Page 1: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 1

Chapter 3

Process Planning and Design

Page 2: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 2

Process Planning and Design

Chapter 2 identified the critical factors in providing value to the customer. This chapter discusses the selection and design of the transformation process that can deliver those factors—low cost, high quality, enhanced functionality, speed, and so on—in an efficient and effective manner.

Page 3: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 3

Introduction

Fender's Custom Shop Assembly line at IBM's plant in Charlotte,

North Carolina Rickard Associates, an editorial production

company Martin Marietta's aerospace electronics

manufacturing facility in Denver, Colorado Nynex

Page 4: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 4

Examples Examples illustrate several transformation systems.

The Fender Custom Shop is a job shop that has specialized departments for routing, lathe operations, inlaying, paint and finishing, and final assembly. Because work is organized by the task performed, Rickard Associates is also a job shop - even though the work is not performed in one location. Companies like Rickard that rely on information technology to bring separated workers together are referred to as virtual organizations. Martin Marietta converted into focused factories. And assembly lines like the one IBM uses are referred to as flow shops.

Page 5: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 5

Fender’s Custom Shop

Customers include Eric Clapton, John Deacon (Queen), David Gilmour, Yngwie Malmsteen and Stevie Ray Vaughn

Production Steps: computer controlled routers and lathes

shape guitar bodies and necks also have Neck Duplicator necks and bodies hand and machine

sanded

Page 6: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 6

Fender’s Custom Shop continued

detailed inlay work done with Hegner precision scroll saw

paint and finishing operations in special room where air is re-circulated 10 times/minute

buffed hung up and seasoned for two weeks final assembly by actual musicians

Page 7: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 7

IBM’s Charlotte, NC Plant

Assembly line produces 27 significantly different products

Products include hand-held bar-code scanners, portable medical computers, fiber-optic connectors, and satellite communications devices

“Kits” of parts delivered to workers Computer screen displays assembly

instructions

Page 8: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 8

Rickard Associates

Produces magazines and marketing materials Only two of editorial production company’s

employees work at headquarters in NJ Art director works in AZ Editors are located in FL, GA, MI, and D.C. Freelancers even more scattered Internet and AOL used to coordinate work

Page 9: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 9

Martin Marietta Aerospace Plant

Originally set up as job shop with numerous functional departments high WIP levels long lead times long travel distances departmental barriers inhibited

communication Plant subsequently arranged into three

focused factories

Page 10: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 10

Martin Marietta continued

Each focused factory completed entire electronic assembly for particular application

Each focused factory treated as separate business enterprise

Factory manager assigned to each focused factory

“NFL draft” used to select worker teams

Page 11: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 11

Martin Marietta continued Within focused factories part families identified

based on technology and processes Standard routings identified for each part

family Improvements

seven months of consecutive production with no scrap

50% reduction in WIP 21% reduction in lead times 90% reduction in overtime

Page 12: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 12

Nynex

Analyzed company in terms of four core processes customer operations customer support customer contact customer provisioning

Page 13: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 13

Nynex continued

Obtained services of Boston Consulting Group

Visited 152 companies to document best practices

Estimated savings are $1.5 to $1.7 billion

Page 14: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 14

Variety of Transformation Systems

Fender Custom Shop is job shop Rickard Associates is job shop and is

also a virtual organization Martin Marietta converted from a job

shop to focused factories IBM uses a flow shop

Page 15: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 15

Transformation System Design and Layout Analysis

Transformation system design considers alternative transformation forms and selects best one given characteristics of desired outputs.

Layout analysis seeks to maximize the efficiency or effectiveness of operations.

Page 16: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 16

Forms of Transformation Systems

Continuous Process

Page 17: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 17

Continuous Process

Highly standardized products in large volumes

Often these products have become commodities

Typically these processes operate 24 hours/day seven days/week

Objective is to spread fixed cost over as large a volume as possible

Page 18: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 18

Continuous Process continued

Starting and stopping a continuous process can be prohibitively expensive

Highly automated and specialized equipment used

Layout follows the processing stages Output rate controlled through

equipment capacity and flow mixture rates

Page 19: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 19

Continuous Process continued

Low labor requirements

Often one primary input

Initial setup of equipment and procedures very complex

Page 20: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 20

Forms of Transformation Systems

Flow Shop

Page 21: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 21

Flow Shop

Similar to continuous process except discrete product is produced

Heavily automated special purpose equipment

High volume - low variety Both services and products can use flow

shop form of processing

Page 22: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 22

A Generalized Flow Shop Operation

Page 23: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 23

Advantages of the Flow Shop

Low unit cost specialized high volume equipment bulk purchasing lower labor rates low in-process inventories simplified managerial control

