    Carpenter 225.00 0.375 600.00 DayDay 1

    Black Smith 1,200.00 2.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.92 2,394.75

    69.75

    Per SQM : Rs 1,549.81

    2,487.66

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 310.21

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 14,403.43

    100 Sft Rs. 2,883.00

    09-25Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Asbestos cement corrugated sheet roofing including overlaps, GI hooks, bolts, nuts

    etc

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 268 of 969

  • Chapter # : 09 ROOFING

    MATERIAL

    G.I Bolt & Nuts 240.00 2.000 120.00 DozDoz 1

    Limpet Washer 266.00 7.000 38.00 DozDoz 1

    Hold Fast With Bolt 150.00 1.500 100.00 KgKg 1

    Corrugated AC Sheet 8,516.88 125.000 68.14 SftSft 1

    Total Material % 67.21 9,172.88

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Carpenter 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.79 1,236.00

    36.00

    Per SQM : Rs 1,354.38

    2,178.30

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 160.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 12,587.18

    100 Sft Rs. 1,488.00

    09-26Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Extra labour for erection of GI sheets, flat sheet or asbestos sheet roofing above 20'

    height

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Pipe Fitter II 60.00 0.100 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 216.30

    6.30

    Per SQM : Rs 28.02

    44.10

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 28.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 260.40

    100 Sft Rs. 260.40

    09-27Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RFTSpec. No :

    Fixing asbestos cement sheet ridges and valleys 1/4" thick

    (British)

    MATERIAL

    G.I Bolt & Nuts 1,200.00 10.000 120.00 DozDoz 1

    Limpet Washer 798.00 21.000 38.00 DozDoz 1

    Corrugated AC Sheet 2,180.32 32.000 68.14 SftSft 1

    Total Material % 55.92 4,178.32

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Carpenter 900.00 1.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 23.08 1,545.00

    45.00

    Per Meter : Rs 226.84

    1,192.45

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 61.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 RFT Rs. 6,915.77

    100 RFT Rs. 1,860.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 269 of 969

  • Chapter # : 09 ROOFING

    09-28-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Plain GI sheet ridging including fixture complete 6" lap & 18" overall of 22 gauge GI

    sheet ridging

    (British)

    MATERIAL

    Wood Deodar 198.17 0.079 2,500.00 CftCft 1

    G.I Sheet 104.16 0.951 109.50 KgKg 1

    Limpet Washer 5.79 0.152 38.00 DozDoz 1

    Hook 16.77 1.524 11.00 NoNo 1

    Total Material % 65.02 324.89

    LABOUR

    Coolie 18.29 0.061 300.00 DayDay 1

    Carpenter 18.29 0.030 600.00 DayDay 1

    Black Smith 18.29 0.030 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.98 56.52

    1.65

    Per Meter : Rs 1,512.62

    79.75

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 223.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 461.17

    Rft Rs. 68.05

    09-28-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Plain GI sheet ridging including fixture complete 9" lap & 24" overall, of 24 gauge GI

    sheet ridging

    (British)

    MATERIAL

    Wood Deodar 175.30 0.070 2,500.00 CftCft 1

    G.I Sheet 124.19 1.134 109.50 KgKg 1

    Limpet Washer 5.79 0.152 38.00 DozDoz 1

    Hook 16.77 1.524 11.00 NoNo 1

    Total Material % 64.94 322.05

    LABOUR

    Coolie 18.29 0.061 300.00 DayDay 1

    Carpenter 18.29 0.030 600.00 DayDay 1

    Black Smith 18.29 0.030 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 14.06 56.52

    1.65

    Per Meter : Rs 1,501.37

    79.16

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 223.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 457.74

    Rft Rs. 68.05

    09-28-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Plain GI sheet ridging including fixture complete 12" lap & 30 overall, of 22 gauge

    GI sheet ridging

    (British)

    MATERIAL

    Wood Deodar 175.30 0.070 2,500.00 CftCft 1

    G.I Sheet 178.94 1.634 109.50 KgKg 1

    Limpet Washer 5.79 0.152 38.00 DozDoz 1

    Hook 16.77 1.524 11.00 NoNo 1

    Total Material % 66.34 376.80

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 270 of 969

  • Chapter # : 09 ROOFING

    LABOUR

    Coolie 18.29 0.061 300.00 DayDay 1

    Carpenter 18.29 0.030 600.00 DayDay 1

    Black Smith 18.29 0.030 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.66 56.52

    1.65

    Per Meter : Rs 1,718.66

    90.65

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 223.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 523.98

    Rft Rs. 68.05

    09-29Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Plain 22 gauge GI sheet gutter semi circular 8" diameter

    (British)

    MATERIAL

    G.I Sheet 75.45 0.689 109.50 KgKg 1

    Bolts / Nuts / Screws 74.70 0.610 122.50 DozDoz 1

    Total Material % 64.26 150.14

    LABOUR

    Coolie 9.15 0.030 300.00 DayDay 1

    Black Smith 18.29 0.030 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 14.74 28.26

    0.82

    Per Meter : Rs 707.49

    37.29

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 111.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 215.70

    Rft Rs. 34.02

    09-30Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Fixing water spouse or parnala.

    (British)

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 231.75

    6.75

    Cost Per Each: 279.00

    47.25

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 279.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 279.00

    Each Rs. 279.00

    09-31Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Making masonry ventilators in c/s mortar 1:4

    (British)

    MATERIAL

    Ordinary Portland Cement 79.98 0.186 430.00 BagBag 1

    Sand 18.00 1.000 1,800.00 CftCft 100

    Burnt Brick 300.00 50.000 6,000.00 NoNo 1,000

    Total Material % 23.30 397.98

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 271 of 969

  • Chapter # : 09 ROOFING

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 55.70 927.00

    27.00

    Cost Per Each: 1,597.56

    272.58

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 1,116.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 1,597.56

    Each Rs. 1,116.00

    09-32Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Making drip course 2"x1/2" under RCC slab edges in outer opening, in c/s mortar

    1:2

    (British)

    MATERIAL

    Ordinary Portland Cement 0.92 0.002 430.00 BagBag 1

    Sand 0.11 0.006 1,800.00 CftCft 100

    Total Material % 10.38 1.03

    LABOUR

    Mason 2.74 0.005 600.00 DayDay 1

    Coolie 2.29 0.008 300.00 DayDay 1

    Bhishti 0.73 0.002 300.00 DayDay 1

    Skilled Coolie 0.73 0.002 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 68.62 6.69

    0.19

    Per Meter : Rs 30.49

    1.58

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 26.41

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 9.30

    Rft Rs. 8.05

    09-33Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Supply and laying of twin GI sheet 20 SWG painted with bitumen & polythene fim

    complete

    (British)

    MATERIAL

    Steel (Struct. Sections) 7.33 0.099 74.00 KgKg 1

    Polythene Sheet 22.78 12.093 1.88 SftSft 1

    Coal Tar (in canisters) 360.00 5.000 72.00 KgKg 1

    G.I Sheet 16,445.80 150.190 109.50 KgKg 1

    Total Material % 68.74 16,835.91

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Skilled Coolie 279.00 0.930 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.26 1,832.37

    53.37

    Per SQM : Rs 2,429.33

    3,909.13

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 237.36

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 22,577.41

    100 Sft Rs. 2,205.96

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 272 of 969

  • Chapter # : 09 ROOFING

    09-34-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit SftSpec. No :

    Provide & lay roof insulation complete with Thermopore sheet 1/2" thick

    (British)

    MATERIAL

    Mud / Clay 0.11 0.017 675.00 CftCft 100

    Ordinary Portland Cement 5.99 0.014 430.00 BagBag 1

    Sand 0.22 0.012 1,800.00 CftCft 100

    Polythene Sheet 1.88 1.000 1.88 SftSft 1

    Coal Tar (in canisters) 3.22 0.045 72.00 KgKg 1

    Thermopore Sheet 0.5" 11.00 1.000 11.00 SftSft 1

    Brick Tile 9"x4.5"x1.5" 28.81 3.601 8,000.00 NoNo 1,000

    Total Material % 60.11 51.24

    LABOUR

    Mason 6.02 0.010 600.00 DayDay 1

    Coolie 3.01 0.010 300.00 DayDay 1

    Bhishti 1.51 0.005 300.00 DayDay 1

    Skilled Coolie 3.01 0.010 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.89 13.96

    0.41

    Per SQM : Rs 847.91

    13.61

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 180.79

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Sft Rs. 78.80

    Sft Rs. 16.80

    09-34-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit SftSpec. No :

    Provide & lay roof insulation complete with Thermopore sheet 3/4" thick

    (British)

    MATERIAL

    Mud / Clay 1.22 0.180 675.00 CftCft 100

    Ordinary Portland Cement 5.99 0.014 430.00 BagBag 1

    Sand 2.36 0.131 1,800.00 CftCft 100

    Coal Tar (in canisters) 3.22 0.045 72.00 KgKg 1

    Brick Tile 9"x4.5"x1.5" 28.81 3.601 8,000.00 NoNo 1,000

    Thermopore Sheet 0.75" 15.50 1.000 15.50 SftSft 1

    Total Material % 61.42 57.10

    LABOUR

    Mason 6.02 0.010 600.00 DayDay 1

    Coolie 3.01 0.010 300.00 DayDay 1

    Bhishti 1.51 0.005 300.00 DayDay 1

    Skilled Coolie 3.01 0.010 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 17.58 13.96

    0.41

    Per SQM : Rs 924.19

    14.84

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 180.79

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Sft Rs. 85.89

    Sft Rs. 16.80

    09-34-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit SftSpec. No :

    Provide & lay roof insulation complete with Thermopore sheet 1" thick

    (British)

    MATERIAL

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 273 of 969

  • Chapter # : 09 ROOFING

    Mud / Clay 1.22 0.180 675.00 CftCft 100

    Ordinary Portland Cement 5.99 0.014 430.00 BagBag 1

    Sand 2.36 0.131 1,800.00 CftCft 100

    Coal Tar (in canisters) 3.22 0.045 72.00 KgKg 1

    Brick Tile 9"x4.5"x1.5" 28.81 3.601 8,000.00 NoNo 1,000

    Thermopore Sheet 1" 22.50 1.000 22.50 SftSft 1

    Total Material % 62.74 64.10

    LABOUR

    Mason 6.02 0.010 600.00 DayDay 1

    Coolie 3.01 0.010 300.00 DayDay 1

    Bhishti 1.51 0.005 300.00 DayDay 1

    Skilled Coolie 3.01 0.010 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.26 13.96

    0.41

    Per SQM : Rs 1,015.33

    16.31

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 180.79

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Sft Rs. 94.36

    Sft Rs. 16.80

    09-35Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Providing and fixing AC rain water down pipe 4" dia, with shoe, tee, bend & clamp

    etc

    (British)

    MATERIAL

    Nails / Screws / Clamps 48.50 0.300 161.67 KgKg 1

    Shoe Head Offs 285.00 0.300 950.00 NoNo 1

    A.C.pipe (b) 4" 153.88 1.000 153.88 RFTRFT 1

    Total Material % 71.59 487.38

    LABOUR

    Mason 15.00 0.025 600.00 DayDay 1

    Coolie 15.00 0.050 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 7.41 30.90

    0.90

    Per Meter : Rs 2,056.33

    108.65

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 122.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 626.93

    Rft Rs. 37.20

    09-36-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Making jharries in existing brick masonry For slabs upto 6" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 20.98 0.049 430.00 BagBag 1

    Sand 0.37 0.020 1,800.00 CftCft 100

    Total Material % 43.75 21.34

    LABOUR

    Mason 6.04 0.010 600.00 DayDay 1

    Coolie 3.02 0.010 300.00 DayDay 1

    Bhishti 0.64 0.002 300.00 DayDay 1

    Skilled Coolie 6.04 0.020 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 35.25 16.20

    0.47

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 274 of 969

  • Chapter # : 09 ROOFING

    Per Meter : Rs 148.69

    7.79

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 63.98

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 45.33

    Rft Rs. 19.51

    09-36-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit RftSpec. No :

    Making jharries in existing brick masonry For slabs exceeding 6" to 12" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 2.62 0.006 430.00 BagBag 1

    Sand 0.38 0.021 1,800.00 CftCft 100

    Total Material % 4.98 3.01

    LABOUR

    Mason 29.40 0.049 600.00 DayDay 1

    Coolie 4.48 0.015 300.00 DayDay 1

    Bhishti 1.46 0.005 300.00 DayDay 1

    Skilled Coolie 7.50 0.025 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 74.02 44.13

    1.29

    Per Meter : Rs 186.19

    9.63

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 174.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Rft Rs. 56.77

    Rft Rs. 53.13

    09-37-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Making recess in existing brick masonry a) upto 1.0' height of girder or beam

    (British)

    MATERIAL

    Ordinary Portland Cement 21.50 0.050 430.00 BagBag 1

    Sand 0.36 0.020 1,800.00 CftCft 100

    Total Material % 8.89 21.86

    LABOUR

    Mason 90.00 0.150 600.00 DayDay 1

    Coolie 30.00 0.100 300.00 DayDay 1

    Bhishti 15.00 0.050 300.00 DayDay 1

    Skilled Coolie 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 70.11 169.95

    4.95

    Cost Per Each: 231.05

    39.24

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 204.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 231.05

    Each Rs. 204.60

    09-37-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Making recess in existing brick masonry b) for every 6" additional height or part

    thereof

    (British)

    MATERIAL

    Ordinary Portland Cement 10.75 0.025 430.00 BagBag 1

    Sand 1.80 0.100 1,800.00 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 275 of 969

