CIAP GUIDELINES TO DETERMINE FILIPINO CAPABILITY IN UNDERTAKING SPECIFIC REQUIREMENTS FOR CONSULTING SERVICES AND/OR CONSTRUCTION OF INFRASTRUCTURE PROJECTS Section 1. Purpose and General Coverage 1.1 These guidelines are being issued pursuant to Section 6.1 of the Implementing Rules and Regulations (IRR) of Executive Order No. 278, Series of 2004, entitled "Prescribing Guidelines for Project Loan Negotiations and Packaging of Government Foreign-Assisted Infrastructure Projects," for the purpose of providing the procedure and criteria to determine sufficiency of Filipino capability in undertaking specific requirements in consulting services and/or construction of infrastructure projects. Section 2. Definition of Terms 2.1 For the purpose of these guidelines, the following terms or words or phrases shall mean or be understood as follows: a) Appropriate Authorities - refers to the head of the procuring entity defined in the IRR-A of RA 9184 as: (i) the head of the agency or body, or his duly authorized official, for national government agencies (NGAs) and the constitutional commissions or offices, and branches of government; (ii) the governing board or its duly authorized official, for Government-Owned and/or -Controlled Corporations (GOCCs), Government Financial Institutions (GFIs), and State Universities and Colleges (SUCs); or (iii) the local chief executive, for Local Government Units (LGUs). Provided, however, that in an agency, department, or office where the procurement is decentralized, the Head of each decentralized unit shall be considered as the head of the procuring entity subject to the limitations and authority delegated by the head of the agency, department, or office. b) Project Appraisal Stage - is one of the stages in project preparation after the approval of the project by the NEDA Investment Coordination Committee (ICC) and prior to loan negotiations. It starts with the submission of the approved project to the International Financing Institutions (IFI) for appraisal and eventual loan financing. It is at this stage where the IFI reviews and confirms the feasibility and readiness of the project for implementation. This stage covers the discussions with the IFIs and the appropriate authorities on project description, its cost, financing to be made by the IFI and GOP, schedule, implementation arrangements and conditions to be made before final negotiations. c) Project Preparation Phase - this phase is initiated once a project is identified. It is a process which involves the refinement of the elements described in the identification phase and includes all steps necessary to bring the project to the stage of appraisal, which consists of the feasibility study. Generally, project preparation begins with a description of project objectives, identification of principal issues, and the setting up of a timetable for the different phases of the development cycle. This phase covers the full range

Upload: phungduong

Post on 11-May-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

CIAP GUIDELINES TO DETERMINE FILIPINO CAPABILITY IN UNDERTAKING SPECIFIC REQUIREMENTS FOR CONSULTING SERVICES AND/OR

CONSTRUCTION OF INFRASTRUCTURE PROJECTS

Section 1. Purpose and General Coverage

1.1 These guidelines are being issued pursuant to Section 6.1 of the Implementing Rules and Regulations (IRR) of Executive Order No. 278, Series of 2004, entitled "Prescribing Guidelines for Project Loan Negotiations and Packaging of Government Foreign-Assisted Infrastructure Projects," for the purpose of providing the procedure and criteria to determine sufficiency of Filipino capability in undertaking specific requirements in consulting services and/or construction of infrastructure projects.

Section 2. Definition of Terms

2.1 For the purpose of these guidelines, the following terms or words or phrases shall mean or be understood as follows: a) Appropriate Authorities - refers to the head of the procuring entity defined

in the IRR-A of RA 9184 as: (i) the head of the agency or body, or his duly authorized official, for national government agencies (NGAs) and the constitutional commissions or offices, and branches of government; (ii) the governing board or its duly authorized official, for Government-Owned and/or -Controlled Corporations (GOCCs), Government Financial Institutions (GFIs), and State Universities and Colleges (SUCs); or (iii) the local chief executive, for Local Government Units (LGUs). Provided, however, that in an agency, department, or office where the procurement is decentralized, the Head of each decentralized unit shall be considered as the head of the procuring entity subject to the limitations and authority delegated by the head of the agency, department, or office.

b) Project Appraisal Stage - is one of the stages in project preparation after

the approval of the project by the NEDA Investment Coordination Committee (ICC) and prior to loan negotiations. It starts with the submission of the approved project to the International Financing Institutions (IFI) for appraisal and eventual loan financing. It is at this stage where the IFI reviews and confirms the feasibility and readiness of the project for implementation. This stage covers the discussions with the IFIs and the appropriate authorities on project description, its cost, financing to be made by the IFI and GOP, schedule, implementation arrangements and conditions to be made before final negotiations.

