chapter 5 deposit appraisal and mine development · 2015. 3. 16. · 83 repor 2013 photo : mern...

13
83 Report on Mineral Activities in Québec - 2013 Photo : MERN CHAPTER 5 Deposit appraisal and mine development Martin Bernatchez, Katrie Bergeron, Denis Blackburn, Dominic Fragasso, Germain Girard, Denys Laplante, Jacinthe Paquet and Denis Raymond During 2013, twenty-eight mining projects were in the deposit appraisal phase (Figure 5.1 and Table 5.1) and eight projects, in the mine development phase (Figure 5.2 and Table 5.2). 5.1 Deposit appraisal Alumina Orbite Aluminae is planning to develop an argillite deposit in Grande-Vallée, Gaspésie. The company wants to produce smelter-grade alumina (SGA) to supply aluminium smelters in Québec and around the world. Argillite resources are estimated at one billion tonnes at an average grade of 23% aluminium oxide. Orbite Aluminae is currently finalizing the construction of a high-purity alumina (HPA) production facility in Cap-Chat, Gaspésie, and intends to build a smelter-grade alumina (SGA) production plant subsequently. Diamond Stornoway Diamond Corporation completed construction of segments C and D of the Route 167 Extension, in order to reach its Renard project located north of the Monts Otish, about 360 km north of Chibougamau. The company also began construction of an airfield in the fall of 2013. Raising the necessary financing is the last step leading to the start of construction at the Renard project, which is scheduled to take two years. Mining operations will take place in open pit and underground, to produce on average 1.6 million carats of diamonds per year. The capital cost of the project is estimated at $832M and the mine will provide some 480 jobs for an expected mine life of 11 years. Iron Champion Iron Mines focused most of its efforts on raising the financing required to continue a feasibility study on the Fire Lake North iron ore project. In the late fall of 2013, the company announced it had raised the financing for the study. The feasibility study is now scheduled for release in the summer of 2014. The company is aiming to begin mining operations in late 2016. Oceanic Iron Ore Corporation reviewed its plans concerning development of the Hopes Advance project located near Aupaluk (west coast of Ungava Bay). The feasibility study, initially scheduled for release in 2013, has been post- poned until 2014. Mining operations are expected to begin in 2018 at the earliest. In the spring of 2013, partners New Millennium Iron Corporation and Tata Steel Minerals Canada received a preliminary version of the feasibility study for the Taconite-KéMag project, located north of Schefferville. Since that time, the two companies have been working to finalize the study, scheduled for release during the first quarter of 2014. The anticipated date for the start of production will be known at that time. In May 2013, the two partners on the Duncan Lake project, Augyva Mining Resources and Century Iron Mines Corporation, released a preliminary economic assessment. The cost of the project is estimated at $4B to produce 12 Mt of iron pellets. A feasibility study is scheduled for release in the summer of 2014. Mining operations are expected to begin in 2017.

Upload: others

Post on 22-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • 83 Report on Mineral Activities in Québec - 2013

    Photo : MERN

    CHAPTER 5

    Deposit appraisal and mine developmentMartin Bernatchez, Katrie Bergeron, Denis Blackburn, Dominic Fragasso, Germain Girard, Denys Laplante, Jacinthe Paquet and Denis Raymond

    During 2013, twenty-eight mining projects were in the deposit appraisal phase (Figure 5.1 and Table 5.1) and eight projects, in the mine development phase (Figure 5.2 and Table 5.2).

    5.1 Deposit appraisalAlumina

    Orbite Aluminae is planning to develop an argillite deposit in Grande-Vallée, Gaspésie. The company wants to produce smelter-grade alumina (SGA) to supply aluminium smelters in Québec and around the world. Argillite resources are estimated at one billion tonnes at an average grade of 23% aluminium oxide. Orbite Aluminae is currently finalizing the construction of a high-purity alumina (HPA) production facility in Cap-Chat, Gaspésie, and intends to build a smelter-grade alumina (SGA) production plant subsequently.

    Diamond

    Stornoway Diamond Corporation completed construction of segments C and D of the Route 167 Extension, in order to reach its Renard project located north of the Monts Otish, about 360 km north of Chibougamau. The company also began construction of an airfield in the fall of 2013. Raising the necessary financing is the last step leading to the start of construction at the Renard project, which is scheduled to take two years. Mining operations will take place in open pit and underground, to produce on average 1.6 million carats of diamonds per year. The capital cost of the project is estimated at $832M and the mine will provide some 480 jobs for an expected mine life of 11 years.

    Iron

    Champion Iron Mines focused most of its efforts on raising the financing required to continue a feasibility study on the Fire Lake North iron ore project. In the late fall of 2013, the company announced it had raised the financing for the study. The feasibility study is now scheduled for release in the summer of 2014. The company is aiming to begin mining operations in late 2016.

    Oceanic Iron Ore Corporation reviewed its plans concerning development of the Hopes Advance project located near Aupaluk (west coast of Ungava Bay). The feasibility study, initially scheduled for release in 2013, has been post-poned until 2014. Mining operations are expected to begin in 2018 at the earliest.

    In the spring of 2013, partners New Millennium Iron Corporation and Tata Steel Minerals Canada received a preliminary version of the feasibility study for the Taconite-KéMag project, located north of Schefferville. Since that time, the two companies have been working to finalize the study, scheduled for release during the first quarter of 2014. The anticipated date for the start of production will be known at that time.

    In May 2013, the two partners on the Duncan Lake project, Augyva Mining Resources and Century Iron Mines Corporation, released a preliminary economic assessment. The cost of the project is estimated at $4B to produce 12 Mt of iron pellets. A feasibility study is scheduled for release in the summer of 2014. Mining operations are expected to begin in 2017.

  • 84Report on Mineral Activities in Québec - 2013

    Lac Otelnuk Mining (LOM) is a joint venture between Adriana Resources and WISCO (a Chinese steelmaker). In October 2013, LOM commissioned engineering firm SNC-Lavalin to finalize a feasibility study on the Lac Otelnuk project, located 150 km north of Schefferville. The feasibility study is expected toward the end of 2014. Mining operations could begin in 2019.

    Barlow Mine, a privately-funded company, continued exploration work and studies on its Montgolfier Iron Hills project located approximately 14 km south of the former Selbaie mine. The company intends to complete a prefeasibility study, then a feasibility study for 2015, but is in search of financing. The main issues in this project are the transportation of iron ore concentrate and the power supply. In January 2012, the company released a NI 43-101 compliant technical report on the project.

    Iron-titanium-vanadium

    In early December 2013, the MDDEFP delivered an environmental certificate of authorization to BlackRock Metals for the construction of the BlackRock mine site, located east of Chibougamau. The company is still waiting for its federal certificate of authorization. The company intends to complete the financing for the project over the course of 2014 and start the construction phase, with the objective of beginning mining operations in the spring of 2016.

    Graphite

    Mason Graphite Corporation released on April 23, 2013, the results of a preliminary economic assessment on the Lac Guéret project, located 260 km north of Baie-Comeau on the southwest shore of Réservoir Manicouagan. Based on an initial capital cost estimated at $130M, annual production would be on the order of 176,000 tonnes of ore grading 27.4% graphitic carbon (Cgr) over a mine life of 22 years. Primary processing will take place on site, to produce 50,000 tonnes of concentrate grading 93.7% Cgr. The company is planning a drilling campaign during the winter of 2013-2014 as well as metallurgical tests and intends to publish a feasibility study in the fall of 2014.

    Focus Graphite updated its preliminary economic assessment (PEA) of 2012 concerning the Lac Knife project located 35 km south of Fermont. According to information published in November 2013, conclusive metallurgical results indicate a higher grade product upon primary concentration. The thermal purification process considered in the first study was abandoned, thus reducing the initial capital cost to $126M. The expected annual production is 300,000 tonnes of ore grading 15.66% graphitic carbon (Cgr) over a mine life of 20 years. According to the company, mining operations may begin in 2016 and would create up to 92 jobs. Primary processing will take place on site, to produce 44,300 tonnes per year of concentrate grading 96.6% Cgr. The company is planning to produce high-purity processed natural graphite for the battery market, and flake concentrate.

    Lithium

    In the Abitibi region, adjacent to the Québec Lithium project of Québec Lithium inc., a subsidiary of Corporation Canada Lithium, Glen Eagle Resources continued work on the Authier project. An open pit mine producing 1,000 tonnes per day of spodumene ore is being considered. Glen Eagle Resources is also examining the possibility of producing lithium metal.

    In the Baie-James region, about 30 km east of the Nemaska Cree community and about 280 km north of Chibougamau, Nemaska Lithium continued deposit appraisal work on the Whabouchi project. The projected open pit mine and concentrator with an annual capacity of 213 Kt of spodumene concentrate will supply a processing plant located in Valleyfield, near Montréal. The plant would produce 20 Kt per year of lithium hydroxide and 5-10 Kt per year of lithium carbonate. The entire project represents a global investment of $477M and would create 190 jobs on the mine site and 75 jobs at the processing plant. A feasibility study is scheduled for release in early 2014. Nemaska Lithium has also launched the permitting process leading to construction.

