Implementation ToolsTest Management in Sap Solution Manager

08Fall

SAP Solution Manager

h t t p : / / w w w . l i n k e d i n . c o m / i n / s o l u t i o n m a n a g e rW e n c e s l a o L a c a z e

Page 2: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 2/15

Solution Manager – Test Management Tools

Table of ContentsAuthor Bio ..................................................................................................................3

Landscape Preparation: .............................................................................................4Create the Test Documents ......................................................................................4

SOLAR02 – Configuration Phase .............................................................................4 Test Plan Management .............................................................................................. 5Creating a Test Package ............................................................................................8

Assign Tester ..........................................................................................................9 The Tester start to work ...........................................................................................10

Changing the Status .............................................................................................11Creating Notes .....................................................................................................11Creating Message .................................................................................................12

Generate the Test Report .........................................................................................13

3438981.doc Page 2 of 15

Page 3: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 3/15

Solution Manager – Test Management Tools

Author BioMy name is Wenceslao Lacaze and I’ve been working as a SAPbasis Administrator and Solution Manager Consultant for the last 8

years.I’m a Techno-Functional SAP Solution Manager Subject MatterExpert (SME), I Design, Build and Implement the product using “RunSap” Methodology.I have developed a very extended experience with medium andlarge scaled SAP installations in several (multi)nationalenvironments.

I am based in Argentina, but work all around the World.I work directly for clients or via an agency.I do speak Spanish, Italian and English fluently. You can contact me at:Email: [email protected]://www.linkedin.com/in/solutionmanager

3438981.doc Page 3 of 15

Page 4: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 4/15

Solution Manager – Test Management Tools

Landscape Preparation:For this Demo we use 1 Solution Manager and 1 IDES ERP.

810 Development

811 Quality

812 Productive

Create the Test Documents

SOLAR02 – Configuration Phase

During the configuration phase, you need to identify all the Business processrelated to the Project, in every Business process you put process step. The test Cases and Test documentation related to the single step need to beupload in the Test Cases TAB.

In the Test Cases Tab you have:

•  Test Case Typeo CATT

o eCATT Test Configuration

o External Applicationo Function Module Test

3438981.doc Page 4 of 15

Page 5: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 5/15

Solution Manager – Test Management Tools

o Manual Test Caseo  Test Document

• Logical component

•  Test Case

• Variant

•  Test Case Name

•  Test Object

•  Test Object Type

Another Important tips is identify well the OU and the Users in End User Roles Tab.This is important because the test case are related to this users and OU.

Test Plan Management You can run the transaction STWB_2 or in the Environment Menu “Test

Organizer: Test Plan Management”

In the Test Plan Management you create the new test plant

3438981.doc Page 5 of 15

Page 6: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 6/15

Page 7: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 7/15

Solution Manager – Test Management Tools

In General data Tab you can see al the information related for every single testdocument in this step.

 You generate the test plan

 When you generate the test plan, solution manager ask you in witch package youwant to save all the test cases.

3438981.doc Page 7 of 15

Page 8: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 8/15

Solution Manager – Test Management Tools

 Then you have the Test Plan for the project.

Creating a Test PackageNow you need to create the test package, click over “test Package” and SolutionManager show this windows

Click in New, select the test document that you want and click in Generate Button

Write the Test Package Title

3438981.doc Page 8 of 15

Page 9: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 9/15

Page 10: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 10/15

Solution Manager – Test Management Tools

Select your tester and OK 

Now you have your test package assigned to the tester

The Tester start to work When the tester logon to the system , run the transaction STWB_WORK and see his

Work list

Double Click over and you can open the Test Plan, from there you can run all thetest and when you end update the test status.

 You click in the Semaphore

3438981.doc Page 10 of 15

Page 11: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 11/15

Solution Manager – Test Management Tools

Changing the Status

Here you need to write the status of the test, how much time and effort and if haverestriction.

Creating Notes

 You can create a test note pressing F5

 You write the situation in the Test note and then Save.

3438981.doc Page 11 of 15

Page 12: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 12/15

Solution Manager – Test Management Tools

Creating Message

In the Message Tab you can create Service Desk Message

Now in the Main window you have all the status information updated

If some user create a Test Message you control this in Message Overview.

3438981.doc Page 12 of 15

Page 13: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 13/15

Solution Manager – Test Management Tools

Generate the Test ReportIn the Main window you can generate the Test Report

 This Document have all the information related to all the test conducted during thisimplantation.

 

When you generate the Test Document the system ask to run the word Macro toend the process.

3438981.doc Page 13 of 15

Page 14: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 14/15

Solution Manager – Test Management Tools

Solution Manager open the word and show the macro windows

When you run the macro the system create a word document whit all the technicalinformation about the test.

3438981.doc Page 14 of 15

Page 15: Charm Implementation Tools

8/6/2019 Charm Implementation Tools

http://slidepdf.com/reader/full/charm-implementation-tools 15/15

Solution Manager – Test Management Tools