100-year Event Analyses of Storm Sewers and Overland Flow Considerations as Applied in Chapter 9 of the City of Houston Design Manual Prepared for the HCEC Drainage Committee January 6, 2005. INTRODUCTION. Chapter 9 – Storm Water Design Requirements Comments Received Overland Flow Analysis. - PowerPoint PPT PresentationTRANSCRIPT
100-year Event Analyses of Storm Sewersand Overland Flow Considerations as
Applied in Chapter 9 of theCity of Houston Design Manual
Prepared for the HCEC Drainage Committee
January 6, 2005
2
1. Chapter 9 – Storm Water Design Requirements
2. Comments Received
3. Overland Flow Analysis
INTRODUCTIONINTRODUCTION
3
Chapter 9 – Stormwater Design RequirementsRevised Criteria
1. Detention• All calculations based on increased impervious area (IIA)• <1 ac; 0.2 ac-ft/ac IIA; exempt single family residential <15K sf• 1ac to 50 ac; 0.5 ac-ft/ac IIA; release at 0.5 cfs/ac, 2 cfs/ac, 2 cfs/ac (100 yr)• >50 ac; comply w/HCFCD
2. Overland (Sheet) Flow for Extreme Event (100-yr)• HGL at or below natural ground at ROW• Max ponding of 6-inch above curb at high point (current criteria)• Max ponding of 18-inch above curb at low point (current criteria)• Claification/emphasis – no change to existing sheet flow patterns; no
discharge to abutting private property
3. HouStorm• Required analysis method for CIP projects and City funded within City limits • Privately funded in City limits and EJT; HouStorm preferred but not required
4
Comment: There is no problem that needs addressing.
Response: The City has determined, as a policy, that more stringent storm water management practices are needed to provide an increased level-of-service to our citizenry.
5
Comment: This criterion and procedure provides no benefit.
Response: Benefit is deemed by the City to include reductions in water surface elevations and the proper management of overland flow during an extreme event, which this criterion addresses. Structural flooding, or the lack thereof, is not the only issue at hand.
6
Comment: All you are doing is sizing the storm sewers for the 100-year flow.
Response: This is an incorrect statement. The storm sewer remains sized for a 2-year event. The City criteria simply requires that the storm sewer system be analyzed for behavior under the 100-year event in conjunction with due consideration of overland flow.
7
Comment: Increases in head on a storm sewer does nothing to increase the flow. Once the storm sewer reaches its 2-year capacity it will not receive any more flow.
Response: If all conduit conditions remain unchanged, an increase in driving head will result in an increased flow through the conduit. Conversely, an increase in conduit size or reduction in friction loss will result in a decrease in driving head (i.e. upstream water surface elevations).
8
Comment: Overland flow is completely ignored and by imposing the concepts applied within TP-101 we are eliminating the consideration of overland flow.
Response: The consideration of overland flow is particularly referenced as a critical element in the design process. TP-101 simply provides a simplified means of adjusting anticipated maximum water surface elevations via adjustments to the storm sewer HGL. Further requirements (i.e. a plotted hydraulic profile) exemplify the study and consideration of overland flow pathways for project areas.
9
Comment: No provision was made in TP-101 to address detailed overland flow determination procedures.
Response: The intent of TP-101 is to provide a simplified manner of controlling anticipated maximum water surface elevations. The paper specifically addresses that more elaborate means of analyzing overland flow may be invoked if deemed warranted; however, it is beyond the subject matter of this paper to detail such an analysis process.
10
Comment: Areas that are inundated by floodwaters or have high existing 25-year tailwater elevations can never be developed or redeveloped.
Response: In project situations where the 100-year water surface elevation, or less (i.e. 50 or 10-year), already inundates the project area(s), for whatever reason, it is not the intent of these guidelines or this criterion to require the design engineer to resolve problem areas beyond their reasonable control. Chapter 9 stipulates this criterion and allows the submittal of documentation demonstrating this project situation. This applies to cases where lower starting water surface elevations for the 100-year analysis are justified.
11
Comment: This criterion and procedure adds too much cost to the project.
Response: Case studies have indicated that the construction cost increases for private projects have ranged from 0 to 11% in storm sewer cost only. The resulting total project cost would be less.
12
Comment: This criterion and procedure adds too much additional design time.
Response: The additional design time has been determined to be very minor based upon all test cases.