  • Chapter # : 09 ROOFING

    Total Material % 11.92 12.55

    LABOUR

    Mason 30.00 0.050 600.00 DayDay 1

    Coolie 15.00 0.050 300.00 DayDay 1

    Bhishti 7.50 0.025 300.00 DayDay 1

    Skilled Coolie 15.00 0.050 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 67.08 69.53

    2.03

    Cost Per Each: 98.89

    16.81

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 83.70

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 98.89

    Each Rs. 83.70

    09-38Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting RS Beams & wooden beams and placing in position

    (British)

    LABOUR

    Mason 72.00 0.120 600.00 DayDay 1

    Coolie 105.00 0.350 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 182.31

    5.31

    Cost Per Each: 219.48

    37.17

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 219.48

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 219.48

    Each Rs. 219.48

    09-39Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position sahl ballies, over roof

    (British)

    LABOUR

    Mason 19.80 0.033 600.00 DayDay 1

    Coolie 9.90 0.033 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 30.59

    0.89

    Cost Per Each: 36.83

    6.24

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 36.83

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 36.83

    Each Rs. 36.83

    09-40-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist precast RCC/pre-stressed conc. battens a) From 5' to 6' long

    (British)

    LABOUR

    Mason 10.20 0.017 600.00 DayDay 1

    Coolie 15.00 0.050 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 25.96

    0.76

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 276 of 969

  • Chapter # : 09 ROOFING

    Cost Per Each: 31.25

    5.29

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 31.25

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 31.25

    Each Rs. 31.25

    09-40-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist precast RCC/pre-stressed conc. battens b) Over 6' to 7' long

    (British)

    LABOUR

    Mason 15.00 0.025 600.00 DayDay 1

    Coolie 22.50 0.075 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 38.63

    1.13

    Cost Per Each: 46.50

    7.88

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 46.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 46.50

    Each Rs. 46.50

    09-40-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist precast RCC/pre-stressed conc. battens c) Over 7' to 8' long

    (British)

    LABOUR

    Mason 19.80 0.033 600.00 DayDay 1

    Coolie 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 51.29

    1.49

    Cost Per Each: 61.75

    10.46

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 61.75

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 61.75

    Each Rs. 61.75

    09-40-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist precast RCC/pre-stressed conc. battens d) Over 8' to 9' long

    (British)

    LABOUR

    Mason 24.00 0.040 600.00 DayDay 1

    Coolie 36.00 0.120 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 61.80

    1.80

    Cost Per Each: 74.40

    12.60

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 74.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 74.40

    Each Rs. 74.40

    09-40-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist precast RCC/pre-stressed conc. battens e) Exceeding 9' length

    (British)

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 277 of 969

  • Chapter # : 09 ROOFING

    Mason 30.00 0.050 600.00 DayDay 1

    Coolie 45.00 0.150 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 77.25

    2.25

    Cost Per Each: 93.00

    15.75

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 93.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 93.00

    Each Rs. 93.00

    09-41-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position RCC troughs Upto 10' in length

    (British)

    LABOUR

    Mason 30.00 0.050 600.00 DayDay 1

    Coolie 45.00 0.150 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 77.25

    2.25

    Cost Per Each: 93.00

    15.75

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 93.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 93.00

    Each Rs. 93.00

    09-41-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position RCC troughs Upto 11' in length

    (British)

    LABOUR

    Mason 40.20 0.067 600.00 DayDay 1

    Coolie 60.00 0.200 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 103.21

    3.01

    Cost Per Each: 124.25

    21.04

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 124.25

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 124.25

    Each Rs. 124.25

    09-41-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position RCC troughs Upto 12' in length

    (British)

    LABOUR

    Mason 49.80 0.083 600.00 DayDay 1

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 128.54

    3.74

    Cost Per Each: 154.75

    26.21

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 154.75

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 154.75

    Each Rs. 154.75

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 278 of 969

  • Chapter # : 09 ROOFING

    09-41-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position RCC troughs Upto 13' in length

    (British)

    LABOUR

    Mason 54.00 0.090 600.00 DayDay 1

    Coolie 81.60 0.272 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 139.67

    4.07

    Cost Per Each: 168.14

    28.48

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 168.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 168.14

    Each Rs. 168.14

    09-41-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position RCC troughs Upto 14' in length

    (British)

    LABOUR

    Mason 60.00 0.100 600.00 DayDay 1

    Coolie 90.00 0.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Cost Per Each: 186.00

    31.50

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 186.00

    Each Rs. 186.00

    09-41-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position RCC troughs Upto 15' in length

    (British)

    LABOUR

    Mason 66.00 0.110 600.00 DayDay 1

    Coolie 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 169.95

    4.95

    Cost Per Each: 204.60

    34.65

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 204.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 204.60

    Each Rs. 204.60

    09-41-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position RCC troughs Upto 16' in length

    (British)

    LABOUR

    Mason 75.00 0.125 600.00 DayDay 1

    Coolie 112.50 0.375 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 193.13

    5.63

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 279 of 969

  • Chapter # : 09 ROOFING

    Cost Per Each: 232.50

    39.38

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 232.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 232.50

    Each Rs. 232.50

    09-41-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position RCC troughs Upto 17' in length

    (British)

    LABOUR

    Mason 85.20 0.142 600.00 DayDay 1

    Coolie 128.40 0.428 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 220.01

    6.41

    Cost Per Each: 264.86

    44.86

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 264.86

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 264.86

    Each Rs. 264.86

    09-41-iItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position RCC troughs Upto 18' in length

    (British)

    LABOUR

    Mason 100.20 0.167 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 257.71

    7.51

    Cost Per Each: 310.25

    52.54

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 310.25

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 310.25

    Each Rs. 310.25

    09-41-jItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position RCC troughs Upto 19' in length

    (British)

    LABOUR

    Mason 120.00 0.200 600.00 DayDay 1

    Coolie 180.00 0.600 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Cost Per Each: 372.00

    63.00

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 372.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 372.00

    Each Rs. 372.00

    09-41-kItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoisting and placing in position RCC troughs Upto 20' in length

    (British)

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 280 of 969

  • Chapter # : 09 ROOFING

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Cost Per Each: 465.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 465.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 465.00

    Each Rs. 465.00

    09-42-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist & place in position RCC inverted battens Upto 10' span

    (British)

    LABOUR

    Mason 19.80 0.033 600.00 DayDay 1

    Coolie 39.90 0.133 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 61.49

    1.79

    Cost Per Each: 74.03

    12.54

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 74.03

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 74.03

    Each Rs. 74.03

    09-42-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist & place in position RCC inverted battens Upto 12' span

    (British)

    LABOUR

    Mason 39.60 0.066 600.00 DayDay 1

    Coolie 79.80 0.266 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 122.98

    3.58

    Cost Per Each: 148.06

    25.07

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 148.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 148.06

    Each Rs. 148.06

    09-42-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist & place in position RCC inverted battens Upto 13' span

    (British)

    LABOUR

    Mason 49.80 0.083 600.00 DayDay 1

    Coolie 99.90 0.333 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.19

    4.49

    Cost Per Each: 185.63

    31.44

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 185.63

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 185.63

    Each Rs. 185.63

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 281 of 969

  • Chapter # : 09 ROOFING

    09-42-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist & place in position RCC inverted battens Upto 14' span

    (British)

    LABOUR

    Mason 60.00 0.100 600.00 DayDay 1

    Coolie 120.00 0.400 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 185.40

    5.40

    Cost Per Each: 223.20

    37.80

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 223.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 223.20

    Each Rs. 223.20

    09-42-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist & place in position RCC inverted battens Upto 15' span

    (British)

    LABOUR

    Mason 66.00 0.110 600.00 DayDay 1

    Coolie 132.00 0.440 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 203.94

    5.94

    Cost Per Each: 245.52

    41.58

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 245.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 245.52

    Each Rs. 245.52

    09-42-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist & place in position RCC inverted battens Upto 16' span

    (British)

    LABOUR

    Mason 75.00 0.125 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 231.75

    6.75

    Cost Per Each: 279.00

    47.25

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 279.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 279.00

    Each Rs. 279.00

    09-42-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist & place in position RCC inverted battens Upto 18' span

    (British)

    LABOUR

    Mason 100.20 0.167 600.00 DayDay 1

    Coolie 200.40 0.668 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.62

    9.02

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 282 of 969

  • Chapter # : 09 ROOFING

    Cost Per Each: 372.74

    63.13

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 372.74

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 372.74

    Each Rs. 372.74

    09-42-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hoist & place in position RCC inverted battens Upto 20' span

    (British)

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 463.50

    13.50

    Cost Per Each: 558.00

    94.50

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 558.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 558.00

    Each Rs. 558.00

    09-43Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    RCC spout including fixing in position, with top and bottom khuras

    (British)

    MATERIAL

    Ordinary Portland Cement 107.50 0.250 430.00 BagBag 1

    Sand 18.00 1.000 1,800.00 CftCft 100

    Steel (bars/rods/section) 58.75 0.750 78.33 KgKg 1

    Total Material % 28.05 184.25

    LABOUR

    Mason 210.00 0.350 600.00 DayDay 1

    Coolie 105.00 0.350 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 50.95 324.45

    9.45

    Cost Per Each: 613.54

    104.84

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 390.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 613.54

    Each Rs. 390.60

    09-44Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    P/F Burnt Brick Tile Roofing over Tee Iron and Steel Girder, in 1:6 c/s mortar (12'

    max span)

    (British)

    MATERIAL

    Mud / Clay 24.84 3.680 675.00 CftCft 100

    Ordinary Portland Cement 139.75 0.325 430.00 BagBag 1

    Sand 0.41 0.023 1,800.00 CftCft 100

    Steel (Struct. Sections) 14,669.02 198.230 74.00 KgKg 1

    Polythene Sheet 188.33 100.000 1.88 SftSft 1

    Brick Tile 9"x4.5"x1.5" 2,845.76 355.720 8,000.00 NoNo 1,000

    Asphalt 2,031.12 26.040 78.00 KgKg 1

    Steel Girder 8"x4"x3/16 4,139.10 15.330 270.00 FtFt 1

    Total Material % 67.81 24,038.34

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 283 of 969

  • Chapter # : 09 ROOFING

    Mason 1,601.40 2.669 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 100.35 0.335 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.19 2,988.80

    87.05

    Per SQM : Rs 3,516.86

    5,657.42

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 387.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 32,684.56

    100 Sft Rs. 3,598.17

    09-45Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit SftSpec. No :

    Providing and Laying Prestressed Roof of Slab/Girder, 2" thick PCC 1:2:4 with

    chicken mesh, polythene, mud, tar

    (British)

    MATERIAL

    Mud / Clay 2.88 0.427 675.00 CftCft 100

    Ordinary Portland Cement 12.11 0.028 430.00 BagBag 1

    Sand 0.06 0.003 1,800.00 CftCft 100

    Crushed Aggregate 0.09 0.003 2,700.00 CftCft 100

    Polythene Sheet 1.88 1.000 1.88 SftSft 1

    Asphalt 20.28 0.260 78.00 KgKg 1

    Izhar Precast Roofing 84.00 1.000 84.00 SftSft 1

    Total Material % 62.73 121.30

    LABOUR

    Mason 12.27 0.020 600.00 DayDay 1

    Coolie 11.99 0.040 300.00 DayDay 1

    Bhishti 1.39 0.005 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.27 26.42

    0.77

    Per SQM : Rs 1,921.53

    30.86

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 342.24

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Sft Rs. 178.58

    Sft Rs. 31.81

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 284 of 969

  • Chapter # : 10 FLOORING

    10-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Laying murum flooring complete as per specs

    (British)

    MATERIAL

    Brick Ballast /Stone Ballast 1,008.00 80.000 1,260.00 CftCft 100

    Fine Powdered Moorum 270.00 9.000 3,000.00 CftCft 100

    Hard Moorum 1,650.00 55.000 3,000.00 CftCft 100

    Total Material % 52.02 2,928.00

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.98 1,390.50

    40.50

    Per SQM : Rs 561.34

    898.38

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 180.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,216.88

    100 Sft Rs. 1,674.00

    10-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Earth flooring 6" thick consolidated layer of moistened earth, including ramming

    (British)

    MATERIAL

    Loose Earth 630.00 70.000 900.00 CftCft 100

    Total Material % 44.33 630.00

    LABOUR

    Mason 75.00 0.125 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 34.67 463.50

    13.50

    Per SQM : Rs 142.06

    226.80

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 60.04

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,320.30

    100 Sft Rs. 558.00

    10-03-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Provide, lay, water & ram clean coarse sand under floor / brick paving, complete

    (British)

    MATERIAL

    Sand 636.30 35.350 1,800.00 CftCft 100

    Total Material % 20.06 636.30

    LABOUR

    Mason 295.80 0.493 600.00 DayDay 1

    Coolie 1,233.00 4.110 300.00 DayDay 1

    Bhishti 246.00 0.820 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 58.94 1,828.04

    53.24

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 285 of 969

  • Chapter # : 10 FLOORING

    Per CUM : Rs 1,049.08

    506.33

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 777.19

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 2,970.67

    100 Cft Rs. 2,200.75

    10-03-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 CftSpec. No :

    Provide, lay, water & ram brick ballast 1.5" to 2" guage mixed with 25% sand for

    floor foundations

    (British)

    MATERIAL

    Sand 636.30 35.350 1,800.00 CftCft 100

    Rubble Or Broken Brick 3,045.00 105.000 2,900.00 CftCft 100

    Total Material % 38.68 3,681.30

    LABOUR

    Mason 591.60 0.986 600.00 DayDay 1

    Coolie 2,466.30 8.221 300.00 DayDay 1

    Bhishti 493.20 1.644 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 40.32 3,657.63

