µCHP WP4 Progress Update Expert groups formed at First meeting of expert groups (Month 6) Blue highlight: Attending first annual meeting N o. 1 2 3 Subject Technologies Integration Fuels Com pany Acronym ContactPerson Com pany Acronym ContactPerson Com pany Acronym ContactPerson Leader ISE Dr.BenoitSicre Dr.-Ing.Andreas Bühring IUAV Prof.Fabio Peron DGS M r.Jan Kai Dobelm ann M r.GunnarBöttger M em ber ECN M r.Sergio Herm an FEE M r.Eberhard O ettel Dr.-Ing.Ingo Rickert Gerog W agner-Lohse BTG M r.Douwe van den Berg M em ber ISET Jan M üller EAT M rs.Yvonne Dickson STSL Dr.Duncan Child M em ber GAIA M r.Jari Hiltunen ARM INES Prof.François-Pascal Neirac CRES Dr.Nicolas Lym beropoulos M em ber BEAM A M r.John Parsons FO RCE M r.JesperCram er M r.M ads B.Nielsen

Upload: christian-robbins

Post on 19-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ΜCHP WP4 Progress Update Expert groups formed at First meeting of expert groups (Month 6) Blue highlight: Attending first annual meeting

µCHP WP4 Progress Update

Expert groups formed at First meeting of expert groups (Month 6)

Blue highlight: Attending first annual meeting

No. 1 2 3

Subject Technologies Integration FuelsCompany Acronym

Contact Person Company Acronym

Contact Person Company Acronym

Contact Person

Leader ISE Dr. Benoit Sicre Dr. -Ing. Andreas Bühring

IUAV Prof. Fabio Peron DGS Mr. Jan Kai Dobelmann Mr. Gunnar Böttger

Member ECN Mr. Sergio Herman FEE Mr. Eberhard Oettel Dr.-Ing. Ingo Rickert Gerog Wagner-Lohse

BTG Mr. Douwe van den Berg

Member ISET Jan Müller EAT Mrs. Yvonne Dickson STSL Dr. Duncan ChildMember GAIA Mr. Jari Hiltunen ARMINES Prof. François-Pascal Neirac CRES Dr. Nicolas LymberopoulosMember BEAMA Mr. John Parsons FORCE Mr. Jesper Cramer

Mr. Mads B. Nielsen

Page 2: ΜCHP WP4 Progress Update Expert groups formed at First meeting of expert groups (Month 6) Blue highlight: Attending first annual meeting

1. Technologies (ISE)

• Database structure defined• Database programmed in MS Excel• Database co-ordinated with WP3 database• User-friendly input form• Database send to all expert group members

for more data

• Deliberations of Potsdam meeting send to WP4-leader

Page 3: ΜCHP WP4 Progress Update Expert groups formed at First meeting of expert groups (Month 6) Blue highlight: Attending first annual meeting

1. Technology – Database structure

State of progress Core tech Power gen Fuel

Proposal submitted Fuel cell Any rotating Wood logProposal accepted ICE (otto) synchron Wood pelletsProject launched ICE (diesel) asynchron Wood powderProject completed Stirling engine linear Wood chips

Turbine (steam) electrochemical CornTurbine (ORC) Other StrawTurbine (gas) Bio-oilCombined cycle Landfill gasOther Sewage gas

HydrogenGeothermalSolar energyCoalPetrochemicalNatural GasOther

Fuel processor

Burner Cooler Flue gas cleaning Know-How

Gasifier Gaseous Water Cyclon Market researchReformer Underfeed stoker Molten salt Electric filter System studyShifting Stoker-fired Air Tissue filter Techno-economicsPyroliser Other Other Quenching Fundamental researchOther Other Field test

SimulationPrototype developmentOther

Page 4: ΜCHP WP4 Progress Update Expert groups formed at First meeting of expert groups (Month 6) Blue highlight: Attending first annual meeting

1. Technology – Input forms

Page 5: ΜCHP WP4 Progress Update Expert groups formed at First meeting of expert groups (Month 6) Blue highlight: Attending first annual meeting

2. Integration (IUAV)

• Database structure defined• Database programmed in MS Excel• Input from IUAV• Database send to all expert group members

for more data

• Deliberations of Potsdam meeting send to WP4-leader

Page 6: ΜCHP WP4 Progress Update Expert groups formed at First meeting of expert groups (Month 6) Blue highlight: Attending first annual meeting

2. Integration – Database structure

Start date

End date

Title

Acronym

Organization name

Contact person

Address

Tel

Fax

Email

Objectives

Page 7: ΜCHP WP4 Progress Update Expert groups formed at First meeting of expert groups (Month 6) Blue highlight: Attending first annual meeting

2. Integration – Database records

Title Acronym

Distributed Generation With High Penetration Of Renewable Energy Sources DISPOWER

Thematic Network on Combined Heat and Power CHAPNET

European Network for Integration of Renewable Sources and Distributed Generation ENIRDG NET

Large scale integration of micro-generation to low voltage grids MICROGRIDS

Policy And Regulatory Roadmaps For The Integration Of Distributed Generation And The Development Of Sustainable Electricity Networks

SUSTELNET

Cluster pilot project for the integration of RES into European energy sectors using hydrogen RES2H2

Wind Power Integration in a Liberalised Electricity Market WILMAR

Development of Semi-transparent CIS Modules for Facade Applications CIS FACADE MODULE

Design guidelines for the efficient integration of Renewable RESSET

A Planning Tool for the Optimal Regional Integration of Renewable Energy Sources OPTIRES

High performance PV in buildings HIPERPB

Integration of Renewable Energy Sources and Distributed Generation into the European Electricity Grid IRED

Investigation on Storage Technologies for Intermittent Renewable Energy INVESTIRE

Distributed Intelligence in Critical Infrastructures for Sustainable Power CRISP

Distributed Flexible AC Transmission Systems DGFACTS

Page 8: ΜCHP WP4 Progress Update Expert groups formed at First meeting of expert groups (Month 6) Blue highlight: Attending first annual meeting

3. Fuels (DGS)

• Database structure defined in Potsdam• Database not programmed

• Deliberations of Potsdam meeting not send to WP4-leader

• DGS will deliver after October 10th

Page 9: ΜCHP WP4 Progress Update Expert groups formed at First meeting of expert groups (Month 6) Blue highlight: Attending first annual meeting

General

• D6: Report from expert groups deliberations (Month 8)– Not completed (missing input)– Deliberations from first expert group meeting will be

delivered before November 2005

• D10 : Second co-ordination seminar (Month 12)– Takes place Thursday 9:00 – 12:00

• D14 : Second meeting of expert groups (Month 18)