    Lithium and tantalum

    About 30 km north of the Nemaska Cree community on the Rose tantalum-lithium project, Critical Elements Corporation plans to mine lithium and tantalum ore from an open pit mine and concentrate it on site. The company is also examining the possibility of building a lithium carbonate production plant on the mine site. According to the preliminary economic assessment, the estimated cost for the project is $270M. Critical Elements Corporation has undertaken various work programs, testing and studies in preparation for an upcoming feasibility study.

  • 85 Report on Mineral Activities in Québec - 2013

    Nickel, copper, cobalt, and platinum group elements (PGE)

    In May 2013, Royal Nickel Corporation published a feasibility study on the Dumont Nickel project located near Amos. The cost of the project is estimated at $1.3B for an annual production of 30 Kt of nickel concentrate. The company is hoping to receive its environmental certificate of authorization by July 2014, which would enable it to raise the necessary financing of the project and begin construction of the mining site. Mining operations on this project could begin in 2016.

    Niobium and tantalum

    Northwest of Girardville in the Lac-Saint-Jean region, deposit appraisal work continues on the Crevier niobium-tantalum project by Les Minéraux Crevier, a subsidiary of MDN. A feasibility study is underway and is scheduled for release in 2014. The estimated cost for the project is $479M and the project would create 300 jobs. Mining operations are expected to begin in 2017.

    Gold

    Conway Resources concluded the acquisition of mining titles of the former Belleterre Mine. Following changes in the board of directors and financial restructuring, Conway Resources announced its intention to close the company by liquidating its assets. A notice to its creditors was sent by the trustee in bankruptcy. The company considers that the lack of annual financing and increasing expenses for a junior public company were responsible for it maintaining a high debt ratio.

    A preliminary economic assessment was published in February 2013 by Clifton Star Resources for the Duparquet project, located near the town of Duparquet in the Abitibi-Témiscamingue region. The study focuses on a project to mine the gold deposit by open pit as well as the tailings of the former Beattie mine. The mine life is estimated at 16 years, at a production rate of 8,000 tonnes of ore per day. It would require investments on the order of $370M. A prefeasibility study is scheduled for release in 2014.

    The Fayolle project held by Typhon Exploration and Hecla Québec is located 40 km northeast of Rouyn-Noranda, near the southern limit of the Parc national d’Aiguebelle. In March 2013, a preliminary economic assessment was published. Two scenarios were considered: open pit mining and underground mining. The life of the mine could reach three years and the daily production capacity would be in the order of 750 to 1,000 tonnes of ore. Investments for the open pit mine and the underground mine are respectively estimated at $5.9M and $22.7M. Typhoon Exploration carried out additional work to increase mineral resources on the property.

    Gold Bullion Development Corporation released in February 2013 a preliminary economic assessment on the Granada project considering open pit mining and underground mining operations. The investment required for the project is estimated at $259M. The mine life is estimated at 11 years and the proposed mill has a daily capacity of 7,500 tonnes of ore. This project is located 2.5 km south of the town of Granada and about 9 km south of Rouyn-Noranda. The prefeasibility study, initially scheduled for the end of 2013, has been postponed.

    On the Joanna project located east of Rouyn-Noranda, Hecla Québec announced it was postponing its decision to mine the Hosco ore deposit, despite the positive outcome of the feasibility study. This announcement comes in the wake of excellent exploration results obtained on the Heva and Hosco West zones, namely indicating higher gold grades and better metallurgical properties. The potential for a mining operation on the Joanna project thus remains quite realistic.

    QMX Gold Corporation (formerly Alexis Minerals Corporation) is still involved in an arbitration process with Thundermin Resources concerning the Lac Pelletier property located near Rouyn-Noranda. The latter is the registered holder of the claims and mining concessions that make up the Lac Pelletier property, however QMX Gold Corporation has performed deposit appraisal work on the property.

    In March 2012, Richmont Mines announced the results of a preliminary economic assessment on the Wasamac property located near Rouyn-Noranda. Since the project provided a less than adequate return on investment, explora-tion and deposit appraisal activities on this property were suspended in November 2012. The company still considers this project as an important asset, not only because of its location and size, but because it remains interesting if gold prices increase. This project will be re-examined in the event of a material change in economic parameters or if further geological information on this project makes it more attractive to develop. Public consultations with local communities near Wasamac will continue so as to maintain open lines of communication and to ensure activities are carried out in a socially acceptable manner.

  • 86Report on Mineral Activities in Québec - 2013

    Phosphate

    Mine Arnaud heads the Arnaud mining project located about 15 kilometres west of Sept-Îles. In August 2013, the company released a prefeasibility study. The project involves an open pit mine with an estimated mine life of 28 years and a mill. The average annual production will be on the order of 1.4 Mt of apatite concentrate. This project will provide nearly 340 jobs during the mining phase. During the months of August and September 2013, the Arnaud mining project was submitted to public scrutiny during the public hearings held by the BAPE (Bureau d’audiences publiques sur l’environnement). The BAPE report is scheduled for publication in early 2014.

    Arianne Phosphate released in June 2013 an environmental impact study for the Lac à Paul project, located about 200 km northeast of the town of Saguenay, followed by a feasibility study in November 2013. The project, involving an open pit mine and a mill, is expected to produce, on average, 3 Mt per year of apatite concentrate. Initial capital costs are estimated at US$982.5M for the mine and US$232.2M to transport the apatite concentrate from the mine site to a shipping dock on the north shore of Rivière Saguenay in Saint-Fulgence. Mining operations could begin in 2016 and the mine would generate 375 jobs over a period of nearly 26 years.

    Rare earths

    In the Labrador Trough, about 130 km south of Kuujjuaq, Commerce Resources Corporation is continuing its metallurgical tests, environmental analyses and geotechnical drilling on the Ashram (Eldor) project to carry out a feasibility study. According to the preliminary economic assessment, the project includes an open pit mine, a mill and a hydrometallurgical plant. A mixed rare earth carbonate concentrate would be produced at a rate of 16.8 Kt per year over a period of at least 25 years. Capital costs for the project are estimated at $763M, including the cost of building a road and port facilities. The project would create 230 jobs.

    About 220 km northeast of Schefferville, work by Quest Rare Minerals Corporation is progressing rapidly on the B-Zone deposit on its Strange Lake project. The prefeasibility study was released on November 23, 2013. The project involves an open pit mine, a mill and a hydrometallurgical plant where products will be separated. The production of mixed rare earth oxide concentrate and niobium and zirconium by-products is being considered. Quest Rare Minerals is planning to ship its entire ore production (1.4 Mt per year) by truck then by boat to Bécancour. To do so, the company needs to build a 165-km road to Anaklalak Bay in Labrador as well as port facilities ($330M). In 2016-2017, the company is planning to develop the mine site at Strange Lake and to build the hydrometallurgical plant in Bécancour, at a cost of $1.3B. Mining operations are expected to begin in late 2017. This project will cost an estimated $2.56B and will create 500 jobs during the construction phase and 834 jobs during the mining phase (324 jobs at the mine, 381 jobs at the plant, and 129 jobs in administration and infrastructure). The company is working to raise the $50M required to complete the feasibility study, scheduled for 2014. It also wishes to interest a strategic partner to advance the project.

    In the Témiscamingue region on the Zeus property, Matamec Explorations completed a feasibility study on the Kipawa rare earth project in September 2013. It is the first study of its kind in Québec. Toyotsu Rare Earth Canada (TRECan) is the strategic partner of Matamec Explorations on this project. A new phase of metallurgical testing, pro-cess optimization and engineering is planned in the coming months. The permitting process is underway. The project involves an open pit mine, a mill and a hydrometallurgical plant, to produce annually 3.6 Kt of mixed heavy rare earth concentrate and mixed light rare earth concentrate. Mining operations may begin in 2016. The estimated cost for the project is $374M and 230 jobs would be created.

    Two other projects at the advanced exploration phase are also worthy of mention, namely the Montviel project by GeoMegA Resources near Lebel-sur-Quévillon and the Niobec rare earth project by Mines Niobec (IAMGOLD Corporation) near Saguenay. In addition, Innovation Metals is currently considering a project to build a rare earth separation plant in the Bécancour area.

    Zinc

    Glencore Canada Corporation and Donner Metals were bound by an agreement, the Matagami Exploration Joint Venture, focusing on five (5) distinct properties in the Matagami area. On December 12, 2013, Donner Metals agreed to sell to Glencore Canada Corporation its interest in this joint venture.

  • 87 Report on Mineral Activities in Québec - 2013

    5.2 Mine developmentAlumina

    In December 2013, Orbite Aluminae was in the process of finalizing construction of a high-purity alumina (HPA) production facility in Cap-Chat, Gaspésie. The company will proceed once it has raised the necessary financing. The plant will be supplied with smelter-grade alumina (SGA) from Orbite, if its SGA plant is commissioned, or from another supplier. Commercial production at the plant is expected to be on the order of 3 tonnes per day in the fourth quarter of 2014, ramping up to 5 tonnes per day during the first half of 2015. HPA will be sold to clients for the production of ceramics, electronic components, sapphires, and light-emitting diodes (LED). Subsequently, Orbite Aluminae will proceed with its construction project to build a SGA production plant.

