chinar shipping and infrastructure (i) pvt. ltd.-profile-final

Upload: vineetaggarwal

Post on 12-Oct-2015

120 views

Category:

Documents


0 download

DESCRIPTION

We are into business of Operations and Management of shipping vessels + Dredging in Inland water ways + Dredging in Ports + Construction of Buildings, Railways, Tunnels, Roads, Highways, Bridges, Water treatment plants, Water pipeline laying etc.

TRANSCRIPT

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    1/31

    Chinar

    Shipping &Infrastructure (India) Pvt. Ltd.An ISO 9001:2008 Company

    REGISTERED ADDRESS:Chinar Shipping & Infrastructure (I) Pvt. Ltd.

    410 Bharat Chambers, 52 Baroda Street,

    Carnac Bunder, P. D' Mello Road,Mumbai 400 009.

    TELEPHONE: +91 22 4213 8130 / 21

    FAX : + 91-22-4213 8131

    EMAIL:[email protected]

    Website: -http://chinarshippinginfratech.com/

    Regional Offices:-New Delhi

    Uttar Pradesh

    Bihar

    mailto:[email protected]:[email protected]:[email protected]://chinarshippinginfratech.com/http://chinarshippinginfratech.com/http://chinarshippinginfratech.com/http://chinarshippinginfratech.com/mailto:[email protected]
  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    2/31

    Chinar Shipping and Infrastructure (I) Pvt. Ltd. Established in 2002, and incorporated in 2006,

    Chinar is an ISO 9001-2008 IRQS Certified company. Our service oriented outfit is registeredwith D G Shipping, Government of India (RPSL No.: RPSL-MUM-118) & registered shipping

    agency in Mumbai Port Trust (Lic. No. C0282).

    Chinar apart from its O & M contracts has expanded its operations in the field of Dredging

    and Infrastructure developments works, and is a reputed organization in handling dredging

    activities in India and overseas along with Civil construction works.

    We are one of the leading O & M contractors in the field of dredging and ship management.

    Our dedicated team of engineers, ex naval officers and master mariners have achieved the

    goals as targeted by our esteemed clients. The executed contracts and ongoing projects

    under our management is the proof of our dedication and commitments towards the

    satisfaction of our clients.

    Companys Profile

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    3/31

    Chinar Shipping and Infrastructure (I) Pvt Ltd aims to be the leader in the field of dredging, civil

    engineering and Infrastructure works.

    We are committed to achieving consistent quality works and believe in making the extra effort to

    provide superior operating results and above all, delivering on time to our customers.

    We continuously upgrade, maintain and acquire equipment to the latest technology to increase

    productivity and improve cost effectiveness as to satisfy the expectations of customers,

    shareholders and employees.

    We believe and commit fully to the highest standards of safety, health and environmental

    responsibility

    CORE VALUES

    We ensurecompliance with

    agreedcommitments

    Honesty

    &

    Dedication

    Mission

    CORE VALUES

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    4/31

    We would like to introduce our company Chinar Shipping and Infrastructure (India). Pvt. Ltd an,

    ISO 9001:2008 CertifiedInfrastructure Company as one of the fastest growing enterprise in the

    field of Dredging, Infrastructure developments and Technical management. We are proud to be

    associated to some of the best known Government organization & companies in the industry. As

    registered RPS License holders with D.G. Shipping we have been providing technical support to

    various ship owners and ship management companies.

    About Us

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    5/31

    We have adequate number of HEME and Dredgers under our management for prompt and

    efficent service.

    CSD - Ravikiran Beaver 1200 CSD - ASR-3 - American 300 Survey boats, wooden boats

    List of Equipment with Chinar and its sisterconcern

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    6/31

    We feel proud to be associated with. Shipping corporation of India (SCI) & Oil and Natural Gas

    Corporation of India (ONGC) for the past 3 Years. We have served them in their offshore

    activities.

    Chinar Shipping has successfully completed dredging projects as an O&M contractor for Norsea

    Global Offshore Pvt Ltd.Singapore in 2010; we have operated one of the largest Cutter Suction

    Dredger CSD Portofino a 3000 M3dredger for the three years at different dredging projects in

    India and Overseas.

