Offshore grids in the North Sea
15th December 2009
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
2/27
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
3/27
Dealing with wind intermittancy
0 1000 2000 3000 4000 5000-0,4
-0,2
0,0
0,2
0,4
0,6
0,8
1,0
Co
rrelationcoefficient(lag=0hours)
Distance [km]
Geographical DispersionEffect
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
4/27
Geographical nature of renewables
Source: Trans-CSP 2006
TWh
TWh
TWh
TWh
TWh
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
5/27
Supergrid Macro benefits
Facilitation of a large,sustainable, clean,
indigenous, secure,
competitive source of
energy
Aggregation and
smoothing of output (thewind is always blowingsomewhere)
Creation of singleelectricity market in
Europe
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
6/27
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
7/27
Resource - average wind speeds offshore and onshore
Source: Ris National Laboratory
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
8/27
Resource North Sea water depths
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
9/27
Resource Proximity to demand
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
10/27
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
11/27
Spur connections ...
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
12/27
Spur connections ... get longer ...
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
13/27
EnvironmentallySensitiveArea
Spur connections ... get longer ... and larger?
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
14/27
Connections can be combined
EnvironmentallySensitiveArea
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
15/27
Or where there is constraint ...
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
16/27
Or where there is constraint ... create bypass
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
17/27
Or where there is constraint ... create bypass
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
18/27
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
19/27
But most significant benefits come from ...
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
20/27
... Interconnection
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
21/27
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
22/27
Example 1 Offshore hubs
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
23/27
Example 2 Offshore grids to avoid onshore constraints
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
24/27
Example 3 Interconnection: areas where interconnected
network makes sense in the North Sea
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
25/27
Example 3: Close-up on UK waters
-
8/9/2019 Chris Veal Transmission Capital 091215_CSP Meeting
26/27
Example 3 Round 3: Dogger Bank
-