13
ABC Project ProfileA
1
A2
A3
A7
A8
A9
A10
A11
A12
OU
T
PO
ND
A4
78
82
86
90
94
98
-50 150 350 550 750 950 1150 1350
Primary Flowpath (ft)
Hei
gh
t (f
t)
Natural Ground
Top of Curb
Gutterline
2-yr. HGL
100-yr. HGL
100-yr. WSEL
25-yr. WSEL
14
Project ABC Storm Sewer Cost
Project ABC
Original Design
Pipe Diameter (ft) Length of Pipe Cost per foot Total Cost
2 925 $46.00 $42,550.00
2.5 493 $56.00 $27,608.00
$70,158.00
Altered Design
Pipe Diameter (ft) Length of Pipe Cost per foot Total Cost
2 925 $46.00 $42,550.00
2.5 493 $56.00 $27,608.00
$70,158.00
Change in Storm Sewer Cost 0.00%
15
LMN Project ProfileA
1
A3
A4
A5
A6
A7
A8
A9
A1
0A
11
A1
2
A1
3
A1
5
I15
1O
UT
PO
ND
A2
A3
6
A3
4
A3
5A
14
30
35
40
45
50
-50 450 950 1450 1950 2450
Primary Flowpath (ft)
Hei
gh
t (f
t)
Natural Ground
Top of Curb
Gutterline
2-yr. HGL
100-yr. HGL
100-yr. Altered
100-yr. WSEL
25-yr. WSEL
16
Project LMN Storm Sewer CostProject LMN
Original Design
Pipe Diameter (ft) Length of Pipe Cost per foot Total Cost
2 3898 $46.00 $179,308.00
4 2050 $110.00 $225,500.00
5 254 $144.00 $36,576.00
3 220 $73.00 $16,060.00
5.5 176 $176.00 $30,976.00
$488,420.00
Altered Design
Pipe Diameter (ft) Length of Pipe Cost per foot Total Cost
2 2916 $46.00 $134,136.00
2.5 982 $56.00 $54,992.00
4 582 $110.00 $64,020.00
4.5 1468 $115.00 $168,820.00
5 195 $144.00 $28,080.00
5.5 235 $176.00 $41,360.00
3 220 $73.00 $16,060.00
$507,468.00
Change in Storm Sewer Cost 3.90%
17
XYZ Project Profile A
1
A2
A3
A4
A5
A11
A18
OU
T
PO
ND
A12
A17
60
65
70
75
80
85
90
-50
50
15
0
25
0
35
0
45
0
55
0
65
0
75
0
85
0
95
0
Primary Flowpath (ft)
Hei
gh
t (f
t)
Natural Ground
Top of Curb
Gutterline
2-yr. HGL
100-yr. HGL
100-yr. WSEL 25-yr.
WSEL
18
Project XYZ Storm Sewer Cost
Project XYZ
Original Design
Pipe Diameter (ft) Length of Pipe Cost per foot Total Cost
2 1660 $46.00 $76,360.00
2.5 31 $56.00 $1,736.00
3 217 $73.00 $15,841.00
$93,937.00
Altered Design
Pipe Diameter (ft) Length of Pipe Cost per foot Total Cost
2 1660 $46.00 $76,360.00
2.5 31 $56.00 $1,736.00
3 217 $73.00 $15,841.00
$93,937.00
Change in Storm Sewer Cost 0.00%
19
QRS Project ProfileA
1
A3
A5
A10
A11
A12
A13
A14
OU
TP
ON
D
A2
A6
45
50
55
60
65
70
-50 150 350 550 750 950 1150
Primary Flowpath (ft)
He
igh
t (f
t)
Natural Ground
Top of Curb
Gutterline
2-yr. HGL
100-yr. HGL
100-yr. Altered
100-yr WSEL 25-yr
WSEL
20
Project QRS Storm Sewer CostProject QRS
Original Design
Pipe Diameter (ft) Length of Pipe Cost per foot Total Cost
2 1171 $46.00 $53,866.00
2.5 254 $56.00 $14,224.00
3 50 $73.00 $3,650.00
Inlets - total
15 $1,500.00 $22,500.00
Manholes total
14 $1,700.00 $23,800.00
$118,040.00
Altered Design
Pipe Diameter (ft) Length of Pipe Cost per foot Total Cost
2 611 $46.00 $28,106.00
2.5 560 $56.00 $31,360.00
3 304 $73.00 $22,192.00
Inlets - total
15 $1,500.00 $22,500.00
Manholes total
14 $1,700.00 $23,800.00
$127,958.00
Change in Storm Sewer Cost 8.40%
21
PQR Project ProfileA
1
A3
A6
A8
A9
OU
T
PO
ND
A2
A7
45
50
55
60
65
70
-50 50 150 250 350 450 550 650 750
Primary Flowpath (ft)
He
igh
t (f
t)
Natural Ground
Top of Curb
Gutterline
2-yr. HGL
100-yr. HGL
100-yr WSEL 25-yr
WSEL
22
Project PQR Storm Sewer CostProject PQR
Original Design
Pipe Size (ft) Length of Pipe Cost per foot Total Cost
2 RCP 795 $46.00 $36,570.00
3 x 5 RCB 101 $206.00 $20,806.00
Inlets - total
8 $1,500.00 $12,000.00
Manholes total
9 $1,700.00 $15,300.00
$84,676.00
Altered Design
Pipe Size (ft) Length of Pipe Cost per foot Total Cost
2 RCP 795 $46.00 $36,570.00
3 x 5 RCB 101 $206.00 $20,806.00
Inlets - total
8 $1,500.00 $12,000.00
Manholes total
9 $1,700.00 $15,300.00
$84,676.00
Change in Storm Sewer Cost 0.00%
23
JKL Project Profile A
1
A2
A3
A4
A5
A7
A8
OU
T
A6
PO
ND
30
35
40
45
-50 50 150
250
350
450
550
650
750
850
950
1050
Primary Flowpath (ft)
He
igh
t (f
t)
Natural Ground
Top of Curb
Gutterline
2-yr. HGL
100-yr. HGL
100-yr. Altered
100-yr. WSEL 25-yr.
WSEL
24
Project JKL Storm Sewer Cost
Project JKL
Original Design
Pipe Diameter (ft) Length of Pipe Cost per foot Total Cost
2 922 $46.00 $42,412.00
2.5 233 $56.00 $13,048.00
3 354 $73.00 $25,842.00
$81,302.00
Altered Design
Pipe Diameter (ft) Length of Pipe Cost per foot Total Cost
2 686 $46.00 $31,556.00
2.5 236 $56.00 $13,216.00
3 411 $73.00 $30,003.00
3.5 176 $88.00 $15,488.00
$90,263.00
Change in Storm Sewer Cost 11.02%