CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
ABBOTT (ROBERT) 259 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
ABBOTT (ROBERT) 259 SI Playground Chicago Plays! - new equipment COMPLETE 2013
ABBOTT (ROBERT) 259 FR Minor Rehab Misc. pool stairs COMPLETE 2015
ABBOTT (ROBERT) 259 FR Swimming Pool Pool - rehab COMPLETE 2016
ABBOTT (ROBERT) 259 SI Paving 2016 DW Paving COMPLETE 2017
ABBOTT (ROBERT) 259 SI Landscape Tree planting COMPLETE 2018
ABBOTT (ROBERT) 259 SI Site Improvement Park improvements COMPLETE 2018
ABBOTT (ROBERT) 259 FR Concrete Masonry Structural Field house - masonry PRE-DESIGN
ADA (SAWYER GARRETT) 45 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
ADA (SAWYER GARRETT) 45 FR Minor Rehab Entrance and washrooms COMPLETE 2012
ADA (SAWYER GARRETT) 45 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
ADA (SAWYER GARRETT) 45 SI Paving Paving - playground COMPLETE 2012
ADA (SAWYER GARRETT) 45 SI Lighting Lighting - parking lot COMPLETE 2012
ADA (SAWYER GARRETT) 45 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
ADA (SAWYER GARRETT) 45 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2013
ADA (SAWYER GARRETT) 45 FR Swimming Pool Misc. rehab COMPLETE 2015
ADA (SAWYER GARRETT) 45 FR Concrete Masonry Structural Field house - masonry and tuckpointing COMPLETE 2017
ADA (SAWYER GARRETT) 45 SI Athletic Field Athletic field - rehab COMPLETE 2018 *
ADA (SAWYER GARRETT) 45 FR Minor Rehab Wheelchair Lift - new COMPLETE 2019
ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water feature - surfacing COMPLETE 2011
ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water feature - surfacing COMPLETE 2012
ADAMS (GEORGE & ADELE) 1019 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
ADAMS (GEORGE & ADELE) 1019 SI Spray Pool Water play feature - major rehab COMPLETE 2018 *
ADAMS (GEORGE & ADELE) 1019 FR Roof Roof and perimeter drainage PRE-DESIGN
ADDAMS (JANE) 262 SI Lighting Lighting - exterior COMPLETE 2012
ADDAMS (JANE) 262 AD Park Development Site preparation COMPLETE 2018
ADDAMS (JANE) 262 AD New Construction ComEd Recreation Center at Addams Park COMPLETE 2020 *
ADDAMS (JANE) MEML. 1224 SI Site Improvement Ohio St. Underpass - artwork COMPLETE 2011
ADDAMS (JANE) MEML. 1224 FR Minor Rehab Misc. - lockers and drainage improvements COMPLETE 2014
ADDAMS (JANE) MEML. 1224 AD New Construction Navy Pier Flyover (CDOT) COMPLETE 2018 *
ADDAMS (JANE) MEML. 1224 AD Planning Framework plan PLANNING
ALTGELD (JOHN) 206 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
ALTGELD (JOHN) 206 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
ALTGELD (JOHN) 206 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
ALTGELD (JOHN) 206 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012 *
ALTGELD (JOHN) 206 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
ALTGELD (JOHN) 206 FR Concrete Masonry Structural Chimney and entrance COMPLETE 2014
ALTGELD (JOHN) 206 SI Site Improvement Misc. -fencing, signage, lighting COMPLETE 2017
ALTGELD (JOHN) 206 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2017
1 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
ALTGELD (JOHN) 206 FR Minor Rehab Gym floor - rehabs COMPLETE 2018
ALTGELD (JOHN) 206 FR Swimming Pool Pool - valves COMPLETE 2020
AMUNDSEN (ROALD) 129 FR Minor Rehab Light Tower - replacement COMPLETE 2020
AMUNDSEN (ROALD) 129 FR Fitness Center Fitness center - upgrade COMPLETE 2011
AMUNDSEN (ROALD) 129 SI Paving Paving - paths COMPLETE 2013
AMUNDSEN (ROALD) 129 SI Athletic Field Artificial turf athletic field and track - new COMPLETE 2016 *
AMUNDSEN (ROALD) 129 FR Roof Roof COMPLETE 2019
AMUNDSEN (ROALD) 129 SI Playground Playground - upgrade COMPLETE 2020 *
ANDERSON (FRED) 561 AD Park Development Park development - 16th St. and Wabash Ave. COMPLETE 2014 *
ANDERSON (FRED) 561 AD Acquisition 16th St. and Wabash Ave. COMPLETE 2015
ANDERSON (FRED) 561 SI Site Improvement Park improvements COMPLETE 2018 *
ANDERSON (LOUIS) 1020 SI Playground Chicago Plays! - new equipment COMPLETE 2014
ANDERSON (LOUIS) 1020 SI Site Improvement Water main - new COMPLETE 2017
ANDERSONVILLE 1078 SI Playground Chicago Plays! - new equipment COMPLETE 2015
ARCHER (WILLIAM BEATTY) 250 FR Minor Rehab Field house - new flooring DESIGN
ARCHER (WILLIAM BEATTY) 250 SI Spray Pool Water playground - misc. PRE-DESIGN
ARCHER (WILLIAM BEATTY) 250 FR Minor Rehab Field house - damage restoration COMPLETE 2020
ARCHER (WILLIAM BEATTY) 250 SI Fencing Misc. - gates COMPLETE 2011
ARCHER (WILLIAM BEATTY) 250 SI Spray Pool Water feature - surfacing COMPLETE 2012
ARCHER (WILLIAM BEATTY) 250 FR Fitness Center Fitness center - upgrade COMPLETE 2012
ARCHER (WILLIAM BEATTY) 250 FR Fitness Center Fitness center - upgrade COMPLETE 2012
ARCHER (WILLIAM BEATTY) 250 SI Lighting Lighting - ballfield COMPLETE 2013
ARCHER (WILLIAM BEATTY) 250 SI Paving Paving - pathways COMPLETE 2015
ARCHER (WILLIAM BEATTY) 250 SI Courts Artificial Turf Court - rehab COMPLETE 2016
ARCHER (WILLIAM BEATTY) 250 SI Athletic Field Athletic field - scoreboard and bleachers COMPLETE 2017 *
ARCHER (WILLIAM BEATTY) 250 FR Major Rehab Field house - major rehab COMPLETE 2018 *
ARCHER (WILLIAM BEATTY) 250 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 *
ARCHER (WILLIAM BEATTY) 250 SI Lighting Athletic field - lighting COMPLETE 2019 *
ARCHER (WILLIAM BEATTY) 250 SI Athletic Field Ballfields - rehab COMPLETE 2020 *
ARMOUR (PHILIP) SQUARE 3 SI Paving Entrance - access paving COMPLETE 2011
ARMOUR (PHILIP) SQUARE 3 SI Athletic Field Ballfield - rehab COMPLETE 2012
ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
ARMOUR (PHILIP) SQUARE 3 FR Minor Rehab Gym floor - restore or replace COMPLETE 2012
ARMOUR (PHILIP) SQUARE 3 FR Minor Rehab Field house - exterior painting COMPLETE 2012
ARMOUR (PHILIP) SQUARE 3 FR Major Rehab Transition plan - access improvements COMPLETE 2012
ARMOUR (PHILIP) SQUARE 3 SI Courts Court - conversion to roller hockey COMPLETE 2013 *
ARMOUR (PHILIP) SQUARE 3 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 *
ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool Pool - liner and filter COMPLETE 2015
ARMOUR (PHILIP) SQUARE 3 FR Swimming Pool ADA - pool stairs COMPLETE 2017
2 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
ARMOUR (PHILIP) SQUARE 3 SI Lighting Ballfield and walkway lighting COMPLETE 2020
ARMSTRONG (LILLIAN HARDIN) 492 SI Site Improvement Misc. pathway lighting and paving COMPLETE 2013
ARMSTRONG (LILLIAN HARDIN) 492 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
ARMSTRONG (LILLIAN HARDIN) 492 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2013
ARMSTRONG (LILLIAN HARDIN) 492 SI Site Improvement Track and walkway - resurfacing COMPLETE 2016 *
ARRIGO (VICTOR) 215 SI Paving Paving - pathways COMPLETE 2017
ASHE (ARTHUR) BEACH 459 SI Fencing Storm damage - protection CONSTRUCTION *
ASHMORE 427 SI Playground Chicago Plays! - new equipment COMPLETE 2015
ASPEN 321 SI Playground Chicago Plays! - new equipment COMPLETE 2016
ASTER 343 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
ATHLETIC FIELD 80 FR Minor Rehab Ceramic Building - rehab DESIGN *
ATHLETIC FIELD 80 FR HVAC and Energy Efficiency Field house - new boiler COMPLETE 2011
ATHLETIC FIELD 80 SI Athletic Field Ballfield - rehab COMPLETE 2014
ATHLETIC FIELD 80 SI Athletic Field Ballfield - rehab COMPLETE 2017 *
ATHLETIC FIELD 80 SI Paving 2016 DW Paving -pathways COMPLETE 2017
ATHLETIC FIELD 80 FR Major Rehab Ceramic Building - major rehab COMPLETE 2018 *
AUGUSTA (CARPENTER) 1021 SI Playground Playground - new COMPLETE 2011 *
AUGUSTA (CARPENTER) 1021 FR Roof Roof - rehab COMPLETE 2019
AUSTIN (HENRY) 1204 SI Spray Pool Site improvements DESIGN
AUSTIN (HENRY) 1204 SI Spray Pool Water play feature - rehab COMPLETE 2016
AUSTIN (HENRY) 1204 SI Playground Chicago Plays! - new equipment COMPLETE 2016
AUSTIN FOSTER 285 SI Playground Chicago Plays! - new equipment COMPLETE 2016
AUSTIN TOWN HALL 207 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011
AUSTIN TOWN HALL 207 FR Fitness Center Fitness center - upgrade COMPLETE 2011
AUSTIN TOWN HALL 207 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
AUSTIN TOWN HALL 207 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
AUSTIN TOWN HALL 207 FR Fitness Center Fitness center - upgrade COMPLETE 2013
AUSTIN TOWN HALL 207 SI Playground Chicago Plays! - new equipment COMPLETE 2014
AUSTIN TOWN HALL 207 FR Swimming Pool Pool - basin rehab COMPLETE 2019
AUSTIN TOWN HALL 207 FR Major Rehab Transition plan - access improvements COMPLETE 2019 *
AUSTIN TOWN HALL 207 FR Major Rehab Cultural Center Initiative DESIGN *
AVALON 29 FR Major Rehab Field house and track - major rehab PLANNING *
AVALON 29 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2012
AVALON 29 FR Major Rehab Transition plan - access improvements COMPLETE 2012
AVALON 29 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
AVALON 29 SI Site Improvement Benches COMPLETE 2012
AVALON 29 SI Paving Track - surfacing COMPLETE 2012
AVALON 29 SI Fencing Misc. - traffic control gates COMPLETE 2013
AVALON 29 SI Spray Pool Pool - rehab COMPLETE 2015
3 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
AVALON 29 SI Playground Chicago Plays! - new equipment COMPLETE 2016
AVALON 29 SI Paving Site paving COMPLETE 2016
AVALON 29 FR Concrete Masonry Structural Field house - tuckpointing COMPLETE 2017
AVALON 29 FR HVAC and Energy Efficiency Boilers - new COMPLETE 2018
AVALON 29 FR Swimming Pool Pool - controls COMPLETE 2018
AVALON 29 FR Swimming Pool Pool - liner PRE-DESIGN
AVONDALE 81 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011
AVONDALE 81 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
AVONDALE 81 FR Concrete Masonry Structural Misc. balcony reconstruction COMPLETE 2014
AVONDALE 81 SI Paving 2016 DW Paving -pathways COMPLETE 2017
AVONDALE 81 SI Site Improvement Park improvements PRE-DESIGN *
AVONDALE 81 FR Major Rehab Field house - major restoration PRE-DESIGN *
BACK OF THE YARDS 1063 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
BACK OF THE YARDS 1063 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BARAGA (FREDERICK) 295 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
BARAGA (FREDERICK) 295 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BARBERRY 332 AD Acquisition Expansion COMPLETE 2012
BARNARD (AMY L.) 1205 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BARRETT (CHARLES) 1022 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 *
BARTELME (MARY) 542 AD Acquisition Sangamon St. and Adams St. - expansion COMPLETE 2011
BAULER (MATHIAS) 365 SI Playground Chicago Plays! - new equipment COMPLETE 2016 *
BEEHIVE 328 AD Acquisition Expansion COMPLETE 2014 *
BEEHIVE 328 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BEILFUSS (ALBERT W.) 1003 SI Playground Chicago Plays! - new equipment COMPLETE 2015 *
BELL (GEORGE,JR.) 121 SI Playground Chicago Plays! - new equipment COMPLETE 2015
BELL (GEORGE,JR.) 121 SI Courts Tennis and Multi-Use Court- rehabs COMPLETE 2017 *
BELL (GEORGE,JR.) 121 SI Spray Pool Water play feature - rehab COMPLETE 2018 *
Beniac (John “Beans”) Greenway 499 AD Acquisition Expansion COMPLETE 2011
BERGER (ALBERT) 1255 SI Site Improvement Storm damage - restoration CONSTRUCTION *
BERGER (ALBERT) 1255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
BERGER (ALBERT) 1255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013
BERGER (ALBERT) 1255 FR Concrete Masonry Structural All Buildings - concrete, structural, masonry COMPLETE 2015
BERGER (ALBERT) 1255 SI Landscape Historic landscape restoration COMPLETE 2016 *
BERGER (ALBERT) 1255 FR Minor Rehab Park Improvements PLANNING *
BERGER (ALBERT) 1255 FR Minor Rehab Cultural Center Initiative PLANNING
BESSEMER (HENRY) 12 SI Fencing Misc. - gates COMPLETE 2011
BESSEMER (HENRY) 12 SI Paving Paving - driveway COMPLETE 2011
BESSEMER (HENRY) 12 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2012
BESSEMER (HENRY) 12 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
4 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
BESSEMER (HENRY) 12 FR Minor Rehab Field house - locker room improvements COMPLETE 2012
BESSEMER (HENRY) 12 FR Concrete Masonry Structural Chimney COMPLETE 2013
BESSEMER (HENRY) 12 FR Minor Rehab Misc. - washrooms COMPLETE 2013
BESSEMER (HENRY) 12 FR Minor Rehab Misc. Pool Stair renovation COMPLETE 2015
BESSEMER (HENRY) 12 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BESSEMER (HENRY) 12 SI Paving 2016 DW Paving COMPLETE 2016
BESSEMER (HENRY) 12 SI Courts Basketball Court - rehab COMPLETE 2016
BESSEMER (HENRY) 12 FR Swimming Pool Pool - filter COMPLETE 2017
BESSEMER (HENRY) 12 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2017
BESSEMER (HENRY) 12 FR Minor Rehab Field house - interior rehab including kitchen, bathrooms COMPLETE 2018 *
BESSEMER (HENRY) 12 SI Site Improvement Running track - resurface COMPLETE 2018 *
BESSEMER (HENRY) 12 SI Site Improvement Artificial Turf Court - rehab PRE-DESIGN *
BEVERLY 254 FR Sculpture and Monument Memorial Sculpture - new COMPLETE 2012
BEVERLY 254 SI Courts In-line hockey - new COMPLETE 2014
BEVERLY 254 SI Playground Playground - new COMPLETE 2018 *
BIG MARSH 564 SI Landscape Big Marsh - Habitat restoration - controlling invasives CONSTRUCTION *
BIG MARSH 564 AD Planning Habitat Plan - Big Marsh COMPLETE 2015 *
BIG MARSH 564 SI Site Improvement Big Marsh - water control structure COMPLETE 2015 *
BIG MARSH 564 SI Landscape Big Marsh - wetland restoration COMPLETE 2016 *
BIG MARSH 564 AD Park Development Park Development - Big Marsh COMPLETE 2016 *
BIG MARSH 564 AD Acquisition Big Marsh - expansion COMPLETE 2017
BIG MARSH 564 SI Landscape Big Marsh - habitat restoration COMPLETE 2017 *
BIG MARSH 564 SI Site Improvement Calumet Area - signage COMPLETE 2017 *
BIG MARSH 564 SI Site Improvement Big Marsh - western access COMPLETE 2018 *
BIG MARSH 564 SI Landscape Big Marsh - upland habitat COMPLETE 2018 *
BIG MARSH 564 SI Site Improvement Big Marsh - east side trail expansion COMPLETE 2018 *
BIG MARSH 564 SI Landscape Big Marsh - hydrology and riparian habitat COMPLETE 2019 *
BIG MARSH 564 SI Site Improvement Park improvements DESIGN *
BIG MARSH 564 AD Park Development Multi-use Trail System - design COMPLETE 2020
BIG MARSH 564 AD New Construction Ford Calumet Environmental Center CONSTRUCTION *
BIRCH 322 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BIXLER (RAY) 1083 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BIXLER (RAY) 1083 SI Site Improvement Chess Table - new COMPLETE 2018 *
BLACKHAWK 122 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
BLACKHAWK 122 SI Athletic Field Athletic field - rehab COMPLETE 2012
BLACKHAWK 122 FR Swimming Pool Pool - rehab COMPLETE 2013
BLACKHAWK 122 SI Playground Chicago Plays! - new equipment COMPLETE 2015
BLACKHAWK 122 SI Courts Tennis court - rehab and conversion to artificial turf COMPLETE 2016 *
BLACKHAWK 122 SI Courts Basketball Court - rehab COMPLETE 2018 *
5 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
BLACKHAWK 122 FR Swimming Pool Pool - valves COMPLETE 2019
BLACKHAWK 122 FR Major Rehab Major Restoratoin PRE-DESIGN *
BLACKWELDER (I.S., GERTRUDE) 373 AD Park Development Park development including new playground COMPLETE 2011 *
BOGAN (WILLIAM) 264 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2013
BOGAN (WILLIAM) 264 SI Playground Chicago Plays! - new equipment COMPLETE 2015
BOGAN (WILLIAM) 264 SI Paving Site paving COMPLETE 2016
BOGAN (WILLIAM) 264 SI Landscape Tree planting COMPLETE 2019
BOLER (LEO ROSCOE, SR.) 496 SI Site Improvement Misc. site improvements COMPLETE 2015
BOLER (LEO ROSCOE, SR.) 496 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BOSLEY (WILLIAM) 1024 SI Athletic Field Athletic field - rehab COMPLETE 2015
BOSLEY (WILLIAM) 1024 FR Roof Roof COMPLETE 2016
BOSLEY (WILLIAM) 1024 SI Site Improvement Park improvements including playground, spray, turf field DESIGN *
BOSWELL (ARNITA YOUNG) 340 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BRADLEY (JOSEPHINE) 1004 SI Playground Playground - Concept Design COMPLETE 2013
BRADLEY (JOSEPHINE) 1004 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BRADLEY (JOSEPHINE) 1004 FR Major Rehab Field House - fire damage COMPLETE 2016
BRADLEY (JOSEPHINE) 1004 FR Minor Rehab Field house - rehab PRE-DESIGN
BRAINERD 177 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
BRAINERD 177 FR HVAC and Energy Efficiency Roof HVAC units - new PRE-DESIGN
BRAINERD 177 FR Sculpture and Monument Monument - restoration PRE-DESIGN
BRANDS 187 FR Minor Rehab Gym floor - refurbish COMPLETE 2019
BRANDS 187 SI Athletic Field Ballfield - rehab COMPLETE 2015
BRANDS 187 FR HVAC and Energy Efficiency HVAC -rehab COMPLETE 2019
BRANDS 187 FR Roof Field house - roof COMPLETE 2019
BRIGHTON 426 SI Playground Playground - rehab PRE-DESIGN *
BRIGHTON 426 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
BROADWAY ARMORY 462 FR Major Rehab Field house - rehab - phase II COMPLETE 2012 *
BROADWAY ARMORY 462 AD Planning Indoor track - feasibility study COMPLETE 2012
BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC - rehab COMPLETE 2013
BROADWAY ARMORY 462 FR Roof Boiler room - rehab COMPLETE 2013
BROADWAY ARMORY 462 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014
BROADWAY ARMORY 462 FR Major Rehab Misc. fire escape rehab COMPLETE 2015
BROADWAY ARMORY 462 FR Minor Rehab Misc. elevator COMPLETE 2016
BROADWAY ARMORY 462 FR Minor Rehab Teen Center - new COMPLETE 2018
BROADWAY ARMORY 462 FR Concrete Masonry Structural Facility Rehab - masonry and parapet BID/AWARD
BRONCHO BILLY 487 SI Playground Spray feature and playground - upgrade COMPLETE 2020 *
BROOKS (GWENDOLYN) 362 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
BROOKS (GWENDOLYN) 362 SI Courts Court conversion to pickleball COMPLETE 2018 *
6 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
BROOKS (OSCAR) 61 SI Site Improvement Tennis court - rehab COMPLETE 2012
BROOKS (OSCAR) 61 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
BROOKS (OSCAR) 61 SI Athletic Field Athletic field - rehab COMPLETE 2013
BROOKS (OSCAR) 61 SI Playground Chicago Plays! - new equipment COMPLETE 2014 *
BROWN (SIDNEY) MEML. 289 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BROWN (SIDNEY) MEML. 289 SI Athletic Field Athletic field - rehab COMPLETE 2016
BROWN (SIDNEY) MEML. 289 SI Landscape Tree planting COMPLETE 2018
BROWN (SIDNEY) MEML. 289 AD Park Development Park expansion - site improvements COMPLETE 2019 *
BRYNFORD 1141 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BUENA CIRCLE 1084 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BURNHAM (DANIEL) 27 AD New Construction Shoreline Protection with U.S. Army Corps (Morgan Shoal) DESIGN *
BURNHAM (DANIEL) 27 AD New Construction Shoreline Protection with U.S. Army Corps (Promontory Point) PLANNING *
BURNHAM (DANIEL) 27 SI Site Improvement Morgan Shoal - storm damage COMPLETE 2020 *
BURNHAM (DANIEL) 27 FR HVAC and Energy Efficiency Promontory Point - boiler CONSTRUCTION
BURNHAM (DANIEL) 27 FR Roof 39th St. Trade Yard - roof COMPLETE 2011
BURNHAM (DANIEL) 27 SI Playground Soldier Field - Playground Expansion - Study COMPLETE 2011
BURNHAM (DANIEL) 27 SI Paving Museum Campus - permeable paving COMPLETE 2013
BURNHAM (DANIEL) 27 SI Lighting Exterior - pathways COMPLETE 2013
BURNHAM (DANIEL) 27 FR Minor Rehab Misc. improvements COMPLETE 2013
BURNHAM (DANIEL) 27 AD New Construction Shoreline Protection with U.S. Army Corps (43rd St. - 45th St.) COMPLETE 2013 *
BURNHAM (DANIEL) 27 AD New Construction New Harbor Development - 31st St. COMPLETE 2014
BURNHAM (DANIEL) 27 FR Concrete Masonry Structural Promontory Point - Concrete and structural COMPLETE 2014
BURNHAM (DANIEL) 27 SI Site Improvement Judd Goldman Sailing Center - shade structure COMPLETE 2015
BURNHAM (DANIEL) 27 AD Planning Morgan Shoal - concept planning COMPLETE 2015 *
BURNHAM (DANIEL) 27 SI Site Improvement 31st St. Harbor - Special Event Deck COMPLETE 2015
BURNHAM (DANIEL) 27 AD New Construction Promontory Point - shoreline revetment COMPLETE 2015
BURNHAM (DANIEL) 27 SI Playground Chicago Plays! - new equipment COMPLETE 2015
BURNHAM (DANIEL) 27 SI Landscape Burnham Wildlife Corridor - improvements COMPLETE 2016 *
BURNHAM (DANIEL) 27 FR Fitness Center 39th St. Beach - Outdoor Fitness Course COMPLETE 2016 *
BURNHAM (DANIEL) 27 AD Planning 18th St. Parking Garage - new COMPLETE 2016
BURNHAM (DANIEL) 27 SI Playground Chicago Plays! - new equipment at 47th St. COMPLETE 2016
BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 31st St. to 35th St. COMPLETE 2016
BURNHAM (DANIEL) 27 FR Sculpture and Monument "David Wallach Memorial Fountain" - restoration COMPLETE 2016 *
BURNHAM (DANIEL) 27 FR Concrete Masonry Structural 39th Street Trades Yard - emergency rehab COMPLETE 2017
BURNHAM (DANIEL) 27 SI Landscape Natural Area - Burnham Wildlife Corridor (31st St to 47th St) COMPLETE 2017 *
BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 35th St. COMPLETE 2017 *
BURNHAM (DANIEL) 27 SI Paving 31st St. Parking Lot - expansion (west lot) COMPLETE 2017
BURNHAM (DANIEL) 27 SI Site Improvement Misc. - brick wall rehab COMPLETE 2017
BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 35th St. to 41st St. COMPLETE 2017 *
7 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
BURNHAM (DANIEL) 27 SI Landscape Tree planting COMPLETE 2018
BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 41st St. COMPLETE 2018 *
BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 39th St. COMPLETE 2018 *
BURNHAM (DANIEL) 27 SI Paving Landscape yard - paving COMPLETE 2018
BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - 41st St. to 55th St. COMPLETE 2018 *
BURNHAM (DANIEL) 27 FR Minor Rehab Promontory Point - new flooring COMPLETE 2018
BURNHAM (DANIEL) 27 SI Site Improvement Lakefront Trail Separation - Roosevelt Rd. to 31st St. COMPLETE 2018 *
BURNHAM (DANIEL) 27 SI Site Improvement Memorial Plaza at 43rd St. -new COMPLETE 2019 *
BURNHAM (DANIEL) 27 SI Paving Parking lot at 55th St - rehab COMPLETE 2019
BURNHAM (DANIEL) 27 FR HVAC and Energy Efficiency 39th St. Trades Yard - furnace and boiler COMPLETE 2019
BURNHAM (DANIEL) 27 AD Planning 31st St. Framework Plan DESIGN
BURNHAM (DANIEL) 27 FR Concrete Masonry Structural Promontory Point - masonry PRE-DESIGN
BURNHAM (DANIEL) 27 FR Roof Judd Goldman Sailing - new roof PRE-DESIGN
BURNHAM (DANIEL) 27 SI Site Improvement Burnham Harbor - dock replacement CONSTRUCTION
BURNHAM (DANIEL) 27 AD New Construction CDOT Bridge - new park access at 43rd St. CONSTRUCTION *
BURNSIDE (AMBROSE) 363 SI Courts Basketball court - rehab BID/AWARD *
BURNSIDE (AMBROSE) 363 AD New Construction Comfort station, spray feature and site improvements PENDING FUNDING *
BURNSIDE (AMBROSE) 363 SI Playground Chicago Plays! - new equipment COMPLETE 2014
BUTTERCUP 385 SI Playground Site improvements PRE-DESIGN
BUTTERCUP 385 SI Playground Playground - new COMPLETE 2013 *
BUTTERNUT 1272 SI Playground Chicago Plays! - new equipment COMPLETE 2016
BYRNES (MARIAN) 562 SI Landscape Woodland/Savanna habitat restoration CONSTRUCTION *
BYRNES (MARIAN) 562 SI Landscape Van Vlissingen - habitat creation COMPLETE 2015 *
BYRNES (MARIAN) 562 SI Landscape Van Vlissingen - Habitat enhancement COMPLETE 2018 *
BYRNES (MARIAN) 562 SI Landscape Van Vlissingen - costal woodland restoration COMPLETE 2019 *
BYRNES (MARIAN) 562 SI Landscape Van Vlissingen - wetland bird habitat COMPLETE 2019 *
BYRNES (MARIAN) 562 SI Site Improvement Park development - including multi-use trail and new habitat COMPLETE 2020 *
BYRNES (MARIAN) 562 AD Park Development Park Development - Van Vlissingen CONSTRUCTION *
CALIFORNIA 189 SI Athletic Field Wheelchair softball - major upgrade PRE-DESIGN *
CALIFORNIA 189 FR HVAC and Energy Efficiency Ice rink - compressor COMPLETE 2011
CALIFORNIA 189 SI Paving Parking lot - rehab COMPLETE 2011
CALIFORNIA 189 FR Roof Roof - rehab COMPLETE 2012
CALIFORNIA 189 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
CALIFORNIA 189 FR HVAC and Energy Efficiency McFetridge - major rehab including HVAC energy management COMPLETE 2012
CALIFORNIA 189 SI Courts Softball court - rehab COMPLETE 2012
CALIFORNIA 189 SI Courts Courts - rehab including drainage COMPLETE 2012
CALIFORNIA 189 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
CALIFORNIA 189 SI Fencing Fencing COMPLETE 2014
CALIFORNIA 189 FR Minor Rehab Misc. interior rehab - McFetridge COMPLETE 2015
8 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
CALIFORNIA 189 FR Swimming Pool Pool - filter COMPLETE 2017
CALIFORNIA 189 SI Playground Chicago Plays! - new equipment and water play feature COMPLETE 2017 *
CALIFORNIA 189 AD New Construction McFetridge -Ice Rink Expansion COMPLETE 2018
CALIFORNIA 189 AD New Construction 312 RiverRun Bridge (CDOT) COMPLETE 2019 *
CALIFORNIA 189 AD Acquisition Park expansion COMPLETE 2019
CALIFORNIA 189 SI Courts Courts - tennis and basketball COMPLETE 2019
CALUMET 11 FR Major Rehab Field house - building envelope PENDING FUNDING *
CALUMET 11 SI Courts Tennis Courts - conversion PLANNING
CALUMET 11 FR Minor Rehab Misc. - bathroom improvements COMPLETE 2011
CALUMET 11 FR Minor Rehab Landscape Yard - rehab COMPLETE 2011
CALUMET 11 FR Minor Rehab Lobby - rehab COMPLETE 2011 *
