chemical and biological responses in the north fork of clear … · 2019-05-13 · chemical and...

29
Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid Mine Drainage Inputs James Ranville Colorado School of Mines Department of Chemistry NIEHS Superfund Research Program (SRP) Progress in Research Webinar May 13 th , 2019

Upload: others

Post on 27-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid Mine Drainage Inputs

James Ranville Colorado School of Mines Department of Chemistry

NIEHS Superfund Research Program (SRP) Progress in Research Webinar May 13th, 2019

Page 2: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Acknowledgements

Investigating Biogeochemical Controls on Metal Mixture Toxicity Using Stable Isotopes and Gene Expression

• Grant 5RO1 1ES024358

Co-PIs & Students

Colorado School of Mines J. Ranville, J. Meyer, E. Lloyd, J Murphy

Colorado State University W. Clements & Chris Kotalik

University of Florida C. Vulpe and Dani Cucchiara

Page 3: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Overall Study Objectives/Approaches We wish to better understand how metal mixtures affect aquatic toxicology and metal bioavailability and how the presence of metal mixtures influence the remediation effectiveness for mining impacted waters

We are using a laboratory and field based-approach.

Laboratory studies of mixture toxicity utilize D. magna, with mortality, metal uptake (measured and computed by BLM), and gene expression as endpoints.

Bioavailability of metals from sediments utilize 65Cu isotope labeling with snails as the test organism.

We are directly measuring the biological and chemical responses to remediation of the mining effluents (todays presentation).

Page 4: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Talk Outline • Background • Site Description/hydrology • Water Chemistry Response • Biological Recovery • Outreach • Summary

Page 5: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Introduction • North Fork of Clear Creek

(NFCC) located 50 km west ofDenver, Colorado USA

• Mining activity 1850s – 1950s • Acid mine drainage (AMD) and

mining solid wastes (sulfideweathering)

• Mixtures of toxic metals (Cu,Zn) enter stream effectingwater column and sediment chemistry

• Stream life highly impacted (absent)

Black Hawk, CO 1987

Page 6: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Welcome to the North Fork Clear Creek-2016

Armoring

Flocculant bed and suspended sedimentsDissolved metals

Aquatic Life ?

Page 7: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Treatment Plant

• High Density Sludge• Operational March 2017• Capture and treatment of

two point sources of AMD entering stream

• Gregory Incline and National Tunnel

• Initial cost of $19.66 millionPhoto Credit: Heather Henry

Page 8: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Flow

Flow

Gauge

Page 9: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Research Goals (Chemistry)

• Monitor water chemistry and biology pre- and post-remediation

• Understand effectiveness of treatment plant in decreasing total metal

loading in stream

• Understand geochemistry of changes in water chemistry (dissolved)

since implementation of remediation

• Evaluate potential aquatic toxicity of dissolved metals

Page 10: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Discharge

0

500

1000

1500

2000

2500

Mar-17

May-17

Jul-17

Sep-17

Nov-17

Jan-18

Mar-18

May-18

Jul-18

Sep-18

Nov-18

Jan-19

Mar-19

Disc

harg

e (L

/sec

)

Sampling Dates

Scouring ScouringBase Flow Base Flow

2017 2018 2018 2019

Page 11: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

March 23 May 1 May 16 August 29 October 27

Visual Improvement in Stream Appearance March-October 2017 @ Downstream Site

March 28: treatment of one source begins, periodic shutdowns occur, second source treatment begins in July

September 15: 24/7 treatment begins

Page 12: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Decrease in Total Metal Loading

0.01

0.1

1

10

100

1000

Aug-16

Mar-17

Sep-17

Apr-18

Oct-18

May-19

Load

(Kg/

day)

Iron

0.01

0.1

1

10

100

1000

Aug-16

Mar-17

Sep-17

Apr-18

Oct-18

May-19

Zinc

0.01

0.1

1

10

100

1000

Aug-16

Mar-17

Sep-17

Apr-18

Oct-18

May-19

CopperDecrease by factor of 1600 Decrease by factor of 50 Decrease by factor of 150

Spring Scouring Event

Pre-Treatment

Pre-Treatment

Pre-Treatment Post-Treatment

Post-Treatment

Post-Treatment

Page 13: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Multiple Remaining Sources with Differing Metal Compositions REF 1 REF 2 ANT RAP

