chemical dosing spec
DESCRIPTION
Chemical dosing specTRANSCRIPT
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 1/14
1
C
HE
MI
CA
L
TR
EA
ME
NT
AN
D
W
AT
ER
F
IL
TR
AT
ION
FO
R
H
I
LL
E
WA
TE
R
C
ON
DE
NS
ER
W
AT
ER
C
IRC
U
ITS
10
1
SY
ST
EM D
ET
AI
LS
10
1 1
C
ooli
ng To
wer
s
Qt
y o
f
C
oo
lin
g
Tow
ers
T
ype
o
f
C
ool
ing
To
we
r
R
eci
rcu
lati
on
ra
te
Tem
p
T
ota
l M
ak
eu
p
Wa
ter
Cy
cle
s
o
f
Co
nce
ntra
tio
n
W
ate
r Qu
alit
y
1
0 1
2
Ch
ille
d W
ate
r
Sys
tem
Qt
y o
f Ch
iller
s
T
yp
e
of
C
hill
ers
Ch
iller
C
apa
city
3N
os
Ind
uce
d
Dra
ft
cou
nte
r
flow
As
shown on drawings
T
o b
e calc
ula
ted
by
Sp
eci
alis
t
6
Mu
nic
ipa
lity
W
at
er
3N
os
W
at
er C
oo
led
Ch
ille
rs
A
s sho
wn
on
dr
aw
ing
s
10
2
M
A
KE
W
A
TE
R
C
HA
R
AC
TER
IS
TIC
S
The
ma
keu
p
wa
ter
to co
oli
ng
to
we
rs
sh
all b
e
v
ia
the dom
est
ic
w
ater
f
rom
Mu
nic
ipa
lity
10
3
TR
EA
TM
EN
T
P
RO
GR
AM
M
E
10
3 1
Nor
ma
l T
rea
tm
ent
P
rog
ram
T
he
c
om
ple
te
r
ecir
cul
atio
n
wa
ter
c
hem
ica
l
tre
atm
en
t
pro
gra
m
sh
all
uti
lize
cor
ros
ion
S
cal
e
In
hib
itor
fed
on
a co
nti
nuo
us
ba
sis
Th
e tr
eat
men
t
p
rog
ram
s
hal
l a
lso
inc
lude
an A
lter
nat
ing
Slu
g
app
lica
tio
n
o
f N
on
Oxi
diz
ing
M
ic
ro
bi
ocid
e
to
h
an
dle
m
icro
o
rga
nis
m
pro
blem
W
hen
req
uir
ed
P
H
adju
sti
ng
fa
cil
itie
s
s
hal
l
also
b
e inc
lud
ed
GCE
7
roposed
HV C Modif ications
t
Modern Bakery
VI
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 2/14
VO
LU
M
Me
ch
anic
al
Se
cti
on
05
Ai
r
C
ond
itio
nin
g Equ
ipm
en
t
10.3 .2
Initial
Dosages
Th
e ini
tial d
osa
ge sh
all
a
sl
ug dos
age o
f ch
em
ica
l
s
uff
icie
nt to
esta
bli
sh
th
e
d
esi
red re
sid
ual
.
sha
ll
on
e tim
e
app
lic
atio
n
ba
sed
on t
he
s
yst
em
v
olu
me
and pr
od
uct
r
esid
ua
l.
10.
3.3
Sta
rt
U
p
T
rea
tme
nt
L
ev
els
T
he
new sy
ste
m
sha
ll
b
e
st
arte
d w
ith
d
oub
le or
tr
iple
th
e no
rma
l lev
els of
c
ont
inu
ous
ly
fe
d
pro
duc
ts
to
en
sure
the rap
id de
velo
pm
en
t
of
cor
ros
ion
in
hib
itin
g
f
ilm
s.
T
he h
igh
trea
tm
ent dos
age
fur t
wo
or
thr
ee da
ys
sha
ll
en
sure t
he re
sid
ual
s
b
ein
g b
rou
ght
to t
hei
r
n
orm
al l
eve
ls.
10 .
3,4
Ma
inte
nan
ce
C
he
mic
als
a
Co
rro
sion
S
ca
le
In
hib
ito
r
T
he pr
odu
ct s
hall
eit
her
a Sy
ner
gis
tic
Al Org
an
ic fo
rm
ula
tion
C
or
ros
ion
o
r Sc
ale
inh
ibi
tor ba
sed
on
P
hos
pho
nat
es
o
r a Zi
nc
Pho
sp
hate
bas
ed
for
mu
lati
on with
dis
per
san
ts
fo
r m
ai
nten
an
ce
of c
lean hea
t
tr
ans
fer
su
rfac
es.