c) Project Preparation Phase - this phase is initiated once a project is

identified. It is a process which involves the refinement of the elements described in the identification phase and includes all steps necessary to bring the project to the stage of appraisal, which consists of the feasibility study. Generally, project preparation begins with a description of project objectives, identification of principal issues, and the setting up of a timetable for the different phases of the development cycle. This phase covers the full range

Page 2: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

of technical, institutional, financial and economic issues relevant to achieving the project objectives.

d) Philippine Contractors Accreditation Board or PCAB - an implementing

arm of the Construction Industry Authority of the Philippines (CIAP) tasked, among others, with the issuance, denial, suspension, or revocation of licenses to construction contractors.

e) Terms of Reference or TOR - refers to the document prepared and

provided for purposes of bidding to consultants by the appropriate authorities containing a description of the project and the consulting services required, project objectives, scope of work to include the functions, duties, and responsibilities of the consultants, expected outputs, expected time frame, and approved budget of the contract. The TOR should contain the name of the project executing agency, as well as the minimum consulting services requirements of the project specifying, among others, the areas of expertise, qualifications of key personnel and other relevant information to enable consultants to prepare fairly reasonable technical and financial proposals.

f) Track Record - refers to applicable work experiences of consultants and

constructors for specific types of projects.

For construction contracts, track record shall be based on the single largest project completed for a specific project type which is of similar technology to the contract to be bid. i.e., it has the same major categories of work, such as bridges and flyovers.

For consulting services contracts, track record shall be based on the overall applicable experiences of the firm (and associates, in case of joint venture) and of the individual experiences of the principal and key staff including the times when employed by other consultants.

Applicable experiences refer to consulting services contracts completed which are similar in nature and complexity to the contract to be bid. g) Umbrella Organization of Consultants - an organization duly recognized

by the Government Procurement Policy Board (GPPB) composed of the various organizations of consultants that may be engaged by the government and which shall accredit its members on the types of services and fields of professions where the members are technically and financially qualified to offer their services. The umbrella organization shall prepare and certify a list of fields and expertise in such fields available with the names of the accredited local consultants which shall be updated as often as necessary and disseminated to concerned agencies of the government.

Section 3. Determination of Filipino Capabilities for Consulting Services 3.1 During the project preparation phase or prior to application for funding and

finalization of the Terms of Reference (TOR) for consulting services pursuant to Section 6.1 of the IRR of EO 278, the appropriate authorities shall refer to the current and updated database summary submitted to the Government Procurement Policy Board (GPPB) by the umbrella organization of consultants

2

Page 3: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

3.2

3.3

3.4

recognized by the GPPB, and posted in any appropriate information system for dissemination to the public reflecting the number of registered and/or accredited consultants per type of consulting service based on track record as defined under Section 2.1 f hereof, as well as to similar reports submitted to the GPPB by government agencies on the number of Filipino consultants engaged by them for specific consulting services, provided such agency reports have been furnished the umbrella organization of consultants recognized by the GPPB for possible comment. If the required type of consulting services is not in the current and updated database summary, the appropriate authority shall issue a written notice to the umbrella organization to confirm such a condition, together with the following information: a) Project description (location, type of project, duration, scope/coverage); b) Specific consulting services required (e.g., pre-investment, including pre-

planning/pre-design, detailed plan and/or design preparation, project and/or construction management, project management, etc.);

c) Estimated cost of the project ; and d) Other pertinent information on the project requirements in terms of specific

consulting services required. The umbrella organization shall officially acknowledge in writing, the receipt of notice and information from the appropriate authority. Within fifteen (15) days from such acknowledgment, the umbrella organization shall issue a certification either confirming that it has no accredited consultants for the required consulting services, or indicating the number of its accredited consultants per type of consulting service based on track record in the required fields. In the event that no certification is issued by the umbrella organization after the 15-day prescribed period, the appropriate authority shall proceed with the finalization of the TOR based on the latest posted list. For consulting services funded through local sources where Filipino capability is determined by the appropriate authorities to be insufficient, Filipino consultants may hire or associate themselves with qualified foreign consultants, provided that the Filipino consultants are the lead consultants.

