Chapter # : 01 CARRIAGE 01-01-a Item Code : Item Name : Detail Qty Amount Rate (Rs.) Unit Unit 50 Meter Spec. No : Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st 50 meter EQUIPMENT Carriage Charges #1 59.00 1.000 59.00 Rs/50m Rs/50m 1 Total Equipment % 76.00 59.00 Cost Per 50 m: 71.39 12.39 Composite Rates Per : Labour Rates Per : Cost Per 50 m: 0.00 % 21 Contractors Profit + Over Heads (Material+Labour+Equipment) : 50 Meter Rs. 71.39 50 Meter Rs. 0.00 01-01-b Item Code : Item Name : Detail Qty Amount Rate (Rs.) Unit Unit 50 Meter Spec. No : Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd 50 meter EQUIPMENT Carriage Charges #2 9.22 1.000 9.22 Rs/50m Rs/50m 1 Total Equipment % 76.00 9.22 Cost Per 50 m: 11.15 1.94 Composite Rates Per : Labour Rates Per : Cost Per 50 m: 0.00 % 21 Contractors Profit + Over Heads (Material+Labour+Equipment) : 50 Meter Rs. 11.15 50 Meter Rs. 0.00 01-01-c Item Code : Item Name : Detail Qty Amount Rate (Rs.) Unit Unit 50 Meter Spec. No : Carriage of 100 cft / 5 tonne of all materials by truck or other means : 3rd to 5th 50 meter EQUIPMENT Carriage Charges #3 6.41 1.000 6.41 Rs/50m Rs/50m 1 Total Equipment % 76.00 6.41 Cost Per 50 m: 7.76 1.35 Composite Rates Per : Labour Rates Per : Cost Per 50 m: 0.00 % 21 Contractors Profit + Over Heads (Material+Labour+Equipment) : 50 Meter Rs. 7.76 50 Meter Rs. 0.00 01-01-d Item Code : Item Name : Detail Qty Amount Rate (Rs.) Unit Unit 250 Meter Spec. No : Carriage of 100 cft / 5 tonne of all materials by truck or other means : 250 to 1000 meter EQUIPMENT Carriage Charges #4 28.56 1.000 28.56 Rs/250m Rs/250m 1 Total Equipment % 76.00 28.56 NWFP CSR 2008 - Approved 25-August-2008 As on Jul-Sep (Qtr-3) 2012 Page 1 of 969

Upload: vudien

Post on 30-Jun-2018

287 views

Category:

Documents


10 download

TRANSCRIPT

  • Chapter # : 01 CARRIAGE

    01-01-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st 50 meter

    EQUIPMENT

    Carriage Charges #1 59.00 1.000 59.00 Rs/50mRs/50m 1

    Total Equipment % 76.00 59.00

    Cost Per 50 m: 71.39

    12.39

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 71.39

    50 Meter Rs. 0.00

    01-01-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 9.22 1.000 9.22 Rs/50mRs/50m 1

    Total Equipment % 76.00 9.22

    Cost Per 50 m: 11.15

    1.94

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 11.15

    50 Meter Rs. 0.00

    01-01-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 3rd to 5th 50

    meter

    EQUIPMENT

    Carriage Charges #3 6.41 1.000 6.41 Rs/50mRs/50m 1

    Total Equipment % 76.00 6.41

    Cost Per 50 m: 7.76

    1.35

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 7.76

    50 Meter Rs. 0.00

    01-01-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 250 MeterSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 250 to 1000

    meter

    EQUIPMENT

    Carriage Charges #4 28.56 1.000 28.56 Rs/250mRs/250m 1

    Total Equipment % 76.00 28.56

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 1 of 969

  • Chapter # : 01 CARRIAGE

    Cost Per 250 m: 34.56

    6.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 250 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    250 Meter Rs. 34.56

    250 Meter Rs. 0.00

    01-01-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 1st kilometer

    EQUIPMENT

    Carriage Charges #5 102.38 1.000 102.38 Rs/KmRs/Km 1

    Total Equipment % 76.00 102.38

    Cost Per km: 123.88

    21.50

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 123.88

    km Rs. 0.00

    01-01-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 2nd - 5th

    kilometer

    EQUIPMENT

    Carriage Charges #6 23.40 1.000 23.40 Rs/KmRs/Km 1

    Total Equipment % 76.00 23.40

    Cost Per km: 28.31

    4.91

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 28.31

    km Rs. 0.00

    01-01-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 6th to 10th

    kilometer

    EQUIPMENT

    Carriage Charges #7 20.00 1.000 20.00 Rs/KmRs/Km 1

    Total Equipment % 76.00 20.00

    Cost Per km: 24.20

    4.20

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 24.20

    km Rs. 0.00

    01-01-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100 cft / 5 tonne of all materials by truck or other means : 11th &

    subsequent kilometer

    EQUIPMENT

    Carriage Charges #8 16.50 1.000 16.50 Rs/KmRs/Km 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 2 of 969

  • Chapter # : 01 CARRIAGE

    Total Equipment % 76.00 16.50

    Cost Per km: 19.97

    3.47

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 19.97

    km Rs. 0.00

    01-02-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st 50 meter

    EQUIPMENT

    Carriage Charges #1 37.17 0.630 59.00 Rs/50mRs/50m 1

    Total Equipment % 76.00 37.17

    Cost Per 50 m: 44.98

    7.81

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 44.98

    50 Meter Rs. 0.00

    01-02-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 5.81 0.630 9.22 Rs/50mRs/50m 1

    Total Equipment % 76.00 5.81

    Cost Per 50 m: 7.03

    1.22

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 7.03

    50 Meter Rs. 0.00

    01-02-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 3rd to 5th 50 meter

    EQUIPMENT

    Carriage Charges #3 4.04 0.630 6.41 Rs/50mRs/50m 1

    Total Equipment % 76.00 4.04

    Cost Per 50 m: 4.89

    0.85

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 4.89

    50 Meter Rs. 0.00

    01-02-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 250 - 1000 meter

    EQUIPMENT

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 3 of 969

  • Chapter # : 01 CARRIAGE

    Carriage Charges #4 17.99 0.630 28.56 Rs/250mRs/250m 1

    Total Equipment % 76.00 17.99

    Cost Per 250 m: 21.77

    3.78

    Composite Rates Per :

    Labour Rates Per : Cost Per 250 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 21.77