CALUMET 11 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 *
CALUMET 11 SI Athletic Field Athletic field - rehab COMPLETE 2012
CALUMET 11 FR Concrete Masonry Structural Power house - chimney COMPLETE 2013
CALUMET 11 FR Concrete Masonry Structural Field house - major rehab COMPLETE 2014
CALUMET 11 FR Roof Roof - rehab COMPLETE 2014
CALUMET 11 SI Lighting Lighting - exterior COMPLETE 2014
CALUMET 11 SI Playground Chicago Plays! - new equipment COMPLETE 2015
CALUMET 11 SI Athletic Field Athletic field - rehab COMPLETE 2015
CALUMET 11 SI Site Improvement Outdoor fitness station - new COMPLETE 2016 *
CALUMET 11 SI Site Improvement Dog Friendly Area - new COMPLETE 2018 *
CALUMET 11 SI Landscape Tree planting COMPLETE 2019
CALUMET 11 FR Minor Rehab Field House - rehab COMPLETE 2020
CALUMET 11 FR Minor Rehab Cultural Center Initiative PLANNING
CALUMET 11 FR Roof Landscape Yard - roof and masonry PRE-DESIGN
CARMEN 1085 SI Playground Chicago Plays! - new equipment COMPLETE 2016
CARPENTER (PHILO) 1086 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2020
CARVER (GEORGE WASHINGTON) 255 FR Swimming Pool Pool - filter system COMPLETE 2011
CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
CARVER (GEORGE WASHINGTON) 255 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency Misc. - exhaust fans COMPLETE 2013
CARVER (GEORGE WASHINGTON) 255 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CARVER (GEORGE WASHINGTON) 255 FR Roof Roof COMPLETE 2014
CARVER (GEORGE WASHINGTON) 255 FR Minor Rehab Teen Fitness Center - new COMPLETE 2015 *
CARVER (GEORGE WASHINGTON) 255 FR HVAC and Energy Efficiency Pool boiler - rehab COMPLETE 2017
CARVER (GEORGE WASHINGTON) 255 SI Landscape Tree planting COMPLETE 2018
CARVER (GEORGE WASHINGTON) 255 FR Swimming Pool Pool - rehab COMPLETE 2018
CARVER (GEORGE WASHINGTON) 255 SI Athletic Field Batting cage and scoreboard - new COMPLETE 2018 *
9 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
CEDAR 1279 SI Playground Playground -rehab COMPLETE 2018 *
CENTENNIAL 1238 SI Site Improvement Identity signage COMPLETE 2019 *
CENTRAL 1087 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CHALLENGER 488 SI Lighting Lighting - parking lot COMPLETE 2013 *
CHASE (SALMON) 103 SI Playground Playground - upgrade COMPLETE 2020 *
CHASE (SALMON) 103 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011
CHASE (SALMON) 103 FR Swimming Pool Pool Retrofit - compliance and liner COMPLETE 2012
CHASE (SALMON) 103 FR Major Rehab Field house - mural COMPLETE 2012 *
CHASE (SALMON) 103 FR Swimming Pool Pool - filter COMPLETE 2014
CHASE (SALMON) 103 FR Minor Rehab Misc. Pool Stair renovation COMPLETE 2015
CHASE (SALMON) 103 FR Minor Rehab Field house - assessment COMPLETE 2018
CHASE (SALMON) 103 FR Swimming Pool Pool - liner rehab COMPLETE 2020
CHASE (SALMON) 103 SI Athletic Field Artificial turf athletic field - new COMPLETE 2020 *
CHASE (SALMON) 103 FR Roof Roof COMPLETE 2020 *
CHESTNUT 1275 SI Playground Chicago Plays! - new equipment COMPLETE 2016
CHICAGO WOMEN'S PARK AND GARDENS 550 FR Sculpture and Monument "Helping Hands" - installation COMPLETE 2011
CHICAGO WOMEN'S PARK AND GARDENS 550 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
CHICAGO WOMEN'S PARK AND GARDENS 550 FR Major Rehab Field house - major rehab COMPLETE 2014 *
CHICAGO WOMEN'S PARK AND GARDENS 550 FR Minor Rehab Park improvements COMPLETE 2017 *
CHICAGO WOMEN'S PARK AND GARDENS 550 FR HVAC and Energy Efficiency HVAC improvement COMPLETE 2018
CHICAGO WOMEN'S PARK AND GARDENS 550 SI Site Improvement Park drainage COMPLETE 2019
CHIPPEWA 167 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CHIPPEWA 167 FR Concrete Masonry Structural Chimney and tuckpointing COMPLETE 2015
CHOPIN (FREDERIC) 146 SI Site Improvement Drainage improvements COMPLETE 2013
CHOPIN (FREDERIC) 146 SI Site Improvement Park improvements COMPLETE 2013
CHOPIN (FREDERIC) 146 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CHOPIN (FREDERIC) 146 SI Courts Tennis court - rehab COMPLETE 2018
CHOPIN (FREDERIC) 146 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 *
CHOPIN (FREDERIC) 146 FR Roof Field house - roof, masonry, interior PRE-DESIGN *
CHRISTIANA 1089 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
CHRISTIANA 1089 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CHRISTIANA 1089 SI Site Improvement Expansion - site improvements COMPLETE 2019 *
CHURCHILL FIELD 412 SI Site Improvement Misc. - drainage COMPLETE 2016
CHURCHILL FIELD 412 SI Athletic Field Athletic field - rehab COMPLETE 2016
CLAREMONT 400 SI Playground Misc. park improvement COMPLETE 2011
CLAREMONT 400 SI Site Improvement Landscape and site improvement COMPLETE 2012
CLAREMONT 400 SI Playground Playground - new COMPLETE 2012 *
CLARENDON COMM. CTR. 1002 SI Landscape Tree planting COMPLETE 2020
CLARENDON COMM. CTR. 1002 SI Lighting Lighting - ballfield COMPLETE 2012
10 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
CLARENDON COMM. CTR. 1002 SI Site Improvement Dog friendly area - new COMPLETE 2012 *
CLARENDON COMM. CTR. 1002 SI Fencing Misc. rehab COMPLETE 2013
CLARENDON COMM. CTR. 1002 FR Major Rehab Field house - major rehab COMPLETE 2015 *
CLARENDON COMM. CTR. 1002 SI Courts Basketball Court - rehab COMPLETE 2016
CLARENDON COMM. CTR. 1002 AD New Construction Field house - study COMPLETE 2016
CLARENDON COMM. CTR. 1002 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2018 *
CLARENDON COMM. CTR. 1002 SI Athletic Field Athletic field - rehab COMPLETE 2019
CLARENDON COMM. CTR. 1002 FR Major Rehab Field house - major restoration DESIGN *
CLARK (JOHN) 1026 FR Swimming Pool Swimming pool - filter BID/AWARD *
CLARK (JOHN) 1026 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
CLARK (JOHN) 1026 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CLARK (JOHN) 1026 FR Swimming Pool Emergency restoration COMPLETE 2019
CLARK (JOHN) 1026 FR Swimming Pool Outdoor pool - water main and tank COMPLETE 2020 *
CLARK (RICHARD) 457 SI Paving Pathway - paving COMPLETE 2020
CLARK (RICHARD) 457 FR Major Rehab Lane Tech Stadium - interior COMPLETE 2011
CLARK (RICHARD) 457 AD New Construction New Chicago River Boat House COMPLETE 2013 *
CLARK (RICHARD) 457 AD New Construction Kerry Wood Cubs Field - new stadium COMPLETE 2015 *
CLARK (RICHARD) 457 SI Athletic Field Artificial Turf Athletic Field - new COMPLETE 2017
CLARK (RICHARD) 457 SI Athletic Field Kerry Wood's Cubs Field - field rehab COMPLETE 2019 *
CLARK (RICHARD) 457 SI Paving Parking lot - accessibility COMPLETE 2019
CLARK (RICHARD) 457 AD New Construction 312 RiverRun -Riverview Bridge (CDOT) COMPLETE 2019 *
CLOVER 1277 SI Playground Chicago Plays! - new equipment COMPLETE 2016
CLYBOURN (ARCHIBALD) 1091 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
CLYBOURN (ARCHIBALD) 1091 SI Courts Basketball court - rehab COMPLETE 2016 *
COCHRAN (JOHN) 420 SI Playground Playground - rehab - surfacing COMPLETE 2014
COLE (NAT KING) 270 AD Park Development Park development - including playground COMPLETE 2011
COLE (NAT KING) 270 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
COLEMAN (BESSIE) 292 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
COLISEUM 507 SI Lighting Lighting - exterior COMPLETE 2013
COLISEUM 507 SI Site Improvement Misc. - site improvements COMPLETE 2013 *
COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool - valves COMPLETE 2020
COLUMBUS (CHRISTOPHER) 209 SI Site Improvement Refectory - water main COMPLETE 2020
COLUMBUS (CHRISTOPHER) 209 FR Windows and Doors Field house - doors COMPLETE 2011
COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Misc. - sump pump COMPLETE 2011
COLUMBUS (CHRISTOPHER) 209 FR Fitness Center Fitness center - upgrade COMPLETE 2011
COLUMBUS (CHRISTOPHER) 209 FR Concrete Masonry Structural Chimney COMPLETE 2012
COLUMBUS (CHRISTOPHER) 209 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2013
COLUMBUS (CHRISTOPHER) 209 SI Athletic Field Artificial Turf Athletic Field - new COMPLETE 2013 *
11 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
COLUMBUS (CHRISTOPHER) 209 SI Site Improvement Lagoon and drainage COMPLETE 2013
COLUMBUS (CHRISTOPHER) 209 SI Playground Chicago Plays! - new equipment COMPLETE 2015
COLUMBUS (CHRISTOPHER) 209 SI Paving Paving - refectory entrance COMPLETE 2016
COLUMBUS (CHRISTOPHER) 209 SI Athletic Field Athletic Field - scoreboard COMPLETE 2016
COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Refectory - remediation COMPLETE 2016
COLUMBUS (CHRISTOPHER) 209 FR HVAC and Energy Efficiency Gymnasium - heaters COMPLETE 2017
COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool - sump pumps and filter COMPLETE 2017
COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Refectory - column restoration COMPLETE 2018
COLUMBUS (CHRISTOPHER) 209 FR Swimming Pool Pool - controls, water line COMPLETE 2018
COLUMBUS (CHRISTOPHER) 209 SI Site Improvement Water main - emergency rehab COMPLETE 2019
COLUMBUS (CHRISTOPHER) 209 FR Minor Rehab Gymnasium - renovation COMPLETE 2020 *
COLUMBUS (CHRISTOPHER) 209 FR Major Rehab Field house and Refectory - Major Rehab COMPLETE 2020 *
COMMERCIAL CLUB PGD. of CHICAGO 1006 FR Concrete Masonry Structural Field house - chimney PRE-DESIGN
COMMERCIAL CLUB PGD. of CHICAGO 1006 FR Windows and Doors Field house - windows and doors PRE-DESIGN
CONNORS (WILLIAM) 1200 SI Site Improvement Misc. - fencing COMPLETE 2013
CONNORS (WILLIAM) 1200 AD New Construction Concession building - new COMPLETE 2013
COOPER (JACK) 287 SI Paving Paving COMPLETE 2011
COOPER (JACK) 287 SI Courts Sport court - installation COMPLETE 2020
CORNELL (PAUL) SQUARE 5 SI Courts Mini-pitch Soccer Court Conversion COMPLETE 2020 *
CORNELL (PAUL) SQUARE 5 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 *
CORNELL (PAUL) SQUARE 5 FR Roof Roof COMPLETE 2011
CORNELL (PAUL) SQUARE 5 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
CORNELL (PAUL) SQUARE 5 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
CORNELL (PAUL) SQUARE 5 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
CORNELL (PAUL) SQUARE 5 SI Playground Playground new with water feature - new COMPLETE 2014 *
CORNELL (PAUL) SQUARE 5 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2014
CORNELL (PAUL) SQUARE 5 SI Landscape Historic landscape restoration COMPLETE 2016 *
CORNELL (PAUL) SQUARE 5 FR Major Rehab Field house - Major Rehab PENDING FUNDING *
CORNELL (PAUL) SQUARE 5 FR Swimming Pool Pool - filter PRE-DESIGN
COSME (MARGARET) 176 SI Playground Chicago Plays! - new equipment COMPLETE 2014
COSME (MARGARET) 176 SI Courts Tennis court - rehab COMPLETE 2018 *
COTTON TAIL 480 SI Site Improvement Bollards - new PRE-DESIGN
COTTON TAIL 480 SI Site Improvement Misc. - benches and fencing COMPLETE 2012
COTTON TAIL 480 SI Lighting Exterior - lighting COMPLETE 2013
COTTONWOOD 416 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
CRAGIN 131 AD New Construction Field house - new PLANNING
CRAGIN 131 SI Courts Court - conversion to sport court COMPLETE 2014
CRAGIN 131 SI Playground Chicago Plays! - new equipment COMPLETE 2014
CRAWFORD (PETER) 359 SI Playground Chicago Plays! - new equipment COMPLETE 2016
12 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
CRESCENT 47 SI Courts Tennis court - rehab COMPLETE 2018
DAVIS (DR. NATHAN) SQUARE 14 FR Roof Roof COMPLETE 2011
DAVIS (DR. NATHAN) SQUARE 14 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
DAVIS (DR. NATHAN) SQUARE 14 FR Concrete Masonry Structural Field house - concrete and masonry COMPLETE 2012
DAVIS (DR. NATHAN) SQUARE 14 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012 *
DAVIS (DR. NATHAN) SQUARE 14 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
DAVIS (DR. NATHAN) SQUARE 14 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
DAVIS (DR. NATHAN) SQUARE 14 FR Concrete Masonry Structural Chimney COMPLETE 2013
DAVIS (DR. NATHAN) SQUARE 14 SI Lighting Lighting - interior gym COMPLETE 2013
DAVIS (DR. NATHAN) SQUARE 14 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DAVIS (DR. NATHAN) SQUARE 14 SI Site Improvement Misc. bleachers and scoreboards COMPLETE 2016 *
DAVIS (DR. NATHAN) SQUARE 14 FR Roof Pool Building - roof COMPLETE 2016
DAVIS (DR. NATHAN) SQUARE 14 SI Courts Mini-pitch Soccer Court - 4 new COMPLETE 2018 *
DAVIS (DR. NATHAN) SQUARE 14 SI Landscape Tree Planting COMPLETE 2019
DAVIS (MARGARET) 1092 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011
DAVIS (MARGARET) 1092 SI Playground Chicago Plays! - new equipment COMPLETE 2014 *
DAWES (CHARLES G.) 239 FR Roof Roof COMPLETE 2012
DAWES (CHARLES G.) 239 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DAWES (CHARLES G.) 239 SI Athletic Field �ƚŚůĞƟĐ�Į ĞůĚ�Ͳ�ƌĞŚĂď COMPLETE 2015 *
DAWES (CHARLES G.) 239 SI Paving Site paving COMPLETE 2016
DAWES (CHARLES G.) 239 SI Courts Basketball Court - rehab COMPLETE 2016
DAWES (CHARLES G.) 239 SI Spray Pool Spray feature - rehab COMPLETE 2017 *
DAWES (CHARLES G.) 239 SI Landscape Tree planting COMPLETE 2018 *
DAWES (CHARLES G.) 239 SI Athletic Field Athletic field - rehab COMPLETE 2018 *
De Burgos (Julia) 554 AD Acquisition Bloomingdale Access Park - Whipple St. and Albany Ave. COMPLETE 2011
De Burgos (Julia) 554 AD Park Development Bloomingdale Access - new park development COMPLETE 2011 *
De Burgos (Julia) 554 SI Playground Park improvements COMPLETE 2019
De Burgos (Julia) 554 AD Park Development Bloomingdale Access Park - expansion CONSTRUCTION *
DEARBORN (HENRY) 465 SI Lighting Exterior lighting - upgrade COMPLETE 2018 *
DEBOW (RUSSELL) 405 SI Playground Chicago Plays! - new equipment COMPLETE 2015
DEGEORGE (BERNICE) 1093 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DEJULIO (ANTHONY) 366 SI Playground Chicago Plays! - new equipment COMPLETE 2014
D'ELIA (AILEEN) 390 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DIXON (LORRAINE) 1210 SI Site Improvement Landscape and site improvement COMPLETE 2011
DIXON (LORRAINE) 1210 SI Site Improvement Park improvements including playground COMPLETE 2015 *
DIXON (LORRAINE) 1210 SI Site Improvement Park improvements - south entranceway COMPLETE 2017 *
DOBSON 1094 SI Playground Chicago Plays! - new equipment COMPLETE 2015
DOGWOOD 344 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
Donahue (Margaret) 570 AD Acquisition 1230 W. School St. COMPLETE 2013 *
13 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
Donahue (Margaret) 570 AD Park Development New park development including playground - 1230 W. School St. COMPLETE 2015 *
DONOVAN (GEORGE) 1029 AD Park Development Expansion - clean and green PRE-DESIGN *
DONOVAN (GEORGE) 1029 AD Acquisition Expansion COMPLETE 2021 *
DONOVAN (GEORGE) 1029 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
DONOVAN (GEORGE) 1029 SI Athletic Field Athletic field - scoreboard COMPLETE 2017
DOUGHERTY (DANIEL) 368 SI Landscape Tree planting COMPLETE 2019
DOUGLASS (ANNA & FREDERICK) 218 FR Concrete Masonry Structural Field house - framing and plastering COMPLETE 2011
DOUGLASS (ANNA & FREDERICK) 218 FR Roof Landscape yard - roof COMPLETE 2011
DOUGLASS (ANNA & FREDERICK) 218 FR Major Rehab Field house - locker room improvements COMPLETE 2012
DOUGLASS (ANNA & FREDERICK) 218 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
DOUGLASS (ANNA & FREDERICK) 218 SI Lighting Lighting - exterior COMPLETE 2012
DOUGLASS (ANNA & FREDERICK) 218 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012 *
DOUGLASS (ANNA & FREDERICK) 218 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
DOUGLASS (ANNA & FREDERICK) 218 SI Site Improvement Misc. - bleachers COMPLETE 2013
DOUGLASS (ANNA & FREDERICK) 218 SI Site Improvement Athletic field - drainage COMPLETE 2013
DOUGLASS (ANNA & FREDERICK) 218 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013
DOUGLASS (ANNA & FREDERICK) 218 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013
DOUGLASS (ANNA & FREDERICK) 218 SI Athletic Field Athletic field - rehab COMPLETE 2013
DOUGLASS (ANNA & FREDERICK) 218 SI Playground Chicago Plays! - new equipment (at 18th St.) COMPLETE 2014
DOUGLASS (ANNA & FREDERICK) 218 FR Swimming Pool Pool - rehab COMPLETE 2015
DOUGLASS (ANNA & FREDERICK) 218 SI Playground Chicago Plays! - new equipment (at California Ave.) COMPLETE 2015 *
DOUGLASS (ANNA & FREDERICK) 218 FR Swimming Pool Pool - rehab COMPLETE 2016
DOUGLASS (ANNA & FREDERICK) 218 SI Paving Paving - paths COMPLETE 2016
DOUGLASS (ANNA & FREDERICK) 218 SI Playground Chicago Plays! - new equipment (at Albany Ave.) with water feature COMPLETE 2016 *
DOUGLASS (ANNA & FREDERICK) 218 SI Playground Chicago Plays! - new equipment at Albany Dr. COMPLETE 2016 *
DOUGLASS (ANNA & FREDERICK) 218 SI Lighting Lighting - pathway COMPLETE 2017
DOUGLASS (ANNA & FREDERICK) 218 FR Minor Rehab Misc. - boiler COMPLETE 2017
DOUGLASS (ANNA & FREDERICK) 218 SI Playground Playground - new equipment at Sacramento Dr. COMPLETE 2017
DOUGLASS (ANNA & FREDERICK) 218 SI Landscape Site improvements - pathways COMPLETE 2018
DOUGLASS (ANNA & FREDERICK) 218 SI Fencing Pergola - security fencing COMPLETE 2018 *
DOUGLASS (ANNA & FREDERICK) 218 SI Courts Tennis court - rehab COMPLETE 2018 *
DOUGLASS (ANNA & FREDERICK) 218 FR Major Rehab Field house - Major Rehab COMPLETE 2019 *
DOUGLASS (ANNA & FREDERICK) 218 SI Site Improvement Cultural Venue - assessment COMPLETE 2019
DOUGLASS (ANNA & FREDERICK) 218 SI Site Improvement Miniature Golf Course - rehab CONSTRUCTION *
DOUGLASS (ANNA & FREDERICK) 218 SI Landscape Natural Area - new CONSTRUCTION *
DOUGLASS (ANNA & FREDERICK) 218 FR Major Rehab Cultural Center Initiative DESIGN *
DOUGLASS (ANNA & FREDERICK) 218 SI Athletic Field Artificial turf athletic field - major rehab COMPLETE 2020 *
DOUGLASS (ANNA & FREDERICK) 218 SI Site Improvement Track - rehab COMPLETE 2020
DOUGLASS (ANNA & FREDERICK) 218 FR Swimming Pool Pool - gutters DESIGN
14 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
DREXEL (FRANCIS) 441 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DUBKIN (LEONARD) 306 SI Site Improvement Misc. - garden beds COMPLETE 2012 *
DUBKIN (LEONARD) 306 SI Paving Paving - entryway COMPLETE 2016 *
DUNBAR (PAUL LAURENCE) 267 SI Courts Basketball court - rehab COMPLETE 2013
DUNBAR (PAUL LAURENCE) 267 SI Lighting Exterior - upgrade COMPLETE 2013
DUNBAR (PAUL LAURENCE) 267 FR Sculpture and Monument Sculpture - new COMPLETE 2014
DUNBAR (PAUL LAURENCE) 267 SI Athletic Field Athletic field - rehab COMPLETE 2014
DUNBAR (PAUL LAURENCE) 267 SI Playground Chicago Plays! - new equipment COMPLETE 2016
DUNBAR (PAUL LAURENCE) 267 SI Courts Tennis court - rehab COMPLETE 2016 *
DUNBAR (PAUL LAURENCE) 267 SI Athletic Field Artificial turf athletic field - new COMPLETE 2019 *
DUNHAM (ROBERT) 258 SI Athletic Field Athletic field -rehab PRE-DESIGN *
DUNHAM (ROBERT) 258 FR Fitness Center Fitness center - new COMPLETE 2011
DUNHAM (ROBERT) 258 SI Courts Tennis court - rehab COMPLETE 2013
DUNHAM (ROBERT) 258 SI Athletic Field Athletic field - rehab COMPLETE 2013
DUNHAM (ROBERT) 258 FR Minor Rehab Gym - bleachers COMPLETE 2018
DUNHAM (ROBERT) 258 SI Lighting Athletic Field - lighting COMPLETE 2020 *
DURKIN (MARTIN) 268 SI Playground Chicago Plays! - new equipment COMPLETE 2014
DURKIN (MARTIN) 268 SI Paving 2016 DW Paving COMPLETE 2016
DURKIN (MARTIN) 268 SI Site Improvement Outdoor fitness station - new COMPLETE 2019 *
DURSO (JOHN) 1037 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
DURSO (JOHN) 1037 SI Playground Playground - new CONSTRUCTION *
DUSABLE (JEAN BAPTISTE POINTE) 478 AD New Construction New Harbor Development - Gateway COMPLETE 2011
DUSABLE (JEAN BAPTISTE POINTE) 478 SI Site Improvement Landscape improvements COMPLETE 2013
DUSABLE (JEAN BAPTISTE POINTE) 478 AD Park Development Park development - clean and green COMPLETE 2016 *
DUSABLE (JEAN BAPTISTE POINTE) 478 AD New Construction Navy Pier Flyover (CDOT) COMPLETE 2019 *
DUSABLE (JEAN BAPTISTE POINTE) 478 SI Site Improvement Environmental remediation CONSTRUCTION *
DUSABLE (JEAN BAPTISTE POINTE) 478 AD Park Development Park development - new PLANNING
DVORAK (ANTON) 216 FR Swimming Pool Pool deck and valves COMPLETE 2020
DVORAK (ANTON) 216 FR Minor Rehab Field house and perimeter drainage COMPLETE 2011
DVORAK (ANTON) 216 SI Paving Paving - paths COMPLETE 2011
DVORAK (ANTON) 216 FR Minor Rehab Misc. entrance accessibility COMPLETE 2011
DVORAK (ANTON) 216 SI Site Improvement Drinking fountain - rehab COMPLETE 2012
DVORAK (ANTON) 216 FR Major Rehab Field house - locker room improvements COMPLETE 2012
DVORAK (ANTON) 216 FR Major Rehab Transition plan - access improvements COMPLETE 2012
DVORAK (ANTON) 216 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
DVORAK (ANTON) 216 SI Athletic Field Ballfield - rehab COMPLETE 2013
DVORAK (ANTON) 216 FR Minor Rehab Misc. - locker rooms COMPLETE 2014
DVORAK (ANTON) 216 SI Playground Chicago Plays! - new equipment COMPLETE 2015 *
DVORAK (ANTON) 216 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015
15 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
DVORAK (ANTON) 216 FR Swimming Pool Pool - filter COMPLETE 2016
DVORAK (ANTON) 216 SI Spray Pool Spray feature -rehab COMPLETE 2018
DVORAK (ANTON) 216 FR Major Rehab Field house and Pool house - Major Rehab COMPLETE 2018 *
DVORAK (ANTON) 216 SI Landscape Tree Planting COMPLETE 2019
DVORAK (ANTON) 216 FR Swimming Pool Pool - liner COMPLETE 2019
DVORAK (ANTON) 216 FR Concrete Masonry Structural Pool Building - masonry BID/AWARD *
DVORAK (ANTON) 216 FR Roof Over porch - new PRE-DESIGN
ECKERSALL (WALTER HERBERT) 232 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
ECKERSALL (WALTER HERBERT) 232 SI Playground Chicago Plays! - new equipment COMPLETE 2016
ECKHART (BERNARD) 208 FR Major Rehab Transition plan - access improvements COMPLETE 2011
ECKHART (BERNARD) 208 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
ECKHART (BERNARD) 208 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
ECKHART (BERNARD) 208 SI Playground Playground with water feature - new COMPLETE 2014 *
ECKHART (BERNARD) 208 FR Swimming Pool Pool - tile and grout COMPLETE 2014
ECKHART (BERNARD) 208 SI Athletic Field Athletic Field - rehab COMPLETE 2017 *
ECKHART (BERNARD) 208 FR Minor Rehab Misc. boiler COMPLETE 2017
ECKHART (BERNARD) 208 FR Major Rehab Field house - Major Rehab COMPLETE 2017 *
ECKHART (BERNARD) 208 FR Swimming Pool Pool - upgrade COMPLETE 2020
ECKHART (BERNARD) 208 FR HVAC and Energy Efficiency Pool dehumidifier - new CONSTRUCTION *
EDGEBROOK 335 SI Athletic Field Athletic field and pathway - drainage COMPLETE 2020
EDISON (THOMAS ALVA) 62 SI Playground Chicago Plays! - new equipment COMPLETE 2015 *
EDISON (THOMAS ALVA) 62 FR Concrete Masonry Structural Field house - concrete and masonry PRE-DESIGN
EDMONDS (MOLLY) 391 AD Acquisition Expansion COMPLETE 2012
EDMONDS (MOLLY) 391 SI Playground Chicago Plays! - new equipment COMPLETE 2014
EHRLER (WILLIAM) 283 SI Site Improvement Playground - upgrade DESIGN
ELLIS (SAMUEL) 1213 SI Site Improvement Fencing and bollards BID/AWARD
ELLIS (SAMUEL) 1213 SI Site Improvement Misc. fencing and lighting COMPLETE 2014 *
ELLIS (SAMUEL) 1213 AD New Construction Quad Communities Arts Recreation and Health Center COMPLETE 2016 *
ELLIS (SAMUEL) 1213 SI Courts Basketball court - rehab COMPLETE 2016 *
ELLIS (SAMUEL) 1213 SI Playground Playground - resurfacing COMPLETE 2016
ELM 279 SI Site Improvement Misc. - paving and fencing COMPLETE 2012
ELSTON (DANIEL) 1097 SI Playground Chicago Plays! - new equipment COMPLETE 2015
EMERALD 1098 SI Fencing Fencing - perimeter COMPLETE 2019
EMERALD 1098 SI Site Improvement Park improvements DESIGN
EMMERSON (LOUIS) 104 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
EMMERSON (LOUIS) 104 SI Playground Chicago Plays! - new equipment COMPLETE 2015
EMMERSON (LOUIS) 104 FR Roof Roof - new PRE-DESIGN
ESSEX 434 SI Playground Playground - new COMPLETE 2013 *
EUCLID 66 FR Minor Rehab Transition plan - access improvements COMPLETE 2011
16 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
EUCLID 66 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
EVERGREEN 1276 SI Playground Playground - surfacing COMPLETE 2017
FELLGER (CHARLES) 1100 SI Spray Pool Water feature - rehab COMPLETE 2017
FERNWOOD 65 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011
FERNWOOD 65 SI Athletic Field Ballfield - rehab COMPLETE 2011
FERNWOOD 65 FR Minor Rehab Field house - interior COMPLETE 2012
FERNWOOD 65 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
FERNWOOD 65 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
FERNWOOD 65 FR HVAC and Energy Efficiency HVAC - exhaust fans COMPLETE 2013
FERNWOOD 65 FR Swimming Pool Pool - liner COMPLETE 2018
FERNWOOD 65 SI Landscape Tree planting COMPLETE 2018
FERNWOOD 65 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2019
FERNWOOD 65 FR Major Rehab Pool building - Major rehab PENDING FUNDING *
FIELD (EUGENE) 41 FR Minor Rehab Misc. sump pump COMPLETE 2011
FIELD (EUGENE) 41 FR Major Rehab Transition plan - access improvements COMPLETE 2012
FIELD (EUGENE) 41 SI Fencing Fencing - at Chicago River COMPLETE 2013
FIELD (EUGENE) 41 AD Park Development Aquatic restoration COMPLETE 2013 *
FIELD (EUGENE) 41 FR Roof Roof - rehab COMPLETE 2014
FIELD (EUGENE) 41 SI Spray Pool Water feature - rehab COMPLETE 2014
FIELD (EUGENE) 41 FR Concrete Masonry Structural Concrete and structural - basement COMPLETE 2015
