Chapter 5 Cost Estimating Chapter 5 Cost Estimating and Biddingand Bidding
BCN 4708 Fall 2008BCN 4708 Fall 2008
Estimating and BiddingEstimating and Bidding
Estimating processEstimating processDetermine labor, material and equipment Determine labor, material and equipment
needsneedsHow much subcontracting?How much subcontracting?Assign prices to quantitiesAssign prices to quantitiesAdd in: indirect costs, overhead and profitAdd in: indirect costs, overhead and profit
ASPEASPEAACEAACE
Estimating and BiddingEstimating and Bidding
Lump-sum EstimatesLump-sum Estimates Unit-price EstimatesUnit-price Estimates Approximate Estimates p.79Approximate Estimates p.79
Cost-per FunctionCost-per Function Area Cost EstimateArea Cost Estimate Volumetric Cost EstimateVolumetric Cost Estimate Modular Takeoff EstimateModular Takeoff Estimate Partial Takeoff EstimatePartial Takeoff Estimate Panel Unit Cost EstimatePanel Unit Cost Estimate Parameter Cost EstimateParameter Cost Estimate
Estimating and BiddingEstimating and Bidding
Bidding ProceduresBidding ProceduresPrivate Private PublicPublic
Advertisement for BidsAdvertisement for BidsPrivate Private PublicPublicReporting servicesReporting services
Estimating and BiddingEstimating and Bidding Decision to BidDecision to Bid Set-AsidesSet-Asides QualificationQualification DepositsDeposits Availability of Plans and SpecsAvailability of Plans and Specs Bidding PeriodBidding Period Instruction to BiddersInstruction to Bidders Preliminary conditionsPreliminary conditions Jobsite VisitJobsite Visit Bid invitationsBid invitations
Estimating and BiddingEstimating and Bidding
Quantity Surveys / TakeoffsQuantity Surveys / TakeoffsArchitect / engineerArchitect / engineerContractorContractor
Professional Quantity SurveyorsProfessional Quantity SurveyorsCost Summaries fig 5.4 / 5.5Cost Summaries fig 5.4 / 5.5Material costsMaterial costsDirect labor costDirect labor cost Indirect labor costsIndirect labor costs
Estimating and BiddingEstimating and Bidding
Equipment CostsEquipment CostsEquipment ExpenseEquipment ExpenseEquipment RatesEquipment RatesOwnership and Operating CostsOwnership and Operating Costs
A = C(n+1) + S(n-1) / 2nA = C(n+1) + S(n-1) / 2nEquipment production ratesEquipment production rates
Estimating and BiddingEstimating and Bidding
Subcontractor bidsSubcontractor bidsBid DepositoriesBid DepositoriesAllowancesAllowancesOverheadOverhead
General OverheadGeneral OverheadProject Time ScheduleProject Time ScheduleMarkup 5 – 20Markup 5 – 20
Estimating and BiddingEstimating and BiddingLump-sum Recap SheetLump-sum Recap SheetBid ChangesBid Changes
Change sheetChange sheetUnit price recap sheetUnit price recap sheet
FactorFactorContract BondContract Bond
Surety Surety Performance or payment bondPerformance or payment bond
AddendaAddenda
Estimating and BiddingEstimating and Bidding
Scope BiddingScope BiddingComputer-Based EstimatingComputer-Based EstimatingRange estimatingRange estimating