    106.53

    Per CUM : Rs 3,128.08

    1,518.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 1,555.03

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Cft Rs. 8,857.74

    100 Cft Rs. 4,403.36

    10-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Mud floor of 6" thick consolidated layer of moist earth & finished off with 1" mud

    plaster

    (British)

    MATERIAL

    Loose Earth 738.00 82.000 900.00 CftCft 100

    Bhoosa 126.28 17.000 7.43 SrSr 1

    Clay (fine) 6.13 0.750 816.67 CftCft 100

    Cow Dung 25.00 0.750 33.33 CftCft 1

    Total Material % 39.56 895.40

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Skilled Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 39.44 849.75

    24.75

    Per SQM : Rs 226.65

    361.28

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,106.44

    100 Sft Rs. 1,023.00

    10-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dry brick paving laid flat,sand grouted, including prep. of bed, by 1/2" thick mud

    plaster

    (British)

    MATERIAL

    Mud / Clay 40.50 6.000 675.00 CftCft 100

    Sand 90.00 5.000 1,800.00 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 286 of 969

  • Chapter # : 10 FLOORING

    Burnt Brick 2,100.00 350.000 6,000.00 NoNo 1,000

    Total Material % 59.57 2,230.50

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 15.00 0.050 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.43 633.45

    18.45

    Per SQM : Rs 372.46

    597.56

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 82.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,461.51

    100 Sft Rs. 762.60

    10-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Dry brick on edge paving, sand grouted, including prep. of bed, by 1/2" thick mud

    plaster

    (British)

    MATERIAL

    Mud / Clay 40.50 6.000 675.00 CftCft 100

    Sand 108.00 6.000 1,800.00 CftCft 100

    Burnt Brick 3,150.00 525.000 6,000.00 NoNo 1,000

    Total Material % 60.14 3,298.50

    LABOUR

    Mason 396.00 0.660 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 24.00 0.080 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.86 896.10

    26.10

    Per SQM : Rs 545.53

    875.39

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 116.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,069.99

    100 Sft Rs. 1,078.80

    10-07Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Grouting 4.5" dry brick work with cement sand mortar 1:5

    (British)

    MATERIAL

    Ordinary Portland Cement 305.30 0.710 430.00 BagBag 1

    Sand 81.00 4.500 1,800.00 CftCft 100

    Total Material % 29.77 386.30

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 49.23 618.00

    18.00

    Per SQM : Rs 130.35

    207.12

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 80.05

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,211.42

    100 Sft Rs. 744.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 287 of 969

  • Chapter # : 10 FLOORING

    10-08Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Flat brick flooring laid in 1:6 c/s mortar over a bed of 3/4" thick cement mortar 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 567.60 1.320 430.00 BagBag 1

    Sand 180.00 10.000 1,800.00 CftCft 100

    Burnt Brick 2,100.00 350.000 6,000.00 NoNo 1,000

    Total Material % 55.53 2,847.60

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 dayday 1

    Total Labour

    Sundries (Labour Only): %3

    % 23.47 1,081.50

    31.50

    Per SQM : Rs 510.84

    818.50

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 140.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,747.60

    100 Sft Rs. 1,302.00

    10-09Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Brick on edge flooring, laid in 1:6 c/s mortar, over a bed of 3/4" thick cement mortar

    1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 718.10 1.670 430.00 BagBag 1

    Sand 234.00 13.000 1,800.00 CftCft 100

    Burnt Brick 3,150.00 525.000 6,000.00 NoNo 1,000

    Total Material % 57.18 4,102.10

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 dayday 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.82 1,390.50

    40.50

    Per SQM : Rs 714.20

    1,144.94

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 180.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 6,637.54

    100 Sft Rs. 1,674.00

    10-10Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Brick tiles (12"x6"x2") laid in 1:6 c/s mortar, over a bed of 3/4" thick c/s mortar 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 481.60 1.120 430.00 BagBag 1

    Sand 144.00 8.000 1,800.00 CftCft 100

    Brick Tile (12"x6"x2") 2,555.00 210.000 12,166.67 CftCft 1,000

    Total Material % 57.14 3,180.60

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 288 of 969

  • Chapter # : 10 FLOORING

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.86 1,081.50

    31.50

    Per SQM : Rs 554.20

    888.43

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 140.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,150.53

    100 Sft Rs. 1,302.00

    10-11Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Brick tiles (9"x4.5"x1.5") laid flat in 1:3 c/s mortar over a bed of 3/4" thick cement

    mortar 1:6

    (British)

    MATERIAL

    Ordinary Portland Cement 610.60 1.420 430.00 BagBag 1

    Sand 216.00 12.000 1,800.00 CftCft 100

    Brick Tiles 10"x5"x1.5" 2,450.00 350.000 7,000.00 NoNo 1,000

    Total Material % 55.63 3,276.60

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 23.37 1,236.00

    36.00

    Per SQM : Rs 586.71

    940.09

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 160.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,452.69

    100 Sft Rs. 1,488.00

    10-12Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement tiles (8"x8"x3/4") laid flat in 1:2 c/s mortar, over 3/4" thick bed of c/s mortar

    1:2

    (British)

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    CC Tile 17x12x1 11,520.00 240.000 48,000.00 NoNo 1,000

    Total Material % 67.55 12,781.20

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.45 1,646.97

    47.97

    Per SQM : Rs 1,877.41

    3,019.84

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 213.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 17,448.01

    100 Sft Rs. 1,982.76

    10-13-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of c/s mortar 1:2 :

    12" x 12" x 1"

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 289 of 969

  • Chapter # : 10 FLOORING

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    CC Tile 17x12x1 5,040.00 105.000 48,000.00 NoNo 1,000

    Total Material % 60.62 6,301.20

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.38 1,646.97

    47.97

    Per SQM : Rs 1,033.74

    1,659.04

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 213.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,607.21

    100 Sft Rs. 1,982.76

    10-13-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of c/s mortar 1:2 : 9"

    x 9" x 3/4"

    (British)

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    CC Tiles 9x9x0.75 4,017.60 186.000 21,600.00 NoNo 1,000

    Total Material % 58.33 5,278.80

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.67 1,646.97

    47.97

    Per SQM : Rs 900.62

    1,444.34

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 213.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,370.11

    100 Sft Rs. 1,982.76

    10-13-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement concrete tiles laid in 1:2 c/s mortar over 3/4" thick bed of c/s mortar 1:2 : 6"

    x 6" x 3/4"

    (British)

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    CC Tiles 6x6x0.75 4,032.00 420.000 9,600.00 NoNo 1,000

    Total Material % 58.37 5,293.20

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.63 1,646.97

    47.97

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 290 of 969

  • Chapter # : 10 FLOORING

    Per SQM : Rs 902.50

    1,447.36

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 213.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,387.53

    100 Sft Rs. 1,982.76

    10-14Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Coloured cement tile (8"x8"x3/4") of dark shade laid flat in 1:2 c/s mortar over 3/4"

    mortar bed

    (British)

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    CC Tiles 8x8x0.75 4,320.00 240.000 18,000.00 NoNo 1,000

    Total Material % 59.08 5,581.20

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.92 1,646.97

    47.97

    Per SQM : Rs 939.99

    1,507.84

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 213.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,736.01

    100 Sft Rs. 1,982.76

    10-15-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in

    panels : 1" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 653.60 1.520 430.00 BagBag 1

    Sand 66.60 3.700 1,800.00 CftCft 100

    Crushed Aggregate 199.80 7.400 2,700.00 CftCft 100

    Glass Panel 266.67 5.000 53.33 SftSft 1

    Total Material % 42.61 1,186.67

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Bhishti 30.00 0.100 300.00 DayDay 1

    Carpenter 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 36.39 957.90

    27.90

    Per SQM : Rs 278.58

    444.50

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 124.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,589.07

    100 Sft Rs. 1,153.20

    10-15-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in

    panels: 1.5" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 860.00 2.000 430.00 BagBag 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 291 of 969

  • Chapter # : 10 FLOORING

    Sand 90.00 5.000 1,800.00 CftCft 100

    Crushed Aggregate 270.00 10.000 2,700.00 CftCft 100

    Glass Panel 333.33 6.250 53.33 SftSft 1

    Total Material % 44.58 1,553.33

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 45.00 0.150 300.00 DayDay 1

    Carpenter 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 34.42 1,127.85

    32.85

    Per SQM : Rs 348.34

    556.15

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 146.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,237.33

    100 Sft Rs. 1,357.80

    10-15-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in

    panels: 1.5" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 963.20 2.240 430.00 BagBag 1

    Sand 99.00 5.500 1,800.00 CftCft 100

    Crushed Aggregate 297.00 11.000 2,700.00 CftCft 100

    Glass Panel 400.00 7.500 53.33 SftSft 1

    Total Material % 46.84 1,759.20

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 45.00 0.150 300.00 DayDay 1

    Carpenter 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.16 1,127.85

    32.85

    Per SQM : Rs 375.14

    599.38

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 146.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,486.43

    100 Sft Rs. 1,357.80

    10-15-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in

    panels : 1.75" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 1,182.50 2.750 430.00 BagBag 1

    Sand 117.00 6.500 1,800.00 CftCft 100

    Crushed Aggregate 351.00 13.000 2,700.00 CftCft 100

    Glass Panel 533.33 10.000 53.33 SftSft 1

    Total Material % 50.62 2,183.83

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 45.00 0.150 300.00 DayDay 1

    Carpenter 150.00 0.250 600.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 292 of 969

  • Chapter # : 10 FLOORING

    Total Labour

    Sundries (Labour Only): %3

    % 28.38 1,127.85

    32.85

    Per SQM : Rs 430.43

    688.55

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 146.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,000.24

    100 Sft Rs. 1,357.80

    10-15-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in

    panels : 2" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 1,311.50 3.050 430.00 BagBag 1

    Sand 133.20 7.400 1,800.00 CftCft 100

    Crushed Aggregate 396.90 14.700 2,700.00 CftCft 100

    Glass Panel 533.33 10.000 53.33 SftSft 1

    Total Material % 49.86 2,374.93

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 45.00 0.150 300.00 DayDay 1

    Carpenter 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 29.14 1,282.35

    37.35

    Per SQM : Rs 475.32

    760.19

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 166.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,417.47

    100 Sft Rs. 1,543.80

    10-15-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in

    panels: 2.25" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 1,505.00 3.500 430.00 BagBag 1

    Sand 153.00 8.500 1,800.00 CftCft 100

    Crushed Aggregate 459.00 17.000 2,700.00 CftCft 100

    Glass Panel 600.00 11.250 53.33 SftSft 1

    Total Material % 45.71 2,717.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 33.29 1,854.00

    54.00

    Per SQM : Rs 593.91

    948.57

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 240.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,519.57

    100 Sft Rs. 2,232.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 293 of 969

  • Chapter # : 10 FLOORING

    10-15-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in

    panels: 2.5" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 1,612.50 3.750 430.00 BagBag 1

    Sand 170.82 9.490 1,800.00 CftCft 100

    Crushed Aggregate 513.00 19.000 2,700.00 CftCft 100

    Glass Panel 680.00 12.750 53.33 SftSft 1

    Total Material % 46.63 2,976.32

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 525.00 1.750 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 32.37 1,931.25

    56.25

    Per SQM : Rs 637.67

    1,018.78

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 250.17

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,926.35

    100 Sft Rs. 2,325.00

    10-15-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in

    panels: 2.75" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 1,720.00 4.000 430.00 BagBag 1

    Sand 189.00 10.500 1,800.00 CftCft 100

    Crushed Aggregate 567.00 21.000 2,700.00 CftCft 100

    Glass Panel 760.00 14.250 53.33 SftSft 1

    Total Material % 44.83 3,236.00

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Carpenter 450.00 0.750 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 34.17 2,317.50

    67.50

    Per SQM : Rs 721.52

    1,152.06

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 300.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 6,705.56

    100 Sft Rs. 2,790.00

    10-15-iItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in

    panels : 3" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 1,922.10 4.470 430.00 BagBag 1

    Sand 198.00 11.000 1,800.00 CftCft 100

    Crushed Aggregate 594.00 22.000 2,700.00 CftCft 100

    Glass Panel 800.00 15.000 53.33 SftSft 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 294 of 969

  • Chapter # : 10 FLOORING

    Total Material % 47.57 3,514.10

    LABOUR

    Mason 1,050.00 1.750 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Carpenter 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.43 2,163.00

    63.00

    Per SQM : Rs 737.71

    1,178.96

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 280.19

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 6,856.06

    100 Sft Rs. 2,604.00

    10-16-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & laying conglomerate floor (two coat work) with top layer of 1/2" thick

    wearing surface of one part of cement 2 parts of stone chips passing 3/16" sieve

    over bottom layer of cement concrete (1:3:6) including surface finishing & dividing in

    (British)

    MATERIAL

    Ordinary Portland Cement 946.00 2.200 430.00 BagBag 1

    Sand 59.04 3.280 1,800.00 CftCft 100

    Crushed Aggregate 177.12 6.560 2,700.00 CftCft 100

    Stone Chips 196.80 3.280 6,000.00 CftCft 100

    Total Material % 31.48 1,378.96

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Skilled Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 47.52 2,008.50

    58.50

    Per SQM : Rs 439.71

    699.08

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 260.18

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,086.54

    100 Sft Rs. 2,418.00

    10-16-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & laying conglomerate floor (two coat work) with top layer of 1/2" thick

    wearing surface of one part of cement 2 parts of stone chips passing 3/16" sieve

    over bottom layer of cement concrete (1:3:6) including surface finishing & dividing in

    (British)