Page 24: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 24

Disadvantages of Flow Shop

Variety of output difficult to obtain Difficult to change rate of output Minor design changes may require

substantial changes to the equipment Worker boredom and absenteeism Work not very challenging Vulnerable to equipment breakdowns

Page 25: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 25

Disadvantages of Flow Shop continued

Line balanced to slowest element Large support staff required Planning, design, and installation very

complex task Difficult to dispose of or modify special

purpose equipment

Page 26: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 26

Flow Shop Layout

Objective is to assign tasks to groups The work assigned to each group should

take about the same amount of time to complete

Final assembly operations with more labor input often subdivided easier

Paced versus unpaced lines

Page 27: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 27

Line Balancing

number of theoretical workstations, task times / cycle timeTN

efficiency = output

input

total task time

N stations) cycle timeA

(

demand

work timeavailable timeCycle

Page 28: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 28

Line Balancing Example

Task Time Required PrecedesA 2.2 min. B, C, DB 3.4 EC 1.7 ED 4.1 FE 2.7 FF 3.3 GG 2.6 --

Page 29: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 29

Line Balancing Example continued

Company operates one shift per day Available time per shift is 450 minutes Demand is 100 units/day

Page 30: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 30

Precedence Diagram

A

B

C

D

E

F G

Page 31: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 31

Calculations

cycle time = 450/75 = 6 minutes/part

NT = 20/6 = 3.33 = 4 stations

Page 32: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 32

Task Assignment

StationTimeAvail.

Elig.Tasks

WillFit?

TaskAssign.

IdleTime

1 6.0 A A

3.8 B,C,D B,C B

0.4 C,D -- -- 0.4

2 6.0 C,D C,D D

1.9 C C C

0.2 E -- -- 0.2

Page 33: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 33

Task Assignment continued

StationTimeAvail.

Elig.Tasks

WillFit?

TaskAssign.

IdleTime

3 6.0 E E E

3.3 F F F 0.0

4 6.0 G G G 3.4

Page 34: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 34

Line Balancing Solution

A

B

C

D

E

F G

Station 1

Station 2

Station 3

Station 4

Page 35: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 35

Efficiency

efficiency = 20/(4*6) = 83.3%

Page 36: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 36

Precedence Graph for Credit Applications

Page 37: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 37

Stations Assignments for Credit Application

Page 38: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 38

Forms of Transformation Systems

Job Shop

Page 39: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 39

Job Shop

High variety - low volume Equipment and staff grouped based on

function Each output processed differently

Page 40: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 40

A Generalized Job Shop Operation

Page 41: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 41

Advantages of the Job Shop

Flexibility to respond to individual demands

Less expensive general purpose equipment used

Maintenance and installation of general purpose equipment easier

General purpose equipment easier to modify and therefore less susceptible to becoming obsolete

Page 42: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 42

Advantages of the Job Shop continued

Dangerous activities can be segregated from other operations

Higher skilled work leading to pride of workmanship

Experience and expertise concentrated Pace of work not dictated by moving line Less vulnerable to equipment

breakdowns

Page 43: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 43

Disadvantages of the Job Shop

General purpose equipment is slower Higher direct labor cost High WIP inventories High material handling costs Management control very difficult

Page 44: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 44

Directly Specified Closeness Preferences

A = absolutely necessary E = especially important I = important O = ordinary closeness OK U = unimportant X = undesirable

Page 45: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 45

Cost-Volume-Distance Model

TC = C V Di=1

N

ij ij ijj=1

N

Page 46: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 46

Office Layout

Page 47: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 47

Forms of Transformation Systems

Cellular Production

Page 48: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 48

The Cell Form

Combines flexibility of job shop with low costs and short response times of flow shop

Based on group technology First identify part families Then form machine cells to produce part

families

Page 49: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 49

Conversion of a Job Shop Layout to a Cellular Layout

Page 50: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 50

Organization of Miscellaneous Parts into Families

Page 51: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 51

Advantages of Cellular Production

Reduced machine setup times increased capacity economical to produce in smaller batch

sizes smaller batch sizes result in less WIP less WIP leads to shorter lead times shorter lead times increase forecast

accuracy and provide a competitive advantage

Page 52: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 52

Advantages of Cellular Production continued

Parts produced in one cell Capitalize on benefits of using worker

teams Minimal cost to move from job shop to

cellular production (e.g. EHC) Can move from cellular production to

“mini-plants”