    50 Meter Rs. 0.00

    01-02-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 1st kilometer

    EQUIPMENT

    Carriage Charges #5 64.50 0.630 102.38 Rs/KmRs/Km 1

    Total Equipment % 76.00 64.50

    Cost Per km: 78.04

    13.54

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 78.04

    km Rs. 0.00

    01-02-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 2nd - 5th kilometer

    EQUIPMENT

    Carriage Charges #6 14.74 0.630 23.40 Rs/KmRs/Km 1

    Total Equipment % 76.00 14.74

    Cost Per km: 17.84

    3.10

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 17.84

    km Rs. 0.00

    01-02-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 6th - 10th kilometer

    EQUIPMENT

    Carriage Charges #7 12.60 0.630 20.00 Rs/KmRs/Km 1

    Total Equipment % 76.00 12.60

    Cost Per km: 15.25

    2.65

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 15.25

    km Rs. 0.00

    01-02-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 1000 Nos. bricks or load upto 3 tonne by truck etc : 11th & subsequent

    kilometer

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 4 of 969

  • Chapter # : 01 CARRIAGE

    EQUIPMENT

    Carriage Charges #8 10.39 0.630 16.50 Rs/KmRs/Km 1

    Total Equipment % 76.00 10.39

    Cost Per km: 12.58

    2.18

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 12.58

    km Rs. 0.00

    01-03-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/50 MetSpec. No :

    Carriage of cement(bag), bitumen/lubricants (drum) by truck or other means : 1st 50

    meter

    EQUIPMENT

    Carriage Charges #1 11.80 0.200 59.00 Rs/50mRs/50m 1

    Total Equipment % 76.00 11.80

    Cost Per tonne/50m: 14.28

    2.48

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/50m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/50 Meter Rs. 14.28

    Tonne/50 Meter Rs. 0.00

    01-03-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/50 MetSpec. No :

    Carriage of cement (bag) bitumen/lubricant (drum) by truck or other means : 2nd 50

    meter

    EQUIPMENT

    Carriage Charges #2 1.84 0.200 9.22 Rs/50mRs/50m 1

    Total Equipment % 76.00 1.84

    Cost Per tonne/50m: 2.23

    0.39

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/50m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/50 Meter Rs. 2.23

    Tonne/50 Meter Rs. 0.00

    01-03-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/50 MetSpec. No :

    Carriage of cement (bag), bitumen/lubricant (drum) by truck or other means : 3rd to

    5th 50 meter

    EQUIPMENT

    Carriage Charges #3 1.28 0.200 6.41 Rs/50mRs/50m 1

    Total Equipment % 76.00 1.28

    Cost Per tonne/50m: 1.55

    0.27

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/50m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/50 Meter Rs. 1.55

    Tonne/50 Meter Rs. 0.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 5 of 969

  • Chapter # : 01 CARRIAGE

    01-03-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/250 MeSpec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 250 to

    1000 meter

    EQUIPMENT

    Carriage Charges #4 5.71 0.200 28.56 Rs/250mRs/250m 1

    Total Equipment % 76.00 5.71

    Cost Per t/250m: 6.91

    1.20

    Composite Rates Per :

    Labour Rates Per : Cost Per t/250m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/250 Meter Rs. 6.91

    Tonne/250 Meter Rs. 0.00

    01-03-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/1 KmSpec. No :

    Carriage of cement(bags), bitumen/lubricant (drum) by truck or other means : 1st

    kilometer

    EQUIPMENT

    Carriage Charges #5 20.48 0.200 102.38 Rs/KmRs/Km 1

    Total Equipment % 76.00 20.48

    Cost Per tonne/km: 24.78

    4.30

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/1 Km Rs. 24.78

    Tonne/1 Km Rs. 0.00

    01-03-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/1 KmSpec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 2nd -

    5th kilometer

    EQUIPMENT

    Carriage Charges #6 4.68 0.200 23.40 Rs/KmRs/Km 1

    Total Equipment % 76.00 4.68

    Cost Per tonne/km: 5.66

    0.98

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/1 Km Rs. 5.66

    Tonne/1 Km Rs. 0.00

    01-03-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/1 KmSpec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 6th -

    10th kilometer

    EQUIPMENT

    Carriage Charges #7 4.00 0.200 20.00 Rs/KmRs/Km 1

    Total Equipment % 76.00 4.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 6 of 969

  • Chapter # : 01 CARRIAGE

    Cost Per tonne/km: 4.84

    0.84

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/1 Km Rs. 4.84

    Tonne/1 Km Rs. 0.00

    01-03-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit Tonne/1 KmSpec. No :

    Carriage of cement(bag), bitumen/lubricant (drum) by truck or other means : 11th &

    subsequent km

    EQUIPMENT

    Carriage Charges #8 3.30 0.200 16.50 Rs/KmRs/Km 1

    Total Equipment % 76.00 3.30

    Cost Per tonne/km: 3.99

    0.69

    Composite Rates Per :

    Labour Rates Per : Cost Per tonne/km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Tonne/1 Km Rs. 3.99

    Tonne/1 Km Rs. 0.00

    01-04-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 1st 50 meter

    EQUIPMENT

    Carriage Charges #1 35.40 0.600 59.00 Rs/50mRs/50m 1

    Total Equipment % 76.00 35.40

    Cost Per 50 m: 42.83

    7.43

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 42.83

    50 Meter Rs. 0.00

    01-04-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 5.53 0.600 9.22 Rs/50mRs/50m 1

    Total Equipment % 76.00 5.53

    Cost Per 50 m: 6.69

    1.16

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 6.69

    50 Meter Rs. 0.00

    01-04-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 3rd to 5th kilometer

    EQUIPMENT

    Carriage Charges #3 3.85 0.600 6.41 Rs/50mRs/50m 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 7 of 969

  • Chapter # : 01 CARRIAGE

    Total Equipment % 76.00 3.85

    Cost Per 50 m: 4.65

    0.81

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 4.65

    50 Meter Rs. 0.00

    01-04-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 250 MeterSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 250 to 1000 meter

    EQUIPMENT

    Carriage Charges #4 17.14 0.600 28.56 Rs/250mRs/250m 1

    Total Equipment % 76.00 17.14

    Cost Per 250 m: 20.73

    3.60

    Composite Rates Per :

    Labour Rates Per : Cost Per 250 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    250 Meter Rs. 20.73

    250 Meter Rs. 0.00

    01-04-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100cft of sarkanda, pichi, frash etc by road or boat : 1st kilometer

