Content
•China Railway BIM applications
•Challenges & Future work
•Railway BIM standard research
• Introduction of China Railway
2
Content
•China Railway BIM applications
•Challenges & Future work
•Railway BIM standard research
• Introduction of China Railway
3
• Formerly as the Ministry ofRailway of China.
• Duty: China’s railwaynetwork construction andrailway transport organization.
• By the end of 2014, thecountry has 112,000km ofrailways
• 16,000km of High-SpeedRailway (HSR) (more thanthe half of the world's HSR)
Introduction
4
Beijing-Tianjin HSR
5
Beijing-Shanghai HSR
6
Harbin-Dalian HSR
7
China Railway BIM (CRBIM) Alliance
• The CRBIM was established in December 2013.
• Its purpose is to promote the application of BIM technology in the China railway field.
• Directing members:
8
Content
•China Railway BIM applications
•Challenges & Future work
•Railway BIM standard research
• Introduction of China Railway
9
10
Design
(2D-based)
Design
11
Station Architecture
Design
Station Structure12
Design
Station MEP
13
Anchor
Reinforcing bar
Steel frame Concrete
Design
14
Tunnel
• Traction, communication, signal, electricity
• Cooperative layout and simulation
15
4-Electric integration
Tunnel temporary works
Tunnel excavation process simulation
16Simulation&Planning
• Digital pre-assembly steel bridge construction
• Construction management based on the pre-
assembly modules
组装过程中的全桥模型
Assembly
17
Fabrication
• Integrated manufacturing of steel beam
• Data exchange between BIM models and NC machine tool G-code
18
Construction
19
• Digital construction for subgrade using BIM
• Data exchange between BIM models and construction machinery
Coordination
• Terrain, alignment, subgrade, track, bridge, tunnel, station
• Design check
• QTO
• Simulation
• Finite element analysis
20
Content
•China Railway BIM applications
•Challenges & Future work
•Railway BIM standard research
• Introduction of China Railway
21
China Railway BIM Standard
• China Railway BIM Standard is composed of three parts:
• Part 1: Railway BIM Classification Standard
• Refer to ISO 12006-2
• Was completed in December 2014.
• Part 2: Railway BIM Data Standard
• Based on ISO 16739
• A draft version was accomplished in June 2015.
• The public version was expected to be available in December 2015.
• Part 3: Railway BIM Delivery Standard
• Based on ISO 29481, started in July 2015, expected to be available in 2016.
• Led by the Third Railway Survey and Design Institute
& Tsinghua University, all direct members involved.
22
Data standard Architecture
Spatial structure
System
Physical elementAssembly
Property Set
23
component
RailwayDisciplines
Terrain
Alignment Track
Station
Tunnel
Subgrade
Overhead line
Bridge
AlignmentIfcCurveSegment2DStartPoint IfcCartesianPointStartDirection IfcPlaneAngleMeasureSegmentLength IfcPositiveLengthMeasureIfcTransitionCurve2DStartRadius IfcPositiveLengthMeasureIsCCW IfcBooleanEndRadius IfcPositiveLengthMeasureTransitionCurveTy
peIfcTransitionCurveTypeEn
um
25
IfcTransitionCurveTypeEnum{BlossCurve,ClothoidCurve,SinusoidalCurve,SinHalfWave,CosinsoidalCurve,CubicParabolas,USERDEFINE}
•Current IfcAlignment• Clothoid Curve
•China Railway Transition curve• Cubic Parabola
• Sin Half Wave
26
Track
Subgrade
27
Bridge
28
29
Tunnel
Systems of Railway
• IfcSystem• IfcRailwaySystem
• IfcRailwaySignalSystem
• IfcRailwayDrainageSystem
• IfcRailwayElectircSystem
30
Property Set for Railway
31
Name Data Type Description
ID TypePropertySingleValue/IfcLabel 股道编号
EffectiveLength TypePropertyBoundedValue/
IfcNonNegativeLengthMeasure
有效长
IsOutOfGauge TypePropertyEnumeratedValue/IfcLabel/PEnum_Ele
mentIsOutOfGauge:YES,NO
是否通行超限列车
IsElectrified TypePropertyEnumeratedValue/IfcLabel/PEnum_Ele
mentIsElectrified:YES,NO
是否是电气化线路
IsCWR TypePropertyEnumeratedValue/IfcLabel/PEnum_Ele
mentIsCWR:YES,NO
是否是无缝线路
CWRType TypePropertyEnumeratedValue/IfcLabel/PEnum_Ele
mentCWRType:WITHTEMPERATURESTRESSCWR,AUT
ODISPERSINGTEMPERATURESTRESSCWR,REGULARDI
SPERSINGTEMPERATURESTRESSCWR
无缝线路类型。分为温度应力式、自动
放散温度应力式、定期放散温度应力式。
LengthOfCWR TypePropertyEnumeratedValue/IfcLabel/PEnum_Ele
mentLengthOfCWR:ORDINARYCWR,CWRWITHINSECT
ION,CWRWITHWELDEDTURNOUT
按长轨条长度区分的无缝线路类型。分
为普通无缝线路、区间无缝线路、跨区
间无缝线路。
eg. Pset_TrackCommon
Content
•China Railway BIM applications
•Challenges & Future work
•Railway BIM standard research
• Introduction of China Railway
32
Challenges and Future work
• To continue the development of the Railway BIM standard
• Following the principles of the international standard
• Integration with the IfcAlignment, IfcRoad, IfcTunnel and IfcBridge
• Hope to contribute to the development of bSI as well as ISO standards
• To promote Railway BIM software development
• Hope the major software vendors to support the CRBIM standards
• To develop BIM software to meet the needs of the China railway
• To continue to carry out BIM applications in China
• To further explore the applications of BIM technologies in various engineeringconditions
• To develop the management system and implementation standards of RailwayBIM
33