Th
e pr
odu
ct
sh
all
b
e dos
ed con
tin
uou
sly
ba
sed
o
n
the r
ate of b
low
d
ow
n.
b
B
ioc
ide
T
he
pr
odu
ct
sha
ll
b
e
a
p
ow
erfu
l
non
-ox
idi
zin
g
qua
ter
nar
y amm
on
iur
n
co
mp
oun
d
ba
sed
mic
ro-
bio
cid
e
in liq
uid
form
wh
ich
co
ntr
ols
b
act
eria
l an
d
alg
ae
g
row
th
in
c
ool
ing w
ate
r
systems. The product shall be shock dosed alternatively with Biocide
-2
to
prevent
the
i
mm
un
ity of th
e bio
cid
e to
mi
cro
org
ani
sm .Th
e
p
rod
uct sh
all b
e do
sed o
nce
a m
on
th
bas
ed o
n th
e
sy
ste
m v
olu
me
.
c
Bi
oci
de—
2
T
he
p
rod
uct sha
ll be
a
po
we
rfu
l bro
ad spe
ctr
um
ac
tiv
ity
non
-ox
idiz
ing
iso
thi
oza
line
ba
sed mi
cro-
bio
cid
e
in
liqu
id for
m
whi
ch con
tro
ls
ba
cte
ria
fu
ng
i alg
ae g
row
th
i
n
co
olin
g
w
at
er s
yste
ms
.
It s
hou
ld al
so ef
fec
tive
aga
ins
t
Le
gio
nel
a
P
ne
umo
ph
ila and
sul
pha
te re
duc
ing
ba
cte
ria.
The p
rod
uct sh
all
be
sh
ock
dos
ed
alt
ern
ativ
ely
w
ith
R
io
cide
2
to
p
rev
ent t
he imm
un
ity
of t
he b
ioc
ide t
o
m
icr
o org
an
ism
.
Th
e pr
od
uct is
d
ose
d on
ce
a
mo
nth b
ase
d on the
sys
tem
vol
um
e.
1
0.4
CLE
AN
IN
G P
RE
-TR
EA
TM
E
NT
CH
EM
IC
AL
S
a
Pre
-tre
atm
en
t C
hem
ica
l
Th
is pro
du
ct
s
ha
ll
a
l
iqu
id
ble
nd of S
eq
ues
tran
t and D
isp
ers
ant
si
fo
r the
gra
dua
l on or o
f li
ne clea
nin
g o
f
n
on
pot
abl
e
w
ate
r
sys
tem
s to
rem
ov
e
gre
ase d
ebr
is a
nd
m
il
s
cal
e.
T
he ch
emi
cal sh
all be
do
sed dur
ing
pre
co
mm
iss
ioni
ng
o
f th
e
s
yst
em
nor
ma
lly
d
uri
ng sta
rt up.
b
H
igh
L
eve
l Pas
siv
atio
n
T
he C
orro
sio
n
S
ca
le
In
hib
ito
r
s
hal
l
dos
ed
a
t
d
ou
ble th
e
no
rma
l
leve
ls
fo
r
w
to
t
hre
e
da
ys
t
o in
sure th
e
r
api
d dev
elo
pm
ent
of
cor
ros
ion
inh
ibit
or
fi
lm s
10
.5
OP
ERA
T
ING
PA
RA
M
ETE
RS
7
Pro
pos
ed
H
V
\C
Mo
dif
icat
ion
s
at Mo
der
n Bak
ery
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 3/14
VO
LU
ME
II
Me
cha
nic
al
Sec
tion
0
5
A
ir
C
on
diti
oni
ng
Eq
uip
me
nt
T
he
coo
lin
g
to
we
r
p
aram
et
ers
s
hal
l
b
e
m
aint
ain
ed
a
nd o
per
ate
d u
nde
r
t
he Ibli
ow
ing
con
dit
ion
s:
P
AR
AM
ET
ER
OP
ER
AT
IO
N
RA
NG
E
P
H
8.2
—8
.8
To
uil
D
iss
olv
ed
So
lids
(mg
/i)
1
500
M
ax
Tot
al
Su
spe
nd
ed So
lid
s
(
mg
/l)
10
50
To
tal A
lka
lin
ity
(m
g/l)
200
-3
00
Z
inc
(m
g/
I)
3
Phosphonate (mg/I)
2
I
nor
gan
ic
P
hos
pha
tes
(m
g/I
)
6
8
T
ota
l H
ard
nes
s
(mg
/i)
200
-
300
T
ota
l
I
ron
mg
’ )
<3
Chl
ori
des (mg
/i)
4
00
Oil
G
re
ase
m
/l
10
Co
ros
ion
Rat
e
5
mi
ls
per ye
ar
To
tal V
iab
le
C
ou
nt
x
10
5
S
ulf
ate
Red
uc
ing
Bac
ter
ia
1
00 /
10
0
m
l
S
cal
ing
3
0
mg
c
m2
/ yea
r
M
g
X
Sio
2
(mg
/ )
< 3
5,0
00
S
ilic
a (m
g/
i)
10
0
-1
25
10
.6
GU
AR
AN
TE
ES
:
a
C
orr
osio
n
rate
s
F
or
M
ild
Ste
el
5
M
PY
.