Section 4. Determination of Filipino Capabilities for the Construction of Infrastructure Projects

4.1

4.2

During the project appraisal stage and for the purpose of finalizing the contract packages for the construction of a project in accordance with Section 5 of the IRR of E.O. 278, the appropriate authorities shall secure and refer to the PCAB official report indicating the contract amounts of the largest projects undertaken by Filipino registered contractors per project type and size range, as well as the number of Filipino registered contractors per project type and size range attached to these Guidelines as Annex A. The PCAB shall issue updates to Annex A quarterly or as often as necessary, which shall be made available to government agencies upon written request.

3

Page 4: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

4.3

4.4

In cases where the required information is not available in the PCAB report, the 1

appropriate authority shall request other government agencies and the national constructors associations duly recognized by CIAP for track record information on specific domestic and overseas projects undertaken by Filipino registered contractors. The appropriate authorities shall ensure that the track record requirements for each of the contract packages of a project shall not exceed the contract amounts of the largest projects undertaken as reflected in the PCAB report.

Section 5. Amendments to these Guidelines

5.1 The CIAP Board shall make the appropriate amendments to these Guidelines as it may deem necessary, subject to the approval of the NEDA-Committee on Infrastructure (INFRACOM).

Section 6. Effectivity These Guidelines shall take effect 15 days after posting of the approved Guidelines in the NEDA website.

1 Department of Public Works and Highways (DPWH) for road, bridge, building, irrigation, flood control projects, park, playground and recreational work; Department of Transportation and Communications (DOTC) for airport horizontal structures, building, industrial plant, communication facilities, equipment, and instrument installation; National Irrigation Administration (NIA) for irrigation, flood control, dam, reservoir, tunneling; National Power Corporation (NPC) for electrical works in power generating plant, dam, reservoir, tunneling, hydro-electric plants, thermal and geothermal generating plants; Philippine Ports Authority (PPA) for ports, harbor, offshore engineering; Metropolitan Waterworks Sewerage System (MWSS) for sewerage and sewage treatment/disposal plant, water treatment and system, dam reservoir, water supply and well drilling work; Local Waterworks Utilities Administration (LWUA) for sewerage and sewage treatment/disposal plant, water treatment and system, water supply; National Electrification Administration (NEA) and National Transmission Corporation (Transco) for transmission poles and towers, sub-stations, and related electrical work; Philippine National Railways (PNR) and Light Rail Transit Authority (LRTA) for railways.

4

Page 5: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

CIAP Guidelines to Determine Filipino Capability for Annex A Consulting Services and/or Construction Infrastructure project page 1 of 5

CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES

PHILIPPINE CONTRACTORS ACCREDITATION BOARD LIST OF SINGLE LARGEST PROJECTS COMPLETED PER PROJECT KIND AND SIZE RANGE

(TRACK RECORD) OF PCAB REGISTERED GOVERNMENT CONTRACTORS as of 08 March 2006

GENERAL ENGINEERING

Road, Highway pavement, Railways, Airport horizontal structures and Bridges

Irrigation and Flood Control

Size Range

No. of Contractors

Single Largest Project (in PHP)

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 29 503,327293.11 Large B 27 380,101,191.17

Large A 23 633.891.373.63 Large A 18 142,030,146.46

Medium B 116 460,466,758.33 Medium B 83 88,563,129.74

Medium A 427 395,862,265.80 Medium A 238 43,498,940.80

Small B 324 37,715,211.16 Small B 176 40,046,062.80

Small A 12 13,640,979.00 Small A 4 10,748,760.45

_______ _______

Total 931 Total 546

Dam, Reservoir, and Tunneling

Water Supply

Size Range

No. of Contractors

Single Largest Project (in PHP)

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 5 269,434,998.27 Large B 15 165,810,884.99

Large A 4 336,579,868.29 Large A 11 33,683,815.

Medium B 19 77,141,223.96 Medium B 26 50,072,514,13

Medium A 27 43,010,046.79 Medium A 50 53,562,811.12

Small B 12 37,270,300.00 Small B 25 33,162,911.71

Small A 1 2,869,897.94 Small A 1 5,007,300.00

_______ ______

Total 49 Total 128

Port, Harbor, and Offshore Engineering

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 6 331,215,804.41

Large A 13 135,469,911.37

Medium B 18 88,422,139.68

Medium A 34 74,946,522.27

Small B 13 105,146,207.12

Small A 2 4,490,509.89

______

Total 86

Page 6: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

CIAP Guidelines to Determine Filipino Capability for Annex A Consulting Services and/or Construction Infrastructure project page 2 of 5