    MATERIAL

    Ordinary Portland Cement 1,032.00 2.400 430.00 BagBag 1

    Sand 72.00 4.000 1,800.00 CftCft 100

    Crushed Aggregate 216.00 8.000 2,700.00 CftCft 100

    Stone Chips 196.80 3.280 6,000.00 CftCft 100

    Total Material % 40.21 1,516.80

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Skilled Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 38.79 1,390.50

    40.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 295 of 969

  • Chapter # : 10 FLOORING

    Per SQM : Rs 377.60

    602.03

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 180.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,509.33

    100 Sft Rs. 1,674.00

    10-16-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & laying conglomerate floor (two coat work) with top layer of 1/2" thick

    wearing surface of one part of cement 2 parts of stone chips passing 3/16" sieve

    over bottom layer of cement concrete (1:3:6) including surface finishing & dividing in

    (British)

    MATERIAL

    Ordinary Portland Cement 1,118.00 2.600 430.00 BagBag 1

    Sand 86.22 4.790 1,800.00 CftCft 100

    Crushed Aggregate 258.66 9.580 2,700.00 CftCft 100

    Stone Chips 196.80 3.280 6,000.00 CftCft 100

    Total Material % 39.92 1,659.68

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Skilled Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 39.08 1,545.00

    45.00

    Per SQM : Rs 416.22

    663.53

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 200.14

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,868.21

    100 Sft Rs. 1,860.00

    10-17Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Add extra in cement concrete floor topping if finished with pigment and polishing

    (British)

    MATERIAL

    Ordinary Portland Cement 219.30 0.510 430.00 BagBag 1

    Pigment Polish 300.00 2.000 150.00 KgKg 1

    Total Material % 40.72 519.30

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 38.28 463.50

    13.50

    Per SQM : Rs 127.65

    203.55

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 60.04

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,186.35

    100 Sft Rs. 558.00

    10-18Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Extra labour for each storey above ground for mosaic, conglomerate, tiles, stone &

    wood floor

    (British)

    LABOUR

    Bhishti 225.00 0.750 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 296 of 969

  • Chapter # : 10 FLOORING

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 231.75

    6.75

    Per SQM : Rs 30.02

    47.25

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 30.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 279.00

    100 Sft Rs. 279.00

    10-19-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Flag stone flooring in lime mortar 1:2, over 3/4" bedding : 2" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 610.60 1.420 430.00 BagBag 1

    Sand 216.00 12.000 1,800.00 CftCft 100

    Charcoal 90.00 2.000 45.00 KgKg 1

    Dressed Stone 483.33 25.000 1,933.33 CftCft 100

    Total Material % 25.86 1,399.93

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Black Smith 60.00 0.100 600.00 DayDay 1

    Bellowman 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 53.14 2,796.45

    81.45

    Per SQM : Rs 544.51

    864.14

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 362.25

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,060.52

    100 Sft Rs. 3,366.60

    10-19-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Flag stone flooring in lime mortar 1:2, over 3/4" bedding : 3" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 765.40 1.780 430.00 BagBag 1

    Sand 2.70 0.150 1,800.00 CftCft 100

    Charcoal 90.00 2.000 45.00 KgKg 1

    Dressed Stone 725.00 37.500 1,933.33 CftCft 100

    Total Material % 29.28 1,583.10

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Bhishti 36.00 0.120 300.00 DayDay 1

    Black Smith 60.00 0.100 600.00 DayDay 1

    Bellowman 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 49.72 2,601.78

    75.78

    Per SQM : Rs 543.14

    862.91

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 337.03

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,047.79

    100 Sft Rs. 3,132.24

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 297 of 969

  • Chapter # : 10 FLOORING

    10-20-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Asphalt floor, including base preparation, remelting, setting out & finish : 1" thick

    topping

    (British)

    MATERIAL

    Coal Tar (in canisters) 8,625.60 119.800 72.00 KgKg 1

    Fine Grit / Aggregate 310.00 10.000 3,100.00 CftCft 100

    Coal 1,200.00 40.000 30.00 KgKg 1

    Total Material % 69.80 10,135.60

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Carpenter 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 9.20 927.00

    27.00

    Per SQM : Rs 1,439.70

    2,317.48

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 120.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 13,380.08

    100 Sft Rs. 1,116.00

    10-20-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Asphalt floor, including base preparation, remelting, setting out & finish : 1/2" thick

    topping

    (British)

    MATERIAL

    Coal Tar (in canisters) 4,312.80 59.900 72.00 KgKg 1

    Fine Grit / Aggregate 155.00 5.000 3,100.00 CftCft 100

    Coal 600.00 20.000 30.00 KgKg 1

    Total Material % 65.86 5,067.80

    LABOUR

    Mason 180.00 0.300 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Carpenter 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.14 803.40

    23.40

    Per SQM : Rs 763.88

    1,228.04

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 104.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 7,099.24

    100 Sft Rs. 967.20

    10-20-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Asphalt floor, including base preparation, remelting, setting out & finish : 1/4" thick

    topping

    (British)

    MATERIAL

    Coal Tar (in canisters) 2,160.00 30.000 72.00 KgKg 1

    Fine Grit / Aggregate 77.50 2.500 3,100.00 CftCft 100

    Coal 300.00 10.000 30.00 KgKg 1

    Total Material % 62.54 2,537.50

    LABOUR

    Mason 96.00 0.160 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 298 of 969

  • Chapter # : 10 FLOORING

    Carpenter 150.00 0.250 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.46 562.38

    16.38

    Per SQM : Rs 403.22

    647.54

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 72.85

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,747.42

    100 Sft Rs. 677.04

    10-21-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    1.375" thick mosaic flooring, including rubbing and polishing complete : Using grey

    cement

    (British)

    MATERIAL

    Ordinary Portland Cement 1,311.50 3.050 430.00 BagBag 1

    Sand 666.00 37.000 1,800.00 CftCft 100

    Crushed Aggregate 199.80 7.400 2,700.00 CftCft 100

    Fine Grit / Aggregate 46.50 1.500 3,100.00 CftCft 100

    Grinding Stone 186.67 0.700 266.67 NoNo 1

    Polish Wax 122.50 0.500 245.00 PackPack 1

    Marble Chips 441.67 10.000 44.17 BagBag 1

    Total Material % 34.39 2,974.63

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 2,175.00 7.250 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 44.61 3,708.00

    108.00

    Per SQM : Rs 867.61

    1,380.67

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 480.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,063.31

    100 Sft Rs. 4,464.00

    10-21-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    1.375" thick mosaic flooring, including rubbing and polishing complete : Using white

    cement

    (British)

    MATERIAL

    Ordinary Portland Cement 653.60 1.520 430.00 BagBag 1

    Sand 66.60 3.700 1,800.00 CftCft 100

    Crushed Aggregate 199.80 7.400 2,700.00 CftCft 100

    Fine Grit / Aggregate 46.50 1.500 3,100.00 CftCft 100

    Grinding Stone 186.67 0.700 266.67 NoNo 1

    Polish Wax 122.50 0.500 245.00 PackPack 1

    Marble Chips 441.67 10.000 44.17 BagBag 1

    White Cement 1,033.60 1.520 680.00 BagBag 1

    Total Material % 32.92 2,750.93

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 2,175.00 7.250 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 46.08 3,708.00

    108.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 299 of 969

  • Chapter # : 10 FLOORING

    Per SQM : Rs 838.49

    1,333.70

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 480.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 7,792.63

    100 Sft Rs. 4,464.00

    10-22-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    1.5" thick mosaic flooring, including rubbing & polishing complete : Using grey

    cement

    (British)

    MATERIAL

    Ordinary Portland Cement 1,419.00 3.300 430.00 BagBag 1

    Sand 66.60 3.700 1,800.00 CftCft 100

    Crushed Aggregate 199.80 7.400 2,700.00 CftCft 100

    Fine Grit / Aggregate 55.80 1.800 3,100.00 CftCft 100

    Grinding Stone 186.67 0.700 266.67 NoNo 1

    Polish Wax 122.50 0.500 245.00 PackPack 1

    Marble Chips 574.17 13.000 44.17 BagBag 1

    Total Material % 31.59 2,624.53

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Bhishti 240.00 0.800 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 47.41 3,800.70

    110.70

    Per SQM : Rs 834.04

    1,326.05

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 492.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 7,751.29

    100 Sft Rs. 4,575.60

    10-22-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    1.5" thick mosaic flooring, including rubbing & polishing complete : Using white

    cement

    (British)

    MATERIAL

    Ordinary Portland Cement 645.00 1.500 430.00 BagBag 1

    Sand 66.60 3.700 1,800.00 CftCft 100

    Crushed Aggregate 199.80 7.400 2,700.00 CftCft 100

    Fine Grit / Aggregate 55.80 1.800 3,100.00 CftCft 100

    Grinding Stone 186.67 0.700 266.67 NoNo 1

    Polish Wax 122.50 0.500 245.00 PackPack 1

    Marble Chips 574.17 13.000 44.17 BagBag 1

    White Cement 1,210.40 1.780 680.00 BagBag 1

    Total Material % 34.46 3,060.93

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 2,250.00 7.500 300.00 DayDay 1

    Bhishti 240.00 0.800 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 44.54 3,800.70

    110.70

    Per SQM : Rs 890.86

    1,417.70

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 492.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,279.33

    100 Sft Rs. 4,575.60

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 300 of 969

  • Chapter # : 10 FLOORING

    10-23Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Laying floor of mosaic marble chips tiles of approved shade including finishing

    complete

    (British)

    MATERIAL

    Ordinary Portland Cement 1,148.10 2.670 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    Grinding Stone 186.67 0.700 266.67 NoNo 1

    Polish Wax 122.50 0.500 245.00 PackPack 1

    White Cement 68.00 0.100 680.00 BagBag 1

    Mosaic Tile 4,200.00 105.000 40.00 NoNo 1

    Total Material % 56.68 5,851.27

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 195.00 0.650 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.32 2,054.85

    59.85

    Per SQM : Rs 1,027.99

    1,647.72

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 266.18

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,553.83

    100 Sft Rs. 2,473.80

    10-24Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Lay floor of white glazed tile 1/4" thick in white cement 1:2 over 3/4" thick cement

    mortar 1:2

    (British)

    MATERIAL

    Ordinary Portland Cement 946.00 2.200 430.00 BagBag 1

    Sand 93.60 5.200 1,800.00 CftCft 100

    White Cement 68.00 0.100 680.00 BagBag 1

    Ceramic Tile 6"x6" White 3,528.00 420.000 8.40 NoNo 1

    Total Material % 49.03 4,635.60

    LABOUR

    Mason 1,200.00 2.000 600.00 Day.Day. 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 29.97 2,626.50

    76.50

    Per SQM : Rs 943.77

    1,508.98

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 340.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,771.08

    100 Sft Rs. 3,162.00

    10-25Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Lay floor of approved coloured glazed tiles 1/4" thick laid in white cement & pigment

    complete

    (British)

    MATERIAL

    Ordinary Portland Cement 946.00 2.200 430.00 BagBag 1

    Sand 93.60 5.200 1,800.00 CftCft 100

    Pigment Polish 34.50 0.230 150.00 KgKg 1

    White Cement 68.00 0.100 680.00 BagBag 1

    Ceramic Tile 6"x6" White 3,528.00 420.000 8.40 NoNo 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 301 of 969

  • Chapter # : 10 FLOORING

    Total Material % 49.16 4,670.10

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 29.84 2,626.50

    76.50

    Per SQM : Rs 948.26

    1,516.22

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 340.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,812.82

    100 Sft Rs. 3,162.00

    10-26-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay marble fine dressed stone flooring on surface in white cement

    complete: 3/4" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)

    (British)

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    Polish Wax 122.50 0.500 245.00 PackPack 1

    White Cement 68.00 0.100 680.00 BagBag 1

    Marble Fine 3/4 Inch Thick 4,725.00 105.000 45.00 NoNo 1

    Total Material % 41.63 6,176.70

    LABOUR

    Mason 3,000.00 5.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 37.37 5,253.00

    153.00

    Per SQM : Rs 1,484.64

    2,368.11

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 680.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 13,797.81

    100 Sft Rs. 6,324.00

    10-26-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay marble fine dressed stone flooring on surface in white cement

    complete: 1" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)

    (British)

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    Polish Wax 122.50 0.500 245.00 PackPack 1

    White Cement 68.00 0.100 680.00 BagBag 1

    Marble Fine 1 Inch Thick 7,560.00 105.000 72.00 SftSft 1

    Total Material % 48.53 9,011.70

    LABOUR

    Mason 3,000.00 5.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 30.47 5,253.00

    153.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 302 of 969

  • Chapter # : 10 FLOORING

    Per SQM : Rs 1,853.75

    2,963.46

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 680.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 17,228.16

    100 Sft Rs. 6,324.00

    10-26-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay marble fine dressed stone flooring on surface in white cement

    complete: 1/2" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)

    (British)

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    Polish Wax 122.50 0.500 245.00 PackPack 1

    White Cement 68.00 0.100 680.00 BagBag 1

    Marble fine 1/2" thick 4,410.00 105.000 42.00 SftSft 1

    Total Material % 40.64 5,861.70

    LABOUR

    Mason 3,000.00 5.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 38.36 5,253.00

    153.00

    Per SQM : Rs 1,443.63

    2,301.96

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 680.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 13,416.66

    100 Sft Rs. 6,324.00

    10-26-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Providing and Laying marble fine dressed stone 4-5 feet and 12" wide 1" thick for

    stairs steps.