Co
ppe
r:
0.5
MP
Y.
SS
<
0.1
MP
Y.
b
Sc
alin
g
1
5-3
Om
g/c
m2
/yea
r.
c
To
tal
Vi
able
Co
unt
5 x
10 5
d
Su
lph
ate
R
edu
cin
g
B
act
eria
’s
1
1
m
l.
1
0.7
CH
EM
IC
AL
DO
SA
GE
S
10
.7.
1 Ma
int
ena
nce
C
he
mic
al
fo
r one y
ear
P
ro
duc
t
D
os
age
I
niti
al
M
ai
nt.
K
gs
/da
y
K
gs/
K
g/
Pa
ck
s
ize
Dr
um
s
(
pp
m)
till
(k
g’h
r)
m
on
th
yea
r
pe
r D
rum
/y
ear
Corrosion 80
100
0.6179
3 9
28 110
S
cal
e I
nhib
ito
r
Sl
it
Di
spe
rsan
t
5
0
.038
6
1
93
34
6
r
i
e
—
l
100
90
108
0
2
5
44
C
E
7
ro
oos
ed [I
VA
C
M
od
ific
ati
ons
at
M
od
ern
B
ak
ery
‘
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 4/14
V
OL
UM
II
M
ech
ani
cal
S
ect
ion
05
Ai
r
Co
nd
itio
ning
Eq
uip
men
t
Product Dosage Initial Maint. Kgs/day Kgs/ Kg/ Pack size Drums
p
pm
fill
kg’
hr)
m
on
th
ye
ar
p
er
D
ru
m
y
ear
kg
s)
Bio
cid
e2
10
0
90
10
80
2
5
9
8
2
5
In
itial F
ill
H
igh
Le
vel P
ass
iva
tion
P
rod
uct
D
osa
ge
Ini
tial
Ma
int.
K
gs
/
d
ay
K
gs
’
Kg
/
Pac
k
siz
e D
rum
s
ppm
)
fill
kg/
hr)
m
on
th
y
ea
r
per
Dru
m
/ye
ar
kgs)
h
igh
L
eve
l
1
15
35
5
P
as
siva
tio
n
Bio
cid
e—
1
100
45
25
2
B
io
cide
-
2
100
4
5
25
2
Cle
anin
g
150
0
60
0
28
2
2
he
nuc
al
NO
TE
:
a
A
ll hou
rly
ch
em
ica
l co
nsu
mp
tion
sh
all
be b
as
ed
on
th
e
f
ollo
win
g
c
alc
ulat
ion
:
Q
uan
tity
kg
s/h
r)
Blo
w dow
n
m
3/hr
x D
os
age
1
00
0
b
A
ll s
lug do
sin
g
of bio
cid
e s
hal
l
b
e
b
ase
d
o
n
the
fol
low
ing
cal
cul
atio
n:
Qu
ant
ity
k
gs/
dos
e)
Sy
stem
Vo
lum
e
m
3
x Do
sag
e
1
000
1
0.8
AU
TO
MA
TI
C
C
ON
DU
CT
IV
ITY
C
ON
TR
OL
LE
D
Ch
EM
IC
AL
OS
IN
SY
ST
EM
10.
8.1
Con
cep
t
T
he
aut
om
atic dos
ing
sy
ste
m
sha
ll
pr
ovi
de
a
n
ef
fec
tive
an
d f
ool
pro
of
wa
y o
f
Co
rro
sion
inh
ibi
tor
d
osin
g. Th
e
s
yste
m
s
hal
l be
b
ase
d
on Co
nd
ucti
vity
con
tro
l,
blo
w
do
wn
an
d ma
keu
p qu
ant
ity,
wi
th an
cill
ary
e
qui
pme
nt
se
lec
ted
to
m
ee
t
t
he
ex
act
ap
plic
atio
n.
10
.8.2
C
oo
lin
g
To
wer
C
on
trol
ler
W
ate
r M
ete
r
I
npu
t, for
Volumetric / Proportional Dosing.
Me
asu
rem
en
t
of C
ond
uct
ivit
y
f
or B
lee
d C
ont
rol.
Me
asu
rem
en
t
of
R
ed
ox
fo
r
C
hlo
rine
Ozo
ne
Add
itio
n.
D
ire
ct co
nne
cti
on
o
f
all Pu
mp
s
V
alv
es.
Ble
ed
In
hib
it
dur
ing
an
d
a
fte
r
d
osi
ng.
c
CE
7
ro
pos
ed
HV
o
dlil
cat
ion
s t
od
ern
ak
ery
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 5/14
VO
U
M
Me
cha
nic
al
Se
ctio
n
05
ir
on
diti
oni
ng
Eq
uip
me
nt
Real Time Clock for Timed Dosing.
Sim
pl
e
I
ntu
itiv
e
Pro
gra
mm
ing
L
arg
e
Ba
klit
n
M
ulti
fun
ctio
n
Dis
pla
y.