    License Awarded BOARDS UNDER WHOM CHINAR IS REGISTERED

    Registered with D G

    Shipping,

    Government of

    India

    RPSL No.:

    RPSL-MUM-118

    RegisteredShippingagency in

    Mumbai PortTrust

    Lic. No. C0282

    Awarded byIndianRegistrar ofQualitySystems

    ISO 9001:2008

    Awarded bySmall ScaleIndustriesassociation

    Memorandumno-27232200998

    DELHI JAL

    BOARD,Govt of

    NCT,Delhi

    DJB

    MAHARASHTRA

    MARITIME

    BOARD,Govt Of

    Maharashtra

    MMB INLAND

    WATERWAYS

    AUTHORITY OF

    INDIA, Ministry

    of Shipping,GOI

    IWAI

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    7/31

    0

    2000

    4000

    6000

    8000

    10000

    12000

    2010-11 2011-12 2012-13 2013-14 2014-15(Projected)

    In Lacs

    F inancial turn over

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    8/31

    Total Achieved Dredging Quanti ty In River Ganga NW-01

    NAME OF CSD Achieved dredgin g Quanti ty in M3

    MAHANANDA 405425.55

    ALAKNANDA 536406.81

    JALANGI 534628.79

    TAPI 602973.49

    SHIPRA 309682.92

    17%

    23%

    22%

    25%

    13%Mahananda

    Alaknanda

    Jalangi

    Tapi

    Shipra

    Milestone

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    9/31

    We consider ourselves as young and budding organization, small, but abundant with talent

    and enthusiasm and a desire to work other such organizations to help each other to achieve

    their individual goals.

    We believe in our technical skills and share this knowledge to entities, so that they stay

    focused on their principal objectives and concentrate on what they are better at doing

    Project Management and Executionof contract for National Waterways 1, 2 & 3 dredging

    projects worth INR 63 Crores through site offices located in Guwahati & Cochin, Contract

    awarded By Inland Waterways Authority of India under Ministry of Shipping, GOI.

    Dredging of River Yamuna Pondage area near Wazirabad, DelhiJal Board water treatment

    plant worth INR 14.96 Crores awarded by DJB, Govt of NCT Delhi.

    Supervising the Infrastructure project Commercial Complex building and road projects

    awarded by Gorakhpur Development Authority, Govt of UP.

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    10/31

    Chinar is a professional and experienced organization covering the Dredging, construction,

    engineering, rail, mining & Infrastructure sector.

    Our consultants & Engineers are experts within their field. We know our clients and most

    important understand the requirements.

    Our project coordinators work round the clocks to ensure coordination with the clients and

    for timely completion of every project.

    There is no institute in India producing manpower for dredging industry.

    With that View Company selected 12 GETs (Graduate Engineer Trainees) from different

    colleges.

    With the emphasis that these young Engineers are trained to maintain & operate thedredger.

    We take pride to mention that this is the 1stever scheme devised by any organization inIndia.

    Why Chinar?

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    11/31

    1. DREDGING

    (a) Dredging & Reclamation

    (b) Maintenance Dredging

    (c) River Dredging

    (d) Dredging & Excavation of Canals and Lakes

    2. CIVIL CONSTRUCTION & INFRASTRUCTURE DEVELOPMENT

    (a) Building Construction

    (b) Drainage System

    (c) Railways Earthwork, Blanketing & Track Linking

    (d) Construction of Canals

    (e) Road Construction

    (f) Minor and Medium Bridges

    (g) ROB (Rail Over Bridges)

    (h) Excavation & Trenching

    3. O&M (Operation & Maintenance) of

    (a) Power Plants

    (b) Dredgers

    (c) Offshore supply Vessels

    (d) Manning & Management of Vessels

    OUR CORE BUSINESS

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    12/31

    Ongoing Projects

    The major work that is being carried out by M/s Chinar Shipping & Infrastructure (India) Pvt. Ltd.

    on the National Waterways No. - 1, 2 & 3, awarded by Inland Waterways Authority of India

    (Ministry of Shipping). We have been handling the total dredging operations required by IWAI.

    By virtue of dredging on these National Waterways today we are one of the most experienced

    organizations in India to carry out dredging work on any of the river and waterways. We have

    Desc ri t io n Of wo rk:

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    13/31

    well experienced staff in dredging these rivers who understand the operations and technical

    aspects of dredging in rivers.

