Chapter 7Project Management

© 2007 Pearson Education

Page 2: Chapter 07

Project Management

• Used to manage large complex projects

• Has three phases:

1. Project planning

2. Project scheduling

3. Project controlling

Page 3: Chapter 07

Phase 1: Project Planning

1. What is the project goal or objective?

2. What are the activities (or tasks) involved?

3. How are activities linked?

4. How much time required for each activity?

5. What resources are required for each activity?

Page 4: Chapter 07

Phase 2: Project Scheduling

1. When will the entire project be completed?

2. What is the scheduled start and end time for each activity?

3. Which are the “critical” activities?

4. Which are the noncritical activities?

Page 5: Chapter 07

Phase 2: Project Scheduling (cont.)

5. How late can noncritical activities be w/o delaying the project?

6. After accounting for uncertainty, what is the probability of completing the project by a specific deadline?

Page 6: Chapter 07

Phase 3: Project ControllingAt regular intervals during the project the

following questions should be considered:

• Is the project on schedule? Early? Late?

• Are costs equal to the budget? Over budget? Under budget?

• Are there adequate resources?

• What is the best way to reduce project duration at minimum cost?

Page 7: Chapter 07

Identifying Activities

• Subdivides a large project into smaller units

• Each activity should have a clearly defined starting point and ending point

• Each activity is clearly distinguishable from every other activity

• Each activity can be a project in itself

Page 8: Chapter 07

Work Breakdown Structure (WBS)Divides the project into its various

subcomponents and defines hierarchical levels of detail

Level

1 Project

2 Major tasks in project

3 Subtasks in major tasks

4 Activities to be completed

Page 9: Chapter 07

Example Work Breakdown Structure

Page 10: Chapter 07

Identify for Each Activity:

• Which other activities must be completed previously (predecessors)

• Time required for completion

• Resources required

This completes the project planning phase.

Page 11: Chapter 07

Project Scheduling Phase

Commonly used techniques:

• Program Evaluation and Review Technique (PERT)

• Critical Path Method (CPM)

Page 12: Chapter 07

Project Management Example:General Foundry Inc.

• Have 16 weeks to install a complex air filter system on its smokestack

• May be forced to close if not completed w/in 16 weeks due to environmental regulations

• Have identified 8 activities

Page 13: Chapter 07
Page 14: Chapter 07

Drawing the Project Network

• AON – Activity on Node networks show each activity as a node and arcs show the immediate predecessor activities

• AOA – Activity on Arc networks show each activity as an arc, and the nodes represent the starting and ending points

We will use the AON method

Page 15: Chapter 07

AON Network for General Foundry

Page 16: Chapter 07

Activity Time Estimates

Page 17: Chapter 07

Determining the Project Schedule

• Some activities can be done simultaneously so project duration should be less than 25 weeks

• Critical path analysis is used to determine project duration

• The critical path is the longest path through the network

Page 18: Chapter 07

Critical Path Analysis

Need to find the following for each activity:

• Earliest Start Time (EST)

• Earliest Finish Time (EFT)

• Latest start time (LST)

• Latest Finish Time (LFT)

Page 19: Chapter 07

Forward Pass• Identifies earliest times (EST and EFT)

• EST Rule: All immediate predecessors must be done before an activity can begin

– If only 1 immediate predecessor, then

EST = EFT of predecessor

– If >1 immediate predecessors, then

EST = Max {all predecessor EFT’s}

Page 20: Chapter 07

• EFT Rule:

EFT = EST + activity time

Node Notation:

Page 21: Chapter 07

Forward Pass: Earliest Start and Finish Times

Page 22: Chapter 07

Backward Pass• Identifies latest times (LST an LFT)

• LFT Rule:

– If activity is the immediate predecessor to only 1 activity, then

LFT = LST of immediate follower

– If activity is the immediate predeccor to multiple activities, then

LFT = Min {LST of all imm. followers}

Page 23: Chapter 07

• LST Rule:

LST = LFT – activity time

Page 24: Chapter 07

Backward Pass: Latest Start and Finish Times

Page 25: Chapter 07

Slack Time and Critical Path(s)

• Slack is the length of time an activity can be delayed without delaying the project