    EQUIPMENT

    Carriage Charges #5 61.43 0.600 102.38 Rs/KmRs/Km 1

    Total Equipment % 76.00 61.43

    Cost Per km: 74.33

    12.90

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 74.33

    km Rs. 0.00

    01-04-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 2nd - 5th kilometer

    EQUIPMENT

    Carriage Charges #6 14.04 0.600 23.40 Rs/KmRs/Km 1

    Total Equipment % 76.00 14.04

    Cost Per km: 16.99

    2.95

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 16.99

    km Rs. 0.00

    01-04-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 6th - 10th kilometer

    EQUIPMENT

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 8 of 969

  • Chapter # : 01 CARRIAGE

    Carriage Charges #7 12.00 0.600 20.00 Rs/KmRs/Km 1

    Total Equipment % 76.00 12.00

    Cost Per km: 14.52

    2.52

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 14.52

    km Rs. 0.00

    01-04-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of 100cft of sarkanda, pilchi, frash etc by road or boat : 11th & subsequent

    kilometer

    EQUIPMENT

    Carriage Charges #8 9.90 0.600 16.50 Rs/KmRs/Km 1

    Total Equipment % 76.00 9.90

    Cost Per km: 11.98

    2.08

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 11.98

    km Rs. 0.00

    01-05-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of small consignments upto 250kg 1st 50 meter

    EQUIPMENT

    Carriage Charges #1 2.95 0.050 59.00 Rs/50mRs/50m 1

    Total Equipment % 76.00 2.95

    Cost Per 50 m: 3.57

    0.62

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 3.57

    50 Meter Rs. 0.00

    01-05-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of small consigmnments upto 250 kg 2nd 50 meter

    EQUIPMENT

    Carriage Charges #2 0.46 0.050 9.22 Rs/50mRs/50m 1

    Total Equipment % 76.00 0.46

    Cost Per 50 m: 0.56

    0.10

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 0.56

    50 Meter Rs. 0.00

    01-05-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 50 MeterSpec. No :

    Carriage of small consignments upto 250 kg 3rd to 5th 50 meters

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 9 of 969

  • Chapter # : 01 CARRIAGE

    EQUIPMENT

    Carriage Charges #3 0.32 0.050 6.41 Rs/50mRs/50m 1

    Total Equipment % 76.00 0.32

    Cost Per 50 m: 0.39

    0.07

    Composite Rates Per :

    Labour Rates Per : Cost Per 50 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    50 Meter Rs. 0.39

    50 Meter Rs. 0.00

    01-05-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 250 MeterSpec. No :

    Carriage of small consignments upto 250 kg 250 - 1000 meter

    EQUIPMENT

    Carriage Charges #4 1.43 0.050 28.56 Rs/250mRs/250m 1

    Total Equipment % 76.00 1.43

    Cost Per 250 m: 1.73

    0.30

    Composite Rates Per :

    Labour Rates Per : Cost Per 250 m: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    250 Meter Rs. 1.73

    250 Meter Rs. 0.00

    01-05-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of small consignments upto 250 kg 1st kilometer

    EQUIPMENT

    Carriage Charges #5 5.12 0.050 102.38 Rs/KmRs/Km 1

    Total Equipment % 76.00 5.12

    Cost Per km: 6.19

    1.07

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 6.19

    km Rs. 0.00

    01-05-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of small consignments upto 250 kg 2nd to 5th kilometer

    EQUIPMENT

    Carriage Charges #6 1.17 0.050 23.40 Rs/KmRs/Km 1

    Total Equipment % 76.00 1.17

    Cost Per km: 1.42

    0.25

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 1.42

    km Rs. 0.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 10 of 969

  • Chapter # : 01 CARRIAGE

    01-05-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of small consignments upto 250 kg 6th to 10th kilometer

    EQUIPMENT

    Carriage Charges #7 1.00 0.050 20.00 Rs/KmRs/Km 1

    Total Equipment % 76.00 1.00

    Cost Per km: 1.21

    0.21

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 1.21

    km Rs. 0.00

    01-05-hItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of small consignments upto 250 kg 11th & subsequent kilometer

    EQUIPMENT

    Carriage Charges #8 0.82 0.050 16.50 Rs/KmRs/Km 1

    Total Equipment % 76.00 0.82

    Cost Per km: 1.00

    0.17

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 1.00

    km Rs. 0.00

    01-06-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of consignments (odd job) Coolie load

    LABOUR

    Coolie 30.00 0.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 30.90

    0.90

    Cost Per km: 37.20

    6.30

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 37.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 37.20

    km Rs. 37.20

    01-06-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of consignments (odd job) Donkey load

    EQUIPMENT

    Donkey 30.00 0.075 400.00 DayDay 1

    Total Equipment % 76.00 30.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 11 of 969

  • Chapter # : 01 CARRIAGE

    Cost Per km: 36.30

    6.30

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 36.30

    km Rs. 0.00

    01-06-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of consignments (odd job) Cart Load

    EQUIPMENT

    Bullock Cart 26.25 0.038 700.00 DayDay 1

    Total Equipment % 76.00 26.25

    Cost Per km: 31.76

    5.51

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 31.76

    km Rs. 0.00

    01-06-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit kmSpec. No :

    Carriage of consignments (odd job) Camel load

    EQUIPMENT

    Camel 45.00 0.075 600.00 DayDay 1

    Total Equipment % 76.00 45.00

    Cost Per km: 54.45

    9.45

    Composite Rates Per :

    Labour Rates Per : Cost Per km: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    km Rs. 54.45

    km Rs. 0.00

    01-07-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit DaySpec. No :

    Hire Charges of Truck

    EQUIPMENT

    Truck (10ton) 6,956.52 7.729 900.00 HourHour 1

    Total Equipment % 76.00 6,956.52

    Cost Per Day: 8,417.39

    1,460.87

    Composite Rates Per :

    Labour Rates Per : Cost Per Day: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Day Rs. 8,417.39

    Day Rs. 0.00

    01-07-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit DaySpec. No :

    Hire charges of Tractor with trolley

    EQUIPMENT

    Tractor With Trolly 5,797.50 7.730 750.00 HourHour 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 12 of 969

  • Chapter # : 01 CARRIAGE

    Total Equipment % 76.00 5,797.50

    Cost Per Day: 7,014.98

    1,217.48

    Composite Rates Per :

    Labour Rates Per : Cost Per Day: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Day Rs. 7,014.98

    Day Rs. 0.00

    01-07-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit DaySpec. No :

    Hire charges of Tractor without trolley

    EQUIPMENT

    Tractor Without Trolly 80 HP 4,347.60 7.246 600.00 DayDay 1

    Total Equipment % 76.00 4,347.60

    Cost Per Day: 5,260.60

    913.00

    Composite Rates Per :