    (British)

    MATERIAL

    Ordinary Portland Cement 537.50 1.250 430.00 BagBag 1

    Sand 90.00 5.000 1,800.00 CftCft 100

    Polish Wax 122.50 0.500 245.00 PackPack 1

    Marble Fine 1 Inch Thick 7,560.00 105.000 72.00 SftSft 1

    Total Material % 47.10 8,310.00

    LABOUR

    Mason 3,000.00 5.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.90 5,253.00

    153.00

    Per SQM : Rs 1,762.39

    2,816.10

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 680.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 16,379.10

    100 Sft Rs. 6,324.00

    10-26-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Providing and Laying marble fine dressed stone 7x1.5 feet and

    1" thick for stairs steps.

    (British)

    MATERIAL

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 303 of 969

  • Chapter # : 10 FLOORING

    Ordinary Portland Cement 537.50 1.250 430.00 BagBag 1

    Sand 90.00 5.000 1,800.00 CftCft 100

    Polish Wax 122.50 0.500 245.00 PackPack 1

    Marble Fine 1 Inch Thick 7,560.00 105.000 72.00 SftSft 1

    Total Material % 47.10 8,310.00

    LABOUR

    Mason 3,000.00 5.000 600.00 DayDay 1

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.90 5,253.00

    153.00

    Per SQM : Rs 1,762.39

    2,816.10

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 680.46

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 16,379.10

    100 Sft Rs. 6,324.00

    10-26-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Providing and fixing glazed tile colour printed border 2" wide

    (British)

    MATERIAL

    Ordinary Portland Cement 215.00 0.500 430.00 BagBag 1

    Sand 36.00 2.000 1,800.00 CftCft 100

    White Cement 34.00 0.050 680.00 BagBag 1

    Glazed tile colour printed border 12,260.50 105.000 116.77 RftRft 1

    Total Material % 73.20 12,545.50

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 5.80 494.40

    14.40

    Per Meter : Rs 517.43

    2,735.36

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 19.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 15,775.26

    100 Rft Rs. 595.20

    10-26-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Providing and fixing glazed tile colour printed border 3" wide

    (British)

    MATERIAL

    Ordinary Portland Cement 215.00 0.500 430.00 BagBag 1

    Sand 36.00 2.000 1,800.00 CftCft 100

    White Cement 34.00 0.050 680.00 BagBag 1

    Glazed tile colour printed border 12,260.50 105.000 116.77 RftRft 1

    Total Material % 73.20 12,545.50

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 5.80 494.40

    14.40

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 304 of 969

  • Chapter # : 10 FLOORING

    Per Meter : Rs 517.43

    2,735.36

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 19.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 15,775.26

    100 Rft Rs. 595.20

    10-26-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Providing and fixing glazed tile colour printed border 4" wide

    (British)

    MATERIAL

    Ordinary Portland Cement 215.00 0.500 430.00 BagBag 1

    Sand 36.00 2.000 1,800.00 CftCft 100

    White Cement 34.00 0.050 680.00 BagBag 1

    Glazed tile colour printed border 12,260.50 105.000 116.77 RftRft 1

    Total Material % 73.20 12,545.50

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 5.80 494.40

    14.40

    Per Meter : Rs 517.43

    2,735.36

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 19.52

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 15,775.26

    100 Rft Rs. 595.20

    10-27Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Rubbing and polishing old grit/mosaic floor, including repairing voids, uneven

    surface, complete

    (British)

    MATERIAL

    Grinding Stone 26.67 0.100 266.67 NoNo 1

    Polish Wax 24.50 0.100 245.00 PackPack 1

    Total Material % 1.49 51.17

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 77.51 2,626.50

    76.50

    Per SQM : Rs 346.89

    546.25

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 340.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,223.91

    100 Sft Rs. 3,162.00

    10-28Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Rubbing & polishing grit floor, including repairing voids, uneen surface, complete

    (British)

    MATERIAL

    Grinding Stone 141.33 0.530 266.67 NoNo 1

    Polish Wax 24.50 0.100 245.00 PackPack 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 305 of 969

  • Chapter # : 10 FLOORING

    Total Material % 12.42 165.83

    LABOUR

    Mason 156.00 0.260 600.00 DayDay 1

    Coolie 177.00 0.590 300.00 DayDay 1

    Skilled Coolie 516.00 1.720 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 66.58 874.47

    25.47

    Per SQM : Rs 134.87

    213.11

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 113.28

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,253.42

    100 Sft Rs. 1,052.76

    10-29Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cleaning and washing mosaic or marble floor with caustic soda mixture

    (British)

    MATERIAL

    Caustic Soda 24.30 0.270 90.00 KgKg 1

    Cloth 68.13 2.800 24.33 MtrMtr 1

    Total Material % 35.58 92.43

    LABOUR

    Bhishti 36.00 0.120 300.00 DayDay 1

    Skilled Coolie 69.00 0.230 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 43.42 108.15

    3.15

    Per SQM : Rs 26.04

    41.46

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 14.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 242.04

    100 Sft Rs. 130.20

    10-30Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Shisham wood boarding or strip flooring 3/4" thick including 2 coats of bitumen laid

    hot complete

    (British)

    MATERIAL

    Fuel Wood 47.77 0.130 367.50 MdsMds 1

    Coal Tar (in canisters) 1,143.36 15.880 72.00 KgKg 1

    Wood Deodar 8,600.00 3.440 2,500.00 CftCft 1

    Wood - Shishim 16,646.00 11.480 1,450.00 CftCft 1

    Sand Paper 340.00 1.500 226.67 DozDoz 1

    Screw 50.40 0.840 60.00 PktPkt 1

    Total Material % 59.40 26,827.54

    LABOUR

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Carpenter 6,000.00 10.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.60 7,725.00

    225.00

    Per SQM : Rs 4,493.52

    7,208.78

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 1,000.68

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 41,761.32

    100 Sft Rs. 9,300.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 306 of 969

  • Chapter # : 10 FLOORING

    10-31Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Deodar wood boarding or strip flooring 3/4" thick including 2 coats of bitumen laid

    hot complete

    (British)

    MATERIAL

    Fuel Wood 47.77 0.130 367.50 MdsMds 1

    Coal Tar (in canisters) 1,110.24 15.420 72.00 KgKg 1

    Wood Deodar 33,200.00 13.280 2,500.00 CftCft 1

    Sand Paper 226.67 1.000 226.67 DozDoz 1

    Screw 50.40 0.840 60.00 PktPkt 1

    Total Material % 65.75 34,635.08

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Carpenter 3,600.00 6.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 13.25 5,562.00

    162.00

    Per SQM : Rs 5,229.84

    8,407.37

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 720.49

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 48,604.45

    100 Sft Rs. 6,696.00

    10-32Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Teak wood boarding or strip flooring 1/2" thick including 2 coats of bitumen laid hot

    complete

    (British)

    MATERIAL

    Fuel Wood 47.77 0.130 367.50 MdsMds 1

    Coal Tar (in canisters) 1,110.24 15.420 72.00 KgKg 1

    Wood Deodar 8,600.00 3.440 2,500.00 CftCft 1

    Sand Paper 453.33 2.000 226.67 DozDoz 1

    Wood - Teak 23,760.00 5.280 4,500.00 CftCft 1

    Screw 50.40 0.840 60.00 PktPkt 1

    Total Material % 62.27 34,021.75

    LABOUR

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Carpenter 6,000.00 10.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.73 7,725.00

    225.00

    Per SQM : Rs 5,430.18

    8,719.57

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 1,000.68

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 50,466.32

    100 Sft Rs. 9,300.00

    10-33Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Shisham wood block flooring 1" thick out to required size, fixed on a layer of

    bitumen base

    (British)

    MATERIAL

    Fuel Wood 47.77 0.130 367.50 MdsMds 1

    Coal Tar (in canisters) 2,612.88 36.290 72.00 KgKg 1

    Wood - Shishim 24,157.00 16.660 1,450.00 CftCft 1

    Sand Paper 453.33 2.000 226.67 DozDoz 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 307 of 969

  • Chapter # : 10 FLOORING

    Total Material % 63.44 27,270.99

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Carpenter 3,600.00 6.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 15.56 5,562.00

    162.00

    Per SQM : Rs 4,271.06

    6,860.91

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 720.49

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 39,693.90

    100 Sft Rs. 6,696.00

    10-34Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Teak wood block 1" thick cut to required size, fixed on a layer of asphalt bitumen

    laid on base

    (British)

    MATERIAL

    Fuel Wood 47.77 0.130 367.50 MdsMds 1

    Coal Tar (in canisters) 2,612.88 36.290 72.00 KgKg 1

    Sand Paper 453.33 2.000 226.67 DozDoz 1

    Wood - Teak 52,470.00 11.660 4,500.00 CftCft 1

    Total Material % 66.96 55,583.99

    LABOUR

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Carpenter 6,000.00 10.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.04 7,725.00

    225.00

    Per SQM : Rs 8,237.49

    13,247.64

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 1,000.68

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 76,556.63

    100 Sft Rs. 9,300.00

    10-35-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Laying wooden paving of hard wood on edge in coal tar & asphalt : Shisham wood

    (British)

    MATERIAL

    Fuel Wood 47.77 0.130 367.50 MdsMds 1

    Coal Tar (in canisters) 1,110.24 15.420 72.00 KgKg 1

    Wood - Shishim 15,703.50 10.830 1,450.00 CftCft 1

    Total Material % 67.58 16,861.51

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Carpenter 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 11.42 2,163.00

    63.00

    Per SQM : Rs 2,475.49

    3,981.92

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 280.19

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 23,006.43

    100 Sft Rs. 2,604.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 308 of 969

  • Chapter # : 10 FLOORING

    10-35-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Laying wooden paving of hard wood on edge in coal tar & asphalt : Kikar wood

    (British)

    MATERIAL

    Fuel Wood 47.77 0.130 367.50 MdsMds 1

    Coal Tar (in canisters) 1,110.24 15.420 72.00 KgKg 1

    Wood - Kiker 8,745.00 11.660 750.00 CftCft 1

    Total Material % 62.70 9,903.01

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Carpenter 600.00 1.000 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.30 2,163.00

    63.00

    Per SQM : Rs 1,569.52

    2,520.63

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 280.19

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 14,586.65

    100 Sft Rs. 2,604.00

    10-36-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Tile skirting laid in 1:2 c/s mortar over 3/4" thick cement mortar 1:2 complete :

    Cement tiles

    (British)

    MATERIAL

    Ordinary Portland Cement 1,070.70 2.490 430.00 BagBag 1

    Sand 108.00 6.000 1,800.00 CftCft 100

    CC Tiles 9x9x0.75 5,184.00 240.000 21,600.00 NoNo 1,000

    Pigment for flooring 125.00 0.500 250.00 KgKg 1

    Total Material % 59.86 6,487.70

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 750.00 2.500 300.00 DayDay 1

    Bhishti 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.14 1,801.47

    52.47

    Per SQM : Rs 1,078.03

    1,729.71

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 233.36

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 10,018.88

    100 Sft Rs. 2,168.76

    10-36-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Tile skirting laid in 1:2 c/s mortar over 3/4" thick cement mortar 1:2 complete :

    Mosaic tiles

    (British)

    MATERIAL

    Ordinary Portland Cement 1,070.70 2.490 430.00 BagBag 1

    Sand 108.00 6.000 1,800.00 CftCft 100

    White Cement 54.40 0.080 680.00 BagBag 1

    Mosaic Tile 16,800.00 420.000 40.00 NoNo 1

    Pigment for flooring 125.00 0.500 250.00 KgKg 1

    Total Material % 68.37 18,158.10

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 309 of 969

  • Chapter # : 10 FLOORING

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 750.00 2.500 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.63 2,085.75

    60.75

    Per SQM : Rs 2,634.30

    4,238.45

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 270.18

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 24,482.30

    100 Sft Rs. 2,511.00

    10-37-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide grey cement skirting 3/8" thick complete 1:2 cement, sand mortar

    (British)

    MATERIAL

    Ordinary Portland Cement 546.10 1.270 430.00 BagBag 1

    Sand 54.00 3.000 1,800.00 CftCft 100

    Total Material % 17.22 600.10

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 61.78 2,110.47

    61.47

    Per SQM : Rs 351.52

    556.31

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 273.39

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,266.88

    100 Sft Rs. 2,540.76

    10-37-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide grey cement skirting 3/8" thick complete 1:3 cement, sand mortar

    (British)

    MATERIAL

    Ordinary Portland Cement 438.60 1.020 430.00 BagBag 1

    Sand 63.00 3.500 1,800.00 CftCft 100

    Total Material % 14.95 501.60

    LABOUR

    Mason 1,500.00 2.500 600.00 DayDay 1

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 64.05 2,110.47

    61.47

    Per SQM : Rs 338.69

    535.63

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 273.39

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 3,147.70

    100 Sft Rs. 2,540.76

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 310 of 969

  • Chapter # : 10 FLOORING

    10-37-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide grey cement skirting 3/8" thick complete Extra if skirting or dado is finished

    with pigment

    (British)

    MATERIAL

    Pigment for flooring 688.25 2.753 250.00 KgKg 1

    Total Material % 62.40 688.25

    LABOUR

    Skilled Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 16.60 154.50

    4.50

    Per SQM : Rs 109.62

    176.03

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 20.01

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,018.78

    100 Sft Rs. 186.00

    10-38-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Glazed tile 1/4" thick dado jointed in white cement complete : White Plain tiles

    (British)

    MATERIAL

    Ordinary Portland Cement 946.00 2.200 430.00 BagBag 1

    Sand 93.60 5.200 1,800.00 CftCft 100

    White Cement 68.00 0.100 680.00 BagBag 1

    Ceramic Tile 6"x6" White 3,528.00 420.000 8.40 NoNo 1

    Total Material % 47.06 4,635.60

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.94 2,935.50

    85.50

    Per SQM : Rs 983.79

    1,571.98

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 380.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,143.08