    Iron

    Tata Steel Minerals Canada (TSMC), a joint venture between New Millennium Iron Corporation and Tata Steel, began open pit mining operations to produce high-grade (~60%) iron ore on the DSO project near Schefferville. From 2014 onward, the company intends to improve its ore processing methods. The commissioning and ramp-up period for the project will continue throughout 2014.

    Lithium

    In the Abitibi region near La Corne, Québec Lithium inc., a subsidiary of Canada Lithium Corporation, finalized at year-end the construction of mining and processing infrastructure as well as the lithium carbonate production plant on the Québec Lithium project. The commissioning and ramp-up period is underway and commercial production will be achieved in early 2014. The processing plant processes spodumene ore from the nearby open pit mine. The annual production is expected to reach 20,000 tonnes of lithium carbonate. The expected mine life would be 15 years and about 200 jobs will be created. A five-year offtake agreement for 12,000 to 14,400 tonnes per year of lithium carbonate was concluded with a Chinese company. This is the first active spodumene mining operation and lithium carbonate production plant in Québec since 1955. In December 2013, Québec Lithium inc. and Sirocco Mining announced their intention to merge the two companies. Sirocco operates an iodine mine in Chile.

    Nickel, copper, cobalt, and platinum group elements (PGE)

    Canadian Royalties, a subsidiary of Jilin Jien Nickel, completed construction work on its Nunavik Nickel project, with the exception of port facilities in Deception Bay. This mine site is located about 100 km west of the Inuit com-munity of Kangiqsujuaq. Mining and processing operations began during the first half of 2013. The commissioning and ramp-up period took much longer than expected, putting the company in a difficult situation. The company is hoping for a turnaround in 2014.

    Gold

    The Elder project held by Abcourt Mines is located about 10 km northwest of Rouyn-Noranda. In November 2012, Abcourt Mines released a preliminary economic assessment for an underground mining project at the former Elder mine. In April 2013, the company received the certificate of authorization to extract 75,000 tonnes of ore, which represents 12,500 ounces of gold. Ore extracted to date has been shipped to the Sleeping Giant mill (property of Aurbec Mines) located 195 km from the mine site. The first gold bar was produced in mid-October, but the project did not reach commercial production in 2013.

    In the Baie-James region, the Eleonore project is in construction at a cost of $1.75B. Les Mines Opinaca, a subsidiary of Goldcorp, intends to commence production at the end of 2014. This will be an underground mine with a capacity of 7,000 tonnes of ore per day, for an average annual production of 600,000 ounces of gold. Mining operations are expected to last 10 years and create more than 600 jobs.

    Agnico Eagle Mines continued development work on two new zones at the Goldex mine near Val-d’Or over the course of 2013. Capital investments are estimated at about $100M, to consolidate 150 jobs and create 100 additional jobs. Extraction and crushing activities resumed in satellite zones E and M at the end of the third quarter of 2013. Commercial production is expected to be achieved in early 2014 and will last an estimated 4 years. The mine and processing plant are located about 60 km east of the LaRonde mine, Agnico Eagle property. In October 2011, production was suspended in the GEZ zone due to geotechnical problems. The company performed the necessary work to correct the situation. Exploration in the deeper D zone could extend the mine life.

  • 88Report on Mineral Activities in Québec - 2013

    About 25 km south of Matagami, North American Palladium (NAP) worked to bring the Vezza mine into production. Annual production was expected to reach 39,000 ounces of gold over a period of 7 to 9 years. The company announced however its intention to sell the property. In March 2013, Maudore Minerals acquired all of NAP Québec’s assets (Vezza mine, Sleeping Giant mine, mill, tailings pond, exploration properties) for $18M and 1.5 million shares and created a subsidiary, Aurbec Mines. In July 2013, Maudore Minerals suspended development work at the Vezza mine and moved some of the workers to the Sleeping Giant site to conduct exploration and development work with the objective of resuming mining operations. In November 2013, processing of stockpiled ore at Vezza was completed. Stopes will be allowed to flood. The Vezza project is now classified as a deposit with a tonnage estimate pending an eventual resumption of operations.

    On June 4, 2013, IAMGOLD Corporation inaugurated the Westwood mine. The capital cost for the Westwood project, including refurbishing the Doyon processing plant, totalled $700M. The annual gold production will be 186,000 ounces over a mine life estimated at 19 years. A total of 700 employees will be required at the underground mine and the processing plant. Gold ore from Westwood will be processed at the Doyon mill. Tailings and waste rock generated from mining operations will be used to rehabilitate the former Doyon mine. In the fall, the company revised and postponed the date of commercial production to the third quarter of 2014. In 2013, IAMGOLD Corporation launched a $100M cost reduction program.

  • 89 Report on Mineral Activities in Québec - 2013

    géotechniques. La société a réalisé les travaux nécessaires pour corriger cette situation. L’exploration de la zone D, plus profonde, pourrait prolonger la vie de la mine.

    À 25 km au sud de Matagami, North American Palladium (NAP) s’affairait à mettre en production la mine Vezza. La production annuelle projetée était de 39 000 onces d’or sur une période de 7 à 9 ans. Toutefois, NAP avait annoncé son intention de vendre la propriété. En mars 2013, Minéraux Maudore se porte acquéreur de tous les actifs (mine Vezza, mine Géant Dormant, concentrateur, parc à résidus, propriétés d’exploration) de NAP Quebec pour 18 M$ et 1,5 million d’actions et crée la filiale Mines Aurbec. En juillet 2013, Minéraux Maudore suspend le développement de la mine Vezza et déplace une partie des emplois vers le site de Géant Dormant pour y faire de l’exploration et du développement en vue d’une reprise de l’exploitation. En novembre 2013, le traitement du minerai empilé de Vezza est terminé. Les chantiers seront ennoyés. Le projet Vezza est ramené au stade de gisement avec tonnage évalué en attendant une éventuelle reprise.

    Le 4 juin 2013, IAMGOLD Corporation a inauguré la mine Westwood. L’investissement total pour le projet Westwood, incluant la rénovation de l’usine de traitement Doyon, est de 700 M$. La production aurifère annuelle serait de 186 000 onces d’or, pour une durée de vie estimée à 19 ans. Le nombre d’employés prévu pour la mine souterraine et l’usine de traitement serait de 700. Le minerai de Westwood serait traité à l’usine Doyon. Les résidus et les stériles générés seraient utilisés pour restaurer l’ancienne mine Doyon. À l’automne, la société a révisé et reporté la date de production commerciale au troisième trimestre de 2014. Pour 2013, IAMGOLD Corporation a instauré un programme de réduction des coûts de 100 M$.

    !(

    !(!(

    !(

    !(

    !(!(

    !(!(!(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !(

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    Gaspé

    Québec

    Salluit

    Fermont

    Kuujjuaq

    Radisson

    Wemindji

    Matagami

    Val-d'Or

    Montréal

    Saguenay Rimouski

    Gatineau

    La Tuque

    Sept-Îles

    Puvirnituq

    Sherbrooke

    Chibougamau

    Kangiqsujuaq

    Schefferville

    Rouyn-Noranda

    Trois-Rivières

    Thetford Mines

    Havre-Saint-Pierre

    Sainte-Anne-des-Monts

    Îled'Anticosti

    Îles de laMadeleine

    Lebel-sur-Quévillon

    PRINCE EDWARD

    ISLAND

    NOVASCOTIA

    NUNAVUT

    NEWFOU

    NDLAND

    ANDLAB

    RADOR

    ONTARIO

    NEWBRUNSWICK

    UNITED STATES

    1927 boudary bythe Private co

    uncil (non definitive)

    HudsonStrait

    UngavaBay

    JamesBay

    Labrador Sea

    St.Law

    rence

    River

    Gulf of St. Lawrence

    Hudson Bay

    Atlantic Ocean

    192

    7boudary

    b ythe

    Privatecouncil (non

    defin itive)

    1

    8

    6

    5

    4

    7

    3

    2

    9

    26

    11

    10

    25

    24

    1413

    28

    17

    16

    27

    54°56°58°60°62°64°66°68°70°72°74°76°78°80°82°84°

    60°

    58°

    56°

    54°

    52°

    50°

    48°

    46°

    !(

    !(

    !(

    !(!(

    !( !(!(

    !

    !