IP
66 Wa
ll
P
ipe Mo
unt
ing
O
pti
ons
.
M
ult
ilin
gua
l
Te
xt Err
or
M
ess
ag
es.
10.8.3 Sp
eci
fica
tion
Rel
ay
Ou
tpu
ts Fo
ur rel
ay
o
utpu
ts B
lee
d,
B
ioc
ide 1 Bi
oci
de
2
and C
orro
sio
n
Inh
ibi
tor
sha
ll
b
e
pro
vid
ed
tbr p
um
p
/s
ole
noi
d
o
per
atio
n
ea
ch
wi
th
live a
nd n
eutr
al
t
erm
ina
l.
A
lar
m R
elay
Vo
lt free con
tac
t to be pro
vid
ed
t
o
giv
e
ext
ern
al
in
dic
atio
n
of s
elec
ted ins
trum
en
t
conditions.
Ti
me
D
os
ing
— T
he
em
bed
ded
real
tim
e
cl
ock
sha
ll
p
rov
ide
a
u
ser
se
lect
abl
e
d
ose p
eri
od
f
rom 5
m
inu
tes
to
24
ho
urs o
r day
of
w
ee
k do
sin
g.
Vol
um
etri
c
D
osi
ng
Th
e
wa
ter
m
ete
r input
sha
ll
p
rov
ide
a
co
ntin
uo
us
co
unt
of
w
at
er in
put
,
u
sin
g
de
fina
ble K
fa
cto
r
al
low
ing vo
lum
e
pro
por
tion
al dos
ing
.
D
osin
g
by
co
nd
ucti
vity Th
e
b
lee
d
out
put
sh
all
be tr
igg
ere
d from
the
c
ond
uct
ivit
y
i
npu
t
op
era
tin
g
wh
en
t
he
i
npu
t
ris
es ab
ov
e
th
e level
Do
sin
g
by
Re
do
x Th
e
bio
cide
o
utp
uts
sh
all
be
trig
ger
ed
fr
om the R
edo
x
s
ens
or in
put
op
era
ting
when the input goes above the
set
level
Se
nso
r I
npu
t
E
lec
trod
les
s
C
on
duc
tivi
ty
S
ens
or
w
ith a m
ea
sur
eme
nt
r
ang
e
of
0
to
9
999
us
/cm
.
Re
dox S
ens
or inp
ut
-2
000
mv
to
+
2
000
mv
.
Po
we
r Su
ppl
y
—
85
to
250
V
C
10.8.4
Eq
uipm
en
t
D
et
ails
a Co
rros
ion I
nhi
bito
r
Do
sin
g
T
ank
.
C
lo
sed
Pol
yet
hyl
ene s
int
ered
UV sta
bil
ized w
ith
s
inte
red
s
cale a
nd scr
ew caps
Ca
pac
ity
3OUS
Ga
llon
s.
b Co
rro
sio
n In
hib
ito
r
D
osi
ng
Pum
p.
E
lect
ron
ica
lly
c
ont
rol
led
so
len
oid
d
riv
en
di
aph
rau
m
m
ete
rin
g
p
um
p
in
pla
stic ho
usin
g.
W
ith
ext
erna
l
pu
lse an
d level
con
tro
l
con
ne
ctio
n
2
30V
,5O
Hz
,IP
65 .
C
ap
—0-4
Iph
:
ba
r
c
B
ioc
ides D
osin
g Ta
nks
.
C
los
ed
Po
lye
thy
lene
s
inte
red
U
V
st
abi
lize
d wit
h
si
nte
red
s
cal
e
a
nd
scr
ew
c
aps
.
Ca
pac
ity
30
US
ga
llon
s.
d
Bi
ocid
es Dos
ing Pu
mp
s.
E
lec
tron
ica
lly co
ntr
olle
d
s
ole
noi
d
d
rive
n
d
iap
hra
gm
m
et
erin
g
p
um
p
in p
last
ic ho
usi
ng.
With
exte
rna
l
pu
lse co
ntro
l and level
c
ont
rol con
nec
tio
n
2
30
V.
5OHz.lP
65 .