GENERAL BLUILDING

Building and Industrial Plant Sewerage and Sewage Treatment/

Disposal Plant

Size Range

No. of Contractors

Single Largest Project (in PHP)

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 19 206,880,319.28 Large B 2 54,259,457.75

Large A 19 174,747,752.00 Large A 1 10,546,863.20

Medium B 89 201,369,502.95 Medium B 2 12,013,760.00

Medium A 308 134,183,558.49 Medium A 3 20,947,442.50

Small B 322 257,134,979.46 Small B 0 0.00

Small A 0 0.00 Small A 0 0.00

______ _____

Total 757 Total 8

Water Treatment Plant and System Park, Playground and Recreational Work

Size Range

No. of Contractors

Single Largest Project (in PHP)

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 4 1,075,363,317.50 Large B 2 343,148,803.55

Large A 2 40,364,362.50 Large A 3 23,024,636.10

Medium B 2 2,882,936.75 Medium B 10 23,889,165.00

Medium A 4 19,449,625.00 Medium A 20 38,509,058.21

Small B 2 3,657,774.28 Small B 7 25,092,305.00

Small A 0 0.00 Small A 2 3,949,762.26

______ _____

Total 14 Total 44

Page 7: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

CIAP Guidelines to Determine Filipino Capability for Annex A Consulting Services and/or Construction Infrastructure project page 3 of 5

SPECIALTIES

Foundation Work Structural Steel Work

Size Range

No. of Contractors

Single Largest Project (in PHP)

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 0 0.00 Large B 0 0.00

Large A 2 61,564,223.71 Large A 1 65,369,781.11

Medium B 2 45,599,098.94 Medium B 1 41,823,622.50

Medium A 1 11,999,795.80 Medium A 0 0.00

Small B 1 4,989,538.80 Small B 1 16,145,000.00

Small A 0 0.00 Small A 0 0.00

______ ______

Total 6 Total 3

Concrete Pre-casting and Pre-stressing Plumbing and Sanitary Work

Size Range

No. of Contractors

Single Largest Project (in PHP)

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 0 0.00 Large B 0 0.00

Large A 0 0.00 Large A 0 0.00

Medium B 0 0.00 Medium B 0 0.00

Medium A 0 0.00 Medium A 1 16,234,183.75

Small B 0 0.00 Small B 1 47,958,814.20

Small A 0 0.00 Small A 0 0.00

______ ______

Total 0 Total 2

Electrical Work Mechanical Work

Size Range

No. of Contractors

Single Largest Project (in PHP)

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 1 144,280,806.64 Large B 1 126,530,520.36

Large A 9 159,940,200.00 Large A 0 0.00

Medium B 15 165,505,908.72 Medium B 5 88,487,183.09

Medium A 22 102,451,273.65 Medium A 2 6,627,000.00

Small B 10 39,781,620.81 Small B 3 6,070,520.00

Small A 0 0.00 Small A 0 0.00

______ ______

Total 57 Total 11

Page 8: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

CIAP Guidelines to Determine Filipino Capability for Annex A Consulting Services and/or Construction Infrastructure project page 4 of 5

Air-conditioning and Refrigeration Work Elevator and Escalator Work

Size Range

No. of Contractors

Single Largest Project (in PHP)

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 0 0.00 Large B 0 0.00

Large A 0 0.00 Large A 0 0.00

Medium B 0 0.00 Medium B 0 0.00

Medium A 3 17,243,542.31 Medium A 0 0.00

Small B 1 5,858,793.04 Small B 0 0.00

Small A 0 0.00 Small A 0 0.00

______ ______

Total 4 Total 0

Fire Protection Work Water proofing Work

Size Range

No. of Contractors

Single Largest Project (in PHP)

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 0 0.00 Large B 0 0.00

Large A 0 0.00 Large A 0 0.00

Medium B 0 0.00 Medium B 0 0.00

Medium A 1 2,499,391.17 Medium A 1 28,163,785.00

Small B 0 0.00 Small B 0 0.00

Small A 0 0.00 Small A 0 0.00

______ ______

Total 1 Total 1

Painting Work Well Drilling Work

Size Range

No. of Contractors

Single Largest Project (in PHP)