    Labour Rates Per : Cost Per Day: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Day Rs. 5,260.60

    Day Rs. 0.00

    01-08-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting loaded railway wagons Upto 500 meter

    LABOUR

    Coolie 450.00 1.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 463.50

    13.50

    Cost Per Each: 558.00

    94.50

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 558.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 558.00

    Each Rs. 558.00

    01-08-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting loaded railway wagons Upto 1 kilometer

    LABOUR

    Coolie 675.00 2.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 695.25

    20.25

    Cost Per Each: 837.00

    141.75

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 837.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 837.00

    Each Rs. 837.00

    01-08-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting loaded railway wagons Upto 2 kilometer

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 13 of 969

  • Chapter # : 01 CARRIAGE

    Coolie 825.00 2.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 849.75

    24.75

    Cost Per Each: 1,023.00

    173.25

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 1,023.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 1,023.00

    Each Rs. 1,023.00

    01-08-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting loaded railway wagons 3rd & subsequent kilometer

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Cost Per Each: 465.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 465.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 465.00

    Each Rs. 465.00

    01-09-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting empty railway wagons Upto 500 meter

    LABOUR

    Coolie 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 231.75

    6.75

    Cost Per Each: 279.00

    47.25

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 279.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 279.00

    Each Rs. 279.00

    01-09-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting empty railway wagons Upto 1 kilometer

    LABOUR

    Coolie 337.50 1.125 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 347.63

    10.13

    Cost Per Each: 418.50

    70.88

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 418.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 418.50

    Each Rs. 418.50

    01-09-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting empty railway wagons Upto 2 kilometer

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 14 of 969

  • Chapter # : 01 CARRIAGE

    LABOUR

    Coolie 412.50 1.375 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 424.88

    12.38

    Cost Per Each: 511.50

    86.63

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 511.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 511.50

    Each Rs. 511.50

    01-09-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Hand shunting empty railway wagons 3rd & subsequent kilometer

    LABOUR

    Coolie 187.50 0.625 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 193.13

    5.63

    Cost Per Each: 232.50

    39.38

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 232.50

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 232.50

    Each Rs. 232.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 15 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    02-01Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 cftSpec. No :

    Load into or unload from railway wagons within 50m shingle, sand, ballast, tiles, etc,

    laid & stacked

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Per CUM : Rs 131.37

    63.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 131.37

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 cft Rs. 372.00

    100 cft Rs. 372.00

    02-02-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 No.Spec. No :

    Load into or unload from railway wagons within 50m laid & stacked : Bricks 10" size

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Cost Per 1000 No.: 465.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 No.: 465.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 No. Rs. 465.00

    1000 No. Rs. 465.00

    02-02-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 No.Spec. No :

    Load into or unload from railway wagons within 50m laid & stacked : Bricks 9" or

    smaller size

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Cost Per 1000 No.: 372.00

    63.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 No.: 372.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 No. Rs. 372.00

    1000 No. Rs. 372.00

    02-03Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Load into or unload from railway wagons, cement in bags and stacking within 50m.

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 16 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Cost Per 100 No.: 465.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 465.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 465.00

    100 No. Rs. 465.00

    02-04Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 No.Spec. No :

    Load into or unload from railway wagons, empty cement bags and stacking

    (British)

    LABOUR

    Coolie 336.00 1.120 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 346.08

    10.08

    Cost Per 1000 No.: 416.64

    70.56

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 No.: 416.64

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 No. Rs. 416.64

    1000 No. Rs. 416.64

    02-05Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load into or unload from railway wagons and stacking white lime in bags

    (British)

    LABOUR

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 77.25

    2.25

    Per Tonne : Rs 93.00

    15.75

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 93.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 93.00

    tonne Rs. 93.00

    02-06Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load into or unload from railway wagons structural steel, RS joists, rails, rail

    fastenings etc

    (British)

    LABOUR

    Coolie 180.00 0.600 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 185.40

    5.40

    Per Tonne : Rs 223.20

    37.80

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 223.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 223.20

    tonne Rs. 223.20

    02-07Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Load into or unload from 45 gallon drums full, into or from railway wagons,lead upto

    50m

    (British)

    LABOUR

    Coolie 24.00 0.080 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 17 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 24.72

    0.72

    Cost Per Each: 29.76

    5.04

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 29.76

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 29.76

    Each Rs. 29.76

    02-08Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit EachSpec. No :

    Loading or unloading packages of all sorts upto 50 kg.

    (British)

    LABOUR

    Coolie 21.00 0.070 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 21.63

    0.63

    Cost Per Each: 26.04

    4.41

    Composite Rates Per :

    Labour Rates Per : Cost Per Each: 26.04

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Each Rs. 26.04

    Each Rs. 26.04

    02-09-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Load or unload sleepers other than wooden, incl stacking, lead upto 50 m : Broad

    gauge

    (British)

    LABOUR

    Coolie 750.00 2.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 772.50

    22.50

    Cost Per 100 No.: 930.00

    157.50

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 930.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 930.00

    100 No. Rs. 930.00

    02-09-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Load or unload sleepers other than wooden, including stacking, lead upto 50 m :

    Metre gauge &

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Cost Per 100 No.: 465.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 465.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 465.00

    100 No. Rs. 465.00

    02-10Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load or unload timber logs or shuttering into or from railway wagons, including

    stacking within 50m

    (British)

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 18 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Coolie 99.00 0.330 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 101.97

    2.97

    Per Tonne : Rs 122.76

    20.79

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 122.76

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 122.76

    tonne Rs. 122.76

    02-11Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Loading or unloading bhoosa in railway wagons lead upto 50 m.