FIELD (EUGENE) 41 AD Acquisition 5056 N. Monticello Ave. COMPLETE 2015 *
FIELD (EUGENE) 41 SI Athletic Field Athletic field - rehab COMPLETE 2017
FIELD (EUGENE) 41 SI Site Improvement Site improvements (CDOT) COMPLETE 2018 *
FIELD (EUGENE) 41 SI Landscape Tree Planting COMPLETE 2019
FIELD (EUGENE) 41 AD Park Development Site improvements - 5056 N. Monticello Ave. CONSTRUCTION *
FIELD (EUGENE) 41 SI Site Improvement Misc. - fencing, landscaping, utilities CONSTRUCTION *
FILBERT 1281 SI Playground Playground - new COMPLETE 2012 *
FLOWER (LUCY) 431 SI Playground Playground with water feature- new COMPLETE 2014 *
FLYING SQUIRREL 331 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
FLYING SQUIRREL 331 SI Fencing Expansion and perimeter fencing COMPLETE 2015
FOSCO (PETER) 1030 FR Concrete Masonry Structural Masonry and Roof - additional CONSTRUCTION *
FOSCO (PETER) 1030 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
FOSCO (PETER) 1030 FR Windows and Doors Pool building - window security COMPLETE 2012
FOSCO (PETER) 1030 FR HVAC and Energy Efficiency Misc. - HVAC rehab COMPLETE 2012
FOSCO (PETER) 1030 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
FOSCO (PETER) 1030 AD Park Development Park expansion COMPLETE 2013 *
FOSCO (PETER) 1030 SI Spray Pool Water play feature - rehab COMPLETE 2016
FOSCO (PETER) 1030 FR Swimming Pool Pool - rehab COMPLETE 2016
FOSCO (PETER) 1030 FR Minor Rehab Gym Floor - rehab COMPLETE 2019
17 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
FOSCO (PETER) 1030 FR HVAC and Energy Efficiency Misc. - compressor COMPLETE 2019
FOSCO (PETER) 1030 FR Major Rehab Roof and masonry COMPLETE 2019 *
FOSCO (PETER) 1030 FR Swimming Pool Dehumidification - new COMPLETE 2020
FOSTER (J. FRANK) 26 SI Lighting Pool and gymnasium - LED upgrade COMPLETE 2019
FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2021
FOSTER (J. FRANK) 26 SI Lighting Lighting - gym COMPLETE 2011
FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011
FOSTER (J. FRANK) 26 FR Windows and Doors Natatorium - doors COMPLETE 2011 *
FOSTER (J. FRANK) 26 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2012
FOSTER (J. FRANK) 26 FR Major Rehab Transition plan - access improvements COMPLETE 2012
FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
FOSTER (J. FRANK) 26 SI Paving Parking lot - rehab COMPLETE 2013
FOSTER (J. FRANK) 26 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015
FOSTER (J. FRANK) 26 SI Playground Chicago Plays! - new equipment COMPLETE 2015
FOSTER (J. FRANK) 26 SI Courts Basketball Court - rehab COMPLETE 2016
FOSTER (J. FRANK) 26 SI Paving Parking lot - rehab COMPLETE 2017
FOSTER (J. FRANK) 26 SI Spray Pool Spray feature - rehab COMPLETE 2017
FOSTER (J. FRANK) 26 FR Swimming Pool Pool - controls COMPLETE 2018
FOSTER (J. FRANK) 26 SI Courts Mini-pitch Soccer Court - new COMPLETE 2019 *
FOSTER (J. FRANK) 26 FR HVAC and Energy Efficiency Foster - air conditioning COMPLETE 2019
FOSTER (J. FRANK) 26 SI Landscape Tree planting COMPLETE 2019
FRANKLIN (BENJAMIN) 202 SI Athletic Field Athletic field -improvements COMPLETE 2020 *
FRANKLIN (BENJAMIN) 202 SI Athletic Field Ballfield - rehab COMPLETE 2011
FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency Misc. - rehab COMPLETE 2012
FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
FRANKLIN (BENJAMIN) 202 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2013
FRANKLIN (BENJAMIN) 202 SI Site Improvement Drinking fountain - new COMPLETE 2013
FRANKLIN (BENJAMIN) 202 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2013
FRANKLIN (BENJAMIN) 202 SI Playground Chicago Plays! - new equipment COMPLETE 2013
FRANKLIN (BENJAMIN) 202 SI Spray Pool Water feature - rehab COMPLETE 2016
FRANKLIN (BENJAMIN) 202 SI Courts Basketball Court - rehab COMPLETE 2016
FRANKLIN (BENJAMIN) 202 FR Minor Rehab Gym floor - rehab COMPLETE 2017
FRANKLIN (BENJAMIN) 202 FR HVAC and Energy Efficiency Field house - major rehab PENDING FUNDING *
FULLER (MELVILLE) 4 FR Minor Rehab Fitness center - roof COMPLETE 2011
FULLER (MELVILLE) 4 FR Roof Field house and gym - roof COMPLETE 2011
FULLER (MELVILLE) 4 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
FULLER (MELVILLE) 4 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
FULLER (MELVILLE) 4 FR Swimming Pool Pool - liner and water line COMPLETE 2013
FULLER (MELVILLE) 4 FR Major Rehab Park Improvements including Field House and Playground COMPLETE 2016 *
18 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
FULLER (MELVILLE) 4 FR Swimming Pool Pool - filter and gutter COMPLETE 2020
GAGE (GEORGE) 22 SI Athletic Field Athletic field - rehab PRE-DESIGN *
GAGE (GEORGE) 22 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011
GAGE (GEORGE) 22 FR Roof Power house - roof COMPLETE 2011
GAGE (GEORGE) 22 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
GAGE (GEORGE) 22 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
GAGE (GEORGE) 22 FR Minor Rehab Field house - basement COMPLETE 2013
GAGE (GEORGE) 22 FR Swimming Pool Pool - liner and water line COMPLETE 2013
GAGE (GEORGE) 22 FR Concrete Masonry Structural Concrete porch - rehab COMPLETE 2014
GAGE (GEORGE) 22 FR Minor Rehab Misc. - boiler COMPLETE 2017
GAGE (GEORGE) 22 SI Courts Mini-pitch soccer court - new COMPLETE 2017 *
GAGE (GEORGE) 22 SI Landscape Tree planting COMPLETE 2018
GAGE (GEORGE) 22 FR Minor Rehab Access chair lift - new COMPLETE 2018
GAGE (GEORGE) 22 FR Swimming Pool Pool - filter and gutters COMPLETE 2018 *
GAGE (GEORGE) 22 FR Roof Pool building - new PRE-DESIGN
GAGE (GEORGE) 22 SI Athletic Field Athletic Field - bleachers and storage COMPLETE 2020 *
GALEWOOD 130 FR Minor Rehab Misc. - rehab after fire COMPLETE 2012
GALEWOOD 130 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
GALEWOOD 130 SI Site Improvement Park improvements COMPLETE 2018 *
GALEWOOD 130 SI Playground Playground - upgrade CONSTRUCTION
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - steam line COMPLETE 2020
GARFIELD (JAMES) 204 FR Major Rehab Power House - Historic Restoration PENDING FUNDING *
GARFIELD (JAMES) 204 SI Site Improvement Water gardens - conversion PENDING FUNDING *
GARFIELD (JAMES) 204 FR Major Rehab Cultural Center Initiative - Bandstand/Music Court PENDING FUNDING *
GARFIELD (JAMES) 204 SI Athletic Field Little League Ballfield - major restoration PENDING FUNDING *
GARFIELD (JAMES) 204 SI Paving Roadway and pathway paving - CDOT DESIGN *
GARFIELD (JAMES) 204 FR Major Rehab Gold Dome - water main and sewer line COMPLETE 2020
GARFIELD (JAMES) 204 SI Athletic Field Athletic Field - rehab COMPLETE 2019
GARFIELD (JAMES) 204 SI Lighting Lighting - lagoon COMPLETE 2011
GARFIELD (JAMES) 204 FR Minor Rehab Misc. - generator COMPLETE 2011
GARFIELD (JAMES) 204 SI Site Improvement Misc. electric service COMPLETE 2011
GARFIELD (JAMES) 204 SI Site Improvement Misc. - site drainage COMPLETE 2011
GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - flooring COMPLETE 2011
GARFIELD (JAMES) 204 FR Major Rehab Gold Dome - concrete and structural COMPLETE 2011 *
GARFIELD (JAMES) 204 FR Major Rehab Gym floor - restore or replace COMPLETE 2011 *
GARFIELD (JAMES) 204 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 *
GARFIELD (JAMES) 204 FR Minor Rehab Misc. conservatory improvement COMPLETE 2011
GARFIELD (JAMES) 204 FR Minor Rehab Field house - lockers and bathrooms COMPLETE 2012
GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - shade cloth system COMPLETE 2012
19 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
GARFIELD (JAMES) 204 SI Fencing Conservatory - fencing COMPLETE 2012
GARFIELD (JAMES) 204 FR Minor Rehab Misc. - sump pump COMPLETE 2012
GARFIELD (JAMES) 204 SI Lighting Exterior lighting COMPLETE 2012
GARFIELD (JAMES) 204 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - HVAC - Jensen Room COMPLETE 2012
GARFIELD (JAMES) 204 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
GARFIELD (JAMES) 204 SI Paving Conservatory - parking lot - rehab COMPLETE 2012
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Gold Dome - boiler - upgrade COMPLETE 2013
GARFIELD (JAMES) 204 SI Landscape Conservatory - exterior pond liners COMPLETE 2013
GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - Show House steam lines COMPLETE 2014
GARFIELD (JAMES) 204 FR Major Rehab Conservatory - Major rehab from storm damage COMPLETE 2014 *
GARFIELD (JAMES) 204 FR Major Rehab Gold Dome - major rehab - front steps and building apron COMPLETE 2015 *
GARFIELD (JAMES) 204 FR Minor Rehab Trades Building - rehab COMPLETE 2015
GARFIELD (JAMES) 204 FR Roof Power house - Rehab COMPLETE 2015
GARFIELD (JAMES) 204 FR Sculpture and Monument Conservatory - Solarise Exhibit COMPLETE 2015 *
GARFIELD (JAMES) 204 FR Major Rehab Stables - restoration COMPLETE 2015
GARFIELD (JAMES) 204 SI Playground Chicago Plays! - new equipment at Madison St. COMPLETE 2016
GARFIELD (JAMES) 204 FR Roof Conservatory - entry roof rehab COMPLETE 2016
GARFIELD (JAMES) 204 SI Athletic Field Athletic field - rehab COMPLETE 2017 *
GARFIELD (JAMES) 204 SI Site Improvement Conservatory - Wild Exploration Garden - design COMPLETE 2017
GARFIELD (JAMES) 204 SI Athletic Field Athletic field - rehab and batting tunnel COMPLETE 2017 *
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - boiler COMPLETE 2017
GARFIELD (JAMES) 204 SI Paving Conservatory - parking lot COMPLETE 2017
GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - plant cooler COMPLETE 2017
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - steam line COMPLETE 2018
GARFIELD (JAMES) 204 FR Minor Rehab Gold Dome - fire escapes COMPLETE 2018
GARFIELD (JAMES) 204 FR Swimming Pool Pool - filter, liner and gutter COMPLETE 2018
GARFIELD (JAMES) 204 SI Landscape Tree planting COMPLETE 2018
GARFIELD (JAMES) 204 FR Major Rehab Conservatory - tempered water system COMPLETE 2018
GARFIELD (JAMES) 204 FR Minor Rehab Conservatory - doors COMPLETE 2018
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Conservatory - Boiler COMPLETE 2018
GARFIELD (JAMES) 204 FR HVAC and Energy Efficiency Horticulture Hall - vacuum system COMPLETE 2018
GARFIELD (JAMES) 204 FR Major Rehab Trades Building - structural COMPLETE 2018 *
GARFIELD (JAMES) 204 SI Courts Tennis courts - rehab COMPLETE 2018 *
GARFIELD (JAMES) 204 SI Lighting Lighting upgrade to LED COMPLETE 2019
GARFIELD (JAMES) 204 FR Minor Rehab Bandstand/Music Court - assessment COMPLETE 2019
GARFIELD (JAMES) 204 SI Site Improvement Conservatory - Children's Wild Garden COMPLETE 2019 *
GARFIELD (JAMES) 204 FR Roof Gold Dome - internal drainage system PRE-DESIGN *
GARFIELD (JAMES) 204 FR Minor Rehab Conservatory glass replacement - annual program COMPLETE 2020
20 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
GARFIELD (JAMES) 204 FR Major Rehab Cultural Center Initiative DESIGN *
GARFIELD (JAMES) 204 SI Playground Playground - upgrade at Homan Ave. and Lake St. CONSTRUCTION
GARFIELD (JAMES) 204 FR Sculpture and Monument Cornwall War Memorial - restoration PRE-DESIGN
GARFIELD (JAMES) 204 SI Paving Paving - pathways COMPLETE 2020
GARFIELD (JAMES) 204 FR Major Rehab Conservatory - Elizabeth Morse Children's Garden PENDING FUNDING *
GARIBALDI (GIUSEPPI) 1047 SI Playground Chicago Plays! - new equipment COMPLETE 2015
GARIBALDI (GIUSEPPI) 1047 FR Sculpture and Monument "Garibaldi" - restoration PRE-DESIGN
GATELY (JAMES) 244 SI Site Improvement Misc. - drainage COMPLETE 2012
GATELY (JAMES) 244 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
GATELY (JAMES) 244 SI Paving Parking lot - rehab COMPLETE 2019
GATELY (JAMES) 244 SI Site Improvement Water main - replacement COMPLETE 2020
GATELY (JAMES) 244 AD New Construction Field house with indoor track and field - new COMPLETE 2020 *
GILL (JOSEPH) 364 FR Concrete Masonry Structural Field house - concrete facade CONSTRUCTION
GILL (JOSEPH) 364 FR Minor Rehab Misc. - sump pump COMPLETE 2011
GILL (JOSEPH) 364 FR Major Rehab Transition plan - access improvements COMPLETE 2011
GILL (JOSEPH) 364 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
GILL (JOSEPH) 364 FR Fitness Center Fitness center - upgrade COMPLETE 2012
GILL (JOSEPH) 364 FR HVAC and Energy Efficiency Misc. - HVAC rehab COMPLETE 2012
GILL (JOSEPH) 364 FR Fitness Center Fitness center - upgrade COMPLETE 2012
GILL (JOSEPH) 364 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2013
GILL (JOSEPH) 364 FR Swimming Pool Pool - new boiler COMPLETE 2013
GILL (JOSEPH) 364 FR Swimming Pool Pool - filter COMPLETE 2014
GILL (JOSEPH) 364 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
GILL (JOSEPH) 364 SI Athletic Field Ballfield - rehab COMPLETE 2015
GILL (JOSEPH) 364 FR Concrete Masonry Structural Concrete and structural - doorway to pool COMPLETE 2016
GILL (JOSEPH) 364 SI Playground Playground - new COMPLETE 2018 *
GILL (JOSEPH) 364 FR HVAC and Energy Efficiency Field house - compressor COMPLETE 2019
GILL (JOSEPH) 364 SI Site Improvement Playground - benches COMPLETE 2019
GINKGO 347 SI Playground Chicago Plays! - new equipment COMPLETE 2016
GLADSTONE (WILLIAM) 93 SI Athletic Field Ball field - rehab COMPLETE 2018
GLADSTONE (WILLIAM) 93 SI Landscape Community garden - new COMPLETE 2019 *
GLADYS (GUNDERSON) 1102 AD Acquisition Expansion COMPLETE 2012
GLADYS (GUNDERSON) 1102 SI Courts Basketball court - rehab COMPLETE 2015
GLADYS (GUNDERSON) 1102 SI Playground Chicago Plays! - new equipment COMPLETE 2016
GOLDBERG (LOUIS) 384 SI Playground Chicago Plays! - new equipment COMPLETE 2013
GOLDBERG (LOUIS) 384 SI Site Improvement Misc. - fencing and drinking fountain COMPLETE 2016 *
GOLDEN GATE 288 SI Playground Chicago Plays! - new equipment COMPLETE 2013
GOLDEN GATE 288 SI Paving Misc. pathway and fitness course COMPLETE 2014
GOMPERS (SAMUEL) 40 SI Site Improvement Little Gompers - pathway drainage PRE-DESIGN
21 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
GOMPERS (SAMUEL) 40 SI Athletic Field Scoreboard - new PRE-DESIGN *
GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - liner COMPLETE 2011
GOMPERS (SAMUEL) 40 FR Minor Rehab Field house - locker room improvements COMPLETE 2012
GOMPERS (SAMUEL) 40 SI Playground Park Development - playground and athletic field COMPLETE 2012 *
GOMPERS (SAMUEL) 40 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
GOMPERS (SAMUEL) 40 FR Windows and Doors Misc. windows COMPLETE 2014
GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - filter room drainage COMPLETE 2014
GOMPERS (SAMUEL) 40 SI Lighting Lighting - ballfield COMPLETE 2015 *
GOMPERS (SAMUEL) 40 FR Swimming Pool Pool - deck COMPLETE 2015
GOMPERS (SAMUEL) 40 SI Lighting Lighting - exterior COMPLETE 2015 *
GOMPERS (SAMUEL) 40 SI Paving 2016 DW Paving -pathways COMPLETE 2017
GOMPERS (SAMUEL) 40 SI Site Improvement Site Improvement COMPLETE 2018 *
GOMPERS (SAMUEL) 40 SI Courts Basketball court - rehab COMPLETE 2019 *
GOMPERS (SAMUEL) 40 SI Courts Court conversion - pickleball and play court COMPLETE 2019 *
GOMPERS (SAMUEL) 40 SI Site Improvement Outdoor fitness station and scoreboard - new PRE-DESIGN *
GOMPERS (SAMUEL) 40 FR Major Rehab Field house - roof, masonry, access DESIGN *
GOMPERS (SAMUEL) 40 SI Spray Pool Water play feature - rehab COMPLETE 2020 *
GOMPERS (SAMUEL) 40 SI Site Improvement Park Improvements - design DESIGN *
GOMPERS (SAMUEL) 40 SI Courts Tennis courts - rehab CONSTRUCTION *
GOOSEBERRY 348 SI Playground Chicago Plays! - new equipment COMPLETE 2016
GOUDY (WILLIAM) SQUARE 105 SI Playground Playground with water feature - new COMPLETE 2014 *
GOUDY (WILLIAM) SQUARE 105 SI Fencing Fencing - planter beds COMPLETE 2015 *
GRAND 1103 SI Playground Chicago Plays! - new equipment COMPLETE 2014
GRAND CROSSING 15 FR Swimming Pool Pool deck COMPLETE 2020
GRAND CROSSING 15 FR Roof Power house - roof COMPLETE 2011
GRAND CROSSING 15 FR Concrete Masonry Structural Power house - chimney COMPLETE 2012
GRAND CROSSING 15 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
GRAND CROSSING 15 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
GRAND CROSSING 15 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
GRAND CROSSING 15 SI Athletic Field Misc. drainage COMPLETE 2013
GRAND CROSSING 15 SI Athletic Field Ballfield - rehab COMPLETE 2013
GRAND CROSSING 15 SI Playground Playground - Community pilot COMPLETE 2015 *
GRAND CROSSING 15 SI Courts Tennis court - conversion to multipurpose COMPLETE 2016 *
GRAND CROSSING 15 SI Landscape Tree planting COMPLETE 2018
GRAND CROSSING 15 FR Swimming Pool Pool - controls COMPLETE 2018
GRAND CROSSING 15 SI Site Improvement Track - rehab COMPLETE 2020
GRAND CROSSING 15 FR Minor Rehab Locker room improvements - men and women COMPLETE 2019 *
GRAND CROSSING 15 FR Roof Landscape Building - roof PRE-DESIGN
GRANDPARENTS 472 SI Playground Chicago Plays! - new equipment COMPLETE 2014
22 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
GRANDPARENTS 472 SI Fencing Fencing - at playground COMPLETE 2018 *
GRANT (ULYSSES) 24 FR Minor Rehab Buckingham Fountain - restoration COMPLETE 2020
GRANT (ULYSSES) 24 SI Lighting Lighting upgrade to LED COMPLETE 2011
GRANT (ULYSSES) 24 FR Minor Rehab Landscape Yard - rehab COMPLETE 2011
GRANT (ULYSSES) 24 SI Landscape Trees - Dutch Elm Disease management COMPLETE 2011
GRANT (ULYSSES) 24 SI Site Improvement Museum Campus - paving and drainage COMPLETE 2011
GRANT (ULYSSES) 24 FR Major Rehab 9th St. pump station - renovation COMPLETE 2012
GRANT (ULYSSES) 24 SI Lighting Lighting - Museum Campus COMPLETE 2012
GRANT (ULYSSES) 24 SI Landscape Hutchinson Field - Study COMPLETE 2012
GRANT (ULYSSES) 24 SI Paving Butler Field - drainage and paving COMPLETE 2013
GRANT (ULYSSES) 24 SI Paving Paving - permeable COMPLETE 2013
GRANT (ULYSSES) 24 FR Major Rehab Van Buren Pedestrian Bridge - renovation COMPLETE 2014
GRANT (ULYSSES) 24 FR Major Rehab Daley Bicentennial Field House - Major Rehab COMPLETE 2014
GRANT (ULYSSES) 24 AD Park Development Park Expansion at Roosevelt including new skate park COMPLETE 2014 *
GRANT (ULYSSES) 24 FR Concrete Masonry Structural Queen's Landing - study COMPLETE 2014
GRANT (ULYSSES) 24 AD Park Development Park development - Maggie Daley Park COMPLETE 2015 *
GRANT (ULYSSES) 24 FR Major Rehab Cancer Survivor Garden - renovation COMPLETE 2015
GRANT (ULYSSES) 24 FR Sculpture and Monument Buckingham Fountain - restoration COMPLETE 2015
GRANT (ULYSSES) 24 FR Roof Buckingham Fountain - concessions COMPLETE 2016
GRANT (ULYSSES) 24 FR Sculpture and Monument John Alexander Logan Monument - paving COMPLETE 2016
GRANT (ULYSSES) 24 SI Site Improvement Hutchinson Field - site improvements COMPLETE 2016 *
GRANT (ULYSSES) 24 FR Sculpture and Monument "Mestrovic" - restoration COMPLETE 2017
GRANT (ULYSSES) 24 FR HVAC and Energy Efficiency Landscape Building - boiler COMPLETE 2017
GRANT (ULYSSES) 24 SI Paving Shoreline - concrete restoration COMPLETE 2017
GRANT (ULYSSES) 24 SI Landscape Cubs Rally - Landscape damages COMPLETE 2017 *
GRANT (ULYSSES) 24 SI Site Improvement Buckingham Fountain - plaza and fencing rehab COMPLETE 2017 *
GRANT (ULYSSES) 24 FR Minor Rehab Buckingham Fountain - improvements COMPLETE 2017
GRANT (ULYSSES) 24 SI Site Improvement Queen's Landing - restoration COMPLETE 2018 *
GRANT (ULYSSES) 24 FR Concrete Masonry Structural Buckingham Fountain- concrete restoration COMPLETE 2018
GRANT (ULYSSES) 24 SI Site Improvement Maggie Daley - park improvements COMPLETE 2018
GRANT (ULYSSES) 24 SI Paving Landscape Yard - paving COMPLETE 2018
GRANT (ULYSSES) 24 SI Site Improvement Lakefront Trail Separation - Chicago River to Roosevelt Rd. COMPLETE 2018 *
GRANT (ULYSSES) 24 SI Lighting Skate Park - lighting and security COMPLETE 2018
GRANT (ULYSSES) 24 SI Courts Maggie Daley - pickleball courts COMPLETE 2018 *
GRANT (ULYSSES) 24 SI Paving Shedd Aquarium - entrance paving COMPLETE 2019
GRANT (ULYSSES) 24 FR Concrete Masonry Structural Van Buren Bridge - additional COMPLETE 2019
GRANT (ULYSSES) 24 FR Minor Rehab Buckingham Fountain - valves and concrete restoration COMPLETE 2019
GRANT (ULYSSES) 24 SI Site Improvement Water main at Harrison St. COMPLETE 2019
GRANT (ULYSSES) 24 FR Minor Rehab Comfort Station - rehab COMPLETE 2019
23 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
GRANT (ULYSSES) 24 FR Roof 9th St - Pump Station BID/AWARD
GRANT (ULYSSES) 24 AD New Construction Navy Pier Flyover (CDOT) CONSTRUCTION *
GRANT (ULYSSES) 24 FR Sculpture and Monument "Logan" - restoration DESIGN
GRANT (ULYSSES) 24 FR Sculpture and Monument "Eagle Fountains" - restoration BID/AWARD
GRAPE 381 SI Playground Chicago Plays! - new equipment COMPLETE 2015
GRAVER (PHILIP) 179 SI Lighting Lighting - security COMPLETE 2011
GRAVER (PHILIP) 179 FR Minor Rehab Field house - dome restoration COMPLETE 2013
GRAVER (PHILIP) 179 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
GRAVER (PHILIP) 179 FR Minor Rehab Misc. - bathroom improvements COMPLETE 2015
GRAVER (PHILIP) 179 SI Spray Pool Water play feature - major rehab COMPLETE 2018
GREEN (JEFFREY) 1212 SI Playground Chicago Plays! - new equipment COMPLETE 2014
GREEN BRIAR 188 SI Site Improvement Drinking Fountain - new PRE-DESIGN *
GREEN BRIAR 188 FR Minor Rehab Misc. rehab COMPLETE 2012
GREEN BRIAR 188 SI Playground Chicago Plays! - new equipment COMPLETE 2014
GREEN BRIAR 188 FR Roof Roof - rehab COMPLETE 2017
GREEN BRIAR 188 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2017
GREENEBAUM (HENRY) 132 AD Park Development Park development including playground, artificial turf field COMPLETE 2012 *
Griffin (Marion Mahony) 1257 SI Site Improvement Misc. beach access COMPLETE 2012 *
GROSS (THEODORE) 1031 SI Site Improvement Fencing and athletic field COMPLETE 2015 *
GROSS (THEODORE) 1031 SI Playground Playground - upgrade CONSTRUCTION *
HAAS (JOSEPH) 1032 AD New Construction Field house and park development COMPLETE 2011 *
HAAS (JOSEPH) 1032 FR Fitness Center Fitness center - new COMPLETE 2012
HAAS (JOSEPH) 1032 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012 *
HALE (NATHAN) 234 FR Swimming Pool Pool - rehab COMPLETE 2020
HALE (NATHAN) 234 SI Site Improvement Benches and warm-up cage COMPLETE 2011 *
HALE (NATHAN) 234 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
HALE (NATHAN) 234 FR Swimming Pool Pool - liner and gutter COMPLETE 2012
HALE (NATHAN) 234 SI Lighting Athletic field - rehabs COMPLETE 2015 *
HALE (NATHAN) 234 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HALE (NATHAN) 234 SI Spray Pool Spray feature - drainage COMPLETE 2017
HALE (NATHAN) 234 SI Courts Tennis Courts - rehab COMPLETE 2017
HALE (NATHAN) 234 FR Minor Rehab Misc. bathroom partitions COMPLETE 2017
HALE (NATHAN) 234 SI Spray Pool Spray feature - filter system COMPLETE 2018
HALE (NATHAN) 234 FR Concrete Masonry Structural Field house - foundation COMPLETE 2018
HALE (NATHAN) 234 SI Athletic Field Artificial Turf Infields - new CONSTRUCTION *
HAMILTON (ALEXANDER) 9 SI Courts Tennis court - rehab COMPLETE 2020 *
HAMILTON (ALEXANDER) 9 SI Courts Mini-pitch Soccer Court Conversion COMPLETE 2020 *
HAMILTON (ALEXANDER) 9 FR Minor Rehab Gym floor - restore or replace COMPLETE 2011
HAMILTON (ALEXANDER) 9 FR Minor Rehab Misc. - basement flooring COMPLETE 2011
24 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
HAMILTON (ALEXANDER) 9 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2013
HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool - rehab COMPLETE 2015
HAMILTON (ALEXANDER) 9 FR Swimming Pool Pool - liner COMPLETE 2016
HAMILTON (ALEXANDER) 9 SI Courts Basketball Court - rehab COMPLETE 2016
HAMILTON (ALEXANDER) 9 SI Paving 2017 DW Paving COMPLETE 2017
HAMILTON (ALEXANDER) 9 SI Athletic Field Athletic Field - rehab COMPLETE 2017
HAMILTON (ALEXANDER) 9 SI Landscape Tree planting COMPLETE 2018
HAMILTON (ALEXANDER) 9 FR Major Rehab Cultural Center Initiative PRE-DESIGN
HAMILTON (ALEXANDER) 9 SI Playground Playground and spray feature - upgrade DESIGN
HAMILTON (ALEXANDER) 9 FR Major Rehab Field house - major rehab CONSTRUCTION *
HAMLIN (HANNIBAL) 106 SI Courts Tennis court - rehab COMPLETE 2011
HAMLIN (HANNIBAL) 106 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
HAMLIN (HANNIBAL) 106 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
HAMLIN (HANNIBAL) 106 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
HAMLIN (HANNIBAL) 106 FR Swimming Pool Pool - rehab COMPLETE 2014
HAMLIN (HANNIBAL) 106 SI Playground Chicago Plays! - new equipment COMPLETE 2015 *
HAMLIN (HANNIBAL) 106 FR Roof Roof COMPLETE 2016
HAMLIN (HANNIBAL) 106 SI Paving 2016 DW Paving COMPLETE 2016
HAMLIN (HANNIBAL) 106 FR Minor Rehab Lobby - new flooring COMPLETE 2018
HAMLIN (HANNIBAL) 106 SI Athletic Field Athletic field - improvements COMPLETE 2019 *
HANSBERRY (LORRAINE) 1111 AD Acquisition Expansion COMPLETE 2012
HANSBERRY (LORRAINE) 1111 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HARDING (FREDERICK) 1106 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
HARDING (FREDERICK) 1106 SI Fencing Fencing - perimeter COMPLETE 2014
HARDING (GEORGE) 1033 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
HARRIS (HARRIET) 524 SI Playground Playground - upgrade PRE-DESIGN
HARRIS (HARRIET) 524 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011
HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2011 *
HARRIS (HARRIET) 524 FR Minor Rehab Misc. - backboards COMPLETE 2012
HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency HVAC improvements COMPLETE 2013