    100 Sft Rs. 3,534.00

    10-38-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Glazed tile 1/4" thick dado jointed in white cement complete : Coloured Plain tiles

    (British)

    MATERIAL

    Ordinary Portland Cement 860.00 2.000 430.00 BagBag 1

    Sand 93.60 5.200 1,800.00 CftCft 100

    White Cement 68.00 0.100 680.00 BagBag 1

    Ceramic Tile 6"x6" White 3,528.00 420.000 8.40 NoNo 1

    Total Material % 46.73 4,549.60

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 311 of 969

  • Chapter # : 10 FLOORING

    Total Labour

    Sundries (Labour Only): %3

    % 32.27 2,935.50

    85.50

    Per SQM : Rs 972.60

    1,553.92

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 380.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,039.02

    100 Sft Rs. 3,534.00

    10-38-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Glazed tile 1/4" thick dado jointed in white cement complete : Printed tiles

    (British)

    MATERIAL

    Ordinary Portland Cement 946.00 2.200 430.00 BagBag 1

    Sand 93.60 5.200 1,800.00 CftCft 100

    White Cement 68.00 0.100 680.00 BagBag 1

    Ceramic Tile 6"x6" White 3,528.00 420.000 8.40 NoNo 1

    Total Material % 47.06 4,635.60

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.94 2,935.50

    85.50

    Per SQM : Rs 983.79

    1,571.98

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 380.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,143.08

    100 Sft Rs. 3,534.00

    10-39Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Glazed tile dado 1/4" thick in pigment over 1:2 c/s mortar 3/4" thick including

    finishing complete

    (British)

    MATERIAL

    Ordinary Portland Cement 946.00 2.200 430.00 BagBag 1

    Sand 93.60 5.200 1,800.00 CftCft 100

    White Cement 68.00 0.100 680.00 BagBag 1

    Ceramic Tile 6"x6" White 3,528.00 420.000 8.40 NoNo 1

    Pigment for flooring 125.00 0.500 250.00 KgKg 1

    Total Material % 47.54 4,760.60

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.46 2,935.50

    85.50

    Per SQM : Rs 1,000.07

    1,598.23

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 380.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 9,294.33

    100 Sft Rs. 3,534.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 312 of 969

  • Chapter # : 10 FLOORING

    10-40-a-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Mosaic dado or skirting complete as per specs Using grey cement : 3/8" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 984.70 2.290 430.00 BagBag 1

    Sand 81.00 4.500 1,800.00 CftCft 100

    Fine Grit / Aggregate 46.50 1.500 3,100.00 CftCft 100

    Grinding Stone 186.67 0.700 266.67 NoNo 1

    Polish Wax 122.50 0.500 245.00 PackPack 1

    Marble Chips 441.67 10.000 44.17 BagBag 1

    Total Material % 25.92 1,863.03

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 53.08 3,708.00

    108.00

    Per SQM : Rs 722.89

    1,147.24

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 480.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 6,718.27

    100 Sft Rs. 4,464.00

    10-40-a-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Mosaic dado or skirting complete as per specs Using grey cement : 1/2" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 1,268.50 2.950 430.00 BagBag 1

    Sand 81.00 4.500 1,800.00 CftCft 100

    Fine Grit / Aggregate 55.80 1.800 3,100.00 CftCft 100

    Grinding Stone 186.67 0.700 266.67 NoNo 1

    Polish Wax 122.50 0.500 245.00 PackPack 1

    Marble Chips 574.17 13.000 44.17 BagBag 1

    Total Material % 29.54 2,288.63

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 49.46 3,708.00

    108.00

    Per SQM : Rs 778.30

    1,236.61

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 480.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 7,233.25

    100 Sft Rs. 4,464.00

    10-40-b-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Mosaic dado or skirting complete as per specs Using white cement : 3/8" thick

    including grinding and polishing

    (British)

    MATERIAL

    Ordinary Portland Cement 387.00 0.900 430.00 BagBag 1

    Sand 81.00 4.500 1,800.00 CftCft 100

    Fine Grit / Aggregate 46.50 1.500 3,100.00 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 313 of 969

  • Chapter # : 10 FLOORING

    Polish Wax 122.50 0.500 245.00 PackPack 1

    Marble Chips 441.67 10.000 44.17 BagBag 1

    White Cement 945.20 1.390 680.00 BagBag 1

    Total Material % 27.35 2,023.87

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 51.65 3,708.00

    108.00

    Per SQM : Rs 743.83

    1,181.01

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 480.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 6,912.88

    100 Sft Rs. 4,464.00

    10-40-b-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Mosaic dado or skirting complete as per specs Using white cement : 1/2" thick

    including grinding and polishing

    (British)

    MATERIAL

    Ordinary Portland Cement 387.00 0.900 430.00 BagBag 1

    Sand 81.00 4.500 1,800.00 CftCft 100

    Fine Grit / Aggregate 62.00 2.000 3,100.00 CftCft 100

    Polish Wax 122.50 0.500 245.00 PackPack 1

    Marble Chips 574.17 13.000 44.17 BagBag 1

    White Cement 1,394.00 2.050 680.00 BagBag 1

    Total Material % 32.02 2,620.67

    LABOUR

    Mason 2,400.00 4.000 600.00 DayDay 1

    Coolie 900.00 3.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 46.98 3,708.00

    108.00

    Per SQM : Rs 821.53

    1,306.34

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 480.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 7,635.01

    100 Sft Rs. 4,464.00

    10-41-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay marble fine dressed and polished stone dado or skirting in white

    cement complete : 3/8" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)

    (British)

    MATERIAL

    Ordinary Portland Cement 473.00 1.100 430.00 BagBag 1

    Sand 54.00 3.000 1,800.00 CftCft 100

    White Cement 102.00 0.150 680.00 BagBag 1

    Marble Fine 3/8 inch Thick 1,850.00 100.000 18.50 SftSft 1

    Total Material % 45.63 2,479.00

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 314 of 969

  • Chapter # : 10 FLOORING

    Total Labour

    Sundries (Labour Only): %3

    % 33.37 1,699.50

    49.50

    Per SQM : Rs 542.91

    867.09

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 220.15

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,045.59

    100 Sft Rs. 2,046.00

    10-41-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide & lay marble fine dressed and polished stone dado or skirting in white

    cement complete : 1/2" thick (Badel, Silky black, Sunny white, Sunny Grey or eq)

    (British)

    MATERIAL

    Ordinary Portland Cement 752.50 1.750 430.00 BagBag 1

    Sand 90.00 5.000 1,800.00 CftCft 100

    White Cement 170.00 0.250 680.00 BagBag 1

    Marble fine 1/2" thick 4,200.00 100.000 42.00 SftSft 1

    Total Material % 57.73 5,212.50

    LABOUR

    Mason 900.00 1.500 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.27 1,699.50

    49.50

    Per SQM : Rs 898.80

    1,441.13

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 220.15

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 8,353.13

    100 Sft Rs. 2,046.00

    10-42Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Rubber flooring, consisting of 12"x12"x1/8" rubber tiles laid on firm foundation

    (British)

    MATERIAL

    Rubber Vinyl Tile 14,000.00 100.000 140.00 NoNo 1

    Adhesive Mixture 542.10 1.390 390.00 LtrLtr 1

    Brush II 170.00 1.000 170.00 NoNo 1

    Total Material % 70.28 14,712.10

    LABOUR

    Mason 597.00 0.995 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 8.72 1,232.91

    35.91

    Per SQM : Rs 2,075.17

    3,340.91

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 159.71

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 19,285.92

    100 Sft Rs. 1,484.28

    10-43-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Provide & fix glass strip 1.5" wide for dividing the floors into panels : 5mm thick

    (British)

    MATERIAL

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 315 of 969

  • Chapter # : 10 FLOORING

    Glass Strip 5mm 420.00 105.000 4.00 FtFt 1

    Total Material % 69.41 420.00

    LABOUR

    Mason 12.60 0.021 600.00 DayDay 1

    Coolie 27.30 0.091 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 9.59 41.10

    1.20

    Per Meter : Rs 18.29

    96.58

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 1.62

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 557.68

    100 Rft Rs. 49.48

    10-43-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Provide & fix glass strip 1.5" wide for dividing the floors into panels : 3mm thick

    (British)

    MATERIAL

    Glass Strip 5mm 420.00 105.000 4.00 FtFt 1

    Total Material % 69.41 420.00

    LABOUR

    Mason 12.60 0.021 600.00 DayDay 1

    Coolie 27.30 0.091 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 9.59 41.10

    1.20

    Per Meter : Rs 18.29

    96.58

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 1.62

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 557.68

    100 Rft Rs. 49.48

    10-43-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Providing and Fixing marble strip 1.5 inch wide 3/8 inch thick for dividing the floor

    into panels

    (British)

    MATERIAL

    Marble strip 1-1/2"x3/8" 420.00 105.000 4.00 RftRft 1

    Total Material % 69.41 420.00

    LABOUR

    Mason 12.60 0.021 600.00 DayDay 1

    Coolie 27.30 0.091 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 9.59 41.10

    1.20

    Per Meter : Rs 18.29

    96.58

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 1.62

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 557.68

    100 Rft Rs. 49.48

    10-43-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 RftSpec. No :

    Providing and Fixing marble strip 2" wide and 3/8" thick for dividing the floor into

    panels

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 316 of 969

  • Chapter # : 10 FLOORING

    MATERIAL

    Marble strip 2"x3/8" 630.00 105.000 6.00 RftRft 1

    Total Material % 71.47 630.00

    LABOUR

    Mason 12.60 0.021 600.00 DayDay 1

    Coolie 27.30 0.091 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 7.53 41.10

    1.20

    Per Meter : Rs 26.63

    140.68

    Composite Rates Per :

    Labour Rates Per : Per Meter : Rs 1.62

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Rft Rs. 811.78

    100 Rft Rs. 49.48

    10-44Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    P/F Vinyl Tiles or Vinyl Sheet flooring over firm foundation

    (British)

    MATERIAL

    Adhesive Mixture 975.00 2.500 390.00 LtrLtr 1

    Brush II 170.00 1.000 170.00 NoNo 1

    Vinyl Flooring Sheet 14,175.00 105.000 135.00 NoNo 1

    Total Material % 70.48 15,320.00

    LABOUR

    Fitter I 900.00 1.500 600.00 DayDay 1

    Skilled Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 8.52 1,236.00

    36.00

    Per SQM : Rs 2,154.71

    3,469.20

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 160.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 20,025.20

    100 Sft Rs. 1,488.00

    10-45Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    P/F Precast Concrete 7000 psi TUFF Tiles over bed of 2" thick sand & 4" thick brick

    ballast comp

    (British)

    MATERIAL

    Brick Ballast /Stone Ballast 74.34 5.900 1,260.00 CftCft 100

    Sand 324.00 18.000 1,800.00 CftCft 100

    TUFF Tiles 7000 psi 3,500.00 100.000 35.00 SftSft 1

    Total Material % 58.11 3,898.34

    LABOUR

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 20.89 1,236.00

    36.00

    Per SQM : Rs 667.66

    1,070.65

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 160.11

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 6,204.99

    100 Sft Rs. 1,488.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 317 of 969

  • Chapter # : 10 FLOORING

    10-46-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    P/F Ceramic Floor Tiles (Emco, National or eq) Size : 12" x 12"

    (British)

    MATERIAL

    Ordinary Portland Cement 395.60 0.920 430.00 BagBag 1

    Sand 72.00 4.000 1,800.00 CftCft 100

    White Cement 183.60 0.270 680.00 BagBag 1

    Ceramic Tile 12" x 12" 5,622.00 100.000 56.22 SftSft 1

    Total Material % 54.97 6,273.20

    LABOUR

    Mason 1,800.00 3.000 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 24.03 2,472.00

    72.00

    Per SQM : Rs 1,136.96

    1,821.37

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 320.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 10,566.57

    100 Sft Rs. 2,976.00

    10-46-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    P/F Ceramic Floor Tiles (Emco, National or eq) Size 20" x 20"

    (British)

    MATERIAL

    Ordinary Portland Cement 395.60 0.920 430.00 BagBag 1

    Sand 72.00 4.000 1,800.00 CftCft 100

    White Cement 183.60 0.270 680.00 BagBag 1

    Ceramic Tile 20" x 20" 8,768.00 100.000 87.68 SftSft 1

    Total Material % 60.57 9,419.20

    LABOUR

    Mason 1,800.00 3.000 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.43 2,472.00

    72.00

    Per SQM : Rs 1,546.56

    2,482.03

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 320.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 14,373.23

    100 Sft Rs. 2,976.00

    10-47Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Burnt brick (1st class) pavement on edge grouted with sand including preparation of

    bed

    (British)

    MATERIAL

    Mud / Clay 40.50 6.000 675.00 CftCft 100

    Sand 234.00 13.000 1,800.00 CftCft 100

    Burnt Brick 3,150.00 525.000 6,000.00 NoNo 1,000

    Total Material % 54.51 3,424.50

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 600.00 2.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 318 of 969

  • Chapter # : 10 FLOORING

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 24.49 1,390.50

    40.50

    Per SQM : Rs 625.98

    1,002.65

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 180.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 5,817.65

    100 Sft Rs. 1,674.00

    10-48-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Porceline tile floor 1/4" thick laid cement 1:2 or 3/4" thick cement mortar 1:2 (Local

    Master Tiles)

    (British)

