Chapter 43
Construction Supervision Procedures
2
Links for Chapter 43
Contracts
Completion Notices
Bids
Inspections
Loans
Appraisals
Change Orders
Building Permits
3
Loan Applications• Although loan applications vary, most contain:
– Plot plan
– Prints of all drawings
– Specifications
– Heat loss calculation room-by-room
– Proposed sale price
– Copy of earnest money agreement
4
Appraisal Requirements
• Individual appraisal requirements include:– Total number of lots in subdivision
– Evidence of acceptance of streets and utilities for maintenance
– Copy of recorded plat and covenants
5
Appraisal Requirements
• Master appraisal requirements include:– Location map and copy of recorded plat and
covenants– Letter from builder including
• Number of lots in area owned by the builder and number of lots proposed to be built
• Number of homes presently under construction and number completed and unsold
6
Change Orders
• Change orders should be submitted to the FHA on FHA Form 2577
• Changes in cost should be indicated
• It must be signed by builder, purchaser, and lender
• Make sure they are well-prepared
7
Building Permits• A building permit identifies:
– Major structures to be built– Legal description and location of property– Information about the applicant
• A building permit includes:– Two sets of plans– A fee depending on the estimated cost
8
Contracts
• Building contracts become a binding agreement between the client, general contractor, and architect
• Fixed-sum is when the contractor agrees to complete the project for a certain cost
• Cost-plus is when the contractor agrees to complete the work for the actual cost plus overhead and profit
9
Contracts
• Contracts specify:– Completion date
– Percentage and date for payments
– Insurance carried by the owner
– How the contract may be ended
10
Completion Notice
• A completion notice is posted in a conspicuous place when work is substantially completed
• It is recorded in a local jurisdiction
• Loan payments can now be completed
• Private inspections are sometimes required
11
Bids
• Bids are used to get the best price for the best quality work
• Bids become legal documents for completing the project
• Be careful to identify every aspect of the project that is to be included in the bid specifications
12
Construction Inspections
• Regularly scheduled inspections occur at various phases during the project to protect the safety of occupants and the public
• The lender also inspects the product to ensure proper material and procedures are being used so funds can be released