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 0 0.00 Large B 0 0.00

Large A 0 0.00 Large A 0 0.00

Medium B 1 12,983,166.63 Medium B 1 50,231,937.13

Medium A 1 2,951,040.00 Medium A 2 5,611,975.56

Small B 0 0.00 Small B 6 12,782,028.49

Small A 0 0.00 Small A 0 0.00

______ ______

Total 2 Total 9

Page 9: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

CIAP Guidelines to Determine Filipino Capability for Annex A Consulting Services and/or Construction Infrastructure project page 5 of 5

Navigation Work Communication Facilities

Size Range

No. of Contractors

Single Largest Project (in PHP)

Size Range

No. of Contractors

Single Largest Project (in PHP)

Large B 0 0.00 Large B 0 0.00

Large A 0 0.00 Large A 0 0.00

Medium B 1 89,193,129.88 Medium B 0 0.00

Medium A 0 0.00 Medium A 0 0.00

Small B 0 0.00 Small B 1 88,207,999.76

Small A 0 0.00 Small A 0 0.00

______ ______

Total 1 Total 1

Page 10: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

COFILCO Member Organization: Council Of Engineering Consultants Of The Philippines (CECOPHIL) E-mail Address: [email protected]

[email protected]

Address: P.O. BOX 1027, Makati Central Post Office, 1250 Makati City, Philippines Tel. 810-5902 Fax 810-5902

Infrastructure Projects

Construction, Improvement,

Rehabilitation or Restoration

Roads & Bridges Advisory & Review

Roads & Bridges Pre-investment or Feasibility Studies

Roads & Bridges Architectural Design

Roads & Bridges Detailed Engineering Design

Roads & Bridges Project Mgmt. & Construction Supervision

NUMBER OF FILIPINO CONSULTANTS AVAILABLE PER PROJECT KIND, TYPE OF SERVICES AND SIZE OF PROJECT

(SUMMARY) OF COFILCO MEMBER ORGANIZATION

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

20,000 M < PC

1 10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

1 500 M < PC < 1,000 M

2 300 M < PC < 500 M

1 100 M < PC < 300 M

20,000 M < PC

1 10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

1 10,000 M < PC < 20,000 M

2 5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

2 300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

3 1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

3 300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

Page 11: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Roads & Bridges Management & Related Services

Roads & Bridges Independent Design Checker

Roads & Bridges Independent Certification Engineer

Roads & Bridges Other Technical Services/Special Studies

Roads & Bridges Other Related Consulting Services

Railways Advisory & Review 20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

2 10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

1 10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

1

50 M < PC < 100 M

10 M < PC < 50 M

300 M < PC < 500 M

1 100 M < PC < 300 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

2 500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

50 M < PC < 100 M

10 M < PC < 50 M

Page 12: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Railways Pre-investment or Feasibility Studies

Railways Architectural Design

Railways Detailed Engineering Design

Railways Project Mgmt. & Construction Supervision

Railways Management & Related Services

Railways Independent Design Checker

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

20,000 M < PC

PC < 10 M

300 M < PC < 500 M

2 100 M < PC < 300 M

2 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

2 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

1 10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

Page 13: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Railways Independent Certification Engineer

Railways Other Technical Services/Special Studies

Railways Other Related Consulting Services

Airports Advisory & Review

Airports Pre-investment or Feasibility Studies

Airports Architectural Design

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

1 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

1 1,000 M < PC < 5,000 M

PC < 10 M

50 M < PC < 100 M

1 10 M < PC < 50 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

Page 14: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Airports Detailed Engineering Design

Airports Project Mgmt. & Construction Supervision

Airports Management & Related Services

Airports Independent Design Checker

Airports Independent Certification Engineer

Airports Other Technical Services/Special Studies

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

4 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

1 300 M < PC < 500 M

1 100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

1 PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

1 10 M < PC < 50 M

Page 15: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Airports Other Related Consulting Services

Dam, Reservoir and Tunneling Advisory & Review

Dam, Reservoir and Tunneling Pre-investment or Feasibility Studies

Dam, Reservoir and Tunneling Architectural Design

Dam, Reservoir and Tunneling Detailed Engineering Design

Dam, Reservoir and Tunneling Project Mgmt. & Construction Supervision

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

PC < 10 M

1 50 M < PC < 100 M

10 M < PC < 50 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

1 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

2 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

Page 16: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Dam, Reservoir and Tunneling Management & Related Services