Slack = LST – EST

• Activities with 0 slack are Critical Activities

• The Critical Path is a continuous path through the network from start to finish that include only critical activities

Page 26: Chapter 07

Project Schedule and Slack Times

Page 27: Chapter 07

Critical Path and Slack Times

Page 28: Chapter 07

Total Slack Time vs. Free Slack Time• Total slack time is shared by more than 1

activity

Example: A 1 week delay in activity B will leave 0 slack for activity D

• Free slack time is associated with only 1 activity

Example: Activity F has 6 week of free slack time

Page 29: Chapter 07

Variability in Activity Times

• Activity times are usually estimates that are subject to uncertainty

• Approaches to variability:

1. Build “buffers” into activity times

2. PERT – probability based

3. Computer simulation

Page 30: Chapter 07

PERT Analysis• Uses 3 time estimates for each activity

Optimistic time (a)

Pessimistic time (b)

Most likely time (m)

• These estimates are used to calculate an expected value and variance for each activity (based on the Beta distribution)

Page 31: Chapter 07

• Expected activity time (t)

t = (a + 4m + b)

6

• Variance = [ (b – a) / 6 ]2

• Standard deviation = SQRT(variance) = (b – a) 6

Go to file 7-1.xls

Page 32: Chapter 07

Project Variance and Standard Deviation

• Project variance (σp2)

= ∑ (variances of all critical path activities)

σp2 = 0.11 + 0.11 + 1.0 + 1.78 + 0.11

= 3.11

• Project standard deviation (σp)

= SQRT (Project variance)

σp = SQRT ( 3.11) = 1.76

Page 33: Chapter 07

Probability of Project Completion• What is the probability of finishing the

project within 16 weeks?

• Assumptions:– Project duration is normally distributed

– Activity times are independent

• Normal distribution parameters:

μp = expected completion time= 15 weeks

σp = proj standard deviation = 1.76 weeks

Page 34: Chapter 07

Normal Probability Calculations

Z = (Target time – expected time) σp

Z = (16 - 15) = 0.57 1.76

This means 16 weeks is 0.57 standard deviations above the mean of 15 weeks.

Page 35: Chapter 07

Probability Based on Standard Normal Table

Prob (proj completion < 16 weeks) = 0.7158

Page 36: Chapter 07

Project Duration for a Given Probability

• What project duration does General Foundry have a 99% chance of completing the project within?

i.e. Prob (proj duration < ? ) = 0.99

• From Std. Normal Table, this corresponds to Z = 2.33

Page 37: Chapter 07

Z = (? - 15) = 2.33 1.76

So ? = 15 + 2.33 x 1.76 = 19.1 weeks

Page 38: Chapter 07

Scheduling Project Costs

1. Estimate total cost for each activity

2. Identify when cost will actually be spent

(we will assume costs are spread evenly)

3. Use EST and LST for each activity to determine how costs are spread over project

Page 39: Chapter 07
Page 40: Chapter 07
Page 41: Chapter 07
Page 42: Chapter 07
Page 43: Chapter 07

Monitoring and Controlling Project Costs

• While the project is underway, costs are tracked and compared to the budget

• What is the value of work completed?Value of work completed = (% of work completed) x (total activity budget)

• Are there any cost overruns?Cost difference = (Actual cost) – (Value of work completed)

Page 44: Chapter 07
Page 45: Chapter 07

Project Crashing• Reducing a project’s duration is called

crashing

• Some activities’ times can be shortened (by adding more resources, working overtime, etc.)

• The crash time of an activity is the shortest possible duration, and has an associated crash cost

Page 46: Chapter 07

Steps in Project Crashing

1. Compute the crash cost per time period

2. Find the current critical path (CP)

3. Find the lowest cost way to crash the CP by 1 time period

4. Update all activity times. If further crashing is needed, go to step 2.

Page 47: Chapter 07
Page 48: Chapter 07

Crashing Using Linear Programming

Decision: How many time periods to crash each activity?

Objective: Minimize the total crash cost

Decision Variables

Ti = time at which activity i starts

Ci = number of periods to crash activity i

Page 49: Chapter 07

Constraints

• An activity cannot begin before all immediate predecessors are complete

• There is a maximum amount that each activity can be crashed

Go to file 7-2.xls