GC E 147
Proposed
[IVAC
Modifications
Modern
Bakery
‘4
36
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 6/14
VO
U
M
II
Me
cha
nic
al
Se
ctio
n 0
5
A
ir
C
on
diti
oni
ng Eq
uip
me
nt
Cap
aci
ty
20
45
Iph
5
bar
e Co
oli
ng T
ow
er
Wa
ll
M
ou
nte
d C
ond
uc
tivi
ty
C
on
tro
ller
0
999
9
m
icro
s
iem
ens
/
cm
an
d
se
nso
r
f
Wa
ter
M
ete
r—
50
mm
di
a
g
E
lect
rica
lly
Act
uat
ed
S
olen
oid
V
alv
e in
Bl
ow
dow
n
li
ne
10 9
TEC
H
NIC
AL
S
ER
VI
CES
Technical services and monitoring shall be an integral part
of
the Treatment program
Con
sid
era
ble
st
ress
s
hal
l
b
e
lai
d on p
rop
er
and
sys
tem
ati
c
m
onit
ori
ng
of s
yst
em
w
ith
de
tail
ed
p
roc
edu
res
A hi
ghl
y
exp
erie
nc
ed
f
ield En
gin
eer
sha
ll be
ass
ign
ed
fo
r
thi
s job
w
ho
sha
ll arra
nge
to i
niti
ate
im
plem
en
t
an
d
s
tab
ilize
th
e
tr
eatm
en
t
pro
gra
m
T
he s
up
plie
r s
hal
l
vi
sit
the pla
nt
for
serv
ice
on a free
of
co
st b
asi
s
wh
ich s
ha
ll inc
lud
e t
he
f
ollo
wi
ng:
a
Ch
eck
and
in
spe
ct
eac
h
plan
t
be
ing tr
eate
d
b
D
is
cus
swi
th
ope
rati
ng
pe
rso
nne
l
the
per
form
an
ceo
f pro
gra
m
c R
evi
ew
l
ogg
ed
an
d
a
nal
yze
s
th
e
sar
nea
t si
te
d
Ta
ke s
am
ple
s
an
d ana
lyz
e
the s
am
e at
s
ite
e
P
rep
are
o
n ea
ch
vi
sit de
tail
ed ha
ndw
rit
en
re
po
rt dis
cus
s
the f
md
ing
of
rep
ort
wit
h
ma
na
gem
en
t
10
10
M
ON
ITO
RI
NG
Th
e p
rog
ram sha
ll inc
lud
e
the
foll
ow
ing
:
a
Corrosion control
Wa
ter An
alys
is
Ir
on An
alys
is
b
D
ep
osit
C
ont
rol
W
at
er
An
alys
is
D
ep
osit A
nal
ysis
Calcium balance
c
Fo
uli
ng
Con
tro
l
\lic
roh
iolo
gic
al
A
na
lysi
s
G
E
47
Pr
opo
sed
F
IV
M
od
ifi
cati
ons M
od
ern
Bak
ery
M
7
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 7/14
VO
U
M
II
M
ech
an
ical Se
ctio
n 0
5
A
ir
Co
ndi
tion
ing Eq
uip
me
nt
Co
rro
sion
Ra
te
Mo
nito
rin
g
10.
11
SEP
AR
AT
OR
Fo
r
s
ide str
eam
filt
rati
on a
cen
trif
uga
l
se
para
tor
sha
ll be
su
ita
bly
si
zed
a
t
10
of
t
he tota
l
flow r
ate o
f
c
ool
ing
to
we
rs.
Th
e sep
arat
or
sh
ll be
of c
arb
on s
tee
l
con
stru
cti
on
wi
th
c
lass 1
50 f
lan
ges
.
M
ate
ria
l
th
ick
nes
s s
hal
l
be
¼”
o
r
sch
ed
ule
40 co
nne
ctio
n
si
ze,
w
hi
che
ver
is le
ss
Separator shall
be
a
cleanout connection
T
he wor
kin
g
p
res
sure
o
f the se
par
ato
r
sha
ll b
e
15
0 ps
i.
Th
e sep
arat
or sha
ll
be
sa
ndb
las
ted
and ex
tern
ally
fi
nish
ed
w
ith a
fus
e
c
oat
ed
pol
yes
ter.
T
he s
epa
rat
or s
yst
em sh
all
als
o incl
ude
a
rec
ove
ry ta
nk s
yste
m w
ith mo
nit
orin
g s
yst
em,
cir
cula
tin
g pu
mp
set du
ty / s
tan
dby
),
pre
ssur
e
gau
ge
s,
p
ipin
g, iso
lati
on
valv
es
a
nd con
tro
l
p
ane
l.
Th
e se
par
ator d
esi
gn sha
ll b
e o
f
lo
w
p
res
sure
ty
pe
wit
h
mi
nim
um
3
ps
id op
era
tion
po
int
.
Se
par
atio
n
pe
rfo
rma
nce
sh
all be
97.
4
by w
ei
ght
, o
f
p
arti
cle
s
4
5 mic
ron
a
nd la
rge
r,
w
ith
sp
ecif
ic
gravity
of
2.6 greater
in
fluids with specific gravity
of
one l.O)
and
less
1
0.1
2
FL
US
HI
NG A
ND
C
LE
AN
ING
Flu
sh all
flui
d-c
arry
ing sy
ste
ms afte
r
co
mp
leti
on
wi
th
a
stre
am
of wat
er
or
ap
pro
pri
ate
flu
id at
th
e
hi
ghe
st
o
bta
ina
ble
p
ress
ure
an
d
v
elo
city
f
or a p
erio
d of
tw
o hou
rs.
D
isc
har
ge
the flus
hin
g flu
id
th
rou
gh
al l
str
ain
ers
nd
out t
hro
ugh
lin
e s
ize
d
v
alv
es
wit
h
h
ose
en
ds
.