Dam, Reservoir and Tunneling Independent Design Checker

Dam, Reservoir and Tunneling Independent Certification Engineer

Dam, Reservoir and Tunneling Other Technical Services/Special Studies

Dam, Reservoir and Tunneling Other Related Consulting Services

Port, Harbor and Offshore Engineering Advisory & Review 20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

1 50 M < PC < 100 M

1 10 M < PC < 50 M

Page 17: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Port, Harbor and Offshore Engineering Pre-investment or Feasibility Studies

Port, Harbor and Offshore Engineering Architectural Design

Port, Harbor and Offshore Engineering Detailed Engineering Design

Port, Harbor and Offshore Engineering Project Mgmt. & Construction Supervision

Port, Harbor and Offshore Engineering Management & Related Services

Port, Harbor and Offshore Engineering Independent Design Checker

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

PC < 10 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

2 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

1 10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

2 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

1 10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

2 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

Page 18: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Port, Harbor and Offshore Engineering Independent Certification Engineer

Port, Harbor and Offshore Engineering Other Technical Services/Special Studies

Port, Harbor and Offshore Engineering Other Related Consulting Services

Irrigation and Flood Control Advisory & Review

Irrigation and Flood Control Pre-investment or Feasibility Studies

Irrigation and Flood Control Architectural Design

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

100 M < PC < 300 M

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

1 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

PC < 10 M

1 50 M < PC < 100 M

10 M < PC < 50 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

1 10 M < PC < 50 M

1 PC < 10 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

20,000 M < PC

10,000 M < PC < 20,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

Page 19: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Irrigation and Flood Control Detailed Engineering Design

Irrigation and Flood Control Project Mgmt. & Construction Supervision

Irrigation and Flood Control Management & Related Services

Irrigation and Flood Control Independent Design Checker

Irrigation and Flood Control Independent Certification Engineer

Irrigation and Flood Control Other Technical Services/Special Studies

PC < 10 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

20,000 M < PC

10,000 M < PC < 20,000 M

1

1 500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

2 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

2 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

1 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

1 5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

Page 20: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Irrigation and Flood Control Other Related Consulting Services

Water Supply Advisory & Review

Water Supply Pre-investment or Feasibility Studies

Water Supply Architectural Design

Water Supply Detailed Engineering Design

Water Supply Project Mgmt. & Construction Supervision

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

1 20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

1 300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

3 1,000 M < PC < 5,000 M

2 500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

4 1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

Page 21: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Water Supply Management & Related Services

Water Supply Independent Design Checker

Water Supply Independent Certification Engineer

Water Supply Other Technical Services/Special Studies

Water Supply Other Related Consulting Services

Other Related Construction Projects Advisory & Review 20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

1 PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

3 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

50 M < PC < 100 M

1 10 M < PC < 50 M

Page 22: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Other Related Construction Projects Pre-investment or Feasibility Studies

Other Related Construction Projects Architectural Design

Other Related Construction Projects Detailed Engineering Design

Other Related Construction Projects Project Mgmt. & Construction Supervision

Other Related Construction Projects Management & Related Services

Other Related Construction Projects Independent Design Checker

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

20,000 M < PC

PC < 10 M

1 300 M < PC < 500 M

2 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

2 500 M < PC < 1,000 M

300 M < PC < 500 M

2 100 M < PC < 300 M

50 M < PC < 100 M

1 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

2 300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < ,5000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

Page 23: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Other Related Construction Projects Independent Certification Engineer

Other Related Construction Projects Other Technical Services/Special Studies

Other Related Construction Projects Other Related Consulting Services

General Building

Construction, Improvement,

Rehabilitation or Restoration

Building and Industrial Plants Advisory & Review

Building and Industrial Plants Pre-investment or Feasibility Studies

Building and Industrial Plants Architectural Design

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < ,5000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < ,5000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

2 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < ,5000 M

2 500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

1,000 M < PC < 5,000 M

PC < 10 M

50 M < PC < 100 M

10 M < PC < 50 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

100 M < PC < 300 M

3 50 M < PC < 100 M

10 M < PC < 50 M

1 PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

Page 24: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Building and Industrial Plants Detailed Engineering Design

Building and Industrial Plants Project Mgmt. & Construction Supervision

Building and Industrial Plants Management & Related Services

Building and Industrial Plants Independent Design Checker

Building and Industrial Plants Independent Certification Engineer

Building and Industrial Plants Other Technical Services/Special Studies

1 100 M < PC < 300 M

50 M < PC < 100 M

2 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

1 10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

2 100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

2 1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

3 100 M < PC < 300 M

50 M < PC < 100 M

2 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

Page 25: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Building and Industrial Plants Other Related Consulting Services