    Rouyn-Noranda

    Val-d'Or

    22 21

    1815

    12

    19

    23

    200 150 km

    1/9 000 000

    49°

    Valuation

    !(

    !(

    Gold: precious metals

    Niobium and tantalum

    Phosphate

    17- Belleterre (Conway Resources)18- Duparquet (Clifton Star Resources)19- Fayolle (Typhon Exploration / Hecla Québec)20- Granada (Gold Bullion Development Corp.)21- Joanna (Hecla Québec)22- Lac Pelletier (QMX Gold Corp. / Thundermin Resources)23- Wasamac (Richmont Mines)

    16- Crevier (Les Minéraux Crevier)!(

    24- Arnaud (Mine Arnaud)25- Lac à Paul (Arianne Phosphate)

    Lithium, lithium and tantalum

    Iron, iron and titanium, vanadium

    12- Authier (Glen Eagle Resources)13- Rose Tantalum-Lithium (Critical Elements Corporation)14- Whabouchi (Nemaska Lithium)

    3- Blackrock (Blackrock Metals / Perilya)4- Fire Lake North (Champion Iron Mines)5- Hopes Advance Bay (Oceanic Iron Ore Corp.)6- KéMag (taconite) (New Millennium Iron / Tata Steel Minerals)7- Lac Duncan (Augyva Mining Resources / Century Iron Mines)8- Lac Otelnuk (Lac Otelnuk Mining)9- Montgolfier Iron Hills (Barlow Mine)

    !(

    !(

    Nickel, copper, cobalt, PGE15- Dumont Nickel (Royal Nickel Corporation)!(

    !( Rare earths26- Eldor (Ashram) (Commerce Resources Corp.)27- Strange Lake / B-Zone (Quest Rare Minerals Corporation)28- Zeus (Kipawa) (Matamec Explorations / Toyotsu Rare Earth)

    Diamond2- Renard (Stornoway Diamond Corporation)!(

    Alumina1- Grande-Vallée (Orbite Aluminae)!(

    Graphite10- Lac Guéret (Mason Graphite Corporation)11- Lac Knife (Focus Graphite)

    !(

    Mining projects

    Figure 5.1 - Location of projects in the deposit appraisal phase in Québec in 2013.

  • 90Report on Mineral Activities in Québec - 2013

    !( !( !(

    !(

    !(

    !(

    !(

    !(

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    !

    Gaspé

    Québec

    Salluit

    Fermont

    Kuujjuaq

    Radisson

    Wemindji

    Matagami

    Val-d'Or

    Montréal

    Saguenay Rimouski

    Gatineau

    La Tuque

    Sept-Îles

    Puvirnituq

    Sherbrooke

    Chibougamau

    Kangiqsujuaq

    Schefferville

    Rouyn-Noranda

    Trois-Rivières

    Thetford Mines

    Havre-Saint-Pierre

    Sainte-Anne-des-Monts

    Îled'Anticosti

    Îles de laMadeleine

    Lebel-sur-Quévillon

    PRINCE EDWARD

    ISLAND

    NOVASCOTIA

    NUNAVUT

    NEWFOU

    NDLAND

    ANDLAB

    RADOR

    ONTARIO

    NEWBRUNSWICK

    UNITED STATES

    HudsonStrait

    UngavaBay

    JamesBay

    Labrador Sea

    St.Law

    rence

    River

    Gulf of St. Lawrence

    Hudson Bay

    Atlantic Ocean

    192

    7boudary

    bythe

    Private

    council (non

    de finitive)1

    2

    3

    7

    64

    5

    8

    54°56°58°60°62°64°66°68°70°72°74°76°78°80°82°84°

    60°

    58°

    56°

    54°

    52°

    50°

    48°

    46°

    0 150 km

    1/9 000 000

    49°

    Mining projects

    !(

    Development

    Gold: precious metals

    Lithium

    Iron

    2- Québec Lithium inc. (Québec Lithium)

    3- Nunavik Nickel (Canadian Royalties / Jilin Jien Nickel)

    4- Elder (Abcourt Mines)5- Éléonore (Les Mines Opinaca / Goldcorp)6- Goldex (Agnico Eagle Mines)7- Vezza (Mines Aurbec / Minéraux Maudore)8- Westwood (IAMGOLD Corporation)

    1- DSO (Tata Steel Minerals Canada)

    !(

    !(

    Nickel, copper, cobalt, PGE!(

    Figure 5.2 - Location of the mining projects in the development phase in Québec in 2013.

  • 91 Report on Mineral Activities in Québec - 2013

    TAB

    LE 5

    .1 –

    Min

    ing

    pro

    ject

    s in

    th

    e d

    epo

    sit

    apra

    isal

    ph

    ase

    in Q

    uéb

    ec in

    201

    3(1

    ) (s

    ee F

    igu

    re 5

    .1).

    No.

    To

    wN

    sh

    ip /

    NT

    s /

    A

    dm

    iNis

    Tr

    AT

    ive r

    eg

    ioN

    pr

    oje

    cT

    co

    mpA

    Ny

    su

    mm

    Ar

    y d

    es

    cr

    ipT

    ioN

    of T

    he p

    ro

    jec

    T A

    Nd

    Ty

    pe o

    f m

    iNe

    co

    mm

    od

    iTie

    sp

    ro

    ve

    N

    re

    se

    rv

    es

    (2)

    pr

    ob

    Ab

    le

    re

    se

    rv

    es

    (2)

    me

    As

    ur

    ed

    re

    so

    ur

    ce

    s

    iNd

    icA

    Te

    d

    re

    so

    ur

    ce

    s

    iNfe

    rr

    ed

    re

    so

    ur

    ce

    s

    ex

    Tr

    Ac

    Tio

    N o

    r

    mil

    l N

    om

    iNA

    l c

    ApA

    ciT

    y

    ex

    pe

    cT

    ed

    sTA

    rT-u

    p

    dA

    Te

    ex

    pe

    cT

    ed

    miN

    e l

    ife

    Alu

    min

    a

    1LE

    FRA

    NC

    OIS

    / 22

    H03

    /

    Gas

    pés

    ie –

    Îles

    -de-

    la-

    Mad

    elei

    ne

    Gra

    nd

    e-Va

    llée

    Orb

    ite

    A

    lum

    inae

    Arg

    illit

    eO

    pen

    pit

    min

    eA

    lum

    ina

    n/a

    n/a

    n/a

    67.3

    Mt

    at23

    .4%

    Al 2O

    3

    6,96

    0 t/

    d(m

    ill)

    n/a

    100

    year

    s

    Dia

    mo

    nd

    233

    A16

    /

    No

    rd-d

    u-Q

    uéb

    ecR

    enar

    dS

    torn

    ow

    ay

    Dia

    mo

    nd

    C

    orp

    ora

    tio

    n

    Kim

    ber

    lite-

    ho

    sted

    d

    iam

    on

    d d

    epo

    sit

    Op

    en p

    it a

    nd

    u

    nd

    erg

    rou

    nd

    min

    e

    Dia

    mo

    nd

    n/a

    *23.

    79 M

    t at

    0.75

    5 c/

    tn

    /a35

    .45

    Mt

    at0.

    764

    c/t

    29.6

    7 M

    t at

    0.57

    c/t

    7,00

    0 t/

    d(m

    ill)

    2016

    11 y

    ears

    Iro

    n, ir

    on

    -tit

    aniu

    m-v

    anad

    ium

    3LE

    MO

    INE

    / 32

    G16

    / N

    ord

    -du

    -Qu

    ébec

    Bla

    ckR

    ock

    Bla

    ckR

    ock

    M

    etal

    s / P

    erily

    a

    Tit

    aniu

    m-v

    anad

    ium

    m

    agn

    etit

    eO

    pen

    pit

    min

    e

    Iro

    nIlm

    enit

    e

    Van

    adiu

    m

    64.3

    Mt

    at30

    .3%

    Fe

    8.48

    % T

    iO2

    0.49

    % V

    2O5

    227.

    4 M

    t at

    26.3

    % F

    e7.

    22%

    TiO

    20.

    4% V

    2O5

    n/a

    n/a

    n/a

    12,4

    00,0

    00 t

    /y(m

    ill)

    2016

    25 y

    ears

    4M

    ALA

    PAR

    T /

    23B

    06 /

    te-N

    ord

    Fire

    Lak

    e N

    ort

    hC

    ham

    pio

    n Ir

    on

    M

    ines

    Sp

    ecu

    lar

    hem

    atit

    e in

    met

    amo

    rph

    ose

    d

    Lake

    Su

    per

    ior-

    typ

    e ir

    on

    fo

    rmat

    ion

    sO

    pen

    pit

    min

    e

    Iro

    n23

    .73

    Mt

    at35

    .96%

    Fe

    440.

    86 M

    t at

    32.1

    7% F

    en

    /an

    /an

    /a23

    ,000

    ,000

    t/y

    (mill

    )20

    1620

    yea

    rs

    524

    M08

    /

    No

    rd-d

    u-Q

    uéb

    ecH

    op

    es

    Ad

    van

    ce B

    ayO

    cean

    ic Ir

    on

    Ore

    C

    orp

    ora

    tio

    nTa

    con

    ite

    Op

    en p

    it m

    ine

    Iro

    n*7

    63.2

    8 M

    t at

    32.3

    % F

    e*5

    95.9

    9 M

    t

    at 3

    2.1%

    Fe

    774.