    (British)

    LABOUR

    Coolie 225.00 0.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 231.75

    6.75

    Per Tonne : Rs 279.00

    47.25

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 279.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 279.00

    tonne Rs. 279.00

    02-12Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load or unload timber scrap or wooden plugs into or from railway wagons &

    stacking within 50m

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Per Tonne : Rs 186.00

    31.50

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 186.00

    tonne Rs. 186.00

    02-13Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 cftSpec. No :

    Load or unload pitching stone/spawl from railway wagons of any guage including

    clearing 1.5m away

    (British)

    LABOUR

    Coolie 111.00 0.370 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 114.33

    3.33

    Per CUM : Rs 48.61

    23.31

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 48.61

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 cft Rs. 137.64

    100 cft Rs. 137.64

    02-14Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 cftSpec. No :

    Loading or unloading building stone including clearing away 1.5m from rails

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 19 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    LABOUR

    Coolie 144.00 0.480 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 148.32

    4.32

    Per CUM : Rs 63.06

    30.24

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 63.06

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 cft Rs. 178.56

    100 cft Rs. 178.56

    02-15-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 ltrSpec. No :

    Unloading oil,bitumen or tar etc : Crude Oil (to be pumped from tank wagon into

    tank)

    (British)

    LABOUR

    Coolie 90.00 0.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 92.70

    2.70

    Cost Per 1000 ltr: 111.60

    18.90

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 ltr: 111.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 ltr Rs. 111.60

    1000 ltr Rs. 111.60

    02-15-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 ltrSpec. No :

    Unloading oil,bitumen or tar etc Crude oil (drained by gravity)

    (British)

    LABOUR

    Coolie 90.00 0.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 92.70

    2.70

    Cost Per 1000 ltr: 111.60

    18.90

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 ltr: 111.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 ltr Rs. 111.60

    1000 ltr Rs. 111.60

    02-15-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit TonSpec. No :

    Unloading oil,bitumen or tar etc Crude oil materials from railway wagons

    (British)

    LABOUR

    Coolie 17.10 0.057 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 17.61

    0.51

    Cost Per Ton: 21.20

    3.59

    Composite Rates Per :

    Labour Rates Per : Cost Per Ton: 21.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    Ton Rs. 21.20

    Ton Rs. 21.20

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 20 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    02-15-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Unloading oil, bitumen or tar etc : Fuel Oil from tank into empty drums including

    stacking within 50 m

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Per Tonne : Rs 186.00

    31.50

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 186.00

    tonne Rs. 186.00

    02-15-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unloading oil,bitumen or tar etc Petrol (2 gallon tin)

    (British)

    LABOUR

    Coolie 189.00 0.630 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 194.67

    5.67

    Cost Per 100 No.: 234.36

    39.69

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 234.36

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 234.36

    100 No. Rs. 234.36

    02-15-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unloading oil, bitumen or tar etc Kerosine oil (4 gallon tin)

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 386.25

    11.25

    Cost Per 100 No.: 465.00

    78.75

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 465.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 465.00

    100 No. Rs. 465.00

    02-15-gItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unloading oil,bitumen or tar etc Tar & Bitumen in drums with carriage upto 1 km

    (British)

    EQUIPMENT

    Bullock Cart 175.00 0.250 700.00 DayDay 1

    Total Equipment % 76.00 175.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 21 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Cost Per 100 No.: 211.75

    36.75

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 0.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 211.75

    100 No. Rs. 0.00

    02-16-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 cftSpec. No :

    Removing and stacking within 50m. lead Stone, spawl, brick bats, shingle, sand,

    lime etc

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Per CUM : Rs 65.69

    31.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 65.69

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 cft Rs. 186.00

    100 cft Rs. 186.00

    02-16-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 No.Spec. No :

    Removing and stacking within 50m. lead Bricks

    (British)

    LABOUR

    Coolie 435.00 1.450 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 448.05

    13.05

    Cost Per 1000 No.: 539.40

    91.35

    Composite Rates Per :

    Labour Rates Per : Cost Per 1000 No.: 539.40

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 No. Rs. 539.40

    1000 No. Rs. 539.40

    02-16-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Removing and stacking within 50m. lead Broad gauge wooden sleepers

    (British)

    LABOUR

    Coolie 240.00 0.800 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 247.20

    7.20

    Cost Per 100 No.: 297.60

    50.40

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 297.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 297.60

    100 No. Rs. 297.60

    02-16-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Removing and stacking within 50m. lead Metre gauge or narrow guage wooden

    sleepers

    (British)

    LABOUR

    Coolie 137.10 0.457 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 22 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 141.21

    4.11

    Cost Per 100 No.: 170.00

    28.79

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 170.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 170.00

    100 No. Rs. 170.00

    02-16-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Removing and stacking within 50m. lead Rails, girders, pipes, cement etc.

    (British)

    LABOUR

    Coolie 69.00 0.230 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 71.07

    2.07

    Per Tonne : Rs 85.56

    14.49

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 85.56

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 85.56

    tonne Rs. 85.56

    02-16-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Removing and stacking within 50m. lead Bridge and crossing timbers, etc.

    (British)

    LABOUR

    Coolie 801.00 2.670 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 825.03

    24.03

    Cost Per 100 No.: 993.24

    168.21

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 993.24

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 993.24

    100 No. Rs. 993.24

    02-17Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load into wagons girders, rails, MS bars, pipes etc. including 50m lead & stacking

    inside wagons

    (British)

    LABOUR

    Coolie 192.00 0.640 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 197.76

    5.76

    Per Tonne : Rs 238.08

    40.32

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 238.08

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 238.08

    tonne Rs. 238.08

    02-18Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Unload from wagons girders, rails, MS bars, girder etc. including 50m lead but

    excluding stacking

    (British)

    LABOUR

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 23 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    Coolie 75.00 0.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 77.25

    2.25

    Per Tonne : Rs 93.00

    15.75

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 93.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 93.00

    tonne Rs. 93.00

    02-19Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Load into wagons wooden baord guage sleepers including 50m lead & stacking

    (British)

    LABOUR

    Coolie 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 618.00

    18.00

    Cost Per 100 No.: 744.00

    126.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 744.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 744.00

    100 No. Rs. 744.00

    02-20Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unload wooden broad gauge sleepers from wagons including 50m lead and

    stacking

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Cost Per 100 No.: 372.00

    63.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 372.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 372.00

    100 No. Rs. 372.00

    02-21Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Loading metre gauge or narrow guage wooden sleepers including 50m lead & stack

    inside wagons

    (British)

    LABOUR

    Coolie 330.00 1.100 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 339.90

    9.90

    Cost Per 100 No.: 409.20

    69.30

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 409.20

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 409.20

    100 No. Rs. 409.20

    02-22Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unloading metre gauge or narrow guage wooden sleepers including 50m lead but

    excluding stacking

    (British)

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 24 of 969

  • Chapter # : 02 LOADING, UNLOADING AND STACKING

    LABOUR

    Coolie 159.00 0.530 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 163.77

    4.77

    Cost Per 100 No.: 197.16

    33.39

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 197.16

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 197.16

    100 No. Rs. 197.16

    02-23Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Loading bridge and crossing timber including 50m lead & stacking

    (British)

    LABOUR

    Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 309.00

    9.00

    Cost Per 100 No.: 372.00

    63.00

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 372.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 372.00

    100 No. Rs. 372.00

    02-24Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 100 No.Spec. No :