Water Treatment Plant and System Advisory & Review

Water Treatment Plant and System Pre-investment or Feasibility Studies

Water Treatment Plant and System Architectural Design

Water Treatment Plant and System Detailed Engineering Design

Water Treatment Plant and System Project Mgmt. & Construction Supervision

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

100 M < PC < 300 M

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

2 100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

PC < 10 M

50 M < PC < 100 M

10 M < PC < 50 M

1 300 M < PC < 500 M

100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

1 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

Page 26: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Water Treatment Plant and System Management & Related Services

Water Treatment Plant and System Independent Design Checker

Water Treatment Plant and System Independent Certification Engineer

Water Treatment Plant and System Other Technical Services/Special Studies

Water Treatment Plant and System Other Related Consulting Services

Sewerage & Sewage Treatment/ Advisory & Review

Disposal Plant

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

1 PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

Page 27: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Sewerage & Sewage Treatment/ Pre-investment or Feasibility Studies

Disposal Plant

Sewerage & Sewage Treatment/ Architectural Design

Disposal Plant

Sewerage & Sewage Treatment/ Detailed Engineering Design

Disposal Plant

Sewerage & Sewage Treatment/ Project Mgmt. & Construction Supervision

Disposal Plant

Sewerage & Sewage Treatment/ Management & Related Services

Disposal Plant

Sewerage & Sewage Treatment/ Independent Design Checker

Disposal Plant

100 M < PC < 300 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

PC < 10 M

50 M < PC < 100 M

10 M < PC < 50 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

1 50 M < PC < 100 M

1 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

1 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

2 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

Page 28: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Sewerage & Sewage Treatment/ Independent Certification Engineer

Disposal Plant

Sewerage & Sewage Treatment/ Other Technical Services/Special Studies

Disposal Plant

Sewerage & Sewage Treatment/ Other Related Consulting Services

Disposal Plant

Park, Playground and Recreational Advisory & Review

Projects

Park, Playground and Recreational Pre-investment or Feasibility Studies

Projects

Park, Playground and Recreational Architectural Design

Projects

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

2 100 M < PC < 300 M

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

1 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

PC < 10 M

50 M < PC < 100 M

10 M < PC < 50 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

2 10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

Page 29: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Park, Playground and Recreational Detailed Engineering Design

Projects

Park, Playground and Recreational Project Mgmt. & Construction Supervision

Projects

Park, Playground and Recreational Management & Related Services

Projects

Park, Playground and Recreational Independent Design Checker

Projects

Park, Playground and Recreational Independent Certification Engineer

Projects

Park, Playground and Recreational Other Technical Services/Special Studies

Projects

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

2 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

1 300 M < PC < 500 M

2 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

Page 30: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Park, Playground and Recreational Other Related Consulting Services

Projects

Other Related Construction Works Advisory & Review

Other Related Construction Works Pre-investment or Feasibility Studies

Other Related Construction Works Architectural Design

Other Related Construction Works Detailed Engineering Design

Other Related Construction Works Project Mgmt. & Construction Supervision

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

100 M < PC < 300 M

50 M < PC < 100 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

1

10 M < PC < 50 M

PC < 10 M

300 M < PC < 500 M

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1 1,000 M < PC < 5,000 M

1 500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

Page 31: CIAP GUIDELINES TO DETERMINE FILIPINO … guidelines to determine filipino capability in undertaking specific requirements for consulting services and/or construction of infrastructure

NO. OF

TYPE OF SERVICESKIND OF PROEJCT SIZE OF PROJECT (PHP)FIRMS

AVAILABLE

Other Related Construction Works Management & Related Services

Other Related Construction Works Independent Design Checker

Other Related Construction Works Independent Certification Engineer

Other Related Construction Works Other Technical Services/Special Studies

Other Related Construction Works Other Related Consulting Services

100 M < PC < 300 M

50 M < PC < 100 M

1 10 M < PC < 50 M

1 PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

1 100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M

20,000 M < PC

10,000 M < PC < 20,000 M

5,000 M < PC < 10,000 M

1,000 M < PC < 5,000 M

500 M < PC < 1,000 M

300 M < PC < 500 M

100 M < PC < 300 M

1 50 M < PC < 100 M

10 M < PC < 50 M

PC < 10 M