    The priority and key focus of the project on National waterways -1 (River Ganga) is to maintain

    the navigational channel for cargo, and coal movement for NTPC power plants located at Farakka

    (W.B.), Kahalgaon, and Barh (Bihar) to accomplish the same, Chinar has been dredging at

    different locations between Haldia , Patna & Varanasi to maintain the minimum LAD for safenavigation. The company with its skilled manpower and dedicated management team has been

    able to dredge a quantity of 2.38 Million cubic meters since 2012.

    IWAI : NW-01

    IWAI :

    NW-02

    IWAI :NW-03

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    14/31

    Delhi Jal Board under Government of NCT has awarded M/s Chinar Shipping the contract for

    dredging 7,77,000 Cubic meter of silt and sand at their water intake channel located at

    Wazirabad so that water shortage problem can be resolved during summers. We were given

    Wazirabad water intake area which caters water need of 30% Delhis population. The dredging

    has been successfully completed before the start of the flood season. The work is extended for

    another one season to maintain the required depth for the water intakes.

    Chinar has completed 2 years of successful dredging operations at different captive ports and

    jetties for Maharashtra Maritime Board, Mumbai.

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    15/31

    The three WTPs located at Wazirabad, Chandrawal and Okhla are supplied with raw water fromWazirabad intakes.

    During closure of Moradnagar Conduit, raw water is also lifted for Bhagirathi and Sonia Vihar

    Water Treatment Plant.

    As a natural phenomenon, silt travels along with water especially during monsoon, resulting in

    reduction of depth of water considerably in the pondage area.

    Over a period of time large quantity of silt/sand got deposited within pondage area, thereby

    reducing depth of water by over a meter.

    No dredging has been done since last six years.

    Deposited silt needs to be removed be mechanical means to retrieve the holding capacity of the

    pondage.

    Pondage acts as the buffer against the variation and release of water by Haryana in non-

    monsoon period and also it takes care of the requirement for few days in emergency condition.

    Backgroun d of The Scheme

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    16/31

    AREA FOR WEED REMOVAL

    AREA TO DREDGE

    AREA FOR WEED REMOVAL

    DETAILED SATELLITE IMAGE OF ENTIRE SITE

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    17/31

    BATHEMETRIC CHART OF THE AREA SURVEYED PRIOR TO

    THE COMMENCEMENT OF PROJECT (OCT 2013)

    Depths are reduced to datum

    & spot levels are with the

    reference to Datum

    The Bench mark value at

    Yamuna East Bank to levels

    +210.1 m with reference to

    MSL

    CD=205.47m - MSL

    Bottom=201.47m - MSL

    < - -1.0 M

    -1.0 - -0.99 M

    0.0 - 0.99 M

    1.0 1.99 M

    2.0 - 2.99 M

    3.0 - 3.99 M

    > = 4.00 M

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    18/31

    WEED INFESTED AREA ON WAZIRABAD SIDE

    WEED REMOVED/UPROOTED AREA ON WAZIRABAD SIDE

    WEEDS WERE PRESENT

    WEEDS WERE REMOVED

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    19/31

    L&T WATER INTAKE BEFORE DREDGING

    DREDGERS IN OPERATION

    DREDGER RAVI KIRAN

    IN OPERATION

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    20/31

    The company also provides ship management, port operations, chartering services and

    undertakes complete end to end operation and management contracts. We ensure every

    necessary measure required to display results with zero percent hurdles and accidents, thus

    providing additional comfort to the clients in the industry.

    The company has maintained high standards of Key Personnel from the field of dredging, marine

    and Infrastructure. We have maintained a dedicated and skilled team of Civil, Mechanical and

    Electrical engineers who are permanent employee of the company.

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    21/31

    OPEN DISCHARGE

    OUR DREDGING STAFF AT WORK

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    22/31

    The rapid growth and requirement in the infrastructure development of the country inspired

    Chinar to venture and expand into different sectors. The company formed Northern Express

    Infrastructure Pvt. Ltd a 100% subsidy company of Chinar. Northern has been actively involved in

    construction of Government buildings, roads and irrigation projects. The company is registered

    with Gorakhpur development authority (GDA) U.P.Irrigation under A class. The company

    started with construction of a small building for a limited company and slowly moved with its

    growth.