    Unloading bridge and crossing timbers including 50m lead but excluding stacking

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Cost Per 100 No.: 186.00

    31.50

    Composite Rates Per :

    Labour Rates Per : Cost Per 100 No.: 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    100 No. Rs. 186.00

    100 No. Rs. 186.00

    02-25Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit tonneSpec. No :

    Load or unload bitumen, asphalt, tar in drums, into or from railway wagons, lead

    upto 50m

    (British)

    LABOUR

    Coolie 150.00 0.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 154.50

    4.50

    Per Tonne : Rs 186.00

    31.50

    Composite Rates Per :

    Labour Rates Per : Per Tonne : Rs 186.00

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    tonne Rs. 186.00

    tonne Rs. 186.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 25 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-01-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation undressed upto single throw of kassi phaorah or shovel etc : in

    ashes, sand, soft soil or silt clearance

    (British)

    LABOUR

    Coolie 1,125.00 3.750 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,158.75

    33.75

    Per CUM : Rs 49.26

    236.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 49.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,395.00

    1000 Cft Rs. 1,395.00

    03-01-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation undressed upto single throw of kassi phaorah or shove etc : in

    ordinary soil,

    (British)

    LABOUR

    Coolie 1,350.00 4.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,390.50

    40.50

    Per CUM : Rs 59.12

    283.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 59.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,674.00

    1000 Cft Rs. 1,674.00

    03-02Item Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in ashes, sand & soft soil or silt clearance, undressed lead upto

    25m.

    (British)

    LABOUR

    Coolie 1,650.00 5.500 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,699.50

    49.50

    Per CUM : Rs 72.25

    346.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 72.25

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,046.00

    1000 Cft Rs. 2,046.00

    03-03-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Bed clearance and dressing slopes of drains including removing of weeds and roots

    etc. Excavated material undressed within 25m

    (British)

    LABOUR

    Coolie 2,100.00 7.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,163.00

    63.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 26 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 91.96

    441.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 91.96

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,604.00

    1000 Cft Rs. 2,604.00

    03-03-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Bed clearance and dressing slopes of drains including removing of weeds and roots

    etc. Excavated material dressed within 25m lead

    (British)

    LABOUR

    Coolie 2,322.00 7.740 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,391.66

    69.66

    Per CUM : Rs 101.68

    487.62

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 101.68

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,879.28

    1000 Cft Rs. 2,879.28

    03-04-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Borrowpit excavation undressed lead upto 50m in Ordinary soil

    (British)

    LABOUR

    Coolie 2,100.00 7.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,163.00

    63.00

    Per CUM : Rs 91.96

    441.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 91.96

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,604.00

    1000 Cft Rs. 2,604.00

    03-04-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Borrowpit excavation undressed lead upto 50m in Hard soil

    (British)

    LABOUR

    Coolie 2,580.00 8.600 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,657.40

    77.40

    Per CUM : Rs 112.98

    541.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 112.98

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,199.20

    1000 Cft Rs. 3,199.20

    03-04-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Borrowpit excavation undressed lead upto 50m in shingle/gravel formation

    (British)

    LABOUR

    Coolie 5,100.00 17.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 27 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 5,253.00

    153.00

    Per CUM : Rs 223.33

    1,071.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 223.33

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 6,324.00

    1000 Cft Rs. 6,324.00

    03-05-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Embankment formation in ordinary soil & compaction by mechanical means at

    optimum moistures content to 95% to 100% max. modified. AASHTO dry density

    (borrow area)

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Dresser 150.00 0.500 300.00 DayDay 1

    Water Sprinkler 27.00 0.090 300.00 DayDay 1

    Water Carrier 24.00 0.080 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 9.97 593.28

    17.28

    EQUIPMENT

    Tractor With Trolly 540.00 0.720 750.00 HourHour 1

    Comp Roller 864.00 0.720 1,200.00 HourHour 1

    Grader 165 HP 4,160.00 1.600 2,600.00 HourHour 1

    Rammer Mech 88.00 0.320 275.00 HourHour 1

    Lab Test 56.00 0.080 700.00 NoNo 1

    Total Equipment % 69.03 5,708.00

    Per CUM : Rs 269.13

    1,319.64

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 25.22

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,620.92

    1000 Cft Rs. 714.24

    03-05-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Embankment formation in ordinary soil & compaction by mechanical means at

    optimum moistures content to 90% max. modified AASHTO dry density (borrow

    area)

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Dresser 150.00 0.500 300.00 DayDay 1

    Water Sprinkler 24.00 0.080 300.00 DayDay 1

    Water Carrier 21.00 0.070 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.01 587.10

    17.10

    EQUIPMENT

    Tractor With Trolly 540.00 0.720 750.00 HourHour 1

    Comp Roller 768.00 0.640 1,200.00 HourHour 1

    Grader 165 HP 4,160.00 1.600 2,600.00 HourHour 1

    Rammer Mech 88.00 0.320 275.00 HourHour 1

    Lab Test 56.00 0.080 700.00 NoNo 1

    Total Equipment % 68.99 5,612.00

    Per CUM : Rs 264.77

    1,298.22

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 24.96

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,497.32

    1000 Cft Rs. 706.80

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 28 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-05-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Embankment formation in ordinary soil & compaction by mechanical means at

    optimum moistures content to 85% max. modified AASHTO dry density (borrow

    area)

    (British)

    LABOUR

    Coolie 375.00 1.250 300.00 DayDay 1

    Dresser 150.00 0.500 300.00 DayDay 1

    Water Sprinkler 21.00 0.070 300.00 DayDay 1

    Water Carrier 18.00 0.060 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 10.05 580.92

    16.92

    EQUIPMENT

    Tractor With Trolly 540.00 0.720 750.00 HourHour 1

    Comp Roller 672.00 0.560 1,200.00 HourHour 1

    Grader 165 HP 4,160.00 1.600 2,600.00 HourHour 1

    Rammer Mech 88.00 0.320 275.00 HourHour 1

    Lab Test 56.00 0.080 700.00 NoNo 1

    Total Equipment % 68.95 5,516.00

    Per CUM : Rs 260.40

    1,276.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 24.70

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,373.72

    1000 Cft Rs. 699.36

    03-06-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth fill in lawns including dressing & compaction with earth available from

    cutting/excavation

    (British)

    LABOUR

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Carrier 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 1,545.00

    45.00

    Per CUM : Rs 65.69

    315.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 65.69

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 1,860.00

    1000 Cft Rs. 1,860.00

    03-06-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth fill in lawns including dressing & compaction with suitable earth borrowed.