TPFlow

0

20

40

60

80

100

REF 1 to REF 2 REF 2 to ANT ANT to RAP

Perc

ent I

ncre

ase

Betw

een

Site

s Cu Zn

BDL

Page 14: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Multiple Remaining Sources with Differing Metal Compositions

REF 1 REF 2 ANT RAP

TPFlow

RBP ARG USGS

Page 15: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

0

5

10

15

20

25

Aug-16

Nov-16

Mar-17

Jun-17

Sep-17

Dec-17

Apr-18

Jul-18

Oct-18

Feb-19

May-19

Tota

l Iro

n (m

g/L)

Post-TreatmentPre-Treatment

Total Iron Concentration: Near Complete Removal

Matchs Visual Improvement

Page 16: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Only Partial Lowering of Dissolved Copper

0

5

10

15

20

25

30

35

40

45

Aug-16

Nov-16

Mar-17

Jun-17

Sep-17

Dec-17

Apr-18

Jul-18

Oct-18

Feb-19

May-19

Diss

olve

d Co

pper

(ug/

L) Pre-Treatment Post-Treatment

Page 17: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Particulate Iron is Your Friend For Copper

0

10

20

30

40

50

60

70

80

90

100

0.01 0.1 1 10 100Pe

rcen

t Diss

olve

d Co

pper

Particulate Iron (mg/L)

Stumm 1992

Pre-remediation

Page 18: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Predicted Toxicity of Instream Cu + Zn to Daphnia magna• Based on measured dissolved Cu

and Zn in stream• Cu and Zn EC50s taken from

previous 48-h lethality tests with D. magna neonates(EC50 = 50% mortality conc.)

• Toxic units• TUCu = [Cu]/EC50Cu

• TUZn = [Zn]/EC50Zn

• ΣTU = TUCu + TUZn

• Predicted mortality = f(ΣTU)

Page 19: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Predicted Toxicity of Instream Dissolved Copper and Zinc (considering effects of multiple metals)

0

20

40

60

80

100

Mar-17

Mar-17

May-17

Jun-17

Aug-17

Sep-17

Oct-17

Nov-17

Jan-18

Apr-18

May-18

Jul-18

Aug-18

Sep-18

Oct-18

Nov-18

Mor

talit

y (%

)

Dilution DilutionBase Flow Base Flow

Page 20: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Chemistry Conclusions

• Total Copper, Iron, and Zinc loads have decreased to different degrees since treatment began

• Multiple and variable sources of uncaptured metals continue to enter NFCC in variable ratios

• Particulate Iron is your friend for Copper but not Zinc • Predicted toxicity of Zinc and Copper to Daphnia magna remains

elevated post remediation • Cannot treat what we do not capture

Page 21: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Field Biomonitoring Hypotheses for AMD Remediation

• H(1): Algal biomass will increase

• H(2): Benthic macroinvertebrates will increase in abundance and taxa richness

• H(3): Benthic and emerging adult biomass will increase

• But how quickly?

Page 22: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

TreatmentPlant

Flow direction

Sampling Locations

Golden 30 km

CSM/CSU Study Objectives• Measure chemical and biological

stream parameters• Identify chemical and biological

processes that drive post-remediation stream conditions

• Determine remediation effectiveness for stream ecological health

”Recovery” Sites

”Impact” Sites

Page 23: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

North Fork Clear Creek, ColoradoAlgal Colonization

Page 24: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

North Fork Clear Creek, ColoradoLarval Colonization

Page 25: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

North Fork Clear Creek, ColoradoBenthic vs Emergence Biomass

Page 26: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Field Biomonitoring Results and Conclusions to date--

• Discrepancies in algal colonization at AMD remediation sites, likely due to top-down control by grazer aquatic insects

• Increased abundance and taxa richness at downstream sites, but richness is still far below Reference site observations

• Benthic and adult emergence biomass improved at downstream sites from Year 1 to Year 2. This suggests increased benthic production and increased subsidy export to terrestrial environments following remediation

Page 27: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Outreach to Local STEM K-12 SchoolsCSM Summer programs engineering

Treatment

Sources

Impacts on Aquatic Life

Page 28: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

CSM Environmental Chemistry Field Session

Site investigations for local stakeholders

Page 29: Chemical and Biological Responses in the North Fork of Clear … · 2019-05-13 · Chemical and Biological Responses in the North Fork of Clear Creek Following Remediation of Acid

Questions