Cle
an
all s
trai
ners
,
R
epe
at
f
lush
ing o
per
atio
n
to
th
e ap
pro
val
o
f
t
he Co
nsu
ltan
t u
ntil n
o fo
reig
n
m
att
er
col
lec
ts
in the
st
rain
ers
.
D
rain
all
tan
ks a
nd clea
n t
ank
s.
I
f th
e wat
er pr
ess
ure
n
orm
all
y
av
aila
ble
on
sit
e
is
in
th
e
C
ons
ult
ants o
pin
ion
,
i
nad
eq
uate
to
perform proper flushing, then The Contractor shall provide
at
his
own expense, pumps, tanks.
etc.
to
g
ive p
res
sure
an
d
v
olu
me
flo
ws
to
the
C
on
sul
tant
’s
s
atis
fac
tion
.
Ens
ure th
at
all
v
alv
es
inc
lud
ing
co
ntro
l valv
es
a
re
f
ully
op
en
d
uri
ng
the f
lus
hin
g
a
nd c
lea
nin
g.
B
ef
ore
s
tar
ting
up
an
y fa
ns, ins
pec
t an
d d
ean
the
ins
ide of al
l
air
h
and
ling
sy
ste
ms
i
ncl
udi
ng
fan
s,
d
uct
s, coi
ls,
ter
min
al u
nit
s,
t
o en
sur
e th
at th
ey
are fre
e fr
om
du
st
a
nd
de
bri
s.
C
ar
ry
out
a
dd
itio
nal
cle
ani
ng
op
erat
ion
s of
sys
tem
s
as sp
ecif
ied
in oth
er
sec
tio
ns
of
this D
ivi
sio
n.
10.1
3
CH
IL
LE
D
W
AT
ER
SY
ST
EM
TR
EA
TM
EN
T
CH
EM
IC
AL
CL
EA
NIN
G
)
Th
e chi
lled
wa
ter
sys
tem
sha
ll
h
e
pre
pare
d as
de
tai
led el
sew
he
re
h
erei
n-T
he s
yst
em
wil
l
the
n
be
fur
the
r
t
rea
ted.
Pr
ior
to
t
est
ing
a
nd
co
mm
iss
ion
ing
,
th
e con
sul
tant
sh
all
b
e
pro
vid
ed w
ith wa
ter c
ond
itio
nin
g
pr
ogr
am
, to c
on
trol
w
ater
q
ual
ity.
Cle
ani
ng
s
hall be
sup
erv
ise
d,
nd
p
rog
ram
of
c
ond
itio
nin
g
a
dm
inis
tere
d
b
y
t
he
co
ndi
tio
ning
co
mp
any
.
CE
47
r
opo
se
H
V o
dili
ca t
ions
a
t o
de
rn
ak
ery
3
8
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 8/14
V
OL
UM
E
II
M
ec
han
ica
l
S
ect
ion
05
A
ir
o
n
d
iti
o
ni
ng
q
u
ip
m
e
nt
For Pre-commission cleaning, the system shall be dosed with Die prescribed am
ou
nt
of th
e
non
-
acid
cle
anin
g
age
nt
an
d
a
su
rfa
ctan
t
a
s
ad
vise
d
by
the
ch
em
ical
com
pa
ny.
Cle
ane
r
s
hal
l
be
run
int
o
the
sy
ste
m
a
nd ret
ain
ed
fo r
a
per
iod
of 7
2
hrs
o
r
m
ore
as a
dvi
sed
by th
e
ch
em
ica
l
c
omp
an
y,
at
th
e en
d
of
thi
s p
erio
d
t
he s
yst
em
sha
ll
be
dr
ain
ed
and
flu
she
d w
ith
cl
ean
w
ater
.
Al
l
str
ain
ers
an
d tra
pp
ing
po
int
s
sha
ll
be
insp
ect
ed,
and
an
y
deb
ris
rem
ov
ed.
S
yst
em
sha
ll
b
e r
efil
led w
ith
cl
ean
wa
ter,
re
-cir
cul
ate
d
o
r
ru
n th
rou
gh
for a
fu
rth
er
fou
r
hou
rs,
an
d
aga
in
dra
ine
d
a
nd
flus
hed
.
Th
e
fl
ush
ing
s
hall
co
ntin
ue
till
the
e
fflu
en
t
is
cle
ar, col
our
les
s,
od
ou
rles
s,
f
ree
fr
om s
usp
end
ed
sol
ids
an
d
suc
h
that
th
e
ir
on
lev
el i
s
n
ot m
or
e
t
han
1
pp
m
an
d
the conductivity
is
no
more than
3
ts/cm
t r
than the make
up wa
ter
.
u
pon
co
mp
leti
on
of flu
shi
ng
all stra
ine
rs
sh
all
he
in
spe
cte
d
and
any d
ebr
is
r
em
ove
d.