    Chinar was awarded with work order from TATA- ALDESA JV for earth work, blanketing and

    construction of minor bridges on Ch No 1090-1115 (25 KM) for the. Dedicated freight Corridor

    Corporation of India (Eastern corridor) under Indian Railways. The project is underway and the

    progress is to the satisfaction of the client. A dedicated team of civil engineers with vast

    experience are working round the clock for timely execution of the project.

    Civil Construction and I nf rastructure Work

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    23/31

    TATA / ALDESA (JV) EASTERN DEDICATED FREIGHT CORRIDOR PROJECT

    SKETCH OF REQUIRED BLANK ETING WORK

    ACTUAL SITE PHOTOGRAPHS OF TATA / ALDESA PROJECT

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    24/31

    NAME OF WORK Earth Work/Blanketing of track formation for Eastern

    Dedicated Freight Corridor

    Formation for Heavy Axle Load for Eastern DFC including b ox

    culver ts and minor br idg es.

    3

    DEDICATED FREIGHT

    CORRIDOR NETWORK

    MUMBAI

    DELHI

    CHENNAI

    KOLKATA

    LUDHIANA

    VIJAYAWADASanctioned projects

    Unsanctionedprojects

    VASCO

    DELHI

    LUDHIANA

    MUMBAI

    DELHI

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    25/31

    COMPANY NAME OF WORK OWNER DATE OF

    START

    COST OF

    PROJECT

    STATUS OF

    PROJECT

    I.W.A.I NOIDA DREDGING AT

    VARIOUS STRECHES

    OF RIVER GANGA(NW1) & RIVER

    (NW2)

    GOVERNMENT OF INDIA 18.10.2011 INR54,00,00,000

    WORK INPROGRESS

    I.W.A.I NOIDA DREDGING ATVARIOUS STRECHES

    OF KOLLAM &UDYOGMANDALCANALS OF NW 3

    GOVERNMENT OF INDIA Feb 2013 INR5,18,10,672

    WORK INPROGRESS

    I.W.A.I NOIDA MANNING,

    OPERATION &MAINTENANCE OF

    SURVEY LAUNCHESPATNA-ALLAHABADSTRETCH NW-1

    GOVERNMENT OF INDIA Feb 2013 INR3,39,02,569

    WORK IN

    PROGRESS

    I.W.A.I NOIDA MANNING,OPERATION &MAINTENANCE OFSURVEY LAUNCHES

    DHUBRI-PANDUSTRETCH NW - 2

    GOVERNMENT OF INDIA JUN 2013 INR2,73,16,923

    WORK INPROGRESS

    MAHARASHTRA

    MARITIME

    BOARD

    MANNING,OPERATION & TECH.

    MANAGEMENT OF 2CSD ATMAHARASHTRA

    MAHARASHTRAMARITIMEBOARD

    FEB2012 INR6,00,00,000

    WORK INPROGRESS

    SCI MANNING GOVERNMENT OF INDIA OCT 2011

    INR28,80,00,000

    WORK INPROGRESS

    SICAL / CHCC RASALZOUR,

    JUBAILK.S.A.

    GOVERNMENT OF

    SAUDI ARABIA

    June 2008 INR6,00,00,000

    Completed July 2009

    DREDGING & MANNING PROJECTS BY CHINAR SHIPPING

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    26/31

    DELHI JAL BOARDdredging of silt fromriver yamuna near

    intake at wazirabadwater works

    DELHI JAL BOARD Aug 2013 INR 40,00,00,000

    WORK INPROGRESS.(IN JV WITH ASRDREDGING

    SERVICES PVTLTD)

    SICAL / MARG MargKaraikal Port MARG PORT March 2010 INR 3,50,00,000 Completed JAN 2011

    TATA ALDESA

    EARTHWORKINVOLVINGBLANKETING OFSTRETCH AND

    CONSTRUCTION OF

    MINOR BRIDGES

    DEDICATED FREIGHTCORRIDOR,MINISTRYOF RAILWAYS

    APRIL2014

    INR47,00,00,000

    WORK INPROGRESS

    CLIENT/COMPANY CONTACT PERSON DESIGNATION CONTACT DETAIL

    INLAND WATERWAYS AUTHORITY OFINDIA

    Mr. S. Dandapat Director (P & M) +919717622733

    DELHI JAL BOARD Mr. Yogendra Singh AE (Civil) 011-23681009

    MAHARSHTRA MARITIME BOARD Mr. S. Shinde Chief Surveyor &Marine Engineer

    +919819239727

    THE SHIPPING CORPORATION OFINDIA

    Mr. Phillip Mathews VP 022 2283 2671.