    MATERIAL

    Ordinary Portland Cement 946.00 2.200 430.00 BagBag 1

    Sand 93.60 5.200 1,800.00 CftCft 100

    Porciline tiles 12x12" Master 4,560.00 100.000 45.60 NoNo 1

    Filler 105.00 1.000 105.00 PktPkt 1

    Total Material % 52.52 5,704.60

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 26.48 2,626.50

    76.50

    Per SQM : Rs 1,082.95

    1,733.47

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 340.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 10,064.57

    100 Sft Rs. 3,162.00

    10-48-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Porceline tile floor 1/4" thick laid cement 1:2 over 3/4" thick cement mortar 1:2

    (Imported Tiles)

    (British)

    MATERIAL

    Ordinary Portland Cement 946.00 2.200 430.00 BagBag 1

    Sand 93.60 5.200 1,800.00 CftCft 100

    Porciline tiles 12x24" Imported 6,720.00 50.000 134.40 NoNo 1

    Filler 105.00 1.000 105.00 PktPkt 1

    Total Material % 57.39 7,864.60

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 21.61 2,626.50

    76.50

    Per SQM : Rs 1,364.17

    2,187.07

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 340.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 12,678.17

    100 Sft Rs. 3,162.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 319 of 969

  • Chapter # : 10 FLOORING

    10-48-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Granitto tile floor 1/4" thick laid cement 1:2 or 3/4" thick cement mortar 1:2

    (Imported Tiles UAE) 24"x24"

    (British)

    MATERIAL

    Ordinary Portland Cement 946.00 2.200 430.00 BagBag 1

    Sand 93.60 5.200 1,800.00 CftCft 100

    Granitto tiles (UAE) 24"x24" 16,200.00 25.000 648.00 NoNo 1

    Filler 105.00 1.000 105.00 PktPkt 1

    Total Material % 66.26 17,344.60

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 12.74 2,626.50

    76.50

    Per SQM : Rs 2,598.43

    4,177.87

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 340.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 24,148.97

    100 Sft Rs. 3,162.00

    10-48-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Granitto tile floor 1/4" thick laid cement 1:2 or 3/4" thick cement mortar 1:2

    (Imported Tiles UAE) 16"x16"

    (British)

    MATERIAL

    Ordinary Portland Cement 946.00 2.200 430.00 BagBag 1

    Sand 93.60 5.200 1,800.00 CftCft 100

    Granitto tiles (UAE) 16"x16" 13,543.20 57.000 237.60 NoNo 1

    Filler 105.00 1.000 105.00 PktPkt 1

    Total Material % 64.76 14,687.80

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 14.24 2,626.50

    76.50

    Per SQM : Rs 2,252.52

    3,619.94

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 340.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 20,934.24

    100 Sft Rs. 3,162.00

    10-49-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Providing and Laying marble fine dressed stone flooring on surface in white

    cement complete using indian green marble 12"x12"x3/4" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    Polish Wax 122.50 0.500 245.00 PackPack 1

    White Cement 68.00 0.100 680.00 BagBag 1

    Indian green marble fine

    dressed 3/4"

    25,000.00 100.000 250.00 NoNo 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 320 of 969

  • Chapter # : 10 FLOORING

    Total Material % 68.26 26,451.70

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.74 3,090.00

    90.00

    Per SQM : Rs 3,844.18

    6,184.86

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 400.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 35,726.56

    100 Sft Rs. 3,720.00

    10-49-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Providing and Laying marble fine dressed stone flooring on surface in white

    cement complete using Trevera marble 12"x12"x3/4" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    Polish Wax 122.50 0.500 245.00 PackPack 1

    White Cement 68.00 0.100 680.00 BagBag 1

    Trevera Marble fine dressed 3/4" 5,000.00 100.000 50.00 NoNo 1

    Total Material % 51.88 6,451.70

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 27.12 3,090.00

    90.00

    Per SQM : Rs 1,240.26

    1,984.86

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 400.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 11,526.56

    100 Sft Rs. 3,720.00

    10-49-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Providing and Laying marble fine dressed stone flooring on surface in white

    cement complete using Botocina marble 12"x12"x3/4" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    Polish Wax 122.50 0.500 245.00 PackPack 1

    White Cement 68.00 0.100 680.00 BagBag 1

    Botocina Marble fine dressed

    3/4"

    10,000.00 100.000 100.00 NoNo 1

    Total Material % 60.22 11,451.70

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 18.78 3,090.00

    90.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 321 of 969

  • Chapter # : 10 FLOORING

    Per SQM : Rs 1,891.24

    3,034.86

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 400.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 17,576.56

    100 Sft Rs. 3,720.00

    10-49-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Providing and Laying marble fine dressed stone flooring on surface in white

    cement complete using Veroona/Lasbela marble 12"x12"x3/4" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 1,135.20 2.640 430.00 BagBag 1

    Sand 126.00 7.000 1,800.00 CftCft 100

    Polish Wax 122.50 0.500 245.00 PackPack 1

    White Cement 68.00 0.100 680.00 BagBag 1

    Veroona Marble fine dressed

    3/4"

    7,000.00 100.000 70.00 NoNo 1

    Total Material % 56.09 8,451.70

    LABOUR

    Mason 1,200.00 2.000 600.00 DayDay 1

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 22.91 3,090.00

    90.00

    Per SQM : Rs 1,500.65

    2,404.86

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 400.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 13,946.56

    100 Sft Rs. 3,720.00

    10-50Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Chemical polishing of marble floor/Dado

    (British)

    MATERIAL

    Grinding Stone 1,066.67 4.000 266.67 NoNo 1

    Polish Wax 122.50 0.500 245.00 PktPkt 1

    Total Material % 50.51 1,189.17

    LABOUR

    Coolie 300.00 1.000 300.00 NoNo 1

    Polisher 300.00 0.500 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 28.49 618.00

    18.00

    Per SQM : Rs 234.88

    375.73

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 80.05

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,182.89

    100 Sft Rs. 744.00

    10-51Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit SftSpec. No :

    Replaced coloured glass panes of sizes upto 4 mm thickness with iron, nails and

    putty including removing broken ones if required in all floors.

    (British)

    MATERIAL

    Coloured glass panes of size

    upto 4mm

    77.50 1.000 77.50 SftSft 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 322 of 969

  • Chapter # : 10 FLOORING

    Putty and Nails 15.00 1.000 15.00 LsLs 1

    Total Material % 59.73 92.50

    LABOUR

    Coolie 8.40 0.028 300.00 DayDay 1

    Glazier 16.80 0.028 600.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 19.27 25.96

    0.76

    Per SQM : Rs 1,540.54

    24.72

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 336.23

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Sft Rs. 143.17

    Sft Rs. 31.25

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 323 of 969

  • Chapter # : 11 SURFACE RENDERING

    11-01-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Mud plaster on walls (excluding gobri leeping) upto 20' height : 1/2" thick

    (British)

    MATERIAL

    Mud / Clay 40.50 6.000 675.00 CftCft 100

    Bhoosa 59.42 8.000 7.43 SrSr 1

    Total Material % 20.70 99.92

    LABOUR

    Mason 102.00 0.170 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Bhishti 15.00 0.050 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 58.30 275.01

    8.01

    Per SQM : Rs 48.63

    77.05

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 35.62

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 451.99

    100 Sft Rs. 331.08

    11-01-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Mud plaster on walls (excluding gobri leeping) upto 20' height : 1" thick

    (British)

    MATERIAL

    Mud / Clay 81.00 12.000 675.00 CftCft 100

    Bhoosa 118.85 16.000 7.43 SrSr 1

    Total Material % 26.84 199.85

    LABOUR

    Mason 120.00 0.200 600.00 DayDay 1

    Coolie 225.00 0.750 300.00 DayDay 1

    Bhishti 21.00 0.070 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 52.16 376.98

    10.98

    Per SQM : Rs 74.85

    118.83

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 48.83

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 695.66

    100 Sft Rs. 453.84

    11-02-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Mud plaster on floor / roof (excluding gobri leeping) upto 20' height : 1/2" thick

    (British)

    MATERIAL

    Mud / Clay 40.50 6.000 675.00 CftCft 100

    Bhoosa 59.42 8.000 7.43 SrSr 1

    Total Material % 22.34 99.92

    LABOUR

    Mason 90.00 0.150 600.00 DayDay 1

    Coolie 135.00 0.450 300.00 DayDay 1

    Bhishti 15.00 0.050 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 324 of 969

  • Chapter # : 11 SURFACE RENDERING

    Total Labour

    Sundries (Labour Only): %3

    % 56.66 247.20

    7.20

    Per SQM : Rs 45.03

    71.38

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 32.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 418.51

    100 Sft Rs. 297.60

    11-02-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Mud plaster on floor / roof (excluding gobri leeping) upto 20' height : 1" thick

    (British)

    MATERIAL

    Mud / Clay 81.00 12.000 675.00 CftCft 100

    Bhoosa 118.85 16.000 7.43 SrSr 1

    Total Material % 23.26 199.85

    LABOUR

    Mason 150.00 0.250 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 3.00 0.010 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 55.74 466.59

    13.59

    Per SQM : Rs 86.46

    137.10

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 60.44

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 803.54

    100 Sft Rs. 561.72

    11-03-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement lime plaster 1:7:12 (c/l/s) upto 20' height 1/4" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 43.00 0.100 430.00 BagBag 1

    Sand 25.20 1.400 1,800.00 CftCft 100

    White Lime 79.25 0.317 250.00 MdsMds 1

    Total Material % 11.52 147.45

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 67.48 849.75

    24.75

    Per SQM : Rs 129.27

    204.21

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,201.41

    100 Sft Rs. 1,023.00

    11-03-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement lime plaster 1:7:12 (c/l/s) upto 20' height 1/2" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 86.00 0.200 430.00 BagBag 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 325 of 969

  • Chapter # : 11 SURFACE RENDERING

    Sand 50.40 2.800 1,800.00 CftCft 100

    White Lime 158.75 0.635 250.00 MdsMds 1

    Total Material % 20.03 295.15

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 58.97 849.75

    24.75

    Per SQM : Rs 148.50

    235.23

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,380.13

    100 Sft Rs. 1,023.00

    11-04-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement Neru plaster 1:2 (c/s) upto 20' height 1/4" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 262.30 0.610 430.00 BagBag 1

    Sand 27.72 1.540 1,800.00 CftCft 100

    Jute Chopped 140.00 1.400 100.00 KgKg 1

    Total Material % 26.04 430.02

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 52.96 849.75

    24.75

    Per SQM : Rs 166.06

    263.55

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,543.32

    100 Sft Rs. 1,023.00

    11-04-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement Neru plaster 1:2 (c/s) upto 20' height 1/2" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 404.20 0.940 430.00 BagBag 1

    Sand 55.44 3.080 1,800.00 CftCft 100

    Jute Chopped 280.00 2.800 100.00 KgKg 1

    Total Material % 35.93 739.64

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 43.07 849.75

    24.75

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 326 of 969

  • Chapter # : 11 SURFACE RENDERING

    Per SQM : Rs 206.37

    328.57

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,917.96

    100 Sft Rs. 1,023.00

    11-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    2" stucco cement plaster 1:2:4 (c/s/shingle) upto 20' height

    (British)

    MATERIAL

    Ordinary Portland Cement 1,294.30 3.010 430.00 BagBag 1

    Sand 136.80 7.600 1,800.00 CftCft 100

    Crushed Aggregate 405.00 15.000 2,700.00 CftCft 100

    Total Material % 37.45 1,836.10

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 1,200.00 4.000 300.00 DayDay 1

    Bhishti 90.00 0.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 41.55 1,946.70

    56.70

    Per SQM : Rs 491.22

    782.48

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 252.17

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 4,565.28

    100 Sft Rs. 2,343.60

    11-06-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide/lay machine sprayed plaster 1/2" thick using cement & zero guage chips :

    Ratio 1:1

    (British)

    MATERIAL

    Ordinary Portland Cement 473.00 1.100 430.00 BagBag 1

    Sand 27.00 1.500 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Marble Chips 3.71 0.084 44.17 BagBag 1

    Total Material % 25.05 608.71

    LABOUR

    Mason 198.00 0.330 600.00 DayDay 1

    Coolie 195.00 0.650 300.00 DayDay 1

    Bhishti 105.00 0.350 300.00 DayDay 1

    Spray Man 140.00 0.350 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 29.26 657.14

    19.14

    EQUIPMENT

    Spray Machine 600.00 4.000 150.00 HourHour 1

    Total Equipment % 24.69 600.00

    Per SQM : Rs 242.49

    387.81

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 85.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,253.66

    100 Sft Rs. 791.12

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 327 of 969

  • Chapter # : 11 SURFACE RENDERING

    11-06-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide/lay machine sprayed plaster 1/2" thick using cement & zero guage chips :

    Ratio 1:1.5

    (British)

    MATERIAL

    Ordinary Portland Cement 387.00 0.900 430.00 BagBag 1

    Sand 28.80 1.600 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Marble Chips 4.02 0.091 44.17 BagBag 1

    Total Material % 22.55 524.82

    LABOUR

    Mason 198.00 0.330 600.00 DayDay 1

    Coolie 201.00 0.670 300.00 DayDay 1

    Bhishti 105.00 0.350 300.00 DayDay 1

    Spray Man 140.00 0.350 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 30.67 663.32

    19.32

    EQUIPMENT

    Spray Machine 600.00 4.000 150.00 HourHour 1

    Total Equipment % 25.78 600.00

    Per SQM : Rs 232.37

    371.45

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 85.93

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,159.59

    100 Sft Rs. 798.56

    11-06-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Provide/lay machine sprayed plaster 1/2" thick using cement & zero guage chips :

    Ratio 1:2

    (British)