The
sys
tem
sh
all b
e re
fill
ed
wit
h
cle
an w
at
er
and
a s
pec
ifie
d
am
ou
nt
of
inh
ibi
tor
ad
de
d.
T
he
C
he
mic
al
C
om
pan
y
r
epr
ese
nta
tive
s
hal
l con
du
ct
an
a
nal
ysis
o
f
t
he
s
yst
ems
wa
ter
a
fte
r
th
e
cl
ean
ing
o
per
atio
n.
and
sh
all
s
ubm
it
a
rop
ed
t
o
th
e Co
nsu
ltan
t.
N
ot
e: Th
e
M
ech
ani
cal
Co
ntra
cto
r
sh
all
ad
vis
e
on
the
ho
ldi
ng
ca
pac
ity
o
f
th
e s
yst
ems
to
be
c
lean
ed
to
the
Che
mi
cal
Com
pa
ny
,
in ord
er
t
hat t
ie a
mo
un
t
o
f
cle
ane
r
req
uire
d
may
b
e ca
lcul
ate
d.
T
he
m
ec
han
ica
l
Co
ntr
acto
r
sh
all
pr
ovi
de
a
utom
at
ic
c
losi
ng
s
yste
m
co
mpl
ete
w
ith
ch
em
ical
t
ank
,
pump and control panel.
1
14
CH
ILL
ED WA
TE
R
S
YS
TE
M
TR
EA
TM
EN
T
C
HE
M
ICA
L
DO
SA
GE
1
14
1
In
itia
l
Re
qu
irem
en
t
o
f Ch
em
ical
s:
The
qu
ant
itie
s
sho
wn
be
low
ar
e
ind
ica
tive
.
The
a
ctu
al q
uan
titie
s
to
be che
ck
ed
by t
he
spe
cia
list
su
ppl
ier
bas
ed
o
n t
he
sys
tem
dem
an
d.
Cl
ean
ing
C
hem
ic
al
1
-
150
Kgs
Corrosion Inhibitor
2
250 Kgs
Mic
rob
ioc
ide
1
Kg
s
Bio
cid
e
5
K
gs
P
ass
iva
tion
Ch
em
ica
l
1
—
15
Kgs
1
1
4 2
Ch
em
ica
ls
for
one
Ye
ar
con
sum
pt
ion
:
C
lean
ing
C
he
mic
al
4 d
rum
s
Co
rro
sion
I
nhi
bito
r
8
d
rum
s
M
ic
rob
ioci
de
2 dr
um
s
Pas
siva
tio
n
Ch
em
ica
l
4
d
rum
s
11
L
T
R
I
MO
TO
RS
U
nle
ss
oth
erw
ise
s
pec
ifie
d
in
the
equ
ipm
en
t
spe
cifi
cati
ons
,
all
m
oto
rs
sup
pli
ed
an
d in
sta
lled
as
a
of m
ec
han
ica
l
w
ork
s
sha
ll co
nf’o
nn
to
th
e
fol
low
ing
r
equ
ire
men
ts:
G 47
Pro
po
sed
H
V
Mo
difi
cat
ion
s
at
Mo
der
n
B
ake
ry
M
9
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 10/14
VOLUME
II
Mechanical Section
05
Air
Conditioning
Equipment
d
et
weight.
e Purchase
order
number.
11 11 All motor
shafts
shall
be
provided
with
a
key way unless
the motor is of
the
flange mounted
type
in
which case they
shall
be
complete
with adjustable
rails.
11 12
The
frame shall
be
painted
in accordance
with
manufacturers standards.
However,
the
painting
shall
at
least
consist of one
coat
of
primer
and two coats
of
oil-resistant
finishing
paint.
12 0
MOTOR
STARTERS,
CONTROLS SWITCHGEAR
All starters and
other control components
shall
be supplied
and
installed
under
this section
but
the
contractor
shall ensure
that
all components
supplied
shall
comply
with the
requirements
of the
relevant
sections
of
the electric
specifications.
13 0 PANEL
BOARDS
AND
MOTOR
CONTROL
CENTRE.
Construction
of all
panel board. motor
control
centres,
control
panels etc
shall
comply with
the
relevant
sections
of
the
electrical
specifications.
13 1
Air handling unit
/
fan
starter
panels:
Each
air handling
unit shall
be
supplied
with a
starter cubicle
including the
following:
a
A
door
interlocked
isolator
handle.
b
A
three
position
HAND/OFF/AUTO
control
switch.
c
“motor
run” lamp
green .
d
A
“motor
trip”
lamp
red .
e
Motor speed
selector
switch
f
Motor
starter assembly.
g Control fuse
h
Filter pressure drop
filter
clog
indication
j
Inter-connection
with fire
alarm
system
and extract fhns
k
Power
fuses
with
carriers
and
bases.
Moisture
elimination heating
coil.
rn Heating
element
contactors and
controls.
n
leating
element
energized’ lamp
Green
GCE 147 Proposed
HVAC
Modifications at
Modern
Bakery
41
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 11/14
VOLUME
II Mechanical
Section
05
Air
Conditioning Equipment
o)
Heating element
tripped
lamp
Red
Note:
Control switch “Off’ Motor shall not run.