    TATA/ ALDESA(JV) Mr. Kamal Kishore

    Singh

    Chief Project Manager

    Our Major ongoing Projects

    Civ i l construct ion & Infrastructure Pro ject by Chinar

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    27/31

    OUR CLIENTS

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    28/31

    EPF ESIC

    Fooding Accomodation

    Travelling

    Allowance

    Connectivity of

    communication

    Bonus&Increment

    Healthyenvironmentof Office

    Office Amenities

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    29/31

    Chinar Shipping & Infrastructure (India) Pvt Ltd, is m anaged by pro fessional ly eff ic ient Board ofDirectors

    MANAGING DIRECTOR

    Our board of directors

    Managing Director

    A.K TRIPATHI

    Director

    R.Dubey

    Director

    J.P Sharma

    Director

    Yogesh Sharma

    Executive Director

    Nitish Tripathi

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    30/31

    Mr. Vineet Agarwal-President (Technical)

    An accomplished and resourceful, self-motivated professional, with masters in engineeringpossessing over twenty five calendar years (more than 38 years based on man hours) of immaculateinternational experience in project execution, project management, claims management, tenderpreparation, tender submission, structural design, soil testing etc.

    Mr. Rajeev Chawla-President (Business Development)-MastersDegree in civil engineeringAccomplished and integrity driven professional offering over 30 years of experience from nationaland multinational organizations, in the field of ZERO TOLARENCE WATERPROOFINGSYSTEMS,

    CONSTRUCTION CHEMICALS and MECHANICAL SPLICING. CUT N BEND OF REBARS, BBS DESIGNCENTRE. CONSTRUCTION MANAGEMENT AND BUSINESS DEVELOPMENT, Expertise in Setting up ofCUT N BEND Plant and BBS Design Centre.

    Prof Dr.S.M Mishra-(Dredging Head)Accomplished and integrity driven professional offering over 35 years of experience from nationaland multinational organizations in river conservation dredging, and preparation of DPR`S for stateGovt and other organisations

    Mr. Anil Mani Tripathi Executive Director (Projects-TATA ALDESA)Mr. Tripathi is an Executive Director (Projects-TATA ALDESA) of Chinar Shipping & Infrastructure

    (India) Pvt Ltd. A results driven professional with over 23 years of wide experience in Project

    Implementation mainly in Steel Plant, Cement Plant, P&O Ports, Metro Rail, Highway Projects, OFC

    Projects and Energy Sector. He holds a strong track record of success in spearheading and

    implementing several Projects across India.

    Our team of TechnocratsMr Vineet Aggarwal - Director (Technical) - Master's Degree in Civil Engineering

    Mr Rajeev Chawla - Director (Business Development) - BE

    Prof. Dr. S M Mishra - Dredging Head

    Mr Anil Mani Tripathi - Executive Director (TATA ALDESA Project)

  • 5/22/2018 Chinar Shipping and Infrastructure (I) Pvt. Ltd.-profile-final

    31/31

    We are proud of our com petent work force and their s t rong comm itments

    Capt.PK Srivastava Chief Operation Officer

    Ms Reena Kanani Chief financial Officer

    Mr.Ajay Tiwari DGM-Finance & Accounts

    Ms Geeta Chawda GM-Human Resources

    Mr.Umacharan Legal Advisor

    Mr.R.S Peshwani Marine Engineering Head

    Mr.R.M Shukla Chartered Accountant

    Mr.Aniket Dwivedi Project Co-coordinatorMr.Anshuman Dubey Business Development

    Our Adm inistrat ive Staff

    http://www.oceansparkle.com/about-team.html