    24 M

    t at

    32.2

    % F

    e61

    3.8

    Mt

    at32

    % F

    e22

    2.19

    Mt

    at32

    .5%

    Fe

    26,0

    00,0

    00 t

    /y(m

    ill)

    2018

    31 y

    ears

    623

    O04

    / N

    ord

    -du

    -Qu

    ébec

    KéM

    ag

    (tac

    on

    ite)

    New

    Mill

    enn

    ium

    Ir

    on C

    orpo

    ratio

    n /

    Tata

    Ste

    el

    Min

    eral

    s C

    anad

    a

    Taco

    nit

    eO

    pen

    pit

    min

    eIr

    on

    n/a

    n/a

    n/a

    300

    Mt

    at31

    .3%

    Fe

    n/a

    76,0

    00,0

    00 t

    /y(m

    ill)

    n/a

    25 y

    ears

    731

    12 /

    33F0

    5 /

    No

    rd-d

    u-Q

    uéb

    ecLa

    c D

    un

    can

    Au

    gyv

    a M

    inin

    g

    Res

    ou

    rces

    /

    Cen

    tury

    Iro

    n

    Min

    es

    Co

    rpo

    rati

    on

    Mag

    net

    ite

    in m

    eta-

    mo

    rph

    ose

    d L

    ake

    Su

    per

    ior-

    typ

    e ir

    on

    fo

    rmat

    ion

    Op

    en p

    it m

    ine

    Iro

    nn

    /an

    /a40

    6 M

    t at

    23.9

    2% F

    e64

    5 M

    t at

    24.7

    3% F

    e56

    3 M

    t at

    24.6

    9% F

    e11

    5,00

    0 t/

    d(m

    ill)

    2017

    20 y

    ears

    823

    N16

    / N

    ord

    -du

    -Qu

    ébec

    Lac

    Ote

    lnu

    kLa

    c O

    teln

    uk

    Min

    ing

    Taco

    nit

    eO

    pen

    pit

    min

    eIr

    on

    n/a

    n/a

    5,51

    0 M

    t at

    29.2

    % F

    e5,

    840

    Mt

    at28

    .7%

    Fe

    12,3

    90 M

    t at

    30.4

    % F

    e19

    5,00

    0,00

    0 t/

    y(m

    ill)

    2019

    30 y

    ears

    932

    E10

    / N

    ord

    -du

    -Qu

    ébec

    Mo

    ntg

    olfi

    er

    Iro

    n H

    ills

    Bar

    low

    Min

    eTa

    con

    ite

    Op

    en p

    it m

    ine

    Iro

    nn

    /an

    /a82

    6.5

    Mt

    at21

    % F

    e43

    7.1

    Mt

    at20

    .1%

    Fe

    1,02

    6.6

    Mt

    at20

    .1%

    Fe

    60,0

    00,0

    00 t

    /y(m

    ill)

    n/a

    n/a

    Gra

    ph

    ite

    1022

    N03

    / C

    ôte

    -No

    rdLa

    c G

    uér

    etM

    aso

    n G

    rap

    hit

    e C

    orp

    ora

    tio

    n

    Gra

    ph

    ite

    dep

    osi

    t in

    p

    arag

    nei

    ssO

    pen

    pit

    min

    eG

    rap

    hit

    en

    /an

    /a4.

    52 M

    t at

    15.5

    %45

    .51

    Mt

    at15

    .6%

    Cg

    r11

    .86

    Mt

    at17

    .1%

    Cg

    r50

    ,000

    t/y

    (mill

    )20

    1622

    yea

    rs

    1123

    B11

    / C

    ôte

    -No

    rdLa

    c K

    nif

    eFo

    cus

    Gra

    ph

    ite

    Gra

    ph

    ite

    dep

    osi

    t in

    p

    arag

    nei

    ssO

    pen

    pit

    min

    eG

    rap

    hit

    en

    /an

    /an

    /a4.

    9 M

    t at

    15.7

    6% C

    gr

    3 M

    t at

    15.5

    8% C

    gr

    44,3

    00 t

    /y(m

    ill)

    2016

    20 y

    ears

  • 92Report on Mineral Activities in Québec - 2013

    TAB

    LE 5

    .1 –

    Min

    ing

    pro

    ject

    s in

    th

    e d

    epo

    sit

    apra

    isal

    ph

    ase

    in Q

    uéb

    ec in

    201

    3(1

    ) (s

    ee F

    igu

    re 5

    .1).

    No

    .TO

    WN

    SH

    IP /

    NT

    S /

    A

    DM

    INIS

    TR

    AT

    IVE

    R

    EG

    ION

    PR

    OJE

    CT

    CO

    MPA

    NY

    SU

    MM

    AR

    Y

    DS

    CR

    IPT

    ION

    OF

    TH

    E

    PR

    OJE

    CT

    AN

    D T

    YP

    E

    OF

    MIN

    E

    CO

    MM

    OD

    I-T

    IES

    PR

    OV

    EN

    RE

    -S

    ER

    VE

    S(2

    )P

    RO

    BA

    BLE

    R

    ES

    ER

    VE

    S(2

    )M

    EA

    SU

    RE

    D

    RE

    SO

    UR

    CE

    SIN

    DIC

    AT

    ED

    R

    ES

    OU

    RC

    ES

    INFE

    RR

    ED

    R

    ES

    OU

    RC

    ES

    EX

    TR

    AC

    TIO

    N

    OR

    MIL

    L N

    OM

    INA

    L C

    APA

    CIT

    Y

    EX

    PE

    CT

    ED

    S

    TAR

    T-U

    P

    DA

    TE

    EX

    PE

    CT

    ED

    M

    INE

    LIF

    E

    Lith

    ium

    , lith

    ium

    -tan

    talu

    m

    12LA

    MO

    TT

    E /

    32D

    08 /

    Ab

    itib

    i-Té

    mis

    cam

    ing

    ue

    Au

    thie

    rG

    len

    Eag

    le

    Res

    ou

    rces

    Sp

    od

    um

    ene-

    bea

    rin

    g

    gra

    nit

    ic p

    egm

    atit

    esO

    pen

    pit

    min

    eLi

    thiu

    mn

    /an

    /a2.

    36 M

    t at

    0.9%

    Li 2O

    5.12

    Mt

    at0.

    92%

    Li 2O

    0.29

    Mt

    at0.

    87%

    Li 2O

    2,20

    0 t/

    d(m

    ill)

    n/a

    12 y

    ears

    1333

    C01

    /

    No

    rd-d

    u-Q

    uéb

    ecR

    ose T

    anta

    lum

    - Li

    thiu

    mC

    riti

    cal E

    lem

    ents

    C

    orp

    ora

    tio

    n

    Sp

    od

    um

    ene-

    bea

    rin

    g

    gra

    nit

    ic p

    egm

    atit

    esO

    pen

    pit

    min

    e

    Lith

    ium

    Tan

    talu

    mn

    /an

    /an

    /a26

    .5 M

    t at

    0.98

    % L

    i 2O16

    3 g

    /t Ta

    2O5

    10.7

    Mt

    at0.

    86%

    Li 2O

    145

    g/t

    Ta2O

    5

    4,60

    0 t/

    d(m

    ill)

    n/a

    17 y

    ears

    1432

    O12

    / N

    ord

    -du

    -Qu

    ébec

    Wh

    abo

    uch

    iN

    emas

    ka L

    ith

    ium

    Sp

    od

    um

    ene-

    bea

    rin

    g

    gra

    nit

    ic p

    egm

    atit

    esO

    pen

    pit

    min

    eLi

    thiu

    mn

    /an

    /a10

    .2 M

    t at

    1.53

    % L

    i 2O9.

    44 M

    t at

    1.45

    5% L

    i 2On

    /a3,

    000

    t/d

    (mill

    )20

    1518

    yea

    rs

    Nic

    kel

    , co

    pp

    er, co

    bal

    t, P

    GE

    15LA

    UN

    AY

    / 32

    D09

    / A

    bit

    ibi-

    Tém

    isca

    min

    gu

    eD

    um

    on

    t N

    icke

    lR

    oya

    l Nic

    kel

    Co

    rpo

    rati

    on

    Mag

    mat

    ic N

    i-Cu-

    PGE

    Op

    en p

    it m

    ine

    Nic

    kel

    Pla

    tin

    um

    Palla

    diu

    mC

    ob

    alt

    *179

    .6 M

    t at

    0.32

    % N

    i0.

    013

    g/t

    Pt

    0.02

    9 g

    /t P

    d11

    4 g

    /t C

    o

    *999

    Mt

    at0.

    26%

    Ni

    0.00

    8 g

    /t P

    t0.

    017

    g/t

    Pd

    106

    g/t

    Co

    372.

    1 M

    t at

    0.28

    % N

    i0.

    011

    g/t

    Pt

    0.02

    4 g

    /t P

    d11

    2 g

    /t C

    o

    1,29

    3.5

    Mt a

    t0.

    26 %

    Ni

    0.00

    8 g

    /t P

    t0.

    017

    g/t

    Pd

    106

    g/t

    Co

    499.

    8 M

    t at

    0.26

    % N

    i0.