Control switch
“Test”
Motor shall run except
for
local lock-off stop
buttons.
Control switch “Auto” Motor shall start and stop under dictation from
remote
control
circuit.
Starter panels, where installed outdoor,
shall
be
of
the
weatherproof
type
in IP 65
enclosure.
13.2 Fan Coil Unit Control Enclosure
Control
components
of each fan
coil
unit like contactors, transformers, controllers, etc. shall be
housed within
an
enclosure located besides
the unit
within the ceiling
void.
13.3
Motor Control Centre
Motor
control centre shall be of
the
cubicle type, floor mounted and shall
contain
the
following:
Incoming
as
shown
on the
schematic
diagram.
Busbars
for
each phase, neutral
and earth.
-Outgoing as
shown
on the
schematic
diagram.
Starter
as
indicated on
the schematic diagram.
Pilot light for each phase
-Pilot light for each motor in the plant room
Push
button start-stop
for
each motor
and plant
room.
-One ammeter
with selector switch
fo r
each
motor
in
plant
room.
One
ammeter
for each phase fo r the incomer power supply
-Volt meter
with selector
switch.
-All required interlock wiring
Motor
duty
selector
switch.
Phase monitor relay
for
each motor
Low
voltage protection device.
-Bank
of
capacitors for
power
factor
improvement
as
required by
DEW
Where
motor
control centres are installed outdoor, the panel shall be of the
weather
proof type IP
iCE 147
Proposed
HVAC
Modifications Modern Bakery
M 42
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 12/14
VOLUME
II
Mechanical
Section
03
Chilled
Water
Pipework
manufacturer imposes
more
stringent requirements.
14 13
The positioning
of
anchors and guides immediately adjacent
to
angular expansion devices
shall
be in
accordance with
the manufacturer’s
recommendation
for
the application
concerned
and shall
be
submitted to
the Consultant
for approval
before
installation
commences.
The
remainder
of
the
pipework
shall
be
set
in guides
at
a maximum
of twice
the maximum
interval
for
support
spacings specified
elsewhere
for
the pipe
size to which
the
expansion
device
is
fitted.
15.0
WATER SYSTEM
TREATMENT
CLEANING
15 1
The chilled
water
system shall
be prepared
as
detailed
elsewhere
herein.
The
system will
then
be further
treated.
15 2
Prior
to
testing
and
commissioning,
the
consultant
shall be
provided with water conditioning
programme,
to
control
water
quality.
Cleaning
shall
be supervised,
and
programme
of
conditioning
administered
by
the
conditioning
company.
15 3
For
Precommission
cleaning,
the
system
shall be
dosed
with the
prescribed
amount of the
non
acid
cleaning
agent
and
a
surfactant as advised
by the
chemical
company.
15 4
Cleaner
shall
be
run into
the
system
and retained for
a
period of 72
hrs.
or
more
as
advised
by
the
chemical
company. At the
end of
this period
the
system
shall
be
drained and
flushed with
clean water.
15 5
All
strainers and trapping
points
shall
be
inspected,
and
any debris
removed.
15 6
System shall
be
refilled
with
clean
water,
re-circulated
or
run
through
for
a
further
four
hours,
and
again
drained and
flushed. The flushing shall
continue
till
the
effluent is clear,
colourless.
odourless,
free from
suspended
solids
and such
that the
iron
level
is
not more
than
10
ppm
and the
conductivity is no
more
than
30 ps/cm greater
than the
make
up
water.
15 7
Upon completion
of flushing
al l strainers shall
be inspected
and any
debris removed.
15 8
The system shall
be refilled
with
clean
water
and
a
specified
amount of inhibitor added.
15 9
The Chemical
Company representative
shall
conduct
an
analysis of the
system’s
water
after
the
cleaning
operation,
and
shall
submit a report
to the
Consultant.
Note:
The Mechanical
Contractor
shall
advise on
the holding
capacity
of the
systems to
be
cleaned to
the
Chemical
Company, in
order that
the amount
of
cleaner
required
may
be
calculated.
16
START
UP
CHEMICALS
16 1
The
supply
of all chemicals
for system startup
shall
be
the
scope
of
this
contract. Chemicals
sufficient
for
contractual maintenance
period
shall
be
arranged
by the
Contractor.
17.0
VIBRATION
ISOLATION
See
Ductwork
Specification.
CE
147-
Proposed
FIVAC
Electrical Modifications
at Modern
Bakery
13
7/17/2019 Chemical Dosing Spec
http://slidepdf.com/reader/full/chemical-dosing-spec 13/14
2 8
Chemical
Treatment Unit
The
chiller plant
manager
via
the
volt
free contacts from
the unit
control panel
shall monitor
the
fo iowng
Pump
set in auto
GCE
47
Proposed HVAC Modifications at Modern
Bakery
M