Page 53: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 53

Disadvantages of Cellular Production

Volumes too low to justify highly efficient high volume equipment

Vulnerable to equipment breakdowns Balancing work across cells Does not offer the same high degree of

customization as the job shop

Page 54: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 54

Cellular Layout

Teams of workers and equipment to produce families of outputs

Workers cross-trained Nominal cells versus physical cells. Remainder cell Cell formation methods

production flow analysis

Page 55: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 55

Original Machine-Component Matrix

A B C D E

1 1 1 1

2 1 1

3 1 1 1

4 1 1

5 1 1

Page 56: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 56

Reordered Machine-Component Matrix

A C E B D

1 1 1 1

3 1 1 1

5 1 1

2 1 1

4 1 1

Page 57: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 57

Forms of Transformation Systems

Project Operations

Page 58: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 58

Project Operations

Large scale Finite duration Nonrepetitive Multiple

interdependent activities

Offers extremely short reaction times

Page 59: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 59

Selection of the Process

Page 60: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 60

Volume/Variety Considerations

High volume indicate automated mass production

High variety implies use of skilled labor and general purpose equipment

Make-to-stock versus make-to-order

Page 61: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 61

Effect of Output Characteristics on Transformation Systems

Page 62: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 62

Product/Process Life Cycles

In R&D stage, product made in small volumes

At peak of life cycle, demand may justify high volume special purpose equipment

System should evolve as market evolves Whether an organization moves with a

product through its life cycle depends on the organization’s focus

Page 63: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 63

Selection of Transformation System by Stage of Life Cycle

Page 64: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 64

Service Processes Often implemented with little

development or pretesting Need to consider amount of customer

contact Customers may not arrive at smooth and

even increments Including customer in service process

provides opportunities to improve service

Page 65: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 65

New Transformational Technologies and Reengineering

Page 66: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 66

Information Technology

World Wide Web Federal Express

Web server set up in late 1994 By 1996 12,000 customers using service each

day to access package-tracking database provides higher customer service saves FedEx $2 million per year

Intranets

Page 67: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 67

Information Technology continued

Decision support systems Artificial intelligence Expert systems

Page 68: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 68

The Office of the Future Focus of 1980s was on improving

individual productivity Focus 1990s is enhancing way teams

work together Groupware

communications (e-mail) collaboration (access to shared data) coordination (jointly accomplishing

activities)

Page 69: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 69

Manufacturing Technologies

Numerical Control (NC) computer numerical control direct numerical control

Robotics Flexible Manufacturing Systems (FMS)

Page 70: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 70

Business Process Design (Reengineering)

Page 71: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 71

Division of Labor Concept

Work broken down into its simplest most basic tasks Performing same task facilitates attaining

greater skill No time lost switching to another task Workers well positioned to improve tools

and techniques

Page 72: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 72

Division of Labor Concept continued

Division of labor concept not challenged until recently despite dramatic changes in technology

Quality, innovation, service, and value more important than cost, growth, and control

Page 73: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 73

Process

Set of activities that taken together produce a result of value to the customer

Organizing on basis of processes Eliminate delays and errors when work is

handed off Capture information once and at source When people closest to process perform

work, there is little need for management overhead

Page 74: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 74

Business Process Design (BPD)

The fundamental rethinking and radical redesign of business processes to bring about dramatic improvements in performance

Hammer, M. and Stanton, S. The Reengineering Revolution, Harper Business, 1995.

Page 75: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 75

Radical

Profoundly change the way work performed

Not concerned with making superficial changes

Get to root Get rid of old Reinventing, not improving

Page 76: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 76

Redesign

BPD is about designing how work is done

Smart, capable, well trained, highly motivated employees mean little if the way work is performed is poorly designed

Page 77: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 77

Process

All organizations perform processes Customers not interested in individual

activities but rather overall results Few of them are organized on the basis

of processes Thus, processes tend to go unmanaged Team approach one way this addressed

Page 78: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 78

Dramatic

Quantum leaps in performance, not marginal or incremental improvements

Breakthroughs in performance

Page 79: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 79

IBM Credit Example

Page 80: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 80

IBM Credit Example continued

Order logged by 1 of 14 people in conference room

Carted upstairs to credit department Information entered into computer to

check borrower’s creditworthiness Results written on piece of paper

Page 81: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 81

IBM Credit Example continued

Business practices department modified standard loan covenant in response to customer requests

Used its own computer system Pricer keyed data into PC to determine

appropriate interest rate Administrator converted to quote letter

and Fedexed to field sales rep.

Page 82: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design 82

IBM Credit Example continued

Average time to process a request was 6 days

Could take as long as 2 weeks Actual processing time 90 minutes Deal Structurer

Turnaround time 4 hours Number of deals processed increased 100

times with small reduction in head count

Page 83: Chapter 3: Process Planning and Design1 Chapter 3 Process Planning and Design

Chapter 3: Process Planning and Design

83