    (British)

    LABOUR

    Coolie 450.00 1.500 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Rammer 450.00 1.500 300.00 DayDay 1

    Digger 900.00 3.000 300.00 DayDay 1

    Carrier 900.00 3.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,935.50

    85.50

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 29 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 124.80

    598.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 124.80

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,534.00

    1000 Cft Rs. 3,534.00

    03-07-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Ordinary

    Soil

    (British)

    LABOUR

    Coolie 1,500.00 5.000 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Skilled Coolie 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,163.00

    63.00

    Per CUM : Rs 91.96

    441.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 91.96

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,604.00

    1000 Cft Rs. 2,604.00

    03-07-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Hard Soil

    (British)

    LABOUR

    Coolie 1,875.00 6.250 300.00 DayDay 1

    Dresser 375.00 1.250 300.00 DayDay 1

    Skilled Coolie 375.00 1.250 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,703.75

    78.75

    Per CUM : Rs 114.95

    551.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 114.95

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,255.00

    1000 Cft Rs. 3,255.00

    03-07-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Very

    hard Soil

    (British)

    LABOUR

    Coolie 1,950.00 6.500 300.00 DayDay 1

    Dresser 390.00 1.300 300.00 DayDay 1

    Skilled Coolie 390.00 1.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,811.90

    81.90

    Per CUM : Rs 119.55

    573.30

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 119.55

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,385.20

    1000 Cft Rs. 3,385.20

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 30 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-07-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut upto 1.5m depth for drains etc & disposal : in Gravel &

    shingle

    (British)

    LABOUR

    Coolie 2,175.00 7.250 300.00 DayDay 1

    Dresser 435.00 1.450 300.00 DayDay 1

    Skilled Coolie 435.00 1.450 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,136.35

    91.35

    Per CUM : Rs 133.34

    639.45

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 133.34

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,775.80

    1000 Cft Rs. 3,775.80

    03-08-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in

    Ordinary Soil

    (British)

    LABOUR

    Coolie 3,000.00 10.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,090.00

    90.00

    Per CUM : Rs 131.37

    630.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 131.37

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,720.00

    1000 Cft Rs. 3,720.00

    03-08-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in

    Hard Soil

    (British)

    LABOUR

    Coolie 3,390.00 11.300 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,491.70

    101.70

    Per CUM : Rs 148.45

    711.90

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 148.45

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 4,203.60

    1000 Cft Rs. 4,203.60

    03-08-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut 1.5m - 3m depth for S.W.Drains etc & disposal : in

    Very Hard Soil

    (British)

    LABOUR

    Coolie 3,900.00 13.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 4,017.00

    117.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 31 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 170.78

    819.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 170.78

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 4,836.00

    1000 Cft Rs. 4,836.00

    03-08-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in open cut 1.5m - 3m depth for drains etc & disposal : in Gravel &

    shingle

    (British)

    LABOUR

    Coolie 6,720.00 22.400 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 6,921.60

    201.60

    Per CUM : Rs 294.27

    1,411.20

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 294.27

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 8,332.80

    1000 Cft Rs. 8,332.80

    03-09-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m

    lead : Dry

    (British)

    LABOUR

    Coolie 5,700.00 19.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 5,871.00

    171.00

    Per CUM : Rs 249.60

    1,197.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 249.60

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,068.00

    1000 Cft Rs. 7,068.00

    03-09-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m

    lead : Wet

    (British)

    LABOUR

    Coolie 6,600.00 22.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 6,798.00

    198.00

    Per CUM : Rs 289.02

    1,386.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 289.02

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 8,184.00

    1000 Cft Rs. 8,184.00

    03-09-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in shingle or gravel formation & rock not req. blast, undressed, 50m lead

    : in Flowing Water

    (British)

    LABOUR

    Coolie 8,400.00 28.000 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 32 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 8,652.00

    252.00

    Per CUM : Rs 367.84

    1,764.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 367.84

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 10,416.00

    1000 Cft Rs. 10,416.00

    03-10-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in

    Ordinary Soil

    (British)

    LABOUR

    Coolie 2,100.00 7.000 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,472.00

    72.00

    Per CUM : Rs 105.10

    504.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 105.10

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 2,976.00

    1000 Cft Rs. 2,976.00

    03-10-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in

    Hard Soil

    (British)

    LABOUR

    Coolie 2,580.00 8.600 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 2,966.40

    86.40

    Per CUM : Rs 126.12

    604.80

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 126.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 3,571.20

    1000 Cft Rs. 3,571.20

    03-10-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in

    Very Hard Soil

    (British)

    LABOUR

    Coolie 3,090.00 10.300 300.00 DayDay 1

    Dresser 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 3,491.70

    101.70

    Per CUM : Rs 148.45

    711.90

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 148.45

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 4,203.60

    1000 Cft Rs. 4,203.60

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 33 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-10-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in

    Shingle/Gravel

    (British)

    LABOUR

    Coolie 5,700.00 19.000 300.00 DayDay 1

    Dresser 600.00 2.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 6,489.00

    189.00

    Per CUM : Rs 275.88

    1,323.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 275.88

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,812.00

    1000 Cft Rs. 7,812.00

    03-11-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Rock Excavation, dressing & disposal up to 50m Soft Rock, slate, shale, schist or

    lateriate

    (British)

    LABOUR

    Coolie 4,200.00 14.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Dresser 2,700.00 9.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 8,034.00

    234.00

    Per CUM : Rs 341.56

    1,638.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 341.56

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 9,672.00

    1000 Cft Rs. 9,672.00

    03-11-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Rock Excavation, dressing & disposal up to 50m Medium hard rock, requiring

    occasional blasting

    (British)

    MATERIAL

    Explosives for Blasting 450.00 3.000 150.00 NoNo 1

    Total Material % 3.58 450.00

    LABOUR

    Coolie 7,299.00 24.330 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Dresser 600.00 2.000 300.00 DayDay 1

    Hammer Man 300.00 1.000 300.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 75.42 9,371.97

    272.97

    Per CUM : Rs 417.68

    2,005.29

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 398.45

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 11,827.26

    1000 Cft Rs. 11,282.76

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 34 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-12-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade I

    (British)

    MATERIAL

    Explosives for Blasting 450.00 3.000 150.00 NoNo 1

    Total Material % 5.68 450.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Black Smith 150.00 0.250 600.00 DayDay 1

    Quarry Man 3,000.00 10.000 300.00 DayDay 1

    Smithy Coolie 75.00 0.250 300.00 DayDay 1

    Chiseller 400.00 1.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 73.32 5,742.25