    MATERIAL

    Ordinary Portland Cement 344.00 0.800 430.00 BagBag 1

    Sand 28.80 1.600 1,800.00 CftCft 100

    Scaffolding 105.00 20.000 5.25 SftSft 1

    Marble Chips 4.42 0.100 44.17 BagBag 1

    Total Material % 21.08 482.22

    LABOUR

    Mason 216.00 0.360 600.00 DayDay 1

    Coolie 195.00 0.650 300.00 DayDay 1

    Bhishti 105.00 0.350 300.00 DayDay 1

    Spray Man 140.00 0.350 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 31.68 675.68

    19.68

    EQUIPMENT

    Spray Machine 600.00 4.000 150.00 HourHour 1

    Total Equipment % 26.23 600.00

    Per SQM : Rs 228.43

    365.03

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 87.53

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,122.92

    100 Sft Rs. 813.44

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 328 of 969

  • Chapter # : 11 SURFACE RENDERING

    11-07-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:2, upto 20' height 3/8" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 421.40 0.980 430.00 BagBag 1

    Sand 45.00 2.500 1,800.00 CftCft 100

    Total Material % 27.45 466.40

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 51.55 849.75

    24.75

    Per SQM : Rs 170.80

    271.19

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,587.34

    100 Sft Rs. 1,023.00

    11-07-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:2, upto 20' height 1/2" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 546.10 1.270 430.00 BagBag 1

    Sand 54.00 3.000 1,800.00 CftCft 100

    Total Material % 32.00 600.10

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 47.00 849.75

    24.75

    Per SQM : Rs 188.21

    299.27

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,749.12

    100 Sft Rs. 1,023.00

    11-07-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:2, upto 20' height 3/4" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 838.50 1.950 430.00 BagBag 1

    Sand 90.00 5.000 1,800.00 CftCft 100

    Total Material % 35.67 928.50

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 375.00 1.250 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 329 of 969

  • Chapter # : 11 SURFACE RENDERING

    Total Labour

    Sundries (Labour Only): %3

    % 43.33 1,081.50

    31.50

    Per SQM : Rs 260.98

    415.49

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 140.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,425.49

    100 Sft Rs. 1,302.00

    11-08-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:3 upto 20' height 3/8" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 288.10 0.670 430.00 BagBag 1

    Sand 45.90 2.550 1,800.00 CftCft 100

    Total Material % 21.90 334.00

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 57.10 849.75

    24.75

    Per SQM : Rs 153.56

    243.39

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,427.14

    100 Sft Rs. 1,023.00

    11-08-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:3 upto 20' height 1/2" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 382.70 0.890 430.00 BagBag 1

    Sand 61.20 3.400 1,800.00 CftCft 100

    Total Material % 26.59 443.90

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 52.41 849.75

    24.75

    Per SQM : Rs 167.87

    266.47

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,560.12

    100 Sft Rs. 1,023.00

    11-08-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:3 upto 20' height 3/4" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 576.20 1.340 430.00 BagBag 1

    Sand 91.80 5.100 1,800.00 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 330 of 969

  • Chapter # : 11 SURFACE RENDERING

    Total Material % 29.55 668.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 375.00 1.250 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 49.45 1,081.50

    31.50

    Per SQM : Rs 227.07

    360.78

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 140.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,110.28

    100 Sft Rs. 1,302.00

    11-09-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:4 upto 20' height 3/8" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 249.40 0.580 430.00 BagBag 1

    Sand 54.00 3.000 1,800.00 CftCft 100

    Total Material % 20.43 303.40

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 58.57 849.75

    24.75

    Per SQM : Rs 149.58

    236.96

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,390.11

    100 Sft Rs. 1,023.00

    11-09-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:4 upto 20' height 1/2" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 318.20 0.740 430.00 BagBag 1

    Sand 64.80 3.600 1,800.00 CftCft 100

    Total Material % 24.10 383.00

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 54.90 849.75

    24.75

    Per SQM : Rs 159.94

    253.68

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,486.43

    100 Sft Rs. 1,023.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 331 of 969

  • Chapter # : 11 SURFACE RENDERING

    11-09-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:4 upto 20' height 3/4" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 498.80 1.160 430.00 BagBag 1

    Sand 99.00 5.500 1,800.00 CftCft 100

    Total Material % 27.57 597.80

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 375.00 1.250 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 51.43 1,081.50

    31.50

    Per SQM : Rs 217.93

    346.04

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 140.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 2,025.34

    100 Sft Rs. 1,302.00

    11-10-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 3/8" thick under soffit of RCC roof slabs only upto 20' height : (1:2)

    (British)

    MATERIAL

    Ordinary Portland Cement 322.50 0.750 430.00 BagBag 1

    Sand 36.00 2.000 1,800.00 CftCft 100

    Total Material % 19.34 358.50

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 59.66 1,081.50

    31.50

    Per SQM : Rs 186.77

    295.79

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 140.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,735.79

    100 Sft Rs. 1,302.00

    11-10-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 3/8" thick under soffit of RCC roof slabs only upto 20' height : (1:3)

    (British)

    MATERIAL

    Ordinary Portland Cement 305.30 0.710 430.00 BagBag 1

    Sand 50.22 2.790 1,800.00 CftCft 100

    Total Material % 19.22 355.52

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 332 of 969

  • Chapter # : 11 SURFACE RENDERING

    Total Labour

    Sundries (Labour Only): %3

    % 59.78 1,081.50

    31.50

    Per SQM : Rs 186.38

    295.16

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 140.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,732.18

    100 Sft Rs. 1,302.00

    11-10-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 3/8" thick under soffit of RCC roof slabs only upto 20' height : (1:4)

    (British)

    MATERIAL

    Ordinary Portland Cement 197.80 0.460 430.00 BagBag 1

    Sand 43.20 2.400 1,800.00 CftCft 100

    Total Material % 14.19 241.00

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 64.81 1,081.50

    31.50

    Per SQM : Rs 171.47

    271.11

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 140.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,593.61

    100 Sft Rs. 1,302.00

    11-11-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:5, upto 20' height 3/8" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 219.30 0.510 430.00 BagBag 1

    Sand 54.00 3.000 1,800.00 CftCft 100

    Total Material % 18.91 273.30

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 60.09 849.75

    24.75

    Per SQM : Rs 145.66

    230.64

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,353.69

    100 Sft Rs. 1,023.00

    11-11-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:5, upto 20' height 1/2" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 288.10 0.670 430.00 BagBag 1

    Sand 72.00 4.000 1,800.00 CftCft 100

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 333 of 969

  • Chapter # : 11 SURFACE RENDERING

    Total Material % 23.09 360.10

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 55.91 849.75

    24.75

    Per SQM : Rs 156.96

    248.87

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,458.72

    100 Sft Rs. 1,023.00

    11-11-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement Plaster 1:5, upto 20' height 3/4" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 438.60 1.020 430.00 BagBag 1

    Sand 108.00 6.000 1,800.00 CftCft 100

    Total Material % 26.02 546.60

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 375.00 1.250 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 52.98 1,081.50

    31.50

    Per SQM : Rs 211.26

    335.29

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 140.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,963.39

    100 Sft Rs. 1,302.00

    11-12-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:6, upto 20' height 3/8" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 176.30 0.410 430.00 BagBag 1

    Sand 54.00 3.000 1,800.00 CftCft 100

    Total Material % 16.59 230.30

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 62.41 849.75

    24.75

    Per SQM : Rs 140.06

    221.61

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,301.66

    100 Sft Rs. 1,023.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 334 of 969

  • Chapter # : 11 SURFACE RENDERING

    11-12-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:6, upto 20' height 1/2" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 232.20 0.540 430.00 BagBag 1

    Sand 72.00 4.000 1,800.00 CftCft 100

    Total Material % 20.47 304.20

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 58.53 849.75

    24.75

    Per SQM : Rs 149.68

    237.13

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,391.08

    100 Sft Rs. 1,023.00

    11-12-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement plaster 1:6, upto 20' height 3/4" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 348.30 0.810 430.00 BagBag 1

    Sand 108.00 6.000 1,800.00 CftCft 100

    Total Material % 23.02 456.30

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 375.00 1.250 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 55.98 1,081.50

    31.50

    Per SQM : Rs 199.50

    316.32

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 140.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,854.12

    100 Sft Rs. 1,302.00

    11-13Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Applying floating coat of cement 1/32" thick

    (British)

    MATERIAL

    Ordinary Portland Cement 176.30 0.410 430.00 BagBag 1

    Total Material % 18.32 176.30

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 75.00 0.250 300.00 DayDay 1

    Bhishti 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 60.68 571.65

    16.65

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 335 of 969

  • Chapter # : 11 SURFACE RENDERING

    Per SQM : Rs 97.00

    153.57

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 74.05

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 901.52

    100 Sft Rs. 688.20

    11-14Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Lime pointing flush upto 20' height, including racking joints in lime sand mortar 1:2

    (British)

    MATERIAL

    Sand 32.40 1.800 1,800.00 CftCft 100

    White Lime 85.00 0.340 250.00 MdsMds 1

    Total Material % 12.44 117.40

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 225.00 0.750 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 66.56 618.00

    18.00

    Per SQM : Rs 95.34

    150.65

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 80.05

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 886.05

    100 Sft Rs. 744.00

    11-15Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Lime pointing struck joints on walls, upto 20' height including racking joints, in lime

    sand mortar 1:2

    (British)

    MATERIAL

    Sand 32.40 1.800 1,800.00 CftCft 100

    White Lime 85.00 0.340 250.00 MdsMds 1

    Total Material % 8.17 117.40

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 70.83 1,004.25

    29.25

    Per SQM : Rs 145.37

    229.40

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,351.05

    100 Sft Rs. 1,209.00

    11-16-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement pointing flush, upto 20' height Ratio 1:2

    (British)

    MATERIAL

    Ordinary Portland Cement 313.90 0.730 430.00 BagBag 1

    Sand 32.40 1.800 1,800.00 CftCft 100

    Total Material % 22.47 346.30

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 336 of 969

  • Chapter # : 11 SURFACE RENDERING

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 56.53 849.75

    24.75

    Per SQM : Rs 155.16

    245.97

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,442.02

    100 Sft Rs. 1,023.00

    11-16-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement pointing flush, upto 20' height Ratio 1:3

    (British)

    MATERIAL

    Ordinary Portland Cement 236.50 0.550 430.00 BagBag 1

    Sand 36.00 2.000 1,800.00 CftCft 100

    Total Material % 18.87 272.50

    LABOUR

    Mason 450.00 0.750 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 60.13 849.75

    24.75

    Per SQM : Rs 145.55

    230.48

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,352.73

    100 Sft Rs. 1,023.00

    11-17-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement pointing 1:2 flush, on floor

    (British)

    MATERIAL

    Ordinary Portland Cement 313.90 0.730 430.00 BagBag 1

    Sand 32.40 1.800 1,800.00 CftCft 100

    Total Material % 27.81 346.30

    LABOUR

    Mason 300.00 0.500 600.00 DayDay 1

    Coolie 225.00 0.750 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 51.19 618.00

    18.00

    Per SQM : Rs 125.14

    198.72

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 80.05

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,163.02

    100 Sft Rs. 744.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 337 of 969

  • Chapter # : 11 SURFACE RENDERING

    11-18-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement pointing struck joints, on walls, upto 20' height : Ratio 1:2

    (British)

    MATERIAL

    Ordinary Portland Cement 313.90 0.730 430.00 BagBag 1

    Sand 32.40 1.800 1,800.00 CftCft 100

    Total Material % 19.92 346.30

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 59.08 1,004.25

    29.25

    Per SQM : Rs 175.18

    277.47

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,628.02

    100 Sft Rs. 1,209.00

    11-18-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Cement pointing struck joints, on walls, upto 20' height : Ratio 1:3

    (British)

    MATERIAL

    Ordinary Portland Cement 236.50 0.550 430.00 BagBag 1

    Sand 36.00 2.000 1,800.00 CftCft 100

    Total Material % 16.60 272.50

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 300.00 1.000 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 62.40 1,004.25

    29.25

    Per SQM : Rs 165.57

    261.98

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 130.09

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,538.73

    100 Sft Rs. 1,209.00

    11-19-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Pointing flush on stone work, upto 20' height in lime sand mortar 1:2 (lime, sand)

    (British)

    MATERIAL

    Sand 36.00 2.000 1,800.00 CftCft 100

    White Lime 112.50 0.450 250.00 MdsMds 1

    Total Material % 11.59 148.50

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 338 of 969

  • Chapter # : 11 SURFACE RENDERING

    Total Labour

    Sundries (Labour Only): %3

    % 67.41 849.75

    24.75

    Per SQM : Rs 129.41

    204.44

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,202.69

    100 Sft Rs. 1,023.00

    11-19-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Pointing flush on stone work, upto 20' height in cement sand mortar 1:3

    (British)

    MATERIAL

    Ordinary Portland Cement 236.50 0.550 430.00 BagBag 1

    Sand 36.00 2.000 1,800.00 CftCft 100

    Total Material % 18.87 272.50

    LABOUR

    Mason 600.00 1.000 600.00 DayDay 1

    Coolie 150.00 0.500 300.00 DayDay 1

    Bhishti 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 60.13 849.75

    24.75

    Per SQM : Rs 145.55

    230.48

    Composite Rates Per :

    Labour Rates Per : Per SQM : Rs 110.07

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 Sft Rs. 1,352.73

    100 Sft Rs. 1,023.00

    11-19-c-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 SftSpec. No :

    Pointing flush on stone work, upto 20' height On stone work raised : in lime sand

    mortar 1:2

    (British)

    MATERIAL

    Sand 36.00 2.000 1,800.00 CftCft 100

    White Lime 112.50 0