cikm presentation at the afaas review workshop addis-ababa 15 oct 2014

12
African Forum for Agricultural Advisory Services Presented at the: Review of the progress in implementation of the AFAAS Strategy and Medium Term Operational Plan (MTOP) workshop by: Emmanuel ATENGA , CIKM Officer Beshale Hotel, Addis Ababa 15 October 2014 Communication, Information and Knowledge Management Component

Upload: afaas

Post on 01-Jul-2015

57 views

Category:

Social Media


1 download

DESCRIPTION

CIKM PRESENTATION

TRANSCRIPT

Page 1: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

African Forum for Agricultural

Advisory Services

Presented at the:

Review of the progress in implementation of the AFAAS Strategy and Medium TermOperational Plan (MTOP) workshop

by:

Emmanuel ATENGA , CIKM Officer

Beshale Hotel, Addis Ababa

15 October 2014

Communication, Information and Knowledge Management Component

Page 2: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

SUMMARY

1. WHY CIKM COMPONENT?

2. CIKM RESULTS SO FAR

3. CIKM FREMAWORK

4. CIKM TOOLS

5. CHALLENGES

6. PLAN 2015

Page 3: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

1. WHY CIKM COMPONENT?

• CIKM Component shall design and implement an informationand knowledge management strategy that enables AASstakeholders to network with each other, to access informationfrom external sources including research and farmers, and togenerate new knowledge themselves.

Page 4: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

2. CIKM RESULTS SO FAR

1. Three Symposia organised ( 2004, 2007 & 2011);

2. One Africa Agricultural Extension Week in 2013 in Botswana;Second planed for 2015 in Addis Ababa in partnership withAUC and MoARD Ethiopia;

3. A website, Social medias and a Virtual platform;

Page 5: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

2. CIKM RESULTS SO FAR

4. A conceptual framework for lesson learning developed;

5. A guide for Piloting Market Oriented AEAS;

6. Study on targeting Women Advisory Service Providers & Capacity Development Programmes;

7. Study on how issues of Climate Change are being addressed in AEAS

Page 6: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

3. CIKM FRAMEWORK

CIKM

AFAAS Website

AFAAS-EU Visibility

Plan

IFAD Project CIKM

Strategy

Twitter Page

Flickr PageSlideshare

Page

Facebook Page

Virtual Platform

AFAAS Brochures

and Publications

Page 7: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

4. CIKM TOOLS

a) AFAAS Website: www.afaas-Africa.orgIt is a tool for communication, Information and visibility around the world. Its management depends on the quality control content.

b) Virtual Platform: networking.afaas-africa.orgTool for enabling AEAS actors to network for purposes, among other things, sharing experiences, finding solutions to everyday problems that they face, accessing global knowledge.

c) AFAAS-EU Visibility Plan (CVP): This Communication and Visibility Plan is designed in conformity to general EU guidelines currently in force and targets actions that are wholly or partially funded by the European Union (EU). It is to be implemented by AFAAS and its Country Fora (CF), which bring together diverse actors and stakeholders from grassroots to the national, regional and international levels.

Page 8: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

4. CIKM TOOLS

d) AFAAS Social Medias (Facebook Page, Twitter, Flickr Slideshare):

Their roles are to improve AFAAS visibility by communicating andinforming about AFAAS and CF activities on social medias.

e) AFAAS Brochures and Publications

Page 9: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

5. CHALLENGES

1. Lack of communication on CIKM needs from CF;

2. Low and varied capacity of key stakeholders to migrate to web-based social media tools, eg: Virtual Platform, Facebook, Twitter(where they are supposed to share information and experiences);

3. Poor internet connectivity;

4. Poor culture of information and experience exchange;

5. Dealing with Multilanguage culture.

Page 10: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

6. PLAN 2015

1. CIKM capacity building in the level of CF;

2. Develop overall CIKM strategy for AFAAS;

3. Recruitment of CIKM Facilitators for established CF;

4. Translation of AFAAS key documents into French and Portuguese (Constitution, Procurement and financial Guidelines, Brochures…).

Page 11: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

Thank you very much

For more information contact :

email: [email protected]/ [email protected]

networking.afaas-africa.org

www.afaas-africa.org

Page 12: CIKM Presentation at the AFAAS Review Workshop Addis-Ababa 15 oct  2014

CIKM Group Work

1. Evaluate and rank the current CIKM tools according to their usefulness for communication in CF;

0 = Not Important; 1 = Low important; 2= Important; 3 = Very Important

2. Identify other tools would be useful for communication within CF;

3. Rank the outputs from the IFAD Project CIKM strategy that should be included in the overall AFAAS.