christiane egger
DESCRIPTION
Creating a market place for energy efficiency. Christiane Egger. O.Ö. Energiesparverband Landstraße 45 A-4020 Linz, Austria T: +43-732-7720-14380 [email protected] www.esv.or.at. ESV-Design. 051129en. Oberösterreich - Upper Austria. Capital:Linz Population:1.38 mio Area:12.000 km² - PowerPoint PPT PresentationTRANSCRIPT
Christiane EggerChristiane Egger
O.Ö. Energiesparverband
Landstraße 45A-4020 Linz, AustriaT: [email protected]
Creating a market place
for energy efficiency
Creating a market place
for energy efficiency
ESV-Design 051129en
ESV-Design 051129en
Oberösterreich - Upper AustriaOberösterreich - Upper Austria
Capital: LinzPopulation: 1.38 mioArea: 12.000 km²GNP: 30.400 mio €Final energy cons.: 273 PJ; 33 % renewables (93 PJ)Unemployment: 4.4 %economic activities: industry, service sector, tourism,
25% of the Austrian exports
Energy Action Plan of Upper AustriaEnergy Action Plan of Upper Austria
1994 - 1999• 30 % renewable energy (14 % hydro, 14 % biomass, 2 % solar)
• energy consumption in new housing reduced by 30 %• 15,000 jobs
2000 - 2010• double biomass & solar• increase energy efficiency by 10 %
Energy Efficiency Programme• implements the planned "Energy Service Directive"• 1% energy saving/year• 1.5% for the public sector
ESV-Design 051129en
O.Ö. EnergiesparverbandO.Ö. Energiesparverband
Objectives• Energy Efficiency• Renewable Energy Sources• New Technologies
• Information and public awareness
• Energy advice
• Events & publications
• European projects
• Energy certification for buildings
• Training
• Third party financing
• Research and pilot projects
• OEC - green energy network
Services
Organisation• Regional Energy Agency• set up in 1991 • Services for private
households, public bodies & businesses
• Member of the European networks (OPET, FEDARENE, EUFORES)
ESV-Design 051129en
Towards Sustainable Buildings in Upper Austria
Towards Sustainable Buildings in Upper Austria
Energy performance indicator Energy certificate
Subsidy programmes
Legal measuresAdvice & information
Training & education
In Austria, the regions are responsible for the implementation of the Buildings Directive.
ESV-Design 051129en
Energy Performance IndicatorEnergy Performance Indicator
fuel consumption:e.g. 3l/100km
energy consumption:e.g. 45 kWh/m²,year
ESV-Design 051129en
The Upper Austrian Energy Performance CertificateThe Upper Austrian Energy Performance Certificate
• Issued as part of funding programme since 1993
• Legal obligation since 1999
• 40,000 certificates issued by O.Ö. Energiesparverband since 1993
• Further development until 2006
ESV-Design 051129en
Towards Sustainable Buildings in Upper Austria
Towards Sustainable Buildings in Upper Austria
Energy performance indicator Energy certificate
Subsidy programmes
Legal measuresAdvice & information
Training & education
In Austria, the regions are responsible for the implementation of the Buildings Directive.
ESV-Design 051129en
Building Trends in Upper AustriaBuilding Trends in Upper Austria
"pas
sive
hou
se" 2
005
"low
ene
rgy
hous
e" 1
999
"ene
rgy
effic
ient
hous
e" 1
997
"ene
rgy
effic
ient
hous
e" 1
995
"ene
rgy
effic
ient
hous
e" 1
993
lega
l thr
esho
ld 1
999
lega
l thr
esho
ld 1
994
exis
ting
build
ing
stoc
k
150
110
9075 70 65 60
50
30 10
0
20
40
60
80
100
120
140
160
kWh/m²,a
min
imum
per
form
ance
requ
irem
ents
200
5"lo
wes
t ene
rgy
hous
e" 2
005
ESV-Design 051129en
Results Sustainable housing programme1993-2004Results Sustainable housing programme1993-2004
• 40,000 homes (new & renovation)
• calculation of the energy performanceindicator ("Energiekennzahl")
• individual energy certificate
• individual energy advice session
• 7 million m²
• 285 mio. kWh energy savings/year
• average energy indicator:- 2001 (4,150 homes): 65 kWh/m²- 2004 (5,700 homes): 54 kWh/m²- 2005 (so far): 52 kWh/m²
ESV-Design 051129en
Third Party Financing ("Contracting")Third Party Financing ("Contracting")
ESV-Design 051129en
time
ene
rgy
cost
s
befo
re in
vest
me
nt energy costreduction
afte
r in
vest
men
t
contract endcontract start
refinancing investment
ene
rgy
cost
s
• existing economic energy efficiency potential
• owner can not/does not want to invest
• ESCO makes energy efficiency investment
• investment is paid back over contract period
ESV-Design 051129en
How to create a regional/local TPF market?How to create a regional/local TPF market?
ESCOs: advice & training
Support thedecision making
process
Clients: advice for projects
General promotion of the instrument
ESV-Design 051129en
The Upper Austrian TPF ProgrammesThe Upper Austrian TPF Programmes
• interesting principle, but no market development by itself
• promotion & advice to clients and ESCOs & (small) subsidy
• municipalities & one type of TPF only
• more than 100 projects realised
• more than 15 ESCOs active in the region
ESV-Design 051129en
Examples of TPF ProjectsExamples of TPF Projects
Energy performance contracting in Freistadt• 7 public buildings retrofitted• 24 % reduction of energy costs• savings of 66,205 €/a
Energy efficient street lighting in Gunskirchen• Total investment: 138,931 Euro• Guaranteed savings of 20%• Reduction of energy consumption: 24,615 kWh/a
Energy performance contracting company Acamp• Total investment: 380,200 Euro• Guaranteed savings of 71,500 Euro/a• Reduction of energy consumption: 809,000 kWh/a
1 - 3 March 2006Wels/Austria
Topics:▌Energy Efficiency Conference▌Green Electricity▌Renewable Heating & Cooling▌European Pellets Forum▌Green Energy Business
www.wsed.atwww.wsed.at
Creating an energy efficiency market…Creating an energy efficiency market…
• takes time!
• much faster if a mix of policy instruments is used ("stick & carrot & tambourine")
• information, information, information!
• address demand for & supply of energy efficiency products & services
• change is possible!
ESV-Design 051129en