    006

    g/t

    Pt

    0.01

    4 g

    /t P

    d10

    1 g

    /t C

    o

    52,0

    00 t

    /d(m

    ill)

    2016

    33 y

    ears

    Nio

    biu

    m a

    nd

    tan

    talu

    m

    16C

    RE

    VIE

    R /

    32H

    07 /

    S

    agu

    enay

    –Lac

    -Sai

    nt-

    Jean

    Cre

    vier

    Les

    Min

    érau

    x C

    revi

    er

    Nep

    hel

    ine

    syen

    ite

    dyk

    es, a

    lkal

    ine

    ign

    e-o

    us

    com

    ple

    xO

    pen

    pit

    min

    e

    Nio

    biu

    mTa

    nta

    lum

    n/a

    n/a

    12.4

    7 M

    t at

    0.2%

    Nb

    2O5

    0.02

    3% Ta

    2O5

    12.9

    Mt

    at0.

    19%

    Nb

    2O5

    0.02

    3% Ta

    2O5

    15.4

    2 M

    t at

    0.17

    % N

    b2O

    50.

    025%

    Ta2O

    5

    6,00

    0 t/

    d(m

    ill)

    2017

    14 y

    ears

    Go

    ld:

    pre

    cio

    us

    met

    als

    17G

    UIL

    LET

    / 31

    M07

    /

    Ab

    itib

    i-Té

    mis

    cam

    ing

    ue

    Bel

    lete

    rre

    Co

    nway

    R

    esso

    urc

    esO

    rog

    enic

    lod

    e g

    old

    Un

    der

    gro

    un

    d m

    ine

    Go

    ldn

    /an

    /an

    /an

    /an

    /an

    /an

    /an

    /a

    18D

    UPA

    RQ

    UE

    T /

    32D

    11 /

    Ab

    itib

    i-Té

    mis

    cam

    ing

    ue

    Du

    par

    qu

    etC

    lifto

    n S

    tar

    Res

    ou

    rces

    Sh

    ear-

    rela

    ted

    d

    isse

    min

    ated

    go

    ld

    sulp

    hid

    es a

    nd

    q

    uar

    tz-c

    arb

    on

    ate

    ve

    inle

    tsO

    pen

    pit

    min

    e

    Go

    ldn

    /an

    /a0.

    18 M

    t at

    1.52

    g/t

    Au

    60.7

    Mt

    at1.

    59 g

    /t A

    u29

    .68

    Mt

    at1.

    51 g

    /t A

    u8,

    000

    t/d

    (mill

    )n

    /a16

    yea

    rs

    19A

    IGU

    EB

    ELL

    E /

    32D

    07 /

    Ab

    itib

    i-Té

    mis

    cam

    ing

    ue

    Fayo

    lleE

    xplo

    rati

    on

    Ty

    ph

    on

    /

    Hec

    la Q

    uéb

    ec

    Sh

    ear-

    rela

    ted

    d

    isse

    min

    ated

    go

    ld

    sulp

    hid

    es a

    nd

    q

    uar

    tz-c

    arb

    on

    ate

    vein

    lets

    Un

    der

    gro

    un

    d a

    nd

    o

    pen

    pit

    min

    e

    Go

    ldn

    /an

    /an

    /a0.

    55 M

    t at

    5.75

    g/t

    Au

    n/a

    750

    to 1

    ,000

    t/d

    (ext

    ract

    ion

    )O

    re p

    roce

    ssed

    at

    Wes

    two

    od

    n/a

    3 ye

    ars

    20R

    OU

    YN

    / 32

    E02

    /

    Ab

    itib

    i-Té

    mis

    cam

    ing

    ue

    Gra

    nad

    aG

    old

    Bu

    llio

    n

    Dev

    elo

    pm

    ent

    Co

    rpo

    rati

    on

    Sh

    ear-

    rela

    ted

    d

    isse

    min

    ated

    go

    ld

    sulp

    hid

    es a

    nd

    qu

    artz

    ve

    inle

    tsU

    nd

    erg

    rou

    nd

    an

    d

    op

    en p

    it m

    ine

    Go

    ldn

    /an

    /a24

    .99

    Mt

    at1.

    01 g

    /t A

    u9.

    34 M

    t at

    1.18

    g/t

    Au

    0.45

    Mt

    at0.

    77 g

    /t A

    u7,

    500

    t/d

    (mill

    )n

    /a11

    yea

    rs

  • 93 Report on Mineral Activities in Québec - 2013

    TAB

    LE 5

    .1 –

    Min

    ing

    pro

    ject

    s in

    th

    e d

    epo

    sit

    apra

    isal

    ph

    ase

    in Q

    uéb

    ec in

    201

    3(1

    ) (s

    ee F

    igu

    re 5

    .1).

    No

    .TO

    WN

    SH

    IP /

    NT

    S /

    A

    DM

    INIS

    TR

    AT

    IVE

    R

    EG

    ION

    PR

    OJE

    CT

    CO

    MPA

    NY

    SU

    MM

    AR

    Y

    DS

    CR

    IPT

    ION

    OF

    TH

    E

    PR

    OJE

    CT

    AN

    D T

    YP

    E

    OF

    MIN

    E

    CO

    MM

    OD

    I-T

    IES

    PR

    OV

    EN

    RE

    -S

    ER

    VE

    S(2

    )P

    RO

    BA

    BLE

    R

    ES

    ER

    VE

    S(2

    )M

    EA

    SU

    RE

    D

    RE

    SO

    UR

    CE

    SIN

    DIC

    AT

    ED

    R

    ES

    OU

    RC

    ES

    INFE

    RR

    ED

    R

    ES

    OU

    RC

    ES

    EX

    TR

    AC

    TIO

    N

    OR

    MIL

    L N

    OM

    INA

    L C

    APA

    CIT

    Y

    EX

    PE

    CT

    ED

    S

    TAR

    T-U

    P

    DA

    TE

    EX

    PE

    CT

    ED

    M

    INE

    LIF

    E

    21JO

    AN

    NE

    S /

    32D

    02 /

    Ab

    itib

    i-Té

    mis

    cam

    ing

    ue

    Joan

    na

    Hec

    la Q

    uéb

    ec

    Sh

    ear-

    rela

    ted

    d

    isse

    min

    ated

    go

    ld

    sulp

    hid

    es a

    nd

    qu

    artz

    ve

    inle

    tsO

    pen

    pit

    min

    e

    Go

    ld28

    .25

    Mt

    at1.

    305

    g/t

    Au

    12.8

    5 M

    t at

    1.15

    1 g

    /t A

    u1.

    89 M

    t at

    1.14

    g/t

    Au

    18.3

    8 M

    t at

    1.36

    g/t

    Au

    16.8

    5 M

    t at

    1.53

    g/t

    Au

    8,50

    0 t/

    d(m

    ill)

    n/a

    13 y

    ears

    22R

    OU

    YN

    / 32

    D03

    /

    Ab

    itib

    i-Té

    mis

    cam

    ing

    ue

    Lac

    Pelle

    tier

    QM

    X G

    old

    C

    orp

    ora

    tio

    n /

    Th

    un

    der

    min

    e R

    eso

    urc

    es

    Lod

    e g

    old

    : g

    reen

    sto

    ne-

    ho

    sted

    q

    uar

    tz-c

    arb

    on

    ate

    vein

    sU

    nd

    erg

    rou

    nd

    min

    e

    Go

    ld*0

    .06

    Mt

    at6.

    2 g

    /t A

    u*0

    .11

    Mt

    at6.

    6 g

    /t A

    u0.

    06 M

    t at

    8.6

    g/t

    Au

    0.22

    Mt

    at8.

    61 g

    /t A

    u0.

    42 M

    t at

    8.37

    g/t

    Au

    620

    t/d

    (ext

    ract

    ion

    )O

    re p

    roce

    ssed

    at

    Cam

    flo

    n/a

    1 ye

    ar

    23B

    EA

    UC

    HA

    STE

    L / 3

    2D03

    / A

    bit

    ibi-

    Tém

    isca

    min

    gu

    eW

    asam

    acR

    ich

    mo

    nt

    Min

    es

    Lod

    e g

    old

    : g

    reen

    sto

    ne-

    ho

    sted

    q

    uar

    tz-c

    arb

    on

    ate

    vein

    sU

    nd

    erg

    rou

    nd

    min

    e

    Go

    ldn

    /an

    /a3.

    12 M

    t at

    2.75

    g/t

    Au

    12.1

    3 M

    t at

    2.89

    g/t

    Au

    18.7

    6 M

    t at

    2.66

    g/t

    Au

    n/a

    n/a

    14 y

    ears

    Ph

    osp

    hat

    e

    24A

    RN

    AU

    D /

    22J0

    2 /

    te-N

    ord

    Arn

    aud

    Min

    e A

    rnau

    dLa

    yere

    d m

    afic

    com

    ple

    xO

    pen

    pit

    min

    eP

    ho

    sph

    ate

    *260

    Mt

    at4.

    34%

    P2O

    5

    *64.

    4 M

    t at

    4.74

    % P

    2O5

    370.

    87 M

    t at

    4.16

    % P

    2O5

    110.