HARRIS (HARRIET) 524 FR HVAC and Energy Efficiency Field house - boiler room ventilation COMPLETE 2017
HARRIS (HARRIET) 524 FR Swimming Pool Pool rehab COMPLETE 2018
HARRIS (HARRIET) 524 FR Swimming Pool Pool - liner BID/AWARD
HARRIS (RYAN) MEMORIAL 1225 SI Playground Playground - new COMPLETE 2016 *
HARRIS (RYAN) MEMORIAL 1225 SI Landscape Tree planting COMPLETE 2018
HARRISON (CARTER) 213 FR HVAC and Energy Efficiency HVAC - new fan assembly COMPLETE 2021
HARRISON (CARTER) 213 FR Fitness Center Fitness center - upgrade COMPLETE 2011
HARRISON (CARTER) 213 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
25 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
HARRISON (CARTER) 213 SI Athletic Field Artificial turf athletic field - new COMPLETE 2012 *
HARRISON (CARTER) 213 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
HARRISON (CARTER) 213 FR HVAC and Energy Efficiency Misc. Senior Center HVAC COMPLETE 2014
HARRISON (CARTER) 213 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
HARRISON (CARTER) 213 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
HARRISON (CARTER) 213 SI Paving Paving - paths and driveway COMPLETE 2016
HARRISON (CARTER) 213 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HARRISON (CARTER) 213 FR Swimming Pool Pool - rehab COMPLETE 2016
HARRISON (CARTER) 213 FR Roof Roof rehab and security COMPLETE 2016
HARRISON (CARTER) 213 SI Paving 2016 DW Paving COMPLETE 2016
HARRISON (CARTER) 213 SI Courts Tennis court - rehab COMPLETE 2018
HARRISON (CARTER) 213 SI Courts Mini-pitch Soccer Court - new COMPLETE 2019 *
HARRISON (CARTER) 213 FR Major Rehab Field house - major rehab COMPLETE 2020 *
HARSH (VIVIAN G.) 324 SI Spray Pool Water play feature - surfacing COMPLETE 2011
HARSH (VIVIAN G.) 324 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HARTIGAN (DAVID) BEACH 1248 SI Site Improvement Misc. - fencing, lighting, landscape, benches COMPLETE 2014 *
HARTIGAN (DAVID) BEACH 1248 SI Paving Misc. pathway extension COMPLETE 2015 *
HARTIGAN (DAVID) BEACH 1248 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HASAN (ELLIOT) 294 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HAYES (FRANCIS) 242 FR Fitness Center Fitness center - upgrade COMPLETE 2012
HAYES (FRANCIS) 242 FR Minor Rehab Misc. - windows and benches COMPLETE 2013
HAYES (FRANCIS) 242 FR Minor Rehab Misc. - kitchen renovation COMPLETE 2013
HAYES (FRANCIS) 242 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2013
HAYES (FRANCIS) 242 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
HAYES (FRANCIS) 242 SI Lighting Lighting - athletic field COMPLETE 2014
HAYES (FRANCIS) 242 FR Windows and Doors Field house - window drainage COMPLETE 2016 *
HAYES (FRANCIS) 242 FR Minor Rehab Natatorium - hot water heater COMPLETE 2018
HAYES (FRANCIS) 242 FR Swimming Pool Pool - gutter and liner COMPLETE 2019
HAYES (FRANCIS) 242 SI Landscape Tree Planting COMPLETE 2019
HAYES (FRANCIS) 242 SI Athletic Field Athletic field - rehab and drainage BID/AWARD *
HAYES (FRANCIS) 242 FR HVAC and Energy Efficiency Roof units - new PRE-DESIGN *
HAYES (FRANCIS) 242 SI Paving Parking lot - rehab COMPLETE 2020
HAZELNUT 417 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HEGEWISCH MARSH 563 AD Acquisition Hegewisch Marsh - 13000 S. Torrence Ave. COMPLETE 2012
HEGEWISCH MARSH 563 SI Landscape Hegewisch Marsh - habitat restoration PLANNING
HEGEWISCH MARSH 563 AD Planning Hegewisch Marsh - Planning Study COMPLETE 2015 *
HEGEWISCH MARSH 563 SI Site Improvement Site improvements - trails and benches COMPLETE 2018
HERMITAGE 1008 SI Courts Slam Dunk Basketball Court COMPLETE 2012
HERMITAGE 1008 SI Playground Playground - new COMPLETE 2012 *
26 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
HERMOSA 125 SI Lighting Athletic Field - lighting PENDING FUNDING *
HERMOSA 125 FR Concrete Masonry Structural Field house - basement COMPLETE 2011
HERMOSA 125 SI Courts Misc. - landscape restoration COMPLETE 2012
HERMOSA 125 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
HERMOSA 125 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HERMOSA 125 SI Fencing Fencing - perimeter COMPLETE 2016
HERMOSA 125 SI Courts Mini-pitch Soccer Court - 2 new COMPLETE 2018 *
HERMOSA 125 SI Athletic Field Athletic field - rehab COMPLETE 2020 *
HERMOSA 125 FR Roof Roof and interior PENDING FUNDING *
HIAWATHA 229 FR Fitness Center Fitness center - upgrade COMPLETE 2011
HIAWATHA 229 SI Paving Parking lot - paving and drainage COMPLETE 2012 *
HIAWATHA 229 FR Fitness Center Fitness center - new equipment COMPLETE 2012
HIAWATHA 229 SI Playground Playground - new COMPLETE 2014 *
HICKORY 299 SI Playground Playground - resurfacing COMPLETE 2018 *
HOARD (EDISON) 387 SI Athletic Field Ballfield - rehab COMPLETE 2014
HOARD (EDISON) 387 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HOLLY 325 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HOLLYWOOD 75 SI Playground Chicago Plays! - new equipment COMPLETE 2014
HOLLYWOOD 75 SI Landscape Tree planting COMPLETE 2018
HOLSTEIN 203 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
HOLSTEIN 203 FR Minor Rehab Misc. - chimney replacement COMPLETE 2013
HOLSTEIN 203 SI Athletic Field Ballfield - rehab COMPLETE 2015
HOLSTEIN 203 FR Swimming Pool Wading Pool - filter COMPLETE 2016
HOLSTEIN 203 SI Spray Pool Water feature - surfacing COMPLETE 2016
HOLSTEIN 203 FR Swimming Pool Pool - deck COMPLETE 2016
HOLSTEIN 203 FR Swimming Pool Pool - filter PRE-DESIGN
HOLSTEIN 203 FR Roof Roof - new COMPLETE 2018 *
HOLSTEIN 203 FR Major Rehab Field house - major rehab - design COMPLETE 2018 *
HOLSTEIN 203 FR Major Rehab Field house - major rehab COMPLETE 2018 *
HOLSTEIN 203 FR Swimming Pool Wading pool - water main COMPLETE 2018
HOLSTEIN 203 SI Site Improvement Water main - emergency replacement COMPLETE 2019
HOMAN (JOSEPH) 1108 SI Playground Playground - design only COMPLETE 2011
HOMAN (JOSEPH) 1108 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HOMAN SQUARE COMM. CTR. 515 FR Minor Rehab Pool building - doors BID/AWARD
HOMAN SQUARE COMM. CTR. 515 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2011
HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2013
HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Misc. boiler tubes COMPLETE 2018
HOMAN SQUARE COMM. CTR. 515 FR HVAC and Energy Efficiency Misc. - compressor COMPLETE 2018
HOMAN SQUARE COMM. CTR. 515 FR Swimming Pool Pool - dehumidification BID/AWARD
27 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
HONEYSUCKLE 351 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HORAN (ALBERT) 1035 SI Courts Basketball court - rehab COMPLETE 2015
HORAN (ALBERT) 1035 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HORAN (ALBERT) 1035 SI Fencing Fencing - perimeter COMPLETE 2020
HORNBEAM 353 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
HORNER (HENRY) 228 SI Site Improvement Dog Friendly Area - improvements CONSTRUCTION *
HORNER (HENRY) 228 SI Site Improvement Tree planting for new pathway COMPLETE 2020
HORNER (HENRY) 228 SI Landscape Tree planting COMPLETE 2020
HORNER (HENRY) 228 SI Lighting Lighting - exterior COMPLETE 2011
HORNER (HENRY) 228 FR Minor Rehab Misc. - gym bleachers COMPLETE 2011 *
HORNER (HENRY) 228 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
HORNER (HENRY) 228 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
HORNER (HENRY) 228 FR Concrete Masonry Structural Field house - stairs and masonry COMPLETE 2012
HORNER (HENRY) 228 FR Major Rehab Transition plan - access improvements COMPLETE 2012
HORNER (HENRY) 228 SI Lighting Lighting - exterior COMPLETE 2013
HORNER (HENRY) 228 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HORNER (HENRY) 228 AD Park Development Riverbank development with Army Corps COMPLETE 2018 *
HORNER (HENRY) 228 SI Site Improvement Dog friendly area - new COMPLETE 2018 *
HORNER (HENRY) 228 SI Site Improvement Mini-pitch Soccer Court - new COMPLETE 2018 *
HORNER (HENRY) 228 SI Lighting Lighting upgrade to LED COMPLETE 2018
HORNER (HENRY) 228 SI Courts Tennis court -rehab COMPLETE 2018 *
HORNER (HENRY) 228 SI Fencing Perimeter fencing along Irving Park Rd. COMPLETE 2019
HORNER (HENRY) 228 AD New Construction 312 RiverRun - Underpass at Irving Park Rd. (CDOT) CONSTRUCTION *
HOUSTON (JESSIE "MA") 278 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
HOUSTON (JESSIE "MA") 278 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HOWARD (URE) BEACH 1256 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HOWARD (URE) BEACH 1256 AD New Construction Site restoration COMPLETE 2018 *
HOWARD (URE) BEACH 1256 SI Site Improvement Shoreline stabilization COMPLETE 2020
HOYNE (THOMAS) 1036 SI Athletic Field Athletic field - rehab PRE-DESIGN *
HOYNE (THOMAS) 1036 SI Playground Chicago Plays! - new equipment COMPLETE 2014
HOYNE (THOMAS) 1036 SI Athletic Field Athletic field - scoreboard CONSTRUCTION *
HUBBARD (GURDON) 1109 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
HUCKLEBERRY 336 SI Playground Chicago Plays! - new equipment COMPLETE 2016
HUMBERT (JAMES) 1121 SI Playground Chicago Plays! - new equipment COMPLETE 2014
HUMBOLDT (ALEXANDER VON) 219 FR Roof Roof - leak at gutter CONSTRUCTION
HUMBOLDT (ALEXANDER VON) 219 SI Paving Pedestrian pathways PRE-DESIGN *
HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Pedestrian Bridge - restoration BID/AWARD
HUMBOLDT (ALEXANDER VON) 219 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 *
HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
28 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
HUMBOLDT (ALEXANDER VON) 219 SI Paving Parking lot - rehab COMPLETE 2012
HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Misc. - water main COMPLETE 2012
HUMBOLDT (ALEXANDER VON) 219 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
HUMBOLDT (ALEXANDER VON) 219 SI Playground Playground - additional equipment COMPLETE 2012
HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool - filter COMPLETE 2013
HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool - water line rehab COMPLETE 2013
HUMBOLDT (ALEXANDER VON) 219 FR Windows and Doors Landscape Yard - doors COMPLETE 2014
HUMBOLDT (ALEXANDER VON) 219 FR Major Rehab Field house - major rehab COMPLETE 2014 *
HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment (at Augusta Ave.) COMPLETE 2014
HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Misc. - pergola rehab COMPLETE 2014
HUMBOLDT (ALEXANDER VON) 219 AD Planning Lagoon Water Management - Study COMPLETE 2015
HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment COMPLETE 2015
HUMBOLDT (ALEXANDER VON) 219 SI Lighting Lighting - electric power COMPLETE 2015
HUMBOLDT (ALEXANDER VON) 219 SI Landscape Formal garden - restoration study COMPLETE 2015
HUMBOLDT (ALEXANDER VON) 219 SI Playground Playground at California - resurfacing COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Lagoon - natural swimming pond COMPLETE 2016 *
HUMBOLDT (ALEXANDER VON) 219 FR Roof Stables - roof COMPLETE 2016 *
HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Gym floor - restore or replace COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 FR Minor Rehab Boat House - remediation COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 SI Playground Chicago Plays! - new equipment (at North Ave.) COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 SI Paving Site paving COMPLETE 2016
HUMBOLDT (ALEXANDER VON) 219 SI Site Improvement Baseball Batting Cages COMPLETE 2017 *
HUMBOLDT (ALEXANDER VON) 219 SI Lighting Lighting - athletic field COMPLETE 2017
HUMBOLDT (ALEXANDER VON) 219 FR Roof Comfort Stations - rehabs COMPLETE 2017
HUMBOLDT (ALEXANDER VON) 219 SI Athletic Field Ballfield - rehab COMPLETE 2018 *
HUMBOLDT (ALEXANDER VON) 219 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 *
HUMBOLDT (ALEXANDER VON) 219 FR Swimming Pool Pool - liner and slide COMPLETE 2019
HUMBOLDT (ALEXANDER VON) 219 SI Landscape Athletic Field - rehab COMPLETE 2019
HUMBOLDT (ALEXANDER VON) 219 FR Major Rehab Cultural Center Initiative DESIGN *
INDEPENDENCE 83 FR Minor Rehab Pool - ceiling stabilization and plaster restoration CONSTRUCTION
INDEPENDENCE 83 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011
INDEPENDENCE 83 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
INDEPENDENCE 83 FR HVAC and Energy Efficiency Misc. - HVAC rehab COMPLETE 2012
INDEPENDENCE 83 FR Major Rehab Bungalow - major rehab and green initiative COMPLETE 2013 *
INDEPENDENCE 83 FR Minor Rehab Gym floor - new COMPLETE 2013
INDEPENDENCE 83 FR Major Rehab Major rehab including transition plan access improvements COMPLETE 2015 *
INDEPENDENCE 83 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
INDEPENDENCE 83 SI Playground Signature Playground - new COMPLETE 2016 *
INDEPENDENCE 83 FR Swimming Pool Pool - filter system and gutter COMPLETE 2017
29 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
INDEPENDENCE 83 SI Paving 2016 DW Paving -pathways COMPLETE 2017
INDEPENDENCE 83 SI Athletic Field Athletic field - rehab COMPLETE 2018
INDEPENDENCE 83 FR Windows and Doors Field House and Pool building - windows COMPLETE 2020
INDIAN BOUNDARY 165 FR Minor Rehab Misc. - sump pump COMPLETE 2011
INDIAN BOUNDARY 165 SI Courts Tennis court - rehab COMPLETE 2011
INDIAN BOUNDARY 165 FR Major Rehab Transition plan - access improvements COMPLETE 2011
INDIAN BOUNDARY 165 FR Minor Rehab Misc. downspouts COMPLETE 2012
INDIAN BOUNDARY 165 FR Major Rehab Field house - major rehab COMPLETE 2013 *
INDIAN BOUNDARY 165 FR Major Rehab Nature Center - rehab COMPLETE 2014
INDIAN BOUNDARY 165 SI Spray Pool Water feature - rehab COMPLETE 2014 *
INDIAN BOUNDARY 165 FR Major Rehab Field house - foundation and drainage COMPLETE 2014
INDIAN BOUNDARY 165 FR Minor Rehab Cultural Center Initiative PLANNING
INDIAN ROAD 1038 SI Athletic Field Ballfield - rehab BID/AWARD
JACKSON (ANDREW) 19 SI Site Improvement Jackson Park - harbor breakwater CONSTRUCTION
JACKSON (ANDREW) 19 SI Site Improvement 63rd Street Beach House - emergency water/sewer main COMPLETE 2020
JACKSON (ANDREW) 19 SI Athletic Field Ballfield - reconfiguration PRE-DESIGN
JACKSON (ANDREW) 19 FR Minor Rehab 59th St Comfort Station - renovation BID/AWARD
JACKSON (ANDREW) 19 FR Concrete Masonry Structural Historic Pavillion at 67th St. - emergency stabilization DESIGN
JACKSON (ANDREW) 19 SI Site Improvement Outer Harbor - storm damage CONSTRUCTION *
JACKSON (ANDREW) 19 SI Site Improvement Lakefront at 67th St. - storm damage COMPLETE 2021 *
JACKSON (ANDREW) 19 SI Landscape Tree planting - Columbia Basin COMPLETE 2020
JACKSON (ANDREW) 19 FR Minor Rehab Landscape Yard - rehab COMPLETE 2011
JACKSON (ANDREW) 19 SI Landscape 63rd St. Beach - dune restoration COMPLETE 2011 *
JACKSON (ANDREW) 19 SI Site Improvement Multi-use trail - Marquette Drive COMPLETE 2011 *
JACKSON (ANDREW) 19 FR Major Rehab Field house - locker room improvements COMPLETE 2011
JACKSON (ANDREW) 19 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 *
JACKSON (ANDREW) 19 SI Site Improvement Misc. - new waterlines COMPLETE 2011
JACKSON (ANDREW) 19 SI Athletic Field Athletic field - rehab COMPLETE 2011
JACKSON (ANDREW) 19 SI Lighting Lighting - exterior COMPLETE 2013
JACKSON (ANDREW) 19 SI Landscape Osaka Garden - restoration COMPLETE 2013
JACKSON (ANDREW) 19 SI Fencing Misc. gate COMPLETE 2013
JACKSON (ANDREW) 19 AD New Construction Water quality - pilot beach barrier COMPLETE 2013 *
JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
JACKSON (ANDREW) 19 SI Lighting Misc. electric transformer COMPLETE 2013
JACKSON (ANDREW) 19 FR Minor Rehab 63rd St. Beach House - electric upgrade COMPLETE 2013 *
JACKSON (ANDREW) 19 FR Minor Rehab Bowling Green Club House - rehab COMPLETE 2013
JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment (at 64th St.) COMPLETE 2014
JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment (Chrysalis) COMPLETE 2014
JACKSON (ANDREW) 19 SI Athletic Field Misc. croquet field COMPLETE 2014
30 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
JACKSON (ANDREW) 19 SI Courts Basketball Court Rehab. COMPLETE 2014
JACKSON (ANDREW) 19 SI Paving Paving - 67th St. Pathway COMPLETE 2016
JACKSON (ANDREW) 19 SI Site Improvement Water conservation - study COMPLETE 2016
JACKSON (ANDREW) 19 SI Playground Chicago Plays! - new equipment at 67th St. COMPLETE 2016
JACKSON (ANDREW) 19 FR Sculpture and Monument "Skylanding" - installation COMPLETE 2016 *
JACKSON (ANDREW) 19 SI Spray Pool 63rd St. Beach Spray Feature - rehab COMPLETE 2017
JACKSON (ANDREW) 19 SI Site Improvement Osaka Garden - site improvements COMPLETE 2017
JACKSON (ANDREW) 19 SI Site Improvement Lakefront Trail Separation - 55th St. to 67th St. COMPLETE 2018 *
JACKSON (ANDREW) 19 SI Paving Landscape Yard - paving COMPLETE 2018
JACKSON (ANDREW) 19 SI Paving Parking Lot at Hayes and Cornell – major rehab COMPLETE 2019
JACKSON (ANDREW) 19 SI Site Improvement Iowa Building - chess tables COMPLETE 2019
JACKSON (ANDREW) 19 SI Site Improvement Driving Range - sewer COMPLETE 2019
JACKSON (ANDREW) 19 AD Park Development Olmsted Historic Restoration COMPLETE 2019 *
JACKSON (ANDREW) 19 SI Paving Parking lot at La Rabida - rehab COMPLETE 2019
JACKSON (ANDREW) 19 FR Major Rehab Darrow Bridge - restoration (CDOT) DESIGN
JACKSON (ANDREW) 19 SI Site Improvement Park improvements PRE-DESIGN *
JACKSON (ANDREW) 19 SI Site Improvement Utility infrastructure (CDOT) CONSTRUCTION *
JACKSON (ANDREW) 19 FR Minor Rehab 63rd St. Beach House -assessment COMPLETE 2020
JACKSON (ANDREW) 19 SI Athletic Field Artificial Turf Field and Track - relocation CONSTRUCTION *
JACKSON (MAHALIA) 386 FR Major Rehab Building demolition COMPLETE 2011
JACKSON (MAHALIA) 386 SI Lighting Lighting - athletic field COMPLETE 2012
JACOB 156 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
JACOB 156 AD Acquisition Expansion COMPLETE 2014 *
JACOB 156 SI Site Improvement Misc. site improvements COMPLETE 2015 *
JACOLIK (FLORIAN S.) 1288 SI Playground Chicago Plays! - new equipment COMPLETE 2016
JEFFERSON (NANCY) 338 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
JEFFERSON (NANCY) 338 SI Courts Misc. - game court graphics COMPLETE 2014
JEFFERSON (THOMAS) MEML. 94 FR Minor Rehab Field house - fire escape COMPLETE 2020
JEFFERSON (THOMAS) MEML. 94 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
JEFFERSON (THOMAS) MEML. 94 FR Roof Pool building - roof COMPLETE 2012
JEFFERSON (THOMAS) MEML. 94 FR Minor Rehab Field house - locker room improvements COMPLETE 2016
JEFFERSON (THOMAS) MEML. 94 FR Swimming Pool Pool - deck COMPLETE 2019
JENSEN (CHRIST) 82 SI Landscape Athletic Field - rehab COMPLETE 2019
JONES (MARY RICHARDSON) 479 SI Playground Playground - resurfacing COMPLETE 2013
JONES (MARY RICHARDSON) 479 SI Fencing Misc. - maintenance gate COMPLETE 2018
JONQUIL 1270 SI Courts Tennis court- rehab COMPLETE 2015 *
JUNCTION GROVE 415 SI Playground Chicago Plays! - new equipment COMPLETE 2016
JUNEWAY BEACH 1258 AD New Construction Site restoration COMPLETE 2018 *
JUNIPER 392 SI Playground Playground with water feature - new COMPLETE 2018 *
31 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
KEELER (CYRUS) 1114 SI Playground Chicago Plays! - new equipment COMPLETE 2016
KELLS (GEORGE) 1040 AD Park Development Park expansion and development PENDING FUNDING *
KELLS (GEORGE) 1040 SI Playground Chicago Plays! - new equipment COMPLETE 2014
KELLS (GEORGE) 1040 SI Athletic Field Athletic Field - rehab COMPLETE 2019 *
KELLY (EDWARD) 260 SI Paving Paving - pathways COMPLETE 2012
KELLY (EDWARD) 260 SI Playground Chicago Plays! - new equipment COMPLETE 2015
KELLY (EDWARD) 260 SI Athletic Field Artificial turf athletic field - new COMPLETE 2015 *
KELLY (EDWARD) 260 SI Athletic Field Athletic field and basketball court- rehab COMPLETE 2017 *
KELLY (EDWARD) 260 SI Athletic Field Athletic field - scoreboard COMPLETE 2017 *
KELLY (JOHN) 493 SI Playground Chicago Plays! - new equipment COMPLETE 2016
KELVYN (WILLIAM) 126 SI Fencing Misc. - gates COMPLETE 2011
KELVYN (WILLIAM) 126 SI Playground Chicago Plays! - new equipment COMPLETE 2014 *
KELVYN (WILLIAM) 126 FR Roof Roof COMPLETE 2015
KELVYN (WILLIAM) 126 FR Minor Rehab Drainage improvements and new gym floor COMPLETE 2015 *
KELVYN (WILLIAM) 126 FR HVAC and Energy Efficiency Boiler - new COMPLETE 2019
KENMORE 1115 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
KENNEDY (DENNIS) 48 SI Paving Paving at entrance COMPLETE 2011
KENNEDY (DENNIS) 48 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
KENNEDY (DENNIS) 48 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
KENNEDY (DENNIS) 48 SI Courts Court - conversion to roller hockey and jr. tennis COMPLETE 2014
KENNEDY (DENNIS) 48 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
KENNEDY (DENNIS) 48 SI Lighting Lighting - athletic field COMPLETE 2015
KENNEDY (DENNIS) 48 SI Paving Site paving COMPLETE 2016
KENNEDY (DENNIS) 48 FR Swimming Pool Pool - rehab COMPLETE 2017
KENNEDY (DENNIS) 48 SI Courts Hockey Roller Court - new COMPLETE 2017 *
KENNEDY (DENNIS) 48 FR Swimming Pool Pool - controls COMPLETE 2018
KENNICOTT (JONATHAN) 485 SI Lighting LED upgrade - field house COMPLETE 2019
KENNICOTT (JONATHAN) 485 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
KENNICOTT (JONATHAN) 485 FR Major Rehab Transition plan - access improvements COMPLETE 2012
KENNICOTT (JONATHAN) 485 SI Playground Chicago Plays! - new equipment COMPLETE 2014
KENNICOTT (JONATHAN) 485 SI Site Improvement Paving, fencing, lighting, alley closure COMPLETE 2016 *
KENSINGTON 1041 SI Site Improvement Site and facility improvements COMPLETE 2012
KENSINGTON 1041 SI Athletic Field Athletic field - rehab COMPLETE 2012
KENSINGTON 1041 SI Lighting Lighting - exterior COMPLETE 2017
KENSINGTON 1041 FR Minor Rehab Misc. improvements COMPLETE 2019
KEN-WELL 1042 SI Paving Paving - entrance COMPLETE 2014
KEN-WELL 1042 SI Playground Chicago Plays! - new equipment COMPLETE 2014 *
KEN-WELL 1042 SI Spray Pool Spray feature -rehab COMPLETE 2017 *
KENWOOD COMM. 1010 SI Paving Site paving COMPLETE 2016
32 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
KENWOOD COMM. 1010 SI Courts Tennis Court -rehab COMPLETE 2020 *
KENWOOD COMM. 1010 SI Playground Playground - upgrade COMPLETE 2020
KENWOOD COMM. 1010 SI Athletic Field Athletic Field - rehab PRE-DESIGN *
KEYSTONE 1116 SI Playground Chicago Plays! - new equipment COMPLETE 2015
KILBOURN 84 FR Minor Rehab Greenhouse - boiler room flooding COMPLETE 2020
KILBOURN 84 SI Paving Landscape yard - paving COMPLETE 2011
KILBOURN 84 SI Fencing Misc. - gates COMPLETE 2011
KILBOURN 84 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
KILBOURN 84 SI Playground Chicago Plays! - new equipment COMPLETE 2013 *
KILBOURN 84 FR Major Rehab Greenhouse - restoration COMPLETE 2014 *
KILBOURN 84 SI Site Improvement Misc. scoreboard COMPLETE 2014
KILBOURN 84 FR Roof Maintenance building - roof COMPLETE 2017
KILBOURN 84 SI Courts Court conversions COMPLETE 2020 *
KILBOURN 84 SI Courts Mini-pitch Soccer Court - new COMPLETE 2020 *
KILBOURN 84 SI Playground Nature playground - new COMPLETE 2019 *
KING (MARTIN LUTHER, JR.) 334 FR Minor Rehab Bowling alley - restoration COMPLETE 2011
KING (MARTIN LUTHER, JR.) 334 FR Roof Bowling alley - roof COMPLETE 2013
KING (MARTIN LUTHER, JR.) 334 FR Sculpture and Monument Monument - restoration COMPLETE 2013
KING (MARTIN LUTHER, JR.) 334 FR Roof Bowling Alley - roof COMPLETE 2016
KING (MARTIN LUTHER, JR.) 334 FR Minor Rehab Misc. bowling alley supplies COMPLETE 2016
KING (MARTIN LUTHER, JR.) 334 FR HVAC and Energy Efficiency HVAC - rehab COMPLETE 2017
KING (MARTIN LUTHER, JR.) 334 FR Minor Rehab Misc. improvements COMPLETE 2019
KING (MARTIN LUTHER, JR.) 334 SI Playground Playground - upgrade DESIGN
King-Lockhart (Patrick, Anthony) 558 AD Park Development Park development - 106th St. and Western Ave. COMPLETE 2011 *
King-Lockhart (Patrick, Anthony) 558 SI Site Improvement Sculpture and Entrance Columns COMPLETE 2013 *
KIWANIS 42 SI Lighting Lighting - exterior COMPLETE 2015 *
KLEIN (LOIS) 544 AD Acquisition Lincoln Ave. and Addison St. COMPLETE 2011
KLEIN (LOIS) 544 SI Playground Misc. kiosk COMPLETE 2013 *
KOLMAR 85 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
KORCZAK (JANUSZ) 1090 SI Playground Chicago Plays! - new equipment COMPLETE 2015
KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. window screens COMPLETE 2011
KOSCIUSZKO (THADEUZ) 120 FR Roof Natatorium - roof COMPLETE 2011
KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2011
KOSCIUSZKO (THADEUZ) 120 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
KOSCIUSZKO (THADEUZ) 120 FR Major Rehab Transition plan - access improvements COMPLETE 2012
KOSCIUSZKO (THADEUZ) 120 SI Paving Pathways and parking lot COMPLETE 2013
KOSCIUSZKO (THADEUZ) 120 FR HVAC and Energy Efficiency Boiler - pool COMPLETE 2014
KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool - rehab COMPLETE 2015
KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. - floor restoration design COMPLETE 2015
33 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
KOSCIUSZKO (THADEUZ) 120 FR Concrete Masonry Structural Field house and Natatorium - concrete, plaster, masonry COMPLETE 2015
KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
KOSCIUSZKO (THADEUZ) 120 SI Site Improvement Artificial Turf Court - rehab COMPLETE 2019 *
KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool Building - exterior doors COMPLETE 2019
KOSCIUSZKO (THADEUZ) 120 SI Site Improvement Including turf infield, playground, spray feature, DFA CONSTRUCTION *
KOSCIUSZKO (THADEUZ) 120 FR Swimming Pool Pool - controls COMPLETE 2019
KOSCIUSZKO (THADEUZ) 120 FR Minor Rehab Field house improvements - windows, doors, gymnasium COMPLETE 2019 *
KRAUSE (FRANCIS VERNON) 1079 SI Playground Playground with water feature - new COMPLETE 2013
KUCINSKI-MURPHY (VICKI, ROSEBETH) 1062 SI Playground Chicago Plays! - new equipment COMPLETE 2014
KUJAWA (CHESTER FRANK) 372 SI Playground Chicago Plays! - new equipment COMPLETE 2015
LA FOLLETTE (ROBERT) 201 SI Courts Mini-pitch court - new with lighting COMPLETE 2020 *
LA FOLLETTE (ROBERT) 201 SI Paving Paving - paths COMPLETE 2011
LA FOLLETTE (ROBERT) 201 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 *
LA FOLLETTE (ROBERT) 201 SI Site Improvement Track - new COMPLETE 2011 *
LA FOLLETTE (ROBERT) 201 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2011
LA FOLLETTE (ROBERT) 201 FR Minor Rehab Field house - painting, plastering, drainage COMPLETE 2012
LA FOLLETTE (ROBERT) 201 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014
LA FOLLETTE (ROBERT) 201 FR Concrete Masonry Structural Field house - concrete and structural COMPLETE 2015
LA FOLLETTE (ROBERT) 201 SI Courts Basketball Court - rehab COMPLETE 2016
LA FOLLETTE (ROBERT) 201 FR HVAC and Energy Efficiency HVAC improvements COMPLETE 2017
LA FOLLETTE (ROBERT) 201 SI Spray Pool Spray feature -rehab COMPLETE 2017
LA FOLLETTE (ROBERT) 201 FR Swimming Pool Pool - rehab COMPLETE 2017
LA FOLLETTE (ROBERT) 201 FR Minor Rehab Field house - plumbing interior COMPLETE 2019
LA FOLLETTE (ROBERT) 201 FR Major Rehab Field house and Natatorium - Major Rehab COMPLETE 2019 *
LA FOLLETTE (ROBERT) 201 FR Swimming Pool Pool - boiler and liner COMPLETE 2020
LA FOLLETTE (ROBERT) 201 SI Site Improvement Improvements including playground, spray feature, paving PRE-DESIGN *
La Villita 553 AD Acquisition Celotex - 2800-3024 S. Sacramento Ave. COMPLETE 2012 *
La Villita 553 AD Park Development Park development - "The Big Park in Little Village" COMPLETE 2015 *
LA VILLITA 553 SI Lighting Exterior - ball field lighting COMPLETE 2020 *
LAKE MEADOWS 263 SI Paving Parking lot - rehab COMPLETE 2011
LAKE MEADOWS 263 FR Minor Rehab Field house - rehab COMPLETE 2011
LAKE MEADOWS 263 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
LAKE MEADOWS 263 SI Playground Chicago Plays! - new equipment COMPLETE 2016
LAKE SHORE 107 SI Site Improvement Outdoor fitness station - new DESIGN *
LAKE SHORE 107 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
LAKE SHORE 107 SI Site Improvement Track - rehab COMPLETE 2015
LAKE SHORE 107 AD Park Development Park improvements - design only COMPLETE 2016
LAKE SHORE 107 SI Athletic Field Athletic field - improvements COMPLETE 2017
LAKE SHORE 107 SI Athletic Field Landscape irrigation system - new COMPLETE 2018 *
34 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
LAKE SHORE 107 SI Playground Playground - new COMPLETE 2020
LAMB (HAROLD) 446 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LAMB (HAROLD) 446 SI Landscape Tree planting COMPLETE 2019
LANGDON (MARY MARGARET) 1077 SI Playground Chicago Plays! new equipment including court conversion COMPLETE 2015 *
LAWLER (MICHAEL) 1011 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
LAWLER (MICHAEL) 1011 SI Playground Playground with water feature - new COMPLETE 2013 *
LAWLER (MICHAEL) 1011 SI Athletic Field Artificial turf field - design BID/AWARD *
LAZARUS (EMMA) 450 SI Playground Chicago Plays! - new equipment COMPLETE 2014 *
LeCLAIRE-HEARST 305 FR Roof Roof COMPLETE 2011
LeCLAIRE-HEARST 305 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
LeCLAIRE-HEARST 305 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015 *
LeCLAIRE-HEARST 305 SI Spray Pool Spray feature - new COMPLETE 2017
LEE (JOHN) 1286 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LEGION 274 FR Sculpture and Monument Misc.- fountain restoration COMPLETE 2013
LEGION 274 SI Playground Chicago Plays! - new equipment (at Catalpa Ave.) COMPLETE 2014
LEGION 274 SI Playground Chicago Plays! - new equipment (at Catalpa Ave.) COMPLETE 2014
LEGION 274 SI Playground Chicago Plays! - new equipment at Thorndale Ave. COMPLETE 2015
LEGION 274 SI Playground Chicago Plays! - new equipment at Hollywood Ave. COMPLETE 2015
LEGION 274 SI Landscape Tree Planting COMPLETE 2019
LELAND GIANTS 395 SI Playground Chicago Plays! - new equipment COMPLETE 2015
LELAND GIANTS 395 SI Landscape Tree Planting COMPLETE 2019
LEONE (SAM) BEACH 1013 SI Paving Lighting - exterior COMPLETE 2012
LEONE (SAM) BEACH 1013 SI Playground Chicago Plays! - new equipment COMPLETE 2016
LEONE (SAM) BEACH 1013 SI Landscape Natural Area - new COMPLETE 2019 *
LEONE (SAM) BEACH 1013 FR Major Rehab Lifeguard Station - Renovation Plan PLANNING
LERNER (LEO) 273 SI Courts Tennis court - rehab COMPLETE 2020 *
LERNER (LEO) 273 SI Playground Playground - equipment COMPLETE 2012
LERNER (LEO) 273 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LERNER (LEO) 273 SI Athletic Field Athletic field - rehab COMPLETE 2014
LEVIN (JOHN) 1220 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
LEVIN (JOHN) 1220 FR Minor Rehab Field house - rehab COMPLETE 2019
LILY GARDENS 1218 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
LILY GARDENS 1218 SI Landscape Tree planting COMPLETE 2018
LIMAS (JULIANN HOPE) 1066 AD Acquisition Expansion - 2422 S. Trumbull Ave. COMPLETE 2015 *
LIMAS (JULIANN HOPE) 1066 SI Playground Chicago Plays! - new equipment COMPLETE 2015
LIN (MARGARET HIE DING) 360 SI Site Improvement Park improvements DESIGN
LINCOLN (ABRAHAM) 100 SI Paving Montrose Butterfly Garden - accessible walkways PRE-DESIGN *
LINCOLN (ABRAHAM) 100 SI Site Improvement Storm Damage - Fullerton Ave. to North Ave. COMPLETE 2020 *
LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial Turf Field at North Ave. - rehab DESIGN
35 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
LINCOLN (ABRAHAM) 100 SI Site Improvement Diversey Driving Range - netting and fencing DESIGN
LINCOLN (ABRAHAM) 100 FR Major Rehab Conservatory - steam tunnel COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Athletic Field Athletic field - rehab COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Landscape North Pond - major restoration DESIGN *
LINCOLN (ABRAHAM) 100 SI Paving Landscape yard - paving COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Osterman Beach House - rehab COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Lighting Diversey Ave. to Fullerton Dr. - lighting COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Minor Rehab Montrose Comfort Station - entrance and washrooms COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Minor Rehab Landscape Yard - rehab COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Minor Rehab Misc. navigation beacon COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Site Improvement Pathways and drainage COMPLETE 2011 *
LINCOLN (ABRAHAM) 100 FR Roof Comfort station at Diversey Ave. - roof COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Lighting Lighting - lagoon COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Montrose Ave. to Addison Ave. COMPLETE 2018 *
LINCOLN (ABRAHAM) 100 FR Major Rehab Transition plan - access improvements - Boat Club COMPLETE 2011
LINCOLN (ABRAHAM) 100 SI Fencing Dog Beach fencing - at Montrose COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Major Rehab Theater on the Lake - terrace walls COMPLETE 2011 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - Restoration of Terrace Walls COMPLETE 2011
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Swedenborg" - restoration COMPLETE 2012
LINCOLN (ABRAHAM) 100 FR Major Rehab Margate Field House - locker room improvements COMPLETE 2012
LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Promenade restoration - Diversey Ave. to Belmont Ave. COMPLETE 2012
LINCOLN (ABRAHAM) 100 SI Paving Paving - paths - near Berwyn Ave. COMPLETE 2012 *
LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Conservatory - HVAC energy management COMPLETE 2012 *
LINCOLN (ABRAHAM) 100 SI Lighting Misc. - electric service near Zoo COMPLETE 2012
LINCOLN (ABRAHAM) 100 SI Courts Tennis court - rehab COMPLETE 2012
LINCOLN (ABRAHAM) 100 SI Lighting Lighting - Roscoe St. and Barry St. underpass COMPLETE 2012
LINCOLN (ABRAHAM) 100 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2012
LINCOLN (ABRAHAM) 100 FR Major Rehab Transition plan - access improvements - Cultural Center COMPLETE 2012
LINCOLN (ABRAHAM) 100 SI Fencing Misc. fencing COMPLETE 2012
LINCOLN (ABRAHAM) 100 SI Paving Belmont Harbor - sidewalk COMPLETE 2012
LINCOLN (ABRAHAM) 100 SI Site Improvement Dog friendly area at Belmont Ave. - improvements COMPLETE 2013 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. benches at North Pond COMPLETE 2013 *
LINCOLN (ABRAHAM) 100 FR Minor Rehab Cultural Center - rehab COMPLETE 2013
LINCOLN (ABRAHAM) 100 FR Major Rehab North Avenue Pier - rehab COMPLETE 2013
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
LINCOLN (ABRAHAM) 100 FR Roof Conservatory - rehab COMPLETE 2013
LINCOLN (ABRAHAM) 100 FR Major Rehab South Field House - renovation and court rehab COMPLETE 2013
LINCOLN (ABRAHAM) 100 SI Paving Pathway and drinking fountain COMPLETE 2019 *
36 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
LINCOLN (ABRAHAM) 100 AD New Construction
Shoreline Protection with U.S. Army Corps (Montrose Dr. to Irving
Park Dr.) COMPLETE 2014 *
LINCOLN (ABRAHAM) 100 SI Lighting Lighting - ballfield COMPLETE 2014
LINCOLN (ABRAHAM) 100 AD Planning Diversey Driving Range - planning study COMPLETE 2014
LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf athletic field - new COMPLETE 2014
LINCOLN (ABRAHAM) 100 AD Planning Montrose Point - Ecological Restoration and Management Plan COMPLETE 2014 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Montrose Beach Dog Friendly Area - site improvements COMPLETE 2014 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. water main rehab at lagoon COMPLETE 2014
LINCOLN (ABRAHAM) 100 SI Fencing Misc. fencing COMPLETE 2014
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Fountain Girl" and Rustic Pavillion- restoration COMPLETE 2014 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Misc. - electric transclosures COMPLETE 2015
LINCOLN (ABRAHAM) 100 AD New Construction Shoreline Protection with U.S. Army Corps (Fullerton Ave.) COMPLETE 2015 *
LINCOLN (ABRAHAM) 100 SI Paving Paving - paths - south COMPLETE 2015 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Montrose Point - restoration COMPLETE 2015 *
LINCOLN (ABRAHAM) 100 FR Windows and Doors Conservatory - doors COMPLETE 2015
LINCOLN (ABRAHAM) 100 FR Windows and Doors Conservatory - glass restoration - Annual Program COMPLETE 2015
LINCOLN (ABRAHAM) 100 SI Playground Playground with water feature - new COMPLETE 2015 *
LINCOLN (ABRAHAM) 100 SI Paving Paving - Diversey Driving Range COMPLETE 2015 *
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment (Morrie Mages) COMPLETE 2015
LINCOLN (ABRAHAM) 100 SI Landscape Montrose Beach Dunes - Planning Study COMPLETE 2015 *
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Charitas" - restoration COMPLETE 2016
LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Waveland Clock Tower - concrete and drainage COMPLETE 2016
LINCOLN (ABRAHAM) 100 SI Paving Green infrastructure renovation - Wilson Parking Lot COMPLETE 2016 *
LINCOLN (ABRAHAM) 100 FR Minor Rehab Misc. - pumps at North Ave. COMPLETE 2016
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Simonds Dr. COMPLETE 2016
LINCOLN (ABRAHAM) 100 SI Paving Site paving COMPLETE 2016
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Sunnyside Ave. COMPLETE 2016
LINCOLN (ABRAHAM) 100 SI Site Improvement Paving - running paths COMPLETE 2016 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Oak St. to Ohio St. COMPLETE 2017 *
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Totem Pole" - restoration COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Fullerton Ave. to North Ave. COMPLETE 2017 *
LINCOLN (ABRAHAM) 100 FR Roof Conservatory - glass roof assessment COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Landscape Montrose Butterfly Garden COMPLETE 2017 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Osterman Beach - beach access COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Stockton Dr. COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf athletic field at Montrose Ave - major rehab COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Site Improvement Outdoor fitness station at Diversey Ave. - new COMPLETE 2017 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Bryn Mawr - dog friendly area COMPLETE 2017 *
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Diversey Pkwy. COMPLETE 2017
37 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
LINCOLN (ABRAHAM) 100 FR Major Rehab Theater on the Lake - major rehab COMPLETE 2017 *
LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Power House - boiler COMPLETE 2017
LINCOLN (ABRAHAM) 100 FR Minor Rehab Theater on the Lake Comfort Station - Rehab COMPLETE 2017
LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Water main at Foster Ave. COMPLETE 2017
LINCOLN (ABRAHAM) 100 SI Site Improvement Ohio Street Beach - line sewer replacement COMPLETE 2018
LINCOLN (ABRAHAM) 100 FR Minor Rehab Shore Club - plumbing and electrical COMPLETE 2018 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Fountain Girl Garden - installation COMPLETE 2018 *
LINCOLN (ABRAHAM) 100 FR Roof Cultural Center - clay tile roof restoration COMPLETE 2018 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Ardmore Ave. to Montrose Ave. COMPLETE 2018 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - North Ave. to Oak St. COMPLETE 2018 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - signage COMPLETE 2018
LINCOLN (ABRAHAM) 100 SI Site Improvement Lakefront Trail Separation - Briar St. to Fullerton Ave. COMPLETE 2018 *
LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Boat House - furnace COMPLETE 2018
LINCOLN (ABRAHAM) 100 SI Site Improvement LFT Separation - Addison St. to Briar Ave. COMPLETE 2018 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Electric transformer - new COMPLETE 2019
LINCOLN (ABRAHAM) 100 SI Paving Wilson Parking Lot - rehab COMPLETE 2019
LINCOLN (ABRAHAM) 100 FR Minor Rehab South Field House - rehab COMPLETE 2019
LINCOLN (ABRAHAM) 100 SI Landscape Montrose Point - Bird Sanctuary Design COMPLETE 2019 *
LINCOLN (ABRAHAM) 100 SI Playground Chicago Plays! - new equipment at Cannon Dr. COMPLETE 2019 *
LINCOLN (ABRAHAM) 100 SI Site Improvement Theater on the Lake - bike racks COMPLETE 2019
LINCOLN (ABRAHAM) 100 FR Minor Rehab Cultural Center Initiative PLANNING
LINCOLN (ABRAHAM) 100 FR HVAC and Energy Efficiency Zoo - gas boosters COMPLETE 2020
LINCOLN (ABRAHAM) 100 SI Landscape Tree planting at North Pond COMPLETE 2019
LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial turf field rehab - at Foster Ave. DESIGN
LINCOLN (ABRAHAM) 100 SI Landscape AIDS Awareness Garden - new BID/AWARD
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Benjamin Franklin" - restoration BID/AWARD
LINCOLN (ABRAHAM) 100 FR Concrete Masonry Structural Waveland Clock Tower - masonry PRE-DESIGN
LINCOLN (ABRAHAM) 100 FR Sculpture and Monument "Grant" - concrete and structural BID/AWARD
LINCOLN (ABRAHAM) 100 FR Roof Margate Field House - roof and gutters PRE-DESIGN
LINCOLN (ABRAHAM) 100 FR Minor Rehab Waveland - 1st Tee Junior Clubhouse CONSTRUCTION
LINCOLN (ABRAHAM) 100 SI Athletic Field Artificial Turf Field at Diversey Ave - new CONSTRUCTION *
LINCOLN (ABRAHAM) 100 SI Courts Foster Beach - basketball court and outdoor fitness station CONSTRUCTION *
LINDBLOM (ROBERT) 243 FR Fitness Center Fitness center -upgrade COMPLETE 2011
LINDBLOM (ROBERT) 243 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
LINDBLOM (ROBERT) 243 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
LINDBLOM (ROBERT) 243 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LINDBLOM (ROBERT) 243 SI Athletic Field Artificial turf field and track COMPLETE 2015 *
LINDBLOM (ROBERT) 243 SI Landscape Tree planting COMPLETE 2018
LINDBLOM (ROBERT) 243 FR Roof Skylights - new COMPLETE 2018
38 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
LINDBLOM (ROBERT) 243 FR Swimming Pool Pool - liner PRE-DESIGN
LINDBLOM (ROBERT) 243 SI Athletic Field Athletic field - rehab COMPLETE 2020 *
LINDEN 308 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
LINDEN 308 SI Playground Chicago Plays! - new equipment COMPLETE 2015
LITTLE VENICE 1055 SI Playground Chicago Plays! - new equipment COMPLETE 2016
LIVINGSTON FIELD 510 AD Acquisition Livingston Field - expansion COMPLETE 2011
LIVINGSTON FIELD 510 AD Park Development Livingston Field - Park development including artificial turf field COMPLETE 2013 *
LONDON (LOUIS) 1120 SI Playground Chicago Plays! - new equipment COMPLETE 2016
LONDON (LOUIS) 1120 AD Acquisition Park expansion COMPLETE 2016
LOWE (SAMUEL) 1044 SI Site Improvement Site Improvements - fencing, lighting COMPLETE 2014
LOWE (SAMUEL) 1044 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LOWE (SAMUEL) 1044 AD New Construction Field house - expansion COMPLETE 2014 *
LOYOLA 115 SI Site Improvement Outdoor Fitness Station - new PRE-DESIGN *
LOYOLA 115 SI Site Improvement Misc. beach access COMPLETE 2012 *
LOYOLA 115 SI Paving Paving - paths COMPLETE 2013
LOYOLA 115 SI Playground Chicago Plays! - new equipment COMPLETE 2016 *
LOYOLA 115 FR Concrete Masonry Structural Field house - masonry COMPLETE 2017
LOYOLA 115 FR Minor Rehab Access - chair lift COMPLETE 2018
LOYOLA 115 SI Athletic Field Athletic field - batting cage COMPLETE 2018 *
LOYOLA 115 SI Lighting Lighting upgrade to LED COMPLETE 2019
LOYOLA 115 FR HVAC and Energy Efficiency Field house - boiler COMPLETE 2020
LUNA 440 SI Playground Chicago Plays! - new equipment COMPLETE 2016
LUNT (ORRINGTON, STEPHEN) 1123 SI Playground Chicago Plays! - new equipment COMPLETE 2014
LYLE (JOHN) 1267 SI Playground Chicago Plays! - new equipment COMPLETE 2016
MADIGAN (MICHAEL J., SR.) 484 SI Lighting Lighting - exterior COMPLETE 2013 *
MAGNOLIA 333 SI Playground Chicago Plays! - new equipment COMPLETE 2016
MAJOR TAYLOR BIKE TRAIL 548 SI Site Improvement Signage COMPLETE 2011
MAJOR TAYLOR BIKE TRAIL 548 SI Lighting Lighting and seating - trail COMPLETE 2018 *
MALUS 394 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MANDRAKE (HENRY BROWN) 504 SI Playground Playground - resurfacing COMPLETE 2012
MANDRAKE (HENRY BROWN) 504 SI Athletic Field Artificial turf athletic field - new COMPLETE 2013 *
MANDRAKE (HENRY BROWN) 504 SI Courts Tennis courts - rehab COMPLETE 2016 *
MANDRAKE (HENRY BROWN) 504 SI Site Improvement Athletic field - new scoreboard COMPLETE 2017
MANDRAKE (HENRY BROWN) 504 SI Paving Paving - entrance COMPLETE 2018
MANN (JAMES) 17 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011
MANN (JAMES) 17 SI Courts Court - conversion to inline skating COMPLETE 2011 *
MANN (JAMES) 17 FR Windows and Doors Natatorium - sliding doors COMPLETE 2011 *
MANN (JAMES) 17 FR Major Rehab Transition plan - access improvements COMPLETE 2011
MANN (JAMES) 17 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012 *
39 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
MANN (JAMES) 17 FR HVAC and Energy Efficiency Pool - new boiler COMPLETE 2012
MANN (JAMES) 17 FR Minor Rehab Field house - wall repair COMPLETE 2013
MANN (JAMES) 17 SI Site Improvement Drainage improvements COMPLETE 2014
MANN (JAMES) 17 SI Athletic Field Ballfield - rehab COMPLETE 2014
MANN (JAMES) 17 FR Minor Rehab Misc. Veteran's Memorial Plaza COMPLETE 2015
MANN (JAMES) 17 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
MANN (JAMES) 17 SI Playground Chicago Plays! - new equipment COMPLETE 2015 *
MANN (JAMES) 17 FR Concrete Masonry Structural Natatorium - major rehab COMPLETE 2017
MANN (JAMES) 17 SI Landscape Tree planting COMPLETE 2018
MANN (JAMES) 17 FR Concrete Masonry Structural Field house - soffits and foundation PRE-DESIGN
MAPLE 1283 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MAPLEWOOD 1045 SI Athletic Field Athletic field - rehab COMPLETE 2017 *
MAPLEWOOD 1045 SI Playground Playground - resurfacing COMPLETE 2019
MAPLEWOOD 1045 AD New Construction Field house - expansion COMPLETE 2019 *
MARIANO (LOUIS) 1239 FR Sculpture and Monument Fountain and plaza - restoration COMPLETE 2016 *
MARQUETTE (JACQUES) 10 FR Major Rehab Cultural Center- major rehab PENDING FUNDING *
MARQUETTE (JACQUES) 10 SI Courts Mini-pitch Soccer Court Conversion COMPLETE 2020 *
MARQUETTE (JACQUES) 10 SI Courts Ballfield - rehab BID/AWARD
MARQUETTE (JACQUES) 10 SI Paving Landscape yard - paving COMPLETE 2011
MARQUETTE (JACQUES) 10 FR Minor Rehab Landscape Yard - rehab COMPLETE 2011
MARQUETTE (JACQUES) 10 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
MARQUETTE (JACQUES) 10 FR HVAC and Energy Efficiency Field house - new boiler COMPLETE 2013
MARQUETTE (JACQUES) 10 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
MARQUETTE (JACQUES) 10 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2013
MARQUETTE (JACQUES) 10 FR Minor Rehab Misc. locker room COMPLETE 2014
MARQUETTE (JACQUES) 10 SI Athletic Field Artificial turf athletic field - major rehab COMPLETE 2015 *
MARQUETTE (JACQUES) 10 FR Minor Rehab Field house - interior restoration COMPLETE 2016
MARQUETTE (JACQUES) 10 FR Sculpture and Monument MLK Monument COMPLETE 2016 *
MARQUETTE (JACQUES) 10 SI Paving Site paving COMPLETE 2016
MARQUETTE (JACQUES) 10 SI Landscape Lagoon -pumps COMPLETE 2018
MARQUETTE (JACQUES) 10 FR Roof Field house - new roof PRE-DESIGN
MARQUETTE (JACQUES) 10 FR Minor Rehab Cultural Center Initiative PLANNING
MARQUETTE (JACQUES) 10 FR Roof Landscape Yard - roof and masonry PRE-DESIGN
MARSHFIELD 1046 SI Courts Slam Dunk Basketball Court COMPLETE 2012
MARSHFIELD 1046 SI Site Improvement Misc. - new water line COMPLETE 2012
MARSHFIELD 1046 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MARTIN (JOHNNY) 447 SI Playground Chicago Plays! - new equipment COMPLETE 2016
MASON (ELIZABETH) 1164 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MASON (ELIZABETH) 1164 SI Fencing Fencing - perimeter COMPLETE 2019 *
40 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
MASON (ELIZABETH) 1164 SI Spray Pool Spray feature - rehab DESIGN
MATANKY (EUGENE) 168 SI Playground Chicago Plays! - new equipment COMPLETE 2014 *
MATHER (STEPHEN TYNG) 241 SI Site Improvement Drinking Fountain and water line - new PRE-DESIGN *
MATHER (STEPHEN TYNG) 241 SI Playground Playground - new COMPLETE 2012 *
MATHER (STEPHEN TYNG) 241 SI Athletic Field Athletic field - diamond, dugouts, bleachers and water supply. COMPLETE 2016 *
MATHER (STEPHEN TYNG) 241 FR Roof Roof - rehab COMPLETE 2017
MATHER (STEPHEN TYNG) 241 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 *
MATHER (STEPHEN TYNG) 241 SI Landscape Tree planting COMPLETE 2018
MAYFAIR 86 SI Paving 2016 DW Paving -pathways COMPLETE 2017
MAYFAIR 86 SI Athletic Field Athletic field - rehab COMPLETE 2018 *
MCGUANE (JOHN) 2 FR Roof Roof - new COMPLETE 2020 *
MCGUANE (JOHN) 2 FR Major Rehab Transition plan - access improvements COMPLETE 2012
MCGUANE (JOHN) 2 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
MCGUANE (JOHN) 2 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
MCGUANE (JOHN) 2 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
MCGUANE (JOHN) 2 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
MCGUANE (JOHN) 2 SI Courts Tennis Courts - rehab COMPLETE 2016 *
MCGUANE (JOHN) 2 AD Planning Field House - feasibility study COMPLETE 2018
MCGUANE (JOHN) 2 FR Swimming Pool Rehab - tile and plumbing COMPLETE 2019
MCGUANE (JOHN) 2 FR Major Rehab Field house - major restoration COMPLETE 2021 *
MCINERNEY (THOMAS) 443 SI Site Improvement Park improvements COMPLETE 2017
MCINERNEY (THOMAS) 443 AD Park Development Park improvements including playground CONSTRUCTION *
MCKEON (JOSEPH) 1162 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MCKIERNAN (DAVID) 1060 FR Minor Rehab Accessibility improvements COMPLETE 2013 *
MCKIERNAN (DAVID) 1060 SI Athletic Field Athletic field - rehab COMPLETE 2016
MCKINLEY (WILLIAM) 23 SI Courts Tennis and Minipitch courts - new COMPLETE 2020 *
MCKINLEY (WILLIAM) 23 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
MCKINLEY (WILLIAM) 23 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
MCKINLEY (WILLIAM) 23 SI Courts Tennis court - rehab COMPLETE 2012
MCKINLEY (WILLIAM) 23 FR Swimming Pool Pool - rehab COMPLETE 2013
MCKINLEY (WILLIAM) 23 FR Windows and Doors Field house - doors COMPLETE 2014 *
MCKINLEY (WILLIAM) 23 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MCKINLEY (WILLIAM) 23 FR Minor Rehab Landscape Yard - removal COMPLETE 2016
MCKINLEY (WILLIAM) 23 SI Paving Site paving COMPLETE 2016
MCKINLEY (WILLIAM) 23 FR Major Rehab Field house - Major Rehab COMPLETE 2018 *
MCKINLEY (WILLIAM) 23 SI Site Improvement Landscape Yard - paving and drainage COMPLETE 2018
MCKINLEY (WILLIAM) 23 SI Spray Pool Spray feature - tank rehab COMPLETE 2018