    167.25

    Per CUM : Rs 263.36

    1,265.25

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 244.13

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 7,457.50

    1000 Cft Rs. 6,913.00

    03-12-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade II

    (British)

    MATERIAL

    Explosives for Blasting 750.00 5.000 150.00 NoNo 1

    Total Material % 8.32 750.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 150.00 0.500 300.00 DayDay 1

    Black Smith 300.00 0.500 600.00 DayDay 1

    Quarry Man 3,300.00 11.000 300.00 DayDay 1

    Smithy Coolie 150.00 0.500 300.00 DayDay 1

    Chiseller 400.00 1.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 70.68 6,283.00

    183.00

    Per CUM : Rs 299.17

    1,438.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 267.12

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 8,471.50

    1000 Cft Rs. 7,564.00

    03-12-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade III

    (British)

    MATERIAL

    Explosives for Blasting 900.00 6.000 150.00 NoNo 1

    Total Material % 8.29 900.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 35 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Black Smith 450.00 0.750 600.00 DayDay 1

    Quarry Man 4,050.00 13.500 300.00 DayDay 1

    Smithy Coolie 225.00 0.750 300.00 DayDay 1

    Chiseller 600.00 1.500 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 70.71 7,570.50

    220.50

    Per CUM : Rs 360.32

    1,732.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 321.86

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 10,203.00

    1000 Cft Rs. 9,114.00

    03-12-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade IV

    (British)

    MATERIAL

    Explosives for Blasting 1,050.00 7.000 150.00 NoNo 1

    Total Material % 8.60 1,050.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 225.00 0.750 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Quarry Man 4,500.00 15.000 300.00 DayDay 1

    Smithy Coolie 300.00 1.000 300.00 DayDay 1

    Chiseller 800.00 2.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 70.40 8,471.75

    246.75

    Per CUM : Rs 405.04

    1,947.75

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 360.17

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 11,469.50

    1000 Cft Rs. 10,199.00

    03-12-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade V

    (British)

    MATERIAL

    Explosives for Blasting 1,200.00 8.000 150.00 NoNo 1

    Total Material % 8.85 1,200.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Quarry Man 5,100.00 17.000 300.00 DayDay 1

    Smithy Coolie 300.00 1.000 300.00 DayDay 1

    Chiseller 1,000.00 2.500 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 70.15 9,373.00

    273.00

    Per CUM : Rs 449.77

    2,163.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 398.49

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 12,736.00

    1000 Cft Rs. 11,284.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 36 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    03-12-fItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting and disposal upto 25m & dressing :

    Grade VI

    (British)

    MATERIAL

    Explosives for Blasting 1,350.00 9.000 150.00 NoNo 1

    Total Material % 9.18 1,350.00

    LABOUR

    Coolie 1,800.00 6.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 750.00 1.250 600.00 DayDay 1

    Quarry Man 5,400.00 18.000 300.00 DayDay 1

    Smithy Coolie 375.00 1.250 300.00 DayDay 1

    Chiseller 1,200.00 3.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 69.82 10,119.75

    294.75

    Per CUM : Rs 487.93

    2,346.75

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 430.24

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 13,816.50

    1000 Cft Rs. 12,183.00

    03-13-aItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting but blasting prohibited, dispose & dress

    within 25 m : Grade I

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 300.00 0.500 600.00 DayDay 1

    Quarry Man 6,000.00 20.000 300.00 DayDay 1

    Smithy Coolie 150.00 0.500 300.00 DayDay 1

    Chiseller 800.00 2.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 11,484.50

    334.50

    Per CUM : Rs 488.26

    2,341.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 488.26

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 13,826.00

    1000 Cft Rs. 13,826.00

    03-13-bItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting where blasting prohibited, dispose &

    dress within 25 m : Grade II

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 300.00 1.000 300.00 DayDay 1

    Black Smith 600.00 1.000 600.00 DayDay 1

    Quarry Man 6,600.00 22.000 300.00 DayDay 1

    Smithy Coolie 300.00 1.000 300.00 DayDay 1

    Chiseller 800.00 2.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 12,566.00

    366.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 37 of 969

  • Chapter # : 03 EARTHWORK (EXCAVATION AND EMBANKMENT)

    Per CUM : Rs 534.24

    2,562.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 534.24

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 15,128.00

    1000 Cft Rs. 15,128.00

    03-13-cItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting where blasting prohibited, dispose &

    dress within 25 m: Grade III

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Black Smith 900.00 1.500 600.00 DayDay 1

    Quarry Man 8,100.00 27.000 300.00 DayDay 1

    Smithy Coolie 450.00 1.500 300.00 DayDay 1

    Chiseller 1,200.00 3.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 15,141.00

    441.00

    Per CUM : Rs 643.72

    3,087.00

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 643.72

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 18,228.00

    1000 Cft Rs. 18,228.00

    03-13-dItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting where blasting prohibited, dispose &

    dress within 25 m: Grade IV

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 450.00 1.500 300.00 DayDay 1

    Black Smith 1,200.00 2.000 600.00 DayDay 1

    Quarry Man 9,000.00 30.000 300.00 DayDay 1

    Smithy Coolie 600.00 2.000 300.00 DayDay 1

    Chiseller 1,600.00 4.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 16,943.50

    493.50

    Per CUM : Rs 720.35

    3,454.50

    Composite Rates Per :

    Labour Rates Per : Per CUM : Rs 720.35

    %21Contractors Profit + Over Heads (Material+Labour+Equipment) :

    1000 Cft Rs. 20,398.00

    1000 Cft Rs. 20,398.00

    03-13-eItem Code :

    Item Name :

    Detail Qty Amount Rate (Rs.)Unit

    Unit 1000 CftSpec. No :

    Excavation in hard rock requiring blasting where blasting prohibited, dispose &

    dress within 25 m: Grade V

    (British)

    LABOUR

    Coolie 3,600.00 12.000 300.00 DayDay 1

    Bhishti 600.00 2.000 300.00 DayDay 1

    Black Smith 1,200.00 2.000 600.00 DayDay 1

    Quarry Man 10,200.00 34.000 300.00 DayDay 1

    Smithy Coolie 600.00 2.000 300.00 DayDay 1

    Chiseller 2,000.00 5.000 400.00 DayDay 1

    Total Labour

    Sundries (Labour Only): %3

    % 79.00 18,746.00

    546.00

    NWFP CSR 2008 - Approved 25-August-2008

    As on Jul-Sep (Qtr-3) 2012Page 38 of 969