    87 M

    t at

    4.24

    % P

    2O5

    42.7

    6 M

    t at

    3.52

    % P

    2O5

    30,0

    00 t

    /d(m

    ill)

    2017

    28 y

    ears

    2522

    E15

    / S

    agu

    enay

    Lac-

    Sai

    nt-

    Jean

    Lac

    à Pa

    ul

    Ari

    ann

    e

    Ph

    osp

    hat

    e

    An

    ort

    ho

    site

    -rel

    ated

    m

    agm

    atic

    dep

    osi

    tO

    pen

    pit

    min

    eP

    ho

    sph

    ate

    *313

    .71

    Mt

    at6.

    92%

    P2O

    5

    *158

    .38

    Mt

    at6.

    8% P

    2O5

    336.

    76 M

    t at

    7.22

    % P

    2O5

    253.

    48 M

    t at

    7.02

    % P

    2O5

    9.81

    Mt

    at5.

    89%

    P2O

    5

    50,0

    00 t

    /d(m

    ill)

    2016

    26 y

    ears

    Rar

    e ea

    rth

    s

    2624

    C16

    /

    No

    rd-d

    u-Q

    uéb

    ecE

    ldo

    r

    (Ash

    ram

    )

    Co

    mm

    erce

    R

    eso

    urc

    es

    Co

    rpo

    rati

    on

    RE

    E-e

    nri

    ched

    ca

    rbo

    nat

    ite

    Op

    en p

    it m

    ine

    Rar

    e ea

    rth

    sLi

    gh

    t R

    EH

    eavy

    RE

    Ytt

    riu

    m

    n/a

    n/a

    1.59

    Mt

    at1.

    77%

    TR

    EO

    1.65

    % L

    RE

    O0.

    07%

    HR

    EO

    0.05

    8% Y

    2O3

    27.6

    7 M

    t at

    1.9%

    TR

    EO

    1.82

    % L

    RE

    O0.

    05%

    HR

    EO

    0.03

    8% Y

    2O3

    219.

    8 M

    t at

    1.88

    % T

    RE

    O1.

    81%

    LR

    EO

    0.04

    % H

    RE

    O0.

    03%

    Y2O

    3

    4,00

    0 t/

    d(m

    ill)

    n/d

    25 y

    ears

    2724

    A08

    /

    No

    rd-d

    u-Q

    uéb

    ecS

    tran

    ge

    Lake

    / B

    -Zo

    ne

    Qu

    est

    Rar

    e M

    iner

    als

    C

    orp

    ora

    tio

    n

    RE

    E- a

    nd y

    ttri

    um-

    enri

    ched

    peg

    mat

    ite

    and

    ap

    lite

    in

    per

    alka

    line

    gra

    nit

    eO

    pen

    pit

    min

    e

    Rar

    e ea

    rth

    sLi

    gh

    t R

    EH

    eavy

    RE

    Zir

    con

    ium

    Ytt

    riu

    m

    n/a

    *43.

    2 M

    t at

    1.16

    % T

    RE

    O0.

    53%

    LR

    EO

    0.63

    % H

    RE

    O2.

    31%

    ZrO

    20.

    35%

    Y2O

    3

    n/a

    278.

    13 M

    t at

    0.93

    % T

    RE

    O0.

    57%

    LR

    EO

    0.12

    % H

    RE

    O1.

    92%

    ZrO

    20.

    24%

    Y2O

    3

    214.

    35 M

    t at

    0.

    85%

    TR

    EO

    0.55

    % L

    RE

    O0.

    11%

    HR

    EO

    1.71

    % Z

    rO2

    0.19

    % Y

    2O3

    1.44

    Mt/

    y(e

    xtra

    ctio

    n)

    Mill

    exp

    ecte

    d

    at B

    écan

    cou

    r

    2017

    30 y

    ears

    28V

    ILLE

    DIE

    U /

    31L1

    5 /

    Ab

    itib

    i-Té

    mis

    cam

    ing

    ue

    Zeu

    s (K

    ipaw

    a)

    Mat

    amec

    E

    xplo

    rati

    on

    s /

    Toyo

    tsu

    Rar

    e E

    arth

    Can

    ada

    RE

    E-e

    nri

    ched

    syé

    nit

    eO

    pen

    pit

    min

    e

    Rar

    e ea

    rth

    sLi

    gh

    t R

    EH

    eavy

    RE

    Ytt

    riu

    m

    *10.

    22 M

    t at

    0.44

    % T

    RE

    O0.

    28%

    LR

    EO

    0.06

    % H

    RE

    O0.

    10%

    Y2O

    3

    *9.5

    5 M

    t at

    0.38

    % T

    RE

    O0.

    24%

    LR

    EO

    0.05

    % H

    RE

    O0.

    09%

    Y2O

    3

    10.4

    8 M

    t at

    0.46

    % T

    RE

    O0.

    29%

    LR

    EO

    0.06

    % H

    RE

    O0.

    11%

    Y2O

    3

    13.3

    8 M

    t at

    0.36

    % T

    RE

    O0.

    23%

    LR

    EO

    0.05

    % H

    RE

    O0.

    08%

    Y2O

    3

    3.27

    Mt

    at0.

    31%

    TR

    EO

    0.22

    % L

    RE

    O0.

    04%

    HR

    EO

    0.06

    % Y

    2O3

    3,65

    0 t/

    d(m

    ill)

    2016

    13 y

    ears

    No

    tes:

    1- T

    he

    list

    of

    abb

    revi

    atio

    ns

    is p

    rovi

    ded

    in A

    pp

    end

    ix 2

    . D

    ata

    com

    pile

    d in

    th

    is t

    able

    are

    pre

    limin

    ary

    and

    are

    bas

    ed o

    n in

    form

    atio

    n p

    ub

    licly

    rel

    ease

    d b

    y m

    inin

    g c

    om

    pan

    ies.

    T

    he

    dis

    tin

    ctio

    n b

    etw

    een

    pro

    ven

    an

    d p

    rob

    able

    res

    erve

    s, a

    nd

    bet

    wee

    n m

    easu

    red

    , in

    dic

    ated

    , an

    d in

    ferr

    ed r

    eso

    urc

    es is

    defi

    ned

    in a

    cco

    rdan

    ce w

    ith

    Nat

    ion

    al In

    stru

    men

    t 43

    -101

    .2-

    *T

    he

    rese

    rves

    are

    incl

    ud

    ed in

    th

    e re

    sou

    rces

    .LR

    EO

    : Lan

    than

    um

    , cér

    ium

    , pra

    séo

    dym

    yum

    , néo

    dym

    ium

    , sam

    ariu

    mH

    RE

    O: E

    uro

    piu

    m, g

    ado

    liniu

    m, t

    erb

    ium

    . Dys

    pro

    siu

    m, h

    olm

    ium

    , erb

    ium

    , th

    uliu

    m, y

    tter

    biu

    m, l

    uté

    ciu

    mT

    RE

    O: L

    RE

    O +

    HR

    EO

    + Y

    2O3

  • 94Report on Mineral Activities in Québec - 2013

    TAB

    LE 5

    .2 –

    Min

    ing

    pro

    ject

    s in

    th

    e d

    evel

    op

    men

    t p

    has

    e in

    Qu

    ébec

    in

    201

    3(1

    ) (se

    e Fi

    gu

    re 5

    .2).

    No

    .TO

    WN

    SH

    IP /

    NT

    S /

    A

    DM

    INIS

    TR

    AT

    IVE

    R

    EG

    ION

    PR

    OJE

    CT

    CO

    MPA

    NY

    SU

    MM

    AR

    Y

    DE

    SC

    RIP

    TIO

    N O

    F T

    HE

    PR

    OJE

    CT

    AN

    DT

    YP

    E O

    F M

    INE

    CO

    MM

    OD

    I-T

    IES

    PR

    OV

    EN

    R

    ES

    ER

    VES

    (2)

    PR

    OB

    AB

    LE

    RE

    SE

    RV

    ES

    (2)

    ME

    AS

    UR

    ED

    R

    ES

    OU

    RC

    ES

    IND

    ICA

    TE

    D

    RES

    OU

    RC

    ESIN

    FER

    RE

    D

    RE

    SO

    UR

    CE

    S

    EX

    TR

    AC

    TIO

    N

    OR

    MIL

    L N

    OM

    INA

    L C

    APA

    CIT

    Y

    EX

    PE

    CT

    ED

    S

    TAR

    T-U

    P

    DA

    TE

    EX

    PE

    CT

    ED

    M

    INE

    LIF

    E

    Iro

    n

    123

    J14

    / Cô

    te-N

    ord

    DS

    OTa

    ta S

    teel

    M

    iner

    als

    Can

    ada

    En

    rich

    ed ir

    on

    fo

    rmat

    ion

    sO

    pen

    pit

    min

    eIr

    on

    21.1

    Mt

    at59

    .87%

    Fe

    43.0

    1 M

    t at

    58.3

    8% F

    e21

    Mt

    at

    59.2

    % F

    en

    /a10

    .3 M

    t at

    58.3

    % F

    e4,

    000,

    000

    t/y

    (m

    ill)

    2013

    15 y

    ears

    Lith

    ium

    2LA

    CO

    RN

    E /

    32C

    05 /

    Ab

    itib

    i-Té

    mis

    cam

    ing

    ue

    Qu

    ébec

    Li

    thiu

    m

    inc.