MCKINLEY (WILLIAM) 23 SI Athletic Field Artificial turf athletic field - major rehab COMPLETE 2019 *
MCKINLEY (WILLIAM) 23 SI Lighting Lighting upgrade to LED COMPLETE 2019
41 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
MCKINLEY (WILLIAM) 23 FR Concrete Masonry Structural Power house - remove chimney COMPLETE 2019
MCKINLEY (WILLIAM) 23 FR Roof Power house - roof COMPLETE 2020
MCKINLEY (WILLIAM) 23 FR Sculpture and Monument "McKinley" - restoration PRE-DESIGN
MCKINLEY (WILLIAM) 23 SI Site Improvement Dog friendly area -new COMPLETE 2019 *
MELLIN (CURTIS, SR.) 1219 SI Site Improvement Drinking fountain and water line - new PRE-DESIGN *
MELLIN (CURTIS, SR.) 1219 SI Playground Playground - new COMPLETE 2013
MEMORIAL 1048 SI Courts Basketball - rehab COMPLETE 2011
MEMORIAL 1048 SI Playground Playground - new BID/AWARD
MERRILL (GEORGE) 1126 SI Courts Site improvement COMPLETE 2013
MERRILL (GEORGE) 1126 SI Playground Chicago Plays! - new equipment COMPLETE 2014 *
MERRILL (GEORGE) 1126 SI Courts Court -rehab COMPLETE 2014 *
MERRIMAC 256 SI Site Improvement Misc. - flag poles COMPLETE 2012 *
MERRIMAC 256 SI Playground Playground with water feature - new COMPLETE 2013 *
MERRIMAC 256 SI Site Improvement Site improvements including paving COMPLETE 2013 *
MERRIMAC 256 FR Minor Rehab Gym floor - restore or replace COMPLETE 2014
MERRYMAN (THERON) 1124 SI Playground Playground - new COMPLETE 2013 *
METCALFE (RALPH) 448 FR Minor Rehab Comfort Station - rehab PENDING FUNDING *
METCALFE (RALPH) 448 SI Courts Tennis court - rehab COMPLETE 2011 *
METCALFE (RALPH) 448 SI Athletic Field Athletic field - lighting and scoreboard COMPLETE 2015
METCALFE (RALPH) 448 SI Playground Chicago Plays! - new equipment COMPLETE 2016
METCALFE (RALPH) 448 SI Courts Basketball Court - new backboards COMPLETE 2019 *
MEYERING (WILLIAM) 1049 SI Courts Basketball court - rehab COMPLETE 2013 *
MEYERING (WILLIAM) 1049 SI Spray Pool Spray feature - rehab COMPLETE 2018
MEYERING (WILLIAM) 1049 SI Playground Playground - surfacing COMPLETE 2019 *
MICEK (FRANK) 1028 SI Playground Playground with water feature - new COMPLETE 2013 *
MICEK (FRANK) 1028 SI Courts Basketball court - rehab COMPLETE 2013
MICEK (FRANK) 1028 SI Fencing Fencing - basketball court COMPLETE 2014
MIDWAY PLAISANCE 1268 FR Minor Rehab Misc. HVAC rehab COMPLETE 2011
MIDWAY PLAISANCE 1268 SI Landscape Tree Planting DESIGN
MILLARD (ALDEN) 1127 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
MILLARD (ALDEN) 1127 AD Acquisition Expansion COMPLETE 2017
MILLARD (ALDEN) 1127 SI Site Improvement Fencing and community garden CONSTRUCTION
MILLER (SAMUEL) 1128 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MINUTEMAN 307 SI Playground Playground - new COMPLETE 2012 *
MINUTEMAN 307 SI Paving Paving - paths COMPLETE 2012
MINUTEMAN 307 FR Roof Roof - rehab COMPLETE 2017
MINUTEMAN 307 SI Fencing Ballfield - perimeter fencing COMPLETE 2019
MOCCASIN RANCH 337 SI Playground Chicago Plays! - new equipment COMPLETE 2016
MONTGOMERY (MABEL) 1129 SI Playground Chicago Plays! - new equipment COMPLETE 2014
42 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
MONTICELLO 1130 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MONUMENT 57 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MOORE (MAURICE) 1050 SI Spray Pool Spray feature - rehab PRE-DESIGN
MOORE (MAURICE) 1050 SI Courts Misc. new backboards COMPLETE 2011
MOORE (MAURICE) 1050 AD Park Development Park development - including playground COMPLETE 2011 *
MOORE (MAURICE) 1050 AD New Construction Expansion and access improvements COMPLETE 2015 *
MORAN (TERRANCE) 1051 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
MORAN (TERRANCE) 1051 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
MORAN (TERRANCE) 1051 FR Roof Roof - rehab COMPLETE 2014
MORAN (TERRANCE) 1051 SI Spray Pool Park improvements PLANNING
MORGAN (THOMAS LEEDS) FIELD 1132 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MOUNT GREENWOOD 251 FR Minor Rehab Gym floor - rehab COMPLETE 2020
MOUNT GREENWOOD 251 SI Paving Paving - paths COMPLETE 2011
MOUNT GREENWOOD 251 FR Major Rehab Transition plan - access improvements COMPLETE 2011
MOUNT GREENWOOD 251 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
MOUNT GREENWOOD 251 SI Athletic Field Miracle Field - rehab COMPLETE 2016 *
MOUNT GREENWOOD 251 FR Swimming Pool Pool - liner and gutter COMPLETE 2016
MOUNT GREENWOOD 251 SI Site Improvement Outdoor fitness station - new COMPLETE 2016 *
MOUNT GREENWOOD 251 SI Playground Playground - fencing and mosaic COMPLETE 2017 *
MOUNT GREENWOOD 251 SI Paving Paving - paths COMPLETE 2017
MOUNT GREENWOOD 251 SI Athletic Field Athletic fields- drainage COMPLETE 2017 *
MOUNT GREENWOOD 251 FR HVAC and Energy Efficiency Steam boiler - new PRE-DESIGN
MOZART (AMADEUS) 128 SI Paving Parking lot and pathways - repave CONSTRUCTION
MOZART (AMADEUS) 128 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
MOZART (AMADEUS) 128 FR Roof Roof - rehab COMPLETE 2014
MOZART (AMADEUS) 128 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MOZART (AMADEUS) 128 SI Athletic Field Athletic field - rehab CONSTRUCTION *
MULBERRY 1284 SI Playground Chicago Plays! - new equipment COMPLETE 2015
MUNROE (ROY) 1052 SI Courts Pickleball court - new BID/AWARD
MUNROE (ROY) 1052 SI Paving Paving - paths and drainage COMPLETE 2013 *
MUNROE (ROY) 1052 SI Playground Playground and spray feature - new COMPLETE 2018 *
MURRAY (DAVID) 1053 SI Courts Basketball court - new COMPLETE 2012 *
MURRAY (DAVID) 1053 SI Playground Chicago Plays! - new equipment COMPLETE 2014
MURRAY (DAVID) 1053 FR Minor Rehab Bathroom - plumbing COMPLETE 2018
MURRAY (DAVID) 1053 SI Site Improvement Park improvements including spray feature, court, paving PRE-DESIGN *
NASH (DON) COMM. CTR. 482 FR Fitness Center Fitness center - upgrade COMPLETE 2011
NASH (DON) COMM. CTR. 482 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2011
NASH (DON) COMM. CTR. 482 FR Roof Roof COMPLETE 2012 *
NASH (DON) COMM. CTR. 482 FR Windows and Doors Field house - doors COMPLETE 2013
43 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
NASH (DON) COMM. CTR. 482 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014
NASH (DON) COMM. CTR. 482 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
NASH (DON) COMM. CTR. 482 SI Playground Park improvement COMPLETE 2017
NASH (DON) COMM. CTR. 482 FR Swimming Pool Pool - rehab COMPLETE 2020
NELSON (ANDREW) 1133 SI Playground Chicago Plays! - new equipment COMPLETE 2015
NICHOLS (JOHN FOUNTAIN) 277 SI Site Improvement Framework Plan - park improvements PENDING FUNDING *
NICHOLS (JOHN FOUNTAIN) 277 SI Site Improvement Miscellaneous - fountain plumbing COMPLETE 2013
NICHOLS (JOHN FOUNTAIN) 277 SI Courts Tennis court - rehab COMPLETE 2016 *
NICHOLS (JOHN FOUNTAIN) 277 SI Playground Chicago Plays! - new equipment at Kenwood Ave. COMPLETE 2016
NICHOLS (JOHN FOUNTAIN) 277 SI Playground Chicago Plays! - new equipment at Kimbark Ave. COMPLETE 2016
NICHOLS (JOHN FOUNTAIN) 277 SI Lighting Lighting upgrade to LED COMPLETE 2019
NINEBARK 355 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
NINEBARK 355 AD Acquisition Expansion COMPLETE 2017
NOETHLING (GRACE) 425 SI Site Improvement Dog friendly area - improvements COMPLETE 2013 *
North Boundary 557 AD Acquisition Kedzie Ave. and Touhy Ave. COMPLETE 2011
North Boundary 557 SI Site Improvement Pathways and benches COMPLETE 2011
North Boundary 557 SI Lighting Lighting - exterior COMPLETE 2014 *
NORTH MAYFAIR 90 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
NORTH PARK VILLAGE NATURE CENTER 533 FR Minor Rehab Lobby - renovation DESIGN
NORTH PARK VILLAGE NATURE CENTER 533 FR Minor Rehab Staff Offices COMPLETE 2018
NORTHERLY ISLAND 34 FR HVAC and Energy Efficiency Terminal Building - new boiler CONSTRUCTION
NORTHERLY ISLAND 34 FR Minor Rehab Solar charging station COMPLETE 2011
NORTHERLY ISLAND 34 SI Fencing Misc. fencing COMPLETE 2011
NORTHERLY ISLAND 34 AD Planning Framework plan COMPLETE 2011
NORTHERLY ISLAND 34 AD New Construction New Concert and Event Venue COMPLETE 2013
NORTHERLY ISLAND 34 SI Site Improvement Rotary Garden - benches COMPLETE 2015
NORTHERLY ISLAND 34 FR Major Rehab Tent - major restoration COMPLETE 2016
NORTHERLY ISLAND 34 SI Paving Lynn White Dr. - curb and asphalt COMPLETE 2016
NORTHERLY ISLAND 34 FR HVAC and Energy Efficiency Landscape Yard - boiler COMPLETE 2017
NORTHERLY ISLAND 34 SI Paving Adler Parking Lot - rehab COMPLETE 2017
NORTHERLY ISLAND 34 SI Landscape Misc. stones COMPLETE 2018
NORTHERLY ISLAND 34 FR Roof Landscape yard - roof COMPLETE 2018
NORTHERLY ISLAND 34 AD Park Development Park development - shoreline and natural area COMPLETE 2018 *
NORTHERLY ISLAND 34 SI Landscape Field restoration COMPLETE 2020 *
NORTHERLY ISLAND 34 FR HVAC and Energy Efficiency Firehouse Building - rehab COMPLETE 2019
NORTHERLY ISLAND 34 SI Site Improvement Hamilton Exhibit - park improvements COMPLETE 2019 *
NORTHERLY ISLAND 34 FR Roof Terminal - roof rehab COMPLETE 2020
NORWOOD 141 FR Roof Landscape yard - roof COMPLETE 2011
NORWOOD 141 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
44 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
NORWOOD 141 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
NORWOOD 141 SI Site Improvement Dog friendly area - new COMPLETE 2013 *
NORWOOD 141 FR Roof Roof COMPLETE 2013
NORWOOD 141 SI Site Improvement Misc. site drainage COMPLETE 2013
NORWOOD 141 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
NORWOOD 141 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
NORWOOD 141 FR Swimming Pool Pool -deck COMPLETE 2016
NORWOOD 141 SI Site Improvement Bocce Ball Court - rehab COMPLETE 2017
NORWOOD 141 SI Paving 2016 DW Paving -pathways COMPLETE 2017
NORWOOD 141 FR Minor Rehab Field house - drainage improvements COMPLETE 2018
NORWOOD 141 SI Site Improvement Hockey rink - new COMPLETE 2018 *
NORWOOD 141 FR Swimming Pool Pool - liner COMPLETE 2019
NORWOOD 141 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2019
NORWOOD 141 FR Windows and Doors Field house - windows BID/AWARD
OAKDALE 235 FR Minor Rehab Misc. - hot water tank COMPLETE 2012
OAKDALE 235 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
OAKDALE 235 FR Minor Rehab Misc. - washrooms COMPLETE 2012
OAKDALE 235 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
OAKDALE 235 FR Minor Rehab Locker room - rehab COMPLETE 2015
OAKDALE 235 FR HVAC and Energy Efficiency Park improvements COMPLETE 2017
OAKDALE 235 SI Landscape Tree planting COMPLETE 2018
OAKDALE 235 FR Swimming Pool Pool - filter COMPLETE 2019
OAKDALE 235 FR Swimming Pool Pool - liner PRE-DESIGN
OAKLEY 1137 SI Playground Chicago Plays! - new equipment COMPLETE 2015 *
OGDEN (WILLIAM) 8 FR Minor Rehab Access improvements COMPLETE 2011
OGDEN (WILLIAM) 8 FR Fitness Center Fitness center - upgrade COMPLETE 2011
OGDEN (WILLIAM) 8 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
OGDEN (WILLIAM) 8 FR Major Rehab Elevator COMPLETE 2012 *
OGDEN (WILLIAM) 8 SI Spray Pool Water feature - rehab COMPLETE 2013
OGDEN (WILLIAM) 8 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2013
OGDEN (WILLIAM) 8 FR Roof Roof COMPLETE 2014
OGDEN (WILLIAM) 8 SI Playground Chicago Plays! - new equipment COMPLETE 2014
OGDEN (WILLIAM) 8 FR Minor Rehab Misc. - field house improvements COMPLETE 2016
OGDEN (WILLIAM) 8 SI Playground Chicago Plays! - new equipment COMPLETE 2016
OGDEN (WILLIAM) 8 SI Courts Mini-pitch Soccer Court - new COMPLETE 2020 *
OGDEN (WILLIAM) 8 SI Courts Tennis Court -rehab COMPLETE 2020 *
OGDEN (WILLIAM) 8 FR Swimming Pool Pool - liner and filter room COMPLETE 2020
OGDEN (WILLIAM) 8 SI Athletic Field Artificial Turf Field and Track - new COMPLETE 2020 *
O'HALLAREN (BERNARD) 1012 SI Courts Slam Dunk Basketball Court COMPLETE 2012
45 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
O'HALLAREN (BERNARD) 1012 SI Courts Tennis court - conversion and rehab COMPLETE 2013 *
OHIO 1139 SI Playground Chicago Plays! - new equipment COMPLETE 2016
OHIO & HARDING 1138 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
OLYMPIA 60 FR HVAC and Energy Efficiency Misc. - HVAC rehab COMPLETE 2012
OLYMPIA 60 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
OLYMPIA 60 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
OLYMPIA 60 SI Athletic Field Athletic field - rehab COMPLETE 2013
OLYMPIA 60 SI Playground Chicago Plays! - new equipment COMPLETE 2014 *
OLYMPIA 60 FR Roof Roof - new DESIGN
ORIOLE 59 SI Lighting Lighting - ballfield COMPLETE 2011 *
ORIOLE 59 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
ORIOLE 59 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
ORIOLE 59 SI Athletic Field Athletic field - rehab COMPLETE 2014 *
ORIOLE 59 SI Playground Chicago Plays! - new equipment (at Balmoral Ave.) COMPLETE 2014
ORIOLE 59 SI Playground Chicago Plays! - new equipment (at Gregory) COMPLETE 2014
ORIOLE 59 SI Spray Pool Misc. surfacing renovation COMPLETE 2016
ORIOLE 59 SI Paving 2016 DW Paving -pathways COMPLETE 2017
ORIOLE 59 SI Site Improvement Outdoor fitness station - new COMPLETE 2019 *
ORIOLE 59 FR Roof Misc. gutters and downspouts PRE-DESIGN
OWENS (JESSE) 237 SI Site Improvement Walking path - renovation PENDING FUNDING *
OWENS (JESSE) 237 SI Athletic Field Athletic field - study COMPLETE 2011
OWENS (JESSE) 237 FR HVAC and Energy Efficiency Boiler - automation system COMPLETE 2012
OWENS (JESSE) 237 SI Athletic Field Ballfield - rehab COMPLETE 2015
OWENS (JESSE) 237 FR Windows and Doors Windows - drainage PRE-DESIGN
OZ 423 SI Playground Playground - rehab including new surfacing COMPLETE 2015 *
OZ 423 SI Courts Tennis Court - rehab COMPLETE 2017 *
OZ 423 SI Athletic Field Athletic field - rehab COMPLETE 2018 *
OZ 423 SI Athletic Field Athletic field - scoreboard COMPLETE 2019 *
PACKINGTOWN 404 SI Playground Chicago Plays! - new equipment COMPLETE 2016
PALMER (BERTHA HONORÉ) 520 SI Playground Chicago Plays! - new equipment COMPLETE 2014
PALMER (JOHN MCAULEY) SQUARE 539 AD Acquisition Palmer Blvd. COMPLETE 2014
PALMER (JOHN MCAULEY) SQUARE 539 SI Landscape Tree planting COMPLETE 2018
PALMER (POTTER) 13 FR Minor Rehab Landscape Building - demolish CONSTRUCTION
PALMER (POTTER) 13 SI Athletic Field Ballfield - rehab COMPLETE 2011
PALMER (POTTER) 13 FR Minor Rehab Gym floor - restore or replace COMPLETE 2011
PALMER (POTTER) 13 SI Paving Track - asphalt and lane lines COMPLETE 2011
PALMER (POTTER) 13 FR Fitness Center Fitness center - equipment COMPLETE 2011
PALMER (POTTER) 13 FR Fitness Center Fitness center - upgrade COMPLETE 2011
PALMER (POTTER) 13 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
46 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
PALMER (POTTER) 13 SI Paving Paving - pathways COMPLETE 2012 *
PALMER (POTTER) 13 FR Major Rehab Transition plan - access improvements COMPLETE 2012
PALMER (POTTER) 13 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
PALMER (POTTER) 13 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
PALMER (POTTER) 13 FR Windows and Doors Field house - windows and doors COMPLETE 2013
PALMER (POTTER) 13 FR Swimming Pool Pool - filter COMPLETE 2013
PALMER (POTTER) 13 SI Playground Chicago Plays! - new equipment COMPLETE 2014
PALMER (POTTER) 13 FR Roof Field house - roof COMPLETE 2015
PALMER (POTTER) 13 FR Minor Rehab Misc. pool stair renovation COMPLETE 2015
PALMER (POTTER) 13 SI Courts Court - conversion to minipitch COMPLETE 2016 *
PALMER (POTTER) 13 SI Paving Site paving COMPLETE 2017
PALMER (POTTER) 13 FR Swimming Pool Water slide - rehab COMPLETE 2019
PALMER (POTTER) 13 SI Site Improvement Walking Track - rehab COMPLETE 2020
PALMER (POTTER) 13 FR Minor Rehab Cultural Center Initiative PLANNING
PALMER (POTTER) 13 FR Major Rehab Transition plan - access improvements COMPLETE 2020 *
PALMISANO (HENRY) 531 SI Fencing Misc. security fencing COMPLETE 2014
PALMISANO (HENRY) 531 SI Site Improvement Misc. - circulation pond COMPLETE 2017
PALMISANO (HENRY) 531 SI Landscape Site improvements - pathways COMPLETE 2018
PALMISANO (HENRY) 531 SI Site Improvement Walkway - rehab COMPLETE 2019
PALMISANO (HENRY) 531 SI Landscape Nature area and Play Space - new COMPLETE 2019 *
PARK NO. 326 326 SI Fencing Misc. - perimeter fencing COMPLETE 2014
PARK NO. 382 382 SI Fencing Misc. - perimeter fencing COMPLETE 2014
PARK NO. 382 382 SI Site Improvement Park improvements PRE-DESIGN
PARK NO. 414 414 SI Fencing Misc. - perimeter fencing COMPLETE 2014
PARK NO. 414 414 SI Site Improvement Park improvements PRE-DESIGN
PARK NO. 419 419 SI Fencing Misc. - perimeter fencing COMPLETE 2014
PARK NO. 421 421 SI Fencing Misc. - perimeter fencing COMPLETE 2014
PARK NO. 421 421 SI Site Improvement Park improvements - TBD PRE-DESIGN
PARK NO. 422 422 SI Lighting Lighting - exterior COMPLETE 2011
PARK NO. 422 422 SI Playground Chicago Plays! - new equipment COMPLETE 2016
PARK NO. 432 432 SI Fencing Misc. - perimeter fencing COMPLETE 2014
PARK NO. 432 432 SI Site Improvement Park development PLANNING
PARK NO. 437 437 SI Fencing Misc. - perimeter fencing COMPLETE 2014
PARK NO. 468 468 SI Site Improvement Park improvements including fencing, signage COMPLETE 2018
PARK NO. 500 500 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
PARK NO. 500 500 SI Playground Chicago Plays! - new equipment COMPLETE 2016
PARK NO. 512 512 FR Roof Landscape yard - roof COMPLETE 2011
PARK NO. 512 512 AD Park Development Bloomingdale Trail - Access Park development COMPLETE 2012
PARK NO. 517 517 SI Lighting Lighting - exterior COMPLETE 2013
47 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
PARK NO. 519 519 SI Playground Playground - upgrade DESIGN
PARK NO. 527 527 AD Planning Trades relocation - study COMPLETE 2011
PARK NO. 527 527 FR Minor Rehab Candle Factory- emergency rehab COMPLETE 2017
PARK NO. 534 534 SI Site Improvement Walking track and plaza - rehab COMPLETE 2020
PARK NO. 534 534 SI Playground Playground - upgrade CONSTRUCTION
PARK NO. 535 535 SI Playground Site improvements COMPLETE 2020
PARK NO. 538 538 SI Landscape Natural Area - new CONSTRUCTION *
PARK NO. 540 540 AD Acquisition Federal St. and 24th St. COMPLETE 2014
PARK NO. 551 551 SI Site Improvement Park improvements COMPLETE 2019
PARK NO. 552 552 AD Acquisition 4901-09 W. Belmont Ave. COMPLETE 2014
PARK NO. 556 556 AD Planning Artesian Ave. and Western Ave. - study COMPLETE 2011
PARK NO. 556 556 AD Acquisition Artesian Ave. and Western Ave. COMPLETE 2013
PARK NO. 556 556 AD Park Development Park development - Artesian Ave. and Western Ave. COMPLETE 2015 *
PARK NO. 559 559 AD Acquisition 6151 N. Sheridan - acquisition COMPLETE 2011
PARK NO. 559 559 SI Site Improvement Park Improvement Fund PLANNING *
PARK NO. 565 565 SI Landscape Indian Ridge Marsh - habitat restoration PRE-DESIGN *
PARK NO. 565 565 SI Landscape Habitat Development - Indian Ridge COMPLETE 2017 *
PARK NO. 565 565 SI Landscape Indian Ridge - restoration and management DESIGN *
PARK NO. 566 566 AD Acquisition USX - 79th St. and Lake Michigan COMPLETE 2014
PARK NO. 566 566 SI Site Improvement Misc. access road COMPLETE 2014
PARK NO. 566 566 SI Landscape Natural Area - Habitat Development COMPLETE 2019 *
PARK NO. 567 567 SI Lighting Lighting - exterior COMPLETE 2012 *
PARK NO. 567 567 AD Park Development Bloomingdale Access - new park at Milwaukee Ave. and Leavitt St. COMPLETE 2013 *
PARK NO. 569 569 AD Park Development Dog friendly area - Monroe St. and Loomis St. COMPLETE 2014 *
PARK NO. 569 569 AD Acquisition Dog friendly area - Monroe St. and Loomis St. COMPLETE 2015
PARK NO. 571 571 AD Acquisition Eleanor Street Park COMPLETE 2012
PARK NO. 571 571 SI Fencing Misc. - site improvements COMPLETE 2014
PARK NO. 571 571 AD New Construction New Chicago River Boat House COMPLETE 2016 *
PARK NO. 572 572 AD Park Development Bloomingdale Line - planning COMPLETE 2014
PARK NO. 572 572 SI Site Improvement Bloomingdale Park and Trail - bollards BID/AWARD
PARK NO. 572 572 AD Park Development The 606- new park and trail development COMPLETE 2015 *
PARK NO. 573 573 AD Acquisition 114th St. and Champlain Ave. COMPLETE 2016
PARK NO. 573 573 SI Site Improvement Misc. new water source COMPLETE 2020 *
PARK NO. 574 574 AD Park Development Park development - "Rockwell Gardens" COMPLETE 2014 *
PARK NO. 574 574 AD Acquisition Jackson Blvd. and Maplewood Ave. COMPLETE 2015
PARK NO. 575 575 AD Park Development Park development - Wacker Interchange COMPLETE 2012
PARK NO. 576 576 AD Acquisition Whitford Pond - 2113 E. 134th St. COMPLETE 2012
PARK NO. 576 576 AD Park Development Whitford Pond - planning PLANNING
PARK NO. 577 577 AD Park Development Morgan Park Sports Complex COMPLETE 2015 *
48 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
PARK NO. 577 577 FR HVAC and Energy Efficiency Air conditioning - supplemental unit COMPLETE 2019
PARK NO. 578 578 AD Park Development Park development - Washington Blvd. and Wolcott Ave. COMPLETE 2016 *
PARK NO. 578 578 AD Acquisition New park - 1919 W. Maypole Ave. COMPLETE 2016
PARK NO. 579 579 AD Park Development Magid Glove - 606 Access Park Environmental Assessment COMPLETE 2016
PARK NO. 580 580 SI Fencing Read Dunning - perimeter fence and netting CONSTRUCTION
PARK NO. 580 580 AD New Construction Phase II - Comfort Station DESIGN *
PARK NO. 580 580 AD Acquisition New park - 4139 N. Oak Park Avenue COMPLETE 2016
PARK NO. 580 580 AD Park Development New Park Development - Oak Park Ave. and Irving Park Rd. COMPLETE 2019 *
PARK NO. 581 581 AD Acquisition New park - 11625 S. Oakley Ave. COMPLETE 2016
PARK NO. 581 581 SI Athletic Field New Park Development - 116th St. and Oakley Ave. COMPLETE 2017
PARK NO. 582 582 AD Acquisition 9202-35 S. Vanderpoel Ave. - new park COMPLETE 2017
PARK NO. 583 583 AD Acquisition 10108 S. Exchange Ave. - new park COMPLETE 2017
PARK NO. 583 583 AD Park Development New park development with nature playground CONSTRUCTION *
PARK NO. 584 584 AD Acquisition 134 W. 119th St. - new park COMPLETE 2017
PARK NO. 584 584 AD Park Development New park development CONSTRUCTION *
PARK NO. 585 585 AD Acquisition 6049 S. Whipple St. - new park COMPLETE 2017
PARK NO. 585 585 AD Park Development 6049 S. Whipple St. - park development CONSTRUCTION *
PARK NO. 586 586 AD Acquisition 7208 S. Maplewood Ave. - new park COMPLETE 2017
PARK NO. 586 586 SI Fencing Fencing - perimeter COMPLETE 2019
PARK NO. 587 587 AD Acquisition 658 E. 95th St. - new park COMPLETE 2017
PARK NO. 587 587 AD Park Development Park improvements COMPLETE 2019 *
PARK NO. 588 588 AD Park Development New park with playground - with Kaboom COMPLETE 2018 *
PARK NO. 589 589 AD Acquisition 227 W 110TH Place - new park COMPLETE 2018
PARK NO. 589 589 SI Fencing Fencing - perimeter COMPLETE 2020
PARK NO. 590 590 AD Park Development 3940 S. Indiana Ave - new dog friendly area COMPLETE 2019 *
PARK NO. 591 591 SI Fencing Fencing and plantings - additional BID/AWARD
PARK NO. 591 591 AD Park Development 3906 S Lake Park Ave - new dog friendly area COMPLETE 2019 *
PARK NO. 592 592 SI Fencing Fencing and plantings - additional BID/AWARD
PARK NO. 592 592 AD Park Development 4153 S. Vincennes Ave - new dog friendly area COMPLETE 2019 *
PARK NO. 593 593 AD Acquisition 4546 N. Kedvale Av. - new park COMPLETE 2018 *
PARK NO. 593 593 SI Site Improvement Park improvements BID/AWARD *
PARK NO. 594 594 SI Site Improvement Park improvements PLANNING *
PARK NO. 596 596 AD Acquisition New park acquisition - 4800 S. Western COMPLETE 2018 *
PARK NO. 596 596 AD Park Development Environmental remediation CONSTRUCTION
PARK NO. 596 596 AD Park Development Park development including field house and turf fields BID/AWARD
PARK NO. 596 596 AD Park Development Park development - design DESIGN
PARK NO. 597 597 SI Landscape Natural area - new DESIGN *
PARK NO. 598 598 AD Park Development New park - 1450 N. Larrabee St. DESIGN *
PARK NO. 599 599 AD Park Development New Park Development - 1623. W. Edgewater Ave. DESIGN *
49 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
PARK-VIEW 1056 SI Playground Chicago Plays! - new equipment COMPLETE 2014
PARSONS (LUCY) 501 SI Playground Playground - expansion COMPLETE 2018 *
PASCHEN (CHRISTIAN) 1057 SI Playground Chicago Plays! - new equipment COMPLETE 2014 *
PASCHEN (CHRISTIAN) 1057 SI Fencing Fencing at basketball court COMPLETE 2016 *
PASCHEN (CHRISTIAN) 1057 FR Concrete Masonry Structural Field house - tuckpointing PRE-DESIGN
PASTEUR (LOUIS) 247 SI Athletic Field Artificial turf athletic field - new COMPLETE 2011 *
PASTEUR (LOUIS) 247 SI Playground Chicago Plays! - new equipment COMPLETE 2015
PASTEUR (LOUIS) 247 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 *
PASTEUR (LOUIS) 247 SI Fencing Misc. - fencing COMPLETE 2019
PENDLETON (HADIYA) 339 AD Acquisition Expansion COMPLETE 2016
PENDLETON (HADIYA) 339 AD Park Development Park development - including playground COMPLETE 2016 *
PERIWINKLE 436 SI Playground Chicago Plays! - new equipment COMPLETE 2015
PETERSON (PEHR SAMUEL) 452 SI Courts Tennis court - rehab COMPLETE 2011
PETERSON (PEHR SAMUEL) 452 SI Paving Paving - paths COMPLETE 2012
PETERSON (PEHR SAMUEL) 452 FR Major Rehab Elevator - rehab COMPLETE 2012
PETERSON (PEHR SAMUEL) 452 FR Minor Rehab Field House - Major Rehab COMPLETE 2014
PETERSON (PEHR SAMUEL) 452 SI Playground Park improvement COMPLETE 2016
PETERSON (PEHR SAMUEL) 452 SI Playground Chicago Plays! - new equipment @ Central Park Ave. COMPLETE 2016 *