    Qu

    ébec

    Lit

    hiu

    m

    Sp

    od

    um

    ene-

    bea

    rin

    g g

    ran

    itic

    p

    egm

    atit

    esO

    pen

    pit

    min

    e

    Lith

    ium

    *6.6

    1 M

    t at

    0.

    92%

    Li 2O

    *10.

    46 M

    t at

    0.

    95%

    Li 2O

    6.91

    Mt

    at

    1.18

    % L

    i 2O26

    .33

    Mt

    at1.

    19%

    Li 2O

    13.7

    6 M

    t at

    1.21

    % L

    i 2O

    3,80

    0 t/

    d(m

    ill)

    2013

    15 y

    ears

    Nic

    kel

    , co

    pp

    er,

    cob

    alt,

    PG

    E

    380

    30 /

    35H

    11 /

    No

    rd-d

    u-

    Qu

    ébec

    Nu

    nav

    ik

    Nic

    kel

    Can

    adia

    n

    Ro

    yalt

    ies

    / Ji

    lin J

    ien

    Nic

    kel

    Mag

    amat

    ic N

    i-C

    u-

    PG

    EO

    pen

    pit

    an

    d

    un

    der

    gro

    un

    d

    min

    e

    Nic

    kel

    Co

    pp

    erPa

    llad

    ium

    Pla

    tin

    um

    Co

    bal

    t

    n/a

    n/a

    0.56

    Mt

    at0.

    93%

    Ni

    1.1%

    Cu

    21.3

    4 M

    t at

    0.93

    % N

    i1.

    15%

    Cu

    5.24

    Mt

    at0.

    72%

    Ni

    0.93

    % C

    u

    4,50

    0 t/

    d(m

    ill)

    2013

    15 y

    ears

    Go

    ld: p

    reci

    ou

    s m

    etal

    s

    4B

    EA

    UC

    HA

    STE

    L / 3

    2D06

    / A

    bit

    ibi-

    Tém

    isca

    min

    gu

    eE

    lder

    Ab

    cou

    rtM

    ines

    Oro

    gen

    ic lo

    de

    go

    ldU

    nd

    erg

    rou

    nd

    m

    ine

    Go

    ldn

    /an

    /a0.

    51 M

    t at

    6.68

    g/t

    Au

    0.67

    Mt

    at

    6.5

    g/t

    Au

    0.41

    Mt

    at

    5.76

    g/t

    Au

    630

    t/d

    (ext

    ract

    ion

    )O

    re p

    ro-

    cess

    ed a

    tG

    éan

    t D

    or-

    man

    t

    2014

    11 y

    ears

    533

    C09

    / N

    ord

    -du

    -Qu

    ébec

    Élé

    onor

    eLe

    s M

    ines

    O

    pin

    aca

    / G

    old

    corp

    Dis

    sem

    inat

    ed-

    rep

    lace

    men

    t g

    old

    d

    epo

    sit

    in a

    hig

    hly

    m

    etam

    orp

    ho

    sed

    se

    dim

    enta

    ry

    seq

    uen

    ceU

    nd

    erg

    rou

    nd

    m

    ine

    Go

    ldn

    /a12

    .48

    Mt

    at7.

    56 g

    /t A

    u0.

    14 M

    t at

    10

    .01

    g/t

    Au

    1.23

    Mt

    at

    11.0

    5 g

    /t A

    u12

    .25

    Mt

    at10

    .6 g

    /t A

    u7,

    000

    t/d

    (mill

    )20

    1410

    yea

    rs

    6D

    UB

    UIS

    SO

    N /

    32C

    04 /

    Ab

    itib

    i-Té

    mis

    cam

    ing

    ue

    Go

    ldex

    Ag

    nic

    o E

    agle

    M

    ines

    Qu

    artz

    -to

    urm

    alin

    e ve

    ins

    wit

    h P

    y-C

    p

    cro

    ss-c

    utt

    ing

    g

    ran

    od

    iori

    te s

    ills

    and

    dyk

    esU

    nd

    erg

    rou

    nd

    m

    ine

    Go

    ld0.

    06 M

    t at

    1.

    7 g

    /t A

    u6.

    94 M

    t at

    1.55

    g/t

    Au

    12.3

    6 M

    t at

    1.83

    g/t

    Au

    14.8

    1 M

    t at

    1.

    83 g

    /t A

    u34

    .65

    Mt

    at

    1.52

    g/t

    Au

    8,20

    0 t/

    d(m

    ill)

    2013

    4 ye

    ars

  • 95 Report on Mineral Activities in Québec - 2013

    TAB

    LE 5

    .2 –

    Min

    ing

    pro

    ject

    s in

    th

    e d

    evel

    op

    men

    t p

    has

    e in

    Qu

    ébec

    in

    201

    3(1

    ) (se

    e Fi

    gu

    re 5

    .2).

    No

    .TO

    WN

    SH

    IP /

    NT

    S /

    A

    DM

    INIS

    TR

    AT

    IVE

    R

    EG

    ION

    PR

    OJE

    CT

    CO

    MPA

    NY

    SU

    MM

    AR

    Y

    DE

    SC

    RIP

    TIO

    N O

    F T

    HE

    PR

    OJE

    CT

    AN

    DT

    YP

    E O

    F M

    INE

    CO

    MM

    OD

    I-T

    IES

    PR

    OV

    EN

    R

    ES

    ER

    VES

    (2)

    PR

    OB

    AB

    LE

    RE

    SE

    RV

    ES

    (2)

    ME

    AS

    UR

    ED

    R

    ES

    OU

    RC

    ES

    IND

    ICA

    TE

    D

    RES

    OU

    RC

    ESIN

    FER

    RE

    D

    RE

    SO

    UR

    CE

    S

    EX

    TR

    AC

    TIO

    N

    OR

    MIL

    L N

    OM

    INA

    L C

    APA

    CIT

    Y

    EX

    PE

    CT

    ED

    S

    TAR

    T-U

    P

    DA

    TE

    EX

    PE

    CT

    ED

    M

    INE

    LIF

    E

    7Ve

    zza

    / 32F

    12 /

    No

    rd-d

    u-Q

    uéb

    ecVe

    zza

    Min

    es A

    urb

    ec /

    M

    inér

    aux

    M

    aud

    ore

    Oro

    gen

    ic lo

    de

    go

    ldU

    nd

    erg

    rou

    nd

    m

    ine

    Go

    ldn

    /an

    /a0.

    19 M

    t at

    6.

    1 g

    /t A

    u1.

    52 M

    t at

    5.8

    g/t

    Au

    0.63

    Mt

    at

    5.0

    g/t

    Au

    750

    t/d

    (ext

    ract

    ion

    )O

    re p

    ro-

    cess

    ed a

    tG

    éan

    t D

    or-

    man

    t

    n/a

    7-9

    year

    s

    8B

    OU

    SQ

    UE

    T /

    32D

    07 /

    Ab

    itib

    i-Té

    mis

    cam

    ing

    ue

    Wes

    two

    od

    IAM

    GO

    LD

    Co

    rpo

    rati

    on

    Go

    ld-r

    ich

    vo

    lcan

    o-

    gen

    ic m

    assi

    ve s

    ul-

    ph

    ides

    , sto

    ckw

    erk

    and

    dis

    sem

    inat

    ed

    sulp

    hid

    esU

    nd

    erg

    rou

    nd

    m

    ine

    Go

    ld*0

    .27

    Mt

    at

    7.6

    g/t

    Au

    *0.6

    7 M

    t at

    13

    .1 g

    /t A

    u0.

    28 M

    t at

    7.5

    g/t

    Au

    1.12

    Mt

    at

    13 g

    /t A

    u9.

    59 M

    t at

    10

    .6 g

    /t A

    u2,

    600

    t/d

    (mill

    )20

    1319

    yea

    rs

    No

    tes:

    1- T

    he

    list

    of

    abb

    revi

    atio

    ns

    is p

    rovi

    ded

    in A

    pp

    end

    ix 2

    . D

    ata

    com

    pile

    d in

    th

    is t

    able

    are

    pre

    limin

    ary

    and

    are

    bas

    ed o

    n in

    form

    atio

    n p

    ub

    licly

    rel

    ease

    d b

    y m

    inin

    g c

    om

    pan

    ies.

    T

    he

    dis

    tin

    ctio

    n b

    etw

    een

    pro

    ven

    an

    d p

    rob

    able

    res

    erve

    s, a

    nd

    bet

    wee

    n m

    easu

    red

    , in

    dic

    ated

    , an

    d in

    ferr

    ed r

    eso

    urc

    es is

    defi

    ned

    in a

    cco

    rdan

    ce w

    ith

    Nat

    ion

    al In

    stru

    men

    t 43

    -101

    .2*

    - T

    he

    rese

    rves

    are

    incl

    ud

    ed in

    th

    e re

    sou

    rces

    .