PETERSON (PEHR SAMUEL) 452 SI Paving Parking lot - rehab COMPLETE 2018
PETERSON (PEHR SAMUEL) 452 SI Landscape Tree planting COMPLETE 2019
PETERSON (PEHR SAMUEL) 452 SI Lighting Lighting upgrade to LED COMPLETE 2019
PETERSON (PEHR SAMUEL) 452 FR Concrete Masonry Structural Field house - concrete and masonry PRE-DESIGN
PIETROWSKI (SYLVESTER) 1058 SI Playground Chicago Plays! - new equipment COMPLETE 2015
PINE 1287 SI Playground Chicago Plays! - new equipment COMPLETE 2014
PIOTROWSKI (LILLIAN) 230 SI Athletic Field Athletic field - batting tunnels PRE-DESIGN *
PIOTROWSKI (LILLIAN) 230 SI Site Improvement Misc. - lighting and drinking fountain COMPLETE 2011 *
PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
PIOTROWSKI (LILLIAN) 230 FR Major Rehab Transition plan - access improvements COMPLETE 2012
PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Swimming pool - dome COMPLETE 2014
PIOTROWSKI (LILLIAN) 230 SI Lighting Lighting - athletic field and pathways COMPLETE 2015 *
PIOTROWSKI (LILLIAN) 230 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2015
PIOTROWSKI (LILLIAN) 230 SI Athletic Field Athletic field - rehab COMPLETE 2016 *
PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Pool - filter and controls COMPLETE 2017
PIOTROWSKI (LILLIAN) 230 FR Concrete Masonry Structural Field house - masonry and roof COMPLETE 2017
PIOTROWSKI (LILLIAN) 230 FR Minor Rehab Pool Building - covered walkway COMPLETE 2017
PIOTROWSKI (LILLIAN) 230 FR Swimming Pool Pool - liner PRE-DESIGN
PIOTROWSKI (LILLIAN) 230 FR Major Rehab Cultural Center Initiative PLANNING
PIOTROWSKI (LILLIAN) 230 SI Playground Playground - rehab DESIGN
PLEASANT POINT 140 SI Playground Playground - new COMPLETE 2014 *
50 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
POPLAR 323 SI Playground Chicago Plays! - new equipment COMPLETE 2016
PORTAGE 147 FR Minor Rehab Field house - water tank rehab COMPLETE 2020
PORTAGE 147 FR Roof Landscape yard - roof COMPLETE 2011
PORTAGE 147 SI Site Improvement Misc. - scoreboard COMPLETE 2011
PORTAGE 147 FR Minor Rehab Field house - gym and community room floors COMPLETE 2011
PORTAGE 147 SI Athletic Field Athletic field - rehab COMPLETE 2011
PORTAGE 147 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
PORTAGE 147 FR Minor Rehab Field house - locker room improvements COMPLETE 2013 *
PORTAGE 147 FR Concrete Masonry Structural Field house and Landscape building - masonry COMPLETE 2013
PORTAGE 147 FR Swimming Pool Deck - drainage improvements COMPLETE 2013
PORTAGE 147 SI Site Improvement Misc. - landscaping and drainage COMPLETE 2013 *
PORTAGE 147 FR Minor Rehab Facility rehab - minor COMPLETE 2013
PORTAGE 147 FR Concrete Masonry Structural Pool house - concrete and masonry COMPLETE 2013
PORTAGE 147 SI Site Improvement Dog friendly area - expansion COMPLETE 2013 *
PORTAGE 147 FR Sculpture and Monument Misc. fountain planters COMPLETE 2014 *
PORTAGE 147 FR Windows and Doors Landscape Yard - doors COMPLETE 2014
PORTAGE 147 SI Paving Paving - parking lot and pathways COMPLETE 2014 *
PORTAGE 147 FR Minor Rehab Misc. Indoor pool stair renovation COMPLETE 2015
PORTAGE 147 SI Paving Paving - paths COMPLETE 2015 *
PORTAGE 147 FR Swimming Pool Pool - rehab COMPLETE 2015
PORTAGE 147 FR Swimming Pool Pool - rehab COMPLETE 2016
PORTAGE 147 FR Roof Roof and Skylight - rehab COMPLETE 2017 *
PORTAGE 147 SI Spray Pool Spray feature - rehab COMPLETE 2017
PORTAGE 147 SI Paving 2016 DW Paving -pathways COMPLETE 2017
PORTAGE 147 SI Paving Landscape Yard - paving COMPLETE 2018
PORTAGE 147 SI Lighting Athletic field - lighting COMPLETE 2018 *
PORTAGE 147 SI Courts Mini-pitch Soccer Court - new COMPLETE 2019 *
PORTAGE 147 FR Swimming Pool Kiddie and lap pool - rehab COMPLETE 2019
PORTAGE 147 FR Swimming Pool Pool - drains COMPLETE 2020
POTTAWATTOMIE 166 SI Site Improvement Dog friendly area - new COMPLETE 2011 *
POTTAWATTOMIE 166 FR Fitness Center Fitness center - new equipment COMPLETE 2011
POTTAWATTOMIE 166 SI Athletic Field Ballfield - rehab COMPLETE 2011
POTTAWATTOMIE 166 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
POTTAWATTOMIE 166 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
POTTAWATTOMIE 166 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2013
POTTAWATTOMIE 166 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015 *
POTTAWATTOMIE 166 FR Minor Rehab Misc. - drinking fountain COMPLETE 2016 *
POTTAWATTOMIE 166 SI Landscape Tree planting COMPLETE 2018
POTTAWATTOMIE 166 FR Roof Roof COMPLETE 2020 *
51 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
PRAIRIE WOLF 329 SI Playground Chicago Plays! - new equipment COMPLETE 2016
PRINTERS ROW 543 AD Acquisition Printers Row Park COMPLETE 2014
PRINTERS ROW 543 SI Lighting Exterior lighting - upgrades COMPLETE 2018 *
PRITZKER 541 AD Acquisition Pritzker Park COMPLETE 2011
PRIVET 375 SI Playground Chicago Plays! - new equipment COMPLETE 2016
PULASKI (CASIMER) 217 FR Concrete Masonry Structural Pool deck - rehab COMPLETE 2011 *
PULASKI (CASIMER) 217 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
PULASKI (CASIMER) 217 FR Minor Rehab Field house - fire escape rehab COMPLETE 2012
PULASKI (CASIMER) 217 FR Minor Rehab Field house - rehab COMPLETE 2013
PULASKI (CASIMER) 217 FR Minor Rehab Field house- interior COMPLETE 2014
PULASKI (CASIMER) 217 SI Athletic Field Ballfield - rehab COMPLETE 2015
PULASKI (CASIMER) 217 SI Spray Pool Spray feature - rehab COMPLETE 2018
PULASKI (CASIMER) 217 FR Swimming Pool Pool - miami tank COMPLETE 2018
PULASKI (CASIMER) 217 FR Major Rehab Field house - concrete, structural, ADA access DESIGN *
PULASKI (CASIMER) 217 SI Spray Pool Water play feature - upgrade COMPLETE 2020
PULLMAN (GEORGE) 1237 SI Site Improvement Park improvements COMPLETE 2020
RAILROAD JUNCTION 354 SI Playground Chicago Plays! - new equipment COMPLETE 2014
RAINBOW BEACH 1001 FR Roof Roof COMPLETE 2012
RAINBOW BEACH 1001 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
RAINBOW BEACH 1001 FR Minor Rehab Misc. - Beach House Rehab COMPLETE 2014
RAINBOW BEACH 1001 SI Playground Chicago Plays! - new equipment COMPLETE 2015
RAINBOW BEACH 1001 SI Site Improvement Water quality COMPLETE 2015 *
RAINBOW BEACH 1001 SI Paving Paving - paths COMPLETE 2016
RAINBOW BEACH 1001 SI Paving Site paving COMPLETE 2016
RAINBOW BEACH 1001 SI Site Improvement Lakefront Kiosk - installation COMPLETE 2017
RAINBOW BEACH 1001 FR Concrete Masonry Structural Field house - masonry COMPLETE 2017
RAINBOW BEACH 1001 FR Minor Rehab Field house - water heaters COMPLETE 2018
RAINBOW BEACH 1001 SI Landscape Tree planting COMPLETE 2018
RAINBOW BEACH 1001 FR Minor Rehab Concession Building - rehab COMPLETE 2019
RAINEY (EDWARD) 33 SI Landscape Tree planting COMPLETE 2020
RAINEY (EDWARD) 33 SI Playground Chicago Plays! - new equipment COMPLETE 2015
RAINEY (EDWARD) 33 SI Courts Court conversion - Cruyff Court COMPLETE 2016 *
RAVENSWOOD MANOR 159 SI Playground Chicago Plays! - new equipment COMPLETE 2015
RENAISSANCE 509 SI Site Improvement Site improvements - paving and plumbing DESIGN
REVERE (PAUL) 185 FR Minor Rehab Misc. plumbing COMPLETE 2011
REVERE (PAUL) 185 SI Paving Pathways - walking track COMPLETE 2015
REVERE (PAUL) 185 SI Site Improvement Site improvements COMPLETE 2017 *
REVERE (PAUL) 185 FR Minor Rehab Misc. - flooring COMPLETE 2017
REVERE (PAUL) 185 SI Athletic Field Athletic Field - rehab COMPLETE 2017 *
52 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
REVERE (PAUL) 185 FR Minor Rehab Facility Assessments COMPLETE 2018
REVERE (PAUL) 185 FR Major Rehab Field House - major restoration CONSTRUCTION *
REYES (GUADALUPE) 352 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
RIDGE 175 FR HVAC and Energy Efficiency Boiler - new CONSTRUCTION
RIDGE 175 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
RIDGE 175 SI Courts Park improvements including paving and lighting COMPLETE 2013 *
RIDGE 175 SI Paving Parking lot - rehab for accessibility COMPLETE 2013
RIDGE 175 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
RIDGE 175 FR Minor Rehab Field house - lobby improvements COMPLETE 2014
RIDGE 175 SI Athletic Field Athletic field - rehab COMPLETE 2014 *
RIDGE 175 FR HVAC and Energy Efficiency Boiler - pool COMPLETE 2015
RIDGE 175 FR Roof Ceramic Building - major rehab COMPLETE 2015
RIDGE 175 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
RIDGE 175 SI Paving Site improvements - paving COMPLETE 2016
RIDGE 175 FR Swimming Pool Pool - filter COMPLETE 2016
RIDGE 175 FR Roof Field house and Ceramic Building - roof COMPLETE 2017
RIDGE 175 FR Swimming Pool Pool - boiler COMPLETE 2018
RIDGE 175 FR Major Rehab Field house - building assessment COMPLETE 2018
RIDGE 175 FR Windows and Doors Field house - windows COMPLETE 2020
RIDGE 175 FR Major Rehab Field house - second floor auditorium and elevator BID/AWARD *
RIDGE 175 FR Minor Rehab Cultural Center Initiative PLANNING
RIIS (JACOB) 123 SI Playground Playground - new CONSTRUCTION
RIIS (JACOB) 123 SI Site Improvement Water service COMPLETE 2011
RIIS (JACOB) 123 FR Minor Rehab Ice Skating Rink - rehab COMPLETE 2011
RIIS (JACOB) 123 SI Paving Paving - paths and parking lot COMPLETE 2011
RIIS (JACOB) 123 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
RIIS (JACOB) 123 SI Spray Pool Water feature - surfacing COMPLETE 2012
RIIS (JACOB) 123 SI Playground Playground - design COMPLETE 2013
RIIS (JACOB) 123 FR Roof Natatorium - roof COMPLETE 2014
RIIS (JACOB) 123 SI Playground Signature Playground - new COMPLETE 2014 *
RIIS (JACOB) 123 FR HVAC and Energy Efficiency Field house boiler - rehab COMPLETE 2016
RIIS (JACOB) 123 SI Courts Tennis Court - rehab COMPLETE 2017 *
RIIS (JACOB) 123 SI Site Improvement Track - rehab COMPLETE 2017 *
RIIS (JACOB) 123 FR Swimming Pool Filter - motor and pump COMPLETE 2017
RIIS (JACOB) 123 SI Lighting Lighting upgrade to LED - Exterior LED upgrades COMPLETE 2019 *
RIIS (JACOB) 123 SI Spray Pool Water playground - minor rehab COMPLETE 2019 *
RIIS (JACOB) 123 AD Planning Park and field house - improvements DESIGN *
RIIS (JACOB) 123 SI Spray Pool Water play feature - major rehab DESIGN
RIVER 186 SI Spray Pool Water feature - rehab COMPLETE 2011 *
53 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
RIVER 186 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2012
RIVER 186 SI Athletic Field Artificial turf athletic field - major rehab COMPLETE 2013 *
RIVER 186 AD New Construction New Chicago River Boat House COMPLETE 2014
RIVER 186 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
RIVER 186 FR Swimming Pool Pool - drainage COMPLETE 2015
RIVER 186 FR Swimming Pool Pool - rehab COMPLETE 2018
RIVER 186 SI Courts Tennis Court -rehab COMPLETE 2018 *
RIVER 186 SI Site Improvement Ballfield Restorations with Stormwater Diversion (CDOT) COMPLETE 2018 *
RIVER 186 SI Landscape Tree planting and ballfield COMPLETE 2019
RIVER 186 SI Lighting Lighting upgrade to LED COMPLETE 2019
RIVER 186 FR Major Rehab Field house - roof and tuckpointing BID/AWARD *
ROBERTS (DANIEL) SQUARE 95 SI Playground Chicago Plays! - new equipment COMPLETE 2014
ROBICHAUX (JOSEPH) 320 SI Playground Chicago Plays! - new equipment COMPLETE 2015
ROBICHAUX (JOSEPH) 320 SI Courts Basketball Court - rehab COMPLETE 2016
ROBICHAUX (JOSEPH) 320 FR Major Rehab Field house - major rehab COMPLETE 2018 *
ROBICHAUX (JOSEPH) 320 FR HVAC and Energy Efficiency HVAC - new roof units COMPLETE 2020
ROBINSON (JACKIE) 236 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
ROBINSON (JACKIE) 236 SI Playground Playground - new COMPLETE 2014 *
ROBINSON (JACKIE) 236 SI Site Improvement Site improvements DESIGN *
ROGERS (PHILLIP) 240 SI Courts Tennis and Pickleball courts - rehab PRE-DESIGN
ROGERS (PHILLIP) 240 SI Athletic Field Athletic field - rehab COMPLETE 2012
ROGERS (PHILLIP) 240 SI Playground Chicago Plays! - new equipment COMPLETE 2014
ROGERS (PHILLIP) 240 SI Paving 2016 DW Paving COMPLETE 2016
ROGERS (PHILLIP) 240 SI Athletic Field Athletic field - rehab COMPLETE 2016
ROGERS (PHILLIP) 240 SI Lighting Lighting upgrade to LED COMPLETE 2019
ROGERS (PHILLIP) BEACH 1262 SI Site Improvement Misc. - site improvements COMPLETE 2016
ROGERS (PHILLIP) BEACH 1262 SI Site Improvement Site restoration COMPLETE 2019 *
RONAN (GEORGE) 275 SI Playground Chicago Plays! - new equipment COMPLETE 2014
RONAN (GEORGE) 275 SI Landscape Zŝǀ ĞƌďĂŶŬ�Ͳ�, ĂďŝƚĂƚ�ZĞƐƚŽƌĂƟŽŶRonan East COMPLETE 2015 *
RONAN (GEORGE) 275 SI Landscape Tree planting COMPLETE 2018
ROOSEVELT (THEODORE) 466 SI Site Improvement Site improvements PENDING FUNDING *
ROOSEVELT (THEODORE) 466 SI Lighting Lighting - exterior COMPLETE 2019 *
ROSEDALE 91 FR Roof Roof COMPLETE 2012
ROSEDALE 91 SI Playground Chicago Plays! - new equipment COMPLETE 2016
ROSENBLUM (J. LESLIE) 231 SI Athletic Field Athletic field - improvements PRE-DESIGN *
ROSENBLUM (J. LESLIE) 231 SI Fencing Fencing - rehab COMPLETE 2020 *
ROSENBLUM (J. LESLIE) 231 AD Park Development Park development - including artificial turf field COMPLETE 2012 *
ROWAN (WILLIAM) 248 FR HVAC and Energy Efficiency Emergency - new blower fan COMPLETE 2020
ROWAN (WILLIAM) 248 SI Fencing Fencing - ballfield COMPLETE 2011
54 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
ROWAN (WILLIAM) 248 FR Minor Rehab Field house - locker room improvements COMPLETE 2014
ROWAN (WILLIAM) 248 FR HVAC and Energy Efficiency Misc. HVAC improvement COMPLETE 2014
ROWAN (WILLIAM) 248 SI Playground Chicago Plays! - new equipment COMPLETE 2016
ROWAN (WILLIAM) 248 SI Paving Site paving COMPLETE 2017
ROWAN (WILLIAM) 248 SI Site Improvement Rink conversion to roller hockey COMPLETE 2019 *
ROWAN (WILLIAM) 248 SI Athletic Field Athletic fields - rehab COMPLETE 2019 *
RUIZ (IRMA C.) 1278 SI Playground Chicago Plays! - new equipment COMPLETE 2015
RUIZ (IRMA C.) 1278 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 *
RUSSELL (MARTIN) SQUARE 6 SI Playground Playground - resurfacing COMPLETE 2011
RUSSELL (MARTIN) SQUARE 6 FR Windows and Doors Field house - windows and doors COMPLETE 2011 *
RUSSELL (MARTIN) SQUARE 6 SI Courts Slam Dunk Basketball Court COMPLETE 2012
RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
RUSSELL (MARTIN) SQUARE 6 FR Minor Rehab Gym floor - restore or replace COMPLETE 2012 *
RUSSELL (MARTIN) SQUARE 6 FR Fitness Center Fitness center - new equipment COMPLETE 2012
RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool - plumbing COMPLETE 2015
RUSSELL (MARTIN) SQUARE 6 FR Swimming Pool Pool - liner, gutter, filter COMPLETE 2016
RUSSELL (MARTIN) SQUARE 6 SI Courts Tennis court - conversion to artificial turf COMPLETE 2016 *
RUSSELL (MARTIN) SQUARE 6 SI Paving Site paving COMPLETE 2016
RUSSELL (MARTIN) SQUARE 6 FR Minor Rehab Field house - exterior wall COMPLETE 2017
RUSSELL (MARTIN) SQUARE 6 FR HVAC and Energy Efficiency Boiler - rehab COMPLETE 2017
RUSSELL (MARTIN) SQUARE 6 SI Landscape Tree planting COMPLETE 2018
RUTHERFORD SAYRE 127 FR Concrete Masonry Structural Field house - masonry COMPLETE 2011
RUTHERFORD SAYRE 127 SI Paving Paving COMPLETE 2012 *
RUTHERFORD SAYRE 127 SI Courts Court - improvements COMPLETE 2012 *
RUTHERFORD SAYRE 127 SI Lighting Lighting - exterior COMPLETE 2013 *
RUTHERFORD SAYRE 127 FR Concrete Masonry Structural Field house - concrete COMPLETE 2014 *
RUTHERFORD SAYRE 127 SI Site Improvement Misc. - flag pole COMPLETE 2016
RUTHERFORD SAYRE 127 SI Site Improvement Outdoor fitness station - new COMPLETE 2018 *
RUTHERFORD SAYRE 127 SI Landscape Natural Area - new CONSTRUCTION *
SACRAMENTO 1147 SI Lighting Lighting - playground - upgrade COMPLETE 2011
SACRAMENTO 1147 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
SAINT LOUIS 1149 SI Site Improvement Misc. - drainage improvement COMPLETE 2011
SAINT LOUIS 1149 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SAUGANASH 195 SI Athletic Field Ballfields - rehab PRE-DESIGN *
SAUGANASH 195 FR Minor Rehab Misc. radiator covers COMPLETE 2012
SAUGANASH 195 SI Site Improvement Outdoor fitness station - new COMPLETE 2016 *
SAUGANASH 195 SI Courts Tennis courts - rehab and conversion COMPLETE 2016 *
SCHAEFER (EDWARD) 1148 SI Playground Chicago Plays! - new equipment COMPLETE 2014
Schafer (Clara D.) 503 AD Park Development South Chicago - Clean and Green COMPLETE 2012 *
55 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
Schafer (Clara D.) 503 AD Park Development South Chicago - Park development COMPLETE 2014
Schafer (Clara D.) 503 AD Acquisition South Chicago Park COMPLETE 2017
SCHAFER (CLARA D.) 503 SI Site Improvement Park improvements DESIGN
SCHREIBER 1061 SI Site Improvement Landscape and site improvement COMPLETE 2011
SCHREIBER 1061 SI Playground Playground - new w/ water feature COMPLETE 2011 *
SCHREIBER 1061 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
SCHREIBER 1061 FR Roof Roof COMPLETE 2017
SCOTTSDALE 265 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SENECA 1242 FR Sculpture and Monument "Ben" - restoration COMPLETE 2012
SENECA 1242 AD Park Development Playground - new CONSTRUCTION *
SENKA (EDWARD "DUKE") 309 SI Athletic Field Artificial turf baseball field - new PLANNING *
SENKA (EDWARD "DUKE") 309 SI Fencing Misc. - perimeter fencing COMPLETE 2012 *
SENKA (EDWARD "DUKE") 309 SI Spray Pool Water feature - surfacing COMPLETE 2012 *
SENKA (EDWARD "DUKE") 309 SI Site Improvement Park improvements including pathways, lighting, courts COMPLETE 2013 *
SENKA (EDWARD "DUKE") 309 SI Playground Playground - surfacing COMPLETE 2018 *
SENN (NICHOLAS) 227 SI Playground Playground and spray feature - new COMPLETE 2017 *
SENN (NICHOLAS) 227 SI Site Improvement Misc. kiosk COMPLETE 2018 *
SEWARD (WILLIAM) 108 FR Minor Rehab Field house -improvements COMPLETE 2020 *
SEWARD (WILLIAM) 108 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
SEWARD (WILLIAM) 108 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
SEWARD (WILLIAM) 108 FR Minor Rehab Field house - lobby improvements COMPLETE 2013
SEWARD (WILLIAM) 108 SI Athletic Field Ballfield - rehab COMPLETE 2015
SEWARD (WILLIAM) 108 SI Courts Basketball Court - drainage COMPLETE 2017
SEWARD (WILLIAM) 108 FR Major Rehab Field house - major rehab CONSTRUCTION *
SHABBONA 148 FR Roof Roof - emergency stabilization COMPLETE 2020 *
SHABBONA 148 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2011
SHABBONA 148 SI Paving Paving - accessibility COMPLETE 2011
SHABBONA 148 SI Playground Playground with water feature - new COMPLETE 2013 *
SHABBONA 148 FR Swimming Pool Misc. restoration COMPLETE 2014
SHABBONA 148 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014
SHABBONA 148 FR Major Rehab Major rehab including transition plan access improvements COMPLETE 2014 *
SHABBONA 148 FR Roof Roof and drainage COMPLETE 2014
SHABBONA 148 FR Minor Rehab Misc. Stair renovation COMPLETE 2015
SHABBONA 148 FR Swimming Pool Pool - ladders COMPLETE 2017
SHABBONA 148 FR HVAC and Energy Efficiency Boiler - tubes COMPLETE 2018
SHABBONA 148 SI Paving Paving - pathways COMPLETE 2018
SHABBONA 148 SI Lighting Lighting upgrade to LED COMPLETE 2019
SHEDD (JOHN G.) 212 SI Fencing Fencing - ballfield COMPLETE 2011
SHEDD (JOHN G.) 212 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
56 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
SHEDD (JOHN G.) 212 SI Courts Basketball court and pathway - resurfacing COMPLETE 2013
SHEDD (JOHN G.) 212 FR Minor Rehab Gym floor - rehab COMPLETE 2013
SHEDD (JOHN G.) 212 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SHEIL (BERNARD) COMM. CTR. 398 FR Minor Rehab Access improvements - entrance, lobby, bathrooms COMPLETE 2015
SHEIL (BERNARD) COMM. CTR. 398 FR HVAC and Energy Efficiency HVAC - new system COMPLETE 2017
SHEIL (BERNARD) COMM. CTR. 398 SI Playground Shade canopy - new COMPLETE 2020 *
SHEIL (BERNARD) COMM. CTR. 398 FR Concrete Masonry Structural Field house - masonry and lintels PRE-DESIGN
SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - sump pump COMPLETE 2021
SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - filter COMPLETE 2021
SHERIDAN (PHILIP HENRY) 205 SI Athletic Field Artificial turf baseball and multipurpose field - new COMPLETE 2011 *
SHERIDAN (PHILIP HENRY) 205 FR HVAC and Energy Efficiency Misc. HVAC rehab COMPLETE 2012
SHERIDAN (PHILIP HENRY) 205 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - new boiler COMPLETE 2012
SHERIDAN (PHILIP HENRY) 205 FR Fitness Center Fitness center - new COMPLETE 2013
SHERIDAN (PHILIP HENRY) 205 FR Minor Rehab Field house - windows, doors, tuckpointing COMPLETE 2014
SHERIDAN (PHILIP HENRY) 205 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
SHERIDAN (PHILIP HENRY) 205 SI Courts Court conversion to inline hockey COMPLETE 2015 *
SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - rehab COMPLETE 2016
SHERIDAN (PHILIP HENRY) 205 FR Swimming Pool Pool - rehab COMPLETE 2016
SHERIDAN (PHILIP HENRY) 205 SI Athletic Field Paving - concrete COMPLETE 2017
SHERMAN (JOHN) 7 FR Roof Pool buildings - roof rehab COMPLETE 2020
SHERMAN (JOHN) 7 FR HVAC and Energy Efficiency Boiler and insulation COMPLETE 2011
SHERMAN (JOHN) 7 FR Concrete Masonry Structural Gym - walls COMPLETE 2011
SHERMAN (JOHN) 7 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
SHERMAN (JOHN) 7 SI Site Improvement Misc. - water main COMPLETE 2012
SHERMAN (JOHN) 7 FR Roof Gym - roof COMPLETE 2012
SHERMAN (JOHN) 7 FR Minor Rehab Field house - kitchen COMPLETE 2013
SHERMAN (JOHN) 7 FR Swimming Pool Pool - liner, filter, water line COMPLETE 2015
SHERMAN (JOHN) 7 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SHERMAN (JOHN) 7 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SHERMAN (JOHN) 7 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
SHERMAN (JOHN) 7 FR Minor Rehab Gym and auditorium floors - rehab COMPLETE 2016
SHERMAN (JOHN) 7 SI Athletic Field Athletic field - rehab COMPLETE 2016
SHERMAN (JOHN) 7 SI Landscape Tree planting COMPLETE 2019
SHERMAN (JOHN) 7 SI Playground Playground - upgrade DESIGN
SHERMAN (JOHN) 7 FR Major Rehab Field house - major rehab COMPLETE 2020 *
SHERWOOD (JESSE) 1014 SI Spray Pool Water feature - surfacing COMPLETE 2012
SHERWOOD (JESSE) 1014 FR Minor Rehab Field house - kitchen COMPLETE 2013
SHERWOOD (JESSE) 1014 FR Minor Rehab Field house - locker room improvements COMPLETE 2015
57 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
SHERWOOD (JESSE) 1014 SI Landscape Athletic Field - rehab COMPLETE 2019
SHERWOOD (JESSE) 1014 SI Site Improvement Park improvements PRE-DESIGN *
SHERWOOD (JESSE) 1014 FR Roof Field house - misc. roof PRE-DESIGN
SIMONS (ALMIRA) 124 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SINTIC (GREGORY) 1155 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SKINNER (MARK) 211 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
SKINNER (MARK) 211 SI Site Improvement Park improvements including playground, garden, and dfa COMPLETE 2014 *
SKINNER (MARK) 211 SI Landscape Community garden COMPLETE 2015 *
SKINNER (MARK) 211 SI Athletic Field Athletic field - rehab COMPLETE 2017
SKINNER (MARK) 211 AD New Construction New Field house - Feasibility Study PLANNING *
SMITH (JOSEPH HIGGINS) 1015 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
SMITH (JOSEPH HIGGINS) 1015 SI Athletic Field Athletic field - rehab COMPLETE 2012 *
SMITH (JOSEPH HIGGINS) 1015 SI Courts Tennis court - rehab and drainage COMPLETE 2012 *
SMITH (JOSEPH HIGGINS) 1015 SI Site Improvement Walkway - new COMPLETE 2012 *
SMITH (JOSEPH HIGGINS) 1015 FR Minor Rehab Misc. - interior bleachers COMPLETE 2012 *
SMITH (JOSEPH HIGGINS) 1015 SI Site Improvement Misc. - pool benches and tables COMPLETE 2013
SMITH (JOSEPH HIGGINS) 1015 FR Concrete Masonry Structural Ceramic Building - major rehab COMPLETE 2013 *
SMITH (JOSEPH HIGGINS) 1015 FR Minor Rehab Field House and Pool building - access improvements COMPLETE 2017
SMITH (JOSEPH HIGGINS) 1015 FR Swimming Pool Pool - liner COMPLETE 2018
SMITH (WENDELL) 272 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SNAPPING TURTLE 396 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SNOWBERRY 389 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SOUTH LAKEVIEW 290 SI Fencing Fencing - rehab COMPLETE 2013
SOUTH SHORE CULTURAL CENTER 429 AD New Construction Shoreline - emergency stabilization CONSTRUCTION
SOUTH SHORE CULTURAL CENTER 429 FR Minor Rehab Misc. environmental COMPLETE 2011
SOUTH SHORE CULTURAL CENTER 429 FR Major Rehab Major rehab - exterior COMPLETE 2012 *
SOUTH SHORE CULTURAL CENTER 429 FR Minor Rehab Auditorium floor - rehab or replace COMPLETE 2012
SOUTH SHORE CULTURAL CENTER 429 FR Minor Rehab Field house - interior painting COMPLETE 2013
SOUTH SHORE CULTURAL CENTER 429 FR HVAC and Energy Efficiency Misc. HVAC rehabs COMPLETE 2014
SOUTH SHORE CULTURAL CENTER 429 FR Concrete Masonry Structural Misc. entrance column restoration COMPLETE 2015
SOUTH SHORE CULTURAL CENTER 429 SI Site Improvement Lakefront Trail Separation - 67th St. to 71st St. COMPLETE 2018 *
SOUTH SHORE CULTURAL CENTER 429 SI Paving Entrance rehab COMPLETE 2018
SOUTH SHORE CULTURAL CENTER 429 FR Minor Rehab Access - chair lift COMPLETE 2018
SOUTH SHORE CULTURAL CENTER 429 FR HVAC and Energy Efficiency Air handler - new COMPLETE 2019
SOUTH SHORE CULTURAL CENTER 429 AD New Construction Beach House - new CONSTRUCTION
SOUTH SHORE CULTURAL CENTER 429 FR Minor Rehab Cultural Center Initiative PRE-DESIGN
SOUTH SHORE CULTURAL CENTER 429 FR Major Rehab Major Rehab - interior COMPLETE 2020 *
SPIKINGS FARM 424 SI Playground Chicago Plays! - new equipment COMPLETE 2015 *
SPRUCE 280 SI Playground Chicago Plays! - new equipment COMPLETE 2015
58 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
STANTON (EDWIN) 109 FR Swimming Pool Pool retrofit -compliance and filter COMPLETE 2011
STANTON (EDWIN) 109 FR Major Rehab Major rehab - interior COMPLETE 2012 *
STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
STANTON (EDWIN) 109 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
STANTON (EDWIN) 109 FR Major Rehab Major rehab - exterior COMPLETE 2013 *
STANTON (EDWIN) 109 FR Swimming Pool Pool - rehab COMPLETE 2013
STANTON (EDWIN) 109 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2014 *
STANTON (EDWIN) 109 FR Swimming Pool Pool - rehab COMPLETE 2015
STANTON (EDWIN) 109 AD Park Development Park development (TIF) COMPLETE 2017
STANTON (EDWIN) 109 SI Playground Playground and spray feature - new COMPLETE 2017 *
STANTON (EDWIN) 109 SI Athletic Field Athletic field - rehab COMPLETE 2018 *
STARR (ELLEN GATES) 497 AD Park Development Park Development including playground COMPLETE 2016 *
STARS & STRIPES 370 SI Playground Playground - new COMPLETE 2014 *
STARS & STRIPES 370 SI Athletic Field Ballfield - fencing COMPLETE 2015
STARS & STRIPES 370 SI Athletic Field Artificial turf - ball field infield COMPLETE 2017
Steelworkers 523 AD Park Development USX site - Phase II - Lake Peoria Sediment Muds to Parks COMPLETE 2014 *
Steelworkers 523 FR Sculpture and Monument Steelworker sculpture - new COMPLETE 2015
Steelworkers 523 AD Planning Park 523- concept planning COMPLETE 2015 *
Steelworkers 523 AD Park Development Park Development COMPLETE 2018 *
STONE (BERNARD) 526 SI Site Improvement Park development - passive park along Chicago River COMPLETE 2017 *
STONE (BERNARD) 526 AD New Construction North Branch Bridge (CDOT) COMPLETE 2020 *
STOUT (FLORENCE) 291 SI Playground Chicago Plays! - new equipment COMPLETE 2016
STROHACKER (HOWARD) 1016 SI Playground Chicago Plays! - new equipment (at Kolin Ave.) COMPLETE 2014
STROHACKER (HOWARD) 1016 SI Spray Pool Water play feature - rehab COMPLETE 2019
SUMAC 1273 AD Acquisition Expansion COMPLETE 2012
SUMAC 1273 SI Playground Playground - new COMPLETE 2012 *
SUMAC 1273 AD Park Development Site Improvements - expansion parcel COMPLETE 2020 *
SUMMERDALE 1151 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SUN YAT-SEN 451 SI Playground Chicago Plays! - new equipment COMPLETE 2015
SUPERIOR 1150 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SWEET CLOVER 430 SI Playground Chicago Plays! - new equipment COMPLETE 2014
SYCAMORE 1274 SI Playground Chicago Plays! - new equipment COMPLETE 2014
TAYLOR (ROBERT ROCHON) 271 FR Swimming Pool Pool - concrete deck PLANNING
TAYLOR (ROBERT ROCHON) 271 SI Courts Slam Dunk Basketball Court COMPLETE 2012
TAYLOR (ROBERT ROCHON) 271 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
TAYLOR (ROBERT ROCHON) 271 SI Lighting Lighting - interior gym COMPLETE 2012
TAYLOR (ROBERT ROCHON) 271 FR Minor Rehab Gym floor - restore or replace COMPLETE 2012
TAYLOR (ROBERT ROCHON) 271 SI Athletic Field Ballfield - rehab COMPLETE 2012
59 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
TAYLOR (ROBERT ROCHON) 271 FR Minor Rehab Misc. - washrooms COMPLETE 2013
TAYLOR (ROBERT ROCHON) 271 FR Swimming Pool Pool - rehab COMPLETE 2016
TAYLOR (ROBERT ROCHON) 271 SI Athletic Field Athletic field - rehab COMPLETE 2020 *
TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 SI Athletic Field Athletic field - rehab COMPLETE 2015 *
TAYLOR-LAURIDSEN (JOHN, EMIL) 1025 SI Site Improvement Parking lot - accessibility COMPLETE 2017
THE GROVE 397 SI Playground Chicago Plays! - new equipment COMPLETE 2014
THROOP (AMOS GAGER) 1159 SI Spray Pool Water feature - rehab COMPLETE 2011
THROOP (AMOS GAGER) 1159 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
THROOP (AMOS GAGER) 1159 SI Playground Chicago Plays! - new equipment COMPLETE 2014
THUIS (GRACE ZWIEFKA) 1119 AD Acquisition Expansion COMPLETE 2012
THUIS (GRACE ZWIEFKA) 1119 SI Playground Chicago Plays! - new equipment COMPLETE 2014
TILL-MOBLEY (MAMIE) 1154 AD Acquisition Expansion COMPLETE 2014 *
TILL-MOBLEY (MAMIE) 1154 SI Playground Chicago Plays! - new equipment COMPLETE 2016
TILTON (GEORGE) 1064 SI Playground Playground - resurfacing COMPLETE 2012
TILTON (GEORGE) 1064 FR Major Rehab Camelot School - joint use facility COMPLETE 2016
TILTON (GEORGE) 1064 FR Minor Rehab Building demolition COMPLETE 2017
TILTON (GEORGE) 1064 SI Playground Playground - upgrade COMPLETE 2020
TOM (PING) MEML. 481 AD Park Development Park development - phase III - shoreline and athletic field COMPLETE 2011 *
TOM (PING) MEML. 481 SI Playground Surfacing - rehab COMPLETE 2013
TOM (PING) MEML. 481 AD New Construction New Chicago River Boat House COMPLETE 2013 *
TOM (PING) MEML. 481 AD New Construction New Field house COMPLETE 2013 *
TOM (PING) MEML. 481 SI Athletic Field Ballfield - rehab COMPLETE 2014
TOM (PING) MEML. 481 FR HVAC and Energy Efficiency Field house - dehumidification system COMPLETE 2019
TOM (PING) MEML. 481 SI Landscape Natural Area - new DESIGN *
TOUHY (PATRICK) 246 SI Playground Playground - new COMPLETE 2013 *
TOUHY (PATRICK) 246 SI Site Improvement Misc. - drinking fountain and trees COMPLETE 2014 *
TOUHY (PATRICK) 246 SI Athletic Field Athletic field - rehab COMPLETE 2016
TOUHY (PATRICK) 246 FR Minor Rehab Field house - rehab COMPLETE 2017
TOUHY (PATRICK) 246 SI Site Improvement Cultural plaza - new COMPLETE 2019 *
TOUHY-HERBERT (JOHN, VICTOR) 1065 SI Playground Chicago Plays! - new equipment COMPLETE 2016
TOUHY-HERBERT (JOHN, VICTOR) 1065 SI Landscape Tree Planting COMPLETE 2019
TOUHY-HERBERT (JOHN, VICTOR) 1065 SI Site Improvement Site improvements PLANNING *
TREBES (ROBERT) 1017 SI Site Improvement Park drainage COMPLETE 2018 *
TRIANGLE 518 SI Landscape Tree planting COMPLETE 2018
TRUMBULL (LYMAN) 16 FR Roof Power house - roof COMPLETE 2011
TRUMBULL (LYMAN) 16 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
TRUMBULL (LYMAN) 16 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
TRUMBULL (LYMAN) 16 FR Swimming Pool Pool Retrofit -compliance COMPLETE 2012
60 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
TRUMBULL (LYMAN) 16 FR Concrete Masonry Structural Chimney COMPLETE 2013
TRUMBULL (LYMAN) 16 SI Playground Chicago Plays! - new equipment COMPLETE 2016
TRUMBULL (LYMAN) 16 FR Swimming Pool Pool - liner and controls COMPLETE 2018
TRUMBULL (LYMAN) 16 FR Concrete Masonry Structural Field house - access improvements DESIGN
TULEY (MURRAY) 18 FR Concrete Masonry Structural Concrete and structural - stairs COMPLETE 2011
TULEY (MURRAY) 18 SI Site Improvement Misc. bollards COMPLETE 2011
TULEY (MURRAY) 18 SI Courts Slam Dunk Basketball Court COMPLETE 2012
TULEY (MURRAY) 18 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
TULEY (MURRAY) 18 FR Minor Rehab Field house - assessment COMPLETE 2014
TULEY (MURRAY) 18 SI Fencing Tennis Court - fencing rehab COMPLETE 2015
TULEY (MURRAY) 18 FR Swimming Pool Pool - controls COMPLETE 2016
TULEY (MURRAY) 18 SI Athletic Field Athletic field - batting cage COMPLETE 2016 *
TULEY (MURRAY) 18 SI Courts Tennis Court - rehab COMPLETE 2017 *
TULEY (MURRAY) 18 FR Minor Rehab Cultural Center Initiative PRE-DESIGN
TULEY (MURRAY) 18 FR Concrete Masonry Structural Field house - foundation and roof BID/AWARD *
UNION 210 SI Lighting Lighting - interior - upgrade COMPLETE 2011
UNION 210 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011
UNION 210 FR Roof Gym - roof COMPLETE 2011
UNION 210 FR Fitness Center Fitness center - upgrade COMPLETE 2011
UNION 210 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
UNION 210 FR Swimming Pool Pool - filter COMPLETE 2012
UNION 210 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
UNION 210 SI Playground Playground with water feature - new COMPLETE 2012 *
UNION 210 FR Minor Rehab Landscape Yard - rehab COMPLETE 2013
UNION 210 FR Major Rehab Field house and Pool house- major rehab COMPLETE 2015 *
UNION 210 FR Swimming Pool Pool - rehab COMPLETE 2016
UNION 210 FR Swimming Pool Pool - gutters COMPLETE 2020
UNION 210 SI Lighting Tennis Court - lighting COMPLETE 2020
UNION 210 FR Concrete Masonry Structural Field house - drainage improvements CONSTRUCTION *
UNITY 293 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013 *
UNITY 293 SI Site Improvement Misc. gazebo and flower beds COMPLETE 2017
VALLEY FORGE 371 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
VALLEY FORGE 371 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
VALLEY FORGE 371 SI Site Improvement Misc. - flag pole COMPLETE 2014
VIOLET 361 SI Playground Chicago Plays! - new equipment COMPLETE 2016
VITTUM (HARRIET ELIZABETH) 233 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
VITTUM (HARRIET ELIZABETH) 233 FR Minor Rehab Elevator - rehab COMPLETE 2013
VITTUM (HARRIET ELIZABETH) 233 SI Playground Chicago Plays! - new equipment including water feature COMPLETE 2015 *
VITTUM (HARRIET ELIZABETH) 233 SI Paving Site paving COMPLETE 2016
61 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
VITTUM (HARRIET ELIZABETH) 233 SI Site Improvement Misc. - water main rehab COMPLETE 2016
VITTUM (HARRIET ELIZABETH) 233 SI Courts Court - conversion to artificial turf junior soccer field COMPLETE 2016 *
VOGLE (HENRY JR.) 402 SI Playground Chicago Plays! - new equipment COMPLETE 2015
WAGNER (CLARENCE) 1068 SI Playground Chicago Plays! - new equipment COMPLETE 2016
WALLACE 1069 SI Playground Chicago Plays! - new equipment COMPLETE 2016
WALSH (JOHN) 393 AD Park Development Bloomingdale Trail - Access Park development COMPLETE 2019 *
WANG (CHI CHE) 522 SI Athletic Field Athletic field - rehab COMPLETE 2016
WARD (A. MONTGOMERY) 511 SI Playground Playground - expansion COMPLETE 2012
WARD (A. MONTGOMERY) 511 AD Park Development Site and Facility Improvements COMPLETE 2012 *
WARD (A. MONTGOMERY) 511 SI Site Improvement Dog friendly area - rehab COMPLETE 2014 *
WARD (A. MONTGOMERY) 511 SI Lighting Dog friendly area - lighting COMPLETE 2018
WARD (A. MONTGOMERY) 511 SI Paving Misc. site improvement COMPLETE 2020
WARREN (LAURENCE) 428 SI Paving Parking lot - drainage improvements COMPLETE 2011
WARREN (LAURENCE) 428 SI Courts Tennis court - rehab COMPLETE 2011
WARREN (LAURENCE) 428 FR Roof Gym - roof COMPLETE 2012
WARREN (LAURENCE) 428 FR Roof Roof - rehab COMPLETE 2012
WARREN (LAURENCE) 428 SI Site Improvement Golf Course - drainage improvements COMPLETE 2013
WARREN (LAURENCE) 428 FR Minor Rehab Misc. - ice rink rehab COMPLETE 2013
WARREN (LAURENCE) 428 SI Fencing Misc. fencing and gates COMPLETE 2014
WARREN (LAURENCE) 428 SI Site Improvement Misc. Cricket Pitch COMPLETE 2014
WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment (at Seeley Ave.) COMPLETE 2014
WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment (at Claremont Ave.) COMPLETE 2014
WARREN (LAURENCE) 428 SI Playground Chicago Plays! - new equipment (at Pratt Blvd.) COMPLETE 2014
WARREN (LAURENCE) 428 SI Paving Parking lot COMPLETE 2017
WARREN (LAURENCE) 428 FR Minor Rehab Field house - water damage rehab COMPLETE 2017
WARREN (LAURENCE) 428 SI Athletic Field Athletic field - lighting COMPLETE 2017 *
WARREN (LAURENCE) 428 SI Paving Pathways COMPLETE 2017
WARREN (LAURENCE) 428 FR Concrete Masonry Structural Field house - tuckpointing COMPLETE 2018
WARREN (LAURENCE) 428 SI Site Improvement Outdoor fitness station - new COMPLETE 2018 *
WARREN (LAURENCE) 428 SI Athletic Field Athletic fields - major rehab COMPLETE 2019 *
WASHINGTON (DINAH) 388 SI Playground Chicago Plays! - new equipment COMPLETE 2015
WASHINGTON (GEORGE) 21 SI Courts Tennis court - rehab COMPLETE 2020 *
WASHINGTON (GEORGE) 21 FR Swimming Pool Pool - slide COMPLETE 2020
WASHINGTON (GEORGE) 21 SI Courts Mini-pitch Soccer Court Conversion COMPLETE 2020 *
WASHINGTON (GEORGE) 21 SI Athletic Field Athletic field - rehab PRE-DESIGN *
WASHINGTON (GEORGE) 21 SI Fencing Fencing - Bynum Island COMPLETE 2011
WASHINGTON (GEORGE) 21 FR Major Rehab DuSable Museum - Roundhouse Building Rehab COMPLETE 2011
WASHINGTON (GEORGE) 21 FR Major Rehab Swiss Chalet - feasibility study COMPLETE 2011
WASHINGTON (GEORGE) 21 SI Fencing Fencing - Green Youth Farm COMPLETE 2011 *
62 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
WASHINGTON (GEORGE) 21 FR Minor Rehab Misc. - gym bleachers COMPLETE 2012
WASHINGTON (GEORGE) 21 SI Lighting Lighting - exterior COMPLETE 2012
WASHINGTON (GEORGE) 21 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
WASHINGTON (GEORGE) 21 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
WASHINGTON (GEORGE) 21 SI Athletic Field Athletic field - rehab COMPLETE 2012
WASHINGTON (GEORGE) 21 FR Minor Rehab Field house - locker room improvements COMPLETE 2013
WASHINGTON (GEORGE) 21 SI Site Improvement Misc. - Allison Davis Garden - rehab COMPLETE 2014
WASHINGTON (GEORGE) 21 SI Athletic Field Ballfield - rehab COMPLETE 2014
WASHINGTON (GEORGE) 21 SI Site Improvement Water service COMPLETE 2015
WASHINGTON (GEORGE) 21 SI Playground Chicago Plays! - new equipment COMPLETE 2015
WASHINGTON (GEORGE) 21 SI Lighting Lighting - athletic field COMPLETE 2016 *
WASHINGTON (GEORGE) 21 SI Playground Chicago Plays! - new equipment at 54th St. COMPLETE 2016
WASHINGTON (GEORGE) 21 FR Swimming Pool Pool - liner and gutter COMPLETE 2017
WASHINGTON (GEORGE) 21 SI Site Improvement DuSable Museum - Plaza Improvements COMPLETE 2017 *
WASHINGTON (GEORGE) 21 FR Minor Rehab Trades Yard - rehab COMPLETE 2018
WASHINGTON (GEORGE) 21 SI Lighting Lighting upgrade to LED COMPLETE 2019
WASHINGTON (GEORGE) 21 SI Paving DuSable Museum - parking lot and drainage COMPLETE 2019
WASHINGTON (GEORGE) 21 SI Landscape Tree Planting COMPLETE 2019
WASHINGTON (GEORGE) 21 SI Athletic Field Athletic field - rehab COMPLETE 2020 *
WASHINGTON (GEORGE) 21 SI Playground Playground - new DESIGN *
WASHINGTON (GEORGE) 21 FR Concrete Masonry Structural Pool Bleachers - major rehab PENDING FUNDING *
WASHINGTON (GEORGE) 21 FR Minor Rehab Lockers - new COMPLETE 2020
WASHINGTON (HAROLD) 494 SI Landscape Tree planting COMPLETE 2020
WASHINGTON (HAROLD) 494 SI Spray Pool Water feature - rehab COMPLETE 2011
WASHINGTON (HAROLD) 494 SI Playground Chicago Plays! - new playground equipment COMPLETE 2014
WASHINGTON (HAROLD) 494 SI Courts Tennis Court - rehab COMPLETE 2016 *
WASHINGTON (HAROLD) 494 SI Paving 2016 DW Paving COMPLETE 2016
WASHINGTON (HAROLD) 494 SI Playground Playground - new picnic area COMPLETE 2019
WASHINGTON (HAROLD) MEM. 506 SI Fencing Misc. - gates COMPLETE 2015 *
WASHINGTON SQUARE 1244 SI Site Improvement Park improvements - TBD COMPLETE 2018 *
WASHTENAW 1070 SI Paving Lighting - exterior COMPLETE 2012
WASHTENAW 1070 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
WASHTENAW 1070 SI Athletic Field Athletic Field - rehab COMPLETE 2016
WEBSTER (DANIEL) 513 SI Site Improvement Site improvements COMPLETE 2017 *
WEISMAN (ALBERT) 1135 SI Paving Misc. concrete curb COMPLETE 2014
WELLES (GIDEON) 110 FR Minor Rehab Natatorium - soffit lighting COMPLETE 2020
WELLES (GIDEON) 110 FR Fitness Center Fitness center - upgrade COMPLETE 2011
WELLES (GIDEON) 110 FR Minor Rehab Field house - lobby improvements COMPLETE 2012
WELLES (GIDEON) 110 FR Major Rehab Transition plan - access improvements COMPLETE 2012
63 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
WELLES (GIDEON) 110 FR Minor Rehab Pool house - rehab COMPLETE 2013
WELLES (GIDEON) 110 FR Fitness Center Misc. new equipment COMPLETE 2013
WELLES (GIDEON) 110 FR Minor Rehab Locker rooms - rehab COMPLETE 2015 *
WELLES (GIDEON) 110 SI Courts Tennis court - rehab COMPLETE 2015 *
WELLES (GIDEON) 110 SI Playground Playground - expansion COMPLETE 2015 *
WELLES (GIDEON) 110 FR Swimming Pool Pool - filter system COMPLETE 2015 *
WELLES (GIDEON) 110 FR Concrete Masonry Structural Gym Building - drainage improvements COMPLETE 2016 *
WELLES (GIDEON) 110 FR Roof Roof COMPLETE 2017 *
WELLES (GIDEON) 110 SI Paving 2016 DW Paving -pathways COMPLETE 2017
WELLES (GIDEON) 110 SI Athletic Field Athletic field - scoreboard COMPLETE 2017 *
WELLES (GIDEON) 110 SI Playground Nature Play Area COMPLETE 2018 *
WELLES (GIDEON) 110 FR Swimming Pool Pool - accessibility stairs COMPLETE 2019
WENDT (KENNETH) 1145 SI Playground Chicago Plays! - new playground equipment COMPLETE 2013
WENTWORTH (JOHN) 238 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
WENTWORTH (JOHN) 238 SI Site Improvement Ice rink - new COMPLETE 2013
WENTWORTH (JOHN) 238 FR Minor Rehab Landscape Building - minor rehab COMPLETE 2014
WENTWORTH (JOHN) 238 SI Athletic Field Ballfield - rehab COMPLETE 2015
WENTWORTH (JOHN) 238 FR Concrete Masonry Structural Misc. entrance improvements COMPLETE 2016
WENTWORTH (JOHN) 238 SI Athletic Field Artificial turf - ball field infield COMPLETE 2017 *
WENTWORTH (JOHN) 238 SI Paving Parking lot COMPLETE 2018
WENTWORTH (JOHN) 238 SI Paving Pathways COMPLETE 2018
WENTWORTH (JOHN) 238 SI Athletic Field Scoreboard - new COMPLETE 2018
WENTWORTH (JOHN) GARDENS 286 SI Playground Playground -new CONSTRUCTION *
WENTWORTH (JOHN) GARDENS 286 FR Swimming Pool Pool - filter DESIGN
WENTWORTH (JOHN) GARDENS 286 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
WESOLEK (MARLENE) 1080 SI Playground Chicago Plays! - new equipment COMPLETE 2016
WEST CHATHAM 249 SI Site Improvement Court resurfacing, bollards and drainage PRE-DESIGN
WEST CHATHAM 249 SI Fencing Fencing - ballfield COMPLETE 2011
WEST CHATHAM 249 SI Fencing Misc. fencing COMPLETE 2011
WEST CHATHAM 249 SI Courts Basketball court - rehab COMPLETE 2012
WEST CHATHAM 249 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
WEST CHATHAM 249 SI Playground Chicago Plays! - new playground equipment COMPLETE 2014
WEST CHATHAM 249 SI Athletic Field Artificial Turf Fields - football and baseball COMPLETE 2018 *
WEST CHATHAM 249 SI Spray Pool Spray feature - rehab COMPLETE 2018
WEST LAWN 245 FR Minor Rehab Field house - new flooring DESIGN
WEST LAWN 245 SI Site Improvement Site improvement PLANNING
WEST LAWN 245 FR Fitness Center Fitness center - accessibility equipment COMPLETE 2011
WEST LAWN 245 FR Fitness Center Fitness center - upgrade COMPLETE 2011
WEST LAWN 245 FR Major Rehab Transition plan - access improvements COMPLETE 2011
64 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
WEST LAWN 245 FR Minor Rehab Misc. - access improvements COMPLETE 2011
WEST LAWN 245 SI Athletic Field Artificial turf athletic field - new COMPLETE 2013 *
WEST LAWN 245 FR Concrete Masonry Structural Field house - parapet walls, drainage, interior restoration COMPLETE 2015
WEST LAWN 245 SI Lighting Athletic field - lighting COMPLETE 2015
WEST LAWN 245 SI Playground Chicago Plays! - new equipment COMPLETE 2015
WEST LAWN 245 SI Site Improvement Misc. - water main COMPLETE 2015
WEST LAWN 245 SI Paving Site paving COMPLETE 2016
WEST LAWN 245 SI Paving Parking lot - rehab COMPLETE 2018
WEST LAWN 245 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 *
WEST PULLMAN 225 FR Minor Rehab Light tower replacement COMPLETE 2020
WEST PULLMAN 225 FR Minor Rehab Misc. - insulation COMPLETE 2011
WEST PULLMAN 225 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
WEST PULLMAN 225 FR Major Rehab Transition plan - access improvements COMPLETE 2012
WEST PULLMAN 225 FR Minor Rehab Misc. - sump pump COMPLETE 2012
WEST PULLMAN 225 FR Roof Roof - rehab COMPLETE 2012
WEST PULLMAN 225 FR Minor Rehab Misc. - bleachers COMPLETE 2013
WEST PULLMAN 225 FR Swimming Pool Pool - filter and liner COMPLETE 2014
WEST PULLMAN 225 FR Minor Rehab Misc. Pool stair renovation COMPLETE 2015
WEST PULLMAN 225 SI Paving 2016 DW Paving COMPLETE 2016
WEST PULLMAN 225 FR Concrete Masonry Structural Fieldhouse - emergency masonry COMPLETE 2016
WEST PULLMAN 225 FR HVAC and Energy Efficiency Boiler and pump - new COMPLETE 2019
WEST PULLMAN 225 FR Minor Rehab Cultural Center Initiative PRE-DESIGN
WEST PULLMAN 225 SI Playground Playground - upgrade COMPLETE 2020
WEST PULLMAN 225 FR Major Rehab Field house - major rehab COMPLETE 2020
WEST RIDGE NATURE PARK 568 AD Acquisition Rosehill Cemetery - Western Ave. and Peterson Ave. COMPLETE 2012
WEST RIDGE NATURE PARK 568 AD Park Development Park development - West Ridge Nature Preserve COMPLETE 2015 *
WEST RIDGE NATURE PARK 568 SI Landscape Nature Playground - new COMPLETE 2019 *
WESTERN 1165 SI Playground Chicago Plays! - new equipment COMPLETE 2014
WHITE (WILLYE B.) 1043 FR HVAC and Energy Efficiency HVAC energy management COMPLETE 2012
WHITE (WILLYE B.) 1043 SI Fencing Misc. - fencing along Ashland COMPLETE 2014 *
WHITE (WILLYE B.) 1043 SI Playground Chicago Plays! - new equipment COMPLETE 2015
WHITE (WILLYE B.) 1043 FR Minor Rehab Security camera - new COMPLETE 2018
WHITE (WILLYE B.) 1043 SI Courts Mini-pitch Soccer Court - new COMPLETE 2018 *
WHITE (WILLYE B.) 1043 SI Athletic Field Athletic field - improvements COMPLETE 2019 *
WHITE (EDWARD) 379 SI Playground Chicago Plays! - new equipment COMPLETE 2014
White (Jesse) 560 AD Acquisition 410 W. Chicago Ave. COMPLETE 2011
White (Jesse) 560 AD New Construction New Community Center COMPLETE 2014 *
WICKER (CHARLES, JOEL) 214 FR Sculpture and Monument Fountain restoration COMPLETE 2019 *
WICKER (CHARLES, JOEL) 214 SI Playground Playground - surfacing PRE-DESIGN
65 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
WICKER (CHARLES, JOEL) 214 FR Roof Roof - rehab CONSTRUCTION
WICKER (CHARLES, JOEL) 214 FR Roof Roof COMPLETE 2011
WICKER (CHARLES, JOEL) 214 FR Sculpture and Monument "Wicker" - restoration COMPLETE 2011 *
WICKER (CHARLES, JOEL) 214 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
WICKER (CHARLES, JOEL) 214 SI Site Improvement Misc. - benches, tables, and paving COMPLETE 2013
WICKER (CHARLES, JOEL) 214 FR Minor Rehab Misc. - building security COMPLETE 2014
WICKER (CHARLES, JOEL) 214 FR Concrete Masonry Structural Field house - entranceways COMPLETE 2015
WICKER (CHARLES, JOEL) 214 SI Athletic Field Field - major restoration COMPLETE 2016
WIEBOLDT (WILLIAM) 449 SI Playground Chicago Plays! - new equipment COMPLETE 2014
WILDWOOD 257 SI Courts Tennis court - rehab COMPLETE 2013
WILDWOOD 257 SI Playground Signature Playground - new COMPLETE 2018 *
WILLIAMS (DANIEL HALE) 261 AD New Construction Field house - new COMPLETE 2019 *
WILLIAMS-DAVIS (HATTIE KAY, IZORA) 532 SI Playground Playground - upgrade DESIGN
WILSON (FRANK) 145 SI Playground Playground - new COMPLETE 2011 *
WILSON (FRANK) 145 FR Concrete Masonry Structural Field house - concrete and masonry COMPLETE 2013
WILSON (FRANK) 145 SI Courts Tennis courts and paving - rehab COMPLETE 2015 *
WILSON (FRANK) 145 SI Spray Pool Spray feature - rehab DESIGN *
WILSON (JOHN) COMM. CTR. 1018 FR Roof Roof - rehab COMPLETE 2020
WILSON (JOHN) COMM. CTR. 1018 FR Concrete Masonry Structural Field house - concrete and structural COMPLETE 2011
WILSON (JOHN) COMM. CTR. 1018 FR Concrete Masonry Structural Masonry COMPLETE 2020
WINNEMAC 486 SI Athletic Field Batting Tunnel - new PRE-DESIGN *
WINNEMAC 486 SI Athletic Field Athletic field rehab - soccer COMPLETE 2013
WINNEMAC 486 SI Athletic Field Athletic field - rehab COMPLETE 2016 *
WINNEMAC 486 SI Athletic Field Athletic Field - rehab COMPLETE 2018 *
WINNEMAC 486 SI Landscape Tree Planting COMPLETE 2019
WINNEMAC 486 SI Playground Playground - upgrade CONSTRUCTION *
WOLCOTT (ALEXANDER) 403 AD Acquisition Expansion COMPLETE 2012
WOLCOTT (ALEXANDER) 403 SI Playground Chicago Plays! - new equipment COMPLETE 2016
WOLFE (RICHARD) 1072 SI Spray Pool Water feature - rehab COMPLETE 2012
WOLFE (RICHARD) 1072 SI Lighting Lighting - exterior COMPLETE 2012
WOLFE (RICHARD) 1072 SI Courts Slam Dunk Basketball Court - rehab COMPLETE 2012
WOLFE (RICHARD) 1072 SI Playground Chicago Plays! - new equipment COMPLETE 2015
WOOD (ELIZABETH) 316 AD Park Development Lathrop Homes Park Development (CHA) COMPLETE 2019
WOODHULL (ROSS) 1073 SI Playground Playground - resurfacing COMPLETE 2011
WOODHULL (ROSS) 1073 FR Major Rehab Transition plan - access improvements COMPLETE 2011
WOODHULL (ROSS) 1073 SI Courts Slam Dunk Basketball Court - rehab with lighting COMPLETE 2012
WRIGHTWOOD 1074 FR Swimming Pool Pool - liner PRE-DESIGN
WRIGHTWOOD 1074 SI Site Improvement Sewer main - replacement COMPLETE 2020
WRIGHTWOOD 1074 FR Swimming Pool Pool Retrofit - compliance COMPLETE 2012
66 of 67
CHICAGO PARK DISTRICT
PARK CAPITAL PROJECTS 2011-2021* As of March 1, 2021
PARK NAME
PARK
NO PROG** SUB PROGRAM PROJECT DESCRIPTION STATUS
YEAR
COMPLETE $
WRIGHTWOOD 1074 FR Swimming Pool Pool - deck COMPLETE 2016
WRIGHTWOOD 1074 SI Paving 2016 DW Paving COMPLETE 2016
WRIGHTWOOD 1074 SI Athletic Field Athletic fields - rehab COMPLETE 2019
WRIGHTWOOD 1074 FR Roof Roof PRE-DESIGN
ZATTERBERG (HELEN) 1107 SI Playground Chicago Plays! - new equipment COMPLETE 2016
** Program definitions: AD= acquisition and development, SI=site improvements, FR=facility rehab
$ Identifies projects funded in part or whole with outside grants or donations.
* Report as of March 1, 2021. The capital plan is a living document that is subject to change. Project listing includes capital projects and not general maintenance; does not include District-Wide Programs.
This document is for public information and is not auditable.